Loading...
HomeMy WebLinkAbout20231466 Ver 1_More Info Received_20240214Baker, Caroline D From: Dave Weikle <dave.weikle@cdge.com> Sent: Wednesday, February 14, 2024 12:20 PM To: Perez, Douglas J CIV USARMY CESAW (USA); Homewood, Sue; Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) Cc: Jimmy Gamertsfelder Subject: [External] RE: Sims Legion Park Attachments: SHEET 9.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Doug, The pipe extension profile is shown on Sheet 11. Our original submittal had 55 linear feet because that was the original length we were adding to the end of the existing pipe. Since then, we have determined that +/-20' of the existing CMP is rusted/rotted so we are removing and replacing it also. The total length of proposed pipe is as follows: 1. Total length of new RCP = 73.5 2. Total length of new RCP End Section = 8 3. Total length of new rip rap outfall = 12 When added all up, that's 93.5 feet of new construction. However, keep in mind that we are removing 20 of exiting storm pipe in that construction meaning we will only be disturbing 73.5 feet of existing delineated stream. Grading will be done above the ordinary high water mark. Notes have been added on the profiles shown on Sheets 11 and 12 to state the streambed is to be left undisturbed. Note # 10 was added to the Construction Sequence on Sheet #9 (see attached). New grading is also proposed above the new section of pipe. That's shown in the plan view on Sheet 11. Dave Weikle Engineer V QCDG 4301 Taggart Creek Rd., Charlotte, NC 28208 Office 704.394.6913 1 Cell 704.604.5215 E-mail dave.weikle@cdge.com From: Perez, Douglas J CIV USARMY CESAW (USA) <Doug.J.Perez@usace.army.mil> Sent: Wednesday, February 14, 2024 10:03 AM To: Dave Weikle <dave.weikle@cdge.com>; Homewood, Sue <sue.homewood@deq.nc.gov>; Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) <Krystynka.B.Stygar@usace.army.mil> Cc: Jimmy Gamertsfelder <Jimmy.Gamertsfelder@cdge.com> Subject: RE: Sims Legion Park Hey Dave, Thanks for sending this over. I wanted to clarify a few things. What are the exact length and width of the culvert extension that is being proposed? In the PCN that was submitted you have 55 linear feet but in our conversation the other day I believe I recall you talking about 70+ linear feet. Similarly, is grading on the banks, 1)being done above the ordinary high water mark and 2) being done on top of the culvert? It seems that, according to the designs you provided, that you'll be stopping grading right at the power line ROW, so you should not need to do any surveys for Schweinitz's Sunflower. Also, based on the photos you provided, the vegetation looks to be too thick for Dwarf -flowered Heartleaf to be in that stretch of stream bank, so you should be good there as well. Let me know, Doug J. Perez Regulatory Specialist US Army Corps of Engineers Wilmington District Charlotte Field Office Office : (704) 510-1439 Cell : (704) 578-1741 From: Dave Weikle <vgoillkll.ggoi> Sent: Tuesday, February 13, 2024 3:51 PM To: Homewood, Sue <sub.e...lrnoi ne o d m .g v>; Stygar, KRYSTYNKA B CIV USARMY CESAW (USA) <IKirys yimlkg.lE3.S y gir uusg girimY...im_ii.11>; Perez, Douglas J CIV USARMY CESAW (USA) <[)OU �.1P ir�z uus��� girim�r.inn.i1> Cc: Jimmy Gamertsfelder <J.ii. inn r.. g.irnn.eirtsfell.�.fir Subject: [Non-DoD Source] Sims Legion Park As discussed during our conversation yesterday, here are the updated drawings that will hopefully give you a better idea on our proposed intentions for this project. There are some minor revisions to take place based on Erosion Control comments, but they should not change the scope of the overall work. Let us know if you have any questions. Dave Weikle Engineer V QCDG 4301 Taggart Creek Rd., Charlotte, NC 28208 Office 704.394.6913 1 Cell 704.604.5215 E-mail dave.weikle@cdge.com