20160405 Ver 1_AllianceHeadwaters_97086_MY4_2023_20240214
MONITORING REPORT (MY4) ALLIANCE HEADWATERS MITIGATION SITE Johnston County, North Carolina NCDEQ Contract No. 6832 DWR ID No. 20160405 DMS ID No. 97086 USACE Action ID No. SAW-2016-00882 RFP No. 16-006477 Neuse River Basin HUC 03020201 Data Collection: January - October 2023 Submission: February 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 Response to Monitoring Year 4 (2023) DMS Comments Alliance Headwaters Stream and Wetland Mitigation Site (DMS #97086) Neuse River Basin 03020201, Johnston County Contract No. 6832 Comments Received (Black Text) & Responses (Blue Text) Report & Field Visit: 1. Due to the most recent groundwater data, have there been additional wetlands identified to be at risk? Please denote wetlands at risk in the asset table. Response: MY4 groundwater data has been assessed with relation to 2024 climatic conditions along with previous monitoring years’ groundwater data including the on-site reference gauge. RS is preparing a mitigation plan addendum/amendment to propose additional wetland monitoring parameters and hydroperiod success criteria for the wetland assets. As a result, 9 wetland areas (1.755 acres) have been determined to be at risk and denoted on the asset table. Wetlands at risk have been separated into two categories “At-Risk of Credit Removal” and “At-Risk of Partial Credit Reduction” these areas have been added to the asset table. 2. CCPV – Please map the at-risk wetlands. Response: The wetlands at risk referenced in the response to comment 1 have been symbolized on the CCPV. 3. Table 11. Verification of Bankfull Events – a. Please verify that that UT2 had a bankfull event on March 16, 2021. Photo # 12 which is referenced is labeled as UT4. Response: The UT2 trail camera did not capture the event in progress, however, UT2 stream gauge data did capture the event. Therefore, this event was documented on UT1, UT2, UT3, and UT4. The table has been updated for clarity. b. List all tributaries that have met bankfull. It is recommended to add a new column on which tributaries have meet. Response: A column was added to Table 11 to indicate the tributary (or tributaries) where each bankfull event was documented. Digital Comments: 1. The digital data submission is missing summary tables (tables 2, 10, 11, & 12 in PDF report submitted) and dedicated photo point photos if applicable, please submit missing components. Response: An excel file containing Tables 1-4 was added to a “Background Tables” folder and an excel file containing Tables 10-12 was added to the “Hydrology” folder in the digital submittal. No permanent photo points were established in the mitigation plan other than cross-sections and veg plot photos. Monitoring Report MY4 (Project No. 97086) Executive Summary Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Alliance Headwaters -- Year 4 (2023) Monitoring Summary General Notes • No encroachment was identified in Year 4. • No evidence of nuisance animal activity (i.e., beaver, heavy deer browsing, etc.) was observed. Streams • Stream measurements were not performed in Year 4 (2023), in accordance with the monitoring schedule. • A visual assessment indicates that across the Site, all in-stream structures are intact and functioning as designed and that channel geometry compares favorably with the proposed conditions outlined in the Detailed Restoration Plan and as constructed. No stream areas of concern were identified during Year 4 (2023) monitoring. Tables for Year 3 (2022) data and annual quantitative assessments are included in Appendix D. • All seven flow gauges recorded continuous flow for more than the 30-days. Recorded flow periods ranged from 63 to 143 consecutive days (Appendix E). • Two bankfull events were documented in Year 4 (2023) monitoring. Six bankfull events have been recorded to date, with at least one occurring in all four monitoring years (Table 16, Appendix E). Wetlands • Thirteen of thirty-six groundwater gauges met success criteria for the Year 4 (2023) monitoring period (Appendix E). The on-site reference gauge met success criteria in Year 4 (2023), with a hydroperiod of 49 days (19.7%). Rainfall data indicate relatively dry conditions leading up to the start of the 2023 growing season: on-site precipitation was near or below the 30th percentile in January, February, March, and May, according to WETS data (Appendix E). However, across the Site, the development of herbaceous hydrophytic species remains abundant. • Wetland At-Risk have been added to the asset table and CCPV with two designations (“At-Risk of Credit Removal” and “At-Risk of Partial Credit Reduction”). RS is preparing a Mitigation Plan Addendum/Amendment to discuss areas and propose a path forward. Vegetation • In accordance with the monitoring schedule, vegetation plot monitoring was not performed in Year 4 (2023). Woody vegetation continues to thrive across the Site, with stem heights reaching 10+ feet in some areas. No areas of vegetation concern were identified in Year 4 (2023). Site Maintenance Report (2023) Invasive Species Work Maintenance work 05/12/2023 Pine thinning (UT1-Reach 3 and UT3-Reach 2) 08/28/2023 Cattail (sporadic locations across the Site) 07/31/23, 09/11/2023, 09/13/2023 Boundary visibility improvement Monitoring Report MY4 (Project No. 97086) Executive Summary Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Site Monitoring Activity and Reporting History Project Millstones Stream Monitoring Complete Vegetation Monitoring Complete Wetland Monitoring Data Analysis Complete Completion or Delivery Construction Earthwork -- -- -- -- July 31, 2019 Planting -- -- -- -- January 16, 2020 As-Built Documentation Dec. 11-16, 2020 Jan. 16-17, 2020 -- January 2020 March 2020 Year 1 Monitoring July 23, 2020 July 27-28, 2020 Jan. – Nov. 2020 November 2020 January 2021 Year 2 Monitoring March 10, 2021 July 6, 2021 Jan. – Nov. 2021 November 2021 December 2021 Year 3 Monitoring May 19, 2022 June 29-July 1, 2022 Jan. – Nov. 2022 November 2022 February 2023 Year 4 monitoring NA NA Jan. – Nov 2023 November 2023 December 2023 Monitoring Report MY4 (Project No. 97086) Executive Summary Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 MONITORING REPORT (MY4) ALLIANCE HEADWATERS MITIGATION SITE Johnston County, North Carolina NCDEQ Contract No. 6832 DWR ID No. 20160405 DMS ID No. 97086 USACE Action ID No. SAW-2016-00882 RFP No. 16-006477 Neuse River Basin HUC 03020201 Data Collection: January - October 2023 Submission: February 2024 Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 Prepared by: And Restoration Systems, LLC Axiom Environmental, Inc. 1101 Haynes Street, Suite 211 218 Snow Avenue Raleigh, North Carolina 27604 Raleigh, North Carolina 27603 Contact: Raymond Holz Contact: Grant Lewis 919-755-9490 (phone) 919-215-1693 (phone) 919-755-9492 (fax) Monitoring Report MY4 (Project No. 97086) Table of Contents page i Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 TABLE OF CONTENTS 1.0 PROJECT SUMMARY ....................................................................................................................1 1.1 PROJECT GOALS & OBJECTIVES ................................................................................................................. 1 1.2 PROJECT BACKGROUND ........................................................................................................................... 1 1.3 PROJECT COMPONENTS AND STRUCTURE.................................................................................................... 2 1.4 SUCCESS CRITERIA .................................................................................................................................. 2 2.0 METHODS....................................................................................................................................3 2.1 MONITORING ......................................................................................................................................... 4 3.0 REFERENCES ................................................................................................................................7 APPENDICES Appendix A. Background Tables and Map Figure 1. Site Location Table 1. Project Components and Mitigation Units Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Appendix B. Visual Assessment Data Figures 2 & 2A-2B. Current Conditions Plan View Tables 5A-5H. Visual Stream Morphology Stability Assessment Table 6. Vegetation Condition Assessment Appendix D. Hydrology Data Tables 10A-G. Channel Evidence Stream Gauge Graphs Table 11. Verification of Bankfull Events Figure E1. 30/70 Percentile Graph for Rainfall Soil Temperature Graph Table 12. Groundwater Hydrology Data Groundwater Gauge Graphs Appendix E. Site Photo Log Appendix F. IRT Correspondence 2022-10-20. MY2 (2021) and MY3 (2022) IRT Site Visit Notes Appendix C. Stream Geomorphology Data Tables 7A-7E. Baseline Stream Data Summary Tables 8A-8D. Monitoring Data-Dimensional Morphology Summary (Dimensional Parameters- Cross-sections) Tables 9A-9E. Monitoring Data-Stream Reach Data Summary Monitoring Report MY4 (Project No. 97086) page 1 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 1.0 PROJECT SUMMARY Restoration Systems, LLC (RS) has established the North Carolina Division of Mitigation Services (NCDMS) Alliance Headwaters Mitigation Site (Site). 1.1 Project Goals & Objectives Project goals and associated objectives are summarized in Table A. Table A: Summary of Goals and Objectives for the Alliance Headwaters Mitigation Project Goals Objectives Pre-construction Functional Status Post-construction Functional Status Goals Specific to the Neuse River and Hannah Creek Watershed Discussed in the RBRP (NCDMS 2010 and 2015) and Neuse River Basinwide Plan (NCDWQ 2009) Remove Direct Nutrient Inputs from Agricultural Lands • Restoration and enhancement of minimum 50-foot riparian buffers along all Project reaches • Protection of riparian buffers with a perpetual conservation easement • Reducing the amount of land in active row crop agriculture • Decreasing drainage to restore wetlands, promoting higher water table conditions, and denitrification Not Functioning Functioning Remove Direct Sediment Inputs from Agricultural Lands • Restoration of stabilized headwater stream systems • Restoration of wetlands and riparian buffers to filter runoff • Increase the distance between active farming operations and receiving waters • Stabilization of gullies and ditches Not Functioning Functioning Additional Benefits to Hannah Creek Significant Natural Heritage Area Improved Aquatic Habitats • Restoration of appropriate bed form diversity, headwater stream/wetland form, and in-stream structures to provide suitable habitat • Restoration of self-sustaining stream/wetland headwaters • Restoration of riparian buffer vegetation to provide organic matter and shade Not Functioning Functioning Improved Connectivity • Restore connectivity to historic remnant channel features. • Improved aquatic connectivity to Hannah Creek Not Functioning Functioning 1.2 Project Background The Alliance Headwaters Mitigation Site (Site) is in Johnston County, approximately six miles southeast of Four Oaks and one mile east of US 701 (Figure 1, Appendix A). The Project is located within the NC Division of Mitigation Services (DMS) targeted watershed for the Neuse River Basin Hydrologic Unit (HU) 03020201150020 and the NC Division of Water Resources (NCDWR) subbasin 03-04-04. The Site has existed in its pre-construction condition since approximately 2005. A review of historic aerials of the Site, and adjacent parcels, taken in 1939, 1965, 1971, 1988, and 2005, revealed that while agriculture was prevalent in the area, much of the Site was not converted to agricultural uses until after 1997/1998. Additional aerial photographs from Google Earth show that before construction, the project Monitoring Report MY4 (Project No. 97086) page 2 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 site had been manipulated for agricultural production numerous times between 1997/1998 and 2019. The channelization of perimeter ditches to carry stream flow undermined the hydrologic connection between the headwaters of UT3 and UT4 (located in the forested sections of the Site) from their downstream channels. In addition, two small impoundments were excavated on the historical flow paths of UT1 and UT3 during this time. Current land use near the Site is predominately agriculture (crop and livestock production) and silviculture. While the Site is near (< 6 miles) to two major interstates (I-95 and I-40), there are no foreseeable signs of impending land use changes or development pressure that would impact the Project's watershed. The conservation easement will eliminate the potential for future development and/or agricultural use in the floodplain areas of the restored streams. 1.3 Project Components and Structure Site restoration activities generated 6029 Stream Mitigation Units (SMUs) and 39.4 riverine Wetland Mitigation Units (WMUs) within a 71.7-acre conservation easement as the result of the following. • Restoration of 6,529 linear feet of stream channels that have been straightened and channelized for agricultural purposes • Restoration of 32.6 acres of drained hydric soil to riparian riverine wetlands as the result of stream restoration activities and ditch plugging • Areas of potential wetland riparian riverine restoration total approximately 7.0 acres of drained soils with hydric inclusions • Enhancement of 0.38 acres of jurisdictional riparian headwater forest through stream realignment activities and supplemental wetland plantings • Creation of 1.99 acres of riparian riverine wetlands in areas of drained hydric soil requiring bench excavation • Preservation of 16.39 acres of jurisdictional riparian riverine wetlands located within forested headwater systems Additional activities that occurred at the Site included the following. • Planting 49.9 acres of the Site with 35,200 stems (planted species and densities by zone are included in Table 7 [Appendix C]) • Application of permanent seed mix across 49.9 acres of the Site and temporary seed mix consisting of grain rye, millet, clover, and turnip The Site's design was completed in October 2018. Construction started on May 13, 2019, and ended with a final walkthrough on July 31, 2019. The Site was planted on January 16, 2020. Completed project activities, reporting history, completion dates, project contacts, and background information are summarized in Tables 1-4 (Appendix A). 1.4 Success Criteria Performance criteria outlined in the NCDMS Mitigation Plan Template (ver. 10/2015) and US Army Corps of Engineers – Wilmington District Public Notice: Notification of Issuance of Guidance for Compensatory Stream and Wetland Mitigation Conducted for Wilmington District (October 24, 2016), will be followed and are briefly outlined below. Monitoring data collected on the Site will include reference photos, plant survival analyses, channel stability analyses, wetland hydrological analyses, and biological data if specifically required by permit conditions. Monitoring Report MY4 (Project No. 97086) page 3 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Monitoring will be conducted for seven years unless the USACE, in consultation with the Interagency Review Team (IRT), agrees that monitoring may be terminated early. Early closure will only be provided through written approval from the USACE in consultation with the IRT. Annual monitoring reports will be submitted to the NCDMS by RS no later than November 30 of each monitoring year. Table B: Success Criteria Streams • All streams must maintain an Ordinary High-Water Mark (OHWM), per RGL 05-05. • A continuous surface flow must be documented each year for at least 30 consecutive days. • Bank height ratio (BHR) cannot exceed 1.2 for a majority of measured cross sections on a given reach. • Entrenchment ratio (ER) must be 2.2 or above for a majority of measured riffle cross-sections on a given reach. • BHR and ER should not change by more than 10% in any given year for a majority of a given reach. • Must document the occurrence of at least 4 bankfull events in separate years during the monitoring period. Wetland Hydrology • Saturation or inundation within the upper 12 inches of the soil surface for, at a minimum, 10 percent of the growing season during average climatic conditions. Note: Soil temperature for growing season establishment will be determined using a continuously logging soil probe installed at the rain gauge. Soil temperature will be measured from mid-February through the end of April (at a minimum). Vegetation • Within planted portions of the Site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 5; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5 and 10 feet in height at year 7. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the Site. • Any single species can only account for 50% of the required stems per monitoring plot. 2.0 METHODS Monitoring requirements and success criteria outlined in this plan follow the October 24, 2016, NC Interagency Review Team Wilmington District Stream and Wetland Compensatory Mitigation Update. Monitoring will be conducted by Axiom Environmental, Inc. Annual monitoring reports of the data collected will be submitted to the NCDMS by Restoration Systems no later than December 31 of each monitoring year data is collected. The monitoring schedule is summarized in Table C. Table C: Monitoring Schedule Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Streams x x x x x Wetlands x x x x x x x Vegetation x x x x x Visual Assessment x x x x x x x Report Submittal x x x x x x x Monitoring Report MY4 (Project No. 97086) page 4 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 2.1 Monitoring Table D summarizes the monitoring parameters. Table D: Monitoring Summary Stream Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Stream Profile Full longitudinal survey As-built (unless otherwise required) All restored stream channels Graphic and tabular data. Stream Dimension Cross-sections Years 1, 2, 3, 5, and 7 Total of 16 cross-sections on restored channels Graphic and tabular data. Channel Stability Visual Assessments Yearly All restored stream channels Areas of concern to be depicted on a plan view figure with a written assessment and photograph of the area included in the report. Additional Cross- sections Yearly Only if instability is documented during monitoring Graphic and tabular data. Stream Hydrology Continuous monitoring of surface water gauges and/or trail camera Continuous recording through the monitoring period Total of 7 surface water gauges: One gauge on UT1 – R2, UT1 – R3, UT1A, UT2, UT3 – R1, UT3 – R2, and UT4 Surface water data for each monitoring period as depicted in Figures 2A-2B. Bankfull Events Continuous monitoring of surface water gauges and/or trail camera Continuous recording through the monitoring period Total of 7 surface water gauges: One gauge on UT1 – R2, UT1 – R3, UT1A, UT2, UT3 – R1, UT3 – R2, and UT4 Surface water data for each monitoring period Visual/Physical Evidence Continuous through the monitoring period All restored stream channels Visual evidence, photo documentation, and/or rain data. Wetland Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Wetland Hydrology Groundwater gauges Years 1, 2, 3, 4, 5, 6, and 7 throughout the year, with the growing season defined as March 1-November 4 36 gauges spread throughout restored wetlands and 1 reference gauge within the wetland preservation area Soil temperature at the beginning of each monitoring period to verify the start of the growing season, groundwater and rain data for each monitoring period Monitoring Report MY4 (Project No. 97086) page 5 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table D: Monitoring Summary (Continued) Vegetation Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Vegetation establishment and vigor Permanent vegetation plots 0.0247 acre (100 square meters) in size; CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) As-built, Years 1, 2, 3, 5, and 7 32 plots spread across the Site Species, height, planted vs. volunteer, stems/acre Annual random vegetation plots, 0.0247 acre (100 square meters) in size As-built, Years 1, 2, 3, 5, and 7 18 plots randomly selected each year Species and height Stream Summary Stream measurements were not performed in Year 4 (2023), in accordance with the monitoring schedule. A visual assessment indicates that across the Site, all in-stream structures are intact and functioning as designed and that channel geometry compares favorably with the proposed conditions outlined in the Detailed Restoration Plan and as constructed. No stream areas of concern were identified during Year 4 (2023) monitoring. Tables for Year 3 (2022) data and annual quantitative assessments are included in Appendix D. Prior to Year 4 (2023) monitoring, all seven (7) stream flow gauges were replaced and reinstalled according to DMS-provided protocol. The gauges are functioning properly with no issues or data loss. All seven flow gauges recorded continuous flow for more than the 30-days. Recorded flow periods ranged from 63 to 143 consecutive days (Appendix E). Two bankfull events were documented in Year 4 (2023) monitoring. Six bankfull events have been recorded to date, with at least one occurring during all four monitoring years (Table 16, Appendix E). Wetland Summary Table E: Summary of Monitoring Period/Hydrology Success Criteria by Year Year Soil Temperatures/Date Bud Burst Documented Monitoring Period Used for Determining Success 10 Percent of Monitoring Period 2020 (Year 1) March 2, 2020* March 2-November 4 (248 days) 25 days 2021 (Year 2) March 1, 2021* March 1-November 4 (249 days) 25 days 2022 (Year 3) March 1, 2022* March 1-November 4 (249 days) 25 days 2023 (Year 4) March 1, 2023* March 1-November 4 (249 days) 25 days *Based on observed/documented bud burst and data collected from a soil temperature data logger located on the Site. Monitoring Report MY4 (Project No. 97086) page 6 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Thirteen of thirty-six groundwater gauges met success criteria for the Year 4 (2023) monitoring period (Appendix E). The on-site reference gauge met success criteria in Year 4 (2023), with a hydroperiod of 49 days (19.7%). Rainfall data indicate relatively dry conditions leading up to the start of the 2023 growing season: on-site precipitation was near or below the 30th percentile in January, February, March, and May, according to WETS data (Appendix E). However, across the Site, the development of herbaceous hydrophytic species remains abundant. After evaluating four years of monitoring gauge data along with data from supplemental gauges added during monitoring RS is preparing a Mitigation Plan Addendum for the wetland assets. RS will submit the Addendum in January 2024 so that a path forward can be determined. Vegetation Summary During quantitative vegetation sampling, 32 sample plots (10-meter by 10-meter) were installed within the Site as per guidelines established in CVS-EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008). In accordance with the monitoring schedule, vegetation plot monitoring was not performed in Year 4 (2023). Woody vegetation continues to thrive across the Site, with stem heights reaching 10+ feet in some areas. No areas of vegetation concern were identified in year 4 (2023). In response to easement encroachment observed during Year 3 (2022) along the northwest parcel boundary of UT1-Reach 3 (under 500 sq. ft.), WE1's southeastern easement boundary (under 0.10 acres), and the southeastern easement boundary along UT1-Reach 1 (0.331 acres), RS had easement boundaries re-surveyed and remarked. The effort included the replacement of several of the easement corner markers with 6-inch treated fence posts with new conservation easement signage. They also added 6-inch treated fence posts with new conservation easement signage to several long straight stretches of easement boundary. Additionally, the encroachment areas were planted with 50, 3-gallon potted trees. Planted species are listed in Table F below, and the location of planting is shown in Figure 2, Appendix B. Visual observations during Year 4 (2023) indicate that easement signage is intact, planted stems are vigorous, and no additional encroachment was observed. Table F – November 2022 Encroachment Planting Species Count Mitigation Plan Approved Wetland Indicator Status Bald Cypress (Taxodium distichum) 10 Yes OBL Black Cherry (Prunus serotina) 8 Yes FACU Persimmon (Diospyros virginiana) 8 Yes FAC Tulip Poplar (Liriodendron tulipifera) 8 Yes FACU Swamp Chestnut Oak (Quercus michauxii) 8 Yes FACW White Oak (Quercus alba) 8 Yes FACU Total = 50 In the MY3 (2022) IRT site visit notes a random transect was to be included through the UT2 wetland enhancement area during MY4 (2023), this will be included in MY5 (2024) when vegetation monitoring resumes. Also, with regards to the MY3 (2022) IRT site visit notes a round of live stake planting is scheduled during the winter of 2023/2024 in areas where pines were removed along the stream banks. Monitoring Report MY4 (Project No. 97086) page 7 Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 3.0 REFERENCES Lee, M.T., R.K. Peet, SD. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Division of Mitigation Services (NCDMS). 2014. Stream and Wetland Mitigation Monitoring Guidelines. North Carolina Department of Environmental Quality, Raleigh, North Carolina. North Carolina Division of Water Quality (NCDWQ). 2005. Cape Fear River Basin wide Water Quality Plan. Available: https://files.nc.gov/ncdeq/Water%20Quality/Planning/BPU/BPU/Cape_Fear/Cape%20Fear%20P lans/2000%20Plan/CPF_2000.pdf North Carolina Division of Water Resources (NCDWR). 2016. Standard Operating Procedures for Collection and Analysis of Benthic Macroinvertebrates (Version 5.0). (online). Available: https://files.nc.gov/ncdeq/Water%20Quality/Environmental%20Sciences/BAU/NCDWRMacroin vertebrate-SOP-February%202016_final.pdf North Carolina Ecosystem Enhancement Program (NCEEP). 2009. Cape Fear River Basin Restoration Priorities 2009 (online). Available: https://files.nc.gov/ncdeq/Mitigation%20Services/Watershed_Planning/Cape_Fear_River_Basin /RBRP%20CapeFear%202009%20Revised%20032013.pdf United States Department of Agriculture (USDA). 2016. Web Soil Survey (online). Available: http://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx [August 2016]. United States Department of Agriculture (USDA). 1911. Soil Survey of Johnston County, North Carolina. Soil Conservation Service. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX A: BACKGROUND TABLES AND MAP Figure 1. Site Location Table 1. Project Components and Mitigation Units Table 2. Project Activity and Reporting History Table 3. Project Contacts Table Table 4. Project Attributes Table Copyright:© 2013 National Geographic Society, i-cubed FIGURE Drawn by: Date: Scale: Project No.: KRJ/CLF AUG 2017 1:20,000 17-002 Title: Project: Prepared for: Johnston County, NC ALLIANCEHEADWATERSMITIGATION SITE SITE LOCATION 1 ³ Copyright:© 2013 National Geographic Society, i-cubed Copyright:© 2013 National Geographic Society, i-cubed Directions to the Site from Raleigh:- Take I-40 East out of Raleigh for approximately 27 miles,- Take exit 328B to merge onto I-95 North,- After 6.5 miles, take exit 87 toward Four Oaks,- Turn right onto Keen Road and travel 2.3 miles,- Turn right onto US-701 South and travel 2.5 miles,- Turn left onto Peach Orchard Road and travel 1.7 miles,- Turn right onto Joyner Bridge Road.- After 0.7 miles, the Site is on both sides of Joyner Bridge Road,- Parts of the Site can be accessed via Old Williams Road.- Site Latitude, Longitude: 35.3752, -78.3410 (NAD83/WGS84) USGS 7.5 Minute Topographic Map (Four Oaks NE andNewton Grove North, NC Quads) Smithfield £¤701 §¨¦95 £¤70 Strickland Crossroads PeachOrchardRoad H a n n a h Creek J o y n e r B r i d g e R o a d StricklandCrossroadsRoad DevilsRacetrackRoad O l d W illi a m s R o a d Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 1. Project Components and Mitigation Credits Alliance Headwaters Restoration Site Reach ID Stream Stationing/ Wetland Type Existing Footage/ Acreage Mitigation Plan Footage/ Acreage Restoration Footage/ Acreage Acreage At- Risk of Credit Removal Acreage At- Risk of Partial Credit Reduction Restoration Level Restoration or Restoration Equivalent Mitigation Ratio Mitigation Credits Comment UT 1A 10+00 to 10+87 -- 87 87 -- -- Restoration 87 1:1 87 UT 1 Reach 1 10+00 to16+71 4761 671 671 -- -- Restoration 671 1:1 671 UT 1 Reach 2 16+71 to 30+33 1362 1362 -- -- Restoration 1362-70= 1292 1:1 1292 70 feet is outside of the easement and is therefore non-credit generating. UT 1 Reach 3 10+00 to 24+63 1463 1463 -- -- Restoration 1463-149= 1314 1.3:1 1011 149 feet is outside of the easement and is therefore non-credit generating. UT 2 10+00 to 19+97 <1 997 997 -- -- Restoration 997-146= 851 1.3:1 655 146 feet either does not have proper buffer width or is outside of the easement and is therefore non-credit generating. UT 3 Reach 1 10+00 to 16+39 3313 639 639 -- -- Restoration 639 1:1 639 UT 3 Reach 2 16+39 to 29+15 1276 1276 -- -- Restoration 1276-132= 1144 1:1 1144 132 feet is outside of the easement and is therefore non-credit generating. UT 4 10+00 to 15+31 1142 531 531 -- -- Restoration 531 1:1 531 Wetland R1 Riparian Riverine 0 7.11 7.108 -- -- Restoration 7.108 1:1 7.108 Wetland Restoration Wetland R2 Riparian Riverine 0 6.97 6.973 0.162 0.379 Restoration 6.973 1.3:1 5.364 Wetland Restoration Wetland R3 Riparian Riverine 0 18.47 18.473 -- 0.923 Restoration 18.473 1:1 18.473 Wetland Restoration Wetland R4 Riparian Riverine 0 0.29 0.285 -- -- Restoration 0.285 1:1 0.285 Wetland Restoration Wetland R5 Riparian Riverine 0 0.95 0.950 -- -- Restoration 0.950 1:1 0.950 Wetland Restoration Wetland R6 Riparian Riverine 0 0.90 0.896 -- -- Restoration 0.896 1:1 0.896 Wetland Restoration Wetland R7 Riparian Riverine 0 0.28 0.284 -- -- Restoration 0.284 1:1 0.284 Wetland Restoration Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 1. Project Components and Mitigation Credits (continued) Alliance Headwaters Restoration Site Reach ID Stream Stationing/ Wetland Type Existing Footage/ Acreage Mitigation Plan Footage/ Acreage Restoration Footage/ Acreage Acreage At-Risk of Credit Removal Acreage At- Risk of Partial Credit Reduction Restoration Level Restoration or Restoration Equivalent Mitigation Ratio Mitigation Credits Comment Wetland R8 Riparian Riverine 0 1.47 1.472 -- -- Restoration 1.472 1.3:1 1.132 Wetland Restoration Wetland R9 Riparian Riverine 0 0.87 0.867 0.009 -- Restoration 0.867 1.3:1 0.667 Wetland Restoration Wetland R10 Riparian Riverine 0 1.11 1.105 -- 0.070 Restoration 1.105 1:1 1.105 Wetland Restoration Wetland R11 Riparian Riverine 0 0.97 0.970 -- -- Restoration 0.970 1:1 0.970 Wetland Restoration Wetland R12 Riparian Riverine 0 0.17 0.170 -- 0.082 Restoration 0.170 1:1 0.170 Wetland Restoration Wetland E1 Riparian Riverine 0.38 0.38 0.384 -- -- Enhancement 0.384 3.25:1 0.118 Wetland Enhancement Wetland C1 Riparian Riverine 0 0.54 0.540 -- -- Creation 0.540 10:1 0.054 Wetland Creation Wetland C2 Riparian Riverine 0 0.55 0.546 0.130 -- Creation 0.546 13:1 0.042 Wetland Creation Wetland C3 Riparian Riverine 0 0.90 0.901 -- -- Creation 0.901 10:1 0.090 Wetland Creation Wetland P1 Riparian Riverine 16.39 16.39 16.392 -- -- Preservation 16.392 10:1 1.639 Wetland Preservation Length & Area Summations by Mitigation Category Overall Assets Summary Restoration Level Stream (linear footage) Riparian Wetland (acreage) Asset Category Overall Credits Restoration 6529* 39.553 Stream 6029.384 Enhancement -- 0.384 Riparian Riverine Wetland 39.354 Creation -- 1.987 Preservation -- 16.392 *An additional 497 linear feet of stream restoration is located outside of the conservation easement and is therefore not included in this total or in mitigation credit calculations. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 2. Project Activity and Reporting History Alliance Headwaters Restoration Site Activity or Deliverable Data Collection Complete Completion or Delivery Technical Proposal (RFP No. 16-006477) October 15, 2015 October 28, 2015 Institution Date (NCDMS Contract No. 6832) -- March 21, 2016 404 Permit -- December 3, 2018 Mitigation Plan -- October 12, 2018 Construction Plans -- October 12, 2018 Site Construction -- May 13, 2019-July 31, 2019 Planting -- January 16, 2020 As-built Baseline Stream Data Collection December 11-16, 2019 -- As-built Baseline Vegetation Data Collection January 16-17, 2020 -- As-built Baseline Monitoring (MY0) October 2019 – January 2020 March 2020 Monitoring Year 1 (2020) Stream Data Collection July 23, 2020 -- Monitoring Year 1 (2020) Vegetation Data Collection July 27-28, 2020 -- Monitoring Year 1 (MY1) January-November 2020 January 2021 Monitoring Year 2 (2021) Stream Data Collection March 10, 2021 -- Monitoring Year 2 (2021) Vegetation Data Collection July 6, 2021 -- Monitoring Year 2 (MY2) January-November, 2021 December 2021 Monitoring Year 3 (2022) Stream Data Collection May 19, 2022 -- Monitoring Year 3 (2022) Vegetation Data Collection June, 2022 -- Monitoring Year 3 (MY3) January-November, 2022 February 2023 Monitoring Year 4 (MY4) January-November, 2023 February 2024 Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 3. Project Contacts Table Alliance Headwaters Mitigation Site Full Delivery Provider Restoration Systems 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Worth Creech 919-755-9490 Construction Contractor Land Mechanic Designs 780 Landmark Road Willow Spring, NC 27592 Lloyd Glover 919-639-6132 Designer, Construction Plans, and Sediment/Erosion Control Plans Ecosystem Planning & Restoration 1150 SE Maynard Road, Suite 140 Cary, NC 27511 Kevin Tweedy, PE 919-999-0262 Planting Contractor Restoration Systems 1101 Haynes Street, Suite 211 Raleigh, North Carolina 27604 Josh Merritt 919-755-9490 As-built Surveyor K2 Design Group 5688 US Highway 70 East Goldsboro, NC 27534 John Rudolph 919-751-0075 Baseline & Monitoring Data Collection Axiom Environmental, Inc. 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919-215-1693 Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 4. Project Attribute Table Alliance Headwaters Mitigation Site Project Information Project Name Alliance Headwaters Mitigation Site Project County Johnston County, North Carolina Project Area (acres) 71.7 Project Coordinates (latitude & latitude) 35.372028ºN, 78.340514ºW Planted area (acres) 49.9 Project Watershed Summary Information Physiographic Province Coastal Plain Project River Basin Neuse USGS HUC for Project (14-digit) 03020201150020 NCDWR Sub-basin for Project 03-04-04 Project Drainage Area (acres) 132 to 546 Percentage of Project Drainage Area that is Impervious <2% CGIA Land Use Classification Agriculture & Forested/Scrubland Reach Summary Information Parameters UT1 UT1A UT2 UT 3 UT4 Length of reach (linear feet) 3495 87 997 1915 531 Valley Classification & Confinement Alluvial, unconfined Drainage Area (acres) 546 6.4 147 354 132 NCDWR Stream ID Score Blue Line NA Blue Line 27.25 27.25 Perennial, Intermittent, Ephemeral Perennial Intermittent Perennial Perennial/ Intermittent Perennial/ Intermittent NCDWR Water Quality Classification C, NSW Proposed Stream Classification (Rosgen 1996) C5 C5 C5 C5 C5 Underlying Mapped Soils Leaf silt loam Drainage Class Poorly-drained Hydric Soil Status Hydric FEMA Classification NA Native Vegetation Community Coastal Plain Small Stream Swamp Watershed Land Use/Land Cover (Site) 31% forest,67% agricultural land, <2% low density residential/impervious surface Percent Composition of Exotic Invasive Vegetation <2% Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX B: VISUAL ASSESSMENT DATA Figures 2 & 2A-2B. Current Conditions Plan View Tables 5A-5H. Visual Stream Morphology Stability Assessment Table 6. Vegetation Condition Assessment FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ NO V 2023 1:4500 18-035 Tit le: Pro jec t: Pre pa red fo r: Wayne County, N C ALLIA NC EHEADWATER SSTREAMAND WETLA NDMITIGATION SITE CUR RE NTCONDITIONSPLAN VIEW 2 ³ 0 50 0 1,0 0 0 1,5 0 0250Fe e t Leg en d Alliance Headw aters Easem ent Figur e 2B Figur e 2A N ote : B a se ma p i s 2 02 3 d ron e im ag ery (w he re a va il a bl e ) o n to p o f 20 21 N C On eM ap ortho i ma ge ry ^_ ^_ ^_ ^_ !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( 1 3 9 8 7 6 4 10 2 5 GW -34 (1 4.5 %) GW -32 (1 9.7 %) GW -09 (2 8.5 %) GW -16 (1 6.5 %) GW -13 (1 0.8 %) GW -10 (1 5.0 %) GW -03 (2 0.0 %)GW -35 (3 .2%) GW -33 (3 .2%) GW -18 (3 .8%) GW -17 (5 .2%) GW -15 (6 .0%) GW -12 (4 .0%) GW -14 (3 .2%) GW -11 (4.0%) GW -08 (2 .8%) GW -07 (1 .6%) GW -06 (3 .6%) GW -02 (2 .0%) GW -01 (2 .8%) GW -05 (2 .8%) GW -04 (0 .8%) 5 4 2 3 6 8 7 9 1 11 17 14 15 13 16 12 10 X S -0 3 X S - 0 2 X S-0 1 XS-04 XS-06 X S -0 5 X S -0 1 XS-08 X S -0 7 XS-0 2 FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ NO V 2023 1:2500 18-035 Tit le: Pro jec t: Pre pa red fo r: Johnston County, N C ALLIA NC EHEADWATER SSTREAMAND WETLA NDMITIGATION SITE CUR RE NTCONDITIONSPLAN VIEW 2A ³ 0 50 0 1,0 0 0250Fe e t UT1 Reach 3 UT1 Reach 1 UT 2 Legend Allian ce H ead wate rs Ea sem ent = 7 1.7 Acre s Subj ect P arce l Bou nda ries Strea m R esto ration = 702 6 ft Wetlan d Re stor ation = 30.2 4 ac Wetlan d Re stor ation - Lo wer Ratio = 9.31 ac Wetlan d En han cem ent = 0 .38 a c Wetlan d Cr eatio n = 1.4 4 ac Wetlan d Cr eatio n - L owe r Ra tio = 0.55 a c Wetlan ds A t-Ris k of Cred it Re mov al Wetlan ds A t-Ris k of Part ial C redit Red uctio n Vege tatio n Plo ts M eetin g Su cce ss C riteria in M Y3 Vege tatio n Plo ts N ot M eetin g Su cces s Cr iteria in M Y3 Rand om 50m x 2m Veg etat ion Trans ects Mee ting S ucc ess Crite ria in MY3 Rand om 50m x 2m Veg etat ion Trans ects Not M eet ing S ucc ess C riter ia in MY3 Cros s-Se ction s !(Grou ndw ater W ells M eet ing S ucc ess C riter ia !(Grou ndw ater W ells N ot M eeti ng S ucce ss C riter ia ^_Flow Gau ges MY3 Enc roach men t Co ntain erize d P lantin g Ar eas UT 1A WC 1 WR 4 WR 6 WR 5 WR 1 WR 7 WE1 WR 2 WR 8 WR 9 WC 2 UT1 Reach 2 N ote : B a se ma p i s 2 02 3 d ron e im ag ery (w he re a va il a bl e ) o n to p o f 20 21 N C On eM ap ortho i ma ge ry ^_ ^_ ^_ !( !( !( !( !( !( !( !( !( !( !( !( !( !( !( #* 1 1 1 8 1 7 1 6 1 5 14 12 13 GW -31 (1 0.8 %) GW -20 (1 5.7 %) GW -23 (1 0.0 %) GW -25 (1 9.7 %) GW -26 (3 3.7 %) GW -22 (1 9.3 %) Refe re nce (19.7%) 24 26 29 27 28 32 30 31 20 19 18 25 21 23 22 GW -36 (3 .2%) GW -30 (1 .2%) GW -28 (4 .0%) GW -29 (4 .0%) GW -19 (2 .0%) GW -21 (4 .4%) GW -24 (2 .4%) GW -27 (4 ..8%) XS-03 XS-02 XS-01 XS-04 X S-0 2 X S - 0 1 FIGU R E Dra wn b y: Da te: Sca le : Pro jec t N o.: KRJ NO V 2023 1:2200 18-035 Tit le: Pro jec t: Pre pa red fo r: Johnston County, N C ALLIA NC EHEADWATER SSTREAMAND WETLA NDMITIGATION SITE CUR RE NTCONDITIONSPLAN VIEW 2B ³ 0 40 0 80 0200Fe e t Le g e n d All ia n ce He a dw a te rs E ase me nt = 71 .7 Acre s Su bj e ct P ar cel B ou n d ar ie s Str ea m Re st o ra tio n = 70 2 6 ft We tl an d R est ora t io n = 3 0 .2 4 a c We tl an d C re at io n = 1.44 a c We tl an d P re serva ti o n = 1 6 .3 9 a c We tl an d s A t-R isk o f Cre d it Re mo val We tl an d s A t-R isk o f Pa rti a l Cre d it Re d uct io n Ve g et at io n P lo ts M ee ti n g Su ccess C ri te ria i n MY 3 Ve g et at io n P lo ts N o t Me e ti ng Su cce ss C rit er ia i n MY3 Ra nd o m 5 0 m x 2 m Ve g et a tio n Tra n sects Me et in g Su cce ss Cri te ri a in MY 3 Ra nd o m 5 0 m x 2 m Ve g et a tio n Tra n sects No t Mee ti n g Su ccess Cri te ria in MY 3 Cro ss-Se cti on s !(Gro un d wa te r We ll s Me e ti ng S u cce ss C rit er ia !(Gro un d wa te r We ll s N ot Me e tin g S ucce ss Cr ite ri a ^_Fl ow Ga u ge s #*Ra in Ga u g e an d S o il Te mp e ra tu re L o gg e r UT 3 Reach 2 UT 3 Reach 1 UT 4 WR 11 WR 1 2 WR 1 0 WR 3 WP1 WC 3 N ote : B a se ma p i s 2 02 3 d ron e im ag ery (w he re a va il a bl e ) o n to p o f 20 21 N C On eM ap ortho i ma ge ry Table 5A Visual Stream Morphology Stability Assessment Reach ID Alliance UT-1 Reach 1 Assessed Length 671 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 14 14 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)13 13 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)13 13 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)13 13 100% 2. Thalweg centering at downstream of meander (Glide)13 13 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.13 13 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 13 13 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.13 13 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 13 13 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.13 13 100% Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Adjusted % for Stabilizing Woody Vegetation Amount of Unstable Footage Totals % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Major Channel Category Table 5B Visual Stream Morphology Stability Assessment Reach ID Alliance UT-1 Reach 2 Assessed Length 1373 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 27 27 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)28 28 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)28 28 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)28 28 100% 2. Thalweg centering at downstream of meander (Glide)28 28 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.25 25 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 25 25 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.25 25 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 25 25 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.25 25 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5C Visual Stream Morphology Stability Assessment Reach ID Alliance UT-1 Reach 3 Assessed Length 1451 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 20 20 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)19 19 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)19 19 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)19 19 100% 2. Thalweg centering at downstream of meander (Glide)19 19 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.18 18 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 18 18 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.18 18 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 18 18 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.18 18 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5D Visual Stream Morphology Stability Assessment Reach ID Alliance UT-1A Assessed Length 87 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 3 3 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)2 2 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)2 2 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)2 2 100% 2. Thalweg centering at downstream of meander (Glide)2 2 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.2 2 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 2 2 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.2 2 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 2 2 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.2 2 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5E Visual Stream Morphology Stability Assessment Reach ID Alliance UT-2 Assessed Length 997 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 15 15 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)14 14 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)14 14 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)14 14 100% 2. Thalweg centering at downstream of meander (Glide)14 14 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.14 14 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 14 14 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.14 14 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 14 14 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.14 14 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5F Visual Stream Morphology Stability Assessment Reach ID Alliance UT-3 Reach 1 Assessed Length 639 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 11 11 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)11 11 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)11 11 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)11 11 100% 2. Thalweg centering at downstream of meander (Glide)11 11 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.11 11 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 11 11 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.11 11 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 11 11 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.11 11 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5G Visual Stream Morphology Stability Assessment Reach ID Alliance UT-3 Reach 2 Assessed Length 1276 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 19 19 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)19 19 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)19 19 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)19 19 100% 2. Thalweg centering at downstream of meander (Glide)19 19 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.18 18 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 18 18 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.18 18 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 18 18 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.18 18 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 5H Visual Stream Morphology Stability Assessment Reach ID Alliance UT-4 Assessed Length 531 1. Bed 1. Vertical Stability (Riffle and Run units) 1. Aggradation - Bar formation/growth sufficient to significantly deflect flow laterally (not to include point bars)0 0 100% 2. Degradation - Evidence of downcutting 0 0 100% 2. Riffle Condition 1. Texture/Substrate - Riffle maintains coarser substrate 9 9 100% 3. Meander Pool Condition 1. Depth Sufficient (Max Pool Depth : Mean Bankfull Depth > 1.6)9 9 100% 2. Length appropriate (>30% of centerline distance between tail of upstream riffle and head of downstrem riffle)9 9 100% 4.Thalweg Position 1. Thalweg centering at upstream of meander bend (Run)9 9 100% 2. Thalweg centering at downstream of meander (Glide)9 9 100% 2. Bank 1. Scoured/Eroding Bank lacking vegetative cover resulting simply from poor growth and/or scour and erosion 0 0 100%100% 2. Undercut Banks undercut/overhanging to the extent that mass wasting appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 0 100%100% 3. Mass Wasting Bank slumping, calving, or collapse 0 0 100%100% 0 0 100%0 0 100% 3. Engineered Structures 1. Overall Integrity Structures physically intact with no dislodged boulders or logs.9 9 100% 2. Grade Control Grade control structures exhibiting maintenance of grade across the sill. 9 9 100% 2a. Piping Structures lacking any substantial flow underneath sills or arms.9 9 100% 3. Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in EEP monitoring guidance document) 9 9 100% 4. Habitat Pool forming structures maintaining ~ Max Pool Depth : Mean Bankfull Depth ratio > 1.6 Rootwads/logs providing some cover at base-flow.9 9 100% Totals Major Channel Category Channel Sub-Category Metric Number Stable, Performing as Intended Total Number in As-built Number of Unstable Segments Amount of Unstable Footage % Stable, Performing as Intended Number with Stabilizing Woody Vegetation Footage with Stabilizing Woody Vegetation Adjusted % for Stabilizing Woody Vegetation Table 6 Vegetation Condition Assessment Alliance Headwaters Planted Acreage1 49.9 1. Bare Areas None 0.1 acres none 0 0.00 0.0% 2. Low Stem Density Areas None 0.1 acres none 0 0.00 0.0% 2B. Low Planted Stem Density Areas None 0.1 acres none 0 0.00 0.0% 0 0.00 0.0% 3. Areas of Poor Growth Rates or Vigor None 0.25 acres none 0 0.00 0.0% 0 0.00 0.0% Easement Acreage2 71.7 4. Invasive Areas of Concern4 None 1000 SF none 0 0.00 0.0% 5. Easement Encroachment Areas3 These areas were re-surveyed, signage was replaced, and a containerized planting was executed. No additional encroachment was observed in MY4 (2023).none yellow crosshatch 1 0.33 0.5% % of Planted Acreage Total Cumulative Total Vegetation Category Definitions Number of Polygons Mapping Threshold CCPV Depiction Combined Acreage CCPV Depiction Number of Polygons Combined Acreage % of Easement AcreageVegetation Category Definitions Mapping Threshold 1 = Enter the planted acreage within the easement. This number is calculated as the easement acreage minus any existing mature tree stands that were not subject to supplemental planting of the understory, the channel acreage, crossings or any other elements not directly planted as part of the project effort. 2 = The acreage within the easement boundaries. 3 = Encroachment may occur within or outside of planted areas and will therefore be calculated against the overall easement acreage. In the event a polygon is cataloged into items 1, 2 or 3 in the table and is the result of encroachment, the associated acreage should be tallied in the relevant item (i.e., item 1,2 or 3) as well as a parallel tally in item 5. 4 = Invasives may occur in or out of planted areas, but still within the easement and will therefore be calculated against the overall easement acreage. Invasives of concern/interest are listed below. The list of high concern spcies are those with the potential to directly outcompete native, young, woody stems in the short-term (e.g. monitoring period or shortly thereafter) or affect the community structure for existing, more established tree/shrub stands over timeframes that are slightly longer (e.g. 1-2 decades). The low/moderate concern group are those species that generally do not have this capacity over the timeframes discussed and therefore are not expected to be mapped with regularity, but can be mapped, if in the judgement of the observer their coverage, density or distribution is suppressing the viability, density, or growth of planted woody stems. Decisions as to whether remediation will be needed are based on the integration of risk factors by DMS such as species present, their coverage, distribution relative to native biomass, and the practicality of treatment. For example, even modest amounts of Kudzu or Japanese Knotweed early in the projects history will warrant control, but potentially large coverages of Microstegium in t he herb layer will not likley trigger control because of the limited capacities to impact tree/shrub layers within the timeframes discussed and the potential impacts of treating extensive amounts of ground cover. Those species with the "watch list" designator in gray shade are of interest as well, but have yet to be observed across the state with any frequency. Those in red italics are of particular interest given their extreme risk/threat level for mapping as points where isolated specimens are found, particularly ealry in a projects monitoring history. However, areas of discreet, dense patches will of course be mapped as polygons. The symbology scheme below was one that was found to be helpful for symbolzing invasives polygons, particulalry for situations where the conditon for an area is somewhere between isolated specimens and dense, discreet patches. In any case, the point or polygon/area feature can be symbolized to describe things like high or low concern and species can be listed as a map inset, in legend items if the number of species are limited or in the narrative section of the executive summary. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX C: STREAM GEOMORPHOLOGY DATA Tables 7A-7E. Baseline Stream Data Summary Tables 8A-8D. Monitoring Data-Dimensional Morphology Summary (Dimensional Parameters-Cross-sections) Tables 9A-9E. Monitoring Data-Stream Reach Data Summary Parameter Gauge2 Dimension and Substrate - Riffle Only LL UL Eq.Min Mean Med Max SD5 n Min Mean Max Min Mean Max Min Med Max Min Med Max Min Mean Med Max SD5 n Bankfull Width (ft)8.4 13.3 24 7.1 7.9 8.6 2 Floodprone Width (ft)100 100 100 100 100 100 2 Bankfull Mean Depth (ft)1.43 1.68 2.25 0.5 0.5 0.5 2 1Bankfull Max Depth (ft)0.9 1 1.1 2 Bankfull Cross Sectional Area (ft2)12.9 22.2 42 3.6 4 4.4 2 Width/Depth Ratio 14 15.6 17.2 2 Entrenchment Ratio 1.3 1.65 2 11.6 12.9 14.1 2 0.9 1 1.1 2 1Bank Height Ratio 2.7 3.0 3.3 1.0 1.0 1.0 2 Profile Riffle Length (ft)9 28.6 28.45 49.5 10.7 35 Riffle Slope (ft/ft)0.000 0.010 0.009 0.021 0.007 13 Pool Length (ft)4.3 10.9 9.14 39.8 7.5 27 Pool Max depth (ft)1.7 1.8 2 3 Pool Spacing (ft)25.3 49.8 50.71 89.2 14.7 35 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 7.0 - 30.0 9.7 0.8 0.75 - 1.00 8 12 > 3.0 1.0 - 1.2 7.4 0.82 0.75 - 1.00 6.1 9 > 3.0 0.007 1.4 -2.1 0.0027 - 0.0088 1 1.22 - 1.591.22 - 1.59 0.0027 - 0.0088 1.22 - 1.59 0.0027 - 0.0088 Incised B5c E5/C5C5/E5 C5E5 Monitoring Baseline 6.5 0.6 0.75 - 1.00 3.8 10 > 3.0 1.0 - 1.2 6.5 - 7.5 100 No distinct repetitive pattern of riffles and pools due to straightening activities. No distinct repetitive pattern of riffles and pools due to straightening activities. 1.0 - 1.2 0.50 - 0.70 0.60 - 0.71 3.0 - 4.0 14 6.9 - 10.2 1.0 2.1 - 6.6 1.2 - 2.3 Table 7a. Baseline Stream Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT1/Reach 1&2 (2033 feet) 1.5 - 2.8 1.4 - 2.1 Design 0.0026 - 0.0049 1.26 -1.29 2033 4.2 -8.4 Regional Curve Pre-Existing Condition Cole Property RefJohanna Creek Ref Still Creek Ref 2.9 - 6.4 5.4 - 8.2 C5 1.4 -2.1 2033 1.26 -1.29 0.0049 Parameter Gauge2 Dimension and Substrate - Riffle Only LL UL Eq.Min Mean Med Max SD5 n Min Mean Max Min Mean Max Min Med Max Min Med Max Min Mean Med Max SD4 n Bankfull Width (ft)5 6 7 10.4 10.4 10.4 1 Floodprone Width (ft)100 100 100 100 100 100 1 Bankfull Mean Depth (ft)0.8 0.8 0.8 1 1Bankfull Max Depth (ft)0.6 0.7 0.8 1.4 1.4 1.4 1 Bankfull Cross Sectional Area (ft2)1 1.75 2.5 8.4 8.4 8.4 1 Width/Depth Ratio 6.6 8.6 10.6 13 13 13 1 Entrenchment Ratio 1.3 1.65 2 9.6 9.6 9.6 1 1.4 1.4 1.4 1 1Bank Height Ratio 2.7 3.0 3.3 1.0 1.0 1.0 1 Profile Riffle Length (ft)12.2 39.6 38.7 63.2 12.7 23 Riffle Slope (ft/ft)0.001 0.006 0.003 0.029 0.009 10 Pool Length (ft)4.7 13 11.75 32 6.4 22 Pool Max depth (ft)1.9 2.1 2.1 2.3 2 Pool Spacing (ft)37.3 68 73.78 87.5 13.9 22 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 14.0 - 25.0 1.0 9.9 100 0.5 - 0.7 0.93 7.0 14 6.7 1.5 - 2.8 2.9 - 6.4 1.2 - 2.3 1.4 - 2.1 2.1 - 6.6 5.4 - 8.2 1.0 - 1.2 1.0 - 1.2 1.0 - 1.2 1463 1 1.22 - 1.59 1.22 - 1.59 1.22 - 1.59 0.026 0.0027 - 0.0088 0.0027 - 0.0088 0.0027 - 0.0088 1.35 0.0018 1.5 10.7 Incised B5c C5/E5 E5 E5/C5 C5 9.7 7.4 6.5 0.8 0.82 0.6 0.75 - 1.00 0.75 - 1.00 0.75 - 1.00 8 6.1 3.8 12 9 10 > 3.0 > 3.0 > 3.0 Regional Curve Pre-Existing Condition Johanna Creek Ref Still Creek Ref Table 7b. Baseline Stream Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT1/Reach 3 (1463 feet) Cole Property Ref Design Monitoring Baseline No distinct repetitive pattern of riffles and pools due to straightening activities. No distinct repetitive pattern of riffles and pools due to straightening activities. C5 1.5 1463 1.35 0.0028 Parameter Gauge2 Dimension and Substrate - Riffle Only LL UL Eq.Min Mean Med Max SD5 n Min Mean Max Min Mean Max Min Med Max Min Med Max Min Mean Med Max SD5 n Bankfull Width (ft)5 6 7 9.9 9.9 9.9 1 Floodprone Width (ft)100 100 100 100 100 100 1 Bankfull Mean Depth (ft)0.6 0.6 0.6 1 1Bankfull Max Depth (ft)0.6 0.7 0.8 1.3 1.3 1.3 1 Bankfull Cross Sectional Area (ft2)1 1.75 2.5 6.1 6.1 6.1 1 Width/Depth Ratio 6.6 8.6 10.6 16.1 16.1 16.1 1 Entrenchment Ratio 1.3 1.65 2 10.1 10.1 10.1 1 1.3 1.3 1.3 1 1Bank Height Ratio 2.7 3.0 3.3 1.0 1.0 1.0 1 Profile Riffle Length (ft)15.7 29.9 28.44 52.3 10.8 11 Riffle Slope (ft/ft)0.000 0.014 0.004 0.014 0.005 8 Pool Length (ft)2.4 14.2 12.38 28.4 7.4 17 Pool Max depth (ft)1.6 1.6 1.6 1.6 1 Pool Spacing (ft)34.5 55.6 54.92 73.1 10.7 16 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 14.0 - 50.0 C5 2.1 7.5 100 0.6 0.7 4.0 14 5.6 1.4 - 2.1 2.1 - 6.6 5.4 - 8.2 1.5 - 2.8 2.9 - 6.4 12 9 10 > 3.0 > 3.0 > 3.0 0.8 0.82 0.6 0.75 - 1.00 0.75 - 1.00 0.75 - 1.00 8 6.1 3.8 9.7 7.4 6.5 997 1 1.22 - 1.59 1.22 - 1.59 1.22 - 1.59 0.004 0.0027 - 0.0088 0.0027 - 0.0088 0.0027 - 0.0088 1.22 0.0049 G5 C5/E5 E5 E5/C5 No distinct repetitive pattern of riffles and pools due to straightening activities. No distinct repetitive pattern of riffles and pools due to straightening activities. 1.0 Design Table 7c. Baseline Stream Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT2 (996.7 feet) Regional Curve Pre-Existing Condition Johanna Creek Ref Still Creek Ref Cole Property Ref 1.0 - 1.2 1.0 - 1.2 1.0 - 1.2 1.2 - 2.3 8.4 C5 2.1 997 1.22 0.0031 Monitoring Baseline Parameter Gauge2 Dimension and Substrate - Riffle Only LL UL Eq.Min Mean Med Max SD5 n Min Mean Max Min Mean Max Min Med Max Min Med Max Min Mean Med Max SD5 n Bankfull Width (ft)5 6 7 7.3 8.1 8.9 2 Floodprone Width (ft)100 100 100 100 100 100 2 Bankfull Mean Depth (ft)0.6 0.6 0.6 2 1Bankfull Max Depth (ft)0.6 0.7 0.8 1 1 1 2 Bankfull Cross Sectional Area (ft2)1 1.75 2.5 4.3 4.9 5.4 2 Width/Depth Ratio 6.6 8.6 10.6 12.4 13.5 14.7 2 Entrenchment Ratio 1.3 1.65 2 11.2 12.5 13.7 2 1.0 1.0 1.0 2 1Bank Height Ratio 2.7 3.0 3.3 1.0 1.0 1.0 2 Profile Riffle Length (ft)22.1 39 35.67 60.9 10 29 Riffle Slope (ft/ft)0.001 0.005 0.005 0.010 0.003 14 Pool Length (ft)7 10.7 10.06 16.8 2.5 28 Pool Max depth (ft)1.6 1.65 1.65 1.7 2 Pool Spacing (ft)45.6 63 60.35 91.7 11.3 28 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 7.5 - 9.2 100 0.6 - 0.7 0.7 - 0.86 4.0 - 6.0 14 4.3 - 5.3 1.0 8.0 - 29.8 0.8 0.82 0.6 0.75 - 1.00 0.75 - 1.00 0.75 - 1.00 8 6.1 3.8 12 9 10 > 3.0 > 3.0 > 3.0 1.0 - 1.2 1.0 - 1.2 1.0 - 1.2 9.7 7.4 6.5 0.003 0.0027 - 0.0088 0.0027 - 0.0088 0.0027 - 0.0088 1.21 - 1.38 0.0038 - 0.0040 1915 1 1.22 - 1.59 1.22 - 1.59 1.22 - 1.59 1.9 - 2.6 7.5 - 15.4 Incised B5c C5/E5 E5 E5/C5 C5 No distinct repetitive pattern of riffles and pools due to straightening activities. No distinct repetitive pattern of riffles and pools due to straightening activities. 1.5 - 2.8 2.9 - 6.4 1.2 - 2.3 1.4 - 2.1 2.1 - 6.6 5.4 - 8.2 Regional Curve Pre-Existing Condition Johanna Creek Ref Still Creek Ref Cole Property Ref Design Table 7d. Baseline Stream Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT3 (1914.8 feet) C5 1.9 - 2.6 1915 1.21 - 1.38 0.0033 Monitoring Baseline Parameter Gauge2 Dimension and Substrate - Riffle Only LL UL Eq.Min Mean Med Max SD5 n Min Mean Max Min Mean Max Min Med Max Min Med Max Min Mean Med Max SD5 n Bankfull Width (ft)5 6 7 7.5 7.5 7.5 1 Floodprone Width (ft)100 100 100 100 100 100 1 Bankfull Mean Depth (ft)0.5 0.5 0.5 1 1Bankfull Max Depth (ft)0.6 0.7 0.8 0.9 0.9 0.9 1 Bankfull Cross Sectional Area (ft2)1 1.75 2.5 3.8 3.8 3.8 1 Width/Depth Ratio 6.6 8.6 10.6 14.8 14.8 14.8 1 Entrenchment Ratio 1.3 1.65 2 13.3 13.3 13.3 1 0.9 0.9 0.9 1 1Bank Height Ratio 2.7 3.0 3.3 1.0 1.0 1.0 1 Profile Riffle Length (ft)17.4 36.6 31.69 74.4 16.6 9 Riffle Slope (ft/ft)0.006 0.008 0.008 0.015 0.003 9 Pool Length (ft)5.2 9.5 9.34 12.3 2.3 9 Pool Max depth (ft)1.4 1.4 1.4 1.4 1 Pool Spacing (ft)21.2 49.6 46.5 75.4 15.6 9 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps) Bankfull Discharge (cfs) Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 10.0 -11.0 0.5 0.61 3.0 14 6.2 1.0 1.5 - 2.8 2.9 - 6.4 1.2 - 2.3 6.5 100 > 3.0 1.0 - 1.2 1.0 - 1.2 1.0 - 1.2 9.7 7.4 6.5 531 1.22 - 1.59 1.22 - 1.59 1.22 - 1.59 0.0027 - 0.0088 0.0027 - 0.0088 0.0027 - 0.0088 1.36 0.0057 2.1 6.2 C5/E5 E5 E5/C5 C5 No distinct repetitive pattern of riffles and pools due to straightening activities. No distinct repetitive pattern of riffles and pools due to straightening activities. 0.8 0.82 0.6 0.75 - 1.00 0.75 - 1.00 0.75 - 1.00 8 6.1 3.8 12 9 10 > 3.0 > 3.0 1.4 - 2.1 2.1 - 6.6 5.4 - 8.2 Regional Curve Pre-Existing Condition Johanna Creek Ref Still Creek Ref Cole Property Ref Table 7e. Baseline Stream Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT4 (530.9 feet) Design Monitoring Baseline 531 1.36 0.0051 C5 2.1 Based on fixed baseline bankfull elevation1 Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used Bankfull Width (ft)15.4 16.1 15.1 17.3 16.4 20.3 16.9 18.5 10.4 14.6 11.6 10.8 10.2 11.7 11.2 13.1 8.6 16.7 9.0 9.9 Floodprone Width (ft)NA NA NA NA NA NA NA NA 100 100 100 100 NA NA NA NA 100 100 100 100 Bankfull Mean Depth (ft)0.9 0.9 1.0 0.8 1.1 0.9 1.1 1.0 0.8 0.6 0.7 0.8 0.9 0.8 0.8 0.7 0.5 0.3 0.5 0.4 Bankfull Max Depth (ft)1.9 2.1 2.1 2.0 2.3 2.3 2.4 2.4 1.4 1.2 1.3 1.3 1.7 1.6 1.7 1.5 1.1 1.0 1.1 1.2 Bankfull Cross Sectional Area (ft2)14.5 14.5 14.5 14.5 18.5 18.5 18.5 18.5 8.4 8.4 8.4 8.4 9.0 9.0 9.0 9.0 4.4 4.4 4.4 4.4 Bankfull Width/Depth Ratio NA NA NA NA NA NA NA NA 12.9 25.4 15.9 13.8 NA NA NA NA 16.8 63.4 18.5 22.3 Bankfull Entrenchment Ratio NA NA NA NA NA NA NA NA 9.6 6.8 8.6 9.3 NA NA NA NA 11.6 6.0 11.1 10.1 Low Bank Height (ft)1.9 2.2 2.1 2.0 2.3 2.4 2.4 2.5 1.4 1.3 1.3 1.3 1.7 1.8 1.8 1.5 1.1 1.0 1.1 1.1 Bankfull Bank Height Ratio 1.00 1.05 1.04 0.97 1.00 1.04 1.02 1.07 1.00 1.08 0.98 0.96 1.00 1.13 1.04 0.97 1.00 1.00 0.99 0.97 Cross Sectional Area between end pins (ft2) 23.4 26.7 23.9 25.1 20.1 24.1 23.2 26.2 11.4 11.3 15.0 14.3 16.9 14.0 13.9 14.2 8.8 12.5 11.2 11.1 d50 (mm) Based on fixed baseline bankfull elevation1 Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used Bankfull Width (ft)10.4 13.4 11.5 14.0 8.0 8.8 8.0 8.9 7.1 7.0 7.3 9.6 Floodprone Width (ft)NA NA NA NA NA NA NA NA 100 100 100.0 100.0 Bankfull Mean Depth (ft)0.6 0.5 0.5 0.4 0.9 0.8 0.9 0.8 0.5 0.5 0.5 0.4 Bankfull Max Depth (ft)2.0 1.2 1.2 1.3 1.8 1.8 1.7 1.7 0.9 0.8 0.8 0.8 Bankfull Cross Sectional Area (ft2)6.1 6.1 6.1 6.1 6.8 6.8 6.8 6.8 3.6 3.6 3.6 3.6 Bankfull Width/Depth Ratio NA NA NA NA NA NA NA NA 14.0 13.6 14.7 14.7 Bankfull Entrenchment Ratio NA NA NA NA NA NA NA NA 14.1 14.3 13.8 13.8 Low Bank Height (ft)2.0 1.3 1.0 1.3 1.8 1.9 1.8 1.6 0.9 0.8 0.9 0.9 Bankfull Bank Height Ratio 1.0 1.08 0.90 0.98 1.0 1.06 1.07 0.97 1.0 1.00 1.12 1.03 Cross Sectional Area between end pins (ft2) 12.8 12.4 10.5 10.4 11.7 11.2 11.5 11 6.1 4.8 7.2 5.7 d50 (mm) 1 = Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: “It is uncertain if the monitoring datum has been consistent over the monitoring history, which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary.” Based on fixed baseline bankfull elevation1 Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used Bankfull Width (ft)11.8 25.8 18.2 25.8 9.9 10.9 10.4 8.6 Floodprone Width (ft)NA NA NA NA 100 100 100 100 Bankfull Mean Depth (ft)0.7 0.3 0.5 0.3 0.6 0.6 0.6 0.6 Bankfull Max Depth (ft)1.6 1.1 1.1 0.9 1.3 1.5 1.3 1.5 Bankfull Cross Sectional Area (ft2)8.8 8.8 8.8 8.8 6.1 6.1 6.1 6.1 Bankfull Width/Depth Ratio NA NA NA NA 16.1 19.5 17.7 17.7 Bankfull Entrenchment Ratio NA NA NA NA 10.1 9.2 9.6 9.6 Low Bank Height (ft)1.6 1.0 0.9 0.9 1.3 1.6 1.3 1.6 Bankfull Bank Height Ratio 1.00 0.91 0.80 0.93 1.00 1.07 1.01 1.07 Cross Sectional Area between end pins (ft2) 10.9 6.7 12.9 7.3 10.8 10.1 10.7 9.5 d50 (mm) Based on fixed baseline bankfull elevation1 Record elevation (datum) used Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull Max Depth (ft) Bankfull Cross Sectional Area (ft2) Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Low Bank Height (ft) Bankfull Bank Height Ratio Cross Sectional Area between end pins (ft2) d50 (mm) 1 = Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: “It is uncertain if the monitoring datum has been consistent over the monitoring history, which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary.” Table 8b. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters – Cross Sections) Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT2 (996.7 feet) Cross Section 1 (Pool)Cross Section 2 (Riffle) Cross Section 6 (Pool)Cross Section 7 (Pool)Cross Section 8 (Riffle) Table 8a. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters – Cross Sections) Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT1/Reach 1,2,3 (3496 feet) Cross Section 1 (Pool)Cross Section 2 (Pool)Cross Section 3 (Riffle)Cross Section 4 (Pool)Cross Section 5 (Riffle) Based on fixed baseline bankfull elevation1 Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used Bankfull Width (ft)11.0 15.8 16.6 13.2 8.9 9.0 10.2 8.5 13.6 14.8 13.5 15.8 7.3 8.0 7.9 8.2 Floodprone Width (ft)NA NA NA NA 100 100 100 100 NA NA NA NA 100 100 100 100 Bankfull Mean Depth (ft)0.9 0.6 0.6 0.8 0.6 0.6 0.5 0.6 0.9 0.9 0.9 0.8 0.6 0.5 0.5 0.5 Bankfull Max Depth (ft)1.6 1.7 1.6 1.8 1.0 1.1 1.0 1.1 1.7 2.0 2.1 2.0 1.0 1.0 1.1 1.1 Bankfull Cross Sectional Area (ft2)10.2 10.2 10.2 10.2 5.4 5.4 5.4 5.4 12.7 12.7 12.7 12.7 4.3 4.3 4.3 4.3 Bankfull Width/Depth Ratio NA NA NA NA 14.7 15.0 19.2 13.4 NA NA NA NA 12.4 14.9 14.4 15.5 Bankfull Entrenchment Ratio NA NA NA NA 11.2 11.1 9.8 9.8 NA NA NA NA 13.7 12.5 12.7 12.3 Low Bank Height (ft)1.6 1.7 1.6 1.8 1.0 1.1 1.1 1.2 1.7 2.0 1.8 1.9 1.0 1.0 1.0 1.2 Bankfull Bank Height Ratio 1.00 1.00 0.98 1.02 1.00 1.00 1.14 1.09 1.00 1.00 0.88 0.98 1.00 1.00 0.92 1.02 Cross Sectional Area between end pins (ft2) 14.1 17.1 13.7 15.1 16.8 18.4 17.8 20.5 22.9 16.2 21.8 21.7 7.6 10.9 9.0 10.5 d50 (mm) Based on fixed baseline bankfull elevation1 Record elevation (datum) used Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull Max Depth (ft) Bankfull Cross Sectional Area (ft2) Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Low Bank Height (ft) Bankfull Bank Height Ratio Cross Sectional Area between end pins (ft2) d50 (mm) 1 = Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: “It is uncertain if the monitoring datum has been consistent over the monitoring history, which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary.” Based on fixed baseline bankfull elevation1 Base MY1 MY2 MY3 MY4 MY5 MY+Base MY1 MY2 MY3 MY4 MY5 MY+ Record elevation (datum) used Bankfull Width (ft)10.9 11.8 11.9 14.3 7.5 11.7 7.5 10.5 Floodprone Width (ft)NA NA NA NA 100 100 100 100 Bankfull Mean Depth (ft)0.7 0.7 0.7 0.6 0.5 0.3 0.5 0.4 Bankfull Max Depth (ft)1.4 1.4 1.3 1.4 0.9 0.8 0.9 0.9 Bankfull Cross Sectional Area (ft2)7.9 7.9 7.9 7.9 3.8 3.8 3.8 3.8 Bankfull Width/Depth Ratio NA NA NA NA 14.8 36.0 14.7 29.0 Bankfull Entrenchment Ratio NA NA NA NA 13.3 8.5 13.4 9.5 Low Bank Height (ft)1.4 1.4 1.3 1.5 0.9 0.8 0.8 0.9 Bankfull Bank Height Ratio 1.00 1.00 0.99 1.06 1.00 1.00 0.90 0.96 Cross Sectional Area between end pins (ft2) 13.3 13.1 14.2 12.4 8.0 5.3 5.9 5.5 d50 (mm) Based on fixed baseline bankfull elevation1 Record elevation (datum) used Bankfull Width (ft) Floodprone Width (ft) Bankfull Mean Depth (ft) Bankfull Max Depth (ft) Bankfull Cross Sectional Area (ft2) Bankfull Width/Depth Ratio Bankfull Entrenchment Ratio Low Bank Height (ft) Bankfull Bank Height Ratio Cross Sectional Area between end pins (ft2) d50 (mm) 1 = Widths and depths for annual measurements will be based on the baseline bankfull datum regardless of dimensional/depositional development. Input the elevation used as the datum, which should be consistent and based on the baseline datum established. If the performer has inherited the project and cannot acquire the datum used for prior years this must be discussed with EEP. If this cannot be resolved in time for a given years report submission a footnote in this should be included that states: “It is uncertain if the monitoring datum has been consistent over the monitoring history, which may influence calculated values. Additional data from a prior performer is being acquired to provide confirmation. Values will be recalculated in a future submission based on a consistent datum if determined to be necessary.” Table 8d. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters – Cross Sections) Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT4 (530.9 feet) Cross Section 1 (Pool)Cross Section 2 (Riffle) Table 8c. Monitoring Data - Dimensional Morphology Summary (Dimensional Parameters – Cross Sections) Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT3 (1914.8 feet) Cross Section 1 (Pool)Cross Section 2 (Riffle)Cross Section 3 (Pool)Cross Section 4 (Riffle) Parameter Dimension and Substrate - Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width (ft)7.1 7.9 8.6 2 7 11.9 16.7 2 7.3 8.15 9 2 9.6 9.75 9.9 2 Floodprone Width (ft)100 100 100 2 100 100 100 2 100 100 100 2 100 100 100 2 Bankfull Mean Depth (ft)0.5 0.5 0.5 2 0.5 0.5 0.5 2 0.5 0.5 0.5 2 0.5 0.5 0.5 2 1Bankfull Max Depth (ft)0.9 1 1.1 2 0.8 0.9 1 2 0.8 0.95 1.1 2 0.8 1 1.2 2 Bankfull Cross Sectional Area (ft2)3.6 4 4.4 2 3.6 4 4.4 2 3.6 4 4.4 2 3.6 4 4.4 2 Width/Depth Ratio 14 15.6 17.2 2 13.8 23.6 33.4 2 14.7 16.6 18.5 2 22.1 24 25.8 2 Entrenchment Ratio 11.6 12.9 14.1 2 6 10.1 14.3 2 11.1 12.5 13.8 2 10.1 10.3 10.4 2 Low Bank Height (ft)0.9 1.0 1.1 2 0.8 0.9 1.0 2 0.9 1 1.1 2 0.9 1 1.1 2 1Bank Height Ratio 1.0 1.0 1.0 2 1.0 1.0 1.0 2 0.99 1.06 1.12 2 0.97 1.00 1.03 2 Profile Riffle Length (ft)9 28.6 28.5 49.5 10.7 35 Riffle Slope (ft/ft)0 0.01 0.01 0.02 0.01 13 Pool Length (ft)4.3 10.9 9.14 39.8 7.5 27 Pool Max depth (ft)1.7 1.8 2 3 Pool Spacing (ft)25.3 49.8 50.7 89.2 14.7 35 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Ri% / Ru% / P% / G% / S% 3SC% / Sa% / G% / C% / B% / Be% 3d16 / d35 / d50 / d84 / d95 / 2% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 MY-2 MY- 3 MY- 4 MY- 5 C5 Baseline MY-1 Exhibit Table 9a. Monitoring Data - Stream Reach Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT1/Reach 1&2 (2033 feet) 0 2033 0.0049 1.26 -1.29 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Parameter Dimension and Substrate - Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width (ft)10.4 10.4 10.4 1 14.6 14.6 14.6 1 11.6 11.6 1 10.8 10.8 1 Floodprone Width (ft)100 100 100 1 100 100 100 1 100 100 1 100 100 1 Bankfull Mean Depth (ft)0.8 0.8 0.8 1 0.8 0.8 0.8 1 0.7 0.7 1 0.8 0.8 1 1Bankfull Max Depth (ft)1.4 1.4 1.4 1 1.2 1.2 1.2 1 1.3 1.3 1 1.3 1.3 1 Bankfull Cross Sectional Area (ft2)8.4 8.4 8.4 1 8.4 8.4 8.4 1 8.4 8.4 1 8.4 8.4 1 Width/Depth Ratio 13 13 13 1 18.3 18.3 18.3 1 15.9 15.9 1 13.7 13.7 1 Entrenchment Ratio 9.6 9.6 9.6 1 6.8 6.8 6.8 1 8.6 8.6 1 9.3 9.3 1 Low Bank Height (ft)1.4 1.4 1.4 1 1.3 1.3 1.3 1 1.3 1.3 1 1.3 1.3 1 1Bank Height Ratio 1.0 1.0 1.0 1 1.1 1.1 1.1 1 0.98 0.98 1 0.96 0.96 1 Profile Riffle Length (ft)12.2 39.6 38.7 63.2 12.7 23 Riffle Slope (ft/ft)0 0.01 0 0.03 0.01 10 Pool Length (ft)4.7 13 11.8 32 6.4 22 Pool Max depth (ft)1.9 2.1 2.1 2.3 2 Pool Spacing (ft)37.3 68 73.8 87.5 13.9 22 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Ri% / Ru% / P% / G% / S% 3SC% / Sa% / G% / C% / B% / Be% 3d16 / d35 / d50 / d84 / d95 / 2% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Exhibit Table 9b. Monitoring Data - Stream Reach Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT1/Reach 3 (1463 feet) Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 0.0028 0 C5 1463 1.35 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Parameter Dimension and Substrate - Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width (ft)9.9 9.9 9.9 1 10.9 10.9 10.9 1 10.4 10.4 1 8.6 8.6 1 Floodprone Width (ft)100 100 100 1 100 100 100 1 100 100 1 100 100 1 Bankfull Mean Depth (ft)0.6 0.6 0.6 1 0.6 0.6 0.6 1 0.59 0.59 1 0.71 0.71 1 1Bankfull Max Depth (ft)1.3 1.3 1.3 1 1.5 1.5 1.5 1 1.33 1.33 1 1.45 1.45 1 Bankfull Cross Sectional Area (ft2)6.1 6.1 6.1 1 6.1 6.1 6.1 1 6.1 6.1 1 6.1 6.1 1 Width/Depth Ratio 16.1 16.1 16.1 1 19.5 19.5 19.5 1 17.7 17.7 1 12.2 12.2 1 Entrenchment Ratio 10.1 10.1 10.1 1 9.2 9.2 9.2 1 9.6 9.6 1 11.6 11.6 1 Low Bank Height (ft)1.3 1.3 1.3 1 1.5 1.5 1.5 1 1.34 1.34 1 1.55 1.55 1 1Bank Height Ratio 1.0 1.0 1.0 1 1.1 1.1 1.1 1 1.01 1.01 1 1.07 1.07 1 Profile Riffle Length (ft)15.7 29.9 28.4 52.3 10.8 11 Riffle Slope (ft/ft)0.00 0.01 0.00 0.01 0.00 8 Pool Length (ft)2.4 14.2 12.4 28.4 7.4 17 Pool Max depth (ft)1.6 1.6 1.6 1.6 1 Pool Spacing (ft)34.5 55.6 54.9 73.1 10.7 16 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Ri% / Ru% / P% / G% / S% 3SC% / Sa% / G% / C% / B% / Be% 3d16 / d35 / d50 / d84 / d95 / 2% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT2 (996.7 feet) Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 Exhibit Table 9c. Monitoring Data - Stream Reach Data Summary C5 996.7 1.22 0.0031 0 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Parameter Dimension and Substrate - Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width (ft)7.3 8.1 8.9 2 8 8.5 9 2 7.87 9.03 10.2 2 8.2 8.35 8.5 2 Floodprone Width (ft)100 100 100 2 100 100 100 2 100 100 100 2 100 100 100 2 Bankfull Mean Depth (ft)0.6 0.6 0.6 2 0.5 0.6 0.6 2 0.53 0.54 0.55 2 0.52 0.58 0.63 2 1Bankfull Max Depth (ft)1 1 1 2 1 1.1 1.1 2 0.98 1.05 1.11 2 1.13 1.13 1.14 2 Bankfull Cross Sectional Area (ft2)4.3 4.9 5.4 2 4.3 4.9 5.4 2 4.3 4.85 5.4 2 4.3 4.85 5.4 2 Width/Depth Ratio 12.4 13.5 14.7 2 14.9 15 15 2 14.4 16.8 19.2 2 13.4 14.5 15.6 2 Entrenchment Ratio 11.2 12.5 13.7 2 11.1 11.8 12.5 2 9.8 11.3 12.7 2 11.8 12 12.3 2 Low Bank Height (ft)1.0 1.0 1.0 2 1.0 1.1 1.1 2 1.02 1.07 1.12 2 1.16 1.2 1.24 2 1Bank Height Ratio 1.0 1.0 1.0 2 1.0 1.0 1.0 2 0.92 1.03 1.14 2 1.02 1.06 1.09 2 Profile Riffle Length (ft)22.1 39 35.7 60.9 10 29 Riffle Slope (ft/ft)0 0.01 0 0.01 0 14 Pool Length (ft)7 10.7 10.1 16.8 2.5 28 Pool Max depth (ft)1.6 1.65 1.65 1.7 2 Pool Spacing (ft)45.6 63 60.4 91.7 11.3 28 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Ri% / Ru% / P% / G% / S% 3SC% / Sa% / G% / C% / B% / Be% 3d16 / d35 / d50 / d84 / d95 / 2% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Exhibit Table 9d. Monitoring Data - Stream Reach Data Summary Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT3 (1914.8 feet) Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 0.0033 C5 1914.8 1.21 - 1.38 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Parameter Dimension and Substrate - Riffle only Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Min Mean Med Max SD4 n Bankfull Width (ft)7.5 7.5 7.5 1 11.7 11.7 11.7 1 7.5 7.5 1 10.5 10.5 1 Floodprone Width (ft)100 100 100 1 100 100 100 1 100.0 100.0 1 100.0 100.0 1 Bankfull Mean Depth (ft)0.5 0.5 0.5 1 0.3 0.3 0.3 1 0.5 0.5 1 0.4 0.4 1 1Bankfull Max Depth (ft)0.9 0.9 0.9 1 0.8 0.8 0.8 1 0.9 0.9 1 0.9 0.9 1 Bankfull Cross Sectional Area (ft2)3.8 3.8 3.8 1 3.8 3.8 3.8 1 3.8 3.8 1 3.8 3.8 1 Width/Depth Ratio 14.8 14.8 14.8 1 36 36 36 1 14.7 14.7 1 29.2 29.2 1 Entrenchment Ratio 13.3 13.3 13.3 1 8.5 8.5 8.5 1 13.4 13.4 1 9.5 9.5 1 Low Bank Height (ft)0.9 0.9 0.9 1 0.8 0.8 0.8 1 0.8 0.8 1 0.9 0.9 1 1Bank Height Ratio 1.0 1.0 1.0 1 1.0 1.0 1.0 1 0.9 0.9 1 1.0 1.0 1 Profile Riffle Length (ft)17.4 36.6 31.7 74.4 16.6 9 Riffle Slope (ft/ft)0.01 0.01 0.01 0.01 0 9 Pool Length (ft)5.2 9.5 9.34 12.3 2.3 9 Pool Max depth (ft)1.4 1.4 1.4 1.4 1 Pool Spacing (ft)21.2 49.6 46.5 75.4 15.6 9 Pattern Channel Beltwidth (ft) Radius of Curvature (ft) Rc:Bankfull width (ft/ft) Meander Wavelength (ft) Meander Width Ratio Additional Reach Parameters Rosgen Classification Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) BF slope (ft/ft) 3Ri% / Ru% / P% / G% / S% 3SC% / Sa% / G% / C% / B% / Be% 3d16 / d35 / d50 / d84 / d95 / 2% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = Proportion of reach exhibiting banks that are eroding based on the visual survey from visual assessment table 3 = Riffle, Run, Pool, Glide, Step; Silt/Clay, Sand, Gravel, Cobble, Boulder, Bedrock; dip = max pave, disp = max subpave 4. = Of value/needed only if the n exceeds 3 Project Name/Number (Alliance Headwaters/97086) - Segment/Reach: UT4 (530.9 feet) Baseline MY-1 MY-2 MY- 3 MY- 4 MY- 5 Exhibit Table 9e. Monitoring Data - Stream Reach Data Summary C5 530.9 1.36 0.0051 Pattern data will not typically be collected unless visual data, dimensional data or profile data indicate significant shifts from baseline Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX D: HYDROLOGY DATA Tables 10A-G. Channel Evidence Stream Gauge Graphs Table 11. Verification of Bankfull Events Figure E1. 30/70 Percentile Graph for Rainfall Soil Temp Graph Table 12. Groundwater Hydrology Data Groundwater Gauge Graphs Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10A. UT1 Downstream Channel Evidence UT1 Downstream Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 201 119 116 143 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 1: UT1 Downstream Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10B. UT1 Upstream Channel Evidence UT1 Upstream Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 190 160 186 132 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 2: UT1 Upstream Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10C. UT1A Channel Evidence UT1A Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 97 73 90 64 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 3: UT1A Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10D. UT2 Channel Evidence UT2 Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 199 125 110 77 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 4: UT2 Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10E. UT3 Downstream Channel Evidence UT3 Downstream Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 119 234 67 63 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 5: UT3 Downstream Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10F. UT3 Upstream Channel Evidence UT3 Upstream Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 136 127 96 93 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 6: UT3 Upstream Channel Evidence Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 10G. UT4 Channel Evidence UT4 Channel Evidence Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) Max consecutive days channel flow 130 228 88 135 Presence of litter and debris (wracking) Yes Yes Yes Yes Leaf litter disturbed or washed away Yes Yes Yes Yes Matted, bent, or absence of vegetation (herbaceous or otherwise) Yes Yes Yes Yes Sediment deposition and/or scour indicating sediment transport Yes Yes Yes Yes Water staining due to continual presence of water Yes Yes Yes Yes Formation of channel bed and banks Yes Yes Yes Yes Sediment sorting within the primary path of flow Yes Yes Yes Yes Sediment shelving or a natural line impressed on the banks Yes Yes Yes Yes Change in plant community (absence or destruction of terrestrial vegetation and/or transition to species adapted for flow or inundation for a long duration, including hydrophytes) Yes Yes Yes Yes Development of channel pattern (meander bends and/or channel braiding) at natural topographic breaks, woody debris piles, or plant root systems Yes Yes Yes Yes Exposure of woody plant roots within the primary path of flow No No No No Other: Photo 7: UT4 Channel Evidence 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT1 Downstream Year 4 (2023 Data) 143 days Total Cumulative Flow: 237 days Bankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 15 17 19 21 23 25 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT1 Upstream Year 4 (2023 Data) 132 days Total Cumulative Flow: 182 days Bankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT1A Year 4 (2023 Data) 64 days Total Cumulative Flow: 130 days Bankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT2 Year 4 (2023 Data) 77 days Total Cumulative Flow: 173 days Bankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 15 17 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT3 Downstream Year 4 (2023 Data) 63 days Total Cumulative Flow: 115 days Bankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 15 17 19 21 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT3 Upstream Year 4 (2023 Data) 93 days Total Cumulative Flow: 119 daysBankfull Event Bankfull Event 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐5 ‐3 ‐1 1 3 5 7 9 11 13 15 17 19 21 23 25 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) St r e a m St a g e Le v e l (i n ) Alliance Headwaters Stream Flow Gauge UT4 Year 4 (2023 Data) 135 days Total Cumulative Flow: 186 days Bankfull Event Bankfull Event Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 11. Verification of Bankfull Events Date of Data Collection Date of Occurrence Method Tributaries Photo (if available) April 30, 2020 April 30, 2020 Stream gauges and trail cameras captured a bankfull event at UT3 after 1.17 inches of rain was documented between April 30 and May 1, 2020 at an on-site rain gauge. UT3 8 November 19, 2020 November 12, 2020 Wrack and laid-back vegetation were observed outside the TOB of UT1 after 3.61 inches of rain was documented between November 12 and 13, 2020 at a nearby weather station. UT1 9 March 16, 2021 March 16, 2021 The UT1, UT2, UT3, and UT4 stream gauges and UT1, UT3, and UT4 trail cameras captured a bankfull event after 2.35 inches of rain was documented on March 16, 2021 at an on-site rain gauge UT1, UT2, UT3, UT4 10-12 February 28, 2022 January 16, 2022 All stream gauges and the UT2 trail camera captured a bankfull event on all site streams after 1.37 inches of rain was documented at an on-site rain gauge. UT1, UT1A, UT2, UT3, UT4 13 April 10, 2023 February 12, 2023 Bankfull event captured by all stream gauges and the UT2 camera after 0.82 and 0.25 inches of rain were recorded on the days leading up to this event by an on-site rain gauge. UT1, UT1A, UT2, UT3, UT4 14 July 25, 2023 April 9, 2023 All stream gauges and the UT3 and UT4 cameras recorded a bankfull event after 2.89 inches of rain fell, as documented by an on-site rain gauge. UT1, UT1A, UT2, UT3, UT4 15, 16 Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Photo 8: UT3 at bankfull stage. Photo 9: Wrack and laid-back vegetation outside the TOB of UT1 after a bankfull event. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Photo 10: UT1 at bankfull stage. Photo 11: UT3 at bankfull stage. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Photo 12: UT4 at bankfull stage. Photo 13: UT2 receding from an overnight bankfull event. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Photo 14: UT2 during a bankfull event. Photo 15: UT3 during a bankfull event. Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Photo 16: UT4 during a bankfull event. 0 2 4 6 8 10 12 Ra i n f a l l A m o u n t i n I n c h e s Figure E1: Alliance Headwaters 30-70 Percentile Graph for Rainfall Current year data from onsite rain gauge 30-70th percentile data from WETS Station: Smithfield, NC 2020 2021 2022 2023 2024 30th Percentile 70th Percentile 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 1/ 1 / 2 3 1/ 1 5 / 2 3 1/ 2 9 / 2 3 2/ 1 2 / 2 3 2/ 2 6 / 2 3 3/ 1 2 / 2 3 3/ 2 6 / 2 3 4/ 9 / 2 3 4/ 2 3 / 2 3 5/ 7 / 2 3 5/ 2 1 / 2 3 6/ 4 / 2 3 6/ 1 8 / 2 3 7/ 2 / 2 3 7/ 1 6 / 2 3 7/ 3 0 / 2 3 8/ 1 3 / 2 3 8/ 2 7 / 2 3 9/ 1 0 / 2 3 9/ 2 4 / 2 3 10 / 8 / 2 3 10 / 2 2 / 2 3 11 / 5 / 2 3 11 / 1 9 / 2 3 So i l Te m p °F Date Alliance Headwaters Soil Temperature Year 4 (2023 Data) March 15: 53.00 °F March 1: 59.25°F Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 12. Groundwater Hydrology Data Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) 1 No 9 days (3.6%) Yes 37 days (14.9%) No 12 days (4.8%) No 7 days (2.8%) 2 No 9 days (3.6%) No 21 days (8.4%) No 11 days (4.4%) No 5 days (2.0%) 3 Yes 55 days (22.2%) Yes 86 days (34.5%) Yes 28 days (11.2%) Yes 49 days (20.0%) 4 No 10 days (4.0%) Yes 36 days (14.5%) No 3 days (1.2%) No 2 days (0.8%) 5 Yes 29 days (11.7%) No 19 days (7.6%) No 11 days (4.4%) No 7 days (2.8%) 6 No 16 days (6.5%) No 20 days (8.0%) No 14 days (5.6%) No 9 days (3.6%) 7 No 7 days (2.8%) No 8 days (3.2%) No 4 days (1.6%) No 4 days (1.6%) 8 Yes 50 days (20.2%) Yes 51 days (20.5%) No 13 days (5.2%) No 7 days (2.8%) 9 Yes 75 days (32.7%) Yes 93 days (37.3%) Yes 45 days (18.1%) Yes 71 days (28.5%) 10 Yes 72 days (29.0%) Yes 58 days (23.3%) Yes 28 days (11.2%) Yes 38 days (15.0%) 11 Yes 64 days (25.8%) Yes 42 days (16.9%) No 13 days (5.2%) No 10 days (4.0%) 12 No 18 days (7.3%) Yes 36 days (14.5%) No 22 days (8.8%) No 10 days (4.0%) 13 No 20 days (8.1%) Yes 58 days (23.3%) No 21 days (8.4%) Yes 27 days (10.8%) 14 No 16 days (6.5%) Yes 44 days (17.7%) No 12 days (4.8%) No 8 days (3.2%) 15 No 13 days (5.2%) No 18 days (7.2%) No 21 days (8.4%) No 15 days (6.0%) 16 Yes 34 days (13.7%) Yes 70 days (28.1%) Yes 27 days (10.8%) Yes 41 days (16.5%) 17 No 19 days (7.7%) Yes 36 days (14.5%) No 13 days (5.2%) No 13 days (5.2%) 18 No 10 days (4.0%) No 19 days (7.6%) No 11 days (4.4%) No 9 days (3.8%) 19 No 8 days (3.2%) No 10 days (4.0%) No 4 days (1.6%) No 5 days (2.0%) Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 Table 12. Groundwater Hydrology Data (continued) * Prior to the MY2 (2021) growing season, six additional wetland gauges were installed in areas of the Site RS felt needed additional data points (near GW19, near vegetation plot 31, near GW 7, at the upstream portion of UT 2, and across UT 1 from GW 11-12). Additionally, a reference groundwater gauge was installed in the wetland preservation area at the headwaters of UT 3 and 4. **Prior to the MY4 (2023) growing season an additional wetland gauge was installed between gauges GW 24 and GW 30 to provide additional data for this area. Gauge Success Criteria Achieved/Max Consecutive Days During Growing Season (Percentage) Year 1 (2020) Year 2 (2021) Year 3 (2022) Year 4 (2023) Year 5 (2024) Year 6 (2025) Year 7 (2026) 20 Yes 36 days (14.5%) Yes 58 days (23.3%) Yes 25 days (10.0%) Yes 39 days (15.7%) 21 Yes 34 days (13.7%) Yes 36 days (14.5%) No 22 days (8.8%) No 11 days (4.4%) 22 Yes 69 days (27.8%) Yes 56 days (22.5%) Yes 28 days (11.2%) Yes 48 days (19.3%) 23 Yes 35 days (14.1%) Yes 42 days (16.9%) Yes 25 days (10.0%) Yes 25 days (10.0%) 24 No 5 days (2.0%) No 14 days (5.6%) No 1 day (0.4%) No 6 days (2.4%) 25 Yes 46 days (18.5%) Yes 55 days (21.1%) Yes 27 days (10.8%) Yes 49 days (19.7%) 26 Yes 167 days (67.3%) Yes 88 days (35.3%) Yes 61 days (24.5%) Yes 84 days (33.7%) 27 Yes 74 days (29.8%) Yes 57 days (22.9%) No 13 days (5.2%) No 12 days (4.8%) 28 Yes 45 days (18.1%) Yes 49 days (19.7%) No 4 days (1.6%) No 10 days (4.0%) 29 Yes 45 days (18.1%) Yes 81 days (32.5%) Yes 12 days (4.8%) No 10 days (4.0%) 30* NA Yes 38 days (15.3%) No 0 days (0.0%) No 3 days (1.2%) 31* NA Yes 98 days (39.4%) Yes 44 days (17.7%) Yes 27 days (10.8%) 32* NA Yes 58 days (23.3%) Yes 45 days (18.1%) Yes 49 days (19.7%) 33* NA Yes 42 days (16.9%) No 13 days (5.2%) No 8 days (3.2%) 34* NA Yes 55 days (22.1%) No 22 days (8.8%) Yes 36 days (14.5%) 35* NA Yes 42 days (16.9%) No 13 days (5.2%) No 8 days (3.2%) 36** NA NA NA No 8 days (3.2%) Ref* NA Yes 51 days (20.5%) No 15 days (6.0%) Yes 49 days (19.7%) 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 1 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 7 Days ‐2.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 2 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 5 Days ‐2.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 3 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 49 Days ‐20.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 4 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 2 Days ‐0.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 5 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 7 Days ‐2.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 6 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 9 Days ‐3.6% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 7 Year 4 (2023 Data) Start Growing Season March 1 4 Days ‐1.6% End Growing Season November 4 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 8 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 7 Days ‐2.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 9 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 71 Days ‐28.5% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 10 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 38 Days ‐15.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 11 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 10 Days ‐4.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 12 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 10 Days ‐4.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 13 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 27 Days ‐10.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 14 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 8 Days ‐3.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 15 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 15 Days ‐6.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 16 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 41 Days ‐16.5% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 17 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 13 Days ‐5.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 18 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 9 Days ‐3.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 19 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 5 Days ‐2.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 20 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 39 Days ‐15.7% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 21 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 11 Days ‐4.4% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 22 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 48 Days ‐19.3% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 23 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 25 Days ‐10.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 24 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 6 Days ‐2.4% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 25 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 49 Days ‐19.7% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 26 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 84 Days ‐33.7% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 27 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 12 Days ‐4.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 28 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 10 Days ‐4.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 29 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 10 Days ‐4.0% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 30 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 3 Days ‐1.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 31 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 27 Days ‐10.8% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 32 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 49 Days ‐19.7% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 33 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 8 Days ‐3.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 34 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 36 Days ‐14.5% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Gauge 35 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 8 Days ‐3.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l A m o u n t s ( i n ) Gr o u n d w a t e r L e v e l ( i n ) Alliance Headwaters Groundwater Gauge 36 Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 8 Days - 3.2% 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 ‐40 ‐38 ‐36 ‐34 ‐32 ‐30 ‐28 ‐26 ‐24 ‐22 ‐20 ‐18 ‐16 ‐14 ‐12 ‐10 ‐8 ‐6 ‐4 ‐2 0 2 4 6 8 10 12 1/ 1 / 2 3 1/ 1 1 / 2 3 1/ 2 1 / 2 3 1/ 3 1 / 2 3 2/ 1 0 / 2 3 2/ 2 0 / 2 3 3/ 2 / 2 3 3/ 1 2 / 2 3 3/ 2 2 / 2 3 4/ 1 / 2 3 4/ 1 1 / 2 3 4/ 2 1 / 2 3 5/ 1 / 2 3 5/ 1 1 / 2 3 5/ 2 1 / 2 3 5/ 3 1 / 2 3 6/ 1 0 / 2 3 6/ 2 0 / 2 3 6/ 3 0 / 2 3 7/ 1 0 / 2 3 7/ 2 0 / 2 3 7/ 3 0 / 2 3 8/ 9 / 2 3 8/ 1 9 / 2 3 8/ 2 9 / 2 3 9/ 8 / 2 3 9/ 1 8 / 2 3 9/ 2 8 / 2 3 10 / 8 / 2 3 10 / 1 8 / 2 3 10 / 2 8 / 2 3 11 / 7 / 2 3 11 / 1 7 / 2 3 11 / 2 7 / 2 3 12 / 7 / 2 3 12 / 1 7 / 2 3 12 / 2 7 / 2 3 Ra i n f a l l Am o u n t s (i n ) Gr o u n d w a t e r Le v e l (i n ) Alliance Headwaters Groundwater Reference Gauge Year 4 (2023 Data) End Growing Season November 4 Start Growing Season March 1 49 Days ‐19.7% Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX E. SITE PHOTO LOG Alliance Headwaters MY-04 (2023) Photo Log Photo 1: Aerial view of vegetation along UT 1 and UT 2 MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Photo 2: Aerial view of UT 3 and 4 Alliance Headwaters MY-04 (2023) Photo Log Photo 3: Aerial view of UT 1 upstream Photo 4: Aerial view of UT1 downstream and UT2 MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 5: Signage and posts at edge of easement Photo 6: Aerial view of easement boundary and signage MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 7: Crossing at edge of easement on UT-1, downstream Photo 8: Crossing at edge of easement on UT-1, upstream MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 9: UT-2 forded crossing, downstream Photo 10: UT-2 forded crossing, upstream MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 11: Culvert at edge of easement, UT-3, downstream Photo 12: Culvert at edge of easement, UT-3, upstream MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 13: Bud Burst of Betula nigra Photo Taken 2/28/23 Photo 14: Bud Burst of Cornus amomum Photo Taken 2/28/23 MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Alliance Headwaters MY-04 (2023) Photo Log Photo 15: Pine Thinning Photo Taken 5/12/23 Photo 16: Pine Thinning Photo Taken 5/12/23 MY4 (2023) Monitoring Report (Project No. 97086) Appendices Alliance Headwaters Stream and Wetland Mitigation Site Restoration Systems, LLC Monitoring Report MY4 (Project No. 97086) Appendices Alliance Headwaters Mitigation Site Restoration Systems, LLC Johnston County, North Carolina February 2024 APPENDIX F. IRT CORRESPONDENCE 2022-10-20. MY2 (2021) and MY3 (2022) IRT Site Visit Notes Restoration Systems, LLC 1101 Haynes St. Suite 211 Raleigh, North Carolina Ph: (919) 755-9490 Fx: (919) 755-9492 1101 Haynes St., Suite 211 • Raleigh, NC 27604 • www.restorationsystems.com • Ph 919.755.9490 • Fx 919.755.9492 October 21, 2022 Lindsay Crocker NC DEQ – Division of Mitigation Services 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Subject: MY2 (2021) and MY 3 (2022) IRT Site Visit Alliance Headwaters Stream & Riparian Riverine Wetland Mitigation Site DMS Contract #: 6832; DMS Project ID: 95017; RFP # 16-006477 USACE Action ID No. SAW-2016-00882; DWR ID No. 20160405 MY2 (2021) and MY 3 (2022) IRT Site Visit: Site Visit Notes On October 20, 2022, Restoration Systems (RS) held an on-site meeting with regulatory agencies to discuss the MY2 (2021) monitoring data and the MY 3 (2022) interim data for the Alliance Headwaters Mitigation Site. Below is a list of attendees and general site visit notes. Attendees: USACE: -Todd Tugwell -Casey Haywood NC DWR: -Erin Davis Restoration Systems: -Raymond Holz -Alex Baldwin Division of Mitigation Services: -Lindsay Crocker Site Visit Notes: -RS will include a random vegetation transect through the UT 2 Wetland Enhancement Area during MY4 (2023). -RS will ensure proper easement signage/marking along all Site’s agriculture boundaries. This effort will include the southern easement boundary of the eastern tract along the gravel ag. road. This effort will consist of treated 6-inch fence posts at all easement corners and adequate marking every 200 feet with easement signage. -RS will implement an initial treatment to pines throughout the easement in Q1 2023 – paying particular attention to pines on and along stream banks. RS will also plant live stakes in areas where pines are removed from the stream banks. -Between groundwater gauges 24 and 30, RS will install a shorter/shallower groundwater gauge to see if the deeper gauges (24 and 30) have punctured through the restrictive soil layer. -If 2022 photos are available that show the streams/site in a wetter condition, RS will provide them in the MY 3 (2022) monitoring Report. -In the MY 3 (2022) monitoring report, RS will provide pictures of the improved road outlets. This includes the additional outlet constructed near groundwater gauge 19 – installed in August of 2022. The purpose of these outlets is to allow surface hydrology to enter the Site from adjacent agricultural fields. -RS will perform groundwater gauge maintenance across the Site, ensuring bentonite caps are in place and level with the surrounding ground elevation. -RS will review alternative approaches to monitoring stream flow and switch stream-flow gauges if appropriate. 1 Ray Holz From:Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil> Sent:Monday, October 31, 2022 1:03 PM To:Tugwell, Todd J CIV USARMY CESAW (USA); Davis, Erin B; Ray Holz Cc:Crocker, Lindsay; Alex Baldwin Subject:RE: [Non‐DoD Source] RE: [External] Alliance Headwaters / MY2 (2021) and MY 3 (2022) IRT Site Visit / . SAW‐2016‐00882; DWR ID No. 20160405 Thanks Todd. And thanks Ray, these look good to me also. Please reach out if you have any questions regarding the diagram for the flow gauge install. Thanks, Casey Casey Haywood Mitigation Specialist, Regulatory Division I U.S. Army Corps of Engineers Work cell: (919) 750‐7397 From: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil> Sent: Monday, October 31, 2022 12:39 PM To: Davis, Erin B <erin.davis@ncdenr.gov>; Ray Holz <rholz@restorationsystems.com>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Alex Baldwin <abaldwin@restorationsystems.com> Subject: RE: [Non‐DoD Source] RE: [External] Alliance Headwaters / MY2 (2021) and MY 3 (2022) IRT Site Visit / . SAW‐ 2016‐00882; DWR ID No. 20160405 Ray, these look fine to me too. Casey, I’m not sure if you received these due to your email snafu, so just sharing. Thanks, Todd From: Davis, Erin B <erin.davis@ncdenr.gov> Sent: Monday, October 31, 2022 12:15 PM To: Ray Holz <rholz@restorationsystems.com>; Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV USARMY CEMVP (USA) <Casey.M.Haywood@usace.army.mil> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Alex Baldwin <abaldwin@restorationsystems.com> Subject: [Non‐DoD Source] RE: [External] Alliance Headwaters / MY2 (2021) and MY 3 (2022) IRT Site Visit / . SAW‐2016‐ 00882; DWR ID No. 20160405 Thanks for sending. I have no additional comments. Much appreciated, Erin B. Davis, PWS (she/her/hers) Stream & Wetland Mitigation Coordinator Division of Water Resources NC Department of Environmental Quality 2 919-817-0360 cell erin.davis@ncdenr.gov From: Ray Holz <rholz@restorationsystems.com> Sent: Friday, October 21, 2022 12:59 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV USARMY CESAW (USA) <casey.m.haywood@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Alex Baldwin <abaldwin@restorationsystems.com> Subject: [External] Alliance Headwaters / MY2 (2021) and MY 3 (2022) IRT Site Visit / . SAW‐2016‐00882; DWR ID No. 20160405 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Todd, Casey, and Erin – Thank you for the time yesterday at Alliance. I feel that it was very productive on many fronts. I have attached a set of site visit notes for your review. Please send along any additional notes you would like added, and I will include all notes in the MY3 (2022) monitoring report. Best, RH ----- ------ ------ Raymond J. Holz | Restoration Systems, LLC 1101 Haynes St. Suite 211 | Raleigh, NC 27604 tel: 919.334.9122 | cell: 919.604.9314 | fax: 919.755.9492 email: rholz@restorationsystems.com