Loading...
HomeMy WebLinkAboutNC0025348_Authorization to Construct_20071116November 16, 2007 Mr. Walter B. Hartman, Jr., City Manager City of New Bern 300 Pollock Street New Bern, North Carolina 28560 SUBJECT: Dear Mr. Hartman: Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Authorization to Construct A to C No. 025348A04 City of New Bern New Bern WTP Craven County Coleco H. Sullins, Director Division of Water Quality A letter of request for Authorization to Construct was received July 13, 2007, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of the 0.5 MGD New Bern Water Treatment Plant wastewater treatment facility, with discharge of treated wastewater into the Neuse River in the Neuse River Basin, through the existing 6.5 MGD New Bern Wastewater Treatment Plant effluent diffuser. This authorization results in an increase in design and permitted capacity of the existing effluent diffuser to 7.0 MGD, and is awarded for the construction of the following: Installation of a new 0.5 MGD Wastewater Treatment Facility at the New Bern Water Treatment Plant including: three (3) 150-ft by 300-ft HDPE lined waste holding lagoons with a total storage capacity of 540,000 gallons; sodium bisulfate dechlorination feed system; a 700 GPM duplex effluent pump station; approximately 16,100 feet of 12-inch effluent force main and tie-in to the existing New Bern WWTP diffuser; and pumps, valves, vaults, site piping, electrical, controls, and appurtenances, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct will place into service approximately 9,500 feet of dry 12-inch force main previously installed under Permit No. WQ0028879 issued June 8, 2005, as part of the effluent force main. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0025348 issued October 1, 2007, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0025348. No Carolina North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet www.ncwatemualiN.ora 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-'496 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% RecycleNlO% Post Consumer Paper Mr. Walter B. Hartman, Jr. November 16, 2007 Page 2 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Washington Regional Office, telephone number (252) 946-6481, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to Cecil G. Madden, Jr., P.E., Construction Grants & Loans, DWQ / DENR, 1633 Mail Service Center, Raleigh, NC 27699- 1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T I 5A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Mr. Walter B. Hartman, Jr. November 16, 2007 Page 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203. Sincerely, Coleen H. Sullins i BSR:cgm cc: M. Blaine Humphrey, P.E., Rivers & Associates, Greenville Craven County Health Department DWQ Washington Regional Office, Surface Water Protection Technical Assistance and Certification Unit Daniel Blaisdell, P.E. Point Source Branch, NPDES Program Cecil G. Madden, Jr., P.E. Seth Robertson, P.E. ATC File