HomeMy WebLinkAbout20200034 Ver 1_PierceTerrace_100139_ MY1_2023_20240214MY1 MONITORING REPORT PIERCE TERRACE WETLAND MITIGATION SITE Gates County, North Carolina Chowan River Basin Cataloging Unit 03010203 & 03010204 DMS Project No. 100139 Full Delivery Contract No. 7907-01 DMS RFP No. 16-007907 (issued 5/6/2019) USACE Action ID No. SAW-2020-00046 DWR Project No. 2020-00034 Data Collection: March 2023–November 2023 Submission: February 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 ------- 0034 Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 Response to Monitoring Year 1 (2023) DMS Comments Pierce Terrace (DMS #100139) Chowan River Basin 03010203 & 03010204, Gates County Contract No. 7907-01 Comments Received (Black Text) & Responses (Blue Text) Report & Field Visit: 1. Section 3.2 – Second paragraph, third sentence says, “an oversight occurred during monitoring and random vegetation transects within these areas did not occur in year 1 (2023)”. Referring to the wetland creation and ditch filled areas. Please depict these random transects in the tables and CCPV, or correct sentence. Table 6. Planted Vegetation Totals, appear to have all random transects represented with data for MY1. Response: The inclusion of this sentence and the sentence after it was an error. These sentences have been deleted. Digital Comments: 1. No comments. Response: Noted. Pierce Terrace Year 1, 2023 Monitoring Summary Wetlands • Three of the 63 groundwater gauges met success criteria during the Year 1 (2023) monitoring period (Appendix C). A detailed analysis is provided in Section 3.1. Vegetation • Year 1 (2023) measurements of all 81 plots (61 permanent plots and 20 temporary transects) resulted in an average of 582 planted stems/acre. Additionally, all individual plots met the success criteria except transect 6 which was two stems shy of meeting target goals and is not representative of a stem density area of concern (Tables 6-7, Appendix B). Visual • An encroachment area was identified in Year 1 (2023) along the western easement boundary from adjacent farming operation. • No evidence of nuisance animal activity (i.e., heavy deer browsing) was observed. Site Permitting/Monitoring Activity and Reporting History Activity or Deliverable Data Collection Complete Completion or Delivery Project Instituted (NCDMS Contract No. 7907-01) NA May 6, 2019 Mitigation Plan Approved NA May 2022 Construction Completed NA August 29, 2022 Planting Completed NA March 3, 2023 As-built Survey Completed NA March 2023 MY-0 Vegetation Data Collection March 6-7, 2023 NA MY-0 Baseline Report March 2023 March 2023 MY-1 Vegetation Data Collection September 6-14, 2023 NA MY-1 Monitoring Report November 2023 December 2023 MY-2+ Monitoring Reports -- -- Site Maintenance Report (2023) Invasive Species Work Maintenance work 9/26/2023 Cattail treatment 11/20/2023 Ditch filled areas and wetland creation areas seeded with clover MY1 MONITORING REPORT PIERCE TERRACE WETLAND MITIGATION SITE Gates County, North Carolina Chowan River Basin Cataloging Unit 03010203 & 03010204 DMS Project No. 100139 Full Delivery Contract No. 7907-01 DMS RFP No. 16-007907 (issued 5/6/2019) USACE Action ID No. SAW-2020-00046 DWR Project No. 2020-00034 Data Collection: January 2023–November 2023 Submission: February 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 Prepared by: And Restoration Systems, LLC Axiom Environmental, Inc. 1101 Haynes Street, Suite 211 218 Snow Avenue Raleigh, North Carolina 27604 Raleigh, North Carolina 27603 Contact: Ray Holz Contact: Grant Lewis 919-755-9490 (phone) 919-215-1693 (phone) 919-755-9492 (fax) Draft MY1 Monitoring Report (Project No. 100139) Table of Contents Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 TABLE OF CONTENTS 1 PROJECT SUMMARY .................................................................................................................................. 1 1.1 Project Background, Components, and Structure ................................................................................... 1 1.2 Success Criteria ....................................................................................................................................... 5 2 PROJECT MONITORING – METHODS .......................................................................................................... 5 2.1 Monitoring ............................................................................................................................................... 5 3 MONITORING YEAR 1 – DATA ASSESSMENT .............................................................................................. 7 3.1 Hydrology Summary ................................................................................................................................. 7 3.2 Vegetative Assessment ............................................................................................................................ 7 3.3 Visual Assessment .................................................................................................................................... 7 3.4 Monitoring Year Summary ....................................................................................................................... 8 4 REFERENCES ............................................................................................................................................. 9 LIST OF REPORT TABLES Table 1. Project Mitigation Quantities and Credits ....................................................................................................... 2 Table 2. Summary: Goals, Performance, and Results .................................................................................................... 3 Table 3. Project Attribute Table ..................................................................................................................................... 4 Table A. Success Criteria ................................................................................................................................................ 5 Table B. Monitoring Schedule........................................................................................................................................ 5 Table C. Monitoring Summary ....................................................................................................................................... 6 APPENDICES Appendix A. Visual Assessment Data Figure 1. Current Conditions Plan View Figure 2A-B. Reference Gauge Location Table 4. Vegetation Condition Assessment Table Vegetation Plot Photographs Photo Log Appendix B. Vegetation Plot Data Table 5A. Planted Bare-Root Woody Vegetation Table 5B. Permanent Seed Mixes Table 6. Vegetation Plot Counts and Densities Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool Appendix C. Hydrologic Data Table 8. Groundwater Hydrology Data Groundwater Gauge Graphs Figure C1. 30-70th Percentile Graph for Rainfall Reference Gauge Soil Profile Description Appendix D. Project Timeline and Contact Info Table 9. Project Timeline Table 10. Project Contacts Draft MY1 Monitoring Report (Project No. 100139) page 1 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 1 PROJECT SUMMARY Restoration Systems, LLC has established the North Carolina Division of Mitigation Services (NCDMS) Pierce Terrace Wetland Mitigation Site (Site). Located in the Chowan River Basin, cataloguing unit 03010203 & 03010204, the Site is in Targeted Local Watershed (TLW) 03010203040040 of the South Atlantic/Gulf Region (NCDWQ sub-basin number 03-01-01). The Site is not located in a Local Watershed Plan (LWP), Regional Watershed Plan (RWP), or Targeted Resource Area (TRA); however, project activities address priorities associated with the 2009 Chowan River Basin Restoration Priorities report. 1.1 Project Background, Components, and Structure The Site is located approximately 2 miles west of Sunbury, 5 miles northeast of Gatesville, and immediately south and east of Merchant Millpond State Park (MMSP). Mitigation work within the Site included 1) wetland creation totaling 3.792 acres, and 2) wetland reestablishment totaling 108.016 acres. The site is expected to provide 109.280 wetland credits by closeout (Table 1, Page 2). A conservation easement was granted to the State of North Carolina and recorded at the Gates County Register of Deeds on November 17, 2020. Before construction, the Site was characterized by agriculture row crop production for over 80 years. Typical crop rotation for the last decade has been a winter wheat with cotton, soybeans, and/or corn. Adjacent land management activities include silviculture and agriculture practices. Site design was completed in June 2022. Construction started on July 19, 2022 and ended with final walkthrough on August 29, 2022. The Site was planted March 1-3, 2023. Completed project activities, reporting history, completion dates, and project contacts are summarized in Tables 8–9 (Appendix D). Space Purposefully Left Blank Original Mitigation Original Original Original Plan As-Built Mitigation Restoration Mitigation Project Segment Ft/Ac Ft/Ac Category Level Ratio (X:1)Credits Wetland Non-riparian Re-establishment I 86.706 87.868 NR REE 1.00000 87.868 Non-riparian Re-establishment II 19.805 20.148 NR REE 1.00000 20.148 Non-riparian Creation 5.670 3.792 NR C 3.00000 1.264 Total:109.280 Project Credits Riparian Non-Rip Coastal Warm Cool Cold Wetland Wetland Marsh Restoration 0.000 0.000 0.000 Re-establishment 0.000 108.016 0.000 Rehabilitation 0.000 0.000 0.000 Enhancement 0.000 0.000 0.000 Enhancement I Enhancement II Creation 0.000 1.264 0.000 Preservation 0.000 0.000 Totals 0.000 0.000 0.000 0.000 109.280 0.000 Total Wetland Credit 109.280 Wetland Mitigation Category Restoration Level CM Coastal Marsh P Preservation R Riparian E Wetland Enhancement - Veg and Hydro NR Non-Riparian EII Stream Enhancement II EI Stream Enhancement I C Wetland Creation RH Wetland Rehabilitation - Veg and Hydro REE Wetland Re-establishment Veg and Hydro R Restoration Table 1. Pierce Terrace Mitigation Site (ID-100139) Project Mitigation Quantities and Credits Restoration Level Stream Comments Draft MY1 Monitoring Report (Project No. 100139) page 3 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 2. Summary: Goals, Performance, and Results Goals Objectives Success Criteria (1) HYDROLOGY - Minimize downstream flooding to the maximum extent possible. - Fill and plug agriculture ditches to restore jurisdictional hydrology - Cease row crop production within the easement - Shallow disking (~4”) of soils within the entire Site to reduce compaction and increase surface roughness - Plant native woody vegetation - Protect the Site with a perpetual conservation easement - Row crop production ceased within the easement - Monitoring wells will be successful if the water table is within 12 inches of the soil surface for 10-12% of the growing season - Vegetation plots will be successful if the plant density is 210 stems per acre with an average plant height of 10 feet at 7 years following planting - Conservation Easement recorded (1) WATER QUALITY - Remove direct nutrient and pollutant inputs from the Site - Reduce agricultural land/inputs - Fill and plug the ditch network to restore ground and surface hydrology within the Site - Plant woody vegetation - Restore jurisdictional wetlands - Row crop production ceased within the easement - Monitoring wells will be successful if the water table is within 12 inches of the soil surface for 10-12% of the growing season - Vegetation plots will be successful if the plant density is 210 stems per acre with an average plant height of 10 feet at 7 years following planting (1) HABITAT - Improve wildlife habitat within and adjacent to the Site - Plant woody native vegetation to provide organic matter and shade - Fill and plug ditches to provide groundwater hydrology - Add woody debris material throughout Site for habitat - Protect the Site with perpetual conservation easement - Restore jurisdictional wetlands - Monitoring wells will be successful if the water table is within 12 inches of the soil surface for 10-12% of the growing season - Vegetation plots will be successful if the plant density is stems per acre with an average plant height of 10 feet at 7 years following planting - Conservation Easement recorded Space Purposefully Left Blank Wetland 2 Wetland 3 0 0 20.148 3.792 Regulation Resolved? Waters of the United States-Section 401 Yes Waters of the United States-Section 404 Yes Endangered Species Act Yes Historic Preservation Act -- Coastal Zone Management Act -- FEMA Floodplain Compliance -- Essential Fisheries Habitat --No % Composition of Exotic Invasive Vegetation Restoration Method Applicable? Yes Yes Yes No No No 0% Regulatory Considerations CE Document (Mitigation Plan App E) NA Pierce Terrace Wetland Restoration Site Project County Gates County, North Carolina Wetland Type Mapped Soil Series Parameters Post-project (acres) NA NCDWR Sub-basin for Project Project Drainage Area (acres) CGIA Land Use Classification 03-01-01 Wetland Summary Information Non-riparian Bladen, Craven, Goldsboro, Lenoir, Pantego Percentage of Project Drainage Area that is Impervious Table 3. Project Attribute Table Project River Basin USGS HUC for Project (14-digit) Project Area (acres) Planted Area (acres) Project Watershed Summary Information Physiographic Province Middle Atlantic Coastal Plain Chowan 03010203040040 125.74 Project Coordinates (latitude & latitude)36.431500°N, 76.649894°W 125.74 Project Information Project Name NA Cultivated Precipitation, surface water run-on Ditched and drained Drainage Class Pre-project (acres) Wetland 1 0 87.868 Poorly drained, Moderately well drained Poorly drained, Somewhat poorly drained, Very poorly drained Native Vegetation Community Hydric Soil Status Source of Hydrology Hydrologic Impairment CE Document (Mitigation Plan App E) Hydric, Non-hydric with inclusions, Non-hydric with inclusions, Non-hydric with inclusions, Hydric Non-riverine Wet Hardwood & Swamp Forest Supporting Documentation PJD package (Mitigation Plan App D) PJD package (Mitigation Plan App D) CE Document (Mitigation Plan App E) CE Document (Mitigation Plan App E) Hydrologic, vegetative Draft MY1 Monitoring Report (Project No. 100121) page 5 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 1.2 Success Criteria Criteria for monitoring and success of stream restoration should relate to project goals and objectives identified from on-site NC WAM data collection. From a mitigation perspective, several of the goals and objectives are assumed to be functionally elevated by restoration activities without direct measurement. Other goals and objectives will be considered successful upon achieving success criteria. The following table summarizes Site success criteria. Table A. Success Criteria Wetland Hydrology • Non-riverine Wet Hardwood Forest – Saturation or inundation within the upper 12 inches of the soil surface for, at a minimum, 10 percent of the growing season, during average climatic conditions based on the Wilmington District Stream and Wetland Compensatory Mitigation Update (USACE 2016), Table 1, for a Typic Albaquult (Bladen). • Non-riverine Swamp Forest – Saturation or inundation within the upper 12 inches of the soil surface for, at a minimum, 12 percent of the growing season, during average climatic conditions based on the Wilmington District Stream and Wetland Compensatory Mitigation Update (USACE 2016), Table 1, for a Umbric Paleaquult (Pantego). Vegetation • Within planted portions of the Site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 5; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5, and 10 feet in height at year 7 in each plot1. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the Site; natural recruits not on the planting list may be considered by the IRT on a case-by-case basis. • Any single species can only account for 50% of the required stems within any vegetation plot. 1Understory/shrub species will be exempt from the vigor performance standard. 2 PROJECT MONITORING – METHODS Monitoring will be conducted, in accordance with 2016 NCIRT Guidelines, by Axiom Environmental, Inc. based on the schedule in the following Table B. A summary of monitoring is outlined in Table C on page 7. Annual monitoring reports will be submitted to the NCDMS by Restoration Systems no later than December 1 of each monitoring year data is collected. Table B. Monitoring Schedule Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Wetlands x x x x x x x Vegetation x x x x x Visual Assessment x x x x x x x Report Submittal x x x x x x x 2.1 Monitoring The monitoring parameters are summarized in the following table. Draft MY1 Monitoring Report (Project No. 100139) page 6 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table C. Monitoring Summary Hydrology Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Wetland Re- establishment and Creation Groundwater gauges Years 1–7 throughout the year with the growing season defined as March 26– November 12 56 gauges spread throughout restored wetlands and 6 gauges spread throughout created wetlands Groundwater/rain data for each monitoring period will be collected and reported for the growing season1 (March 26–November 12). Soil profile descriptions As-built and Years 3, 5, 7 61 profile descriptions, one at each groundwater gauge Soil profile descriptions completed to assess the development of hydric soil morphologic features Vegetation Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Vegetation establishment and vigor Permanent vegetation plots 0.0247 acre (100 square meters) in size; CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) As-built, Years 1, 2, 3, 5, and 7 61 plots spread across the Site Species, height, planted vs. volunteer, stems/acre Annual random vegetation plots, 0.0247 acre (100 square meters) in size 20 random transects spread across the Site Species and height Visual Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Encroachment, stabilized outfalls Visual Years 1–7 23 fixed photo points and Site boundary walking Documented conditions in yearly monitoring report narrative, current condition figures, and reporting tables 1The growing season will begin on March 26 and end on November 12 (231 days), which is the WETS growing season based on the most recent (1991–2020) 30-year historical temperature data from the WETS weather station closest to Site (Murfreesboro, NC). 2During Vegetation monitoring years, three of the random transects will be located in the non-credit generating upland buffers with the remaining 17 random transects to be located in credit generating wetland assets. Of the 17 remaining random transects in credit generating areas two random transects will be placed in the wetland creation areas (one in each area), and three ransom transects will be placed in the non-riverine swamp forest planting zone. Draft MY1 Monitoring Report (Project No. 100139) Page 7 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 3 MONITORING YEAR 1 – DATA ASSESSMENT Annual monitoring and site visits were conducted in March - November 2023 to assess the condition of the project. Wetland and vegetation criteria for the Site follow the approved success criteria presented in the Mitigation Plan and summarized in Section 1.2; monitoring methods are detailed in Section 2.1. 3.1 Hydrology Summary Year Monitoring Period Used for Determining Success 10 Percent of Monitoring Period 12 Percent of Monitoring Period 2023 (Year 1) March 26 – November 12 (231 days) 23 days 28 days Fifty-six groundwater gauges were installed in areas of non-riverine wet hardwood forest and 6 groundwater gauges were installed in non-riverine swamp forest areas. One gauge was installed in a non- credit-generating area that was initially proposed for wetland creation, for a total of 63 total gauges. Three of the 63 groundwater gauges met success criteria during the Year 1 (2023) monitoring period (Appendix C). Rainfall data indicate dry conditions leading up to the start of the 2023 growing season: on-site precipitation was near or below the 30th percentile in February, March, and April, according to WETS data (Figure C1, Appendix C), and rainfall remained relatively low through the remainder of the year as annual rainfall is below the 30th percentile of normal precipitation. Across the Site, however, the development of herbaceous hydrophytic species is abundant, and with proper rainfall, the wetland hydroperiods are expected to meet or exceed success criteria in coming years. A reference gauge has been installed within a Bladen soil map unit associated with a non-riverine wet hardwood forest at MMSP (Figure 2, Appendix A). The reference gauge location was identified and utilized as a reference for the Hofler Mitigation Site (DMS Project ID #: 95355). The old gauge was located but was no longer operable. As a result, a new gauge was installed in a new auger hole boring on November 13, 2023 with a soil profile description (Appendix C). 3.2 Vegetative Assessment The Year 1 (2023) vegetative survey was completed September 6-14, 2023. Vegetation monitoring resulted in a sitewide stem density average of 582 planted stems per acre, above the interim requirement of 320 stems per acre required at MY3. All 61 fixed vegetation plots and 19 of the 20 random transects met the interim success criteria. Please refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table, and Appendix B for Vegetation Plot Data. No vegetation areas of concern were identified during MY1. Herbaceous vegetation establishment continues to improve within ditch filled areas along with wetland creation areas. These areas were seeded with clover on November 20, 2023 to facilitate establishment of herbaceous vegetation. 3.3 Visual Assessment Visual assessments of the easement boundary and stabilized outfalls were conducted throughout the Year 1 (2023) monitoring period. A small area (0.02-acres) of encroachment was observed along the western boundary where ~5-rows of crops scalloped the edge of the easement boundary. The farmer was notified and treated wooden post with markings are scheduled to be installed once the crops are harvested. In addition, damaged witness and online markings noted in the as-built report have been repaired and/or Draft MY1 Monitoring Report (Project No. 100139) Page 8 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 replaced. The three stabilized outlets have experienced surface water flow and remain stable without any issues. Please refer to Appendix A for Visual Assessment Photographs. 3.4 Monitoring Year Summary Site vegetation is thriving; all plots are on track to exceed the Year 3 interim requirement of 320 planted stems per acre. Site wetlands have not developed expected wetland hydrology during Year 1 (2023). In coming years, assuming average to above-average rainfall, especially prior to and early in the growing season, wetland hydrology is expected to meet the 10-12% hydroperiod performance standards. Space Purposefully Left Blank Draft MY1 Monitoring Report (Project No. 100139) Page 9 Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 4 REFERENCES Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Division of Mitigation Services (NCDMS). 2014. Stream and Wetland Mitigation Monitoring Guidelines. North Carolina Department of Environmental Quality, Raleigh, North Carolina. North Carolina Ecosystem Enhancement Program (NCEEP 2007). Lower Catawba River Basin Restoration Priorities 2007 (online). Available: https://files.nc.gov/ncdeq/Mitigation%20Services/Watershed_Planning/Catawba_River_Basin/R BRP_2007%20Lower%20CAT_032013%20Final.pdf. North Carolina Department of Environment and Natural Resources, Raleigh (December 18, 2018). North Carolina Stream Functional Assessment Team. (NC SFAT 2015). N.C. Stream Assessment Method (NC SAM) User Manual. Version 2.1. North Carolina Wetland Functional Assessment Team. (NC WFAT 2010). N.C. Wetland Assessment Method (NC WAM) User Manual. Version 4.1. Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Appendix A: Visual Assessment Data Figure 1. Current Conditions Plan View Figure 2A-B. Reference Gauge Location Table 4. Visual Vegetation Condition Assessment Table Vegetation Plot Photographs Photo Log ! ! ! ! ! ! ! ! ! ! ! # # ! ! ! !! ! ! ! ! ! ! ! ! # ! !! ! ! !!!! ! ! ! ! ! # ! ! !! ! ! # ! !! ! !! # ! !" ! ! ! ! ! ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_^_ ^_^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ ^_ XW XW XW XW XW XW 6 9 1 2 3 4 5 7 8 11 12 10 1 3 1 4 15 1 6 17 1 8 19 20 23 09 24 27 11 19 22 40 26 25 60 30 14 54 44 37 33 59 12 61 34 29 13 28 08 55 47 45 4332 10 57 50 16 05 20 21 31 17 51 18 15 01 52 46 35 56 36 38 53 42 03 07 04 39 02 58 49 4806 41 56 05 04 03 02 01 55 39 38 37 36 57 07 06 58 08 09 12 11 10 53 54 35 34 32 63 33 49625250 40 41 42 51 48 59 13 16 17 15 18 19 60 28 22 23 21 24 61 27 25 26 30 31 29 46 44 43 47 45 14 20 1 2 3 4 5 6 7 8 9 1 1 1 3 1 2 14 1 0 1 5 16 17 18 1 9 2 0 23 22 21 FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ NO V 2023 1:4000 22-037 Tit le: Pro jec t: Pre pa red fo r: Gates County, N C PIE RCE TE RRA CEWETLANDMITIGATIONSITE CUR RE NTCONDITIONSPLAN VIEW 1 ³ Lege nd Co ns er va tio n E a se me nt = 1 25 .7 a cre s We tla nd C rea ti on = 3 .8 ac re s We tla nd R e-e st ab lis hm e nt - N o n-r ive ri ne S wa mp F or es t = 10 .6 ac re s We tla nd R e-e st ab lis hm e nt - N o n-r ive ri ne We t Ha rd wo od F or es t = 97 .3 ac re s Pe rm an en t Ve ge tat io n P lo ts M ee tin g Su cc es s C ri ter ia (6 1) MY 1 Ra nd om P lo ts M ee tin g Su cc es s Cr ite ria MY 1 Ra nd om P lo ts N ot Me e tin g S u ce ss Cr ite ria ^_Plo t Or igi ns !Gr ou nd wa te r G a ug e M e eti ng S uc ce ss C rit eri a - 1 0% H yd ro pe rio d !Gr ou nd wa te r G a ug e N o t M ee ti ng Su c ce ss Cr ite ria - 10 % H yd ro pe rio d #Gr ou nd wa te r G a ug e N o t M ee ti ng Su c ce ss Cr ite ria - 12 % H yd ro pe rio d "Ra in Ga u ge Ph oto P oi nt s (23 ) XW Ho fler Di tch Pl ug Lo we ring L oca tio ns 202 3 Enc ro ach m ent Ar eas 202 3 Ca ttai l Tr ea tme nt Are as05001,00 0 1,50 0250Feet ^_ FIGURE Drawn by: Date: Scale: Project No.: BEF JUNE 2023 1:12,000 22-037 Title: Project: Prepared for: Gates County, NC PIERCE TERRACEWETLANDMITIGATIONSITE REFERENCE GAUGE LOCATION 2A ³ Legend Conservation Easement = 125.7 acres ^_ Reference Gauge05001,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500250Feet Reference Gauge !. # FIGURE Drawn by: Date: Scale: Project No.: MLA NOV 2023 1:12,000 22-037 Title: Project: Prepared for: Gates County, NC PIERCE TERRACEWETLANDMITIGATIONSITE REFERENCEGAUGELOCATION 2B ³ Legend !.Reference Gauge #Parking05001,000 1,500 2,000250Feet Reference Gauge (36.437024, -76.681604) PARK HERE 34.438777, -76.683455 36.452290,-76.679241 Access from 158 Table 4. Visual Vegetation Assessment Planted acreage 125.74 Bare Areas Very limited cover of both woody and herbaceous material.0.10 acres 0.00 0.0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria.0.10acres 0.00 0.0% 0.00 0.0% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard.0.10 acres 0.00 0.0% 0.00 0.0% Easement Acreage 125.74 Invasive Areas of Concern Areas where cattail was observed and treated.0.10 acres 0.41 0.3% Easement Encroachment Areas Area of encroachment along the western easement boundary from adjacent farming operation.none % of Planted Acreage 0.02 ac Cumulative Total Vegetation Category Definitions Mapping Threshold Combined Acreage % of Easement Acreage Total Vegetation Category Definitions Mapping Threshold Combined Acreage Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Plot 1 Plot 2 Plot 3 Plot 4 Plot 5 Plot 6 Plot 7 Plot 8 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 9 Plot 10 Plot 11 Plot 12 Plot 13 Plot 14 Plot 15 Plot 16 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 17 Plot 18 Plot 19 Plot 20 Plot 21 Plot 22 Plot 23 Plot 24 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 25 Plot 26 Plot 27 Plot 28 Plot 29 Plot 30 Plot 31 Plot 32 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 33 Plot 34 Plot 35 Plot 36 Plot 37 Plot 38 Plot 39 Plot 40 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 41 Plot 42 Plot 43 Plot 44 Plot 45 Plot 46 Plot 47 Plot 48 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 49 Plot 50 Plot 51 Plot 52 Plot 53 Plot 54 Plot 55 Plot 56 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Plot 57 Plot 58 Plot 59 Plot 60 Plot 61 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Random Transect 5 Random Transect 6 Random Transect 7 Random Transect 8 Random Transect 1 Random Transect 2 Random Transect 3 Random Transect 4 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Random Transect 13 Random Transect 14 Random Transect 15 Random Transect 16 Random Transect 9 Random Transect 10 Random Transect 11 Random Transect 12 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Vegetation Monitoring Photographs Random Transect 17 Random Transect 18 Random Transect 19 Random Transect 20 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Photo Points Photo Point 1 Photo Point 2 Photo Point 3 Photo Point 4 Photo Point 6 Photo Point 5 Photo Point 8 Photo Point 7 Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Photo Point 9 Photo Point 10 Photo Point 11 Photo Point 12 Photo Point 14 Photo Point 13 Photo Point 16 Photo Point 15 Pierce Terrace Site MY1 (2023) Photo Points Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Photo Point 17 Photo Point 18 Photo Point 19 Photo Point 20 Photo Point 21 Photo Point 22 Photo Point 23 Pierce Terrace Site MY1 (2023) Photo Points Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pierce Terrace Site MY1 (2023) Boundary Photographs Pierce Terrace Site Appendix A: Visual Assessment Data MY1 Monitoring Report – December 2023 Pt 24 Repaired/Resurveyed Pt 38 Repaired/Resurveyed Pt 39 Repaired/Resurveyed Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Appendix B: Vegetation Data Table 5A. Planted Bare-Root Woody Vegetation Table 5B. Permanent Seed Mixes Table 6. Vegetation Plot Counts and Densities Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 5A. Planted Bare Root Woody Vegetation Pierce Terrace Site Vegetation Association Non-riverine Wet Hardwood Forest Canopy Species (125.73 acres) Facultative Rating # planted % of total (680 stems/acre) River birch (Betula nigra) FACW 2,200 2.42% Persimmon (Diospyros virginiana) FAC 2,500 2.76% Green ash (Fraxinus pennsylvanica) FACW 3,460 3.81% Tulip poplar (Liriodendron tulipifera) FACU 6,500 7.17% Swamp tupelo (Nyssa biflora) OBL 2,500 2.76% Black gum (Nyssa sylvatica) FAC 7,700 8.49% Sycamore (Platanus occidentalis) FACW 5,000 5.51% Laurel oak (Quercus laurifolia) FACW 8,635 9.52% Overcup oak (Quercus lyrata) OBL 5,000 5.51% Swamp chestnut oak (Quercus michauxii) FACW 6,735 7.43% Water oak (Quercus nigra) FAC 7,000 7.72% Cherrybark oak (Quercus pagoda) FACW 8,635 9.52% Willow oak (Quercus phellos) FACW 9,135 10.07% Bald cypress (Taxodium distichum) OBL 3,000 3.31% Understory Species (125.73 acres) # planted % of total (680 stems/acre) Hornbeam (Carpinus caroliniana) FAC 2,500 2.76% Sweetbay magnolia (Magnolia virginiana) FACW 2,500 2.76% Swamp bay (Persea palustris) FACW 2,500 2.76% Vegetation Association Non-riverine Swamp Forest Canopy Species (15.49 acres) – in addition to Site-wide planting # planted % of total (335 stems/acre) Water tupelo (Nyssa aquatica) OBL 1,300 1.43% Swamp tupelo (Nyssa biflora) OBL 1,300 1.43% Pond cypress (Taxodium ascendens) OBL 1,300 1.43% Bald cypress (Taxodium distichum) OBL 1,300 1.43% TOTAL 90,700 100.0% Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 5B. Permanent Seed Mix Pierce Terrace Site – Sitewide Seed Mix Species Wetland Indicator Species Wetland Indicator Species Wetland Indicator Carex albolutescens FACW Eupatorium fistulosum FACW Panicum anceps FAC Carex lupulina OBL Eupatorium perfoliatum FACW Panicum clandestinum FACW Chamaecrista fasciculata FACU Helenium flexuosum FACW Panicum rigidulum FACW Chamaecrista nictitans FACU Helianthus angustifolius FACW Pycnanthemum tenuifolium FACW Coreopsis lanceolata UPL Heliopsis helianthoides UPL Rhynchospora globularis FACW Coreopsis tinctoria FAC Hibiscus moscheutos OBL Rudbeckia hirta FACU Desmodium canadense FAC Juncus effusus OBL Scirpus cyperinus OBL Echinacea purpurea FACU Juncus tennuis FAC Tridens flavus FACU Elymus riparius FACW Liatris spicata FAC Verbena hastata FAC Elymus virginicus FAC Monarda fistulosa FACU Vernonia noveboracensis FACW Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 6. Planted Vegetation Totals Pierce Terrace Site Plot # Planted Stems/Acre Success Criteria Met? 1 688 Yes 2 810 Yes 3 648 Yes 4 567 Yes 5 445 Yes 6 445 Yes 7 607 Yes 8 810 Yes 9 688 Yes 10 607 Yes 11 688 Yes 12 729 Yes 13 769 Yes 14 567 Yes 15 769 Yes 16 688 Yes 17 729 Yes 18 567 Yes 19 729 Yes 20 648 Yes 21 688 Yes 22 486 Yes 23 445 Yes 24 648 Yes 25 445 Yes 26 486 Yes 27 526 Yes 28 567 Yes 29 526 Yes 30 486 Yes 31 445 Yes 32 648 Yes 33 526 Yes 34 688 Yes Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 6. Planted Vegetation Totals (Cont.) Pierce Terrace Site Plot # Planted Stems/Acre Success Criteria Met? 35 729 Yes 36 648 Yes 37 486 Yes 38 405 Yes 39 688 Yes 40 607 Yes 41 607 Yes 42 648 Yes 43 607 Yes 44 526 Yes 45 567 Yes 46 486 Yes 47 445 Yes 48 769 Yes 49 648 Yes 50 607 Yes 51 526 Yes 52 486 Yes 53 1052 Yes 54 607 Yes 55 810 Yes 56 972 Yes 57 405 Yes 58 729 Yes 59 607 Yes 60 567 Yes 61 526 Yes R-1 648 Yes R-2 648 Yes R-3 526 Yes R-4 607 Yes R-5 324 Yes R-6 243 No R-7 445 Yes Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 6. Planted Vegetation Totals (Cont.) Pierce Terrace Site Plot # Planted Stems/Acre Success Criteria Met? R-8 526 Yes R-9 526 Yes R-10 364 Yes R-11 405 Yes R-12 486 Yes R-13 445 Yes R-14 405 Yes R-15 526 Yes R-16 567 Yes R-17 364 Yes R-18 445 Yes R-19 405 Yes R-20 688 Yes Average Planted Stems/Acre 582 Yes Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 1122 Carpinus caroliniana American hornbeam Tree FAC 11 Fraxinus pennsylvanica green ash Tree FACW 44 112244 Liriodendron tulipifera tuliptree Tree FACU 2211 88 Magnolia virginiana sweetbay Tree FACW 1111 1111 Nyssa aquatica water tupelo Tree OBL 112211 11 Nyssa biflora swamp tupelo Tree OBL 1 1 221111 Nyssa sp. Nyssa sylvatica blackgum Tree FAC 22112233222211 22 Persea palustris swamp bay Shrub FACW 11 11 Platanus occidentalis American sycamore Tree FACW 1111 4411 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW Quercus laurifolia laurel oak Tree FACW 33113311111111 4433 Quercus lyrata overcup oak Tree OBL 1133 1133 2211 Quercus michauxii swamp chestnut oak Tree FACW 112233 333333 Quercus nigra water oak Tree FAC 2 2 2211 33 Quercus pagoda cherrybark oak Tree FACW 334422 2233 Quercus phellos willow oak Tree FACW 666611 331111 1133 Quercus rubra northern red oak Tree FACU 11 Quercus sp. Taxodium ascendens pond cypress Tree OBL 11 Taxodium distichum bald cypress Tree OBL 11 11 Sum Performance Standard 17 17 20 20 16 16 14 14 11 11 11 11 15 15 20 20 17 17 15 15 17 20 16 14 11 11 15 20 17 15 688 810 648 567 445 445 607 810 688 607 61087788897 35 30 19 29 27 27 27 40 24 27 1111111111 0000000000 17 20 16 14 11 11 15 20 17 15 688 810 648 567 445 445 607 810 688 607 61087788897 35 30 19 29 27 27 27 40 24 27 1111111111 0000000000 Post Mitigation  Plan  Performance  Standard Current Year Stem Count Current Year Stem Count Stems/Acre Stems/Acre Species Count Species Count Dominant Species Composition (%) Dominant Species Composition (%) Average Plot Height (ft.) Average Plot Height (ft.) % Invasives % Invasives Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Veg Plot 9 F Veg Plot 10 FIndicator  Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Veg Plot 7 F Veg Plot 8 F Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) Scientific Name Common Name Tree/Shrub 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 5 5 1 1 Carpinus caroliniana American hornbeam Tree FAC 11 11 Fraxinus pennsylvanica green ash Tree FACW 44 11 Liriodendron tulipifera tuliptree Tree FACU 1111 4433331188 Magnolia virginiana sweetbay Tree FACW Nyssa aquatica water tupelo Tree OBL 2 2 1 1 Nyssa biflora swamp tupelo Tree OBL 2211 11 Nyssa sp. Nyssa sylvatica blackgum Tree FAC 221122 22 11 Persea palustris swamp bay Shrub FACW 3 3 2 2 Platanus occidentalis American sycamore Tree FACW 2 2 22 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW Quercus laurifolia laurel oak Tree FACW 111122 22 11 Quercus lyrata overcup oak Tree OBL 5511 4477111111 55 Quercus michauxii swamp chestnut oak Tree FACW 11111111 113311 Quercus nigra water oak Tree FAC 11112211113333 22 Quercus pagoda cherrybark oak Tree FACW 11551122226666223344 Quercus phellos willow oak Tree FACW 44111122 2222221133 Quercus rubra northern red oak Tree FACU Quercus sp.11 Taxodium ascendens pond cypress Tree OBL Taxodium distichum bald cypress Tree OBL 1 1 2 2 33 Sum Performance Standard 17 17 18 18 19 19 14 14 19 19 17 17 18 18 14 14 18 18 16 16 17 18 19 14 19 17 18 14 18 16 688 729 769 567 769 688 729 567 729 648 812108677776 29 28 26 29 37 35 33 21 44 31 1111111111 0000000000 17 18 19 14 19 17 18 14 18 16 688 729 769 567 769 688 729 567 729 648 812108677776 29 28 26 29 37 35 33 21 44 31 1111111111 0000000000 Veg Plot 17 F Veg Plot 18 F Veg Plot 19 F Veg Plot 20 FVeg Plot 11 F Veg Plot 12 F Veg Plot 13 F Veg Plot 14 FIndicator  Status Veg Plot 15 F Veg Plot 16 F Plot size (ACRES) Scientific Name Common Name Tree/Shrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Average Plot Height (ft.) % Invasives Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Post Mitigation  Plan  Performance  Standard Current Year Stem Count 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Stems/Acre Species Count Dominant Species Composition (%) Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 3 3 Carpinus caroliniana American hornbeam Tree FAC 1 1 2 2 Fraxinus pennsylvanica green ash Tree FACW 1 1 1 1 4 4 22 Liriodendron tulipifera tuliptree Tree FACU 2 2 2 2 1 1 2 2 Magnolia virginiana sweetbay Tree FACW 3 3 11 Nyssa aquatica water tupelo Tree OBL 11 Nyssa biflora swamp tupelo Tree OBL 33 11 Nyssa sp. Nyssa sylvatica blackgum Tree FAC 1 1 2 2 2 2 1122 Persea palustris swamp bay Shrub FACW Platanus occidentalis American sycamore Tree FACW 332244 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW Quercus laurifolia laurel oak Tree FACW 1 1 22111122 222222 Quercus lyrata overcup oak Tree OBL 33111122 22662255 Quercus michauxii swamp chestnut oak Tree FACW 1122443311 44 Quercus nigra water oak Tree FAC 1 1 4422 Quercus pagoda cherrybark oak Tree FACW 442222 22221111 Quercus phellos willow oak Tree FACW 2 2 11332211 Quercus rubra northern red oak Tree FACU Quercus sp. Taxodium ascendens pond cypress Tree OBL 1 1 Taxodium distichum bald cypress Tree OBL 1111 11 Sum Performance Standard 17 17 12 12 11 11 16 16 11 11 12 12 13 13 14 14 13 13 12 12 17 12 11 16 11 12 13 14 13 12 688 486 445 648 445 486 526 567 526 486 9759755675 24 25 36 19 27 33 31 43 31 42 1212222212 0000000000 17 12 11 16 11 12 13 14 13 12 688 486 445 648 445 486 526 567 526 486 9759755675 24 25 36 19 27 33 31 43 31 42 1212222212 0000000000 Veg Plot 25 F Veg Plot 26 F Veg Plot 27 F Veg Plot 28 F Veg Plot 29 F Veg Plot 30 FVeg Plot 21 F Veg Plot 22 F Veg Plot 23 F Veg Plot 24 FIndicator  StatusScientific Name Common Name Tree/Shrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Post Mitigation  Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Plot size (ACRES) 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 1 1 2222 Carpinus caroliniana American hornbeam Tree FAC 1 1 Fraxinus pennsylvanica green ash Tree FACW 3 3 2 2 11 Liriodendron tulipifera tuliptree Tree FACU 113311 77114477 Magnolia virginiana sweetbay Tree FACW 33 Nyssa aquatica water tupelo Tree OBL Nyssa biflora swamp tupelo Tree OBL 22 Nyssa sp. Nyssa sylvatica blackgum Tree FAC 2 2 11 22 Persea palustris swamp bay Shrub FACW 11 Platanus occidentalis American sycamore Tree FACW 1 1 2233 33 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW Quercus laurifolia laurel oak Tree FACW 1 1 1 1 1 1 1111 Quercus lyrata overcup oak Tree OBL 333322221133 11 Quercus michauxii swamp chestnut oak Tree FACW 1122 114411 113322 Quercus nigra water oak Tree FAC 2 2 1 1 1 1 4 4 2 2 Quercus pagoda cherrybark oak Tree FACW 2255 5533 2233 Quercus phellos willow oak Tree FACW 331155444422 22 Quercus rubra northern red oak Tree FACU Quercus sp.11 Taxodium ascendens pond cypress Tree OBL Taxodium distichum bald cypress Tree OBL 1 1 11 11 Sum Performance Standard 11 11 16 16 13 13 17 17 18 18 16 16 13 13 10 10 17 17 15 15 11 16 13 17 18 16 13 10 17 15 445 648 526 688 729 648 486 405 688 607 5867894775 27 31 38 29 22 19 54 30 24 47 2121111111 0000000000 11 16 13 17 18 16 13 10 17 15 445 648 526 688 729 648 486 405 688 607 5867894775 27 31 38 29 22 19 54 30 24 47 2121111111 0000000000 Veg Plot 40 FVeg Plot 34 FIndicator  Status Veg Plot 35 F Veg Plot 36 F Veg Plot 37 F Veg Plot 38 F Veg Plot 39 FVeg Plot 31 F Veg Plot 32 F Veg Plot 33 FScientific Name Common Name Tree/Shrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Post Mitigation  Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Plot size (ACRES) 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 1 1 11 Carpinus caroliniana American hornbeam Tree FAC 11 Fraxinus pennsylvanica green ash Tree FACW 1122 11 Liriodendron tulipifera tuliptree Tree FACU 4 4 2211 11 22 Magnolia virginiana sweetbay Tree FACW 1 1 11 Nyssa aquatica water tupelo Tree OBL Nyssa biflora swamp tupelo Tree OBL Nyssa sp. Nyssa sylvatica blackgum Tree FAC 112233 Persea palustris swamp bay Shrub FACW 1133 11 Platanus occidentalis American sycamore Tree FACW 1133 2211 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW 1 1 22 Quercus laurifolia laurel oak Tree FACW 22 Quercus lyrata overcup oak Tree OBL 44774411444411 1177 Quercus michauxii swamp chestnut oak Tree FACW 1111 2211 441133 Quercus nigra water oak Tree FAC 1144 11 11 3311 Quercus pagoda cherrybark oak Tree FACW 5511 11 1133222244 Quercus phellos willow oak Tree FACW 3333 22661177 Quercus rubra northern red oak Tree FACU 11 Quercus sp.11 1133 Taxodium ascendens pond cypress Tree OBL Taxodium distichum bald cypress Tree OBL Sum Performance Standard 15 15 16 16 15 15 13 13 14 14 12 12 11 11 19 19 16 16 15 15 15 16 15 13 14 12 11 19 16 15 607 648 607 526 567 486 445 769 648 607 5598648894 33 44 27 23 29 50 27 37 19 47 2212112121 0000000000 15 16 15 13 14 12 11 19 16 15 607 648 607 526 567 486 445 769 648 607 5598648894 33 44 27 23 29 50 27 37 19 47 2212112121 0000000000 Veg Plot 50 FVeg Plot 45 F Veg Plot 48 F Veg Plot 49 FVeg Plot 41 F Veg Plot 42 F Veg Plot 43 F Veg Plot 44 FIndicator  Status Veg Plot 46 F Veg Plot 47 FCommon Name Tree/Shrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Post Mitigation  Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Plot size (ACRES) Scientific Name 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Betula nigra river birch Tree FACW 11 11 Carpinus caroliniana American hornbeam Tree FAC Fraxinus pennsylvanica green ash Tree FACW 44 11 Liriodendron tulipifera tuliptree Tree FACU 5511 44 22332244 Magnolia virginiana sweetbay Tree FACW 11 11 Nyssa aquatica water tupelo Tree OBL 2211 Nyssa biflora swamp tupelo Tree OBL 11 11 Nyssa sp.22 Nyssa sylvatica blackgum Tree FAC 22 33 33 11 Persea palustris swamp bay Shrub FACW 11 Platanus occidentalis American sycamore Tree FACW 1 1 5 5 1122 33331111 Quercus alba white oak Tree FACU Quercus bicolor swamp white oak Tree FACW Quercus laurifolia laurel oak Tree FACW 3 3 3 3 Quercus lyrata overcup oak Tree OBL 1166114411 11 Quercus michauxii swamp chestnut oak Tree FACW 3 3 4411 111111 Quercus nigra water oak Tree FAC 11112233 11 11 44 Quercus pagoda cherrybark oak Tree FACW 22224422221212 22 Quercus phellos willow oak Tree FACW 222244333322 99 11 Quercus rubra northern red oak Tree FACU Quercus sp.22 11 Taxodium ascendens pond cypress Tree OBL 2222 22 Taxodium distichum bald cypress Tree OBL 3311 33 44 Sum Performance Standard 13 13 12 12 26 26 15 15 20 20 24 24 10 10 18 18 15 15 14 14 13 13 13 12 26 15 20 24 10 18 15 14 13 526 486 1052 607 810 972 405 729 607 567 526 67779847669 38 25 23 20 20 50 30 50 27 29 31 11111221111 00000000000 13 12 26 15 20 24 10 18 15 14 13 526 486 1052 607 810 972 405 729 607 567 526 67779847669 38 25 23 20 20 50 30 50 27 29 31 11111221111 00000000000 Veg Plot 61 FVeg Plot 55 F Veg Plot 56 F Veg Plot 57 F Veg Plot 58 F Veg Plot 59 FVeg Plot 51 F Veg Plot 52 F Veg Plot 53 F Veg Plot 54 F Veg Plot 60 F Plot size (ACRES) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Indicator  Status Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Tree/ShrubScientific Name Common Name 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Post Mitigation  Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Table 7. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) 125.74 2023‐03‐03 NA  NA  2023‐09‐07 0.0247 Veg Plot 1 R Veg Plot 2 R Veg Plot 3 R Veg Plot 4 R Veg Plot 5 R Veg Plot 6 R Veg Plot 7 R Veg Plot 8 R Veg Plot 9 R Veg Plot 10 R Veg Plot 11 R Veg Plot 12 R Veg Plot 13 R Veg Plot 14 R Veg Plot 15 R Veg Plot 16 R Veg Plot 17 R Veg Plot 18 R Veg Plot 19 R Veg Plot 20 R Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Total Betula nigra river birch Tree FACW 1 Carpinus caroliniana American hornbeam Tree FAC 2 11 Fraxinus pennsylvanica green ash Tree FACW 2 1 2 2 4 1 1 2 3 Liriodendron tulipifera tuliptree Tree FACU 1 1 2 6 1 13121 Magnolia virginiana sweetbay Tree FACW 2 1 1 Nyssa aquatica water tupelo Tree OBL Nyssa biflora swamp tupelo Tree OBL 1 Nyssa sp. Nyssa sylvatica blackgum Tree FAC 3 1 1 2 1 2 Persea palustris swamp bay Shrub FACW 31 Platanus occidentalis American sycamore Tree FACW 1 1 11 Quercus alba white oak Tree FACU 21 Quercus bicolor swamp white oak Tree FACW 1 112 Quercus laurifolia laurel oak Tree FACW 3 3 1 1 1 3 Quercus lyrata overcup oak Tree OBL 3 3 3 2221324 234 Quercus michauxii swamp chestnut oak Tree FACW 4243 15 1 412 Quercus nigra water oak Tree FAC 1 3 1 1 1 1 3 2 1 2 Quercus pagoda cherrybark oak Tree FACW 3 1 3 1341 12 1 23 Quercus phellos willow oak Tree FACW 2 3 4 1 3 1 2 1 4 Quercus rubra northern red oak Tree FACU 1 Quercus sp.2 21232 2 Taxodium ascendens pond cypress Tree OBL Taxodium distichum bald cypress Tree OBL 7212 2 Sum Performance Standard 16 16 13 15 8 6 11 13 13 9 10 12 11 10 13 14 9 11 10 17 16 16 13 15 8 6 11 13 13 9 10 12 11 10 13 14 9 11 10 17 648 648 526 607 324 243 445 526 526 364 405 486 445 405 526 567 364 445 405 688 48674484486765677656 44 19 31 20 38 50 18 38 46 22 30 25 27 30 31 29 22 36 30 24 212122221122123111122 00000000000000000000 16 16 13 15 8 6 11 13 13 9 10 12 11 10 13 14 9 11 10 17 648 648 526 607 324 243 445 526 526 364 405 486 445 405 526 567 364 445 405 688 48674484486765677656 44 19 31 20 38 50 18 38 46 22 30 25 27 30 31 29 22 36 30 24 212122221122123111122 00000000000000000000 Plot size (ACRES) Scientific Name Common Name Tree/Shrub Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Indicator  Status Species  Included in  Approved  Mitigation Plan Mitigation Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular  font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Post Mitigation  Plan  Performance  Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) % Invasives Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Appendix C: Hydrologic Data Table 8. Groundwater Hydrology Data Groundwater Gauge Graphs Figure C1. 30-70th Percentile Graph for Rainfall Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Table 8. Groundwater Hydrology Data Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2023) Year 2 (2024) Year 3 (2025) Year 4 (2026) Year 5 (2027) Year 6 (2028) Year 7 (2029) 1 No – 4 days (1.7%) 2 No – 1 day (0.4%) 3 No – 5 days (2.2%) 4 No – 2 days (0.9%) 5 No – 6 days (2.6%) 6 No – 2 days (0.9%) 7 No – 1 day (0.4%) 8 No – 0 days (0.0%) 9 No – 2 days (0.9%) 10 No – 2 days (0.9%) 11 No – 2 days (0.9%) 12 No – 15 days (6.5%) 13 No – 0 days (0.0%) 14 No – 0 days (0.0%) 15 No – 0 days (0.0%) 16 No – 0 days (0.0%) 17 No – 2 days (0.9%) 18 No – 0 days (0.0%) 19 No – 0 days (0.0%) Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2023) Year 2 (2024) Year 3 (2025) Year 4 (2026) Year 5 (2027) Year 6 (2028) Year 7 (2029) 20 No – 1 day (0.4%) 21 No – 5 days (2.2%) 22 No - 3 days (1.3%) 23 No – 8 days (3.4%) 24 No – 5 days (2.2%) 25* No – 2 days (0.9%) 26 No – 5 days (2.2%) 27* No – 10 days (4.3%) 28 No – 0 days (0.0%) 29 No – 3 days (1.3%) 30 No – 13 days (5.6%) 31 Yes – 26 days (11.2%) 32 No – 10 days (4.3%) 33 Yes – 25 days (10.8%) 34 No – 14 days (6.0%) 35 No – 5 days (2.2%) 36 No – 4 days (1.7%) 37 No – 3 days (1.3%) 38 No – 7 days (3.0%) Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2023) Year 2 (2024) Year 3 (2025) Year 4 (2026) Year 5 (2027) Year 6 (2028) Year 7 (2029) 39* No – 12 days (5.2%) 40 No – 5 days (2.2%) 41 No – 14 days (6.0%) 42 No - 13 days (5.6%) 43 No – 7 days (3.0%) 44 No – 6 days (2.6%) 45 No – 6 days (2.6%) 46 No – 14 days (6.0%) 47 No – 16 days (6.9%) 48 Yes – 24 days (10.3%) 49 No – 4 days (1.7%) 50 No – 7 days (3.0%) 51 No - 13 days (5.6%) 52 No – 7 days (3.0%) 53 No – 17 days (7.3%) 54* No – 25 days (10.8%) 55 No – 8 days (3.4%) 56 No – 5 days (2.2%) 57 No – 2 days (0.9%) Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 * These gauges are located in the non-riverine swamp forest and have a hydroperiod performance standard of 12%. All other gauges are located in non-riverine wet hardwood forest and have a hydroperiod performance standard of 10%. Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2023) Year 2 (2024) Year 3 (2025) Year 4 (2026) Year 5 (2027) Year 6 (2028) Year 7 (2029) 58* No – 8 days (3.4%) 59* No – 12 days (5.2%) 60 No – 0 days (0.0%) 61 No – 0 days (0.0%) 62 No – 12 days (5.2%) 63 No – 9 days (3.9%) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 1 Year  1 (2023 Data) End Growing Season November 12 Start Growing Season March 26 4 Days 1.7% Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 2 Year  1 (2023 Data) 1 Day 0.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 3 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 4 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 5 Year  1 (2023 Data) 6 Days 2.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 6 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 7 Year  1 (2023 Data) 2 Day 0.86% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 8 Year  1 (2023 Data) 1 Days 0.43% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 9 Year  1 (2023 Data) 3 Days 1.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 10 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 11 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 12 Year  1 (2023 Data) 15 Days 6.5% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 13 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 14 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 15 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 16 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 17 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 18 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 19 Year  1 (2023 Data) 1 Day 0.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 20 Year  1 (2023 Data) 1 Day 0.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 21 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 22 Year  1 (2023 Data) 3 Days 1.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 23 Year  1 (2023 Data) 8 Days 3.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 24 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 25 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 26 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 27 Year  1 (2023 Data) 10 Days 4.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 28 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 29 Year  1 (2023 Data) 4 Days 1.7% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 30 Year  1 (2023 Data) 13 Days 5.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 31 Year  1 (2023 Data) 26 Days 11.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 32 Year  1 (2023 Data) 10 Days 4.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 33 Year  1 (2023 Data) 25 Days 10.8% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 34 Year  1 (2023 Data) 14 Days 6.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 35 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 36 Year  1 (2023 Data) 4 Days 1.7% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 37 Year  1 (2023 Data) 3 Days 1.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 38 Year  1 (2023 Data) 7 Days 3.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 39 Year  1 (2023 Data) 12 Days 5.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 40 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 41 Year  1 (2023 Data) 14 Days 6.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 42 Year  1 (2023 Data) 13 Days 5.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 43 Year  1 (2023 Data) 7 Days 3.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s  (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 44 Year  1 (2023 Data) 6 Days 2.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 45 Year  1 (2023 Data) 6 Days 2.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 46 Year  1 (2023 Data) 14 Days 6.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 47 Year  1 (2023 Data) 16 Days 6.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 48 Year  1 (2023 Data) 24 Days 10.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 49 Year  1 (2023 Data) 4 Days 1.7% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 50 Year  1 (2023 Data) 7 Days 3.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 51 Year  1 (2023 Data) 13 Days 5.6% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 52 Year  1 (2023 Data) 7 Days 3.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 53 Year  1 (2023 Data) 17 Days 7.3% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 54 Year  1 (2023 Data) 25 Days 10.8% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 55 Year  1 (2023 Data) 8 Days 3.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 56 Year  1 (2023 Data) 5 Days 2.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 57 Year  1 (2023 Data) 2 Days 0.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 58 Year  1 (2023 Data) 8 Days 3.4% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 59 Year  1 (2023 Data) 12 Days 5.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Swamp Forest - Wetland Hydroperiod Success Criteria is 12% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 60 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 61 Year  1 (2023 Data) 0 Days 0.0% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 62 Year  1 (2023 Data) 12 Days 5.2% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0.0 0.5 1.0 1.5 2.0 2.5 3.0 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l  Am o u n t s   (i n ) Gr o u n d w a t e r   Le v e l  (i n ) Pierce Terrace  Groundwater Gauge 63 Year  1 (2023 Data) 9 Days 3.9% End Growing Season November 12 Start Growing Season March 26 Non-riverine Wet Hardwood Forest - Wetland Hydroperiod Success Criteria is 10% of Growing Season 0 1 2 3 4 5 6 7 8 Ra i n f a l l  Am o u n t  in  In c h e s Figure C1: Pierce Terrace 30‐70 Percentile  Graph for Rainfall  30‐70th percentile data from WETS Station: Wallaceton‐Lake Drummond, VA* 2023 2024 2025 2026 2027 2028 2029 30th Percentile 70th Percentile *The site is located in Gates County, NC,  however no WETS data is available for  Gates County. The nearest station is  located 19.5 miles NE in Wallaceton‐Lake  Drummond, Chesapeake City, VA. Draft MY1 Monitoring Report (Project No. 100139) Appendices Pierce Terrace Site Restoration Systems, LLC Gates County, North Carolina February 2024 Appendix D: Project Timeline and Contact Info Table 9. Project Timeline Table 10. Project Contacts Table 9. Project Timeline Activity or Deliverable Data Collection Complete Completion or Delivery Project Instituted (NCDMS Contract No. 7907‐01)NA May 6, 2019 Mitigation Plan Approved NA May 2022 Construction Completed NA August 29, 2022 Planting Completed NA March 3, 2023 As‐built Survey Completed NA March 2023 MY‐0 Vegetation Data Collection March 6‐7, 2023 NA MY‐0 Baseline Report March 2023 March 2023 MY‐1 Vegetation Data Collection September 6‐14, 2023 NA MY‐1 Monitoring Report November 2023 December 2023 MY‐2+ Monitoring Reports    Table 10. Project Contacts Full Delivery Provider Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, NC 27604 Mitigation Provider POC Raymond Holz 919‐755‐9490 Designer Sungate Design Group, P.A. 905 Jones Franklin Rd Raleigh, NC 27606 Primary project design POC Josh Dalton 919‐710‐8333 Monitoring Axiom Environmental, Inc. 218 Snow Ave Raleigh, NC 27603 Primary project monitoring POC Grant Lewis 919‐215‐1693 Surveyor & Land Quality Permit k2 Design Group 5688 U.S. Hwy 70 East Goldsboro, NC 27534 Surveryor POC John Rudolph (L‐4194) 919‐755‐9490 Planting Contractor Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, NC 27604 Primary planting POC Josh Merritt 919‐755‐9490 Construction Contractor Land Mechanic Design 126 Circle G Lane Willow Spring, NC 27592 Primary project construction POC Charles Hill 919‐639‐6132 General Contractor Restoration Systems, LLC 1101 Haynes Street, Suite 211 Raleigh, NC 27604 General Contractor POC Worth Creech (GC #64807) 919‐755‐9490 Pierce Terrace Wetland Mitigation Site/100139