Loading...
HomeMy WebLinkAbout20170359 Ver 1_Email_20240216Homewood, Sue From: Homewood, Sue Sent: Friday, February 16, 2024 8:32 AM To: Duerr, Keven; Fuemmeler, Amanda J CIV USARMY CESAW (USA); Hickman, Tyler N; Winston, Joey; Leslie, Andrea J Cc: Alan Shuping; Schueler, Tim; McSwain, Joel Subject: RE: [External] Grandfather Golf & Country Club maintenance dredging plan Keven, Thank you for the opportunity to review the draft turbidity monitoring and management plan for the proposed dredgingwork. DWR and NCWRC have reviewed the document and offer the following combined comments. 1. The plan does not propose monitoring in the lake itself. In accordance with NCAC 02B .0211(21) turbidity standards are applicable to lakes and reservoirs, as well as to streams. Please clarify if there is a reason you do not propose monitoring turbidity levels within the lake. 2. The plan only proposes monitoring on days with active dredging. This is of significant concern to the agencies. Previous issues that arose during in -lake activities was typically a result of inadequate E&SC measures causing turbidity in the lake, not the dredge operation itself. The main problem was from the exposed soils from the lake drawdown during storm events. The agencies request that the plan be modified to include some form of turbidity monitoring while the lake is drawn down, possibly tying it to rain events or at a regular interval. We would like to strongly recommend that you carefully evaluate the S&EC plan with regard to finding ways to address the previous causes of high turbidity results during storm events. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Duerr, Keven <kduerr@hazenandsawyer.com> Sent: Thursday, January 18, 2024 10:06 AM To: Fuemmeler, Amanda J CIV USARMY CESAW (USA) <Amanda.Jones@usace.army.mil>; Homewood, Sue <sue.homewood@deq.nc.gov>; Hickman, Tyler N <tyler.hickman@deq.nc.gov>; Winston, Joey <joey.winston@deq.nc.gov>; Leslie, Andrea J <andrea.leslie@ncwildlife.org> Cc: Alan Shuping <ashuping@grandfatherclubnc.com>; Schueler, Tim <tschueler@hazenandsawyer.com>; McSwain, Joel <jmcswain@hazenandsawyer.com> Subject: [External] Grandfather Golf & Country Club maintenance dredging plan CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning! We last met to discuss the Grandfather Golf & Country Club's plan to perform maintenance dredging in Loch Dornie in September 2023. A draft turbidity monitoring and management plan for the proposed work has been developed. Please review the attached draft turbidity plan, and let us know if you have any questions, concerns, or comments. Thankyou, Ms. Keven Duerr Associate I Hazen and Sawyer 4011 WestChase Blvd., Suite 500, Raleigh, NC 27607 919 863-9350 (direct); 919 522-4269 (mobile) kduerr(a�hazenandsawyer.com I hazenandsawyer.com