HomeMy WebLinkAbout820065_Permit Renewal Application 2019_20190410State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications
Must be received by the Division of Water Resources by no later than April 3, 2019.
Please do not leave any question unanswered. Please verify all information and make any necessaq corrections below.
Application must be signed abd dated by the Permittee.
1. Farm Number: 82-0065 Certificate Of Coverage Number: AWS820065
2. Facilitv Nam e: 5M Farms
3. Landowner's Name (same as on the Waste Management Plan): Derek McLamb
4. Landowner's Mailing Address: 1496 Mt Elam Church Rd
City: Roseboro State: NC Zip: 28382
Telephone Number: 910-990-0698 Ext, E-mail:
5. Facility's Physical Address: 95 Williams Lk_&
City: Roseboro State: NC
6. County where Facility is located: Sampson
7. Farm Manager's Name (if different from Landowner):
8. Farm Manager's telephone number (include area code):
9. Integrator's Name (if there is not an Integrator, write "None"):
10. Operator Name (OIC): Derek Lee McLamb
11. Lessee's Name (if there is not a Lessee, write "None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type
Swine - Wean to Feeder
Operation Types:
Swine
Cattle
Wean to Finish
Dairy Calf
Wean to Feeder
Dairy Heifer
Farrow to Finish
Milk Cow
Feeder to Finish
Dry Cow
Farrow to Wean
Beef Stocker Calf
Farrow to Feeder
Beef Feeder
Boar/Stud
Beef Broad Cow
Gilts
Other
Other
Prestage Farms Inc
Phone No.: 910-567-6616
A] lowable Count
4,800
Zip: 28382
OIC #: 998377
Dry Pouttry
Other Types
Non Laying Chickens
Horses - Horses
Laying Chickens
Horses - Other
Pultets
Sheep- Sheep
Turkeys
Sheep - Other
Turkey Pullet
_Wet Poultr%
Non Laying Pullet
Layers
13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary
corrections and provide missing data.)
Structure
Name
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
(Cubic Feet)
Estimated
Surface Area
(Square Feet)
Design Freeb . oard
"Redline"
(Inches)
I
I C)
CLAY
19.00
—34"OOC3
29.49
Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application
as required by NC General Statutes 143-215.10C(d) to the address below.
The CAWMP must include the following components:
I . The most recent Waste Utilization Plan (WUP), si-.,ned b% the owner and a certified technical speciali t, containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.)
b. A map of every field used for land application (for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
It. The required NRCS Standard specifications
2. A site map/schematic
3. Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and
complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to
your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, waste transfers, etc.)
As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the
application and all the CAWMP items above to: 2019PermitRenewal*nedcnr.gov
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement,
representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C.
Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for
a similar offense.)
Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a
corporation, signature should be by a principal executive officer of the corporation):
Name: Title: &04j'_
31&)19
Signature. Date:
Name:
Title:
S ignature:
Date:
Name:
Title:
Signature:
Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
E-mail: 2019PermitRenewa]Cancdenr.gov
FORM: RENEWAL -STATE GENERAL 02/2019
ROY COOPER
ow"Or
MICHAEL $. REGAN
sermtory
LINDA, CULPEPPER.
oirwor
Derek McLamb
5M Farms
1496 Mt Elam Church Rd
Roseboro, NC 28382
NORTH CAROLINA
EnvironmentalQ9WIty
Subject: Application for Renewal of Coverage for Expiring State General Permit
D�2 Pe-mittee:
February 27, 2019
N%
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Di . ar e General Permits,
which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge Genporal Permits are available
at https:Hdeci.nc.Lov/about/divisions/water-resources/`vvater-civalit% -rev-ionat-operations/afo or by writing or calling:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
In order to assure \our continued coverace under the State Non-Discharoe General Permits_�ou must submit an application for
permit coverage to the Division. Enclosed %ou will find a "Request for Certificate of Coverage, FacilitN Currentll Covered b% an
Eairi1M State Non -Discharge General Permit." The application form must be completed, signed and returned b� AtIril 3, 2019
Please note that �ou must include one (1) con% of the Certified Animal Waste Manaeement Plan (CAWMPI with the
completed and sipned amilication form. A list of items included in the CAWMP can be found on page 2 of the renewal
aimlication form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could
result in assessments of civil penalties of up to $25,000 per day.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel
free to contact the Animal Feeding Operations Branch staff at 919-707-9100.
Sincerely,
Jon Risgaard, Section Chief
Animal Feeding Operations and Groundwater Section
Enclosures
cc (w/o enclosures): Fayetteville Regional Office, Water Quality Regional Operations Section
Sampson County Soil and Water Conservation District
AFOG Section Central Files - AWS820065
Prestaue Farms Inc
M�,t� Ca -a ns0ep&*TT a -tofE-v'rcrri!rt9 q.. a 'ty 1 0 Vs'" of 1�:atv Reso, roes
512 N� Sa 'SbLr, St. 1 IS36 11'a Se�% m::e-te— I Re e i�, Nostr =aro -,* 276S9-iSZ6
S iS,7:�7 S: 30
Version —November 26, 2018
Mortality Management Methods
Indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table. Attach burial location map and plan.
Landfill at municipal solid waste facility permitted by NC DEQ Under GS 15A NCAC
El 1:1 13B .0200.
Renderino at a rendering plant licensed under G.S. 106-168.7.
Complete incineration according to 02 NCAC 52C .0102.
A composting system approved and permitted by the NC Department of Agriculture & Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm,
additional requirements must be met and a permit is required from NC DEQ.
In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture & Consumer Services (G.S. 106-549.70).
Any method which, in the professional opinion of the State Veterinarian, would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm -specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency, the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
Signature of//a rm Owner/Manager Date
.&G111- � 4�1
Signature of T(Vchnical Specialist Date
Waste Utilization Plan
.Prod� cer: Derek McLamb County: Sampson
Name of Farm: 5 M Farms
Location: 1496 Mt. Elam Church Rd.
Roseboro NC 28382
Phone: 910-990-0698
Type of Operation: Wean -Feed
Number of Animal: 4800
Storage Structure: Anaerobic Lagoon
Method of Application: Irrigation
Amount of waste produced per year: 2027 ton/year
Amount of plant available N (PAN) produced/year: 2304 lbs./year
The waste from your animal facility must be land applied at a specified rate to prevent
pollution of surface water and/or groundwater. The plant nutrients in the animal waste
should be used to reduce the amount of commercial fertilizer required for the crops in the
fields where the waste is to be applied.
This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed
before each application cycle. Annual soil tests are strongly encouraged so that all plant
nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in the implementing your waste utilization plan in order to
maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally
safe manner.
1. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize.
2. Soil types are important as they have different infiltration rates, leaching potentials,
cation exchange capacities, and available water holding capacities.
3. Normally waste shall not be applied to land eroding at more than 5 tons per acre per
year. Waste may be applied to land eroding at 5 or more tons per acre annually, but
less than 10 tons per acre per year providing that adequate filter strips are
established.
4. Do not apply waste on saturated soils, when it is raining, or when the surface is
frozen. Either of these conditions may in runoff to the surface waters which is not
allowed under DWQ regulations.
5. Wind conditions should also be considered to avoid drift and downwind odor problems.
6. To maximize the value of the nutrients for crops production and to reduce the potential for
pollution, the waste should be applied to a growing crop or applied not more than 30 days
prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will
conserve nutrients and reduce odor problems.
This plan is based on the waste application method shown above. if you choose to change methods
in the future, you need to revise this plan. Nutrient levels for different applications methods are
not the same.
The estimated acres needed to apply the animal waste is based on typical nutrient content for
this type of facility. Acreage requirements should be based on the waste analysis report from
your waste management facility. In some cases you may want to have plant analysis made, which
5 M Farms Page 2
could allow additional waste to be applied. Provisions shall be made for the area receiving
waste to be flexible so as to accommodate changing waste analysis content and the crop type.
Lime must be applied to maintain pH in the optimum range for specific crop production. This
waste utilization plan, if carried out, meets the requirements for compliance with ISA NCAC
2H.0217 adopted by the Environmental Management Commission.
YOUR WASTE UTILIZATION PLAN IS BASED ON THE FOLLOWING:
Tract No.
Pull No.
FS�I�lType
Crop
Yield/Ac
Lbs. N
Acres
Lbs N
Month to
Lbs. N
Code
unit
Used
Apply
Per Ac.
1982
I -A
NoA
Corn
110
1.07
1.855
218
FEB15-JUN
117.7
1982
I -A
NoA
Wheat
60
2.40 1
1.855
267
SEP-MAR
144
1982
1-A-
NoA
Soybeans
33
4.00
1.855
245
APR-SEP15
132
1982
I-B
NoA
Corn
110
1.07
1.855
218
FEB15-JUN
117.7
1982
1-B
NoA
Wheat
60
2.40
1.855
267
SEP-MAR
144
.1982
1-13
NOA
Soybeans
33
4.00-
1.855
245
APR-SEP15
132
1982
I-C
NoA
Corn
110
1.07
1
197
FEB15-JUN
117.7
1982
1-C
NoA
�Wheat
6-0
2.40
1.675
241
SEP-MAR
144
1982
1-C
NoA
So beans
33
4.00
1.675
221
APR-SEP15
132
1982
1-D
-NoA
Corn
110
1.07
1.815
214
FEBIS-JUN
117.7
1982
I-D -
NoA
Wheat
a
60
2.40
1.815
261
SEP-MAR
1-44
L 1982
I-D
NoA
Soybeans
33
4.00
1.815
240'_
APR-SEP15 1
132
1982
2-A
WaB
-
4.7
50 I
3.54
832
MAR-SEP
235
1982
2-A
WaB
Rye/OS
1
50
3.54
177
1
OCT-MAR
so
1982
2-13 -
WaB
CB/Hay
4.7
so
2.39
562 .
MAR-SEP
235
1982
2-13
WaB
__fye/OS
- 1
50 1
2.39
1201
OcIF-MAR
5
1982
3-A
NoB
CB/Hay
6.4
46
3.51
10281
MA-R-SEP
-2903
1982
1
3-A
NoB
_fLeZ-OS
1
-----
6
-
3.51
176
OC`r-MAR
50
1982
3-13
NoB
_jL/Hay -
6.4
2.60
762
MAR-SEP
293
1982
3-B
NOB
Rye/05
1
�46
1
So
so
2.60
130
OCT-MAR ±:j2:d
50
Total
26.44
6620 lbs.
Available Nitrogen
2304 lbs.
Surplus or deficit
-4316 lbs.
Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply
the waste in a timely manner.
Acres in Pull(s) 1-A, 1-B, I-C, and 1-11) are reduced by half to allow for a two year rotation of corn, wheat and soybeans
Use these acres on the IRR-2
Pull 1-A = 3.71 ac.
Pull 1-113 = 3.71 ac.
Pull I-C = 3.35 ac.
Pull I-D = 3.63 ac
5 M Farms
Page 3
The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future,
regulations may require farmers in some parts of North Carolina to have a nutrient management plan that
addresses all nutrients. This plan only addresses nitrogen.
In interplanted fields (i.e. small grain, etc. interseeded in bermuclagrass), forage must be removed through
grazing, hay and /or silage. Where grazin& plants should be grazed when they reach a height of six to nine
inches. Cattle should be removed when plants are grazed to a height of four inches. in fields where small grain
etc. is to be removed for hay or silage, care should be exercised not to let small grain to reach maturity,
especially late in the season ( i.e. April or May) Shading may result if small grain gets too high and this will
definitely interfere with the stand of bermudagrass. This loss of stand will result in reduced yields and less
nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal
situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage
two to three times during the season, depending on the time small grain is planted in the fall.
The ideal time to interplant small grain, etc. is late September or early October. Drilling is recommended over
broad:asting. Bermuclagrass should be grazed or mowed to a height of about two inches before drilling for best
result;.
Caution must be exercised in grazing or haying summer annuals under stressed conditions. Nitrate poisoning
may occur in livestock. Sampling forage or hay for nitrate levels is recommended.
Acres shown in the tables are considered to be the usable acres excluding required buffers, filters strips along
ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to
equipment limitations. Actual total acres in the field listed may, and most likely will be, more than the acres
shown in the tables.
See attached map showing the fields to be used for the utilization of animal waste.
SLUDGE APPLICATION:
The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates.
The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients
or other elements. Your production facility will produce approximately 173 lbs. of plant available
nitrogen per year in the sludge.
If you remove sludge every 5 years you will have approximately 864 lbs. of PAN to utilize. Assuming
you apply this PAN to hybrid bermuclagrass hayland at the rate of 300 lbs/acre you will need
acres of land. If you apply the sludge to corn at the rate of 125 lbs. of nitrogen per acre you will need
acres of land. Please be aware that these are only estimates of the PAN and the land needed. Actual
requirements could vary by 25% depending on the sludge waste analysis, SoH types, realistic yields, and
application methods.
APPLICATION OF WASTE BY IRRIGATION
The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that
runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water
droplet size, and organic solids. The application amount should not exceed the available water holding capacity
5 M Farms
Page 4
of the soil at the time of irrigation
nor should the plant available nitrogen
the crop.
applied exceed the nitrogen needs of
If surface irrigation is the
irrigation designer
method of land application for this
plan, it is the responsibility
to ensure that an
irrigation system is installed
of the producer and
to
Failure to apply the recommended
properly irrigate the acres shown in tables.
rates and amounts of nitrogen
invalid.
shown in the tables may make this plan
The following table is provided as a
guide for establishing
application
rates and amounts.
Tract No.
Field No.
Soil Type
Crop
Applic.
Applic.
1982
I -A
NoA
Code
Rate(in/hr) Amount
1982
1-A
NoA
Corn
Wheat
0.5
0.5
1.0
-
1982
I -A
NoA
So beans
0.5
.0
1.0
1982
1-B
NoA
Corn
0.5
1.0
1982
1982
I-B
NoA
Wheat-
0.5
1.0
1982
1-13
NoA
Soybeans
0.5
1.0
1982
1-C
I-C
NoA
NoA
Corn
Wheat
0.5
1.0
1982
I-C
NoA
Soybeans
0.5
0.5
1.0
1.0
1982
1982
I-D
I-D
NoA
Corn
0.5
1.0
1982
1-D
NoA
NoA
Wheat
Soyb a s
0.5
f% ,
Ln
1982
2-A
WaB
CB/Hay
0.6
1.0
1982
2-A
WaB
Rye/OS
0.6
1.0
1982
2-13
WaB
CB/Hay
0.6
1.0
1982
2-13
WaB
Rye/OS
0.6
1.0
1982
3-A
NoB
CB/Hay
0.5
1982
3-A
NoB
R e/OS
0.5
1982
3-13
NoB
1982
3-13
NoB
5 M Farms
Page 5
This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the
crop is not over applied. In many situations the application amount shown cannot be applied because of the
nitrogen limitations. The maximum application amount shown can be applied under optimum Soil conditions.
Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the
average of once every 6 months. In no instances should the Volume of the waste be stored in Your structure
be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour
storm.
It is the responsibility of the producer and the waste applicator to ensure that the spreader equipment is operated
properly to apply the correct rates shown in the tables. Failure to apply the recommended rates and amounts*of
nitrogen shown in the tables may make this plan invalid.
Call Your technical specialist after you have receive the waste analysis report for assistance in determining the
amount of waste per acre and the Proper application rate prior to applying the waste.
NARRATIVE OF OPERATION
5 M Farms
WASTE UTILIZATION PLAN Page 6
REQUIRED SPECIFICATIONS
1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct clischarg� during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2. There Must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land. on which to properly apply waste. If the producer
does not own adequate land to properly dispose of waste, he/she shall provide a copy of
an agreement with a landowner who is within a reasonable proximity, allowing him/her the
use of the land for waste application. It is the responsibility of the owner of the facility to
secure an update of the Waste Utilization Plan when there is a change in the operation,
increase in the number of animals, method of utilization, or available land.
3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop
yields based on soil type, available moisture, historical data, c imatic condit ons, and le I
of management, unless there are regulations that re ve
nutrients. strict the rate of application for other
4. Animal waste shall be applied to land eroding less than .5 tons per acre per year. Waste
may be applied to land that is eroding at 5, or more tons, but less than 10 tons per acre per
year providing grass filter strips are installed where runoff leaves the field. (See FOTG
standard 393 - Filter Strip).
5. Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland. When applied to conservation tilled crops or grassland,
the waste may be broadcast provided the application does not occur during a season
prone to flooding. (See "Weather and Climate in North Carolina" for guidance.)
7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate that runoff
does not occur offsite or to the surface waters and in a method which does not cause drift
from the site during application. No poncling should occur in order to control odor or flies.
8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
9. Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would inhibit growth. The Potential for salt damage
from animal waste should also be considered.
10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a
high Potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste
shall not be applied more than 30 days prior to planting of the crop or forages breaking
dormancy.
Any new swine facility sited on or after October 1, 1995 shall comply with the following:
The outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential Property boundary
and from any perennial stream or river (other than an irrigation ditch or canal. Animal
waste other than swine waste from facilities sited on or after October 1, 1995), shall not be
applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips).
5 M Farms
Page 7
REQUIRED SPECIFICATIONS
(continued)
12. Animal waste shall not be applied closer than 100 feet to wells.
13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned
by he landowner.
14. Waste shall be applied in a manner not to reach'other property and public right-of-ways.
is. Animal waste shall not be discharged into surface waters, drainage ways, or wetlands by
discharge or by over -spraying. Animal waste may be applied to prior converted wetlands
provided they have been approved as a land application site by a "technical specialist".
Animal waste shall not be applied on grassed waterways that discharge directly into water
courses, and on other grassed waterways, waste shall be applied at agronomic rates in a
manner that causes no runoff or drift from the site.
16. Domestic and industrial waste from wash down facilities, showers, toilets, sinks, etc., shall
not be discharged into the animal waste management system.
17. A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to
protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc.,
are limited to areas where considered appropriate. Lagoon areas should be kept mowed
and accessible. Berms and structures should be inspected regularly for evidences of
erosion, leakage or discharge.
18. If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "Closure plan" which. will eliminate the
Possibility of an illegal discharge, Pollution and erosion.
19. Waste handling structures, piping Pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be
kept on site.
20. Animal waste can be used in a rotation that includes vegetation and other crops for direct
human consumption. However, if animal waste is used on crops for direct human
consumption it should only be applied pre -plant with no further applications of animal waste
during the crop season.
21. Highly visible markers shall be installed to mark the top and the bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to
mark the maximum storage volume for waste storage ponds.
22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually
at crop sites where waste products are applied. Nitrogen shall be the rate -determining
element. Zinc and copper levels in the soil shall be monitored and alternative crop sites
shall be used when these metal approach excessive levels. PH shall be adjusted for
optimum crop production and maintained. Soil and waste analysis records shall be kept
for five (5) years. Poultry dry waste application records shall be maintained for three (3)
years. Waste application records for all other waste shall be maintained for five (5) years.
23. Dead animals will be disposed of in a manner that meets North Carolina regulations.
WASTE UTILIZATION PLAN AGREEMENT
Name Of Farm: 5 M Farms
O*ner/Manager Agreement Derek McLamb
Page 8
I (we) understand and will follow and implement the specifications and the operation and maintenance proce-
dures established in the approved animal waste utilization plan for the farm named above. I (we) know that any
expansion to the existing design capacity of the waste treatment and Storage system or construction of new
facilities will require a new certification to be submitted to the North Carolina Division of Water Quality
before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste
from this system to the surface waters of the state from a storm event less severe than the 25-year, 24 hour
storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water
Conservation District and will be available for review by NCDWQ upon request.
Name of Facility own Derek McLamb
Signature: )-a
Name of Manager (If different from owner)
Signature:
Name of Person Preparing Plan: G. Glenn Clifton
Affiliation: Prestage Farms, Inc.
Address: P.O. Box 438
Clinton, NC 28329
Signature: -A.
Phone: 910-596-5749
Date: dL�
Date:
Date: _LLL I
nil,
6,V.
k�'!' It r 15.
13.
o-11
P In
M-41;
k ot
jl.
r.
. . .
. . . . . . . . .
SAMPSON COUNTY
EMERGENCY ACTION PLAN
DIVISION OF WATER RESOURCES (DWR) 910-433-3300
EMERGENCY MANAGEMENT SERVICES (EMS) 910-592-8996
SOIL & WATER CONSERVATION DISTRICT (SWCD) 910-592-7963
NATURAL RESOURCES CONSERVATION SERVICE (NRCS) 910-592-7963
COOPERATIVE EXTENSION SERVICE (CES) 910-592-7161
This plan will be implemented in the event that waste from your operation are leaking,
overflowing, or running off the site. You should NOT wait until wastes reach surface
waters or leave your property to consider that you have a problem. You should make
every effort to ensure that this does not happen. This plan should be posted in an
accessible location for all employees at the facility. The following are some action items
you should take.
1. Stop the release of wastes. Depending on the situation, this may or may not be
possible. Suggested response to problems are listed below:
A. Lagoon overflow -possible solutions are:
a. Add soil to berrn to increase elevation of dam, any permanent alteration of the
dam should be approved by a qualified technical specialist.
b. Pump wastes to field at an acceptable rate.
c. Stop all additional flow to the lagoon, hold wastes in the house if possible.
d. Call a pumping contractor.
e. Make sure no surface water is entering lagoon.
B. Runoff from wastes application field -action include:
a. Immediately stop wastes application.
b. Create a temporary diversion or berm to contain the waste.
C. Incorporate waste to reduce further runoff.
d. Evaluate and eliminate the reason(s) that caused the runoff.
e. Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinkler -action includes:
a. Stop recycle (flushing system) pump.
b. Stop irrigation pump.
c. Close values to eliminate further discharge.
d. Repair all leaks prior to restarting pumps.
D. Leakage from flush system, houses, solids separators -action includes:
a. Stop recycle (flushing system) pump.
b. Stop irrigation pump.
c. Make sure no siphon effect has been created.
d. Stop all flows in the house, flush systems, or solid separators.
e. Repair all leaks prior to restarting pumps.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to
flowing leaks -possible action:
a. Dig a small sump or ditch to catch all seepage, put in a submersible pump, and
pump back into lagoon.
b. If holes are caused by burrowing animals, trap or remove animals and fill holes
and compact with a clay type soil.
c. Have a professional evaluate the condition of the sidewalls and the lagoon
bottom as soon as possible.
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach any surface waters?
b. Approximately how much was released and what duration?
c. Any damage noted, such as employee injury, fish kills, or property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger (either on or off of the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours, call your DWQ (Division of Water Quality)
regional office, at 910-433-3300, after hours, emergency number: 1-800-858-
0368. Your phone call should include: YOUR NAME, FACILITY
NUMBER, TELEPHONE NUMBER, THE DETAILS OF TE INCIDENT
FROM ITEM #2 ABOVE, THE EXACT LOCATION OF THE FACILITY,
AND THE LOCATION OR DIRECTION OF MOVEMENT OF THE
SPILL, WEATHER AND WIND CONDITIONS, THE CORRECTIVE
MEASURES THAT RAVE BEEN UNDER TAKEN, AND THE
SERIOUSNESS OF THE SITUATION.
b. If the spill leaves the property or enters surface waters, call local (EMS)
Emergency Management Services at 910-592-8996.
c. Instruct EMS to contact local Health Department.
d. Contact local Soil and Water Conservation District, Natural Resources
Conservation Service office at 910-592-7963 and Cooperative Extension
Service at 910-592-7161 for advice/technical assistance.
4. If none of the above works call 911 or the sheriffs Department and explain your
problem to them and ask that person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair of the problem to minimize off -
site damage.
a. Contractors Name:
b. Contractors Address:
c. Contractors Phone: LD - 2-1 q--
Page 2
6. Contact the technical specialist who certified the lagoon.
a. Name: &&�- a, � /,�
b. Phone: q)6-- 3.96— 9317
7. hnplement procedures as advised by DWQ and technical assistance agencies to
rectify the damage, repair the system, and reassess the waste management plan to
keep problems with release of wastes from happening again.
8. If you are a contract swine grower associated with a swine company integrator,
contact the company representative at 910-592-577 1.
Page 3
Swine Farm Waste Management Odor Control Checklist
Source Cause BMPs to Minimize Odor Site Specific Practices
Farmstead Swine production 11 Vegetative or wooded buffers
19 Recommended best management practices
IN Good judgment and common sense
Animal body # Dirty manure -covered 01 Dry floors
surfaces animals
Floor surfaces * Wet manure -covered floors C3 Slotted floors
M Waterers located over slotted floors
1$ Feeders at high end of solid floors
10 Scrape manure buildup from floors
C3 Underfloor Ventilation for drying
Manure collection
* Urine
F1
Frequent manure removal by flush, pit recharge,
pits
9 Partial microbial
or scrape
decomposition
13
Underfloor ventilation
Ventilation exhaust
* Volatile gases
10
Fan maintenance
fans
e Dust
IN
Efficient air movement
Indoor surfaces Dust 15 Washdown between groups of animals
C3 Feed additives
C3 Feeder covers
Feed delivery downspout extenders to feeder
covers
Flush tanks Agitation of recycled lagoon C3 Flush tank covers
liquid while tanks are filling Q0 Extend fill lines to near bottom of tanks with
anti -siphon vents
Swine Farm Waste Management.0dor Control Checklist
Source Cause BMPs to Minimize Odor Site Specific Practices
Flush alleys Agitation during wastewater 13 Underfloor flush with underfloor ventilation
conveyance
Pit recharge points Agitation of recycled lagoon C3 Extend recharge lines to near bottom of pits with
liquid while pits are filling anti -siphon vents
Lift stations @ Agitation during sump tank 0 Sump tank covers
filling and drawdown
Outsid6 drain 9 Agitation during wastewater 0 Box covers
collection or conveyance
junction boxes
End of drainpipes e Agitation during wastewater 0 Extend discharge point of pipes underneath
at lagoon conveyance lagoon liquid* level
Lagoon surfaces e Volatile gas emissions
• Biological mixing
• Agitation
Irrigation sprinkler High pressure agitation
nozzles Wind drift
ZI Proper lagoon liquid capacity
0 Correct lagoon startup procedures
@I Minimum surface area -to -volume ratio
M Minimum agitation when purnping
13 Mechanical aeration
C3 Proven biological additives
N Irrigate on dry days with little or*no wind
M Minimum recommended operating pressure
N Pump intake near lagoon liquid surface
C3 Pump from second -stage lagoon
Swine Farm Waste Management Odor Control Checklist
Source Cause BMPs to Minimize Odor Site Specific Practices
Storage tank or Partial microbial C3 Bottom or midlevel loading
basin surface decomposition C3 Tank covers
Settling basin
surface
Manure, slurry, or
sludge spreader
outlets
Uncovered manure,
slurry, or sludge on
field surfaces
* Mixing while filling
* Agitation when emptying
* Partial microbial
decomposition
* Mixing while filling
* A gitation when emptying
• Agitation when spreading
• Volatile gas emissions
0 Basin surface mats of solids
C3 Proven biological additives or oxidants
C3 Extend drainpipe outlets underneath liquid level
C3 Remove settled solids regularly
C3 Soil injection of slurry/sludges
C3 Wash residual manure from spreader after use
C3 Proven biological additives or oxidants
Volatile gas emissions while C3 Soil injection of slurry/sludges
drying 13 Soil incorporation within 48 hours
C3 Spread in thin uniform layers for rapid drying
C3 Proven biological additives or oxidants
Dead animals * Carcass decomposition IN Proper disposition of carcasses,
Dead animal * Carcass decomposition C3 Complete covering of carcasses in burial pits
dispo sal pits C3 Proper location/construction of disposal pits
Incinerators 9 Incomplete combustion 13 Secondary stack burners
Standing water 0 Improper drainage 119 Grade and landscape such that water drains away
around facilities e Microbial decomposition of from facilities
organic matter
Insect Control Checklist for Animal Operations
Source Cause
BMPs to Control Insects Site Specific Practices
Feed storage Accumulations of feed Z
Reduce moisture accumulation within and around
residues
immediate perimeter of feed storage areas by
ensuring drainage is away from site and/or
providing adequate containment (e.g., covered bin
for brewer's grain and similar high moisture grain
products)
Z0
Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed
Animal holding Accumulations of animal C3
Eliminate low areas that trap moisture along fences
areas wastes and feed wastage
and other locations where waste accumulates and
disturbance by animals is minimal
13
Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e., inspect for and remove or break up
accumulated solids as needed)
Dry manure Accumulations of animal C3
Remove spillage on a routine basis (e.g.,
handling systems wastes
7- to 10-day interval during summer; 15- to 30-day
interval during winter) where manure is loaded for
land application or disposal
C3
Provide for adequate drainage around manure
stockpiles
0
Inspect for and remove or break up accumulated
wastes in filter strips around stockpiles and manure
handling areas as needed
For more information contact:
Cooperative Extension'Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613.
Insect Control Checklist for Animal Operations
Source Cause BMPs to Control Insects Site Specific Practices
Feed storage Accumulations of feed A Reduce moisture accumulation withi—n a—ndarou—nd
residues immediate perimeter of feed storage areas by
ensuring drainage is away from site and/or
providing adequate containment (e.g., covered bin
for brewer's grain and similar high moisture grain
products)
dN Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed
Animal holding Accumulations of animal ffl Eliminate low areas that trap moisture along fences
areas wastes and feed wastage and other locations where waste accumulates and
disturbance by animals is minimal
C3 Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e., inspect for and remove or break up
accumulated solids as needed)
Dry manure Accumulations of animal C3 Remove spillage on a routine basis (e.g.,
handling systems wastes 7- to 10-day interval during summer; 15- to 30-day
interval during winter) where manure is loaded for
land application or disposal
E3 Provide for adequate drainage around manure
stockpiles
C3 Inspect for and remove or break up accumulated
wastes in filter strips around stockpiles and manure
-handling areas as needed
For more information contact:
Cooperative Extension'Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613.
Insect Control Checklist for Animal Operations
Source Cause BMPs to Control Insects Site Specific Practices
Liquid Systems
Flush gutters Accumulation of solids N Flush system is designed and operated
sufficiently to remove accumulated solids from
gutters as designed
0 Remove bridging of accumulated solids at
discharge.
Lagoons and pits Crusted solids IN Maintain lagoons, settling basins and pits whefe-
pest breeding is apparent to minimize the crusting
of solids to a depth of no more than 6 to 8 inches
over more than 30 percent of surface
Excessive vegetative * Decaying vegetation 49 Maintain vegetative control along banks of
growth lagoons and other impoundments to prevent
accumulation of decaying vegetative matter along
water's edge on impoundment's perimeter.
Dry Systems
Feeders Feed spillage N Design, operate, and maintain feed systems
(e.g., bunkers and troughs) to minimize the
accumulation of decaying wastage
Clean up spillage on a routine basis (e.g., 7- to 10-
day interval during summer; 15- to 30-day interval
during winter)
U. S. Department of Agriculture
Soil Conservation Service
NC-ENG-34
September 1980
HAZARD CLASSIFICATION DATA SHEET FOR DAMS
Landowner—muLAma-aaQa,---------,
Community or Group No.
Estimated Depth of Water to Top of Dam
Date of Field Hazard Investigation 7f 3/93
County SAMPSON
Conservation Plan No.
Ft. Length of Flood Pool
Ft.
Evaluation by reach of flood plain downstream to the point of estimated minor effect
from sudden dam.failure.
fs--t.Elev. irs—t—.—P—evation
Kind of :Improvements: of Breach
Reach: Length:'Width: Slope: Land Use Improvements Above :Floodwater Above
Flood Plain: Flood Plain
Ft. Ft. % Ft. Ft.-
2
3
Describe potential for loss of life and damage to existing or probable future downstream
improvements from a sudden breach A SUDDEN FAILURE OF STRUCTURE WILL NOT DANGER LIFE
OR DAMAGE PUBLIC."TRANSPORTAT ION. THE LAGOON WILL BE LOCATED IN A RURAL AREA.
IT WILL BE APPROX* 1000f TO CEASER SWAMP AND APPROX. 2000? TO SR 1456.
Hazard Classification of Dam (a, b, c) (see NEM-Part 520.21)
Dam Classification (1, 11, 111, IV, V)
By HERMAN RIGGS., SOIL CONS- TECH*
— T—name) (tit] e)
Concurred B
Y*n aie9 �ti t
NOTE: 1. Instructions on reverse side.
2. Attach additional sheets as needed.
Date 9/1/93
Date
Operator:MCLAMS FARMS County:
SAMPSON
Date:
10/05/93
Distince
to'nearest residence (other than owner):
1300 feet
1. STEADY
STATE LIVE WEIGHT
0
Sows ffarrow to finish)
x
1417
lbs.
0
0
Sows (farrow to feeder)
x
522
lbs-.
0
0
Head (finishing only)
x
135
lbs.
0
0
Sows ffarrow to wean)
x
433
lbs.
0
4560
Head (wean to feeder)
x
30
lbs.
136800
TOTAL STEADY STATE LIVE WEIGHT <SSLW) 136800
2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 136800 lbs. SSLW X Treatment Volume CF/lb. SSLW
Treatment Volume CF/lb. SSLW= 1.'0 CF/lb. SSLW
Volume = , 136800 oubic feet
3. STORAGE VOLUME FOR SLUDGE ACCUMULATION OWNER REQUESTS NO SLUDGE STORA
Volume = 0 cubic feet SLUDGE WILL BE REMOVED AS NEED
4. TOTAL DESIGN VOLUME
Inside top: fength 200 feet ; width 180 feet
Top of dike at elevation 48.00 feet
Freeboard 1.3 feet Side slopes 2.5:1<inside)
Total design lagoon liquid level at elevation 46.70 feet
Bottom of lagoon at elevation 36.00 feet
Seasonal high water table elevation 42.50 feet
Total design volume using prismoidal formula:
SS/END1 SS/END2 3S/SIDEI SS/END2 LENGTH WIDTH DEPTH
2.5 2.5 2.5 2.5 193.5 173.5 10.70
AREA OF -TOP
LENGTH X WIDTH
194 174
AREA OF BOTTOM
LENGTH X WIDTH
140 120
AREA OF MIDSECTION
LENGTH X WIDTH X 4
167 147
33572 <Area of Top>
16800 <Area of Bottom)
97882 (Area of Midsection X 4)
CU. FT. = [Area top+<4XArea Midsection)+Area Bottom] X Depth/6
33572 97882 16800 2
VOL. OF LAGOON AT TOTAL DESIGN �LIQUID LEVEL = 264387' CU. FT.
5. TEMPORARY STORAGE REQUIRED
Drainage Area:
Lagoon (top of dike>
Length X Width =
200 180 36000 Square Feet
Buildings <roof and lot water)
Length X Width =
0 0 0 3quare Feet
TOTAL DA :36000 Square Feet
Design temporary storage to be 180 days.
A. Volume of waste produced
Approximate daily production of manure in CF/LB SSLW 0.00136
Volume = 1:36800 Lbs. SSLW X CF of wasie/lb/day X 180
Volume = 33489 Cubic feet
B. Volume of w-ash wate r r
This is the amount of fresh water used for washing floors or
volume of fresh'water used for a flush system. Flush systems
that recirculate the lagoon water are accounted for in 5A.
Volume 0 Gallons/day X 180 days storage/7.48
gallons per CF
Volume 0 Cubic feet
C. Volume of rainfall in excess of evaporation
Use period of time when rainfall exceeds evaporation by
largest am"Ount.
180 days excess rai�nfall 7.0 inches
Volume = - 7.0 Inches X DA / 12 inches per foot
Volume = 21000 Cubic feet
D. Volume of 25 year 24 hour storm
Volume = 7.0-inches / 12 inches per foot X DA
Volume = 21000 Cubic feet
TOTAL REQUIRED TEMPORARY STORAGE
5A. 33489 Cubic feejc
56. 0 Cubic feet
5C. 21000 Cubic feet
5D. 21000 Cubic feet
TOTAL 75489 Cubic fe-st
6. SUMMARY
Total required volume 212289 Cubic feet
Total design volume avail.= 264387 Cubic feet
Min. reqrd. trtmnt. vol. plus sludge accum.= 136800 Cu. Ft.
At elev. 42.00 Ft; Vol= 126000 Cubic feet (end pumping)
Total design volume less 25yr-24hr storm = 243387 Cu. Ft.
At elev. 44.00 Ft; Vol= 180267 Cubic feet. (start pumping)
Seasonal high water table elevation is -42.50 Feet,'which must
be lower than the el'evation of top of treatment volume 42.00
DEST GNED BY:
Ale-1-ma-s- -2
D ATE :
APPROVED BY:
DATE:
V-2 -Ey
U�T
NOTE: SEr-' ATTACHED WASTE I LLIZATION PLA.1\J
ADDITIONAL NOTES:
4
Operator:MCLAMB NURSERY county: SAMPSON Date:
Distance to nearest residence (other than owner):
1. AVERAGE LIVE WEIGHT (ALW)
0 sows (farrow to finish)
0 sows (farrow to feeder)
0 head (finishing only)
0 sows (farrow to wean)
4800 head (wean to feeder)
Describe other :
x 1417 lbs.
x 522
lbs.
x 135
lbs.
x 433
lbs.
x 30
lbs.
10-5-93
1300 feet
0
lbs
0
lbs
0
lbb
0
lbs
144000
lbs
0
lbs
To-t-al A�vera�geL�ive WeighTt= 144000 lbs
2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 144000 lbs. ALW x Treatment Volume(CF)/lb. ALW
Treatment Volume(CF)/lb. ALW 1 CF/lb. ALW
Volume = 144000 cubic feet
3. STORAGE VOLUME FOR SLUDGE ACCUMULATION SLUDGE STORAGE ACCUMULATION
NOT COMPUTED AT OWNER'S
Volume 0 cubic feet REQUEST. WILL BE REMOVED AS
4. TOTAL DESIGNED VOLUME NEEDED.
inside top length (feet) ---------------------
Inside top width (feet) ----------------------
Top of dike elevation (feet) -----------------
Bottom of lagoon elevation (feet) ------------
Freeboard (feet) -----------------------------
Side slopes (inside lagoon) ------------------
Total design volume using prismoidal formula
SSIEND1 SS/END2 SS/SIDE1 S8/SIDE2 LENGTH
2.5 2.5 2.5 2.5 195.0
AREA OF TOP
LENGTH * WIDTH
19S.0 175.0
AREA OF BOTTOM
LENGTH * WIDTH
140.0 120.0
AREA OF MIDSECTION
LENGTH * WIDTH * 4
167.5 147.5
200.0
180.0
48.0
3G.0
1.0
2.5
WIDTH DEPTH
175.0 11.0
34125 (AREA OF TOP)
1G800 (AREA OF BOTTOM)
98825 (AREA OF MIDSECTION * 4)
CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6
34125.0 98825.0 16800.0 1.8
Total Designed Volume Available =274541.67 CU. FT
5- TEMPORARY STORAGE REQUIRED
DRAINAGEAREA:
Lagoon (top of dike)
Length * Width =
200.0 180.0 36000.0 square feet
Buildings (roof and lot water)
O.O.square feet Describe this area.
TOTAL DA 36000.0 square feet
Design temporary storage period to be 180 days.
SA. Volume of waste producied
Feces & urine production in gal./day per 135 lb. ALW 1.37
Volume = 144000 lbs. ALW/135 lbs ALW * 1.37 gal/day 180 days
'Volume = 263040 gals. or 35165.8 cubic feet
5B. Volume of wash water
This is the amount of fresh water used,for-washing floors or volume
of fresh water used for a flush system -or excess water. Flush systems
that recirculate the lagoon water are accounted for in 5A.
Volume = 0.0 gallons/day 180 days storage/7.48 gallon
Volume = 0.0 cubic feet per CF
5C. Volume of rainfall in excess of evaporation
Use period of time when rainfall exceeds evaporation by largest amount
180 days excess rainfall 7.0 inches
Volume = 7.0 inches * DA / 12 inches per foot
Volume = 21000.-o cubic feet
5D. Volume of 25 year - 24 hour storm
Volume = 7.0 inches / 12 inches per foot * DA
Volume = 21000.0 cubic feet
TOTAL REQUIRED TEMPORARY STORAGE
SA. 35166 cubic feet
5B. 0 cubic feet
5C. 21000 cubic feet
5D. 21000 cubic feet
TOTAL 77166 cubic feet
G. SUMMARY
Temporary storage period====================>
180
Rainfall in excess of evaporation===========>
7.0
25 year -. 24 hour rainfall==================>
7.0
Freeboard===================================>
1.0
Side
2.5
Inside top length===========================>
200.0
Inside top width============================>
180.0
Top of dike elevation=======================>
48.0
Bottom of lagoon elevation==================>
36.0
Total required volume====================.==>
221166
Actual design volume========================>274541.67
Seasonal high watertable elevation (SHWT)===>
42.5
stop pumping
44.5
Must be > or = to the SHWT elev.==========>
42.5
Must be > or = to min. req. treatment el.=>
42.0
Required minimum treatment volume===========>
144000
Volume at stop pumping elevation============>
194880
Start pumping
46.3
Must be at bottom of freeboard & 25 yr. rainfall
Actual volume less 25 yr - 24 hr rainfall===>
253542
Volume at start pumping elevation===========>
251104
Required volume to be pumped================>
5G1G6
Actual volume to be pumped==================>
56224
Min. thickness of soil liner when required==>
1.8
7. DESIGNED BY- APPROVED BY:
DATE: DATE:
NOTE: SEE ATTACHED WASTE UTILIZATION PLAN
COMMENTS:
days
inches
inches
f eet
: 1
f eet
f eet
f eet
f eet
cu. f t.
cu. f t.
f eet
f eet
f eet
f eet
cu. f t.
cu. f t.
f eet
cu. f t.
cu. f t.
CU. ft..
cu. ft.
f eet
- - - - - - - - - - - - - - - - - - - - - - - - ---- - - - -
-;h;s .'agoon is designed f 0- wasze 'Perma-�en t storagE,) .,Vj-4-,
I
Minimum odor control. -he t-me requ , re�d thk annec f 110i d !eve
to be reached (permanc-n + t r- in p S70:'age" 'rr-)ay
f 1�.lshinq operations and t.-ic-
aMount- of r,�sn
ac-ze-:; -.0 Cne
T h gin a d 6 �lj C, j-1 E IM) P 0 r a r o ra a
V C.1 j T; e
wased on wast-e froi-n ai-I
I e;-.cess 3
evaporation; a-d L 6
e ar e 2`4 r a y .17 a
o c, c 1j r s o ri IC h, a a v e r a,
.2 a o Y y U ;':1 7
waste genera zad f rol-11 a -c2 I v"11 .-I
� e i 0 an m a 5 e TI a y'
constant '61h rou hou - -- . - _L
zrle a r anu- `ro.r. ea r a
e s
mate s based on 7 exc.ess rai a; s
e q u a 11 e x c -3 e. s L
nes-
`Xcass a y e a r
Th e av e r ag e ann u a e X C -m- S S ra il a S a p p r o x i m a e 6
-rhere-Pore , a,-, a ve rage o-,�' -" ;
cn e
C :_� S 5 CI
be Pumped each year. z _C
I ; - — _j v 9 a r r w i not �De a
actor to consider in ar i a
p u p ! nc or a C a
-1 .. 7
-9 av a! a" 1 a ri, a x r n u in a i e V -a o r. S
volume must always LW 0
d e te rm I ned in eac?i des I G n 0 b e 0 ri P UM D i ng and th 1 5 i S
t h e 0 ul, a t i n v a r o f p :1 p e "L S o i-I u a ri s f
U
P PG is 110' install e d 0 �-, t r. e e 1 e v a 0 1-,
10 b. a M g a
permanent marker must -be inst'�aiied on t-his etlzva-�_,
.1 � . C, n Z 0
indicate when Pumping should begin. An aleva-,ion mus�. be
estab 1 i shed to s top Pump i n� 60 ma i nt a ; n m i n i m u, n 11, r 9 a- _�-nen` ep
< 6 f e a t) Pumping can L9 Started
or stopped any -_Ime be 6 w e a n
these two elevations for operating conven;ence as si-Le
cOnditions p e rn I t_ (we at'h e r a k,
I , crop, a n z -8 q u I P. nn e r, z a P. P I y
waste without runoff or jeach;ng>.
on of was+-e wat-er is -recog,-,-ze,
"and applica-IL11
m eLk,* h o d of d i s p o s.a I Metr!ods oi� a0l -,or. ;.Ic;ude
. p ; : c a 1.
C; r_- n ". e r p i v 0 t U n S arid travei ing gjr, -.rr,ca�' r, ""are -,4
0
be taken when applyi nq was tB TO prevei-i -, runo 1:'f -Iz ro:r. the f :: a : J
or damiage to crops.
The fo! !owing i tems are to 'Ce carr ed
Is S+
r o n g I Y e E-3 m
charged to 1/2 e 1. a g C., 0 n Lb 6 r a
i-apac ky Pr e V e i-I 7 excessive 01-i , Ors cur
ss IC a r t - u p Pre -charging reduces on 0;
I n e j
was te a n te r i n a th e 1 ag 0 0 n th, e re b y re d Li c :
ing odors. o 1 i ds
should be covered wiith efifluei-It a� all t,
I ri i e S . kh ta n p r e -
charging is completed, flus,- -u,,di ng s .4
recyc e d agoon
iquid. Fresh water shouic not. be used 'For fI;us'j;n9 after
initial filling.
2. The attaohed waste utt: I ization pi an slhal : be fo :' 1 ,,,qed.
Thi s plan recommends samp; in@ and testj ng of was-:1-e (see
Attachment belFore land app t
- L V .