Loading...
HomeMy WebLinkAboutNCC203569_NOT Closeout Documents_20240214 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Wayne Project: Overman Solar,LLC River basin: Neuse Person financially responsible: Project#: WAYNE-2021-002 Address: 1. Project Location: Herring Road,Goldsboro Pictures: No 2. Weather and soil conditions: sunny,warm,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one onsite Title: Inspection report: Sent Report Date given/sent: October 4,2023 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self- inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES 10. Comments: General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: October 3,2023 Time arriving on site: 1:00 PM Time leaving site: 1:30 PM cc: BlueRidgepower