HomeMy WebLinkAboutNC0088056_NOV2023PC0468_20230905
September 05, 2023
Ed Nunez, Agent Registered
Vista Developers, LLC
525 N Main St
Hendersonville, NC 28792
SUBJECT: NOTICE OF VIOLATION
Tracking Number: NOV-2023-PC-0468
Permit No. NC0088056
Blacksmith Run WWTP
Henderson County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Blacksmith Run WWTP on
August 9, 2023. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0088056. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following violation(s) were noted during the inspection:
Inspection Area Description of Violation _________________________________________________________________________________________________________________________________________________________________________ Equalization Basins New pump installed one week prior to inspection. The visual alarm was not working.
_________________________________________________________________________________________________________________________________________________________________________
Effluent Sampling Timed composite sampling is currently being performed rather than flow proportional
sampling. Mr. Barr said the sampler should be set up for flow proportional sampling
within three months. _________________________________________________________________________________________________________________________________________________________________________
In addition, the issues below must also be addressed:
Compliance Issue(s): Sludge blanket levels were very high.
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law.
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
To prevent further action, please respond in writing to this office within 30 days upon your receipt of this Notice
of Violation regarding your plans or measures to be taken to address the indicated violations and other identified
issues, if applicable.
If you should have any questions, please do not hesitate to contact me at the Asheville Regional Office at
828-296-4500.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: Laserfiche, Bob Barr
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0088056 23/08/09 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Blacksmith Run WWTP
Off Chimney Rock Rd
Edneyville NC 28727
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 23/08/09 20/12/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Robert P Barr/ORC/828-251-1900/
Other Facility Data
11:00AM 23/08/09 25/10/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Ed Nunez,525 N Main St Hendersonville NC 28792//828-698-2400/8286988801 Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Self-Monitoring Program
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Rachel Rose DWR/ARO WQ/828-296-4500/
Daniel J Boss DWR/ARO WQ/828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
2/19/2024
2/19/2024
NPDES yr/mo/day
23/08/09
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 8/9/2023, Rachel Rose and I (Daniel Boss) met with Bob Barr (ORC) to conduct a Compliance
Evaluation Inspection of the Blacksmith Run WWTP. Also present were Jesse Barnes (Specialist
Winston-Salem Region), Kevin Fowler (Specialist Raleigh Region), and Michael Hall (Specialist
Raleigh Region).
The plant seems to be running at a high solids level. There was only about one foot of clear
supernatant in the clarifiers.
The visual alarm for the equalization basin isn't working.
The sampler is currently set up for timed composite sampling. Flow proportional effluent sampling is
required by the permit. Mr. Barr said that the sampler should be set up for flow proportional sampling
within 90 days.
The grating over the equalization basin is rusted and needs to be replaced for safety.
NC0088056 17 (Cont.)
Page#2
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
Permit:NC0088056
Inspection Date:08/09/2023
Owner - Facility:
Inspection Type:
Blacksmith Run WWTP
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Page#3
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
Permit:NC0088056
Inspection Date:08/09/2023
Owner - Facility:
Inspection Type:
Blacksmith Run WWTP
Compliance Evaluation
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
New pump installed one week prior to inspection. The visual alarm was not working.Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
Settleable solids at 30 minutes was 60% in Train 1 and 68% in Train 2. The DO was
about 1 mg/L and pH was about 7.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Page#4
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
Permit:NC0088056
Inspection Date:08/09/2023
Owner - Facility:
Inspection Type:
Blacksmith Run WWTP
Compliance Evaluation
Secondary Clarifier Yes No NA NE
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Sludge blanket levels Train 1: 10' out of 11' depth and 6' out of 8' depth. Train 2: 10'
out of 11' depth, and 7' out of 8' depth.
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
There is a redundant UV bank.Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
The meter was calibrated on 8/9/2023.Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Timed composite sampling is currently being performed rather than flow proportional
sampling. Mr. Barr said the sampler should be set up for flow proportional sampling
within three months.
Comment:
Effluent Pipe Yes No NA NE
Page#5
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784
Permit:NC0088056
Inspection Date:08/09/2023
Owner - Facility:
Inspection Type:
Blacksmith Run WWTP
Compliance Evaluation
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up
power?
Is the generator fuel level monitored?
This a natural gas powered generator. The owner of the facility has contracted with a
third party for service of the generator.
Comment:
Page#6
DocuSign Envelope ID: D15B3275-B1D5-453F-98FE-979554103784