HomeMy WebLinkAbout[External] NWP 3 Authorization/ NCDMS Moores Fork (Repair) / SAW-2011-02257/ Surry County
Baker, Caroline D
From:Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil>
Sent:Monday, February 12, 2024 3:30 PM
To:Xu, Lin
Cc:Tugwell, Todd J CIV USARMY CESAW (USA); Kichefski, Steven L CIV USARMY CESAW
(USA); Isenhour, Kimberly T CIV USARMY CESAW (USA); Davis, Erin B CIV USARMY
CESAW (USA); Reid, Matthew; Alex French; Kirsten Ullman; Youngman, Holland J;
Bowers, Todd; Polizzi, Maria; fritz.rohde@noaa.gov; Friedman-Herring, Andrew; Leslie,
Andrea J; McHenry, David G; Wilson, Travis W.
Subject:\[External\] NWP 3 Authorization/ NCDMS Moores Fork (Repair) / SAW-2011-02257/
Surry County
Attachments:2022 NWP 3.pdf; NWP3_Moores Fork_SAW-2011-02257.pdf
Follow Up Flag:Flag for follow up
Flag Status:Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Lin,
A?ached to this message is the requested Sec?on 404 permit authoriza?on for the following project:
Project Name: NCDMS Moores Fork Mi?ga?on Project
USACE Ac?on ID: SAW-2011-02257
Loca?on: La?tude: 36.508661°N Longitude: -80.719268°W
County: Surry
Also a?ached are the corresponding regional and general condi?ons, and the permit compliance cer?fica?on.
Please note that design plans submi?ed with the PCN as well as all special, general and regional condi?ons must be
strictly adhered to in order for this verifica?on le?er/authoriza?on to remain valid.
This electronic copy is your official Department of the Army authoriza?on; no paper copy will be mailed.
Thank you,
Casey Haywood
TREC Project Manager / Team Lead
US Army Corps of Engineers Savannah District
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
1
From: Haywood, Casey M CIV USARMY CESAW (USA)
Sent: Thursday, February 1, 2024 12:53 PM
To: Xu, Lin <lin.xu@deq.nc.gov>
Cc: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY
CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA)
<Kimberly.T.Isenhour@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Reid,
Matthew <matthew.reid@deq.nc.gov>; Alex French <Alex.French@kci.com>; Kirsten Ullman <Kirsten.Ullman@kci.com>;
Youngman, Holland J <holland_youngman@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Polizzi, Maria
<maria.polizzi@deq.nc.gov>; fritz.rohde@noaa.gov; Friedman-Herring, Andrew <andrew.friedmanherring@deq.nc.gov>;
Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org>; Wilson, Travis W.
<travis.wilson@ncwildlife.org>
Subject: Provisional NWP 3 Verification/ NCDMS Moores Fork (Repair) / SAW-2011-02257/ Surry County
Lin,
This is a provisional general permit verifica?on. Your proposed work may be authorized by the above referenced general
permit once EPA has completed their review and issues a determina?on for this project pursuant to CWA Sec?on 401
(a)(2). Once received, the Corps will provide you with a final general permit verifica?on. Your proposed work shall NOT
commence un?l a?er the 401 Cer?fica?on has been issued or waived AND un?l a final general permit verifica?on has
been provided to you. A?ached are the corresponding regional and general condi?ons associated with this permit.
Please note addi?onal special condi?ons may be added to the final general permit verifica?on.
Project Name: NCDMS Moores Fork Mi?ga?on Project
USACE Ac?on ID: SAW-2011-02257
Loca?on: La?tude: 36.508661°N Longitude: -80.719268°W
County: Surry
As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA)
authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a
written DA authorization would constitute a violation of Federal laws and subject you to further enforcement
action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine
Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior
to commencing the work.
Please contact me if you have any ques?ons regarding this provisional verifica?on.
Respec?ully,
Casey Haywood
TREC Project Manager / Team Lead
US Army Corps of Engineers Savannah District
3331 Heritage Trade Drive, Suite 105
Wake Forest, NC 27587
2