Loading...
HomeMy WebLinkAboutSAW-2024-00185_Roe Property_NWP 3_02202024DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT ASHEVILLE FIELD OFFICE 151 PATTON AVENUE ROOM 208 ASHEVILLE NORTH CAROLINA 28801-5006 February 20, 2024 Regulatory Program/Division Robert and Karen Roe 140 Venetian Drive Delray Beach, Florida 33483 Via Email: rkroe@bellsouth.net SUBJECT: Nationwide Permit Verification – SAW-2024-00185 – Roe Bulkhead & Boathouse Project Dear Mr. and Mrs. Roe: This letter is in reference to the proposed work located along the shoreline of Lake Toxaway, at 74 Toxaway Landing Drive in Lake Toxaway, Transylvania County, North Carolina. The project is identified as Transylvania County PIN 001054/000299, at a latitude of 35.13779 and longitude of -82.93913. The work as described in your submittal dated December 15, 2023 consists of the replacement of an existing bulkhead and installation of a boathouse at the above-reference property. The project would impact approximately 0.01-acre of Lake Toxaway. We have determined that the proposed work is authorized by Nationwide Permit 3 - Maintenance pursuant to authorities under Section 404 of the Clean Water Act (33 U.S.C. § 1344). The proposed work must be accomplished in strict accordance with the general permit conditions, any regional conditions, the application materials, and the enclosed plans. If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised PCN must be submitted to this office for written approval before work is initiated. Any violation of permit conditions or deviation from your submitted plans may subject the permittee to enforcement action. This verification is valid until March 14, 2026, unless prior to this date the subject NWP(s) is suspended, revoked, or is modified such that the activity no longer complies with the terms and conditions of this NWP. If you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. This NWP verification does not preclude the necessity to obtain any other Federal, State, or local permits, licenses, and/or certifications, which may be required. If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Brooke Davis, Regulatory Project Manager of the Asheville Field Office at (828)271-7980 ext. 4232, by mail at the above address, or by email at brooke.a.davis@usace.army.mil. Please take a moment to complete our customer satisfaction survey located at https://regulatory.ops.usace.army.mil/customer-service-survey/. Sincerely, Brooke Davis Regulatory Project Manager Enclosures Cc (w/enclosures) Emma Joyner, Engineering of Brevard. PLLC (via ejoyner45@gmail.com) Joey Winston, NCDWR (joey.winston@deq.nc.gov) Andrea Leslie, NCWRC (andrea.leslie@ncwildlife.org) Compliance Certification Form Action ID Number: SAW-2024-00185 County: Transylvania Permittee: Robert and Karen Roe Project Name: Roe Bulkhead & Boathouse Project Date Verification Issued: 2/20/2024 Project Manager: Brooke Davis Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS Wilmington District Attn: Brooke Davis Asheville Field Office 151 Patton Avenue Room 208 Asheville, North Carolina 28801-5006 or brooke.a.davis@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work, and mitigation (if applicable), authorized by the above referenced permit has been completed in accordance with the terms and conditions of the said permit including any general or specific conditions. Date Authorized Work Started: ___________ Completed: ___________ Describe any deviations from permit (attach drawing(s) depicting the deviations): ______________________________________________________________________ ______________________________________________________________________ *Note: The description of any deviations on this form does not constitute approval by the Corps. __________________________________ ______________________ Signature of Permittee Date