Loading...
HomeMy WebLinkAboutSAW-2017-01913 - Critcher Brothers MY3 Monitoring Report MONITORING YEAR 3 ANNUAL REPORT FINAL Submitted for IRT Review February 12, 2024 YADKIN VALLEY UMBRELLA MITIGATION BANK CRITCHER BROTHERS MITIGATION SITE Wilkes County, NC Yadkin River Basin HUC 03040101 USACE Action ID No. SAW-2017-01913 NCDWR #20190922 v1 Data Collection Period: January 2023 – December 2023 PREPARED FOR: North Carolina Interagency Review Team (IRT) Project Manager: Steve Kichefski Mitigation Specialist: Casey Haywood US Army Corps of Engineers – Wilmington District 151 Patton Avenue, Room 208 Asheville, NC 28806-5006 MONITORING YEAR 3 ANNUAL REPORT YADKIN VALLEY UMBRELLA MITIGATION BANK CRITCHER BROTHERS MITIGATION SITE Wilkes County, NC Yadkin River Basin HUC 03040101 USACE Action ID No. SAW-2017-01913 NCDWR #20190922 v1 PREPARED BY: Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Phone: 704.332.7754 Fax: 704.332.3306 Wildlands Engineering, Inc.  phone 704-332-7754 1430 South Mint Street Suite 104  Charlotte, NC 28203 February 12, 2024 U.S. Army Corps of Engineers Regulatory Division 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Attention: Steve Kichefski Subject: Action ID No. SAW-2017-01913 Wildlands Yadkin Valley Umbrella Mitigation Bank – Critcher Brothers Mitigation Site Fifth Credit Release (Monitoring Year 3 Completion) Dear Mr. Kichefski: This correspondence is in reference to the Critcher Brothers Mitigation Site, part of the Wildlands Yadkin Valley Umbrella Mitigation Bank. The 72.46-acre site is in the Upper Yadkin Watershed of the Upper Pee Dee River Basin (03040101) and is located 7 miles east of Wilkesboro in southeast Wilkes County, North Carolina. The purpose of this letter is to request the fifth release of credits (Year 3 Monitoring Complete) for this mitigation site. Monitoring year 3 (MY3) site assessments were conducted between January and December 2023. Overall, the Site has met the required stream, vegetation, and hydrology success criteria for MY3. The project streams are in good condition and functioning as intended, with only minor instances of scour or aggradation identified. At least one bankfull event has been documented on all the required project reaches since the completion of construction. Vegetation assessments indicated an average planted stem density of 497 stems per acre and overall, the Site has met the MY3 requirement of 320 stems per acre. While about 96% of the Site is free of invasive species, a few small populations of invasive plant species were identified in 2023. Wildlands will continue monitor all areas of concern and document repairs and management activities in the MY4 report. Pursuant to the Umbrella Mitigation Banking Instrument and the site-specific Critcher Brothers Final Mitigation Plan, successful completion of monitoring year 3 activities and demonstration that interim performance standards are being met for all parcels within the bank grants ten percent (10%) of the mitigation site’s total stream restoration and enhancement credits be available for sale. We are requesting 2,010.21 stream mitigation units (SMUs) be released. With this release, 60% of the total stream restoration and enhancement credits and 100% of the total stream preservation credits will have been released. Please contact us at 704-332-7754 if you have any questions. Thank you, Andrea Eckardt Emily Reinicker, PE, CFM Bank Manager Project Manager Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non- Riverine Non-Riparian Coastal 20,762.00 20,591.73 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine Riparian Non-Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%3,548.65 15%15%Feb-20 2/19/2020 2 (Year 0/As-Built)3 15%2,972.26 15%15%May-21 5/21/2021 3 (Year 1 Monitoring)10%2,009.54 10%10%Mar-22 7/6/2022 4 (Year 2 Monitoring)10%2,010.21 10%15%Mar-23 6/2/2023 5 (Year 3 Monitoring)10%2,010.21 15%20%Mar-24 6 (Year 4 Monitoring)15%3,015.32 5%10%Mar-25 7 (Year 5 Monitoring)10%2,010.21 15%15%Mar-27 8 (Year 6 Monitoring)5%1,005.11 5%NA NA Mar-28 9 (Year 7 Monitoring)10%2,010.21 10%NA NA Mar-29 Stream Bankfull Standard4 0%- NA NA NA NA NA NA Varies4 Total Credits Release to Date 6,520.910 Date Wilmington District Mitigation Bank Credit Release Schedule Yadkin Valley Umbrella Mitigation Bank: Critcher Brothers Site County:Wilkes County Wildlands Holdings IV, LLC 8-Digit HUC:03040101 Potential Credits from As-Built Survey SAW-2017-01913 Year Project Instituted:10/17/2019 20190922 v1 Date Prepared:2/12/2024 Total Potential Credits Credit Classification Stream Credits Forested Wetland Credits Potential Credits from Mitigation Plan Current and Future Credit Releases Credit Release Milestone Stream Credits Forested Wetland Credits Non-Forested Wetland Credits Projected Release Date Actual Release Date 4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met. Contingencies (if any): Original As Built Credit Total was 20,578.40 Cool Water Credits. 100 feet changed from Preservation to Enhancement II after the MY0 was approved. The new total stream credits is above (20,591.73). Credit release 3 includes all adjustments needed from the previous two credit released. Projected Credit Releases 4-9 are based on the final credit total 20,591.73. Signature of Wilmington District Official Approving Credit Release 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Type Jurisdiction Date Permittee Credits Permits (SAW #) Credit Classification Impact HUC Impact Quantity Total Withdrawn Available Comments SMU 2/19/2020 3,548.65 SAW-2017-01913 Cool stream 03040101 3,548.650 Initial release - Site establishment (15% restoration and enhancement credits and 100% preservation credits) SMU 5/21/2021 2,972.26 SAW-2017-01913 Cool stream 03040101 6,520.910 As-built credit release (15% of restoration and enhancement credits) SMU 7/6/2022 2,009.54 SAW-2017-01913 Cool stream 03040101 8,530.450 MY1 credit release (10% of restoration and enhancement credits) SMU 6/2/2023 2,010.21 SAW-2017-01913 Cool stream 03040101 10,540.660 MY2 credit release (10% of restoration and enhancement credits) Totals:10,540.66 - 10,540.660 Yadkin Valley Umbrella Mitigation Banking Instrument: Critcher Brothers Mitigation Site Stream Credit Ledger Yadkin Valley River Basin HUC 03040101 Date Last Updated: 02-12-2024 USACE Action ID No. SAW-2017-01913 Total Credits Released To Date: 10,540.66 Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - FINAL i EXECUTIVE SUMMARY Wildlands Engineering, Inc. (Wildlands) implemented the Critcher Brothers Mitigation Site (Site) as part of the Yadkin Valley Umbrella Mitigation Bank. The Site is located in Wilkes County, North Carolina within the Yadkin River Basin Hydrologic Unit Code (HUC) 03040101. The Site was selected to provide stream mitigation credits to compensate for permitted impacts to Waters of the United States within the Yadkin River Basin 03040101 (Yadkin 01) service area. The project includes the restoration, enhancement, and preservation of 27,938 linear feet (LF) of stream on South Fork Fishing Creek, West Fork Fishing Creek, and 22 tributaries. At the time of As-Built, the Site was determined to generate 20,578.400 cool stream mitigation units (SMUs). With additional enhancement II work completed on Magnolia Tributary at the IRT’s request, the net credits have increased by 13.333 SMU to a total of 20,591.733 SMU. The Site is protected by a 72-acre conservation easement spanning three parcels. Cattle farming, timber harvesting and other agricultural activity in the Yadkin River Valley has negatively impacted stream function throughout the basin. Major stream stressors to the Site included concentrated agricultural runoff inputs, degraded instream habitat, active stream incision, bank erosion and failure, and a lack of stabilizing streamside vegetation and bedform diversity. The effects of these stressors resulted in degraded water quality and habitat throughout the Site compared to reference conditions. The project approach focused on evaluating the existing functional condition, potential for recovery, and need for intervention. The project goals defined in the Mitigation Plan (Wildlands, 2019) were established with careful consideration of 2009 Upper Yadkin River Basin Restoration Priorities (RBRP) goals and objectives to address stressors identified in the watershed. The established project goals included:  Reducing pollutant inputs to streams including fecal coliform, nitrogen, and phosphorus;  Reducing inputs of sediment into streams from eroding stream banks;  Returning networks of streams to a stable form that is capable of supporting hydrologic, biologic, and water quality functions;  Raising local groundwater elevations and allow for more frequent overbank flows to reduce shear stress on channels during larger flow events;  Improving aquatic habitat in project streams;  Creating and improving riparian habitats to provide a canopy to shade streams and reduce thermal loadings, to create a source of woody inputs for streams, to reduce flood flow velocities on the floodplain, and to improve long-term lateral stability of streams; and  Ensuring that development and agricultural uses that would damage the site or reduce the benefits of project are prevented. The Site construction and as-built surveys were completed between April 2020 and February 2021. Planting and baseline vegetation data collection occurred during February 2021. Monitoring Year (MY) 3 assessments and site visits were completed between January 2023 and December 2023 to assess the conditions of the project. Overall, the Site has met the required stream, vegetation, and hydrology success criteria for MY3. The overall average planted stem density for the Site is 497 stems per acre and is on track to meet the MY5 requirement of 260 stems per acre. Geomorphic surveys indicate that cross-section bankfull dimensions closely match the baseline monitoring with some minor adjustments, and streams are functioning as intended. At least one bankfull event was documented on all required project reaches since the completion of construction and 15 of 19 reaches have documented 2 or more bankfull events in 3 separate years. The MY3 visual assessment identified a few areas of concern including small populations of invasive plant species or minor instances of scour, erosion, or aggradation. Adaptive management will Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - FINAL ii be implemented as necessary throughout the seven-year monitoring period to benefit the ecological health of the Site. Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - FINAL iii CRITCHER BROTHERS MITIGATION SITE Monitoring Year 3 Annual Report TABLE OF CONTENTS Section 1: PROJECT GOALS, BACKGROUND, AND ATTRIBUTES ........................................................1-1 1.2.1 Vegetation Assessment ...................................................................................................... 1-3 1.2.2 Vegetation Areas of Concern and Management Activity .................................................. 1-3 1.2.3 Stream Assessment ............................................................................................................ 1-4 1.2.4 Stream Hydrology Assessment .......................................................................................... 1-5 1.2.5 Stream Areas of Concern and Proposed Management Activity ........................................ 1-6 1.2.6 Completed Stream Management Activity ......................................................................... 1-7 Section 2: REFERENCES .................................................................................................................2-1 Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - FINAL iv APPENDICES Appendix 1 General Figures and Tables Figure 1 Project Vicinity Map Figure 2 Project Component Map Table 1 Mitigation Assets and Components Table 2 Project Activity and Reporting History Table 3 Project Contacts Table Table 4a-b Project Information and Attributes Table 5a-f Monitoring Component Summary Appendix 2 Visual Assessment Data Figures 3.0 – 3.7 Current Condition Plan View Maps (Key – Sheet 7) Table 6A-HH Visual Stream Morphology Stability Assessment Table Table 7 Vegetation Condition Assessment Table Table 8a-b Areas of Concern and Management Table Stream Photographs Internal Crossing Photographs Permanent Vegetation Plot Photographs Mobile Vegetation Plot Photographs Shaded Vegetation Transect Photograph Areas of Concern Photographs Stream Management Activity Photographs Appendix 3 Vegetation Plot Data Table 9 Vegetation Plot Criteria Attainment Table Table 10a-c Planted and Total Stem Counts Table 10d Shaded Vegetation Transect Stem Counts Appendix 4 Morphological Summary Data and Plots Table 11a – 11e Morphology and Hydraulic Summary (Dimensional Parameters-Cross-Section) Cross-Section Plots Appendix 5 Hydrology Summary Data and Plots Table 12a-b Verification of Bankfull Events Bankfull Evidence Photographs Table 13 Verification of Consecutive and Cumulative Flow Days Table 14 Rainfall Summary Monthly Rainfall Data Stream Gage Plots Crest Gage Plots Appendix 6 Agency Correspondence Year 2 Monitoring Report Review and Credit Release – June 2, 2023 NCIRT Review Comment Response Letter Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-1 Section 1: PROJECT GOALS, BACKGROUND, AND ATTRIBUTES The Yadkin Valley Umbrella Mitigation Bank (Bank) sites are located in Wilkes, Watauga, and Surry Counties. The site described in this Annual Monitoring Report is the Critcher Brothers Mitigation Site (Site) which is located approximately 7 miles east of the Town of Wilkesboro in Wilkes County in the Yadkin River Basin 14-digit hydrologic unit code (HUC) 03040101060060, and the North Carolina Division of Water Resources (NCDWR) Sub-basin 03-07-01 (Figure 1). The Site is protected by a 72-acre conservation easement spanning three parcels. The main stem of the project, South Fork (SF) Fishing Creek, flows generally northwest through the center of the Site and drains 3,942 acres of surrounding land. SF Fishing Creek has a gently sloped alluvial valley that ranges from unconfined to moderately confined. Critcher Tributary, Antioch Tributary, Chicken Tributary 1, Robin Hill Tributary, and Oak Tributary each have steep, confined valleys that widen at the downstream end as the streams enter the floodplain of SF Fishing Creek. West Fork (WF) Fishing Creek has a gently sloped alluvial valley with an unconfined floodplain. Magnolia Tributary, Ironwood Tributary, Shew Ridge Tributary, and Timber Tributary have steep confined valleys that widen as they enter the flatter receiving floodplain of WF Fishing Creek. WF Fishing Creek joins SF Fishing Creek towards the downstream limits of the Site. Located within the Inner Piedmont lithotectonic belt of the Piedmont physiographic province, the Site topography and relief are typical for the region (NCGS, 1985). Generally, the project watershed is dominated by agricultural and forested land. Prior to construction activities, the Site was used for livestock grazing, crop production, and maintained as managed herbaceous cover or forested lands. Vegetation in project reaches with partially wooded riparian buffers was largely overwhelmed by invasive species and cattle impacts. Cattle farming and lack of well-established riparian buffers, associated with current and historical agricultural use, contributed to major stream impairments across the Site including bank erosion, stream incision, excess fine sediment and nutrient loading, and poor in-stream habitat. Pre-construction conditions are outlined in Table 4 of Appendix 1. The final mitigation plan was submitted and accepted by the North Carolina Interagency Review Team (NC IRT) in July 2019. Construction activities were completed in February 2021 by Wildlands Construction and Land Mechanic Designs. Kee Mapping and Surveying PA completed the as-built survey in February 2021. Planting was completed in February 2021 by Bruton Natural Systems, Inc. Refer to Appendix 1 for detailed project activity, history, contact information, and watershed/site background information. Directions and a map of the Site are provided in Figure 1, and project components are illustrated for the Site in Figure 2. 1.1 Project Goals and Objectives The Site is providing numerous ecological benefits within the Yadkin River Basin. The project goals were established with careful consideration to address stressors that were identified in the RBRP (EEP, 2009). Improvements to water quality and ecological processes are outlined below as project goals and objectives. Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-2 Goals Objectives Reduce pollutant inputs to streams including fecal coliform, nitrogen, and phosphorous. Exclude cattle from streams and buffers by installing fencing around conservation easements adjacent to cattle pastures and providing alternative water sources as necessary, or by removing cattle from sites. Remove riparian buffer areas within conservation easement from agricultural production. Reduce inputs of sediment into streams from eroding stream banks. Reconstruct stream channels with stable dimensions. Add bank revetments and instream structures to protect restored/enhance streams. Capture agricultural erosion in BMP basins. Stabilize eroding gully features. Return networks of streams to a stable form that can support hydrologic, biologic, and water quality functions. Construct stream channels that will maintain a stable pattern and profile considering the hydrologic and sediment inputs to the system, the landscape setting, and the watershed conditions. Raise local groundwater elevations and allow for more frequent overbank flows. Reduce shear stress on channels during larger flow events. Reconstruct stream channels with appropriate bankfull dimensions and depth relative to the existing floodplain. Improve aquatic habitat in project streams. Install habitat features such as constructed riffles, cover logs, and brush toe into restored/enhanced streams. Add woody materials to channel beds. Construct pools of varying depth. Create and improve riparian habitats. Provide a canopy to shade streams and reduce thermal loadings. Create a source of woody inputs for streams. Reduce flood flow velocities on the floodplain and improve long-term lateral stability of streams. Plant native tree and understory species in riparian zone. Ensure that development and agricultural uses that would damage the Site or reduce the benefits of project are prevented. Establish conservation easements on the Site. 1.2 Monitoring Year 3 Data Assessment Annual monitoring for MY3 was conducted between January and December 2023 to assess the condition of the project. The stream, vegetation, and hydrologic success criteria for the Site follows the approved success criteria presented in the Critcher Brothers Mitigation Plan (Wildlands, 2019). Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-3 1.2.1 Vegetation Assessment Vegetation plot monitoring is being conducted in post-construction monitoring years 1, 2, 3, 5, and 7. Permanent plots are monitored in accordance with the guidelines and procedures developed by the Carolina Vegetation Survey-EEP Level 2 Protocol (Lee et al., 2008) and the 2016 USACE Stream and Wetland Mitigation Guidance to assess the vegetation success. A total of 15 permanent vegetation plots were established within the easement. All permanent plots were established as either a 10-meter by 10- meter square plot or 5-meter by 20-meter rectangular plot. In addition, 10 mobile vegetation plots were arbitrarily established in MY3 throughout the planted area to evaluate the random vegetation performance for the Site. Mobile plots will be re-established at varying locations in monitoring years 3, 5, and 7. Mobile vegetation plot assessments will document stem count, species, and height using a circular or 100-meter square/rectangular plot. The final vegetative performance standard will be the survival of 210 planted stems per acre in the planted riparian areas at the end of the required seven-year monitoring period. The interim measure of vegetative success for the Site will be the survival of at least 320 planted stems per acre at the end of MY3 and at least 260 stems per acre at the end of MY5. It should be noted that no single planted or volunteer species shall comprise more than 50% of the total stem density within any plot at year three, five, or seven. In NC mountain counties, planted trees must average 6 feet in height in each plot at the end of MY5 and 8 feet in height at MY7. For both permanent and random plots, all woody stems, including exotic and invasive species, should be counted. Supplemental plantings and volunteer plants must be present for at least two growing seasons before counting toward performance standards for monitoring years five and seven. Invasive species will not count toward success of performance standards. The MY3 vegetation survey was completed in July 2023. The average planted stem density for the Site is 497 stems per acre. In MY3, 23 out of the 25 (92%) vegetation plots are on track to individually meet the interim MY3 requirement of 320 planted stems per acre. Stem densities in monitored vegetation plots ranged from 162 to 1,174 stems per acre. Refer to section 1.2.2 for further discussion about vegetation plots that are not meeting the MY3 density requirements. In MY3, the survival rate of monitored stems was approximately 95% in the permanent vegetation plots, with red oak (Quercus rubra) and black cherry (Prunus serotina) exhibiting the highest mortality rates among planted stems. Stems in permanent vegetation plots are thriving, with 91% of stems scoring a vigor of 3 or greater indicating robust overall health and minimal stem damage. Approximately 2% of stems scored a vigor of 2 or 1. This low vigor rating is likely due to suffocation from dense herbaceous vegetation, poor soil conditions, storm damage, or other unknown factors. Per IRT request, an additional shaded vegetation transect (SVT) was established in the shaded planting area of SF Fishing Creek Reach 9. The MY3 assessment revealed that both planted and volunteer stems are thriving and resulted in a density of 1,740 stems per acre in this area. This shaded vegetation transect is not held to the vegetative performance standards for the Site. Refer to Appendix 2 for vegetation plot photographs and Appendix 3 for vegetation data tables. 1.2.2 Vegetation Areas of Concern and Management Activity Invasive Species MY3 visual assessments indicate that over 96% of the Site is free of invasive species. Invasives were generally seen growing in existing wooded buffers on Site and total 3.0 acres or approximately 4% of the total easement acreage. Several patches of Chinese privet (Ligustrum sinense) were documented on Robin Hill Tributary Reach 1, West Fork Fishing Reaches 1, 4 and 5 and SFFC Reaches 9 and 10. Occurrences of Japanese honeysuckle (Lonicera japonica) were observed on Timber Trib Reach 2. Kudzu Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-4 (Pueraria montana) runners were identified along SFFC Reaches 2 and 3 but were swiftly treated upon observation in July 2023. Targeted invasive species treatments including mechanical removal and herbicide applications were completed by a contractor in October and November 2023. Wildlands will continue to treat mapped invasive species in MY4. While the amount of Marsh dewflower (Murdannia keisak) on Site was greatly reduced in MY3, smaller streams such as Robin Hill Trib A and Antioch Trib A Reach 2 are still affected by in-stream vegetation and associated aggradation. These areas were treated with herbicide applications in July 2023, and are likely to improve as the riparian buffer continues to develop a riparian canopy. In-stream vegetation treatments did not result in any collateral damage to the native planted woody stems along the banks. Vegetation areas of concern will continue to be monitored in MY4, and invasive species will continue to be treated throughout the post-construction monitoring period as needed. Invasive species and vegetation areas of concern are documented on Table 7 and shown on the Current Condition Plan View (CCPV) Figures 3.0 – 3.7 in Appendix 2. Supplemental Planting and Areas of Low Stem Density In March 2023, Wildlands supplementally planted approximately 0.1 acres of low stem density areas previously documented in MY2. These areas were located near the confluence of WF Fishing Creek Reach 1 and Shew Ridge Tributary Reach 2, and SF Fishing Reach 3, and represented by mobile vegetation plot (MVP) 2, and permanent vegetation plot (VP) 12, respectively. MY3 vegetation data collection and visual assessment showed that the March 2023 supplemental plantings improved the stem density in and around MVP2 and VP12. However, the improved stem density in VP12 is not reflected in the MY3 vegetation data since new stems must be documented for 2 consecutive years before counting towards success criteria in the permanent plots. The supplementally planted stems will be included in the MY5 vegetation data assessment. MVP6 has a stem density of 283 stems per acre which does not meet the interim success criteria of 320 stems per acre in MY3. However, this area of low stem density is isolated to mobile plot location, where planted stems have been outcompeted by dense herbaceous vegetation. This mobile plot is still meeting the MY5 and MY7 stem density criteria, therefore is not an area of concern. Supplementally planted areas are shown on the Current Condition Plan View (CCPV) Figures 3.0 – 3.7 in Appendix 2. Conservation Easement Boundary In MY3, Wildlands documented 6 instances of damaged easement fencing associated with downed trees, high flood waters, and one hay bale that accidentally rolled into the easement fencing. In the summer of 2023, Wildlands and the landowner removed debris and repaired damaged segments of fencing. Damaged fencing resulted in minor cattle encroachment; however, the cattle were removed within 24 hours, and damage to planted stems was minimal. In December 2023, vegetation maintenance under the overhead power line, within the utility easement, was observed on Magnolia Trib Reach 2. Approximately 0.009 acres within the project boundary was disturbed, primarily affecting volunteer box elder (Acer negundo). Wildlands will supplementally plant this area with shorter shrub species in 2024. Clearing for logging operations has occurred outside of the easement area on upper Magnolia Trib Reach 1. No encroachments have been documented, Wildlands anticipates a heavy sediment load may affect the downstream reaches. Wildlands will install silt fencing to reduce aggradation in Magnolia Tributary. A full boundary inspection has been completed, and all fences on the Site are intact. No additional encroachments were present as of December 2023. 1.2.3 Stream Assessment Riffle cross-sections on the restoration reaches should be stable and should show little change in bankfull area and width-to-depth ratio. Per NC IRT guidance, bank height ratios shall not exceed 1.2 and Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-5 entrenchment ratios shall be at least 1.4 for restored B-type channels and 2.2 for restored C-type channels to be considered stable. All riffle cross-sections should fall within the parameters defined for channels of the appropriate stream type. If any changes do occur, these changes will be evaluated to assess whether the stream channel is showing signs of instability. Indicators of instability include a vertically incising thalweg or eroding channel banks. Changes in the channel that indicate a movement toward stability or enhanced habitat include a decrease in the width-to-depth ratio in meandering channels or an increase in pool depth. Remedial action would not be taken if channel changes indicate a movement toward stability. Morphological surveys for MY3 were conducted in June 2023. Cross-section survey results indicate that channel dimensions are stable and functioning as designed on all restoration and enhancement I reaches with minimal adjustments. All 49 cross-sections are generally stable, with bank height ratios at or near 1.0. Changes occurring within some cross-sections include slight variations in cross-sectional areas and bankfull depths. Pool cross-section 1 (SF Fishing Reach 2), riffle cross-section 22 (Critcher Tributary C), and pool cross- section 34 (Robin Hill Tributary Reach 1) exhibited a reduction in depth and cross-sectional area in MY3 due to localized aggradation. MY3 survey revealed that cross-section 22 has maintained a similar cross- sectional area and max depth when compared to as-built, and the riffle appears to have stabilized with no signs of active instability. Though pool cross-section 1 has displayed some filling, it has maintained a max depth and cross-sectional area within the reach’s design parameters. The cross-sectional area at cross-sections 34 was significantly reduced in MY3 due to excess sediment along Robin Hill Tributary Reach 1 from an off-project sediment source. Visual sediment assessments revealed Oak Trib and Antioch Trib Reaches 2 and 3 also exhibited an excess fine sediment load in MY3. Consistent channel bed and bank are still present on these reaches and are still functioning as streams and not considered an area of concern. MY4 is a reduced monitoring year; however, Wildlands will continue to visually monitor these reaches for signs of aggradation. Refer to section 1.2.5 for a larger discussion about this area of concern Refer to Appendix 4 for morphological tables and cross-section plots. 1.2.4 Stream Hydrology Assessment Nineteen automated pressure transducers were installed on restoration and enhancement reaches across the Site and are used to document stream hydrology throughout the seven-year monitoring period. Automated transducers are programmed to record every 2 hours. Fifteen gages are documenting bankfull events and are referred to as “crest gages” (CG). The remaining four gages document both baseflow and bankfull events and are referred to as “stream gages” (SG). Annual precipitation data is derived from the NC Cronos Station, North Wilkesboro 5.5 SE, NC. This rain gage is located approximately 4 miles from the Site which is sufficiently close to provide accurate precipitation data for the Site. Bankfull Events At the end of the seven-year monitoring period, four or more bankfull flow events must have occurred in separate years within the restoration and enhancement level I reaches. At least one bankfull event was documented on all required project reaches since the completion of construction and 15 of 19 (78%) reaches have documented 2 or more bankfull events in 3 separate years. 5 of 19 (26%) reaches have documented 3 or more bankfull events in 3 separate years. Therefore, the performance standard for bankfull events has been partially met for all reaches. Though several reaches, including Timber Trib Reach 2, Robin Hill Trib Reach 1, and Robin Hill Trib B, have not yet recorded a bankfull event with the pressure transducers, visual bankfull indicators have been documented on those reaches. In February Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-6 2023, Wildlands installed two additional crest gages on Timber Trib Reach 2 (CG18) and Robin Hill Trib Reach 2 (CG19) to supplement existing crest gage data on these tributaries. CG19 recorded a bankfull event on 6/20/2023. CG18 did not record a bankfull event, but visual bankfull evidence was documented on Timber Trib Reach 2 on 12/14/2023. Wildlands will continue to document bankfull indicators such as floodplain sediment deposits and debris wracklines on project reaches. In MY2, Wildlands requested the bankfull requirement on Robin Hill Trib B (CG16) be omitted due to its steep A3 channel type. Wildlands visually documented a bankfull event on this reach on 2/2/2023. Wildlands will continue to monitor in- stream flow events on this reach. Per IRT request, Wildlands will install a game camera downstream of CG16 in early MY4. Refer to Appendix 5 for hydrology summary data, and photographs of bankfull evidence. Baseflow Monitoring During the seven-year monitoring period, consistent baseflow must be documented every year for at least 30 consecutive days in low flow/intermittent channels that receive restoration or enhancement I level approaches. Automated SGs were installed on the upper third of Critcher Tributary Reach 1, Critcher Tributaries C and D, and Robin Hill Tributary A. In MY3, 4 of 4 (100%) low flow reaches exceeded the success criteria for baseflow monitoring. Days of consecutive stream flow ranged from 109 days on Critcher Trib Reach 1 to 305 days on Critcher Trib C. Refer to Appendix 5 for hydrology summary data and plots. 1.2.5 Stream Areas of Concern and Proposed Management Activity The MY3 visual assessment revealed that the majority (between 98% and 100%) of the project reaches' bed and banks are stable and performing as intended with only minor instances of bank erosion, localized aggradation and isolated structure issues. One beaver dams was documented and removed on SF Fishing Reach 7 in MY3. Bank Erosion SF Fishing Reach 11, station 179+20 to 179+50 and Magnolia Trib Reach 2, station 809+95 to 810+15 exhibited approximately 20 to 30 LF of erosion and scour in MY3. Lack of established woody vegetation resulted in localized segments of right bank erosion and scour. To stabilize these reaches, Wildlands will implement bank repairs at these isolated locations. Repairs will likely include grading, matting, seeding and adding livestake fascines to the floodplain and bank. Aggradation Robin Hill Tributary A, station 551+20 to 552+20 and Antioch Trib A, station 348+00 to 349+00 exhibited approximately 100 LF of aggradation in MY3. Loss of stream power due to reduction in channel gradient promoted deposition of upstream sediments within the channel. Fine grain sediments now dominate the channel bed, resulting in some loss of defined bed and bank on these reaches. To address these issues, Wildlands will mobilize sediment along these reaches and install additional livestakes on the banks to better define the channels. Structure Erosion A log sill on SF Fishing Reach 3, station 122+60 exhibited erosion around the structure, threatening the bank stability due to concentrated flow vectors. A log sill on Robin Hill Trib Reach 2, station 508+75 became dislodged in MY3 and caused minor incision downstream of the dislodged log sill. To address these issues, Wildlands will make hand repairs on the degraded structures. The culvert at SF Fishing Reach 9, station 159+45 overtopped during large flow events and is exhibiting erosion. The private property owner is responsible for maintenance and upkeep of the culvert. Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-7 Wildlands will closely monitor the area to ensure that erosion does not extend beyond the easement exclusion area and into the conservation easement. Wildlands will continue to monitor all areas of concern and document repairs and management activities in the MY4 report. Refer to Appendix 2 for stream stability tables, area of concern photos, CCPV Figures 3.0 – 3.7, and the Areas of Concern (AOC) and Management Activities Tables. 1.2.6 Completed Stream Adaptive Management Activities Each of the MY2 areas of concern have been stabilized, except for one structure issue on Robin Hill Trib Reach 2, which has been added to the MY3 Areas of Concern list. Refer to Appendix 2 for stream the AOC and Management Activities Tables and the Stream Management Activity Photographs.  MY2-4 – SFFC Reach 3, station 121+55 to 121+70 – Wildlands added live stakes to the affected bank in February 2023. The area has stabilized and is no longer an area of concern.  MY2-5 – SFFC Reach 11, station 168+90 to 169+20 – Wildlands periodically mobilized sediment on the edges of the bar. Vegetation growing on the bar received herbicide applications in June 2023. While portions of the bar are still present, the area has stabilized and is no longer an area of concern.  MY2-6 – WFFC Reach 3, station 714+00 to 714+15 – Wildlands cut several low hanging branches and cleared the debris jam. Live stakes were added to the affected bank in February 2023. While portions of the downed tree are still present, the area has stabilized and is no longer an area of concern.  MY2-7 – Robin Hill Trib Reach 1, station 503+00 – Wildlands added tree branches above the swale to diffuse the flow path, and the swale was re-seeded in March 2023. The area has stabilized and is no longer an area of concern.  MY2-8 – Robin Hill Trib Reach 2, station 508+75 – Wildlands replaced the filter fabric on the log sill to prevent it from piping. In MY3, the log sill became dislodged. This area has been added to the MY3 AOC list and will be addressed in MY4.  MY2-9 – Critcher Tributary Reach 3 BMP, station 209+00 – Wildlands filled the void space behind the log sill with rock, woody debris, and soil in May 2023. The area has stabilized and is no longer an area of concern. In MY3, Wildlands documented several areas of concern that required hand repairs in MY3.  MY3-1 – Ironwood Trib Reach 1, station 1002+00 – Wildlands observed rilling in the right floodplain and stabilized the area by installing coir logs in April 2023 to diffuse the flow path. The area has stabilized and is no longer an area of concern.  MY3-2 – Robin Hill Trib Reach 1, station 500+60 – Wildlands observed excess sediment throughout Robin Hill Run Reach 1 and determined it was caused by an erosional feature upstream of the jurisdictional stream. Wildlands installed coir logs upstream of the jurisdictional stream in November 2023 to diffuse the flow path and capture sediment. 1.3 Monitoring Year 3 Summary Overall, the Site has met the required stream, vegetation, and hydrology success criteria for MY3. The overall average planted stem density for the Site is 497 stems per acre and is on track to meet the MY5 requirement of 260 stems per acre. Geomorphic surveys indicate that cross-section bankfull dimensions closely match the baseline monitoring with some minor adjustments, and streams are functioning as intended. At least one bankfull event was documented on all required project reaches since the completion of construction and 15 of 19 reaches have documented 2 or more bankfull events in 3 separate years. The MY3 visual assessment identified a few areas of concern including small populations Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 1-8 of invasive plant species or minor instances of scour, erosion, or aggradation. Adaptive management will be implemented as necessary throughout the seven-year monitoring period to benefit the ecological health of the Site. Critcher Brothers Mitigation Site Monitoring Year 3 Annual Report - DRAFT 2-1 Section 2: REFERENCES Doll, B.A., Grabow, G.L., Hall, K.A., Halley, J., Harman, W.A., Jennings, G.D., and Wise, D.E. 2003. Stream Restoration A Natural Channel Design Handbook. Harrelson, Cheryl C; Rawlins, C.L.; Potyondy, John P. 1994. Stream Channel Reference Sites: An Illustrated Guide to Field Technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. 61 p. Lee, Michael T., Peet, Robert K., Steven D., Wentworth, Thomas R. 2008. CVS-EEP Protocol for Recording Vegetation Version 4.2. Retrieved from: http://cvs.bio.unc.edu/protocol/cvs-eep-protocol-v4.2-lev1- 2.pdf North Carolina Climate Retrieval and Observations Network of the Southeast Database (NCCRONOS). 2021. State Climate Office of North Carolina. Version 2.7.2. Station ID North Wilkesboro 5.5 SE, NC. Accessed December 2023. North Carolina Climate Retrieval and Observations Network of the Southeast Database (NCCRONOS). 2020. State Climate Office of North Carolina. Version 2.7.2. WETS Station ID North Wilkesboro, NC. WETS Data Years 1993 – 2023. North Carolina Division of Water Resources (NCDWR), 2015. Surface Water Classifications. http://portal.ncdenr.org/web/wq/ps/csu/classifications North Carolina Ecosystem Enhancement Program (EEP), 2009. Upper Yadkin Pee-Dee River Basin Restoration Priorities. North Carolina Geological Survey (NCGS), 1985. Geologic Map of North Carolina: North Carolina Survey, General Geologic Map, scale 1:500,000. https://deq.nc.gov/about/divisions/energy-mineral-land- resources/north-carolina-geological-survey/ncgs-maps/1985-geologic-map-of-nc4 Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. Rosgen, D.L. 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. United States Army Corps of Engineers (USACE). 2008. Regulatory Guidance Letter No. 08-03: Minimum Monitoring Requirements for Compensatory Mitigation Projects Involving the Restoration, Establishment, and/or Enhancement of Aquatic Resources. Retrieved from https://www.usace.army.mil/missions/civil-works/regulatory-program-and-permits/guidanceletters/ United States Army Corps of Engineers (USACE), October 2016. Stream Mitigation Guidelines. USACE, NCDENR-DWQ, USEPA, NCWRC. Wildlands Engineering, Inc., 2019. Critcher Brothers Mitigation Site Mitigation Plan. Charlotte, NC. Wildlands Engineering, Inc., 2021. Critcher Brothers Mitigation Site Baseline Monitoring Document and As-Built Baseline Report. Charlotte, NC. APPENDIX 1. General Figures and Tables Figure 1 Project Vicinity Map Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Wilkes County, NC 0 1 2 Mile Project Location Hydrologic Unit Code (14) ¹ Directions to Site: From Charlotte: Head north on Interstate 77, take exit 73B to merge onto US-421 toward Wilkesboro. Take exit 277 for Windy Gap Road/Speedway Road. Turn right to Speedway Road and continue for 0.2 miles. Turn right onto Antioch Church Road and continue for approximately 0.8 miles. Turn left onto the Site's farm road to arrive at the Site. Table 1. Mitigation Assets and Components Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 597 Cool Enhancement II N/A 2.5 597 N/A 829 Cool Restoration P1 1.0 829 N/A 854 Cool Restoration P1 1.0 854 N/A 298 Cool Enhancement II N/A 5.0 298 N/A 952 Cool Restoration P1 1.0 952 N/A 526 Cool Restoration P1 1.0 526 N/A 679 Cool Restoration P1 1.0 679 N/A 819 Cool Restoration P1 1.0 819 N/A 527 Cool Enhancement II N/A 2.5 527 N/A 346 Cool Restoration P1 1.0 346 N/A 1,092 Cool Restoration P1 1.0 1,092 N/A 207 Cool Restoration P1 1.0 207 N/A 266 Cool Restoration P1 1.0 266 N/A 1,155 Cool Restoration P1 1.0 1,155 N/A 424 Cool Restoration P1 1.0 424 N/A 817 886 Cool Restoration P1 1.0 886 N/A 120 117 Cool Restoration P1 1.0 117 N/A 106 132 Cool Restoration P1 1.0 132 N/A 185 Cool Enhancement II N/A 2.5 185 N/A 518 Cool Restoration P1 1.0 518 N/A 606 Cool Restoration P1 1.0 606 N/A 385 Cool Restoration P1 1.0 385 N/A 730 Cool Enhancement II N/A 2.5 730 N/A 136 Cool Restoration P1 1.0 101 N/A 177 178 Cool Enhancement II N/A 2.5 178 N/A 448 Cool Enhancement II N/A 2.5 448 N/A 390 Cool Restoration P1 1.0 400 N/A 440 443 Cool Enhancement II N/A 2.5 443 N/A 113 122 Cool Enhancement II N/A 2.5 122 N/A 681 Cool Enhancement II N/A 5.0 680 N/A 735 Cool Restoration P1 1.0 735 N/A 1,076 1,055 Cool Enhancement II N/A 3.0 1,055 N/A 705 Cool Restoration P1 1.0 705 N/A 451 Cool Restoration P1 1.0 451 N/A 158 155 Cool Restoration P1 1.0 155 N/A 259 235 Cool Restoration P1 1.0 235 N/A 493 583 Cool Restoration P1 1.0 583 N/A 723 Cool Restoration P1 1.0 723 N/A 281 Cool Restoration P1 1.0 281 N/A 600 Cool Enhancement I P1 1.5 600 N/A 650 Cool Enhancement I P1 1.5 650 N/A 695 Cool Enhancement I P1 1.5 695 N/A 910 Cool Preservation N/A 7.5 758 MY0: Reach 1 was shortened by 102 LF. 414 Cool Enhancement II N/A 2.5 315 MY0: Reach 2 was shortened by 149 LF and approach changed from EI to EII. MY1: 50 LF of stream was changed from preservation to EII. 893 Cool Preservation N/A 7.5 893 N/A 310 Cool Restoration P1 1.0 310 N/A 446 411 Cool Preservation N/A 7.5 345 N/A 522 Cool Restoration P1 1.0 516 N/A 210 Cool Preservation N/A 7.5 210 N/A 1,296 Cool Preservation N/A 7.5 1,296 N/A 821 Cool Restoration P1 1.0 821 N/A 106 104 Cool Preservation N/A 7.5 104 N/A Warm Cool Cold Riverine Non-Riv N/A 16,840.000 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,296.667 N/A N/A 1,965.467 N/A N/A N/A N/A N/A N/A 489.600 N/A N/A N/A N/A N/A 20,591.733 N/A N/A N/A N/A N/A Creation Preservation Totals Restoration Re-establishment Rehabilitation Enhancement Enhancement I Enhancement II Timber Tributary A Project Credits Restoration Level Stream Riparian Wetland Non-Riparian Wetland Coastal Marsh Shew Ridge Tributary A Ironwood Tributary Reach 1 769Ironwood Tributary Reach 2 Timber Tributary Reach 1 2,184Timber Tributary Reach 2 Magnolia Tributary Reach 1 910Magnolia Tributary Reach 2 Shew Ridge Tributary Reach 1 1,175Shew Ridge Tributary Reach 2 WF Fishing Creek Reach 1 3,443 WF Fishing Creek Reach 2 WF Fishing Creek Reach 3 WF Fishing Creek Reach 4 WF Fishing Creek Reach 5 Oak Tributary Antioch Tributary B1 Antioch Tributary C Chicken Tributary 1 Reach 1 1,591Chicken Tributary 1 Reach 2 Chicken Tributary 1A Robin Hill Tributary Reach 1 1,183Robin Hill Tributary Reach 2 Robin Hill Tributary A Robin Hill Tributary B Antioch Tributary A Reach 1 943Antioch Tributary A Reach 2 Antioch Tributary A1 Antioch Tributary B Reach 1 867Antioch Tributary B Reach 2 Critcher Tributary D Antioch Tributary Reach 1 1,738Antioch Tributary Reach 2 Antioch Tributary Reach 3 Antioch Tributary Reach 4 2,099Critcher Tributary Reach 2 Critcher Tributary Reach 3 Critcher Tributary Reach 4 Critcher Tributary A Critcher Tributary C SF Fishing Creek Reach 7 SF Fishing Creek Reach 8 SF Fishing Creek Reach 9 SF Fishing Creek Reach 10 SF Fishing Creek Reach 11 Critcher Tributary Reach 1 SF Fishing Creek Reach 1 8,625 SF Fishing Creek Reach 2 SF Fishing Creek Reach 3 SF Fishing Creek Reach 4 SF Fishing Creek Reach 5 SF Fishing Creek Reach 6 Project Components Project Area/Reach Existing Footage (LF) or Acreage Mitigation Plan Footage/ Acreage Mitigation Category Restoration Level Priority Level Mitigation Ratio (X:1) As-Built Footage/ Acreage Comments Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 1Seed and mulch is added as each section of construction is completed. Table 3. Project Contacts Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Designers Construction Contractors Planting Contractor Seed Mix Sources Nursery Stock Suppliers Bare Roots Live Stakes Herbaceous Plugs Monitoring Performers Monitoring POC February 2024 Beaver Dam Removal Supplemental Planting Invasive Species Treatment June 2023 July 2022 February 2021 Summer 2021 August, December 2021 August 2022 July 2023 March 2023 March 2021 December 2021 July 2023 July 2022 September, October 2022 October 2021 February 2022 February 2023 August 2022 Year 3 Monitoring Stream Management Activities February, March, May, June, November 2023 Activity or Report Construction Mitigation Plan Final Design - Construction Plans Temporary S&E mix applied to entire project area1 Vegetation Survey Stream Survey Baseline Monitoring Document (Year 0) Stream Survey Stream Survey Beaver Dam Removal Year 1 Monitoring Stream and Crossing Repairs Invasive Species Treatment Stream RepairsYear 2 Monitoring Vegetation Survey July, September, October 2023 Vegetation Survey Stream Survey Vegetation Survey Table 2. Project Activity and Reporting History October 2019 October 2019 February 2021 February 2021 November 2019 November 2019 February 2021 February 2021 February 2021 February 2021 February 2021 February 2021 October 2017 - December 2018 404 Permit Data Collection Complete Completion or Delivery July 2019 Permanent seed mix applied to reach/segments Bare root and live stake plantings for reach/segments Wildlands Construction, LLC 312 West Millbrook Road, Suite 225 Raleigh, NC 27609 Land Mechanics Designs, Inc. 126 Circle G Lane Willow Spring, NC 27592 919.639.6132 Bruton Natural Systems, Inc. Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 704.332.7754 Wetland Plants, Inc. Wildlands Engineering, Inc. Mimi Caddell 828.774.5547 Ext. 107 PO Box 1197 Fremont, NC 27830 Green Resources Bruton Natural Systems, Inc. Foggy Mountain Nursery Emily G. Reinicker, PE Soil Amendments and Re-seeding March 2022 Year 5 Monitoring Year 4 Monitoring Year 6 Monitoring Invasive Species Treatment Stream Survey Vegetation Survey Stream Survey Vegetation Survey Stream SurveyYear 7 Monitoring Vegetation Survey Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Project Area (acres) Project Coordinates (latitude and longitude) 36.16463889, -81.03651389 Planted Acreage (acres of woody stems planted)1 Physiographic Province River Basin USGS Hydrologic Unit 8-digit USGS Hydrologic Unit 14-digit NCDWR Sub-basin 1 Includes both open and shaded supplemental planting areas Yes Supporting Documentation NPDES Construction Stormwater General Permit NCG010000 Categorical Exclusion Document in Mitigation Plan Resolved? Yes Yes Yes USACE Action ID SAW-2017-01913 DWR # 19-0922 v1 03040101 03040101060060 03-07-01 2.3% FEMA Floodplain Compliance Essential Fisheries Habitat Historic Preservation Act Coastal Zone Management Act (CZMA)/Coastal Area Management Act (CAMA) Division of Land Quality (Erosion and Sediment Control) Endangered Species Act Project Drainage Area (acres)3,942 Table 4a. Project Information and Attributes Project Watershed Summary Information Piedmont Project Information Yadkin Critcher Brothers Mitigation Site Wilkes County 72.46 59.2 Project Name Project Drainage Area Percentage of Impervious Area 2011 NLCD Land Use Classification 60% forested, 35% managed herbaceous, 2% shrubland, <1% unmanaged herbaceous, 3% cultivated Categorical Exclusion Document in Mitigation Plan N/A Regulatory Considerations Waters of the United States - Section 401 Regulation Waters of the United States - Section 404 Applicable? Yes Yes Wilkes County Floodplain Development Permit N/A Yes Yes No Yes No Yes N/A Yes N/A Yes Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 R1 R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 597 829 854 298 952 526 679 819 527 346 1,092 1,082 1,632 1,651 1,690 3,942 -C4 C4 -F4 ----F4 F4 -C4 C4 -C4 C4 C4 C4 -C4 C4 R1 R2 R3 R4 R1 R2 R3 R4 207 266 1,155 424 886 117 132 185 518 606 385 Confined to unconfined Confined to unconfined Confined Confined Confined to unconfined 13 19 45 106 59 2 5 45 66 I P P I I --G4 G4 F4 F4 G4 --F4 F4 A4 B4 B4c C4 B4c B3c A3 -A4 B4 C4 R1 R2 R1 R2 R1 R2 730 101 178 448 400 443 122 680 735 1,055 583 Confined Confined Confined Confined Confined Confined Moderately confined Confined Confined to unconfined 7 5 1 19 24 I, P P I I, P P -G4 --F4b ---B4c -- -B4 --C4 ---C4 -A4 R1 R2 R1 R2 R3 R4 R5 R1 R2 705 451 155 235 723 281 600 650 695 808 265 Confined Confined to unconfined Confined Confined Confined Moderately confined 19 24 4 3 1,997 2,074 2,080 2,106 2,167 I, P P G4 G4 G4 G4 F4 F4 F4 F4 F4 -G4 A4 C4 A3 A3 C4 C4 C4 C4 C4 -- R1 R2 R1 R2 R1 R2 893 310 345 516 210 1,296 821 104 Confined Confined to unconfined Confined Confined Confined Confined Confined to unconfined Confined 15 4 P I,P P I -G4 -G4 --G4 - -C4 -B4 --B4c/C4 - 4919 P P FEMA classification Ironwood Tributary Timber Tributary Timber Trib A Class C None P NCDWR Water Quality Classification Morphological Description (stream type) - Pre-Restoration Morphological Description (stream type) - Post-Restoration Drainage area (acres)69 Perennial, Intermittent, Ephemeral Valley confinement (Confined, moderately confined, unconfined) P Length of reach (linear feet) - Post-Restoration Valley confinement (Confined, moderately confined, unconfined)Unconfined Parameters Robin Hill Tributary Robin Hill Trib A P Length of reach (linear feet) - Post-Restoration Parameters Shew Ridge Tributary Shew Ridge Trib A FEMA classification Morphological Description (stream type) - Pre-Restoration Morphological Description (stream type) - Post-Restoration NCDWR Water Quality Classification Class C None Robin Hill Trib B WF Fishing Creek Magnolia Tributary Drainage area (acres) Perennial, Intermittent, Ephemeral 1,734 13 PP P P P 24 444 202 FEMA classification None FEMA classification None Antioch Trib A Antioch Trib A1 Antioch Trib B Antioch Trib B1 Antioch Trib C Chicken Tributary 1 Chicken Tributary 1A Oak Trib NCDWR Water Quality Classification Class C Morphological Description (stream type) - Pre-Restoration Morphological Description (stream type) - Post-Restoration Drainage area (acres)20 Perennial, Intermittent, Ephemeral Length of reach (linear feet) - Post-Restoration Valley confinement (Confined, moderately confined, unconfined) Confined Parameters NCDWR Water Quality Classification Class C Morphological Description (stream type) - Pre-Restoration Morphological Description (stream type) - Post-Restoration Drainage area (acres) Perennial, Intermittent, Ephemeral Length of reach (linear feet) - Post-Restoration Valley confinement (Confined, moderately confined, unconfined) Confined Confined Table 4b. Project Information and Attributes Drainage area (acres) Perennial, Intermittent, Ephemeral Length of reach (linear feet) - Post-Restoration Valley confinement (Confined, moderately confined, unconfined) Reach Summary Information Parameters SF Fishing Creek Critcher Trib D Antioch Tributary Unconfined to moderately confined P FEMA classification Zone AE Parameters Critcher Tributary Critcher Trib A Critcher Trib C NCDWR Water Quality Classification Class C Morphological Description (stream type) - Pre-Restoration Morphological Description (stream type) - Post-Restoration 947 1,178 Table 5a. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Reach 7 Reach 8 Reach 9 Reach 10 Reach 11 Riffle Cross-Section N/A 1 1 N/A 2 1 1 1 N/A 1 1 Pool Cross-Section N/A 1 1 N/A 1 0 1 0 N/A 0 1 Pattern Pattern N/A Yes Yes N/A Yes Yes Yes Yes N/A Yes Yes Year 0 Profile Longitudinal Profile N/A Yes Yes N/A Yes Yes Yes Yes N/A Yes Yes Year 0 Substrate Reach Wide (RW) Pebble Count N/A 1 RW 1 RW N/A 1 RW 1 RW 1 RW 1 RW N/A 1 RW 1 RW Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)N/A N/A N/A Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: 19 Parameter Monitoring Feature Yes 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) 1 CG 1 CG 1 CG 2 Frequency Notes 1DimensionYear 0, 1, 2, 3, 5, and 7 Quantity / Length by Reach SF Fishing Creek 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. Table 5b. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 3 Reach 4 Riffle Cross-Section 1 1 2 1 1 1 1 Pool Cross-Section 0 0 1 0 1 0 0 Pattern Pattern Yes Yes Yes Yes Yes Yes Yes Year 0 Profile Longitudinal Profile Yes Yes Yes Yes Yes Yes Yes Year 0 Substrate Reach Wide (RW) Pebble Count 1 RW 1 RW 1 RW 1 RW 1 RW 1 RW 1 RW Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)1 SG 1 CG 1 SG 1 SG Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: Dimension Year 0, 1, 2, 3, 5, and 7 1 2 Parameter Monitoring Feature Quantity / Length by Reach Frequency Notes Critcher Tributary 1 CG 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) Yes 12 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. Critcher Trib A Critcher Trib C Critcher Trib D Table 5c. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 3 Reach 4 Reach 1 Reach 2 Reach 1 Reach 2 Riffle Cross-Section N/A 1 1 1 N/A 1 N/A N/A 1 N/A N/A Pool Cross-Section N/A 0 0 0 N/A 0 N/A N/A 0 N/A N/A Pattern Pattern N/A Yes Yes Yes N/A Yes N/A N/A Yes N/A N/A Year 0 Profile Longitudinal Profile N/A Yes Yes Yes N/A Yes N/A N/A Yes N/A N/A Year 0 Substrate Reach Wide (RW) Pebble Count N/A 1 RW 1 RW 1 RW N/A 1 RW N/A N/A 1 RW N/A N/A Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)N/A N/A 1 CG N/A N/A 1 CG N/A N/A Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: Monitoring Feature Quantity / Length by Reach Frequency Notes Antioch Tributary Antioch Trib C 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) Yes 11 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. Antioch Trib A Antioch Trib A1 Antioch Trib B Antioch Trib B1 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. Dimension Year 0, 1, 2, 3, 5, and 7 1 2 1 CG Parameter Table 5d. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 1 Reach 2 Riffle Cross-Section N/A 2 N/A 1 1 1 1 1 Pool Cross-Section N/A 1 N/A 1 0 0 0 0 Pattern Pattern N/A Yes N/A Yes Yes Yes Yes Yes Year 0 Profile Longitudinal Profile N/A Yes N/A Yes Yes Yes Yes Yes Year 0 Substrate Reach Wide (RW) Pebble Count N/A 1 RW N/A 1 RW 1 RW 1 RW 1 RW 1 RW Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)N/A 1 CG N/A 1 SG 1 CG 1 CG Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: Parameter Monitoring Feature Quantity / Length by Reach Frequency NotesOak Trib 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) Yes 11 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. Chicken Trib 1 Chicken Trib 1A Robin Hill Trib Robin Hill Trib A Robin Hill Trib B 1 CG 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. Dimension Year 0, 1, 2, 3, 5, and 7 1 2 Table 5e. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Riffle Cross-Section 1 1 1 1 1 Pool Cross-Section 1 0 0 0 0 Pattern Pattern Yes Yes Yes Yes Yes Year 0 Profile Longitudinal Profile Yes Yes Yes Yes Yes Year 0 Substrate Reach Wide (RW) Pebble Count 1 RW 1 RW 1 RW 1 RW 1 RW Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: Notes 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) Yes 9 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. WF Fishing Creek 1 CG 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. Dimension Year 0, 1, 2, 3, 5, and 7 1 2 Parameter Monitoring Feature Quantity / Length by Reach Frequency Table 5f. Monitoring Component Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach 1 Reach 2 Reach 1 Reach 2 Reach 1 Reach 2 Reach 1 Reach 2 Riffle Cross-Section N/A N/A N/A 1 N/A 1 N/A N/A 1 N/A Pool Cross-Section N/A N/A N/A 1 N/A 0 N/A N/A 1 N/A Pattern Pattern N/A N/A N/A Yes N/A Yes N/A N/A Yes N/A Year 0 Profile Longitudinal Profile N/A N/A N/A Yes N/A Yes N/A N/A Yes N/A Year 0 Substrate Reach Wide (RW) Pebble Count N/A N/A N/A 1 RW N/A 1 RW N/A N/A 1 RW N/A Year 0 3 Hydrology Crest Gage (CG) and or/Stream Gage (SG)N/A N/A N/A 1 CG N/A 1 CG N/A N/A 1 CG N/A Semi-Annual 4 Vegetation CVS Level 2/Mobile plots Year 0, 1, 2, 3, 5, and 7 5 Visual Assessment Semi-Annual Exotic and Nuisance Vegetation Semi-Annual 6 Project Boundary Semi-Annual 7 Reference Photos Photographs Annual Notes: Parameter Monitoring Feature Quantity / Length by Reach Frequency Notes 15 permanent plots, 10 mobile plots, 1 shaded plot/transect (Total for the Site) Yes 13 1.  Cross-sections were permanently marked with rebar to establish location. Surveys include points measured at all breaks in slope, including top of bank, bankfull, edge of water, and thalweg. 2.  Pattern and profile will be assessed visually during semi-annual site visits. Longitudinal profile was collected during as-built baseline monitoring survey only, unless observations indicate widespread lack of vertical stability (greater than 10% of reach is affected) and profile survey is warranted in additional years to monitor adjustments or survey repair work. 3. Riffle 100-count substrate sampling were collected during the baseline monitoring only. Pebble counts will not be conducted during the remaining monitoring years unless requested by the IRT or deemed necessary based on best professional judgement. Magnolia Trib Shew Ridge Trib Shew Ridge Trib A Ironwood Trib Timber Trib Timber Trib A 4.  Crest gages and/or stream gages will be inspected and dowloaded quarlerly or semi-anually, evidence of bankfull events will be documented with a photo when possible. Transducers, if used, will be set to record stage once every 2 hours. The transducer will be inspected and downloaded semi-annually. 5.  Both mobile and permanent vegetation plots will be utilized to evaluate the vegetation performance for the open areas planted. 2% of the open planted acreage will be monitored with permanent plots and mobile plots. Permanent vegetation monitoring plot assessments will follow CVS Level 2 protocols. Mobile vegetation monitoring plot assessments will document number of planted stems, height, and species using a circular or 100 meter square/rectangular plot. Planted shaded areas will be visually assessed. 6. Locations of exotic and nuisance vegetation will be mapped. 7. Locations of vegetation damage, boundary encroachments, etc. will be mapped. Dimension Year 0, 1, 2, 3, 5, and 7 1 2 APPENDIX 2. Visual Assessment Data Table 6A-B. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 SF Fishing Creek Reach 2 829 1,658 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% SF Fishing Creek Reach 3 854 1,708 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 5 6 83% Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6C-D. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 SF Fishing Creek Reach 5 952 1,904 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% SF Fishing Creek Reach 6 526 1,052 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Totals: Bank Structure Totals: Structure % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6E-F. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 SF Fishing Creek Reach 7 679 1,358 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% SF Fishing Creek Reach 8 819 1,638 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6G-H. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 SF Fishing Creek Reach 10 346 692 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 2 2 100% SF Fishing Creek Reach 11 1,092 2,184 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 30 99% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 30 99% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6I-J. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Critcher Tributary Reach 1 207 414 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 12 12 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 3 3 100% Critcher Tributary Reach 2 266 532 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 9 9 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6K-L. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Critcher Tributary Reach 3 1,155 2,310 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 29 29 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 18 18 100% Critcher Tributary Reach 4 424 848 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 5 5 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6M-N. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Critcher Tributary A 886 1,772 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 18 18 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 13 13 100% Critcher Tributary C 117 234 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 0 0 N/A Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6O. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Critcher Tributary D 132 264 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 12 12 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% Date of Assessment: 12/14/2023 % Stable, Performing as Intended Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: Table 6P-Q. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Antioch Tributary Reach 2 518 1,036 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 16 16 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 7 7 100% Antioch Tributary Reach 3 606 1,212 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 11 11 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6R-S. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Antioch Tributary Reach 4 385 770 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Antioch Tributary A Reach 2 101 202 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 1 1 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6T-U. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Antioch Tributary B Reach 2 400 800 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 6 6 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Chicken Tributary 1 Reach 2 735 1,470 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 9 9 100% Structure Assessed Stream Length Assessed Bank Length Bank Totals: Date of Assessment: 12/14/2023 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage % Stable, Performing as Intended Date of Assessment: 12/14/2023 Assessed Stream Length Structure % Stable, Performing as Intended Amount of Unstable Footage Total Number in As-built Number Stable, Performing as Intended Metric Assessed Bank Length Major Channel Category Bank Totals: Table 6V-W. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Robin Hill Tributary Reach 1 705 1,410 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 17 17 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 0 0 N/A Robin Hill Tributary Reach 2 451 902 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 3 67% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length Bank Totals: Structure % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Table 6X-Y. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Robin Hill Tributary A 155 310 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 0 0 N/A Robin Hill Tributary B 235 470 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 8 8 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 0 0 N/A Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6Z. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Oak Tributary 583 1,166 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 17 17 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 2 2 100% Date of Assessment: 12/14/2023 Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6AA-BB. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 WF Fishing Creek Reach 1 723 1,446 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% WF Fishing Creek Reach 2 281 562 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 3 3 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6CC-DD. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 WF Fishing Creek Reach 3 600 1,200 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 3 3 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 4 4 100% WF Fishing Creek Reach 4 650 1,300 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Bank Totals: Structure Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Table 6EE-FF. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 WF Fishing Creek Reach 5 695 1,390 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 3 3 100% Shew Ridge Tributary Reach 2 310 620 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 5 5 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 2 2 100% Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Structure Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Assessed Stream Length Assessed Bank Length Bank Totals: % Stable, Performing as Intended Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Table 6GG-HH. Visual Stream Morphology Stability Assessment Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Ironwood Tributary Reach 1 516 1,032 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 22 23 96% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 5 5 100% Timber Tributary Reach 2 821 1,642 Surface Scour/ Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour.0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse.0 100% 0 100% Grade Control Grade control structures exhibiting maintenance of grade across the sill. 11 11 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. 6 6 100% Structure Assessed Stream Length Assessed Bank Length Bank Totals: Date of Assessment: 12/14/2023 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage % Stable, Performing as Intended Date of Assessment: 12/14/2023 Assessed Stream Length Assessed Bank Length % Stable, Performing as Intended Major Channel Category Metric Number Stable, Performing as Intended Total Number in As-built Amount of Unstable Footage Bank Totals: Structure Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Planted Acreage 59.20 Vegetation Category Definitions Mapping Threshold (ac) Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material.0.10 0.00 0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria. 0.10 0.00 0.00% 0.00 0.00% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard.0.10 0 0% 0.00 0.00% Easement Acreage 72.60 Vegetation Category Definitions Mapping Threshold (ac) Combined Acreage % of Easement Acreage Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage. Include species with the potential to directly outcompete native, young, woody stems in the short-term or community structure for existing communities. Invasive species included in summation above should be identified in report summary. 0.10 3.01 4.1% Easement Encroachment Areas Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area. none 1 Area of Encroachment (0.009 acres) Table 7. Vegetation Condition Assessment Table Total Cumulative Total Date of Assessment: 12/14/2023 Date of Assessment: 12/14/2023 Table 8a. Areas of Concern and Management Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 MY Reported/Observed - AOC #1,3 Stream Name Station AOC Description1 Repair Date Management Description and Current Condition2 Length (LF) AB - 1 SFFC Reach 9 160+00 - 160+75 Right bank scour and high density of privet on the left bank. Wildlands mechanically removed the privet and re-stabilized the banks. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area has stabilized and is no longer an area of concern. 75 LF AB - 2 Mangolia Tributary Reach 2 810+00 - 810+50 Right bank scour and erosion. Wildlands re-stabilized the right bank. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area is exhibiting scour and has been added to the MY3 AOC list. 50 LF AB - 3 Ironwood Tributary Reach 1 1006+70 Log sill trending towards instability. May 2021 Wildlands replaced the log sill with a boulder sill for long term stability. The area has stabilized and is no longer an area of concern. N/A MY1 - 1 SFFC Reach 9 164+00 - 164+70 Localized aggradation in enhancement reach. The sediment mobilized over time, and is no longer an area of concern. 70 LF MY1 - 2 SFFC Reach 10 167+30 - 167+40 Minor left bank scour at XS12. Wildlands added livestakes to the left bank. The area has stabilized and is no longer an area of concern. 10 LF MY1 - 3 SFFC Reach 11 178+75 Right floodplain scour and erosion. Wildlands re-seeded this area. The area became vegetated and is no longer an area of concern. 5 LF MY1 - 4 Antioch Trib Reach 4 313+25 Floodplain scour where wetland hydrology abuts the stream. Wildlands backfilled the scour pocket and planted juncus plugs in the area. The area has stabilized and is no longer an area of concern. 7 LF MY1 - 5 Robin Hill Trib Reach 2 505+75 - 505+80 Minor bed scour. Wildlands re-adjusted riffle material and added livestakes to the banks to prevent futher incision and scour. The area has stabilized and is no longer an area of concern. 5 LF MY1 - 6 WFFC Reach 5 727+55 - 727+65 Riffle material became mounded in the center of the channel causing divergent flow and scour on both banks.August 2022 Wildlands distributed the riffle substrate to center the channel thalweg and stabilized 10 LF of stream bank on both banks. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area has stabilized and is no longer an area of concern. 20 LF MY2 - 1 WFFC Reach 5 724+90 - 725+10 Both banks started to slump and scour which caused a segment of the channel to braid. Wildlands cleared excess sediment from this area and stabilized 15 LF of stream bank on both banks. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area has stabilized and is no longer an area of concern. 30 LF MY2 - 2 WFFC Reach 5 730+30 - 730+55 Mass-wasting and scour on both banks. Wildlands stabilized 25 LF of stream bank on both banks. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area has stabilized and is no longer an area of concern. 50 LF MY2 - 3 SFFC Reach 11 178+30 Erosion on both banks where a log sill is keyed in. Wildlands reset the structure and added stabilizing rock material to both banks for bank revetment and structure stability. Bank repairs included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The area has stabilized and is no longer an area of concern. 10 LF 3Abbreviations correspond to photos located in the Stream Management Activity Photographs photolog. March 2021 March 2022 June 2022 August 2022 1MY = Monitoring Year, AOC = Area of Concern, RB = Right Bank, LB = Left Bank 2Areas described as "no longer an area of concern" will continue to be monitored closely in subsequent monitoring years. Table 8b. Areas of Concern and Management Table Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 MY Reported/Observed - AOC #1,3 Stream Name Station AOC Description1 Repair Date Management Description and Current Condition2 Length (LF) MY2 - 4 SFFC Reach 3 121+55 - 121+70 A j-hook became dislodged from the bank resulting in minor bank scour. February 2023 Wildlands added livestakes to the affected bank. The area has stabilized and is no longer an area of concern. 15 LF MY2 - 5 SFFC Reach 11 168+90 - 169+20 A mid-channel bar has developed and become vegetated. February, March, June, November 2023 Wildlands periodically mobilized sediment on the edges of the bar. Vegetation growing on the bar was sprayed in June. While portions of the bar are still present, the area has stabilized and is no longer an area of concern. 30 LF MY2 - 6 WFFC Reach 3 714+00 - 714+15 A tree fell on the bank resulting in recurrent debris jams and isolated right bank scour.February 2023 Wildlands cut several low hanging branches and cleared the debris jam. Livestakes were added to the affected bank. While portions of the downed tree are still present, the area has stabilized and is no longer an area of concern. 15 LF MY2 - 7 Robin Hill Trib Reach 1 503+00 The swale in the right floodplain near station 503+00 is degraded and exhibiting minor scour.March 2023 Wildlands added tree branches above the swale to disrupt the single flow path, and the swale was re-seeded. The area has stabilized and is no longer an area of concern. N/A MY2 - 8 Robin Hill Trib Reach 2 508+75 A log sill is piping. Wildlands replaced the filter fabric on the log sill to prevent it from piping. In MY3, the log sill became dislodged. This area has been added to the MY3 AOC list. N/A MY2 - 9 Critcher Tributary Reach 3 BMP 209+00 The bottom log sill on the BMP located in the left floodplain is experiencing some piping and scour. Wildlands filled the void space behind the log sill with rock, woody debris and soil. The area has stabilized and is no longer an area of concern. N/A MY3 - 1 Ironwood Trib Reach 1 Floodplain near 1002+00 Rilling in the right floodplain. April 2023 Wildlands installed coir logs to diffuse the flow path. 10 LF MY3 - 2 Robin Hill Trib Reach 1 500+60 Erosional feature above the jurisdictional portion of the reach. November 2023 Wildlands installed coir logs to diffuse the flow path and capture sediment. N/A MY3 - 3 SFFC Reach 3 122+60 Erosion on the left bank where a log sill is keyed in. Wildlands will add rock and soil to the bank to re-stabilize the structure. N/A MY3 - 4 SFFC Reach 9 159+45 Scour around culvert. The private property owner is responsible for maintenance and upkeep of the culvert. Wildlands will closely monitor the area to ensure that erosion does not extend beyond the easement exclusion area and into the conservation easement. N/A MY3 - 5 SFFC Reach 11 179+20 - 179+50 Right bank scour and erosion. Wildlands will stabilize 30 LF of stream bank on the right bank. Bank repairs will likely include grading, matting, seeding, and adding livestake fascines to the floodplain and bank. 30 LF MY3 - 6 Antioch Trib A Reach 2 348+00 - 349+00 Off-project sediment source causing aggradation. Wildlands will mobilize sediment and install additional livestakes along the banks. 100 LF MY3 - 7 Robin Hill Trib Reach 2 508+75 - 508+82 A log sill became dislodged, resulting in minor incision downstream of the missing structure.Wildlands will develop a repair plan after further assessment. 7 LF MY3 - 8 Robin Hill Trib A 551+20 to 552+20 Off-project sediment source causing aggradation. Wildlands will mobilize sediment and install additional livestakes along the banks. 100 LF MY3 - 9 Magnolia Trib Reach 2 809+95 - 810+15 Right bank scour and erosion. Wildlands will stabilize 20 LF of stream bank on the right bank. Bank repairs will likely include grading, matting, seeding, and adding livestake fascines to the floodplain and bank. 20 LF 3Abbreviations correspond to photos located in the Stream Management Activity Photographs photolog. 2Areas described as "no longer an area of concern" will continue to be monitored closely in subsequent monitoring years. 1MY = Monitoring Year, AOC = Area of Concern, RB = Right Bank, LB = Left Bank May 2023 Repairs planned for 2024 Stream Photographs Monitoring Year 3 Photo Point 1 – SFFC Reach 1, view upstream (4/5/2023) Photo Point 1 – SFFC Reach 1, view downstream (4/5/2023) Photo Point 2 – SFFC Reach 2, view upstream (4/5/2023) Photo Point 2 – SFFC Reach 2, view downstream (4/5/2023) Photo Point 3 – SFFC Reach 2, view upstream (4/5/2023) Photo Point 3 – SFFC Reach 2, view downstream (4/5/2023) Photo Point 4 – SFFC Reach 3, view upstream (4/5/2023) Photo Point 4 – SFFC Reach 3, view downstream (4/5/2023) Photo Point 5 – SFFC Reach 3, view upstream (4/5/2023) Photo Point 5 – SFFC Reach 3, view downstream (4/5/2023) Photo Point 6 – SFFC Reach 4, view upstream (4/5/2023) Photo Point 6 – SFFC Reach 4, view downstream (4/5/2023) Photo Point 7 – SFFC Reach 5, view upstream (4/5/2023) Photo Point 7 – SFFC Reach 5, view downstream (4/5/2023) Photo Point 7 – Antioch Tributary R4, view upstream (4/5/2023) Photo Point 8 – SFFC Reach 5, view upstream (4/5/2023) Photo Point 8 – SFFC Reach 5, view downstream (4/5/2023) Photo Point 9 – SFFC Reach 5, view upstream (4/5/2023) Photo Point 9 – SFFC Reach 5, view downstream (4/5/2023) Photo Point 10 – SFFC Reach 6, view upstream (4/5/2023) Photo Point 10 – SFFC Reach 6, view downstream (4/5/2023) Photo Point 11 – SFFC Reach 7, view upstream (4/5/2023) Photo Point 11 – SFFC Reach 7, view downstream (4/5/2023) Photo Point 12 – SFFC Reach 7, view upstream (4/5/2023) Photo Point 12 – SFFC Reach 7, view downstream (4/5/2023) Photo Point 13 – SFFC Reach 8, view upstream (4/5/2023) Photo Point 13 – SFFC Reach 8, view downstream (4/5/2023) Photo Point 14 – SFFC Reach 8, view upstream (4/5/2023) Photo Point 14 – SFFC Reach 8, view downstream (4/5/2023) Photo Point 15 – SFFC Reach 9, view upstream (4/5/2023) Photo Point 15 – SFFC Reach 9, view downstream (4/5/2023) Photo Point 16 – SFFC Reach 10, view upstream (4/5/2023) Photo Point 16 – SFFC Reach 10, view downstream (4/5/2023) Photo Point 17 – SFFC Reach 10, view upstream (4/5/2023) Photo Point 17 – SFFC Reach 11, view downstream (4/5/2023) Photo Point 17 – WFFC Reach 5, view upstream (4/5/2023) Photo Point 18 – SFFC Reach 11, view upstream (4/5/2023) Photo Point 18 – SFFC Reach 11, view downstream (4/5/2023) Photo Point 19 – SFFC Reach 11, view upstream (4/5/2023) Photo Point 19 – SFFC Reach 11, view downstream (4/5/2023) Photo Point 20 – Critcher Trib R1, view upstream (4/5/2023) Photo Point 20 – Critcher Trib R1, view downstream (4/5/2023) Photo Point 21 – Critcher Trib R2, view upstream (4/5/2023) Photo Point 21 – Critcher Trib R2, view downstream (4/5/2023) Photo Point 22 – Critcher Trib R3, view upstream (4/5/2023) Photo Point 22 – Critcher Trib R3, view downstream (4/5/2023) Photo Point 23 – Critcher Trib R3, view upstream (4/5/2023) Photo Point 23 – Critcher Trib R3, view downstream (4/5/2023) Photo Point 24 – Critcher Trib R3, view upstream (4/5/2023) Photo Point 24 – Critcher Trib R3, view downstream (4/5/2023) Photo Point 25 – Critcher Trib R4, view upstream (4/5/2023) Photo Point 25 – Critcher Trib R4, view downstream (4/5/2023) Photo Point 26 – Critcher Trib D, view upstream (4/5/2023) Photo Point 26 – Critcher Trib D, view downstream (4/5/2023) Photo Point 27 – Critcher Trib C, view upstream (4/5/2023) Photo Point 27 – Critcher Trib C, view downstream (4/5/2023) Photo Point 28 – Critcher Trib A, view upstream (4/5/2023) Photo Point 28 – Critcher Trib A, view downstream (4/5/2023) Photo Point 29 – Critcher Trib A, view upstream (4/5/2023) Photo Point 29 – Critcher Trib A, view downstream (4/5/2023) Photo Point 30 – Antioch Trib R1, view upstream (4/5/2023) Photo Point 30 – Antioch Trib R1, view downstream (4/5/2023) Photo Point 31 – Antioch Trib R2, view upstream (4/5/2023) Photo Point 31 – Antioch Trib R2, view downstream (4/5/2023) Photo Point 32 – Antioch Trib R3, view upstream (4/5/2023) Photo Point 32 – Antioch Trib R3, view downstream (4/5/2023) Photo Point 33 – Antioch Trib R4, view upstream (4/5/2023) Photo Point 33 – Antioch Trib R4, view downstream (4/5/2023) Photo Point 34 – Antioch Trib C, view upstream (4/5/2023) Photo Point 34 – Antioch Trib C, view downstream (4/5/2023) Photo Point 35 – Antioch Trib B1, view upstream (4/5/2023) Photo Point 35 – Antioch Trib B1, view downstream (4/5/2023) Photo Point 36 – Antioch Trib B R1, view upstream (4/5/2023) Photo Point 36 – Antioch Trib B R1, view downstream (4/5/2023) Photo Point 37 – Antioch Trib B R2, view upstream (4/5/2023) Photo Point 37 – Antioch Trib B R2, view downstream (4/5/2023) Photo Point 38 – Antioch Trib A1, view upstream (4/5/2023) Photo Point 38 – Antioch Trib A1, view downstream (4/5/2023) Photo Point 39 – Antioch Trib A R1, view upstream (4/5/2023) Photo Point 39 – Antioch Trib A R1, view downstream (4/5/2023) Photo Point 39 – Antioch Trib A1, view upstream (4/5/2023) Photo Point 40 – Antioch Trib A R2, view upstream (4/5/2023) Photo Point 40 – Antioch Trib A R2, view downstream (4/5/2023) Photo Point 41 – Chicken Trib 1A, view upstream (4/5/2023) Photo Point 41 – Chicken Trib 1A, view downstream (4/5/2023) Photo Point 42 – Chicken Trib 1A, view upstream (4/5/2023) Photo Point 42 – Chicken Trib 1A, view downstream (4/5/2023) Photo Point 43 – Chicken Trib 1 R1, view upstream (4/5/2023) Photo Point 43 – Chicken Trib 1 R1, view downstream (4/5/2023) Photo Point 44 – Chicken Trib 1 R2, view upstream (4/5/2023) Photo Point 44 – Chicken Trib 1 R2, view downstream (4/5/2023) Photo Point 45 – Chicken Trib 1 R2, view upstream (4/5/2023) Photo Point 45 – Chicken Trib 1 R2, view downstream (4/5/2023) Photo Point 46 – Robin Hill Trib B, view upstream (4/5/2023) Photo Point 46 – Robin Hill Trib B, view downstream (4/5/2023) Photo Point 47 – Robin Hill Trib A, view upstream (4/5/2023) Photo Point 47 – Robin Hill Trib A, view downstream (4/5/2023) Photo Point 48 – Robin Hill Trib R1, view upstream (4/5/2023) Photo Point 48 – Robin Hill Trib R1, view downstream (4/5/2023) Photo Point 49 – Robin Hill Trib R1, view upstream (4/5/2023) Photo Point 49 – Robin Hill Trib R1, view downstream (4/5/2023) Photo Point 50 – Robin Hill Trib R2, view upstream (4/5/2023) Photo Point 50 – Robin Hill Trib R2, view downstream (4/5/2023) Photo Point 51 – Oak Trib, view upstream (4/5/2023) Photo Point 51 – Oak Trib, view downstream (4/5/2023) Photo Point 52 – WFFC Reach 1, view upstream (4/5/2023) Photo Point 52 – WFFC Reach 1, view downstream (4/5/2023) Photo Point 53 – WFFC Reach 1, view upstream (4/5/2023) Photo Point 53 – WFFC Reach 1, view downstream (4/5/2023) Photo Point 54 – WFFC Reach 2, view upstream (4/5/2023) Photo Point 54 – WFFC Reach 2, view downstream (4/5/2023) Photo Point 55 – WFFC Reach 3, view upstream (4/5/2023) Photo Point 55 – WFFC Reach 3, view downstream (4/5/2023) Photo Point 56 – WFFC Reach 3, view upstream (4/5/2023) Photo Point 56 – WFFC Reach 3, view downstream (4/5/2023) Photo Point 57 – WFFC Reach 4, view upstream (4/5/2023) Photo Point 57 – WFFC Reach 4, view downstream (4/5/2023) Photo Point 58 – WFFC Reach 4, view upstream (4/5/2023) Photo Point 58 – WFFC Reach 4, view downstream (4/5/2023) Photo Point 59 – WFFC Reach 5, view upstream (4/5/2023) Photo Point 59 – WFFC Reach 5, view downstream (4/5/2023) Photo Point 60 – WFFC Reach 5, view upstream (4/5/2023) Photo Point 60 – WFFC Reach 5, view downstream (4/5/2023) Photo Point 61 – Magnolia R1, view upstream (4/5/2023) Photo Point 61 – Magnolia R1, view downstream (4/5/2023) Photo Point 62 – Magnolia R2, view upstream (4/5/2023) Photo Point 62 – Magnolia R2, view downstream (4/5/2023) Photo Point 63 – Shew Ridge Trib A, view upstream (4/5/2023) Photo Point 63 – Shew Ridge Trib A, view downstream (4/5/2023) Photo Point 64 – Shew Ridge Trib R1, view upstream (4/5/2023) Photo Point 64 – Shew Ridge Trib R1, view downstream (4/5/2023) Photo Point 65 – Shew Ridge Trib R2, view upstream (4/5/2023) Photo Point 65 – Shew Ridge Trib R2, view downstream (4/5/2023) Photo Point 66 – Ironwood Trib R1, view upstream (4/5/2023) Photo Point 66 – Ironwood Trib R1, view downstream (4/5/2023) Photo Point 67 – Ironwood Trib R1, view upstream (4/5/2023) Photo Point 67 – Ironwood Trib R1, view downstream (4/5/2023) Photo Point 68 – Ironwood Trib R2, view upstream (4/5/2023) Photo Point 68 – Ironwood Trib R2, view downstream (4/5/2023) Photo Point 69 – Timber Trib A, view upstream (4/5/2023) Photo Point 69 – Timber Trib A, view downstream (4/5/2023) Photo Point 70 – Timber Trib R1, view upstream (4/5/2023) Photo Point 70 – Timber Trib R1, view downstream (4/5/2023) Photo Point 71 – Timber Trib R1, view upstream (4/5/2023) Photo Point 71 – Timber Trib R1, view downstream (4/5/2023) Photo Point 72 – Timber Trib R2, view upstream (4/5/2023) Photo Point 72 – Timber Trib R2, view downstream (4/5/2023) Photo Point 73 – Timber Trib R2, view upstream (4/5/2023) Photo Point 73 – Timber Trib R2, view downstream (4/5/2023) Photo Point 74 – Critcher Trib BMP, left floodplain (4/5/2023) Photo Point 74 – Critcher Trib BMP, left floodplain (4/5/2023) Photo Point 75 – Critcher Trib BMP, right floodplain (4/5/2023) Photo Point 75 – Critcher Trib BMP, right floodplain (4/5/2023) Internal Crossing Photographs Monitoring Year 3 Culvert Photo – SF Fishing Reach 9, outlet (4/5/2023) Culvert Photo – SF Fishing Reach 9, inlet (4/5/2023) Crossing Photo – WF Fishing Reach 4, view NW (4/5/2023) Crossing Photo – WF Fishing Reach 4, view SE (4/5/2023) Culvert Photo – Chicken Trib 1 Reach 1, outlet (4/5/2023) Culvert Photo – Chicken Trib 1 Reach 1, inlet (4/5/2023) Culvert Photo – Chicken Trib 1 Reach 2, outlet (4/5/2023) Culvert Photo – Chicken Trib 1 Reach 2, inlet (4/5/2023) Culvert Photo – Antioch Trib Reach 4, outlet (4/5/2023) Culvert Photo – Antioch Trib Reach 4, inlet (4/5/2023) Culvert Photo – Antioch Trib A Reach 1, outlet (4/5/2023) Culvert Photo – Antioch Trib A Reach 1, inlet (4/5/2023) Permanent Vegetation Plot Photographs Monitoring Year 3 PERMANENT VEGETATION PLOT 1 (7/18/2023) PERMANENT VEGETATION PLOT 2 (7/18/2023) PERMANENT VEGETATION PLOT 3 (7/18/2023) PERMANENT VEGETATION PLOT 4 (7/18/2023) PERMANENT VEGETATION PLOT 5 (7/27/2023) PERMANENT VEGETATION PLOT 6 (7/18/2023) PERMANENT VEGETATION PLOT 7 (7/18/2023) PERMANENT VEGETATION PLOT 8 (7/18/2023) PERMANENT VEGETATION PLOT 9 (7/28/2023) PERMANENT VEGETATION PLOT 10 (7/18/2023) PERMANENT VEGETATION PLOT 11 (7/18/2023) PERMANENT VEGETATION PLOT 12 (7/18/2023) PERMANENT VEGETATION PLOT 13 (7/18/2023) PERMANENT VEGETATION PLOT 14 (7/18/2023) PERMANENT VEGETATION PLOT 15 (7/18/2023) Mobile Vegetation Plot Photographs Monitoring Year 3 MOBILE VEGETATION PLOT 1 (7/18/2023) MOBILE VEGETATION PLOT 2 (7/18/2023) MOBILE VEGETATION PLOT 3 (7/27/2023) MOBILE VEGETATION PLOT 4 (7/27/2023) MOBILE VEGETATION PLOT 5 (7/18/2023) MOBILE VEGETATION PLOT 6 (7/18/2023) MOBILE VEGETATION PLOT 7 (7/18/2023) MOBILE VEGETATION PLOT 8 (7/18/2023) MOBILE VEGETATION PLOT 9 (7/18/2023) MOBILE VEGETATION PLOT 10 (7/18/2023) Shaded Vegetation Transect Photograph Monitoring Year 3 SFFC Reach 9 – SHADED VEGETATION TRANSECT (7/27/2023) Areas of Concern Photographs Monitoring Year 3 MY3-3 – SFFC Reach 3, station 122+60 – Erosion around log sill (12/14/2023) MY3-4 – SFFC Reach 9, station 159+45 – Scour around culvert (12/14/2023) MY3-5 – SFFC Reach 11, station 179+20 to 179+50 – Right bank scour and erosion (12/14/2023) MY3-6 – Antioch Trib A Reach 2, station 348+00 to 349+00 – Aggradation (12/14/2023) MY3-7 – Robin Hill Trib Reach 2, station 508+75 – Missing log sill facilitating incision (12/14/2023) MY3-8 – Robin Hill Trib A, station 551+20 to 552+20 – Aggradation (12/14/2023) MY3-9 – Magnolia Reach 2, station 809+95 to 810+15 – Right bank scour (12/14/2023) Magnolia Reach 2, station 813+90 – Utility maintenance (12/14/2023) Stream Management Activity Photographs Monitoring Year 3 AB-1 – SFFC Reach 9, station 160+00 to 160+75 – After management (5/24/2021) AB-1 – SFFC Reach 9, station 160+00 to 160+75 – After management (10/21/2021) AB-2 – Magnolia Tributary Reach 2, station 810+00 to 810+50 – After management (5/24/2021) AB-2 – Magnolia Tributary Reach 2, station 810+00 to 810+50 – After management (10/21/2021) AB-3 – Ironwood Tributary Reach 1, station 1006+70 – After management (5/24/2021) AB-3 – Ironwood Tributary Reach 1, station 1006+70 – After management (10/21/2021) MY1-1 – SFFC Reach 9, station 164+00 to 164+70 – Before management (12/15/2021) MY1-1 – SFFC Reach 9, station 164+00 to 164+70 – After management (4/5/2023) MY1-2 – SFFC Reach 10, station 167+30 to 167+40 – Before management (12/15/2021) MY1-2 – SFFC Reach 10, station 167+30 to 167+40 – After management (6/14/2023) MY1-3 – SFFC Reach 11, station 178+75 – Before management (12/15/2021) MY1-3 – SFFC Reach 11, station 178+75 – After management (2/15/2022) MY1-4 – Antioch Trib Reach 4, station 313+25 – Before management (12/15/2021) MY1-4 – Antioch Trib Reach 4, station 313+25 – After management (12/14/2023) MY1-5 – Robin Hill Trib Reach 2, station 505+75 to 505+80 – Before management (12/15/2021) MY1-6 – WFFC Reach 5, station 727+55 to 727+65 – Before management (12/15/2021) MY1-6 – WFFC Reach 5, station 727+55 to 727+65 – After management (12/14/2023) MY2-1 – WFFC Reach 5, station 724+90 to 725+10 – Before management (2/8/2022) MY2-1 – WFFC Reach 5, station 724+90 to 725+10 – After management (12/14/2023) MY2-2 – WFFC Reach 5, 730+30 to 730+55 – Before management (2/8/2022) MY2-2 – WFFC Reach 5, 730+30 to 730+55 – After management (12/14/2023) MY2-3 – SFFC Reach 11, station 178+30 – Before management (4/20/2022) MY2-3 – SFFC Reach 11, station 178+30 – After management (10/3/2022) MY2-4 – SFFC Reach 3, station 121+55 to 121+70 – Before management (1/6/2023) MY2-4 – SFFC Reach 3, station 121+55 to 121+70 – After management (12/14/2023) MY2-5 – SFFC Reach 11, station 168+90 to 169+20 – Before management (8/12/2022) MY2-5 – SFFC Reach 11, station 168+90 to 169+20 – After management (1/6/2023) MY2-6 – WFFC Reach 3, station 714+00 to 714+15 – Before management (1/6/2023) MY2-6 – WFFC Reach 3, station 714+00 to 714+15 – After management (12/14/2023) MY2-7 – Robin Hill Trib Reach 1, station 503+00 – Before management (1/6/2023) MY2-7 – Robin Hill Trib Reach 1, station 503+00 – Management unsuccessful, active AOC (12/14/2023) MY2-8 – Robin Hill Trib Reach 2, station 508+75 – Before management (1/6/2023) MY2-8 – Robin Hill Trib Reach 2, station 508+75 – After management (12/14/2023) MY2-9 – Critcher Tributary Reach 3 BMP, station 209+00 – Before management (1/6/2023) MY2-9 – Critcher Tributary Reach 3 BMP, station 209+00 – After management (12/14/2023) MY3-1 – Ironwood Trib Reach 1, station 1002+00 – Before management (1/6/2023) MY3-1 – Ironwood Trib Reach 1, station 1002+00 – After management (4/6/2023) MY3-2 – Robin Hill Trib Reach 1, station 500+60 – Before management (1/6/2023) MY3-2 – Robin Hill Trib Reach 1, station 500+60 – After management (12/14/2023) APPENDIX 3. Vegetation Plot Data Table 9. Vegetation Plot Criteria Attainment Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Permanent Vegetation Plot MY3 Success Criteria Met (Y/N) Tract Mean Overall Mean 1 Y 2 Y 3 Y 4 Y 5 Y 6 Y 7 Y 8 Y 9 Y 10 Y 11 Y 12 N 13 Y 14 Y 15 Y Mobile Vegetation Plot MY3 Success Criteria Met (Y/N) 1 Y 2 Y 3 Y 4 Y 5 Y 6 N 7 Y 8 Y 9 Y 10 Y 92% 90% 93% Table 10a. Planted and Total Stem Counts Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Scientific Name Common Name Species Type PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Acer negundo Boxelder Maple Tree 1 1 1 2 2 5 2 2 2 15 8 1 1 1 2 Asimina triloba Common Pawpaw Shrub Tree 1 1 1 1 1 1 Betula nigra River Birch Tree 2 2 2 2 2 2 3 3 3 1 1 1 2 2 2 2 2 2 1 1 2 1 1 1 Carpinus caroliniana Ironwood Tree Diospyros virginiana American Persimmon Tree 1 1 1 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 1 1 1 Liriodendron tulipifera Tulip poplar Tree Morus rubra Red Mulberry Tree 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Platanus occidentalis Sycamore, Plane-tree Tree 1 1 1 5 5 6 4 4 4 2 2 67 3 3 24 3 3 3 3 3 6 3 3 44 4 4 4 Populus deltoides Cottonwood Tree Prunus serotina Black Cherry Shrub Tree 1 1 1 1 1 1 1 1 1 2 2 2 Quercus alba White Oak Tree 1 1 1 2 2 2 Quercus falcata Southern Red Oak Tree 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Quercus rubra Northern Red Oak Tree 2 2 2 1 1 1 3 3 3 1 1 1 2 2 2 1 1 1 1 1 1 Ulmus americana American Elm Tree 1 1 1 1 1 1 1 1 1 1 1 1 Ulmus rubra Slippery Elm Tree 2 2 2 1 1 1 1 1 1 1 1 1 2 2 2 11 11 11 16 16 20 15 15 15 8 8 75 12 12 46 12 12 20 9 9 14 10 10 52 10 10 10 8 8 8 9 9 9 8 8 8 7 7 8 8 8 8 8 8 9 5 5 6 7 7 7 6 6 6 445 445 445 647 647 809 607 607 607 324 324 3035 486 486 1862 486 486 809 364 364 567 405 405 2104 405 405 405 Scientific Name Common Name Species Type PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T PnoLS P-all T Acer negundo Boxelder Maple Tree 1 1 1 6 1 1 1 1 1 1 1 1 1 10 10 44 9 9 37 11 11 19 12 12 12 Asimina triloba Common Pawpaw Tree 2 2 2 4 4 4 5 5 5 10 10 10 11 11 11 Betula nigra River Birch Tree 6 6 6 1 1 1 2 2 2 2 2 2 25 25 26 26 26 26 29 29 29 30 30 30 Carpinus caroliniana Ironwood Tree Diospyros virginiana American Persimmon Shrub 1 1 1 1 1 1 3 3 3 3 3 3 2 2 2 20 20 20 20 20 21 21 21 21 21 21 21 Liriodendron tulipifera Tulip poplar Tree 16 24 Morus rubra Red Mulberry Tree 1 1 1 2 2 2 1 1 1 1 1 1 12 12 12 12 12 12 12 12 12 12 12 12 Platanus occidentalis Sycamore, Plane-tree Shrub 3 3 13 2 2 2 1 1 1 3 3 3 2 2 2 39 39 180 39 39 178 40 40 81 42 42 42 Populus deltoides Cottonwood Tree 20 Prunus serotina Black Cherry Tree 1 1 1 1 1 1 1 1 1 8 8 8 10 10 10 18 18 18 23 23 23 Quercus alba White Oak Shrub 1 1 1 2 2 2 2 2 2 8 8 8 8 8 8 9 9 9 10 10 10 Quercus falcata Southern Red Oak Tree 1 1 1 3 3 3 10 10 10 10 10 10 13 13 13 13 13 13 Quercus rubra Northern Red Oak Tree 1 1 1 12 12 12 16 16 16 22 22 22 23 23 23 Ulmus americana American Elm Tree 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9 9 9 10 10 10 11 11 11 11 11 11 Ulmus rubra Slippery Elm Tree 1 1 1 1 1 1 1 1 1 1 1 1 11 11 11 11 11 11 12 12 12 12 12 12 10 10 20 11 11 17 4 1 4 4 9 9 9 15 15 15 16 16 16 168 168 344 176 176 382 208 208 281 220 220 220 8 8 8 4 4 5 3 3 3 7 7 7 9 9 9 10 10 10 12 12 12 12 12 15 12 12 13 12 12 12 405 405 809 445 445 688 162 1 162 162 364 364 364 607 607 607 647 647 647 453 453 928 475 475 1031 561 561 758 594 594 594 Color for Density Exceeds requirements by 10% PnoLS: Number of planted stems excluding live stakes Exceeds requirements, but by less than 10% P-all: Number of planted stems including live stakes Fails to meet requirements, by less than 10% T: Total stems Fails to meet requirements by more than 10% Volunteer species included in total Current Permanent Vegetation Plot Data (MY3 2023) Permanent Plot 12 1 0.0247 Current Permanent Vegetation Plot Data (MY3 2023) Permanent Plot 9 1 0.0247 Permanent Plot 8 0.0247 Permanent Plot 14 Permanent Plot 15 MY3 (07/2023) 1 1 15 Permanent Plot 5 1 0.0247 1 0.0247 1 0.0247 1 Permanent Plot 6 Permanent Plot 7Permanent Plot 4 Permanent Plot 10 1 0.0247 1 0.0247 Stem count Permanent Plot 2Permanent Plot 1 size (ACRES) size (ares) Permanent Plot Annual Mean MY0 (02/2021)MY1 (10/2021)MY2 (08/2022)Permanent Plot 13 Permanent Plot 3 1 0.0247 1 0.0247 Stem count size (ares) Species count Species count Stems per ACRE Stems per ACRE 0.0247 Permanent Plot 11 1 0.0247size (ACRES) 1 15 0.3707 1 0.0247 0.0247 0.0247 0.37 15 0.3707 15 0.3707 1In MY3, supplemental planting occurred in the area represented by VP12. 5 new stems were recorded in VP12 in MY3. These new stems will be counted towards success criteria in following MYs. Including the new stems, the density for VP12 would be 364 stems per acre. Table 10b. Planted and Total Stem Counts Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Scientific Name Common Name Species Type Acer negundo Boxelder Maple Tree Asimina triloba Common Pawpaw Shrub Tree Betula nigra River Birch Tree Carpinus caroliniana Ironwood Tree Diospyros virginiana American Persimmon Tree Liriodendron tulipifera Tulip poplar Tree Morus rubra Red Mulberry Tree Platanus occidentalis Sycamore, Plane-tree Tree Populus deltoides Cottonwood Tree Prunus serotina Black Cherry Shrub Tree Quercus alba White Oak Tree Quercus falcata Southern Red Oak Tree Quercus rubra Northern Red Oak Tree Ulmus americana American Elm Tree Ulmus rubra Slippery Elm Tree Scientific Name Common Name Species Type Acer negundo Boxelder Maple Tree Asimina triloba Common Pawpaw Tree Betula nigra River Birch Tree Carpinus caroliniana Ironwood Tree Diospyros virginiana American Persimmon Shrub Liriodendron tulipifera Tulip poplar Tree Morus rubra Red Mulberry Tree Platanus occidentalis Sycamore, Plane-tree Shrub Populus deltoides Cottonwood Tree Prunus serotina Black Cherry Tree Quercus alba White Oak Shrub Quercus falcata Southern Red Oak Tree Quercus rubra Northern Red Oak Tree Ulmus americana American Elm Tree Ulmus rubra Slippery Elm Tree Color for Density Exceeds requirements by 10% PnoLS: Number of planted stems excluding live stakes Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total 611 Mobile Plot Annual Mean 6 11 19 8 8 151 10 0.2471 13 11 1 6 20 5 0.2471 328 10 13 3 14 3 1 1 4 MY2 (08/2022) PnoLS 2 2 PnoLS 12 7 24 2 1 1 MY0 (02/2021) Mobile Plot 6 Mobile Plot 7 2 1 14 1 3 PnoLS 4 4 2 1 7 3 1 7 Mobile Plot 1 Mobile Plot 2 Current Mobile Vegetation Plot Data (MY3 2023) PnoLSPnoLSPnoLS 12 Mobile Plot 3 Mobile Plot 4 3 7 PnoLS PnoLS Mobile Plot 5 Mobile Plot 9 Mobile Plot 10 MY1 (10/2021) 5 Mobile Plot 8 1 1 1 0.0247 0.0247 0.0247 PnoLS PnoLS 6 4 Stem count size (ares)1 1 18 9 81139 10 89 10 3 Species count 8 6 11 size (ACRES)0.0247 0.0247 0.2471 171 6 4 102 3 2 1 3 2 1 3 1 1 3 1 1 1 3 3 1 0.0247 0.0247 PnoLS PnoLS 2 Species count Stems per ACRE 5 9 1 1 1 MY3 (08/2023) PnoLS 1 Stem count size (ares) 2 Stems per ACRE 4 1 1 1 1 1 728 364 1 5 size (ACRES)0.0247 0.0247 4 6 3 1 1 4 1 1 1 1 20 324 769 364 283 364 567 1 28 2 10 27 7 3 1223 17 7 1 Current Mobile Vegetation Plot Data (MY3 2023) 1 29 7 1,174 17 8 19 9 7 9 7 688 PnoLS 1 11 17 2 3 10 8 12 2 2 4 0.0247 4 5 19 13 563 5 360 2 0.2471 13 Table 10c. Planted and Total Stem Counts Table 10b. Planted and Total Stem Counts Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Scientific Name Common Name Species Type Acer negundo Boxelder Maple Tree Asimina triloba Common Pawpaw Shrub Tree Betula nigra River Birch Tree Carpinus caroliniana Ironwood Tree Diospyros virginiana American Persimmon Tree Liriodendron tulipifera Tulip poplar Tree Morus rubra Red Mulberry Tree Platanus occidentalis Sycamore, Plane-tree Tree Populus deltoides Cottonwood Tree Prunus serotina Black Cherry Shrub Tree Quercus alba White Oak Tree Quercus falcata Southern Red Oak Tree Quercus rubra Northern Red Oak Tree Ulmus americana American Elm Tree Ulmus rubra Slippery Elm Tree Color for Density Exceeds requirements by 10% PnoLS: Number of planted stems excluding live stakes Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% Volunteer species included in total 58 0 13 14 PnoLS 0 32 14 67 0 12 11 0 2 38 7 48 20 12 16 22 PnoLS MY0 (02/2021) 16 24 42 19 20 MY3 (08/2023) MY2 (08/2022) MY1 (10/2021) PnoLS 14 3 24 18 54 38 2 15 Stem count 22 8 24 30 16 26 0 62 13 1 25 22 11 69 0 30 Stems per ACRE 371 25 301 25 307 497 429 487 601 25 265 Overall Site Annual Mean 0.6178 15 25 0.6178 15 0.6178 15 0.6178 15 0 40 11 20 11 22 24 37 17 28 size (ares) size (ACRES) Species count PnoLS Table 10d. Shaded Vegetation Transect Stem Counts Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Scientific Name Common Name Species Type MY1 ( 12/2021)MY2 ( 10/2022)MY3 ( 10/2023) Total Total Total Acer negundo Boxelder Maple Tree 1 1 1 Asimina triloba Common Pawpaw Shrub Tree Betula nigra River Birch Tree 1 1 11 Carpinus caroliniana Ironwood Tree 6 Diospyros virginiana American Persimmon Tree 2 1 1 Juglans nigra Black Walnut Tree Liriodendron tulipifera Tulip poplar Tree 2 2 Morus rubra Red Mulberry Tree 3 2 2 Platanus occidentalis Sycamore, Plane-tree Tree 1 1 20 Prunus serotina Black Cherry Shrub Tree 1 1 Quercus alba White Oak Tree 1 1 1 Quercus falcata Southern Red Oak Tree Quercus rubra Northern Red Oak Tree 1 Ulmus americana American Elm Tree Ulmus rubra Slippery Elm Tree 1 1 13 11 43 1 1 1 0.0247 0.0247 0.0247 9 9 8 526 445 1740 Total: Total stems including planted and volunteer stems Shaded Vegetation Transect Species count Stems per ACRE Stem count size (ares) size (ACRES) APPENDIX 4. Morphological Summary Data and Plots Table 11a. Morphology and Hydraulic Summary (Dimensional Parameters - Cross-Section) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1025.34 1025.11 1025.12 1025.36 1025.22 1025.44 1025.38 1025.58 1023.15 1022.81 1022.75 1022.75 Low Bank Elevation (ft) 1025.34 1025.11 1025.12 1025.36 1025.22 1025.25 1025.19 1025.48 1023.15 1022.74 1022.75 1022.67 Bankfull Width (ft)30.0 33.5 35.2 31.2 19.4 18.0 18.8 19.6 19.1 22.7 22.4 22.3 Floodprone Width (ft)2 --- --- --- --- 96 96 95 96 93 86 70 86 Bankfull Mean Depth (ft)2.3 1.2 1.0 1.0 1.3 1.3 1.2 1.2 1.4 1.1 1.2 1.1 Bankfull Max Depth (ft)5.1 4.0 3.7 2.7 2.3 2.2 2.2 2.5 2.3 2.1 2.2 2.1 Bankfull Cross-Sectional Area (ft 2)68.5 41.5 36.5 29.7 26.2 22.6 22.4 24.2 27.0 25.4 27.0 25.3 Bankfull Width/Depth Ratio 13.2 27.0 33.9 32.7 14.4 14.2 15.8 15.8 13.5 20.3 18.5 19.6 Bankfull Entrenchment Ratio3 --- --- --- --- 4.9 5.3 5.1 4.9 4.9 3.8 3.1 3.9 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 0.9 0.9 1.0 1.0 1.0 1.0 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1021.91 1021.94 1021.95 1021.92 1008.13 1008.09 1008.07 1008.31 1007.83 1007.92 1007.84 1008.13 Low Bank Elevation (ft) 1021.91 1021.94 1021.95 1021.92 1008.13 1008.14 1008.13 1008.11 1007.83 1007.92 1007.84 1008.13 Bankfull Width (ft)27.9 28.3 27.9 29.8 28.0 28.5 29.0 25.7 41.0 41.9 41.1 49.4 Floodprone Width (ft)2 --- --- --- --- 118 118 117 118 --- --- --- --- Bankfull Mean Depth (ft)2.1 1.9 1.8 2.2 1.4 1.5 1.4 1.4 2.4 2.0 1.9 1.6 Bankfull Max Depth (ft)4.7 4.4 4.5 4.9 2.5 2.7 2.7 2.8 5.2 4.8 4.7 4.5 Bankfull Cross-Sectional Area (ft 2)59.2 52.7 50.6 64.9 40.4 41.8 42.0 35.1 98.6 83.4 77.0 79.1 Bankfull Width/Depth Ratio 13.1 15.2 15.3 13.6 19.4 19.5 20.0 18.8 17.1 21.0 21.9 30.8 Bankfull Entrenchment Ratio3 --- --- --- --- 4.2 4.1 4.0 4.6 --- --- --- --- Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 1.0 1.0 0.9 --- --- --- --- Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1007.37 1007.46 1007.48 1007.56 1003.42 1003.39 1003.38 1003.42 1000.42 1000.54 1000.51 1000.57 Low Bank Elevation (ft) 1007.37 1007.34 1007.31 1007.33 1003.42 1003.41 1003.42 1003.42 1000.42 1000.42 1000.44 1000.53 Bankfull Width (ft)24.1 23.4 23.3 24.1 32.3 31.4 31.6 31.4 31.8 30.6 31.9 31.6 Floodprone Width (ft)2 118 118 118 118 109 108 108 109 98 98 98 98 Bankfull Mean Depth (ft)1.5 1.4 1.4 1.3 1.6 1.7 1.7 1.6 1.8 1.7 1.7 1.8 Bankfull Max Depth (ft)2.3 2.3 2.2 2.2 2.5 2.7 2.7 2.5 2.8 2.7 2.8 2.7 Bankfull Cross-Sectional Area (ft 2)37.0 33.8 33.0 31.3 51.8 52.2 53.0 51.7 57.1 53.2 54.8 55.9 Bankfull Width/Depth Ratio 15.6 16.2 16.4 18.5 20.1 18.8 18.8 19.1 17.7 17.7 18.6 17.9 Bankfull Entrenchment Ratio3 4.9 5.0 5.1 4.9 3.4 3.4 3.4 3.5 3.1 3.2 3.1 3.1 Bankfull Bank Height Ratio 1 1.0 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 999.88 1000.02 1000.00 1000.19 997.87 997.99 997.98 997.98 991.83 991.43 991.45 991.50 Low Bank Elevation (ft) 999.88 1000.02 1000.00 1000.19 997.87 997.92 997.91 998.00 991.83 991.31 991.33 991.26 Bankfull Width (ft)33.9 35.8 35.0 36.2 27.6 27.5 25.3 29.6 27.1 30.4 30.4 28.9 Floodprone Width (ft)2 --- --- --- --- 98 97 93 98 102 90 90 90 Bankfull Mean Depth (ft)2.9 2.9 3.0 3.0 1.5 1.4 1.5 1.4 2.0 1.7 1.7 1.6 Bankfull Max Depth (ft)5.0 5.8 5.7 5.6 2.6 2.5 2.6 2.4 3.3 3.3 3.2 3.0 Bankfull Cross-Sectional Area (ft 2)99.5 103.7 105.5 109.3 41.0 38.9 37.0 41.6 54.4 50.7 51.3 47.1 Bankfull Width/Depth Ratio 11.5 12.4 11.6 12.0 18.5 19.4 17.3 21.1 13.5 18.2 18.0 17.8 Bankfull Entrenchment Ratio3 --- --- --- --- 3.5 3.5 3.7 3.3 3.7 3.0 3.0 3.1 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 2 Floodprone width is calculated from the width of cross-section but valley width may extend further. 3 Entrenchment ratio for the baseline/monitoring parameters is based on the width of the cross-section, in lieu of assuming the width across the floodplain. SF Fishing Creek Reach 2 Cross-Section 2, Riffle SF Fishing Creek Reach 3 Cross-Section 4, Pool SF Fishing Creek Reach 7 Cross-Section 10, Pool SF Fishing Creek Reach 8 Cross-Section 11, Riffle SF Fishing Creek Reach 10 Cross-Section 12, Riffle SF Fishing Creek Reach 7 Cross-Section 9, Riffle SF Fishing Creek Reach 5 Cross-Section 6, Pool SF Fishing Creek Reach 3 Cross-Section 3, Riffle SF Fishing Creek Reach 5 Cross-Section 7, Riffle 1 Bankfull elevation for riffles are based on the MY0 cross-sectional area. MY1-MY7 Bank Height Ratio is calculated based on the As-built (MY0) cross-sectional area as described in the Standard Measurement of the BHR Monitoring Parameter document provided by the NCIRT and NCDMS (9/2018). The remainder of the cross-section dimension parameters were calculated based on the current low bank height. SF Fishing Creek Reach 6 Cross-Section 8, Riffle SF Fishing Creek Reach 5 Cross-Section 5, Riffle SF Fishing Creek Reach 2 Cross-Section 1, Pool Table 11b. Morphology and Hydraulic Summary (Dimensional Parameters - Cross-Section) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 990.12 989.68 989.78 990.12 990.07 990.18 990.14 990.10 1070.40 1070.42 1070.50 1070.42 Low Bank Elevation (ft) 990.12 989.68 989.78 990.12 990.07 990.26 990.27 990.24 1070.40 1070.40 1070.47 1070.41 Bankfull Width (ft)49.4 37.8 39.0 39.3 33.9 34.7 35.2 35.8 11.0 11.0 10.7 10.7 Floodprone Width (ft)2 --- --- --- --- 117 116 116 117 46 47 48 47 Bankfull Mean Depth (ft)3.5 3.3 3.1 4.1 2.3 2.3 2.4 2.3 0.7 0.7 0.7 0.7 Bankfull Max Depth (ft)7.2 5.1 5.0 5.9 4.0 4.3 4.2 4.1 1.4 1.5 1.6 1.4 Bankfull Cross-Sectional Area (ft 2)174.3 123.9 122.0 161.5 78.8 81.3 83.3 83.9 8.1 7.9 7.9 8.0 Bankfull Width/Depth Ratio 14.0 11.6 12.4 9.6 14.6 14.8 14.9 15.3 14.9 15.4 14.6 14.4 Bankfull Entrenchment Ratio3 --- --- --- --- 3.5 3.4 3.3 3.3 4.2 4.3 4.4 4.3 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1059.11 1059.20 1059.11 1059.17 1054.58 1054.57 1054.65 1054.53 1054.02 1054.07 1054.06 1054.02 Low Bank Elevation (ft) 1059.11 1059.02 1059.01 1058.96 1054.58 1054.57 1054.65 1054.53 1054.02 1054.00 1054.01 1053.97 Bankfull Width (ft)8.9 7.8 9.7 8.7 9.4 8.4 8.9 9.8 6.8 5.6 7.0 6.7 Floodprone Width (ft)2 53 46 52 47 --- --- --- --- 33 31 31 30 Bankfull Mean Depth (ft)0.6 0.5 0.5 0.4 0.6 1.1 1.0 1.0 0.4 0.4 0.4 0.4 Bankfull Max Depth (ft)1.2 0.9 1.1 0.9 1.4 2.5 2.5 2.7 0.7 0.7 0.8 0.7 Bankfull Cross-Sectional Area (ft 2)5.6 4.0 4.5 3.7 6.1 8.9 9.3 9.7 2.8 2.4 2.5 2.5 Bankfull Width/Depth Ratio 14.1 15.3 20.8 20.6 14.7 8.0 8.6 9.8 16.6 13.1 19.7 18.4 Bankfull Entrenchment Ratio3 6.0 5.9 5.3 5.3 --- ---------4.8 5.6 4.4 4.4 Bankfull Bank Height Ratio 1 1.0 0.8 0.9 0.8 --- --- --- --- 1.0 1.0 0.9 0.9 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1048.93 1048.93 1049.00 1049.05 1026.81 1026.93 1027.01 1026.99 1067.04 1067.13 1067.17 1067.18 Low Bank Elevation (ft) 1048.93 1048.91 1048.94 1049.04 1026.81 1026.81 1026.80 1026.79 1067.04 1067.18 1067.23 1067.09 Bankfull Width (ft)8.7 9.1 8.0 9.0 11.7 11.5 11.7 11.6 10.4 11.0 11.9 11.0 Floodprone Width (ft)2 56 55 49 56 60 59 59 60 28 24 20 32 Bankfull Mean Depth (ft)0.5 0.5 0.5 0.5 0.8 0.6 0.5 0.6 0.6 0.6 0.6 0.5 Bankfull Max Depth (ft)1.0 0.9 0.9 1.0 1.3 1.2 1.0 1.2 1.1 1.2 1.2 1.2 Bankfull Cross-Sectional Area (ft 2)4.4 4.2 3.9 4.3 8.9 7.4 6.2 6.5 6.4 6.9 7.1 5.4 Bankfull Width/Depth Ratio 17.0 19.4 16.6 19.1 15.3 17.9 22.0 20.8 16.8 17.4 20.0 22.2 Bankfull Entrenchment Ratio3 6.5 6.0 6.1 6.2 5.2 5.1 5.1 5.2 2.7 2.2 1.7 2.9 Bankfull Bank Height Ratio 1 1.0 1.0 0.9 1.0 1.0 0.8 0.8 0.9 1.0 1.0 1.0 0.9 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1056.16 1056.25 1056.22 1056.35 1035.91 1036.01 1036.04 1036.16 1035.42 1035.66 1035.69 1035.78 Low Bank Elevation (ft) 1056.16 1056.19 1056.17 1056.34 1035.91 1036.02 1035.99 1035.95 1035.42 1035.66 1035.69 1035.78 Bankfull Width (ft)5.5 5.8 5.6 6.9 9.4 9.8 9.6 7.6 11.1 11.9 12.5 11.5 Floodprone Width (ft)2 38 31 34 35 57 57 56 57 --- --- --- --- Bankfull Mean Depth (ft)0.3 0.2 0.2 0.2 0.7 0.7 0.6 0.6 1.2 0.6 0.6 0.6 Bankfull Max Depth (ft)0.8 0.5 0.6 0.5 1.3 1.4 1.3 1.4 2.4 1.3 1.3 1.4 Bankfull Cross-Sectional Area (ft 2)1.7 1.3 1.4 1.6 6.5 6.5 6.0 4.8 12.9 7.7 7.4 7.3 Bankfull Width/Depth Ratio 18.4 25.3 23.4 29.7 13.5 14.8 15.2 12.0 9.6 18.4 21.1 18.2 Bankfull Entrenchment Ratio3 6.8 5.2 5.9 5.0 6.1 5.8 5.9 7.5 --- --- --- --- Bankfull Bank Height Ratio 1 1.0 0.8 0.9 1.0 1.0 1.0 1.0 0.9 --- --- --- --- 2 Floodprone width is calculated from the width of cross-section but valley width may extend further. 3 Entrenchment ratio for the baseline/monitoring parameters is based on the width of the cross-section, in lieu of assuming the width across the floodplain. SF Fishing Creek Reach 11 Cross-Section 13, Pool SF Fishing Creek Reach 11 Cross-Section 14, Riffle Critcher Tributary Reach 4 Cross-Section 20, Riffle Critcher Tributary Reach 1 Cross-Section 15, Riffle Critcher Tributary Reach 2 Cross-Section 16, Riffle Critcher Tributary Reach 3 Cross-Section 17, Pool 1 Bankfull elevation for riffles are based on the MY0 cross-sectional area. MY1-MY7 Bank Height Ratio is calculated based on the As-built (MY0) cross-sectional area as described in the Standard Measurement of the BHR Monitoring Parameter document provided by the NCIRT and NCDMS (9/2018). The remainder of the cross-section dimension parameters were calculated based on the current low bank height. Critcher Tributary D Cross-Section 21, Riffle Critcher Tributary C Cross-Section 22, Riffle Critcher Tributary A Cross-Section 23, Riffle Critcher Tributary A Cross-Section 24, Pool Critcher Tributary Reach 3 Cross-Section 18, Riffle Critcher Tributary Reach 3 Cross-Section 19, Riffle Table 11c. Morphology and Hydraulic Summary (Dimensional Parameters - Cross-Section) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1037.06 1037.16 1037.12 1037.28 1025.72 1025.91 1025.74 1025.89 1014.35 1014.42 1014.42 1014.40 Low Bank Elevation (ft) 1037.06 1037.09 1037.09 1037.08 1025.72 1025.57 1025.58 1025.60 1014.35 1014.34 1014.33 1014.39 Bankfull Width (ft)6.4 6.2 6.4 6.4 7.6 7.4 8.3 7.1 10.7 10.4 10.5 10.8 Floodprone Width (ft)2 26 23 24 22 48 46 44 41 63 63 62 66 Bankfull Mean Depth (ft)0.5 0.5 0.5 0.3 1.1 0.7 0.8 0.8 0.8 0.7 0.7 0.8 Bankfull Max Depth (ft)1.1 0.8 1.0 0.8 1.8 1.3 1.4 1.3 1.5 1.4 1.4 1.6 Bankfull Cross-Sectional Area (ft 2)3.4 2.9 3.1 2.0 8.1 5.3 6.7 5.8 8.6 7.7 7.6 8.6 Bankfull Width/Depth Ratio 12.0 13.2 12.9 19.8 7.1 10.3 10.4 8.7 13.2 14.1 14.6 13.6 Bankfull Entrenchment Ratio3 4.0 3.6 3.8 3.4 6.4 6.2 5.2 5.7 5.9 6.0 5.9 6.1 Bankfull Bank Height Ratio 1 1.0 0.9 1.0 0.8 1.0 0.8 0.9 0.8 1.0 0.9 0.9 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1031.15 1031.12 1031.17 1031.24 1016.57 1016.56 1016.56 1016.58 1009.67 1009.78 1009.78 1010.01 Low Bank Elevation (ft) 1031.15 1031.07 1031.10 1031.12 1016.57 1016.61 1016.61 1016.61 1009.67 1009.66 1009.70 1009.76 Bankfull Width (ft)7.9 8.1 8.9 8.8 8.2 8.7 8.6 8.6 16.6 15.9 16.9 15.4 Floodprone Width (ft)2 40 38 38 39 34 35 35 35 98 98 97 98 Bankfull Mean Depth (ft)0.6 0.5 0.5 0.4 0.5 0.5 0.6 0.5 1.2 1.1 1.1 1.0 Bankfull Max Depth (ft)1.0 0.9 0.8 0.9 1.0 1.1 1.1 1.1 1.9 1.9 2.0 2.1 Bankfull Cross-Sectional Area (ft 2)4.7 4.2 4.1 3.6 4.3 4.7 4.7 4.5 19.7 17.8 18.4 15.7 Bankfull Width/Depth Ratio 13.1 15.4 19.3 21.3 15.8 16.1 15.5 16.6 14.1 14.1 15.5 15.1 Bankfull Entrenchment Ratio3 5.1 4.8 4.3 4.4 4.1 4.0 4.1 4.0 5.9 6.2 5.7 6.3 Bankfull Bank Height Ratio 1 1.0 0.9 0.9 0.9 1.0 1.0 1.0 1.0 1.0 0.9 1.0 0.9 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1009.28 1009.20 1009.25 1009.23 1006.37 1006.38 1006.41 1006.46 1024.47 1024.56 1024.51 1024.62 Low Bank Elevation (ft) 1009.28 1009.20 1009.25 1009.23 1006.37 1006.45 1006.45 1006.37 1024.47 1024.52 1024.55 1024.61 Bankfull Width (ft)16.7 15.6 15.7 15.5 16.2 16.6 17.0 16.3 4.6 4.7 4.9 5.2 Floodprone Width (ft)2 --- --- --- --- 54 54 55 54 15 15 18 16 Bankfull Mean Depth (ft)1.6 1.4 1.4 1.3 1.0 1.1 1.0 0.9 0.5 0.4 0.5 0.4 Bankfull Max Depth (ft)3.0 2.8 2.6 3.1 1.7 1.8 1.8 1.7 0.8 0.7 0.8 0.7 Bankfull Cross-Sectional Area (ft 2)27.0 22.5 22.5 19.5 16.9 17.9 17.6 15.4 2.3 2.1 2.4 2.2 Bankfull Width/Depth Ratio 10.3 10.8 10.9 12.2 15.5 15.4 16.4 17.3 9.3 10.8 9.8 12.2 Bankfull Entrenchment Ratio3 --- --- --- --- 3.4 3.3 3.2 3.3 3.3 3.2 3.6 3.0 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 1.0 1.0 1.0 1.0 0.9 1.1 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1023.92 1023.77 1023.64 1023.88 1000.90 1001.09 1001.19 1001.24 1034.71 1034.74 1034.73 1034.75 Low Bank Elevation (ft) 1023.92 1023.77 1023.64 1023.88 1000.90 1000.88 1000.89 1000.91 1034.71 1034.67 1034.69 1034.79 Bankfull Width (ft)6.1 7.0 6.7 2.3 9.4 8.5 8.8 8.3 3.7 3.5 3.9 4.3 Floodprone Width (ft)2 --- --- --- --- 73 73 73 73 11 9 9 12 Bankfull Mean Depth (ft)0.9 0.4 0.4 0.1 0.8 0.6 0.5 0.5 0.5 0.4 0.4 0.4 Bankfull Max Depth (ft)1.7 1.0 0.8 0.2 1.3 1.1 0.9 0.9 0.8 0.7 0.7 0.9 Bankfull Cross-Sectional Area (ft 2)5.5 3.0 2.7 0.3 7.4 5.5 4.6 4.5 1.7 1.5 1.5 1.9 Bankfull Width/Depth Ratio 6.8 16.0 16.2 15.6 11.8 13.1 16.9 15.4 7.9 8.2 10.1 9.7 Bankfull Entrenchment Ratio3 --- --- --- --- 7.8 8.6 8.3 8.8 2.9 2.6 2.4 2.7 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 0.9 0.8 0.7 1.0 0.9 0.9 1.0 2 Floodprone width is calculated from the width of cross-section but valley width may extend further. 3 Entrenchment ratio for the baseline/monitoring parameters is based on the width of the cross-section, in lieu of assuming the width across the floodplain. Antioch Tributary Reach 4 Cross-Section 27, Riffle Antioch Tributary B Cross-Section 28, Riffle Antioch Tributary A Cross-Section 29, Riffle Antioch Tributary Reach 2 Cross-Section 25, Riffle Antioch Tributary Reach 3 Cross-Section 26, Riffle Chicken Tributary 1 Reach 2 Cross-Section 30, Riffle 1 Bankfull elevation for riffles are based on the MY0 cross-sectional area. MY1-MY7 Bank Height Ratio is calculated based on the As-built (MY0) cross-sectional area as described in the Standard Measurement of the BHR Monitoring Parameter document provided by the NCIRT and NCDMS (9/2018). The remainder of the cross-section dimension parameters were calculated based on the current low bank height. Chicken Tributary 1 Reach 2 Cross-Section 31, Pool Chicken Tributary 1 Reach 2 Cross-Section 32, Riffle Robin Hill Tributary Reach 1 Cross-Section 33, Riffle Robin Hill Tributary Reach 1 Cross-Section 34, Pool Robin Hill Tributary Reach 2 Cross-Section 35, Riffle Robin Hill Tributary B Cross-Section 36, Riffle Table 11d. Morphology and Hydraulic Summary (Dimensional Parameters - Cross-Section) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1008.52 1008.61 1008.57 1008.58 1003.12 1003.19 1003.18 1003.23 1004.58 1004.68 1004.68 1004.79 Low Bank Elevation (ft) 1008.52 1008.52 1008.54 1008.56 1003.12 1003.13 1003.12 1003.12 1004.58 1004.57 1004.47 1004.69 Bankfull Width (ft)5.1 5.2 5.8 6.1 8.4 8.4 8.0 7.7 28.1 27.4 26.7 28.9 Floodprone Width (ft)2 40 40 29 41 26 30 29 34 83 82 82 83 Bankfull Mean Depth (ft)0.4 0.3 0.3 0.3 0.6 0.5 0.6 0.5 2.2 2.1 2.1 2.0 Bankfull Max Depth (ft)0.7 0.6 0.7 0.8 1.0 1.0 1.0 1.1 3.8 3.8 3.7 3.9 Bankfull Cross-Sectional Area (ft 2)2.2 1.7 2.0 2.1 5.0 4.4 4.5 4.1 61.3 58.1 55.3 58.4 Bankfull Width/Depth Ratio 11.6 15.6 16.8 17.8 14.3 15.9 14.2 14.6 12.8 13.0 12.8 14.2 Bankfull Entrenchment Ratio3 7.9 7.6 5.0 6.7 3.0 3.5 3.6 4.4 2.9 3.0 3.1 2.9 Bankfull Bank Height Ratio 1 1.0 0.9 1.0 1.0 1.0 0.9 0.9 0.9 1.0 1.0 0.9 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1003.67 1003.85 1004.12 1004.22 1002.81 1002.97 1002.91 1002.84 1000.07 1000.15 1000.12 1000.04 Low Bank Elevation (ft) 1003.67 1003.85 1004.12 1004.22 1002.81 1002.82 1002.80 1002.75 1000.07 1000.14 1000.05 1000.05 Bankfull Width (ft)30.0 29.7 34.8 35.4 26.7 26.5 25.8 26.4 26.9 27.1 26.3 26.1 Floodprone Width (ft)2 --- --- --- --- 93 93 80 93 81 82 81 81 Bankfull Mean Depth (ft)2.5 2.7 2.3 2.0 2.2 2.1 2.2 2.2 2.3 2.2 2.2 2.3 Bankfull Max Depth (ft)5.1 5.5 4.3 4.2 3.8 3.9 4.0 3.9 3.8 3.9 3.8 4.1 Bankfull Cross-Sectional Area (ft 2)75.1 80.4 80.3 71.8 59.7 55.8 57.0 57.4 60.8 60.7 59.0 61.0 Bankfull Width/Depth Ratio 12.0 11.0 15.0 17.5 11.9 12.6 11.7 12.2 11.9 12.1 11.7 11.2 Bankfull Entrenchment Ratio3 --- --- --- --- 3.5 3.5 3.1 3.5 3.0 3.0 3.1 3.1 Bankfull Bank Height Ratio 1 --- --- --- --- 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 996.05 996.00 996.05 995.93 992.88 993.02 992.96 993.02 1003.72 1004.04 1004.02 1004.09 Low Bank Elevation (ft) 996.05 995.94 996.03 995.92 992.88 992.98 992.98 992.95 1003.72 1003.96 1004.03 1003.96 Bankfull Width (ft)25.5 24.6 25.5 24.8 33.8 33.8 34.5 34.1 9.3 8.1 8.3 8.7 Floodprone Width (ft)2 77 74 77 77 88 85 84 88 56 55 56 56 Bankfull Mean Depth (ft)1.9 1.9 1.9 1.9 2.3 2.3 2.3 2.2 0.5 0.5 0.6 0.5 Bankfull Max Depth (ft)3.0 3.0 3.1 3.2 3.8 3.4 3.5 3.5 0.9 1.0 1.2 1.0 Bankfull Cross-Sectional Area (ft 2)48.0 46.3 47.6 47.7 77.8 76.7 78.6 75.4 5.1 4.4 5.2 3.9 Bankfull Width/Depth Ratio 13.5 13.1 13.7 12.9 14.7 14.9 15.2 15.4 17.1 14.8 13.4 19.2 Bankfull Entrenchment Ratio3 3.0 3.0 3.0 3.1 2.6 2.5 2.4 2.6 6.0 6.8 6.7 6.4 Bankfull Bank Height Ratio 1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 0.9 1.0 0.9 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1003.45 1003.60 1003.32 1003.48 Low Bank Elevation (ft) 1003.45 1003.60 1003.32 1003.48 Bankfull Width (ft)10.9 11.1 9.1 10.4 Floodprone Width (ft)2 --- --- --- --- Bankfull Mean Depth (ft)1.2 0.7 0.5 0.5 Bankfull Max Depth (ft)2.1 1.3 1.0 1.1 Bankfull Cross-Sectional Area (ft 2)12.7 7.3 4.4 5.2 Bankfull Width/Depth Ratio 9.3 16.8 18.4 20.7 Bankfull Entrenchment Ratio3 --- --- --- --- Bankfull Bank Height Ratio 1 --- --- --- --- 2 Floodprone width is calculated from the width of cross-section but valley width may extend further. 3 Entrenchment ratio for the baseline/monitoring parameters is based on the width of the cross-section, in lieu of assuming the width across the floodplain. WF Fishing Creek Reach 1 Cross-Section 39, Riffle WF Fishing Creek Reach 1 Cross-Section 40, Pool WF Fishing Creek Reach 2 Cross-Section 41, Riffle Robin Hill Tributary A Cross-Section 37, Rifffle Oak Tributary Cross-Section 38, Riffle WF Fishing Creek Reach 3 Cross-Section 42, Riffle 1 Bankfull elevation for riffles are based on the MY0 cross-sectional area. MY1-MY7 Bank Height Ratio is calculated based on the As-built (MY0) cross-sectional area as described in the Standard Measurement of the BHR Monitoring Parameter document provided by the NCIRT and NCDMS (9/2018). The remainder of the cross-section dimension parameters were calculated based on the current low bank height. WF Fishing Creek Reach 4 Cross-Section 43, Riffle WF Fishing Creek Reach 5 Cross-Section 44, Riffle Shew Ridge Trib Reach 2 Cross-Section 47, Riffle Shew Ridge Trib Reach 2 Cross-Section 48, Pool Table 11e. Morphology and Hydraulic Summary (Dimensional Parameters - Cross-Section) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Dimension and Substrate Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Base MY1 MY2 MY3 MY4 MY5 MY6 MY7 Bankfull Elevation (ft)1 1029.24 1029.25 1029.27 1029.39 1005.88 1005.82 1005.85 1005.78 1004.79 1004.77 1004.83 1004.70 Low Bank Elevation (ft) 1029.24 1029.19 1029.28 1029.19 1005.88 1005.82 1005.85 1005.78 1004.79 1004.80 1004.83 1004.80 Bankfull Width (ft)7.9 7.9 8.4 6.4 12.1 10.8 11.3 11.5 8.3 8.4 8.8 8.6 Floodprone Width (ft)2 23 22 25 21 --- --- --- --- 42 43 48 46 Bankfull Mean Depth (ft)0.5 0.5 0.5 0.5 1.1 1.0 0.9 1.0 0.6 0.7 0.7 0.7 Bankfull Max Depth (ft)1.0 1.0 1.1 0.9 2.1 2.0 2.0 2.0 1.0 1.2 1.4 1.4 Bankfull Cross-Sectional Area (ft 2)4.3 3.8 4.3 3.0 13.5 11.1 10.7 11.3 5.3 5.5 6.5 6.1 Bankfull Width/Depth Ratio 14.7 16.8 16.1 13.3 10.9 10.6 12.0 11.8 13.2 12.6 12.0 12.1 Bankfull Entrenchment Ratio3 2.9 2.8 2.9 3.3 --- --- --- --- 5.0 5.2 5.4 5.3 Bankfull Bank Height Ratio 1 1.0 0.9 1.0 0.8 --- --- --- --- 1.0 1.0 0.9 1.1 2 Floodprone width is calculated from the width of cross-section but valley width may extend further. 3 Entrenchment ratio for the baseline/monitoring parameters is based on the width of the cross-section, in lieu of assuming the width across the floodplain. 1 Bankfull elevation for riffles are based on the MY0 cross-sectional area. MY1-MY7 Bank Height Ratio is calculated based on the As-built (MY0) cross-sectional area as described in the Standard Measurement of the BHR Monitoring Parameter document provided by the NCIRT and NCDMS (9/2018). The remainder of the cross-section dimension parameters were calculated based on the current low bank height. Timber Trib Reach 2 Cross-Section 51, RiffleIronwood Trib Reach 1 Cross-Section 49, Riffle Timber Trib Reach 2 Cross-Section 50, Pool Bankfull Dimensions 29.7 x-section area (ft.sq.) 31.2 width (ft) 1.0 mean depth (ft) 2.7 max depth (ft) 32.5 wetted perimeter (ft) 0.9 hydraulic radius (ft) 32.7 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 1-South Fork Fishing Creek Reach 2 Monitoring Year 3 - 2023 View Downstream 1020 1022 1024 1026 1028 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 112+93 Pool MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 24.2 x-section area (ft.sq.) 19.6 width (ft) 1.2 mean depth (ft) 2.5 max depth (ft) 20.5 wetted perimeter (ft) 1.2 hydraulic radius (ft) 15.8 width-depth ratio 95.6 W flood prone area (ft) 4.9 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 2-South Fork Fishing Creek Reach 2 Monitoring Year 3 - 2023 View Downstream 1022 1023 1024 1025 1026 1027 1028 1029 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 113+45 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 25.3 x-section area (ft.sq.) 22.3 width (ft) 1.1 mean depth (ft) 2.1 max depth (ft) 22.9 wetted perimeter (ft) 1.1 hydraulic radius (ft) 19.6 width-depth ratio 85.8 W flood prone area (ft) 3.9 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 3-South Fork Fishing Creek Reach 3 Monitoring Year 3 - 2023 View Downstream 1020 1021 1022 1023 1024 1025 1026 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 118+98 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 64.9 x-section area (ft.sq.) 29.8 width (ft) 2.2 mean depth (ft) 4.9 max depth (ft) 33.7 wetted perimeter (ft) 1.9 hydraulic radius (ft) 13.6 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 4-South Fork Fishing Creek Reach 3 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1016 1018 1020 1022 1024 0 10 20 30 40 50 60 El e v a t i o n ( f t ) Width (ft) 119+51 Pool MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 35.1 x-section area (ft.sq.) 25.7 width (ft) 1.4 mean depth (ft) 2.8 max depth (ft) 26.6 wetted perimeter (ft) 1.3 hydraulic radius (ft) 18.8 width-depth ratio 117.9 W flood prone area (ft) 4.6 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 5-South Fork Fishing Creek Reach 5 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1004 1006 1008 1010 1012 30 40 50 60 70 80 90 El e v a t i o n ( f t ) Width (ft) 131+62 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 79.1 x-section area (ft.sq.) 49.4 width (ft) 1.6 mean depth (ft) 4.5 max depth (ft) 52.0 wetted perimeter (ft) 1.5 hydraulic radius (ft) 30.8 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 6-South Fork Fishing Creek Reach 5 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1002 1004 1006 1008 1010 20 30 40 50 60 70 80 90 El e v a t i o n ( f t ) Width (ft) 132+34 Pool MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 31.3 x-section area (ft.sq.) 24.1 width (ft) 1.3 mean depth (ft) 2.2 max depth (ft) 24.7 wetted perimeter (ft) 1.3 hydraulic radius (ft) 18.5 width-depth ratio 118.2 W flood prone area (ft) 4.9 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 7-South Fork Fishing Creek Reach 5 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1004 1006 1008 1010 1012 30 40 50 60 70 80 90 El e v a t i o n ( f t ) Width (ft) 132+88 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 51.7 x-section area (ft.sq.) 31.4 width (ft) 1.6 mean depth (ft) 2.5 max depth (ft) 32.1 wetted perimeter (ft) 1.6 hydraulic radius (ft) 19.1 width-depth ratio 108.8 W flood prone area (ft) 3.5 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 8-South Fork Fishing Creek Reach 6 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 999 1001 1003 1005 1007 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 141+25 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 55.9 x-section area (ft.sq.) 31.6 width (ft) 1.8 mean depth (ft) 2.7 max depth (ft) 32.4 wetted perimeter (ft) 1.7 hydraulic radius (ft) 17.9 width-depth ratio 98.4 W flood prone area (ft) 3.1 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 9-South Fork Fishing Creek Reach 7 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 996 998 1000 1002 1004 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 149+20 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 109.3 x-section area (ft.sq.) 36.2 width (ft) 3.0 mean depth (ft) 5.6 max depth (ft) 40.1 wetted perimeter (ft) 2.7 hydraulic radius (ft) 12.0 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 10-South Fork Fishing Creek Reach 7 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 994 996 998 1000 1002 30 40 50 60 70 80 90 El e v a t i o n ( f t ) Width (ft) 149+93 Pool MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 41.6 x-section area (ft.sq.) 29.6 width (ft) 1.4 mean depth (ft) 2.4 max depth (ft) 30.4 wetted perimeter (ft) 1.4 hydraulic radius (ft) 21.1 width-depth ratio 97.8 W flood prone area (ft) 3.3 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 11-South Fork Fishing Creek Reach 8 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 994 996 998 1000 1002 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 154+38 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 47.1 x-section area (ft.sq.) 28.9 width (ft) 1.6 mean depth (ft) 3.0 max depth (ft) 30.2 wetted perimeter (ft) 1.6 hydraulic radius (ft) 17.8 width-depth ratio 90.2 W flood prone area (ft) 3.1 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 12-South Fork Fishing Creek Reach 10 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 986 988 990 992 994 996 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 167+25 Riffle MY0 (01/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 161.5 x-section area (ft.sq.) 39.3 width (ft) 4.1 mean depth (ft) 5.9 max depth (ft) 43.6 wetted perimeter (ft) 3.7 hydraulic radius (ft) 9.6 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 13-South Fork Fishing Creek Reach 11 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 982 984 986 988 990 992 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 173+22 Pool MY0 (01/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 83.9 x-section area (ft.sq.) 35.8 width (ft) 2.3 mean depth (ft) 4.1 max depth (ft) 37.2 wetted perimeter (ft) 2.3 hydraulic radius (ft) 15.3 width-depth ratio 116.9 W flood prone area (ft) 3.3 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 14-South Fork Fishing Creek Reach 11 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 984 986 988 990 992 994 996 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 174+01 Riffle MY0 (01/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 8.0 x-section area (ft.sq.) 10.7 width (ft) 0.7 mean depth (ft) 1.4 max depth (ft) 11.3 wetted perimeter (ft) 0.7 hydraulic radius (ft) 14.4 width-depth ratio 46.5 W flood prone area (ft) 4.3 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 15-Critcher Tributary Reach 1 Monitoring Year 3 - 2023 View Downstream 1068 1069 1070 1071 1072 0 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 200+72 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 3.7 x-section area (ft.sq.) 8.7 width (ft) 0.4 mean depth (ft) 0.9 max depth (ft) 9.0 wetted perimeter (ft) 0.4 hydraulic radius (ft) 20.6 width-depth ratio 46.5 W flood prone area (ft) 5.3 entrenchment ratio 0.8 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 16-Critcher Tributary Reach 2 Monitoring Year 3 - 2023 View Downstream 1057 1058 1059 1060 1061 0 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 203+66 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 9.7 x-section area (ft.sq.) 9.8 width (ft) 1.0 mean depth (ft) 2.7 max depth (ft) 12.4 wetted perimeter (ft) 0.8 hydraulic radius (ft) 9.8 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 17-Critcher Tributary Reach 3 Monitoring Year 3 - 2023 View Downstream 1051 1052 1053 1054 1055 1056 1057 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 205+17 Pool MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 2.5 x-section area (ft.sq.) 6.7 width (ft) 0.4 mean depth (ft) 0.7 max depth (ft) 7.0 wetted perimeter (ft) 0.4 hydraulic radius (ft) 18.4 width-depth ratio 29.5 W flood prone area (ft) 4.4 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 18-Critcher Tributary Reach 3 Monitoring Year 3 - 2023 View Downstream 1052 1053 1054 1055 1056 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 205+33 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 4.3 x-section area (ft.sq.) 9.0 width (ft) 0.5 mean depth (ft) 1.0 max depth (ft) 9.4 wetted perimeter (ft) 0.5 hydraulic radius (ft) 19.1 width-depth ratio 56.3 W flood prone area (ft) 6.2 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 19-Critcher Tributary Reach 3 Monitoring Year 3 - 2023 View Downstream 1047 1048 1049 1050 1051 0 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 207+58 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 6.5 x-section area (ft.sq.) 11.6 width (ft) 0.6 mean depth (ft) 1.2 max depth (ft) 12.2 wetted perimeter (ft) 0.5 hydraulic radius (ft) 20.8 width-depth ratio 60.2 W flood prone area (ft) 5.2 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 20-Critcher Tributary Reach 4 Monitoring Year 3 - 2023 View Downstream 1025 1026 1027 1028 1029 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 218+60 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 5.4 x-section area (ft.sq.) 11.0 width (ft) 0.5 mean depth (ft) 1.2 max depth (ft) 11.4 wetted perimeter (ft) 0.5 hydraulic radius (ft) 22.2 width-depth ratio 32.2 W flood prone area (ft) 2.9 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 21-Critcher Tributary D Monitoring Year 3 - 2023 View Downstream 1065 1066 1067 1068 1069 0 5 10 15 20 25 30 El e v a t i o n ( f t ) Width (ft) 260+74 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 1.6 x-section area (ft.sq.) 6.9 width (ft) 0.2 mean depth (ft) 0.5 max depth (ft) 7.0 wetted perimeter (ft) 0.2 hydraulic radius (ft) 29.7 width-depth ratio 34.7 W flood prone area (ft) 5.0 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 22-Critcher Tributary C Monitoring Year 3 - 2023 View Downstream 1055 1056 1057 1058 25 30 35 40 45 El e v a t i o n ( f t ) Width (ft) 270+80 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 4.8 x-section area (ft.sq.) 7.6 width (ft) 0.6 mean depth (ft) 1.4 max depth (ft) 8.2 wetted perimeter (ft) 0.6 hydraulic radius (ft) 12.0 width-depth ratio 56.9 W flood prone area (ft) 7.5 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 23-Critcher Tributary A Monitoring Year 3 - 2023 View Downstream 1032 1034 1036 1038 1040 0 10 20 30 40 50 60 El e v a t i o n ( f t ) Width (ft) 243+90 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 7.3 x-section area (ft.sq.) 11.5 width (ft) 0.6 mean depth (ft) 1.4 max depth (ft) 12.3 wetted perimeter (ft) 0.6 hydraulic radius (ft) 18.2 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 24-Critcher Tributary A Monitoring Year 3 - 2023 View Downstream 1032 1034 1036 1038 1040 0 10 20 30 40 50 60 El e v a t i o n ( f t ) Width (ft) 244+13 Pool MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 2.0 x-section area (ft.sq.) 6.4 width (ft) 0.3 mean depth (ft) 0.8 max depth (ft) 6.7 wetted perimeter (ft) 0.3 hydraulic radius (ft) 19.8 width-depth ratio 21.7 W flood prone area (ft) 3.4 entrenchment ratio 0.8 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 25-Antioch Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1035 1036 1037 1038 1039 0 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 304+59 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 5.8 x-section area (ft.sq.) 7.1 width (ft) 0.8 mean depth (ft) 1.3 max depth (ft) 8.0 wetted perimeter (ft) 0.7 hydraulic radius (ft) 8.7 width-depth ratio 40.5 W flood prone area (ft) 5.7 entrenchment ratio 0.8 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 26-Antioch Tributary Reach 3 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1023 1024 1025 1026 1027 1028 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 308+25 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 8.6 x-section area (ft.sq.) 10.8 width (ft) 0.8 mean depth (ft) 1.6 max depth (ft) 11.4 wetted perimeter (ft) 0.7 hydraulic radius (ft) 13.6 width-depth ratio 65.7 W flood prone area (ft) 6.1 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 27-Antioch Tributary Reach 4 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1012 1013 1014 1015 1016 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 314+39 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 3.6 x-section area (ft.sq.) 8.8 width (ft) 0.4 mean depth (ft) 0.9 max depth (ft) 9.3 wetted perimeter (ft) 0.4 hydraulic radius (ft) 21.3 width-depth ratio 38.5 W flood prone area (ft) 4.4 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 28-Antioch Tributary B Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1029 1030 1031 1032 1033 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 356+75 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 4.5 x-section area (ft.sq.) 8.6 width (ft) 0.5 mean depth (ft) 1.1 max depth (ft) 9.2 wetted perimeter (ft) 0.5 hydraulic radius (ft) 16.6 width-depth ratio 34.7 W flood prone area (ft) 4.0 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 29-Antioch Tributary A Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1015 1016 1017 1018 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 348+45 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 15.7 x-section area (ft.sq.) 15.4 width (ft) 1.0 mean depth (ft) 2.1 max depth (ft) 16.1 wetted perimeter (ft) 1.0 hydraulic radius (ft) 15.1 width-depth ratio 97.6 W flood prone area (ft) 6.3 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 30-Chicken Tributary 1 Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1006 1008 1010 1012 1014 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 410+75 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 19.5 x-section area (ft.sq.) 15.5 width (ft) 1.3 mean depth (ft) 3.1 max depth (ft) 17.6 wetted perimeter (ft) 1.1 hydraulic radius (ft) 12.2 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 31-Chicken Tributary 1 Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1005 1007 1009 1011 1013 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 411+14 Pool MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 15.4 x-section area (ft.sq.) 16.3 width (ft) 0.9 mean depth (ft) 1.7 max depth (ft) 16.9 wetted perimeter (ft) 0.9 hydraulic radius (ft) 17.3 width-depth ratio 54.2 W flood prone area (ft) 3.3 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 32-Chicken Tributary 1 Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1004 1005 1006 1007 1008 1009 1010 0 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 413+85 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 2.2 x-section area (ft.sq.) 5.2 width (ft) 0.4 mean depth (ft) 0.7 max depth (ft) 5.6 wetted perimeter (ft) 0.4 hydraulic radius (ft) 12.2 width-depth ratio 15.8 W flood prone area (ft) 3.0 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 33-Robin Hill Tributary Reach 1 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1023 1024 1025 1026 1027 5 10 15 20 25 El e v a t i o n ( f t ) Width (ft) 501+85 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 0.3 x-section area (ft.sq.) 2.3 width (ft) 0.1 mean depth (ft) 0.2 max depth (ft) 2.4 wetted perimeter (ft) 0.1 hydraulic radius (ft) 15.6 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 34-Robin Hill Tributary Reach 1 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1022 1023 1024 1025 1026 10 15 20 25 30 El e v a t i o n ( f t ) Width (ft) 502+00 Pool MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 4.5 x-section area (ft.sq.) 8.3 width (ft) 0.5 mean depth (ft) 0.9 max depth (ft) 8.7 wetted perimeter (ft) 0.5 hydraulic radius (ft) 15.4 width-depth ratio 73.4 W flood prone area (ft) 8.8 entrenchment ratio 0.7 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 35-Robin Hill Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 998 1000 1002 1004 15 25 35 45 El e v a t i o n ( f t ) Width (ft) 509+83 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 1.9 x-section area (ft.sq.) 4.3 width (ft) 0.4 mean depth (ft) 0.9 max depth (ft) 4.7 wetted perimeter (ft) 0.4 hydraulic radius (ft) 9.7 width-depth ratio 11.6 W flood prone area (ft) 2.7 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 36-Robin Hill Tributary B Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1033 1034 1035 1036 1037 1038 5 10 15 20 El e v a t i o n ( f t ) Width (ft) 576+95 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 2.1 x-section area (ft.sq.) 6.1 width (ft) 0.3 mean depth (ft) 0.8 max depth (ft) 6.5 wetted perimeter (ft) 0.3 hydraulic radius (ft) 17.8 width-depth ratio 40.9 W flood prone area (ft) 6.7 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 37-Robin Hill Tributary A Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1007 1008 1009 1010 15 20 25 30 35 El e v a t i o n ( f t ) Width (ft) 551+75 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 4.1 x-section area (ft.sq.) 7.7 width (ft) 0.5 mean depth (ft) 1.1 max depth (ft) 8.2 wetted perimeter (ft) 0.5 hydraulic radius (ft) 14.6 width-depth ratio 33.8 W flood prone area (ft) 4.4 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 38-Oak Tributary Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1001 1003 1005 1007 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 603+86 Riffle MY0 (02/2021)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 58.4 x-section area (ft.sq.) 28.9 width (ft) 2.0 mean depth (ft) 3.9 max depth (ft) 30.6 wetted perimeter (ft) 1.9 hydraulic radius (ft) 14.2 width-depth ratio 82.6 W flood prone area (ft) 2.9 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 39-West Fork Fishing Creek Reach 1 Monitoring Year 3 - 2023 View Downstream 1001 1003 1005 1007 1009 10 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 704+66 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 71.8 x-section area (ft.sq.) 35.4 width (ft) 2.0 mean depth (ft) 4.2 max depth (ft) 37.7 wetted perimeter (ft) 1.9 hydraulic radius (ft) 17.5 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 40-West Fork Fishing Creek Reach 1 Monitoring Year 3 - 2023 View Downstream 998 1000 1002 1004 1006 10 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 705+32 Pool MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 57.4 x-section area (ft.sq.) 26.4 width (ft) 2.2 mean depth (ft) 3.9 max depth (ft) 27.9 wetted perimeter (ft) 2.1 hydraulic radius (ft) 12.2 width-depth ratio 93.2 W flood prone area (ft) 3.5 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 41-West Fork Fishing Creek Reach 2 Monitoring Year 3 - 2023 View Downstream 998 1000 1002 1004 1006 1008 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 709+87 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 61.0 x-section area (ft.sq.) 26.1 width (ft) 2.3 mean depth (ft) 4.1 max depth (ft) 28.0 wetted perimeter (ft) 2.2 hydraulic radius (ft) 11.2 width-depth ratio 81.1 W flood prone area (ft) 3.1 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 42-West Fork Fishing Creek Reach 3 Monitoring Year 3 - 2023 View Downstream 995 997 999 1001 1003 1005 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 716+40 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 47.7 x-section area (ft.sq.) 24.8 width (ft) 1.9 mean depth (ft) 3.2 max depth (ft) 26.1 wetted perimeter (ft) 1.8 hydraulic radius (ft) 12.9 width-depth ratio 76.7 W flood prone area (ft) 3.1 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 43-West Fork Fishing Creek Reach 4 Monitoring Year 3 - 2023 View Downstream 992 994 996 998 1000 10 20 30 40 50 60 70 El e v a t i o n ( f t ) Width (ft) 720+33 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 75.4 x-section area (ft.sq.) 34.1 width (ft) 2.2 mean depth (ft) 3.5 max depth (ft) 35.3 wetted perimeter (ft) 2.1 hydraulic radius (ft) 15.4 width-depth ratio 87.5 W flood prone area (ft) 2.6 entrenchment ratio 1.0 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots Cross-Section 44-West Fork Fishing Creek Reach 5 Monitoring Year 3 - 2023 View Downstream 989 991 993 995 997 10 20 30 40 50 60 70 80 El e v a t i o n ( f t ) Width (ft) 729+14 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (07/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 3.9 x-section area (ft.sq.) 8.7 width (ft) 0.5 mean depth (ft) 1.0 max depth (ft) 9.1 wetted perimeter (ft) 0.4 hydraulic radius (ft) 19.2 width-depth ratio 55.8 W flood prone area (ft) 6.4 entrenchment ratio 0.9 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 47-Shew Ridge Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1002 1003 1004 1005 1006 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 912+19 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (06/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 5.2 x-section area (ft.sq.) 10.4 width (ft) 0.5 mean depth (ft) 1.1 max depth (ft) 10.9 wetted perimeter (ft) 0.5 hydraulic radius (ft) 20.7 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 48-Shew Ridge Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1001 1002 1003 1004 1005 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 912+65 Pool MY0 (10/2020)MY1 (12/2021)MY2 (06/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 3.0 x-section area (ft.sq.) 6.4 width (ft) 0.5 mean depth (ft) 0.9 max depth (ft) 6.8 wetted perimeter (ft) 0.4 hydraulic radius (ft) 13.3 width-depth ratio 21.0 W flood prone area (ft) 3.3 entrenchment ratio 0.8 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 49-Ironwood Tributary Reach 1 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1028 1029 1030 1031 10 15 20 25 30 El e v a t i o n ( f t ) Width (ft) 1004+38 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (06/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area Bankfull Dimensions 11.3 x-section area (ft.sq.) 11.5 width (ft) 1.0 mean depth (ft) 2.0 max depth (ft) 12.5 wetted perimeter (ft) 0.9 hydraulic radius (ft) 11.8 width-depth ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 50-Timber Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1003 1004 1005 1006 1007 10 20 30 40 El e v a t i o n ( f t ) Width (ft) 1116+47 Pool MY0 (10/2020)MY1 (12/2021)MY2 (06/2022)MY3 (06/2023)Bankfull Bankfull Dimensions 6.1 x-section area (ft.sq.) 8.6 width (ft) 0.7 mean depth (ft) 1.4 max depth (ft) 9.3 wetted perimeter (ft) 0.7 hydraulic radius (ft) 12.1 width-depth ratio 45.8 W flood prone area (ft) 5.3 entrenchment ratio 1.1 low bank height ratio Survey Date:06/2023 Field Crew:Wildlands Engineering View Downstream Cross-Section 51-Timber Tributary Reach 2 Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Cross-Section Plots 1003 1004 1005 1006 1007 10 20 30 40 50 El e v a t i o n ( f t ) Width (ft) 1116+80 Riffle MY0 (10/2020)MY1 (12/2021)MY2 (06/2022)MY3 (06/2023) Bankfull Bankfull (Based on MY0 Area)Floodprone Area APPENDIX 5. Hydrology Summary Data and Plots Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach MY1 (2021)MY2 (2022)MY3 (2023)MY4 (2024)MY5 (2025)MY6 (2026)MY7 (2027) Critcher Trib Reach 3 - CG1 No bankfull events recorded 7/7/2022 7/10/2022 Photographic Evidence - 02/02/2023 Critcher Trib A - CG2 No bankfull events recorded 5/26/2022 6/8/2022 7/7/2022 7/10/2022 8/30/2022 6/20/2023 7/8/2023 7/15/2023 9/7/2023 Critcher Trib C - SG3 8/16/2021 2/4/2022 3/23/2022 5/23/2022 5/26/2022 6/8/2022 7/7/2022 8/26/2022 8/30/2022 9/5/2022 9/30/2022 10/1/2022 11/6/2022 11/11/2022 11/15/2022 11/30/2022 12/15/2022 12/22/2022 4/6/2023 4/28/2023 5/28/2023 6/20/2023 6/26/2023 7/8/2023 7/15/2023 9/7/2023 9/9/2023 9/12/2023 11/21/2023 12/10/2023 Critcher Trib D - SG1 8/17/2021 7/7/2022 6/20/2023 SF Fishing Reach 2 - CG3 No bankfull events recorded 5/26/2022 6/8/2022 7/7/2022 7/30/2022 3/3/2023 4/28/2023 6/20/2023 7/15/2023 SF Fishing Reach 6 - CG14 No bankfull events recorded No bankfull events recorded 3/4/2023 4/28/2023 6/21/2023 SF Fishing Reach 10 - CG7 8/18/2021 7/7/2022 3/3/2023 6/20/2023 7/16/2023 9/9/2023 Antioch Trib A Reach 2 - CG4 No bankfull events recorded 7/7/2022 Photographic Evidence - 06/20/2023 Antioch Trib Reach 2 - CG5 No bankfull events recorded 7/7/2022 6/20/2023 Antioch Trib B Reach 2 - CG6 No bankfull events recorded 7/7/2022 6/20/2023 7/15/2023 9/7/2023 11/28/2023 Table 12a. Bankfull Events Summary Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach MY1 (2021)MY2 (2022)MY3 (2023)MY4 (2024)MY5 (2025)MY6 (2026)MY7 (2027) Timber Trib Reach 2 - CG8 No bankfull events recorded No bankfull events recorded No bankfull events recorded Timber Trib Reach 2 - CG181 N/A N/A Photographic Evidence - 12/14/2023 Ironwood Trib Reach 1 - CG9 No bankfull events recorded 7/7/2022 6/20/2023 WF Fishing Reach 1 - CG11 No bankfull events recorded 7/7/2022 6/20/2023 7/15/2023 9/10/2023 Shew Ridge Trib Reach 2 - CG12 8/18/2021 5/27/2022 3/3/2023 4/27/2023 6/20/2023 7/15/2023 9/9/2023 12/10/2023 Chicken 1 Reach 2 - CG13 No bankfull events recorded 7/7/2022 4/28/2023 6/20/2023 7/15/2023 Oak Trib - CG15 No bankfull events recorded 7/7/2022 Photographic Evidence - 02/02/2023 Robin Hill Trib A - SG4 8/17/2021 3/23/2022 5/23/2022 5/26/2022 7/7/2022 11/11/22 11/15/22 12/15/22 1/4/2023 1/25/2023 4/7/2023 4/28/2023 5/28/2023 6/20/2023 6/26/2023 7/15/2023 9/10/2023 12/10/2023 Robin Hill Trib B - CG16 No bankfull events recorded No bankfull events recorded Photographic Evidence - 02/02/2023 Robin Hill Trib Reach 1 - CG17 No bankfull events recorded No bankfull events recorded Photographic Evidence - 02/02/2023 Robin Hill Trib Reach 2 - CG191 N/A N/A 6/20/2023 Table 12b. Bankfull Events Summary 1Crest gages 18 and 19 were installed on 2/22/2023 and will supplement bankfull data for Timber Trib and Robin Hill Trib. Bankfull Evidence Photographs Monitoring Year 3 Critcher Trib Reach 3, CG1 – Bankfull evidence (02/02/2023) Antioch Trib A Reach 2, CG4 – Bankfull evidence (06/20/2023) Oak Trib, CG15 – Bankfull evidence (02/02/2023) Robin Hill Trib B – Bankfull evidence (02/02/2023) Robin Hill Trib Reach 1, CG17 – Bankfull evidence (02/02/2023) (12/14/2023) Tiber Trib Reach 2, CG18 – Bankfull evidence (12/14/2023) Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Reach MY1 (2021)1 MY1 (2021)2 MY2 (2022)1 MY2 (2022)2 MY3 (2023)1 MY3 (2023)2 Critcher Trib D - SG1 2/17/2021 - 12/31/2021 318 Days 318 Days 8/9/2022 - 11/14/2022 96 Days 178 Days 1/1/2023 - 6/8/2023 158 Days 345 Days Critcher Trib Reach 1 - SG2 5/23/2021 - 7/23/2021 61 Days 255 Days 3/22/2022 - 3/26/2022 4 Days 48 Days 6/19/2023 - 10/6/2023 109 Days 314 Days Critcher Trib C - SG3 4/3/2021 - 12/31/2021 273 Days 318 Days 1/1/2022 - 12/31/2022 365 Days 365 Days 1/1/2023 - 11/1/2023 305 Days 345 Days Robin Hill Trib A - SG4 5/7/2021 - 12/31/2021 238 Days 288 Days 7/9/2022 - 12/23/2022 167 Days 362 Days 1/1/2023 - 10/18/2023 290 Days 344 Days 1Consecutive stream flow days 2Cumulative stream flow days Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 MY1 (2021)MY2 (2022)MY3 (2023) Annual Precip Total1 42.66 59.16 60.71 WETS 30th Percentile2 33.41 33.41 33.41 WETS 70th Percentile2 60.93 60.93 60.93 Normal Normal Normal Normal Table 13. Verfication of Consecutive and Cumulative Flow Days Table 14. Rainfall Summary 1Annual precipitation data was collected from 1-1-23 to 12-31-23 and is derived from the NC CRONOS Station,North Wilkesboro 5.5 SE, NC, which is approxminately 4 miles away from the Site. 230th and 70th percentile precipitation data derived from the WETS station North Wilkesboro, NC. Monthly Rainfall Data Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Monitoring Year 3 - 2023 Annual precipitation data was collected from 1-1-23 to 12-31-23 and is derived from the NC CRONOS Station, North Wilkesboro 5.5 SE, NC which is approxminately 4 miles away from the Site. 30th and 70th percentile precipitation data derived from the WETS station North Wilkesboro, NC. 0 2 4 6 8 10 12 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Pr e c i p i t a t i o n ( i n ) Date Critcher Brothers 30-70 Percentile Graph for Rainfall in 2023 North Wilkesboro 5.5 SE 30th Percentile 70th Percentile Stream Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. 158 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1067.0 1067.5 1068.0 1068.5 1069.0 1069.5 1070.0 1070.5 1071.0 1071.5 1072.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers : Stream Gage #1 Critcher Trib D Temperature Spikes Stream Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 109 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1068 1069 1069 1070 1070 1071 1071 1072 1072 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers : Stream Gage #2 Critcher Trib Reach 1 Temperature Spikes Stream Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 305 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1054.0 1054.5 1055.0 1055.5 1056.0 1056.5 1057.0 1057.5 1058.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers : Stream Gage #3 Critcher Trib C (XS22) Temperature Spikes Stream Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 290 days of consecutive stream flow Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1008.0 1008.5 1009.0 1009.5 1010.0 1010.5 1011.0 1011.5 1012.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers : Stream Gage #4 Robin Hill Trib A Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1047.0 1047.5 1048.0 1048.5 1049.0 1049.5 1050.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #1 - Critcher Trib Reach 3 (XS19) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1033.0 1034.0 1035.0 1036.0 1037.0 1038.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #2 - Critcher Trib A (XS23) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false bankfull spikes recorded from 1/9/2023 to 2/18/2023 due to freezing water around the pressure diaphram of the gage. The recorded bankfull events on 3/15/2023 and 3/20/2023 were also disregarded due to lack of corresponding precipitation events. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #3 - SF Fishing Reach 2 (XS2) Temperature Spikes False Bankfull Events Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1014.0 1014.5 1015.0 1015.5 1016.0 1016.5 1017.0 1017.5 1018.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #4 - Antioch Trib A Reach 2 (XS29) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Crest gage 5 recorded an elevated water level from 2/28/2023 to 4/28/2023, before the water level gradually returned to typical elevation. This was likely caused by a debris jam downstream of the crest gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1035.0 1035.5 1036.0 1036.5 1037.0 1037.5 1038.0 1038.5 1039.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #5 - Antioch Trib Reach 2 (XS25) Temperature Spikes Elevated Water Level Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1029.0 1029.5 1030.0 1030.5 1031.0 1031.5 1032.0 1032.5 1033.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #6 - Antioch Trib B Reach 2 (XS28) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 987.0 988.0 989.0 990.0 991.0 992.0 993.0 994.0 995.0 996.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #7 - SF Fishing Creek Reach 10 (XS12) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1002.0 1002.5 1003.0 1003.5 1004.0 1004.5 1005.0 1005.5 1006.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #8 - Timber Trib Reach 2 (XS51) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1027.0 1027.5 1028.0 1028.5 1029.0 1029.5 1030.0 1030.5 1031.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #9 - Ironwood Trib Reach 1 (XS49) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 999.0 1000.0 1001.0 1002.0 1003.0 1004.0 1005.0 1006.0 1007.0 1008.0 1009.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #11 - WF Fishing Creek Reach 1 (XS39) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1002.0 1002.5 1003.0 1003.5 1004.0 1004.5 1005.0 1005.5 1006.0 1006.5 1007.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #12 - Shew Ridge Trib Reach 2 (XS47) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1007.0 1007.5 1008.0 1008.5 1009.0 1009.5 1010.0 1010.5 1011.0 1011.5 1012.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #13 - Chicken 1 Reach 2 (XS30) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1000.0 1000.5 1001.0 1001.5 1002.0 1002.5 1003.0 1003.5 1004.0 1004.5 1005.0 1005.5 1006.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #14 - SF Fishing Creek Reach 6 (XS8) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1001.0 1001.5 1002.0 1002.5 1003.0 1003.5 1004.0 1004.5 1005.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #15 - Oak Trib (XS38) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1032.0 1032.5 1033.0 1033.5 1034.0 1034.5 1035.0 1035.5 1036.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #16 - Robin Hill Trib B (XS36) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 1022.0 1022.5 1023.0 1023.5 1024.0 1024.5 1025.0 1025.5 1026.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #17 - Robin Hill Trib Reach 1 (XS33) Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Crest gage 18 was installed on 2/22/2023 and will supplement bankfull data for Timber Trib. Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 998.0 998.5 999.0 999.5 1000.0 1000.5 1001.0 1001.5 1002.0 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #18 - Timber Trib Reach 2 Temperature Spikes Crest Gage Plots Monitoring Year 3 - 2023 Critcher Brothers Mitigation Site USACE Action ID No. SAW-2017-01913 Wildlands disregarded the false spikes recorded from 11/1/2023 to 11/28/2023 due to lack of corresponding precipitation events. False spikes were likely caused by freezing water around the pressure diaphram of the gage. Crest gage 19 was installed on 2/22/2023 and will supplement bankfull data for Robin Hill Trib. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 1 2 3 4 5 6 7 8 9 10 999 1000 1001 1002 1003 1004 1005 Pr e c i p i t a t i o n ( i n ) El e v a t i o n ( f t ) Monitoring Year 3 - 2023 Daily Precipitation Water Level Thalweg Bankfull 30-Day Rolling Precip Total 30th & 70th Percentile Critcher Brothers: Crest Gage #19 - Robin Hill Trib Reach 2 (XS35) Temperature Spikes APPENDIX 6. Agency Correspondence June 2, 2023 Regulatory Division SUBJECT: Year 2 Monitoring Report Review and Credit Release associated with Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Mitigation Site, Action ID No. SAW-2017-01913 Ms. Andrea Eckardt Wildlands Engineering, Inc. 1430 South Mint Street, Suite 104 Charlotte, NC 28203 Dear Ms. Eckardt: This correspondence is in reference to the Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Mitigation Site. The site includes unnamed tributaries in the Yadkin River Basin, Cataloging Unit (03040101), and is located in Wilkes County, North Carolina. The purpose of this letter is to transmit comments provided by the NC Interagency Review Team (NCIRT) during the review of the annual monitoring report (see attached) and to confirm the Year 2 credit release for this mitigation site. Pursuant to the site’s Umbrella Mitigation Banking Instrument and the site-specific Mitigation Plan, the following mitigation credits shall be available for sale provided the annual monitoring report demonstrates interim performance standards are being met : • 10% of the total enhancement and/or restoration Stream Mitigation Units (SMUs) associated with year 2 annual monitoring (2,010.21 Cool Water SMUs) Based on a review of the data provided for the stream restoration and enhancement on the site, we confirm that you have satisfied the above requirements, and 2,010.21 Cool Water SMUs are now available for sale. To date, 50% of the total restoration and enhancement SMUs and 100% of the preservation SMUs (10,540.66 SMUs) have been released for sale. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 Please review the comments provided by the NCIRT during their review of the monitoring report. While it is not necessary to provide a response to specific comments at this time, please be sure to address the issues raised in future monitoring report submittals. Please note that this electronic copy provided to you via email is your official copy. Should you wish to receive a paper copy of this correspondence, please contact us. Thank you for your time and cooperation. If you have any questions, please contact Mr. Steve Kichefski by email at steven.l.kichefski@usace.army.mil or by phone at (828) 933- 8032. Sincerely, for Todd Tugwell Chief, Mitigation Branch Enclosure cc (by email): NCIRT Distribution List DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON, NORTH CAROLINA 28403-1343 CESAW-RG/Kichefski June 2, 2023 MEMORANDUM FOR RECORD SUBJECT: Action ID # SAW-2017-01913, NCIRT Review Comments on the Wildlands Yadkin Valley Umbrella Mitigation Bank, Critcher Brothers Year 2 Monitoring Report Todd Bowers, USEPA: I have reviewed the Monitoring Year 2 (MY2) monitoring report for the Critcher Brothers mitigation site (a component of the Yadkin Valley Umbrella Mitigation Bank) dated February 2, 2023 submitted by Wildlands Engineering, Inc (WEI). The project includes the restoration, enhancement, and preservation of 27,938 linear feet (LF) of stream on South Fork Fishing Creek, West Fork Fishing Creek, and 22 tributaries. At the time of as-built, the Site was determined to generate 20,578.400 cool stream mitigation units (SMUs). With additional enhancement II work completed on Magnolia Tributary at the IRT’s request, the net credits have increased by 13.333 SMU to a total of 20,591.733 SMU. Per WEI, MY2 site assessments were conducted between January 2022 and January 2023. Overall, the Site has met the required stream, vegetation, and hydrology success criteria for MY2. The project streams are in good condition and functioning as intended, with only minor instances of scour identified. At least one bankfull event has been documented on 80% of the project reaches since the completion of construction. Vegetation assessments indicated an average planted stem density of 429 stems per acre and the Site is on track to meet the MY3 requirement of 320 stems per acre. While over 99% of the Site is free of invasive species, a few small populations of invasive plant species were identified in 2022. Wildlands will continue to monitor all areas of concern and document repairs and management activities in the MY3 r eport. Wildlands is requesting 2,010.21SMUs be released for successful completion of MY2 activities and demonstrating that interim performance standards are being met. Overall, I am very pleased with the report and the work that has been completed at the site as well as efforts towards adaptive management and corrective actions for culvert retrofits, stream repairs, beaver removal, supplemental planting plans and invasive species treatments. The following additional items in the MY2 were noted: • Areas of low stem density are located along WF Fishing Creek Reach 1, Shew Ridge Tributary Reach 2, and SF Fishing Reach 3 and are represented by mobile vegetation plots 1 and 2, and permanent plot 12, respectively. Management activities are planned for winter 2023, and areas of low stem density will be supplementally planted with approved species from the project’s Final Mitigation Plan. No concerns. -2- • During MY2, Wildlands documented 3 instances of cattle encroachment within the easement that have been resolved. Wildlands and landowner are actively collaborating on repairs and prevention of further instances. No concerns. • All 49 stream cross-sections are stable, with bank height ratios at or near 1.0. Minor stream adjustments/instabilities and locations and outlined in the report along with photos. Corrective actions were outlined in Section 1.2.5. No concerns. • Wildlands has requested that the bankfull requirement on Robin Hill Trib B (CG16) be omitted. This tributary is a steep A3-type channel, and therefore unlikely to have a bankfull event. I concur with this assessment and approve the request. • Only 75% (3 of 4) low flow reaches (intermitted flow regime) exceeded the success criteria for baseflow monitoring with streams ranging from 4 to 365 days of consecutive of stream flow. Noted; no concerns as last year all reaches attained success. • In July 2022, three beaver dams were identified and removed from SF Fishing Reach 7 and WF Fishing Creek Reach 1. Wildlands is monitoring and removing as needed. Noted. • In the MY1 report, Wildlands documented several areas of concern that required mechanical repairs in MY2. All repairs were completed in August 2022 and repairs on WF Fishing Reach 5 included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The photos are appreciated. • No site visit requested. Thank you for the opportunity to review and provide comments on the Critcher Brothers Mitigation Site MY2 monitoring report. Having not been on-site, I really appreciated all the photos in the report. I recommend the appropriate credit release for cool stream SMUs for monitoring milestone 4. If you or the sponsor have any questions, please do not hesitate to contact me. Casey Haywood, USACE: 1. Repairs: Good photo documentation. The repairs on WF Fishing Reach 5 and SG Fishing Reach 11 look good, and the seeding and soil amendments in 2022 on Critcher R3 appear to have been successful. Please include photos of the 2023 planned repairs in next year’s report. 2. Vegetation: Noted that three veg plots are not meeting MY3 success. Low stem density areas will be supplementally planted in 2023. Please include a discussion of the management activities in next year’s report to include any management of herbaceous vegetation. Are the 77 American sycamore stems in permanent plot 4 a reporting error? 3. Cross-sections: Thank you for providing the detailed information regarding cross- section observations. Several of the cross-sections appear to be stable from last year. Noted minor aggradation on XS40, likely from the beaver dam. Please continue to monitor these areas and note in future reports. -3- 4. Stream AOC: To confirm, have all AOCs listed in the MY1 report been addressed and/or stabilized on their own? These areas include: floodplain scour Antioch R4 STA 313+50, aggradation (possible mid-channel bar formation) SFFC R9 164+70, and left bank scour on SFFC R10 XS12. Given the number of repairs and size of the site, it would be helpful to have the repairs listed in a tabular format. 5. Murdannia was treated in 2022. If more treatments are anticipated, please pay close attention to live stake survival, and supplementally plant additional live stakes as needed. Please include these areas on the CCPV in next year’s report if the problem worsens. 6. Three instances of cattle encroachment occurred during the monitoring year due to fencing issues. These areas were repaired, and no damage was observed in the easement. Noted. 7. Flow: SG2 on Critcher Trib R1 only recorded 4 days of consecutive flow (48 cumulative) but met last year. Recommend installing a game cam to help supplement flow data if the reach doesn’t meet in MY3. 8. Culvert photo- Antioch Trib A R1: There is a large rock in front of the culvert. Has it always been there? In last year’s photo it looked like a clump of fescue. Is the culvert perched? 9. Bankfull: No bankfull events on Robin Trib B or R1, Timber R2, and SFFC R6 in MY1 or MY2. However, bankfull indicators were observed on SFFC R6. Were any bankfull indicators observed on the other reaches? Recommend including photo documentation of observations to help supplement future reports. 10. Wildlands requested the bankfull requirement on Robin Hill Trib B (CG16) to be omitted due to the steep A3-type channel. Since this is a restoration reach, the crest gauge should remain in place and a camera needs to be installed to help monitor flow. This reach was listed as perennial, but the graph indicates that the system may be acting more as an intermittent tributary. Steve Kichefski Mitigation Project Manager Mitigation Branch Wildlands Engineering, Inc.  phone 704-332-7754  fax 704-332-3306  1430 S. Mint Street, # 104  Charlotte, NC 28203 February 12, 2024 RE: NCIRT Review Comment Response Letter Yadkin Valley Umbrella Mitigation Bank Critcher Brothers Year 2 Monitoring Report Action ID # SAW-2017-01913 Wildlands Engineering, Inc. (Wildlands) has reviewed the NCIRT comments and observations from the Critcher Brothers Year 2 Monitoring Report, received on June 2, 2023. Your comments and observations from the report are noted below in Bold. Wildlands’ response to those comments are noted in Italics. Todd Bowers, USEPA Comment #1: Areas of low stem density are located along WF Fishing Creek Reach 1, Shew Ridge. Tributary Reach 2, and SF Fishing Reach 3 and are represented by mobile vegetation plots 1 and 2, and permanent plot 12, respectively. Management activities are planned for winter 2023, and areas of low stem density will be supplementally planted with approved species from the project’s Final Mitigation Plan. No concerns. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #2: During MY2, Wildlands documented 3 instances of cattle encroachment within the easement that have been resolved. Wildlands and the landowner are actively collaborating on repairs and prevention of further instances. No concerns. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #3: All 49 stream cross-sections are stable, with bank height ratios at or near 1.0. Minor stream adjustments/instabilities and locations and outlined in the report along with photos. Corrective actions were outlined in Section 1.2.5. No concerns. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #4: All 49 stream cross-sections are stable, with bank height ratios at or near 1.0. Minor stream adjustments/instabilities and locations and outlined in the report along with photos. Corrective actions were outlined in Section 1.2.5. No concerns. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #5: Wildlands has requested that the bankfull requirement on Robin Hill Trib B (CG16) be omitted. This tributary is a steep A3-type channel, and therefore unlikely to have a bankfull event. I concur with this assessment and approve the request. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #6: Only 75% (3 of 4) low flow reaches (intermitted flow regime) exceeded the success criteria for baseflow monitoring with streams ranging from 4 to 365 days of consecutive days of stream flow. Noted; no concerns as last year all reaches attained success. Wildlands’ Response: Noted Wildlands Engineering, Inc.  phone 704-332-7754  fax 704-332-3306  1430 S. Mint Street, # 104  Charlotte, NC 28203 Todd Bowers, USEPA Comment #7: In July 2022, three beaver dams were identified and removed from SF Fishing Reach 7 and WF Fishing Creek Reach 1. Wildlands is monitoring and removing as needed. Noted. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #8: In the MY1 report, Wildlands documented several areas of concern that required mechanical repairs in MY2. All repairs were completed in August 2022 and repairs on WF Fishing Reach 5 included grading, matting, seeding, and adding livestake fascines to the floodplain and banks. The photos are appreciated. Wildlands’ Response: Noted Todd Bowers, USEPA Comment #9: No site visit requested. Wildlands’ Response: Noted Casey Haywood, USACE Comment #1: Repairs: Good photo documentation. The repairs on WF Fishing Reach 5 and SG Fishing Reach 11 look good, and the seeding and soil amendments in 2022 on Critcher R3 appear to have been successful. Please include photos of the 2023 planned repairs in next year’s report. Wildlands’ Response: Repairs and management activities are reported in Section 1.2.5 and in Table 8. Casey Haywood, USACE Comment #2: Vegetation: Noted that three veg plots are not meeting MY3 success. Low stem density areas will be supplementally planted in 2023. Please include a discussion of the management activities in next year’s report to include any management of herbaceous vegetation. Are the 77 American sycamore stems in permanent plot 4 a reporting error? Wildlands’ Response: A discussion of vegetation management activities is located in Section 1.2.2. In MY2, there were 77 volunteer American sycamore stems in permanent vegetation (VP) plot 4. In MY3, there were 67 volunteer American sycamore stems in VP4. American sycamore volunteers are small and are not interfering with the health of the planted stems. Casey Haywood, USACE Comment #3: Cross-sections: Thank you for providing the detailed information regarding cross- section observations. Several of the cross-sections appear to be stable from last year. Noted minor aggradation on XS40, likely from the beaver dam. Please continue to monitor these areas and note in future reports. Wildlands’ Response: Cross-sections initially mentioned in the MY2 report have stabilized in MY3. Wildlands will continue to monitor cross-sections throughout the Site, and report areas of concern in the annual monitoring report. Refer to section 1.2.3 Stream Assessment in the MY3 report. Casey Haywood, USACE Comment #4: Stream AOC: To confirm, have all AOCs listed in the MY1 report been addressed and/or stabilized on their own? These areas include: floodplain scour Antioch R4 STA 313+50, aggradation (possible mid-channel bar formation) SFFC R9 164+70, and left bank scour on SFFC R10 XS12. Given the number of repairs and size of the site, it would be helpful to have the repairs listed in a tabular format. Wildlands’ Response: All AOC’s reported in MY1 have stabilized. Wildlands has added Table 8: Areas of Concern and Management Table to Appendix 2 of the report. The MY4 report will include a photolog of all former areas of concern. Wildlands Engineering, Inc.  phone 704-332-7754  fax 704-332-3306  1430 S. Mint Street, # 104  Charlotte, NC 28203 Casey Haywood, USACE Comment #5: Murdannia was treated in 2022. If more treatments are anticipated, please pay close attention to live stake survival, and supplementally plant additional live stakes as needed. Please include these areas on the CCPV in next year’s report if the problem worsens. Wildlands’ Response: On-site murdannia was greatly reduced after treatments in MY2. In June 2023, murdannia was treated on SFFC Reaches 9 and 10, with no damage to livestakes. These areas are mapped on the CCPV. Casey Haywood, USACE Comment #6: Three instances of cattle encroachment occurred during the monitoring year due to fencing issues. These areas were repaired, and no damage was observed in the easement. Noted. Wildlands’ Response: Noted Casey Haywood, USACE Comment #7: Flow: SG2 on Critcher Trib R1 only recorded 4 days of consecutive flow (48 cumulative) but met last year. Recommend installing a game cam to help supplement flow data if the reach doesn’t meet in MY3. Wildlands’ Response: SG2 on Critcher Trib Reach 1 recorded 109 days of consecutive flow in MY3. Wildlands does not currently see a need for a game camera at this time. Casey Haywood, USACE Comment #8: Culvert photo- Antioch Trib A R1: There is a large rock in front of the culvert. Has it always been there? In last year’s photo it looked like a clump of fescue. Is the culvert perched? Wildlands’ Response: The MY1 report documented the culvert crossing located on Antioch Trib A Reach 1. The MY2 report documented the crossing located on Antioch Trib Reach 4 but was mislabeled. The MY1 and MY2 reports did not document both culvert crossings located on the Antioch Tributaries. Both culvert crossings have been documented in the MY3 report. The large rock in front of the Antioch Trib Reach 4 culvert has always been there, and the culvert is not perched. Casey Haywood, USACE Comment #9: Bankfull: No bankfull events on Robin Trib B or R1, Timber R2, and SFFC R6 in MY1 or MY2. However, bankfull indicators were observed on SFFC R6. Were any bankfull indicators observed on the other reaches? Recommend including photo documentation of observations to help supplement future reports. Wildlands’ Response: Wildlands will continue to document bankfull indicators on all reaches to supplement or verify crest gage data. Casey Haywood, USACE Comment #10: Wildlands requested the bankfull requirement on Robin Hill Trib B (CG16) to be omitted due to the steep A3-type channel. Since this is a restoration reach, the crest gauge should remain in place and a camera needs to be installed to help monitor flow. This reach was listed as perennial, but the graph indicates that the system may be acting more as an intermittent tributary. Wildlands’ Response: Wildlands will install a game camera on Robin Hill Trib B in MY4. Wildlands Engineering, Inc.  phone 704-332-7754  fax 704-332-3306  1430 S. Mint Street, # 104  Charlotte, NC 28203 Sincerely, Andrea Eckardt Aeckardt@wildlandseng.com