HomeMy WebLinkAbout20081473 Ver 4_Yea 3 Ph II Monitoring Report_20151015ARRINGTON BRIDGE
BANK PARCEL
NEUSE RIPARIAN BUFFER &
NUTRIENT OFFSET
MITIGATION SITE
WAYNE COUNTY, NORTH CAROLINA
PHASE II
MONITORING YEAR 3 REPORT
DWQ # 2008- 1473v.4
October 8, 2015
Table of Contents
1.0 Introduction .................................................................................................. ..............................1
1.1 Project Location and Description ........................................................... ..............................1
1.2 Project Goals and Objectives.......
2.0 Vegetation Condition and Comparison ........................................................ ..............................2
3.0 Methodology ................................................................................................ ..............................3
3.1 Vegetation Monitoring Plots .................................................................. ..............................3
3.2 Photo Stations ........................................................................................ ..............................3
4.0 References .................................................................................................... ..............................4
Appendix A: Site Mans
Figure 1: Site Location Map
Figure 2: Site Overview Exhibit
Figure 2A: Neuse Buffer & Nutrient Offset Restoration Areas
Figure 3: Monitoring Year 3 Exhibit
Figure 3A: Monitoring Year 3 Easement Encroachments
Appendix B: Vegetation As es$ ent Data
Table 1: Vegetation Pot ffitigation Success Summary
Table 2: Stem Count Total and Planted Species by Vegetation Plot
Table 3: Planted Species Comparison by Vegetation Plot.
Table 4: Supplemental Plantings
Annendix C: Vegetation Monitoring Plot Photos
Appendix D: Vegetation Monitoring Plot Data Sheets
Appendix E: Photo Stations and Easement Encroachment Photos
i
1.0 Introduction
1.1 Project Location and Description
Located off of Arrington Bridge Road, at its intersection with John Street in Goldsboro, North
Carolina (Figure 1) is the Neuse buffer and nutrient offset restoration area previously referred to
as the Wayne County Development Alliance Bank Parcel and currently known as the Arrington
Bridge Bank Parcel (hereafter referred to as the Bank Site). The Bank Site was developed in two
(2) phases: Phase I and Phase II. According to the Wayne County Development Alliance Bank
Parcel Development Package (EcoEngineering, April 2012), Phase II consists of Parcel Numbers
2598632250 and 2598543857. Since approval of the Bank Parcel Development Package (BPDP),
Parcel Number 2598632250 has been subdivided into two parcels (Parcel Numbers 2598538731
and 2598622980). Parcel Number 2598538731 is located immediately adjacent to the east of
John Street, while Parcel Number 2598622980 is located immediately adjacent to the east of
Parcel Number 2598538731. Phase II construction of the Bank Site easement consists of 13.973
acres on Parcel Number 2598538731 (Figure 2). Figure 2A (Appendix A) is provided to
illustrate the constructed Phase II Conservation Easement (CE) compared to the approved Bank
Site as described within the BPDP. Future construction within the Bank Site will be consistent
with the previously approved BPDP.
The Bank Site and the Bank Site Service Area is contained within 8 -digit USGS HUC 03020201.
Stormwater runoff from the Bank Site drains into an unnamed tributary of the Neuse River
(Stream Index #27- (56)). According to the Basinwide Information Management System (BIMS),
the Neuse River is classified as Class C and NSW (Nutrient Sensitive Waters) in this location.
The purpose of this Bank Site is to improve water quality within the Neuse River watershed by
providing off -site mitigation for development (both existing and proposed) requiring Buffer
Mitigation and Nutrient Offset Credits.
The Bank Site will provide Neuse Riparian Buffer Mitigation Credits and Nutrient Offset
Mitigation Credits for development impacts within the Neuse River Basin USGS HUC 03020201
(Figure 3). The Phase II CE of the Bank Site is 13.973 acres and contains a Neuse Riparian
Buffer restoration area of 4.460 acres (194,267 sf) that will be used to generate 4.460 acres
(194,267 sf) of Neuse Riparian Buffer Credits. The remaining 7.788 acres (339,245 sf) of
riparian restoration area within the Phase II CE (i.e. areas outside of the Neuse Buffer) will
provide Nutrient Offset Credits for nitrogen (currently based on 2,273.02 lbs of nitrogen/ac of
riparian restoration). Therefore, Phase II of the Bank Site will provide 17,702.28 pounds of
Nitrogen Nutrient Offset Credits.
This Bank Site has been established under the terms and conditions of the EBX Neuse Riparian
Buffer Umbrella Mitigation Bank (Bank) made and entered into by EBX Neuse I, LLC (EBX),
acting as the Bank Sponsor, and the North Carolina Department of Environment and Natural
Resources - Division of Water Quality (DWQ), and was entered into by the parties on November
10, 2008. The Division of Water Quality is now hereby referred to as Division of Water
Resources (DWR).
1
1.2 Project Goals and Objectives
The goals of this nutrient offset mitigation project are to:
• Improve the overall water quality and aquatic habitat in and around the unnamed
tributary of the Neuse River by reducing nutrient and sediment loads into the streams
caused by agricultural influences,
• Improve the richness and diversity of the plant species within the conservation easement,
and
• Provide perpetual protection for the unnamed tributary to the Neuse River and associated
riparian and upland buffers.
These goals will be met through the following objectives:
• By establishing a native plant community to match the endemic plant species at the Bank
Site,
• By reducing the quantities of exotic invasive species at the Bank Parcel through chemical
methods,
• By establishing a conservation easement to provide long -term protection for the Bank
Site, and
• By donation of the conservation easement and all of its interests, in perpetuity, to an
accredited or approved land trust or stewardship program.
2.0 Vegetation Condition and Comparison
Current stem counts (i.e. stem is defined as single living tree species) were calculated using
vegetation plot monitoring data. Success will be defined as the survival of a minimum density of
320 planted trees per acre after five (5) years. As of Monitoring Year 3, the Bank Parcel had four
(4) plots encompassing 0.0988 acres, containing 30 planted stems, which yielded a density of
304 planted stems per acre. Monitoring Year 3 field activities were conducted on September 17
and 24, 2015. The planted vegetation survival threshold was met for Vegetation Plots 2 and 3.
Vegetation Monitoring Plots 1 and 4 each contained 121 planted stems per acre, and thus did not
meet the success criteria. Summary tables of the data collected are provided in Appendix B.
During Monitoring Year 2 field investigations, it was determined that Vegetation Plots 1 and 4
did not meet the vegetation threshold of 320 trees per acre. Replanting within the area of
Vegetation Plots 1 and 4 was prescribed after Monitoring Year 2 activities.
Re- planting within the CE occurred on December 17 and 18, 2014. A total of 3,100 new stems
were planted within the CE. Table 4 (Appendix B) provides a summary of re- planting activities
within the CE.
During Monitoring Year 3 field investigations, it was determined that Vegetation Plots 1 and 4
did not meet the vegetation threshold of 320 trees per acre. Therefore, it is the intent of the Bank
Sponsor to replant within the area of Vegetation Plots 1 and 4 sometime between the months of
November 2015 and April 2016. In addition, it is the intent of the Bank Sponsor to establish
additional easement markings to prevent easement encroachments in the future.
2
Encroachments into the CE were observed during Monitoring Year 3 field investigations. The
encroachments were in the form of mowing along the western CE boundary. In addition, the CE
markers were damaged within the northern section of the CE and the Photo Station Number 4
marker was destroyed. The CE encroachments total approximately 0.81 acres. The approximate
location of the CE encroachments are depicted in Figure 3A (Appendix A).
3.0 Methodology
3.1 Vegetation Monitoring Plots
All monitoring methodologies follow the most current templates and guidelines provided by NC
DMS (EEP, 2010; EEP, 2011). Baseline vegetation monitoring was conducted in accordance
with CVS -EEP Protocol for Recording Vegetation (CVS -EEP, v4.2). All four (4) vegetation
plots installed by McAdams were located in Monitoring Year 3. Table 1 (Appendix B) provides
a success summary for each vegetation monitoring plot. Based on the vegetation monitoring, two
(2) of the four (4) vegetation monitoring plots were above the five (5) year monitoring period
requirement. Vegetation Monitoring Plots 1 and 4 fell below the five (5) year monitoring period
requirement. Table 2 (Appendix B) provides a stem count total and planted stem total by each
individual vegetation plot. Table 3 (Appendix B) provides a summary of only planted stem
counts as compared to planted stem counts of the As Built.
Vegetation monitoring plots were photographed and are located in Appendix C. Vegetation
Monitoring Plot Data Sheets are provided in Appendix D. Each Vegetation Monitoring Plot
Data Sheet provides measurements, location, and vigor of each planted species within a
respective vegetation monitoring plot.
3.2 Photo Stations
Photo documentation is essential to monitoring the success the Bank Parcel. Photos provide a
visual assessment of the vegetation conditions. Although Photo Station Number 4 was destroyed
due to easement encroachments, all four (4) photo stations were located in Monitoring Year 3.
Photographs were taken at high resolution using an Olympus FE -115 5.0 megapixel digital
camera. The locations of the photo stations are depicted in the Monitoring Year 3 Exhibit
(Appendix A, Figure 2). Photographs for the photo stations are located in Appendix E.
C
4.0 References
EcoEngineering — A division of The John R. McAdams Company, Inc. April 27, 2012. Wayne
Countv Development Alliance Bank Parcel Bank Parcel Development Package.
EcoEngineering — A division of The John R. McAdams Company, Inc. June 2013. Arrington
Bridge Bank Parcel Neuse Riparian Buffer and Nutrient Offset Mitigation, Phase II — As-
Built Report.
Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. CYS -EEP
Protocol for Recording Vegetation Level. Version 4.2
North Carolina Ecosystem Enhancement Program (EEP) October 2004. Guidelines for Riparian
Buffer Restoration.
Available at internet site: httD:// www. ncee -D.net/news /reports/buffers.i)df.
North Carolina Ecosystem Enhancement Program (EEP) January 15, 2010. Procedural Guidance
and Content Requirements for EEP Monitoring Reports.
North Carolina Ecosystem Enhancement Program (EEP) November 7, 2011. Monitoring
Requirements and Performance Standards for Stream and /or Wetland Mitigation.
Schafale MP and AS Weakley. 1990. Classification of the Natural Communities of North
Carolina: Third Approximation. North Carolina Natural Heritage Program, Division of
Parks and Recreation, Department of Environment and Natural Resources. Raleigh,
North Carolina.
rd
� 1`��
Aj ��
51te
Maps
OT
J/ 73
1 ,
L
I 1
28
r
tr_
I
I i
I�
r
r
r r_
V IYI 11 \V 1 L VVVV VYY VVLV VV VI�V lf(V/-lV, 1 VI T `I 1 IV 1 V 11 \VI LV 1 LV
7.5 MINUTE U S G S "SE GOLDSBORO" QUAD; 1982 (PHOTO INSPECTED 1
FIGURE 1 - USGS QUAD
- SW /SE GOLDSBORO tcoEn gineerin 0 1,000 2,000 4,000 g
1 91 Feet A division of The John R. McAdams Company, Inc.
1 inch = 2,000 feet
461=:':aj*�e t ;sew
d
"MINARY PLAT"
LES, CONVEYANCES,
4ECOROATION.
tad:
re�ae�� ow 4ms
a�wrrr�
■e..�►�s
i�w��aes' rec
eera�e�.reiro sw�
rw�e�.ewie��t•t reren►
.�sw e��ueer
*r
MAMW CASr,, PELC
awe W. sm �wi io aww
r a-el-� •ec s! aure�r
aw oes: .fie
P. water "l: meow "
.LL oc %emo mz
at I mwe mm aurae
i FIGURE 2A - NEUSE BUFFER
� &NUTRIENT OFFSET RESTORATION AREAS EcoEngineering PHASE II
0 255 510 1,020
Feet A division of The John R. McAdams Company, Inc.
1 inch = 500 feet je
RENEIY OABOER aT
I f =O ,, CERiFY WT THE YIP OR PLAT 70
7f�` CLRTFM.ITRW 5 AFFUM AEM AU STATVMW
REO(AREAENTS FOR RECORM4
RENEW OAFlGER
611E
FrtID PDR RE4'611M1RW
TJ11 Y
Pl.1r O167Er /M�
REOLSIER OF DEEDS
WIYME WUNTY
"PRELIMINARY PLAT"
NOT FOR SALES, CONVEYANCES,
OR RECORDA TION.
1�aENR
AI)E MEAY
NLS - NEw 3lARE
ES - EXIST" IAtl nroA7 srMc
EIPA - RYSRN6 YAC 1
EFY - IXSRNC PM /114
71J - 7@ t/NC
CCJ -CON RNi. CCRnER
—___- AO..6'NW6 PR6�ERry LME
ARG OOA
AA J =' 9, A' S F F ( Yr A -,7) )
;
CIIRISREYIER K —CK PFpff9lOIYL (N!0 SUR1£NM
NO. 4189 OE FY RNi 7NS SURWY S OF A TWR
G17EWRY. TO *M AR FASEYENr SUR6fl:
L -4199
STATE OF NO RR/ GYIOUNA IWYNE COUNTY
. CEKTIEY RMT 1A/5
PUT NKS 621W11 Ui6ER NY SUPERNS,ON fR611 AN ACIANE
SURIfY AYC1E UNDER NY S..PERYt96N; (O® UESIXiRON
RE"LLlR0E0 M YW d OEFO BJM3 NOi y i}YT RE
bO11NWR�v M1DT 9/iVEYEO ARE ttFAA —T.1- AS 6MWN
or F IMEDRYAREWI REFERlM'm Il7EfAY; RNT 11E RIT10
pF PREC90N AS CALCULATED IS I: 10.000+: TIYT TNS PUT
WAS PRFPMTD M ALCOR6W(F MRM 45. 41 -.a7 AS
AYENOEO. IITINESS NY OROW SOGMTURE. REG57H ON
NLYdA AND SFAL 11AS �g pY OF "S•.yRY , A6.,
9013
L -4189
MATRIX EAST, PLLC
C „ PROFESSIONAL LAND SURVEYORS
• 90B N. DUEEN ST., SUITE A IONSTON, NC 2d501
2D13 TEL: 252 -522 -2500 FAX: 252- 522 -4747
120 FIRM LIC. # P -0221 DANL' au rveyormm e6atriet
240' DRAWN BY: CKP PROJECT NO, 20120074
SURVEYED BY: ALL DATE: 1/29/2013
SCALE: 1" - 120' DRAWING NAME: EASTERN
FIGURE 3A
MY3 EASEMENT ENCROACHMENT AREAS
ARRINGTON BRIDGE PHASE II
0 100 200 400
Feet
1 inch = 200 feet
1
1
APPENDIX B
Vegetation Assessment Data
Table 1. Vegetation Plot Mitigation Success Summary Table
Arrington Bridge Bank Parcel
Neuse Riparian Buffer & Nutrient Offset Mitigation Site
Phase II
Wayne County, NC
Monitoring Year 3: September 17 & 24, 2015
McAdams Project #: EBX -13020
Vegetation
Threshold
Vegetation Plot ID Met ?* Tract Mean
1 No
2 Yes 50%
3 Yes
4 No
* Target density is a minimum of 320 planted trees per acre at the end of the five (5) year monitoring period according to
the "Wayne county Development Alliance Bank Park - Bank Parcel Development Package'; April 27, 2012.
Scientific Name I Common Name
Table 2. Stem Count Total and Planted Species by Vegation Plot
Arrington Bridge Bank Parcel
Neuse Riparian Buffer & Nutrient Offset Mitigation Site
Phase II
Wayne County, NC
Monitoring Year 3: September 17 & 24, 2015
McAdams Project #: EBX -13020
Current Plot Data ANNUAL MEANS
Species Type VP -1 I VP -2 I VP -3 I VP -4 I MY -3 (Sept 2015) I MY -2 (Aug 2014) I MY -1 (Oct 2013) I AS BUILT (Mar 2013)
Planted Stems
Betula nigra river birch I Tree I 2 1 3 I 3 I 5 I 6
Fraxinus pennsylvanica
green ash
Tree
Platanus occidentalis
sycamore
I
Tree
Quercus michauxii
swamp chestnut oak I
Tree
Quercus nigra
water oak
Tree
Quercus phellos
willow oak
Tree
Taxodium distichium
bald cypress
Tree
Planted Stem Count Total
Size of Vegetation Plot (Acres)
Number of Different Species
Planted Stems Per Acre
Total CE Area = 13.97 acres; Total Neuse Riparian and Nutrient
2
1
3
0.0247
2
121
Offset R.
2
3
2
1
3
13
0.0247
6
526
:storation
2
1
8
11
0.0247
3
445
Area = 1
1
1
3
0.0247
3
121
2.27 acres
2
8
4
1
1
11
30
0.0988
14
304
2
8
4
3
1
11
32
0.0988
17
324
2
13
5
5
0
11
41
0.0988
20
415
2
16
7
8
0
20
59
0.0988
20
597
Comparison by V egation Plot
planted Species Comp parcel Table 3. ton Bridge Bank
Arrington Nutrient offset Mitigation site
Neuse Riparian Buffer &
phase II
Wayne County, NC � 2015
Year 3: September 11 020 Vp -4
or�ng BX -
Momt s Project #. E 1 VP 3 � 3
McAdam VV-2 11 13
I VV -1 13 16
3 18 -10
Count Total -5 23%
12 -5 69%
Year 3 Planted Stem Count Total -9 or 'dead" at the time
Monitoring lanted Stem AS Built 720° nussmg'
AS guilt P 25% species which were deemed '
d Stem Difference $om 3 is due to sp species from identification during
P104 tor►ng Year owth obscurring the sp identification and
Plante o� 1 er Monitorin s Built and Neon' allow for their species may
Rate ( er and because the
0
Surivability between planted stems trom he er than the herbaceous lay went years ears the species could
Iimissing" species is due t grow could survive in subseq subsequent y
Note: l he dltteren e betty explanation for species could gr ' idead! fore, in subseq
One possible exp ossilbe "ssLng below ground. There
of monitoring. Therefore, it is p In addition, species which were deem Ving
Monitoring `jet 3' onitoring yews` species are sure
ent in subsequent m while the roots of the sp
measurm ant at the time of monitoring
have gone dorm
grow under more favorable conditions.
Table 4. Supplemental Plantings
Arrington Bridge Bank Parcel
Neuse Riparian Buffer & Nutrient Offset Mitigation Site
Phase II
Wayne County, NC
Monitoring Year 3: September 17 & 24, 2015
McAdams Project #: EBX -13020
Species
swamp chestnut oak (Quercus michauxii)
water oak (Quercus nigra)
white oak (Quercus alba)
willow oak (Quercus phellos)
yellow poplar (Liriodendron tulipifera)
river birch (Betula nigra)
sycamore (Platanus occidentalis)
Total
Number of Stems Planted
700
700
200
200
100
600
600
3100
Note: Re- planting within the CE was prescribed after Monitoring Year 2 activities. Re- planting within the CE occurred on
December 17 and 18, 2014 by H &J Forest Service.
APPENDIX C
Vegetation Monitoring Plot Photos
1
1
1
1
r
1
r
r
1
r
1
1
1
r
A
A
1
1
1
1
1
1
1
A
A
r
1
r
1
r
r
1
r
r
1
PxoaErT
, EBX -13020
N
FILENAME: EBX13020X.DWG
MscnLE.
AS SHOWN
IIA-F 09 -17 -2015
- -- - - - -. - • w. n v1&-F\ rrw1rvv
- - -- . iv t L1 v IMN rAUI146 2515K
_ 0/
'!J
Tim JOHN R bfrAp pDp
Coe�ntvr, wC.
2905 Merldt Parkway
Durham, North Carolina 27713
T w', Uoense No.: C -0293
MCAL,kms (8001733 -WA6.! ,,kdamsCo.mm
1
1
1
1
A
1
r
A
1
A
1
1
1
1
1
1
1
A
r
r
1
1
1
A
1
A
1
r
1
A
r
r
r
r
r
4060"
PROJECT
NO. EBX -13020
M�
Pll.ENAME: EE3Xl3020X.DWG
M>
scn1E:
AS SHOWN
DATE. 09 -17 -2015
- - - -- • . • w . -- . tLrl rry lWR7 =-Nt.
- - -- I I -?I vlrvv rAGIN5 -5°5W.
7iM JOHN R MCADAM
J COIWANY.INC.
2905 Meridian Parkway
Durham. North Carolina 27713
Ucense No.: C -0293
MCADAMS MOO) 733 -5646 • MMdemsCo.com
APPENDIX D
Vegetation Monitoring Data Sheets
Site: Arrington Bridge Bank Parcel
Page: 1
Monitoring Year: MY -3
Date: 9/17/2015
Area: Phase 2
Vag Plot No.: 1
X -axis: 5 1SW
Plot Location: see sketch below
Map ID Scientific Name
1 Quercus nigra
2 Platanus occidentalis
3 Platanus occiden�Vis
4 Quercus mich¢ uwi
5 Platanus occidentalis
ti Platanus occidentalis
7 Platanus occidentalis
I 8 Betula nigra
9 Taxodium distichium
10 Platanus occidentalis
11 Quercus nigra
12 Platanus occidentalis
= bare root
y
L ditch
145 XY
I CURRENT MONITORING YEAR DATA
scientific Name
Liquidambar styraciflua
IPrunus sp.
I
I
Note: Ipomoeu sp. (vine) covering 20% of plot
No replantings
road j "Oe'
x /
i
i
HEIGHT CLASSES (cm)
10 -50 50.100 Z 00
2 4 1
2 2�
Notes
I CURRENT MONITORING YEAR DATA
X
Y
ddh I
Height
DBH
Common Name
Source meter
meter
mm
cm
cm Vipor
water oak
B
0.4
1.1
M
sycamore
B
9.6
2.1
23.19
148
0.953 3
sycamore
B
I 6.6
2.9
M
swamp chestnut oak
B
3.7
3.8
M
svcamore
B
0.3
4.3
M
sycamore
B
2.4
6.4
M
sycamore
B
I 3.2
0.4
15.15
104
3
river birch
B
5.3
5.8
M
bald cypress
B
I 5.2
7.6
M
sycamore
B
7.5
7.8
M
water oak
B
I 1.6
9.2
14.53
152
3
sycamore
8
4.8
9.1
M
I CURRENT MONITORING YEAR DATA
scientific Name
Liquidambar styraciflua
IPrunus sp.
I
I
Note: Ipomoeu sp. (vine) covering 20% of plot
No replantings
road j "Oe'
x /
i
i
HEIGHT CLASSES (cm)
10 -50 50.100 Z 00
2 4 1
2 2�
Notes
Site: Arrington Bridge Bank Parcel
Page:
2
Monitoring Year:
MY -3
Date:
9/17/2015
Area:
Phase 2
Veg Plot No.:
1
X -axis:
5 0SW
10
9
8
7
6
5
4
3
2
1
0.5
0,0 0.5
13SE°
1 2 3 4 5 6 7 8 9 10
X -AXIS
ODenotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at
the time of monitoring. Stem should be searched for at location during subsequent Monitoring Years
because the stem may qrow above herbaceous layer. I
(Denotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years
because the roots of the stem may survive and therefore re- sprout in subsequent Monitorinq Years.
Site: Arrington Bridge Bank Parcel
Page: 1
Monitoring Year: MY -3
Date: 9117/2015
Area: Phase 2
Veg Plot No.: 2
X -axis: 16 1SE
Plot Location: see sketch below
Map ID Scientific Name
I 1 Quercus phellos
I 2 Taxodium distichium
I 3 Betula nigra
I 4 Fraxinus pennsYlvanica
I 5 Taxodium distichium
I 6 Quercus nigra
I 7 Taxodium distichium
I 8 Platanus occidentalis
I 9 Quercus michauxii
1 10 Taxodium distichium
11 Platanus occidentalis
12 Fraxinus pennsylvanica
13 Platanus occidentalis
I 14 Taxodium distichium
15 Betula nigra
16 Quercus michauxii
17 Taxodium distichium
18 Platanus occidentalis
C b o bare root
I
� x
rail road xy
I CURRENT MONITORING YEAR DATA
Scientific Name
IUlmus elate
IPinus taeda
I Liquidambar styraciflua
I
No replantings
VOLUNTEER HEIGHT CLASSES Jcm)
10 -50 50 -100 > 100
12
15
6
C RRENT ONITORING YEAR DATA
X
I
d h
'Height
DBH
Common Name
Source meter
meter I
mm
cm
cm
VI or Notes
willow oak
B
1.2
1.51
9.73
50
bald cypress
B
0.3
4.21
M
river birch
B
1.3
6.21
213
1.762
3
green ash
B
1.2
8.2
16.53
107
3
bald cypress
B
3.7
8
M
water oak
B
9.1
10
M
bald cypress
B
6.1
7.9
13.4
94
3
sycamore
B
3.8
6.2
21.52
162
0.502
3
swamp chestnut oak
B
2.1
4.2
7.79
44
3
bald cypress
B
4.3
4.2
15.02
105
3
sycamore
B
3.6
1.6
161
0.528
3
preen ash
B
5.7
1.7
12.92
87
3
sycamore
B
8.2
1.6
M
bald cypress
B
8.2
4.1
M
river birch
B
6.3
4.1
218
1.144
3
swamp chestnut oak
B
5.9
5.7
106
1.475
3
bald cypress
B
8.9
5.6
20.01
98
3
sycamore
B
8.2
5.7
6.34
62
3
I CURRENT MONITORING YEAR DATA
Scientific Name
IUlmus elate
IPinus taeda
I Liquidambar styraciflua
I
No replantings
VOLUNTEER HEIGHT CLASSES Jcm)
10 -50 50 -100 > 100
12
15
6
Site: Arrington Bridge Bank Parcel
Page: 2
Monitoring Year: MY -3
Date: 9/17/2015
Area: Phase 2
Veg Plot No.: 2
X -axis: 16 0SE
23SWO
0 1
0
1
2
3
4
N
5
6
7
8
9
10
X -AXIS
2 3 4 5 6 7 8 9 10
ODenotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at
Ithe time of monitoring. Stem should be searched for at location during subsequent Monitoring Years
Obecause the stem may grow above herbaceous layer.
I Denotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years
because the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years.
i
-
1 I (
12
!
13
—
1
9
10
15 ,
14
1 I I _
16
I
18 -l/ 17
{
{
I
ODenotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at
Ithe time of monitoring. Stem should be searched for at location during subsequent Monitoring Years
Obecause the stem may grow above herbaceous layer.
I Denotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years
because the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years.
Site: Arrington Bridge Bank Parcel
Page: 1
Monitoring Year: MY -3
Date: 9/1712015
Area: Phase 2
Vag Plot No.: 3
X -axis: 3 1NE
I
CURRENT MgNITQRING YEAR DATA
j
Plot Location: see sketch below
X
Y
ddh
Height
DBH J
I Map ID Scientific Name Common Name
Source meter
1
meter
mm
cm
cm
Vi o
q rl
I 1 Quercus michauxii �bald wamp chestnut oak
B
I 0
1.3
7.07
60
� I
I 2 Taxodium distichium cypress
B
I 4.7
2
145
[ 0.215
3 1
3 Taxodium distichium aid cypress
B
I 2
3.5
9.73
52
1
3 1
1 4 Platanus occidentalis Isycamore
B
1 5.7
4.41
1
168
0.702 1
3 1
I 51Taxodium distichium Ibald cypress
IB
1 3.81
61
1
171
1 0.841 1
3
I 61Platanus occi entalis Isycamore
IB
1 1.51
6.71
1
I I
M
I 71Taxodium distichium (bald cypress
81 latanus
�B
1 1.71
9.61
1
209
1 1.515 1
3 1
occidpntalis (sycamore
jB
1 31
8.91
1
201
I 1.273 I
3 I
I 91Taxodium distichium Ibald cypress
IB
1 5.41
9.71
1
175
I 0.951 1
3 I
I 101Taxodium distichium Ibald cypress
IB
1 5.81
8.31
42.55 1
117
I I
3 I
I 111Platanusoccidentalis Isycamore
IB
I 7.6
6.51
1
I I
M I
12 Taxodium distichium (bald cypress
IB
I 7.91
9.51
1
I I
M
I 131Taxodiurn distichium Ibald cypress
IB
1 9.21
8.41
1
196
I 1.161 1
3 I
14 Quercus ni9 ra [water oak
IB
I 4 .21
9.3I
I
( I
M I
1 15 Quercus michauxii kswamp chestnut oak
I 16 distichium
B
I 7.81
1.91
I
I 1
M I
axodium (bald cypress
1 9.21
01
16.52 1
88
1 I
3 1
C ) B = bare root
ditch
x
1
i
I
I XY � y
45
I CURRENT MONITORIN? YEAR DATA VOLUNTEER
I Scientific name
I HEIGHT CLASSES f cm)
110-50 50
-100
> 100
'
IFrfxinus per?ngylvanica
l
1
1P atanus occi entalis
I
1
Liquidambar styraciflua
1 5
IPrunus sp.
I I
I
1
No replantings
Notes
Site: Arrington Bridge Bank Parcel
Page: 2
Monitoring Year: MY -3
Date: 9/17/2015
Area: Phase 2
Veg Plot No.: 3
X -axis: 3 0N E
o 1
1
Z
3
4
N_
5
6
7
8
9
10
55NE°
x -Axis
2 3 4 5 6 7 8 9^
io 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ODenotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at
Ithe time of monitoring. Stem should be searched for at location during subsequent Monitoring Years
Obecause the stem may grow above herbaceous layer.
IDenotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years
because the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years.
Site: Arrington Bridge Bank Parcel
Page: 1
Monitoring Year: MY-3
Date: 9/1712015
Area: Phase 2
Veg Plot No.: 4
X -axis: 32 1SW I CURRENT MQNITQRINgYEAR DATA
Plot Location: see sketch below X Y dddh Height DBH I
Map ID Scientific Name Common Name Source meter meter mm cm cm Vi or
1 Quercus michauxii swamp chestnut oak B 0.2 0.8 248 1.779 3
I 2 Quercus nigra water oak B 0.7 3.2 M
I 3 Taxodium distichium bald cypress B 1.1 6 M
1 4 Quercus michauxii swamp Qhestnut oak B I 1.3 8.7 M 1
I 5 Quercus nigra water oak I B 1 3.9 9.61 1 I M I
1 6 Platanus occidentaiis sycamore IB 1 7.51 8.11 1 179 1 1.276 M I
I 71Betula nigra Inver birch B 1 7.21 6.11 1 I 1 M I
I 8 Taxodium distichium bald cypress 1 4.21 6.31 1 1 1 M I
9�Betula nigra 1river birch IB 1 3.21 3.61 74 1 1.597 1 M I
101Taxodium distichium Ibald cypress iB 1 7.1 2.8 I M
111Quercusmichauxii Iswyymp chestnut oak (B I 101 1.3� 1 M
1 12 Taxodium distichium (bald cypress 1 6.81 0.61 I I I M I
1 13 Quercus nigra Iwater oak 1 3.11 0.21 1 1 1 M I
= bare root
ditch l
y C ,
1
J
xy x
- i
118
I CURRENT MONITORING YEAR DATA VOLUNTEER - (EIGHT CLASSES fcm
I Scientific Name 10 -50 50 -10.0 > 00
IFraxinus penngylvapica 1
Platanus occiddentalis 1
I I
I I I j
No replantings
Notes
Site: Arrington Bridge Bank Parcel
Page:
2
Monitoring Year:
MY-3
Date:
9/17/2015
Area:
Phase 2
Veg Plot No.:
4
X -axis:
32 1SW
10
9
8
7
6
5
4
3
2
1
0.5
0,0
75SW°
0.5 1 2 3 4 5 6 7 8 9 10
X -AXIS
ODenotes "Missing ". Stem may be missing because of thick herbaceous layer and therefore not visible at
Ithe time of monitoring. Stem should be searched for at location during subsequent Monitoring Years
Obecause the stem may grow above herbaceous layer.
I Denotes "Dead ". Stem should still be searched for at location during subsequent Monitoring Years
because the roots of the stem may survive and therefore re- sprout in subsequent Monitoring Years.
APPENDIX E
Photo Stations and Easement Encroachment Photos
r
r
1
1
1
1
1
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
1
1
r
i
r
r
r
l�
1
)
Ao'-"
PROJECT NO. EBX -13020
FILENAME: EBX1302OX.DWG
scALE: AS SHOWN
DATE: 09 -17 -2015
PHOTO STATION I: VIEW PAGINS 48451^1.
PHOTO STATION 2: VIEW PAGIN6 58 °NE.
ARFZINGTON BRIDGE TM ,CM R McAMUS
BANK PARCEL J COWAW,
PHASE II VW-
2905 NortLL C Parkway
Divham. North Carolina 27713
wane=pp qq�� Clcense No.: C -0293
RR` 1pk0 nva MCADAMS (800) 733- 5648.MCAdamsCo.co-
F
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
r
l
r
r
.� PROJECT N0. EBX- 13020
M� FILENAME: EBX1302OX -DWG
M C scncs: AS SHOWN
DATE: 09 -17 -2015
PHOTO STATION St VIEW FAGIN6 T7 °SE.
PHOTO STATION 4: VIEW PAGING al °E.
ARRINGTON BRIDGE
BANK PARCEL
PHASEII
WAJ �QN1AP^
WI MA
III 111 11 11 11 II r 1 1 11
JIIILI■ IIIJV1111,... ..I■
I
\
"
THE JOHN R WADANS
J
COMPANY. INC,
2905 Meridian Parkway
Durham, North Carolina 27713
Laoense No.: C -0293
MCADAMS
(11001733 -56461 MrAdamsCo.rnm
Arrington Bridge Bank Parcel — Phase II
Monitoring Year 3 Report
Wayne County, North Carolina
EBX -13020
September 17, 2015
Easement Encroachment Photos:
Photo 1: Mowing within the northern section of CE View facing southeast along CE line
from the location of Photo Station 4.
Photo 2: Mowing within the central section of CE. View facing northeast into CE from
the location of Photo Station 2.