Loading...
HomeMy WebLinkAboutNC0085812_Quarterly Rpt_20240215UN(ONCOUNTY ,+VAT E R Mr. John Hennessy North Carolina Department of Water Resources Water Quality Permitting Section/NPDES 1617 Mail Service Center Raleigh, NC 27699-1617 Tuesday, January 23, 2024 RE: EMC SOC WQ S20-001 November 2023 Quarterly Progress Report Mr. Hennessy, Union County Water receieved the fully excuted SOC for the Grassy Branch WRF on June 21, 2022. As a requirement of this SOC the County is to submit quarterly progress reports. This letter is intended to serve as the quarterly progress report. Below is a summary of items that took place during the August 2023 report period. For Collections system permit WQCS00054 • Ongoing inflow and infiltration (I&I) rehabilitation in the Grassy Branch basin. o All I&I concerns identified in the June 2022 Grassy Branch Collections System Assessment Report have been addressed. For NPDES Permit NCO085812 • Submit Contract documents for regulatory approval for Grassy Branch WWTP upgrade project. o Contract documents and Authorization to Construct was submitted on December 19, 2023 • Upon receiept of the required Division of Water Resources Authorization to Construct, begin construction of Grassy Branch WWTP upgrades. he_required approval from DMM If you have any further questions please feel free to contact me. Sincerely, Christopher Clark, PE Water & Wastewater Division Director CC: Hyong Yi, Public Works Administrator Josh Brooks, Water & Wastewater Assistant Division Director John Shutak, Engineering Division Director Greg Morgan, Utility Field Services Superintendent Jonathan Jordan, WU Superintendent Union County Water 4600 Goldmine Rd Monroe, NC 28112 7 704.289.1434 unioncountync.gov/water