HomeMy WebLinkAbout20231707 Ver 1_USACE Correspondence_20240213Chandler, Rebecca D
From:
Lawrence, Jennifer L CIV USARMY CESAW (USA) <Jennifer.L.Lawrence@usace.army.mil>
Sent:
Tuesday, February 13, 2024 2:37 PM
To:
paulgmilam@gmail.com
Cc:
Brad Luckey; Chandler, Rebecca D
Subject:
[External] SAW-2023-00709 - Provisional NWP29 US Highway 158 / Advance, Davie
County
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Dear Mr. Milam,
This is in response to a Pre -Construction Notification (PCN) SAW-2023-00709 received on December 8, 2023, and
considered complete on February 2, 2024. In submitting the PCN, you requested verification that the proposed project is
authorized by a Department of the Army (DA) Nationwide Permit 29 (Residential Developments).
The work affecting waters of the United States is part of an overall project known as US Highway 158. The activities in
waters of the United States include the construction of road crossings and associated infrastructure for a proposed
residential townhome development.
The project proposes 212 linear feet (0.014 acres) of permanent loss stream impacts for road crossing installation with
15 linear feet (0.006 acres) of temporary stream impacts for dewatering, 0.055 acres of permanent wetland impacts for
road crossing installation, 0.0026 acres of temporary wetland impacts for sewer installation, and 0.005 acres of
permanent open water impacts for pond fill. The project is located at Latitude 35.998181 and Longitude-80.442753; in
Advance, Davie County, North Carolina.
Conditions of the Individual Section 401 WQC, will generally become conditions of any final Nationwide Permit 29
verification letter. Should state action on the required WQC approve a project different from that shown on the current
application, a modification to the PCN will be required. You should notify our office of any such changes as substantial
changes may require further evaluation.
As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA)
authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a
written DA authorization would constitute a violation of Federal laws and subject you to further enforcement action.
Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries)
does not preclude the requirement for obtaining DA authorization (e.g., an NWP/RGP verification letter) prior to
commencing the work.
In all future correspondence, please refer to file number SAW-2023-00709. A copy of this letter is forwarded to State
and/or Federal agencies for their information. If you have any questions, please contact Jennifer Lawrence, at (980)392-
9980 or by email at Jennifer.L.Lawrence@usace.army.mil.
Thank you,
Jennifer Lawrence, PWS (she/her)
Regulatory Specialist, Charlotte Regulatory Field Office
U.S. Army Corps of Engineers, Wilmington District
8430 University Executive Park Drive, Suite 615
Charlotte, NC 28262
Email: Jennifer.L.Lawrence@usace.army.mil
Cell: (980)392-9980