Loading...
HomeMy WebLinkAboutNCC240411_ESC Approval Submitted_20240219 1,41-We ' t ROY COOPER t1£� a • Governor _ -i v, ELIZABETH S.BISER t ,� Secretary __ DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality April 6, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Western N.C. Housing Partnership ATTN: Ms.Joy Strassel 224 Thompson St., Suite 181 Hendersonville, NC 28792 RE: Project Name: VALLEY RIVER APARTMENTS Acres Approved: 7.00 Project ID: CHERO-2023-004 County: Cherokee City: Murphy Address: US Hwy. 74/19 River Basin: Hiwassee Stream Classification: Valley River- Class C, Trout Submitted By: Bateman Civil Survey Company- Mr. Thomas Speight,Jr., PE Date Received by LQS: March 8, 2023 Plan Type: Residential Dear Ms. Strassel, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page.This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: DE _.-.,_ North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa,North Carolina 28778 NOFIH c TIOLJNL. Mp Environnental arbnent 828.296.4500 Letter of Approval with Modifications Western N.C. Housing Partnership, Inc. ATTN: Ms. Joy Strassel April, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, c ,)__,A,Ocie___ Fred Walker, PE Engineer III Land Quality Section Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications Required for Approval ec: Mr. Thomas Speight,Jr., PE (info@batemancivilsurvey.com) Ms. Savannah Leduc- NCDEQ-LQS (savannah.leduc@ncdenr.gov) Mr.Andrew Moore, PG - NCDEQ-DWR (andrew.w.moore@ncdenr.gov) cc: Regional Office file Letter of Approval with Modifications Western N.C. Housing Partnership, Inc. ATTN: Ms.Joy Strassel April, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: VALLEY RIVER APARTMENTS Project ID: CHERO-2023-004 County: Cherokee 1. Provide a revised notarized Financial Responsibility/Ownership form with Part B.2.a completed to match information on file for the registered agent for Western N.C. Housing Partnership, Inc. {G.S. 113A-54.1.(a)} 2. Hatch all areas required to meet 7-day stabilization requirement in NPDES NCG010000. {NPDES NCG010000} 3. Extend skimmer basin inlets into the floor of the basin past the toe of the basin side slopes. All upgradient runoff must be directed to a stabilized inlet to prevent short- circuiting of settling treatment. Provide verification that pond below basin discharge is sized to handle discharge from skimmer basin. {G.S. 113A-57.(3)} 4. Include all E&SC measures that will be installed or maintained as part of this project within the LOD. {G.S. 113A-57.(4)} 5. Revise construction sequence to include the following language: no major grading activities are to take place during wet weather or periods of predicted wet weather, specify order in which initial E&SC measures must be installed, and to install inlet protection at the end of each day for any installed stormwater inlets. {15A NCAC 04B .0106(a)(2)} 6. Due to proximity to receiving stream apply fertilizer per soil test recommendations. {G.S. 113A-57.(3)} 7. Provide wire backed double row silt fence or super silt fence between construction activities and receiving stream. Include construction detail for proposed perimeter measure. {G.S. 113A-57.(3)} 8. Verify that post-construction stormwater permitting has been approved, applied for, or is not required for this project. • r� k • hit h, = C '' °'1 N..�., Ali/ kar Pi: Oil e �"h �1 r' Pm: P CD e—h h y+ P:iw — mac! Pi 0 l l M.d• Vd ..; q -• 'w'13 m C O = _• '"'- �,' n .. r_. - © tn 0- . P.4, 0 .. A5 h--d n el, v' r-►. o r 01 Maitiq • O' r-r -. OCACD �• C � { Cr = 41 pi -- tit 1 AD �1 CD " CD A• C p qi. :,_A_____ - fir: n' { V I offplY o ' p 1t _\CP = AD O w r-► F. 11A _ CA - - ► � w � II c� cll o )— I' A1 Al. r . . ,: .A . -wL Nn e.., e..s. n � - ‘c:,1 = o a) CD r-►, p-i• CD