Loading...
HomeMy WebLinkAbout310039_Digester Volume Calculation Update_20231220Facility Number: 31-039 Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11 /27/23 County: Duplin NC Sheet 1 of 12 ANAEROBIC DIGESTER DESIGN FARM INFORMATION Farm Population: Nursery: ---------------- -- 0 Wean to Finish: ------------------- 0 Finishing: ------------------- 6120 Hd. ------------------- n ------------------- 0 Boars: 0 25 Yr. / 24 Hr Storm Event ------------------- 7.5 In. Recycle Flush Water Volume: DIGESTER INFORMATION Is Digester Designed as an Irregular Shape? (Y/N)------------ Was This Facility Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- unk Freeboard: ------------------- 1.0 Ft. Side Slopes: ------------------- 3 :1 (H:V) From Lagoon Volume Check Contours 250.0 Ft. contour areas see sheet 2 of 7... 125.0 Ft. Top of Dike Elevation: ---------------- Depth 136.50 Ft. Finished Bottom Elevation: ---------------- 16.50 Ft. 120.00 Ft. Start Pump Elevation: ---------------- 20.4 In. 134.80 Ft. Stop Pump Elevation: ---------------- 24 In. 134.50 Ft. Top of Sludge Elevation: ---------------- 174 In. 122.00 Ft. DIGESTER VOLUMES REQUIRED VOL. Storm Temp= 19222 (Cu.Ft.) Temporary = 0 (Cu.Ft.) Operational = 195840 (Cu.Ft.) Permanent Sludge = 0 (Cu.Ft.) Total Volume = 215,062 (Cu.Ft.) Lagoon Surface Area: (Inside TOD) DESIGN VOLUMES 19,657 (Cu.Ft.) 7,989 (Cu.Ft.) 199,428 (Cu.Ft.) 10,527 (Cu.Ft.) 237,601 (Cu.Ft.) % REQ'D. 102.26% 4.08% 101.83% 110.48% 30,755 S.F. Smithfield Hog Production Engineering P.O. Box 856,Warsaw, NC 28398 (910) 293-3434 acility um er: 31-039 Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 County: Duplin, NC Sheet 2 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: ®Cu. Ft. DIGESTER STAGE -AREA VOLUMES Contour Elevation (FTJ Area SF Incr. Vol. (Cu. FT) 120.00 1,647 121.00 5,724 122.00 7,019 123.00 8,204 124.00 9,444 125.00 10,752 126.00 12,129 127.00 13,575 128.00 15,090 129.00 16,675 130.00 18,328 131.00 20,050 132.00 21,841 133.00 23,701 134.00 25,631 135.00 27,629 136.00 29,696 136.50 30,755 3,685 6,372 7,612 8,824 10,098 11,440 12,852 14,333 15,882 17,501 19,189 20,946 22,771 24,666 26,630 28,662 15,113 Cumul. Vol. (Cu. 470 4,155 10,527 18,139 26,963 37,060 48,501 61,353 75,685 91,568 109,069 128,258 149,203 171,975 196,640 223,270 251,932 267,045 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 649,221 CF CUMULATIVE VOL. ZONE VOL. 110.48% END PUMP = = = = 134.50 FT 209,955 CF TR'MT 199,428 101.83% START PUMP = =: 134.80 FT 217,944 CF TEMP 7,989 4.08% MAX STORAGE = 135.50 FT 237,601 CF STORM 19,657 102.26% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: enson Farm Address: PO Box 856 Warsaw, NC 28398 County: Duplin, NC Designed By: JEO Checked By: DSE Date: 11/27/23 Sheet 3 of 12 WASTE STORAGE POND DESIGN 2nd STAGE FARM INFORMATION Farm Population: Nursery. - Wean to Finish: ------------------- 0 Finishing: ------------------- ------------------- 6120 Hd. Storage Period: ------------------- Days 25 Yr. / 24 Hr Storm Event ------------------- 7.5 In. "Heavy Rain" Factor Not Applicable Even if Value Shown 0 Rainfall in Excess of Evaporation ------------------- 7 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 STORAGE INFORMATION Is Storage Pond Designed as an Irregular Shape? (Y/N)------------ Y Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to 9/96? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N)------------ N Seasonal High Water Table Elev: ------------------- 0.00 Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Even if Value Shown 0 Side Slopes: ------------------- 3 :1 (H-.V) From Lagoon Volume Check Contours 0.0 contour areas see shp-t d of 12... 0.0 Top of Dike Elevation: ---------------- Depth 99.40 Ft. Finished Bottom Elevation: ---------------- 11.90 Ft. 87.50 Ft. Start Pump Elevation: ---------------- 19.92 In. 97.74 Ft. Stop Pump Elevation: ---------------- 58.4 In. 94.53 Ft. STORAGE VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D. Storm Stor = 94914 (Cu.Ft.) 95,979 (Cu.Ft.) 101.12% Temporary = 427313 (Cu.Ft.) 435,482 (Cu.Ft.) 101.91 % Permanent = 0 (Cu.Ft.) 790,227 (Cu.Ft.) Total Volume = 522,227 (Cu.Ft.) 1,321,687 (Cu.Ft.) 253.09% 90 Temporary Storage Volume Elevation = 96.83 Ft. 30.80 In. Lagoon Surface Area: (Inside TOD)------------------- 151,862 S.F. Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 �Grower�nson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 Countv: Duglin. NC Sheet 4 of 12 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. STORAGE POND STAGE -AREA VOLUMES Contour Elevation (FT. i Area (SF) Incr. Vol. (Cu. FT] Cumul. Vol. [.Cu. FT] 87.50 96,923 0 88.00 99,031 48,989 48,989 89.00 103,299 101,165 150,154 90.00 107,638 105,469 255,622 91.00 112,047 109,843 365,465 92.00 116,526 114,287 479,751 93.00 121,076 118,801 598,552 94.00 125,696 123,386 721,938 95.00 130,387 128,042 849,980 96.00 135,148 132,768 982,747 97.00 139,979 137,564 1,120,311 98.00 144,881 142,430 1,262,741 99.00 149,853 147,367 1,410,108 99.40 151,862 60,343 1,470,451 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 649,221 CF CUMULATIVE VOL. ZONE VOL. 253.09% END PUMP = _ _ = 94.53 FT 790,227 CF TR'MT 790,227 START PUMP = = 97.74 FT 1,225,709 CF TEMP 435,482 101.91 % MAX STORAGE = 98.40 FT 1,321,687 CF STORM 95,979 101.12% Smithfield Hog Production Engineering P.O. Box 856, Warsaw, NC 28398 (910) 293-3434 Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 County: Duplin, NC Sheet 5 of 12 MINIMUM REQUIRED VOLUME CALCULATIONS DIGESTER Permanent Storage: Required Treatment Volume: Animal Type Capacity (cu.ft./hd) = Total'I Nurse Wean to Finish 0 32.00 0 Finishing 6,120 32.00 195,840 feeder .00 Farrow to finish 1 .00 Total Required Treatment Volume (cu. ft.)= Sludge Storage Volume: 195,840 Animal Type Capacity ALW (cu.ft./lb) = Total' Nurse Wean to Finish 0 115 0.000 0 Finishing 6,120 135 0.00 0 Farrow weanling 0 0 Farrow feede finis 0 1 1 Soars Total Required Sludge Storage Volume (cu. ft.)= No Storm Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (30755 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr.124Hr. Storm Event (cu.ft)= No "Heavy Rain" Storage Unless a Partial Cover Digester: Vol.=(Digester Surf. Area + Addt'I Drainage Area) * "Heavy Rain" Factor (in) / 12in./ft. Vol.= (30755 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) _ (for Extended Periods of Chronic Rainfall) '.. 0 19,222 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= 19,222 (CU.FT) Total Required Permanent Storage (Treatment + Sludge) = 195,840 (CU.FT) TOTAL REQUIRED DIGESTER VOLUME = 215062 (CU.FT.) 0 Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 Countv: Duplin, NC Sheet 6 of 12 Temporary Storage Volume: Manure Production: Animal Type Capacity to. Period = Total 0 0 Wean to Finish 0 180 1.17 0 Finishing 6,120 180 1.40 1,542,240 Farrow 0 feede, 0 4.50 nish 0 Excess Fresh Water: Smithfield Hog Total Manure Production (gals.)= 1,542,240 Total Manure Production (cu.ft.)= 206,182 Animal Type Capacity Sto. Period = Total 0 Wean to Finish 0 180 0.77 0 Finishing 6,120 180 0.90 991,440 Farrow weanline 2.90 Farrow to feeaer 3.50 Farro to Total Fresh Water Excess (gals.)= 991,440 Total Fresh Water Excess (cu.ft.)= 132,545 w Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 County: Duplin, NC Sheet 7 of 12 Tem ora Storage Volume: Cont. Rainfall in Excess of Evaporation: Only in Waste Storage Pond since digester is covered Vol.=(Digester Surface Area + Waste Storage Pond Area + Additional Drainage Area) * Rainfall / 12in./ft Vol.= (0.0 sq.ft. + 151862 sq.ft. + 0 sq.ft.) * 7.0 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= 88,586 Storm Storage: Only in Waste Storage Pond since digester is covered Vol.=(Waste Storage Pond Area + Additional Drainage Are * 25Yr./24Hr Storm(in.)/12in./ft. Vol.= (0.0 sq.ft. + 151862 sq.ft. + 0 sq.ft.) * 7.5 in. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= 94,914 "Heavy Rain" Storage: Only in Waste Storage Pond when required since digester is covered Vol.=(Waste Storage Pond Area + Additional Drainage Area) * = Heavy Rain Factor(in) / 12in./ft. Vol.= (0.0 sq.ft. + 151862 sq.ft. + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (25Yr. / 24Hr. Storm +'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage)= Total Required Permanent Storage (Treatment + Sludge) _ 94,914 (CU.FT) 427,313 (CU.FT) 0 (CU.FT) TOTAL REQUIRED 2nd STAGE VOLUME = 522227 (CU.FT.) 0 Grower: Benson Farm Address: PO Box 856 Warsaw, NC 28398 County: Duplin, NC DIGESTER DESIGN SUMMARY Designed By: JEO Checked By: DSE Date: 11 /27/23 Sheet 8 of 12 Top of Dike Elevation ------------------- 136.50 FT. Top of 25Yr. / 24Hr. Storm Storage ------------------- 135.50 FT. Start Pump Elevation ------------------- 134.80 FT. End Pump Elevation ------------------- 134.50 FT. Top of Sludge Storage ------------------- 122.00 FT. Seasonal High Watertable Elev.------------------- unk Finished Bottom Elevation ------------------- 120.00 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 30,755 SF ------------------- Freeboard Depth ------------------- 1.00 FT, Zone Depths: TOTAL DESIGN VOLUME = 237601 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 14.5 FT. Temporary Storage Zone Depth ----------- 0.3 FT. Freeboard Depth ----------- 1.7 FT. Total Digester Depth ----------- 16.5 FT, I Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 County: Duplin, NC Sheet 9 of 12 STORAGE POND DESIGN SUMMARY 2nd STAGE Top of Dike Elevation ------------------- 99.40 FT. Emergency Spillway Crest Elevation ------------------- Not Applicable Top of 25Yr. / 24Hr. Storm Storage ------------------- 98.40 FT. Top of "Heavy Rain" Storage ------------------- Not Applicable Start Pump Elevation ------------------- 97.74 FT. End Pump Elevation ------------------- 94.53 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev.------------------- 0.00 Finished Bottom Elevation ------------------- 87.50 FT. Inside Top Length ------------------- Not Applicable Inside Top Width ------------------- Not Applicable Side Slopes ------------------- 3.0:1 H:V Lagoon Surface Area ------------------- 151,862 SF Freeboard Depth Temporary Storage Period Zone Depths: 1.00 FT. 180 Days TOTAL DESIGN VOLUME = 1652581 (CU.FT.) Treatment / Sludge Storage Zone Depth ----------- 7.0 FT. Temporary Storage Zone Depth ----------- 3.2 FT. Freeboard / Storm Storage Zone Depth ----------- 1.7 FT. Total Storage Pond Depth ----------- 11.9 FT Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 CO N N .= N T r O U)LU o o T• N N U) � a m U N C � 2 U cn U � U w w H co w C7 co Z O Q w J w w Z N co m co co N LL 0000 Z U C: x z O O M C U) CO i . _ aca (II o � m a) c o- cD a 0 O O M I I w J w w Y 0 LL a O H O LO L6 ce) n w J w O r) LL O 0- 0 O Itt cM I I w J w H Z w Q w LL O CL O 0 (M T II w J W J Q Z O a w a O LL O d O 00 M Lo co li co II � J II w w n a Q U) w O O N N c- I I w J w w 0 J U) LL O a. O O O O N I I w J w 2i O m 0 w 2 U) Z LL W M d7 M M N U Z c>3 i LO 00 k O m M N ti cV N c— r W OW U) O � � r r N � U C>3 � > 00 m 0-0 N � C Y � U .0 U MU a z O a w a O CO CO z O Q W J w w z N 00 m co 00 N EC9U LL 00 c X Z N m cn _ cl co cal�o oo a� cn c o � CD Q U O rn O I I > w J w w Y 0 U- O d O O d- 06 rn I I > w J w O LL O a O d- II w J w W C7 Q 0 U) a 2 w I- w O a O ti O I I J w a Q F- u� II O "' > w O I` J O OD w O II H II z W z J w < w 2 w O (D a O Q W J m O U n. w w O O = F- U) a O z H LL cM LO d' O I I J w a a z W N OD 0) c'') co N v cB i LO M 0 00 E CO Grower: Benson Farm Designed By: JEO Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 11/27/23 County: Duplin, NC Sheet 12 of 12 This Anerobic Digester is designed in accordance with the North Carolina Natural Resources Conservation Service PRACTICE STANDARD 366- ANEROBIC DIGESTER, revised in September, 2018. The Waste Storage Pond is designed in accordance with the North Carolina Natural Resources Convservation Service PRACTICE STANDARD 313- WASTE STORAGE FACILITY, revised in December, 2017. 11 /27/2023 DATE: 11 /27/2023 COMMENTS: The lagoon has been designed as an irregular shape. Actual contour areas taken from the lagoon design are used to calculate the surface area and storage volume characteristics of the lagoon. This approach ensures that rainfall capture on the lagoon is fully accounted for and that storage volumes calculated represent actual conditions. Elevations are based on an assumed benchmark and do not represent mean sea level datum. / certify, to the best of my professional knowledge, judgement, and belief, this design calculation is in accordance with the applicable NRCS standards. Smithfield Hog Production Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434