Loading...
HomeMy WebLinkAboutNCC240461_ESC Approval Submitted_20240216 �PEx / P 1873 WATER RESOURCES 0 6.fY/MIIMIN�WW. \' 9PTy C A�OV February 15, 2024 Scott Krusell CRP/BI Jenks Rd Apex Owner LLC 7315 Wisconsin Ave Suite 925W Bethesda, MD 20814 Re: Letter of Plan Approval Project Name: Arden at Summit Pines Project Location: Jenks and Lowell Project Number: 23-004 Submitted By: . ESE Consultants Date Submitted: July 1, 2023 Disturbed Area: 8.78 The Soil Erosion and Sedimentation Control Plan (S&E) you submitted has been reviewed and accepted. The Town of Apex (Town) hereby issues this Letter of Plan Approval. The Town's S&E program is performance oriented, requiring protection of the natural resources and adjoining properties. If at any time during this project it is determined by Town staff that the approved S&E Plan is inadequate to meet the Town's S&E ordinance, this office may require revisions to the S&E Plan and its implementation to ensure compliance with the S&E ordinance (Section 5- 154). In accordance with Section 5-158 of the Town's S&E ordinance, you are hereby notified that this office has the right to periodically inspect any land-disturbing activities to ensure compliance with the approved S&E Plan and ordinance. You are to notify this office twenty- four(24) hours before starting work. You are also required to keep the working drawings on site. Stormwater runoff generated from sites disturbing one (1) acre or more is permitted pursuant to the National Pollution Discharge Elimination System (NPDES) administered in North Carolina by the Division of Energy, Mineral and Land Resources; Stormwater Section. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 I (919) 362-8166 I www.apexnc.org Letter of Plan Approval Page 2 of 2 receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOl form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. On or after October 3, 2023, a $120 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Complete a Grading Permit Application and receive a Grading Permit from the Building Inspections & Permitting Department as required by the North Carolina Building Code Appendix J for Grading. Both the Grading Permit and Certificate of Coverage from NCDEMLR must be submitted to the Stormwater Field Services Supervisor prior to the commencement of any land disturbance activity. The Contractor will be permitted to clear only as necessary to install the required S&E measures. Once the required S&E measures are installed, contact Environmental Engineering staff to schedule an on-site inspection. A Certificate of Compliance will be issued after a site inspection is completed to ensure that the S&E measures are installed per the approved S&E Plan. The approval of an S&E Plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations, and rules. In addition, the Town's NPDES Phase II permit requires site contractors to control construction site wastes that may cause adverse water quality impacts. Please have your site contractor review the attached Town Construction Site Waste Management Plan to become familiar with the requirements. Town staff will inspect your site to ensure these waste management practices are being implemented. You will need to provide evidence of compliance if applicable. I look forward to working with you on this project and if you have any questions, please call (919) 372-7470. Regards, /„._49 James Misciagno, CES, CPESC Stormwater Engineering Enclosures: Town Construction Site Waste Management Plan TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 I (919) 362-8166 I www.apexnc.org Letter of Plan Approval Page 2 of 2 TOWN OF APEX The Peak of Good Living PO Box 25o Apex, NC 27502 I (919) 362-8166 I www.apexnc.org