Loading...
HomeMy WebLinkAboutPump Around Typical.pdfEXAMPLE OF PUMP -AROUND OPERATION NOTES: 1) All excavation shall be performed in only dry or isolated areas of the work zone. 2) Impervious dikes are to be used to isolate work from stream flow when necessary. 3) Maintenance of stream flow operations shall be incidental to the work. This includes polyethylene sheeting, diversion pipes, pumps and hoses. 4) Pumps and hoses shall be of sufficient size to dewater the work area. .� low, ttt` Silt Bag IMPERVIOUS DIKE (SEE PROJECT SPECIAL PROVISIONS) TEMPORARY FLEXIBLE HOSE Siff Bag 1 DEWATERING PUMP 1 1 1 1 1 EXISTING STREAM � CHANNEL I I CULVERT 1 I 1 ow PUMPAROUND TOP OF BANK SEQUENCE OF CONSTRUCTION FOR TYPICAL WORK AREA 1. INSTALL SPECIAL STILLING BASIN(S). 2. INSTALL UPSTREAM PUMP AND TEMPORARY FLEXIBLE HOSE. 3. PLACE UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. PLACE DOWNSTREAM IMPERVIOUS DIKE AND PUMPING APPARATUS. DEWATER ENTRAPPED AREA.AREA TO BE DEWATERED SHALL BE EQUAL TO ONE DAY'S WORK. 5. INSTALL CULVERT(S) IN ACCORDANCE WITH THE PLANS. 6. EXCAVATE ANY ACCUMULATED SILT AND DEWATER BEFORE REMOVAL OF IMPERVIOUS DIKES. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE. (DOWNSTREAM IMPERVIOUS DIKES FIRST). 7. REMOVE SPECIAL STILLING BASIN(S) AND BACKFILL. STABILIZE DISTURBED AREA WITH SEED AND MULCH. IMPERVIOUS DIKE Project Name: Coddle Creek Road / McKenzie Bluffs lFor: Weeks Development Group Attn: Todd Doupona Coordinates: 35.553421,-80.778788 Date: January 24, 2023