Loading...
HomeMy WebLinkAbout[External] NWP 3 Authorization/ NCDMS Moores Fork (Repair) / SAW-2011-02257/ Surry County Baker, Caroline D From:Haywood, Casey M CIV USARMY CESAW (USA) <Casey.M.Haywood@usace.army.mil> Sent:Monday, February 12, 2024 3:30 PM To:Xu, Lin Cc:Tugwell, Todd J CIV USARMY CESAW (USA); Kichefski, Steven L CIV USARMY CESAW (USA); Isenhour, Kimberly T CIV USARMY CESAW (USA); Davis, Erin B CIV USARMY CESAW (USA); Reid, Matthew; Alex French; Kirsten Ullman; Youngman, Holland J; Bowers, Todd; Polizzi, Maria; fritz.rohde@noaa.gov; Friedman-Herring, Andrew; Leslie, Andrea J; McHenry, David G; Wilson, Travis W. Subject:\[External\] NWP 3 Authorization/ NCDMS Moores Fork (Repair) / SAW-2011-02257/ Surry County Attachments:2022 NWP 3.pdf; NWP3_Moores Fork_SAW-2011-02257.pdf Follow Up Flag:Flag for follow up Flag Status:Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Lin, A?ached to this message is the requested Sec?on 404 permit authoriza?on for the following project: Project Name: NCDMS Moores Fork Mi?ga?on Project USACE Ac?on ID: SAW-2011-02257 Loca?on: La?tude: 36.508661°N Longitude: -80.719268°W County: Surry Also a?ached are the corresponding regional and general condi?ons, and the permit compliance cer?fica?on. Please note that design plans submi?ed with the PCN as well as all special, general and regional condi?ons must be strictly adhered to in order for this verifica?on le?er/authoriza?on to remain valid. This electronic copy is your official Department of the Army authoriza?on; no paper copy will be mailed. Thank you, Casey Haywood TREC Project Manager / Team Lead US Army Corps of Engineers Savannah District 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 1 From: Haywood, Casey M CIV USARMY CESAW (USA) Sent: Thursday, February 1, 2024 12:53 PM To: Xu, Lin <lin.xu@deq.nc.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (USA) <Todd.J.Tugwell@usace.army.mil>; Kichefski, Steven L CIV USARMY CESAW (USA) <Steven.L.Kichefski@usace.army.mil>; Isenhour, Kimberly T CIV USARMY CESAW (USA) <Kimberly.T.Isenhour@usace.army.mil>; Davis, Erin B CIV USARMY CESAW (USA) <Erin.B.Davis@usace.army.mil>; Reid, Matthew <matthew.reid@deq.nc.gov>; Alex French <Alex.French@kci.com>; Kirsten Ullman <Kirsten.Ullman@kci.com>; Youngman, Holland J <holland_youngman@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Polizzi, Maria <maria.polizzi@deq.nc.gov>; fritz.rohde@noaa.gov; Friedman-Herring, Andrew <andrew.friedmanherring@deq.nc.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; McHenry, David G <david.mchenry@ncwildlife.org>; Wilson, Travis W. <travis.wilson@ncwildlife.org> Subject: Provisional NWP 3 Verification/ NCDMS Moores Fork (Repair) / SAW-2011-02257/ Surry County Lin, This is a provisional general permit verifica?on. Your proposed work may be authorized by the above referenced general permit once EPA has completed their review and issues a determina?on for this project pursuant to CWA Sec?on 401 (a)(2). Once received, the Corps will provide you with a final general permit verifica?on. Your proposed work shall NOT commence un?l a?er the 401 Cer?fica?on has been issued or waived AND un?l a final general permit verifica?on has been provided to you. A?ached are the corresponding regional and general condi?ons associated with this permit. Please note addi?onal special condi?ons may be added to the final general permit verifica?on. Project Name: NCDMS Moores Fork Mi?ga?on Project USACE Ac?on ID: SAW-2011-02257 Loca?on: La?tude: 36.508661°N Longitude: -80.719268°W County: Surry As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior to commencing the work. Please contact me if you have any ques?ons regarding this provisional verifica?on. Respec?ully, Casey Haywood TREC Project Manager / Team Lead US Army Corps of Engineers Savannah District 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 2