Loading...
HomeMy WebLinkAbout820005_Digester Volume Calculation Update_20231220Facility Number: 82-0005 Grower: Kilpatrick Farm Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 10/16/23 County Sampson Sheet 1 of 12 ANAEROBIC DIGESTER DESIGN FARM INFORMATION Farm Population: Nursery: Wean to Finish: ------------------- Finishing:------------------- feeder: 25 Yr. / 24 Hr Storm Event Recycle Flush Water Volume: DIGESTER INFORMATION Is Digester Designed as an Irregular Shape? (Y/N)------------ Y Was This Facility Built Prior to 9/96? (Y/N)------------ N Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- Freeboard:------------------- Side Slopes: Top of Dike Elevation: Finished Bottom Elevation: Start Pump Elevation: Stop Pump Elevation: Top of Sludge Elevation: From Lagoon Volume Check Contours contour areas see sheet 2 of 7... ---------------- Depth ---------------- 10.40 Ft. ---------------- 19.81n. ---------------- 241n. ---------------- 76.81n. DIGESTER VOLUMES REQUIRED VOL. Storm Temp= Temporary = Operational = Permanent Sludge = Total Volume = 115689 (Cu.Ft.) 0 (Cu.Ft.) 426752 (Cu.Ft.) 0 (Cu.Ft.) 542,441 (Cu.Ft.) Lagoon Surface Area: (Inside TOD) DESIGN VOLUMES 115,881 (Cu.Ft.) 61,262 (Cu.Ft.) 718,920 (Cu.Ft.) 570,490 (Cu.Ft.) 1,466,552 (Cu.Ft.) iI 13336 Hd. 0 i, 7.5 In. C 0.00 1.0 Ft. 3 :1 (H:V) 0.0 0.0 91.40 Ft. 81.00 Ft. 89.75 Ft. 89.40 Ft. 85.00 Ft. % REQ'D. 100.17% 14.36% 168.46% 270.36% 185,103 S.F Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Face it�um1)er: 82-0005 Grower: Kilpatrick Farm Address: PO Box 856 Warsaw, NC 28398 Countv: Sampson Designed By: BHW Checked By: JEO Date: 10/16/23 Sheet 2 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. DIGESTER STAGE -AREA VOLUMES Contour Elevation (FT.Area SF Incr. Vol. (Cu. FTi 81.00 133,209 82.00 137,851 83.00 142,567 84.00 147,357 85.00 152,221 86.00 157,159 87.00 162,171 88.00 167,257 89.00 172,417 90.00 177,651 91.00 182,959 91.40 185,103 135,530 140,209 144,962 149,789 154,690 159,665 164,714 169,837 175,034 180,305 73,612 Cumul. Vol. (Cu. FT) 0 135,530 275,739 420,701 570,490 725,180 884,845 1,049,559 1,219,396 1,394,430 1,574,735 1,648,347 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 578,336 CF CUMULATIVE VOL. ZONE VOL. 0.00% END PUMP = = = = 89.40 FT 1,289,410 CF TR'MT 718,920 168.46% START PUMP = =: 89.75 FT 1,350,672 CF TEMP 61,262 14.36% MAX STORAGE = 90.40 FT 1,466,552 CF STORM 115,881 100.17% Smithfield Hog Production Engineering P.O. Box 856 ,Warsaw, NC 28398 (91 D) 293-3434 rower: Kilpatrick Farm Storage on esigne may: 9H Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 10/16/23 County: Sampson Sheet 3 of 12 WASTE STORAGE POND DESIGN 2nd STAGE FARM INFORMATION Farm Population: i------------------- Wean to Finish: ------------------- 13336 Hd. Finishing: ------------------- 0 to r=arrow to fe► C;ei 0 Boars: 0 Storage Period: ------------------- 180 Days 100 Yr. / 24 Hr Storm Event ------------------- 7.5 In. "Heavy Rain" Factor Not Applicable Even if Value Shown 0 Rainfall in Excess of Evaporation ------------------- 7 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 STORAGE INFORMATION Is Storage Pond Designed as an Irregular Shape? (Y/N)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 0.00 Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0.3 Ft. Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 0.0 contour areas see sheet 2 of 7... 0.0 Top of Dike Elevation: ---------------- Depth 103.10 Ft. Finished Bottom Elevation- ---------------- 10.20 Ft. 92.90 Ft. Start Pump Elevation: ---------------- 19.92 In. 101.44 Ft. Stop Pump Elevation: ---------------- 96.12 In. 95.09 Ft. STORAGE VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D. Storm Stor = 95577 (Cu.Ft.) 96,349 (Cu.Ft.) 100.81 % Temporary = 709768 (Cu.Ft.) 828,855 (Cu.Ft.) 116.78% Permanent = 0 (Cu.Ft.) 245,184 (Cu.Ft.) Total Volume = 805,345 (Cu.Ft.) 1,170,388 (Cu.Ft.) 145.33% 90 Temporary Storage Volume Elevation = 97.80 Ft. 1 63.62 In. Lagoon Surface Area: (Inside TOD)------------------- 152,923 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 grower: Kilpatrick Farm Storage Pond Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 10/16/23 County: Sampson Sheet 4 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. STORAGE POND STAGE -AREA VOLUMES Contour Elevation (FT. 7 Area iSFj Incr. Vol. (Cu. FT) 92.90 107,341 93.00 107,749 10,754 94.00 111,876 109,813 95.00 116,079 113,978 96.00 120,357 118,218 97.00 124,712 122,535 98.00 129,143 126,928 99.00 133,650 131,397 100.00 138,233 135,942 101.00 142,892 140,563 102.00 147,627 145,260 103.00 152,438 150,033 103.10 152,923 15,268 Cumul. Vol. (Cu. FTC 0 10,754 120,567 234,544 352,762 475,297 602,224 733,621 869,562 1,010,125 1,155,385 1,305,417 1,320,685 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 578,336 CF ;CUMULATIVE VOL. ZONE VOL. 145.33% END PUMP = = = = 95.09 FT 245,184 CF TR'MT 245,184 START PUMP = = : 101.44 FT 1,074,039 CF TEMP 828,855 116.78% MAX STORAGE = 102.10 FT 1,170,388 CF STORM 96,349 100.81 % Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Kilpatrick Farm Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 County: Sampson Sheet 5 of 12 MINIMUM REQUIRED VOLUME CALCULATIONS DIGESTER Permanent Storage: Required Treatment Volume: Animal Type Capacity (cu.ft./hd) = Total Nursery 0 Wean to Finish 13,336 32.00 426,752 Finishing 0 32.00 0 Farrow 0 i 0 0.67 finish 0 0 0.50 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 426,752 Animal Type Capacity ALW (cu.ft. Ib) = Total Nursery 0.25 Wean to Finish 13,336 115 0.00 0 Finishing 0 135 0.00 0 Farrow D to '417 _ Boars 1 0 Total Required Sludge Storage Volume (cu. ft.)= No Storm Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (185103 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= No "Heavy Rain" Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (185103 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) _ (for Extended Periods of Chronic Rainfall) 0 115,689 Total Required Storm Storage (100Yr. / 24Hr. Storm +'Heavy Rain')= 115,689 (CU.FT) Total Required Permanent Storage (Treatment + Sludge) = 426,752 (CU.FT) TOTAL REQUIRED DIGESTER VOLUME = 542441 (CU.FT.) 0 Grower: Kilpatrick Farm Storage Pond Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 Countv: Sampson Sheet 6 of 12 Temporary Storage Volume: Manure Production: Animal Type Capacity Sto. Period = Total 0 0 0 Wean to Finish 13,336 180 1.17 2,801,360 Finishing 0 180 1.40 0 0 0 1 4.50 Farrow to 0 Total Manure Production (gals.)= 2,801,360 Total Manure Production (cu.ft.)= 374,513 Excess Fresh Water: Anima ype Capacity to. Period =Total Nursery Wean to Finish 13,336 180 0.77 1,840,448 Finishing 0 180 0.90 0 0 Farrow to 0 Farrow finish 0 Total Fresh Water Excess (gals.)= 1,840,448 Total Fresh Water Excess (cu.ft.)= 246,049 Hog Production Engineering w Grower: Kilpatrick Farm Storage Pond Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 Countv: Sampson Sheet 7 of 12 Temporary Storage Volume: Cont.) Rainfall in Excess of Evaporation: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (0 sq.ft. + 152923 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 89,205 Storm Storage: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area - * 100Yr./24Hr Storm(in.)/12in./ft. Vol.= (0 sq.ft + 152923 sq.ft. + 0 sq.ft.) * 7.5 in. /12 Total Required Volume for 100Yr./24Hr. Storm Event (cu.ft)= 95,577 "Heavy Rain" Storage: Only in Waste Storage Pond when required since digester is covered .=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Heavy Rain Factor(in) / 12in Vol.= (0 sq.ft + 152923 sq.ft. + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (100Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage)= Total Required Permanent Storage (Treatment + Sludge) _ 95,577 (CU.FT) 709,768 (CU.FT) 0 (CU.FT) TOTAL REQUIRED 2nd STAGE VOLUME = 805345 (CU.FT.) P.O. Box 856, Warsaw NC 28398 (91 0 Grower: Kilpatrick Farm Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 County: Sampson Sheet 8 of 12 DIGESTER DESIGN SUMMARY Top of Dike Elevation ------------------- 91.40 FT. Top of 25Yr. / 241-1r. Storm Storage 90.40 FT. Start Pump Elevation ------------------- 89.75 FT. End Pump Elevation ------------------- 89.40 FT. Top of Sludge Storage ------------------- 0.00 Applicable Seasonal High Watertable Elev.------------------- 0.00 Finished Bottom Elevation ------------------- 81.00 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 185,103 SF Freeboard Depth Zone Depths: TOTAL DESIGN VOLUME = 1289410 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- Temporary Storage Zone Depth ----------- Freeboard Depth ----------- Total Digester Depth----------- Smithfield Hog Production Engineering P.O. Box 856, 1.00 FT. 8.4 FT. 0.3 FT. 1.7 FT. 10.4 FT. Grower: Kilpatrick Farm Storage Pond Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 County: Sampson Sheet 9 of 12 STORAGE POND DESIGN SUMMARY 2nd S Top of Dike Elevation ------------------- 103.10 FT. Emergency Spillway Crest Elevation ------------------- Not Applicable Top of 100Yr. / 24Hr. Storm Storage ------------------- 106.90 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 101.44 FT. End Pump Elevation ------------------- 95.09 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev.------------------- 0.00 Finished Bottom Elevation ------------------- 92.90 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 152,923 SF Freeboard Depth Temporary Storage Period Zone Depths: TOTAL DESIGN VOLUME = 1170388 (CU.FT.) Treatment / Sludge Storage Zone Depth Temporary Storage Zone Depth Freeboard / Storm Storage Zone Depth Total Storage Pond Depth 1.00 FT. 180 Days 2.2 FT. 6.3 FT. 1.7 FT. 10.2 FT. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 N N ti � N = W O o a) o I I A U) m m 2 U) C 32 w.2)o DU 0 �I o r`OD C) OD rn II o LLI W oo 00 V1 II 0) � W J W p II (7 W II W LLJ J W W z z J w Z Y W O w LL Q LL Q w Q 0 W J 0- O (� o W ~ LL LL 00 LL O LL O LU W O 00 O O Z N H H H I— J LL O rn 0 E N i LL to Z 00 C U') o .L O (a Q (t3 o i 07 00 d7 00 (0 Y d co I I A W J a w a a C: ~ 0 0 0 z C� Q U U) ui V co co114. M N O Nal co m co co co U i LO O co �7 N N ti � N = W o O co0 i O T- O +' a) Cl I I co - F- M U) U) !_ U c) N U � � �U Z o O aII rn rn w CDO C7 p > W O N O II � W II 0 W II W U) J W Q -J W W W W O o O O W ~ a aLL O o w LL w `L w 00 a O LL a O w z a c= O O z N 1- LL �I c 0 d a� L 0 c 0 i I i E N i L.L Lo Z Y 00 U X�: C 0 d. - O O L 0 Q O cu L C (B C II L6 Y a- U) W J d W d a a 0 L D 0 I— o Z (D Q U U) W N 00 0) co N U LO co 0 00 Grower: Kilpatrick Farm Designed By: BHW Address: PO Box 856 Checked By: JEO Warsaw, NC 28398 Date: 01/17/22 County: Sampson Sheet 12 of 12 This Anerobic Digester is designed in accordance with the North Carolina Natural Resources Conservation Service PRACTICE STANDARD 366- ANEROBIC DIGESTER, revised in September, 2018. The Waste Storage Pond is designed in accordance with the North Carolina Natural Resources Convservation Service PRACTICE STANDARD 313- WASTE STORAGE FACILITY, revised in December, 2017. 11 /27/2023 DESIGNED: �v DATE: 11 /27/2023 COMMENTS: The lagoon has been designed as an irregular shape. Actual contour areas taken from the lagoon design are used to calculate the surface area and storage volume characteristics of the lagoon. This approach ensures that rainfall capture on the lagoon is fully accounted for and that storage volumes calculated represent actual conditions. Elevations are based on an assumed benchmark and do not represent mean sea level datum. 1 certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434