HomeMy WebLinkAbout820037_Permit Renewal Application 2019_20190410State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications
must be received by the Division of Water Resources by no later than April 3, 2019.
Please do not leave any question unanswered. Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Permittee.
1. Farm Number: 82-0037
2. Facility Name: Underwood Farms
3. Landowner's Name (same as on the Waste Management Plan):
4. Landowner's Mailing Address: 287 Ammie Jordan Ln
City: Clinton State: NC
Telephone Number: 910-271-2275 Ext. E-mail:
5. Facility's Physical Address: 494 five ftm
An! �! �,j It 5
City: Clinton State: NC
6. County where Facility is located: Sami)so
7. Farm Manager's Name (if different from Landowner):
8. Farm Manager's telephone number (include area code):
9. Integrator's Name (if there is not an Integrator, write "None"):
10. Operator Name (OIC): Jordan Mark Lee Underwood
11. Lessee's Name (if there is not a Lessee, write "None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type
Swine - Wean to Feeder
Operation Types:
Swine
Cattle
Wean to Finish
Dairy Calf
Wean to Feeder
Dairy Heifer
Farrow to Finish
Milk Cow
Feeder to Finish
Dry Cow
Farrow to Wean
Beef Stocker Calf
Farrow to Feeder
Beef Feeder
Boar/Stud
Beef Broad Cow
Gilts
Other
Other
Certificate Of Coverage Number:
Mark Underwood
� Ck rk 50 rX R�%
MWhy-Brown LLC
Phone No.: 910-260-1975
Allowable Count
6,0P
Dry Poultry
Non Laying Chickens
Laying Chickens
Pullets
Turkeys
Turkey Pullet
Wet PoultrV
Non Laying Pullet
Layers
AWS820037
Zip: 28328
Zip: 28328
OIC 4: 1002214
Other Tvpes
Horses - Horses
Horses - Other
Sheep - Sheep
Sheep - Other
ROY COOPER
Govemor
MICHAEL S. REGAN
LINDA CULPEPPER
Dlorftlfot
-'T A'r
NORTH CAROLINA
Envkonmentai(Qualfty
February 27, 2019
Mark Underwood
Underwood Farms
287 Animie Jordan Ln
Clinton, NC 28328
Subject: Application for Renewal of Coverage for Expiring State General Permit
Dc --- Peri-nittee:
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits,
which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available
at httns7//deq.nc.i,-ov/about/divisions/water-resources/water7s]ualit% -regional-operations/afo or by writing or calling:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
In order to assure �,our continued coverape under the State Non -Discharge General Permits- ,ou must submit an mplication for
permit coverage to the Division. Enclosed you will find a "Request for Certificate of Coverage Faciliti Currenth Covered bv an
Expiring State Non-Discharne General Permit." The application form must be coUleted. signed and returned b% April 3, 2019:
Please note that �ou must include one (1) copv of the Certified Animal Waste Manggement Plan ICAWMP) with the
completed and signed application form. A list of items included in the CAWMP can be found on rage 2 of the renewal
application form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could
result in assessments of civil penalties of up to $25,000 per day.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel
free to contact the Animal Feeding Operations Branch staff at 919-707-9 100.
Sincerely,
A '1� _'�
Jon Risgaard, Section Chief
Animal Feeding Operations and Groundwater Section
Enclosures
cc (xv/o enclosures): Fgyetteville Regional Office, Water Quality Regional Operations Section
Sampson County Soil and Water Conservation District
AFOG Section Central Files - AWS820037
Mumh� -Brown LLC
Xoqt Zam s Depawrer, t Bf E-N ror fre- ts C�.;a V, I D vs z�, of Water ResoLroas
51.2 N, Sa i4M VIE Sen :e Ze�te, I R as e, Nor& CaTo r a 276ge-IS3S
13. Waste Treatment and Storage Lagoons (Verifi- the following information is accurate and complete. Make all necessary
corrections and provide missing data.)
Estimated
Liner Ty
' Pe
Estimated
Design Freeboard
Structure
Date
(Clay. Synthetic,
Capacity
Surface Area
I
Redline"
"(Inches)
Name
Built
Unkno%n)
(Cubic Feet)
(Sci
95-11
C�11
% 4X14
1 U- A
19.00
Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed. application
as required by NC General Statutes 143-215.10C(d) to the address below.
The CAWMP must include the following components:
1. The most recent Waste Utilization Plan (WUP), sie ned b% the owner and a certified technical specialist containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation. injection. etc.)
b. A map of every field used for land application (for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2. A site map/schematic
3. Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
7. Lagoon/storage pond capacity documentation (design. calculations, etc.) Please be sure the above table is accurate and
complete. Also provide any site evaluations. wetland determinations. or hazard classifications that may be applicable to
your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, waste transfers. etc.)
As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the
application and all the CAWMP items above to: 2019PermitRenewaFWncdenr.gov
I attest that this application has been reviewed by me and is accurate and complete to the best of. my knowledge. I understand that,
if all required parts of this application are not completed and that if all, required 'supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NQ General Statutes J43-215.6A
and 143-215�613, any person Who knowingly. makes any false statement,
representation, or certification in any application may be subj"ect "to"' civil penalties 'up io $25,000 per violation. (18 U.S.C.
Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for
a similar offense.)
Printed Name OU'Signing Official (Landowner, f multiple Landowners all landowners should sign. If Landowner is a
fir , ice r of the corporation):
corporation, signature should be by a princip executiv( f
Nar� %k r tie Title: ZS )Z) a !t r
Sign,Z,7S7JL onk -->
_A . Date:
Name:
Title:
Signature:
Date:
Name:
Title:
Signature:
Date:
THE COMPLETED -APPLICATION. SHOULD BE SENT TQTHETOLLOWING ADDRESS:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
E-mail: 2019PermitRenewal(onedenr.gov
APR 0 3 2019
wo�,Qua,lfty
FORM: RENEWAL -STATE GENERAL 02/2019
13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary
corrections and provide missing data.)
Structure
Name
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
(Cubic Feet)
Estimated
Surface Area
(Square Feet)
Design Freeboard
"Redline"
(Inches)
1
19.00
L
I
Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed. application
as required by NC General Statutes 143-215.10C(d) to the address below.
The CAWMP must include the following components:
1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigaiion, injection, etc.)
b. A map of every field used for land application (for example. irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2, A site map/schematic
3. Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and
complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to
your facility.
8. Operation and Maintenance Plan
if your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, waste transfers, etc.)
As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the
application and all the CAWMP items above to: 2019PermitRcnewal(_a)ncdenr.gov
WASTE UTILIZATION PLAN
Wednesday, May 06, 2010
- '!
Producer: Underwood Farms
Farm Name: Underwood Farms 82-37
287 Ammie Jordan Ln
Clinton,NC 28328
Telephone # - (910) 271-2275
Type of Operation : Wean to Feeder Swine
Number of Animals : 6080 pigs design capacity
Application Method: irrigation
The waste from your animal facility must be land applied at a specified rate to prevent
pollution,of surface and/or groundwater. The plant nutrients in the animal waste should be
used to reduce the amount of commercial fertilizer required for the crops in the fields where
waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient.
Waste should be analyzed before each application cycle. Annual soil tests are strongly
encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be
grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe
manner. Always apply waste based on the needs of the crop to be grown and the nutrient
contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are
important as they have different infiltration rates, leaching potentials, cation exchange
capacities, and avaialable water holding capacities. Normally waste shall not be applied to
land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may
be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on
saturated soils, when it is raining, or when the surface is frozen. Either of these conditions
may result in runoff to surface waters which is not allowed under DEM regulations. Wind
conditions should also be considered to avoid drift and downwind odor problems. To
maximize the value of the nutrients for crop production and to reduce the potential for
pollution, the waste should be applied to a growing crop or applied to bare ground not more
than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and
reduce odor problems. This plan is based on waste application through irrigation for this is
the manner in which you have chosen to apply your waste. If you choose to inject the waste
in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating
waste are not the same.
The estimated acres needed to apply the animal waste is based on typical nutrient content
for this type, of facility. Acreage requirements should be based on the waste analysis report
from your waste management facility. Attached you will find information on proper sampling
techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste
utilization plan, if carried out, meets the requirements for compliance with 15A NCAC
2H.0217 adopted by the Environmental Management Commission.
Page I of 10
AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.)
6080 pigs X .4 tons waste/pigslyear = 2432 tons
AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR
6080 pigs X .48 Ibs PAN/pigs/year = 2918.4 PAN/year
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner.
The following acreage will be needed for waste application based on the crop to be grown,
soil type and suface application.
TABLE I: ACRES OWNED BY PRODUCER
TRACT
FIELD
SOIL TYPE &CLASS-
CROP
DETERMINING PHASE
CODE
4440
*
10
LUMBEE DRAINED
C
4440
-
10
LUMBEE DRAINED
w
4440
*
10
'LUMBEE DRAINED
SB
4440
*
11
LUMBEE DRAINED
C
4440
11
-LUMBEE DR AINED
w
4440
COR19EE DRAINED
SB
4440
12
LUMBEE DRAI�ED'
4440
*
12
LUMBEE DRAINED
W
4440
*
12
LUMBEE DRAINED
SB
4440
*
13
CHIPLEY 0-5%
C
4440
*
13
CHIPLEY 0-5%
W
4440
1_3.
�CHIPLEY 0-5%
SB
4440
14
:CHIPLEY 0-5%
c
4440
14
CHIPLEY 0-5%
w
4440
14
CHIPLEY 6-5%
SB
4433
2
BLANTON 0-5%
BC
443'3
2
SG
4433
3
WAGRAM 0-6%
BC
,iii-3-
3
WAGRAM 0--6%-
SG
4433
4
WAGRAM 0-6%
ac
4433
4
WAGRAM 0-6%
SG
4440
9
__1_
UMBEE DRAINED
C
,440
9
LUMBEE DRAINED
w
4440
9
LUMB E D INE
E
SB
YIELD LBS AW COMM ACRES LBS AW APPLIC.
NIACRE
N/ACRE
USED
TIME
110
124.3
0
2.73
339.33 9
MAR-J.UN_
-
50
96
0
2.731
-
262.08
SEP-AP R
38
147.06
0
2.731
401:4i4)��R-S_E_P 15
115
124.2
0.
0.641
79.488'
MAR-JUN
50
96
0
0.64
61.44
SEP-APR
38*
147.06-
_0____0.6'4
94.1184-APR-S'EP 15
115
124.2*
b'-
2_.3_3_'_2_8_Q.3"8"6
MAR-JUN
50'
96'
0
2.33
223.6e
§EP-Alilk
38
147.06
0
2.33
342.65 APR-SEP 15
60
71.4
0.
4.54
324.166
MAR-JUN
35
78.05
0
4.54
354.347
SEP-APR
17-
67.15-
_4.64
304.8 61 APR-SEP 15
60
71.4
0
1.53
109.242
MAR-JUN
35
78.05
0'
1.53
119.417
SEP-APR
17
67.15
0'
1.53
102.74!APR-SEP 15
3.8
190
0
0.92
174.8
MAR-OCT
1
50
0
0.92
46
SEP-MAY
4.7
235
0
2 . 921
686.2
MAR-OCT
1
50
0
2,921
146
SEP-MAY
4.7
235
0
1.81
423'
MAR-OCT
1
so
0
1.8
90
SEP-MAY
115
124.2
0
2.67
331.614
MAR-JUN
50
96
0
2.67
256.32
SEP-APR
iC
1 �7. 09-
0'
2.671_392.650'APR-S-EP-
I . 5
TOTALS:
3760-50
- Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow
summer annuals.
* Indicates a Crop Rotation
NOTE: The applicator is cautioned that P and K may be over applied while meeting the N
requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in
some eastern counties of NC to have a nutrient management plan that addresses all
nutrients. This plan only addresses Nitrogen.
APR 0 12019
ftwOublitY Page 2 of 10
Regional Oinrations Section
. TABLE 2: ACRES WITH AGREEMENT OR LONG TERM LEASE
11
(Agreement with adjacent landowners must be attached.)
(Required only if operator does not own adequate land. See required specifications 2.)
TRACT
FIELD
SOIL TYPE &CLASS-
CROP
YIELD
LBS AW COMM
ACMES
LBS AW APPLIC.
DETERMINING PHASE
CODE
NIACRE
N/ACRE
USED TIME
4433
1
BLKWf&�__0_-5%
3.8
190
0
4.431
841 *7 MAR-OCT
4433
1
BLA N 0 0-
T N -5 A
SG
1
50
0
4.431
221 � 5' SEP-MAY
1770
_1T70
5
BLANTON 0-5%
C
60'
70.8
0
2.21: t
156.468' MAR-JUN
5
131��NfON 0-5%
W
35'
78.05'
0
2.21 .
172.491' SEP-APR
1770
5
�_ - _'
BLANTON 0-5%
SI3
21
84'
0'
2.21
185.6,�A'PI4-§LP 1'5
1 7-70
6
BLANTO��-5%
w
35'
78.05'
0'
1.99
155.3
-i SEP-A*PR
177011
BLANTON 0-5%
C
60
70.8
0
1.99
140.892 MAR-JUN
1770
__fi�0_
6
BLA14t N 0- A
0
SB
21
82 5
.9
0
1 . 9 9
.0
165 71 APR-SEP 15
7
BLANTON 0-5%
C
60'
" 70.8-
0
2.45i
173.4"6'" MAR-JUN
1770
7
BLANTON 0-5%
w
35
78,05'
0
2.451'
191.223 SEP-APR
1770
7
BLANTON 0-5%
SB
21
82.95
0
2.45
203.228'APR-SEP 15
1770
8
-6LkWT_0N 0.5_9��_
C,
60*
70.8
0
2.98
210.984' MAR-JUN
1770
8
:BLANTON 0-5%
w
35
78.05
0
2.98
232.589 SEP-APR
1770
BLk1NTCN 0-59/.
SB
21'
82.95'
0'
2.66
247.191 APR-SEI5 15
TOTALS;
2180.48
Indicates that this field is being overseeded (i.e. interplanted)
or winter
annuals follow
summer
annuals.
* Indicates a Crop Rotation
* Acreage figures may exceed total acreage in field due to overseeding.
**Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial
nitrogen (COMM N) supplied.
The following legend explains the crop codes used in TABLES 1 and 2 above:
CROP CODE
CROP
UNITS
LISS N/UNIT
C
CORN
BUSHELS
1.25
BC __"__AYBRID
BERM bA -CONTROLLED
U - dWS -GRAZED
TONS
50
'�G
sMACL Gkk1N__6VERSEEDED
AC
50
_SB _§OigikNS
BUSHELS
4
_W_
HEAT__
Page 3 of 10
TOTALS FROM TABLES I AND 2
ACRES LBS AW
N USED
TABCE-1----- 20.08] 3.7'61
'TA6LE 2 14.061 2.180
TOTALS: 34.14 - " 5,941
AMOUNT OF N PRODUCED: 2,918
*** BALANCE -3,023
*** This number must be less than or equal to 0 in order to fully utilize the animal waste N
produced.
Acres show in each of the preceeding tables are considered to be the usable acres excluding
required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter
areas not receiving full application rates due to equipment limitations. Actual total acres in
the fields listed may, and most likely will be, more than the acres shown in the tables.
NOTE: The Waste Utilization Plan must contain provisions for periodic land application of
sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary
measures to prevent over application of nutrients or other elements. Your production facility
will produce approximately 462.08 pounds of plant available nitrogen (PAN) per year in the
sludge that will need to be removed on a periodic basis. This figure is PAN when
broadcasting the sludge. Please be aware that 2dditional2cres of land, as well special
equipment, may be needed when you remove this sludge.
See the attached map showing the fields to be used for the utilization of waste water.
APPLICATION OF WASTE BY IRRIGATION
The irrigation application rate should not exceed the intake rate of the soil at the time of
irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture
content, soil structure, soil texture, water droplet size, and organic solids. The application
amount should not exceed the available water holding capacity of the soil at the time of
irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the
crop.
Your facility is designed for 180 days of temporary storage and the temporary storage must
be removed on the average of once every 5.92 months. In no instance should the volume of
waste being stored in your structure be within 1.58 feet of the top of the dike.
If surface irrigation is the method of land application for this plan, it is the responsiblity of the
producer and irrigation designer to ensure that an irrigation system is installed to properly
irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and
amounts of Nitrogen shown in the tables may make this plan invalid.
The following table is provided as a guide for establishing application rates and amounts.
APPLICATION
APPLICATION
TRACT
FIELD
SOIL TYPE
CROP
RATE (in/hr)
AMT (inches)
�1770
*5, *6, *7, *8
BLANTON 0-5%
w
��770
*5, *6, *7, *8
BLANTON 0-5%
SB
0.75
*1
.1770
*5. *6, *7. *8
BLAN TON 0-5%
0
0.75
-4
WAGRAM 0 -6%
SG
0.60
.1
,4
3,4
WAGRAM 0-6%
B0
0.60
*1
,1,4433
-1'-2
BLANTON 0-5%
so
0.75
L44433
1,2
�BLANTON 0-5%
BC
0.75
*1
*10, *11. *12, *9
LUMBEE DRAINED
W
0.75
.1
4--
14440
*10, *11, *12, *9
D69BEHWINED
813
0.40
.1
�440-j
*10, *11, *12, *9
LUMBEE DRAINED
C
0.40
.1
-13.-14 - -
dkPLEY'0-5%-
w
0.40
*1
'4440
*13. *14
CHIPLEY 0-5%
SB
0.75
Page 4 of 10
jCHiPuEib-5% C 0.75
�440 *13, '14
This is the maximum application amount allowed for the soil assuming the amount of
nitrogen allowed for the crop is not over applied. In many situations, the application
amount shown cannot be applied because the nitrogen limitation. The maximum
application amount shown can be applied under optimum soil conditions.
Page 5 of 10
NARRATIVE OF OPERATION
Producer has option to plant a small grain cover behind soybeans and apply 50 lbs/N/acre
and this cover crop must be harvested.
Page 6 of 10
PLANS & SPECIFICATIONS
1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade�
conveyances, direct application, or direct discharge during operation or land application. Any
discharge of waste which reaches surface water is prohibited. Illegal discharges are subject
to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every
day the discharge -continues.
2. The Field Office must have documentation in the design folder that the producer either
owns or has long term access to adequate land to properly dispose of waste. If the producer
does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy
of a written agreement with a landowner who is within a reasonable proximity, allowing
him/her the use of the land for waste application for the life expectancy of the production
facility. It is the responsibility of the owner of the facility.to secure an update of the Waste
Utilization Plan when there is a change in the operation, increase in the number of animals,
method of utilization, or available land.
3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic
crop yields based on soil type, available moisture, historical data, climate conditions, and
level of management, unless there are regulations that restrict the rate of application for
other nutrients.
4. Animal waste may be applied to land that has a Resource Management System (RMS) or
an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no
greater than 10 tons per acre per year and appropriate filter strips will be used where runoff
leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See
FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers).
5. Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6, When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland, When applied to conservation tilled crops or grassland, the
waste may be broadcast provided the application does not occur during a season prone to
flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference -
Environment file for guidance.)
*7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that
runoff does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No ponding should occur in order to control conditions
conducive to odor or flies and to provide uniformity of application.
8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
9. Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would inhibit growth.
10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with
a high potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall
not be applied more than 30 days prior to planting of a crop on bare soil.
11. Any new swine facility sited on or after October 1, 1995 shall comply with the following:
the outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential property boundary
and from anv oerennial stream or river (other that an irriaetion ditch or canal. Animal waste
Page 7 of 10
other than swine waste from facilities sited on or after October 1, 1995), shall not be applied
closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips)
12. Animal waste shall not be applied closer than 100 feet to wells.
13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those
owned by the landownwer.
14. Waste shall be applied in a manner not to reach other property and public right - of ways.
15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by
discharge or by over -spraying. Animal waste may be applied to prior converted croplands
provided they have been approved as a land application site by a "technical specialist".
Animal waste should not be applied on grassed waterways that discharge directly into water
courses, except when applied at agronomic rates and the application causes no runoff or
drift from the site.
*16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc.,
shall not be discharged into the animal waste management system.
*17. A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be
provided for these areas and shall be fenced, as necessary, to protect the vegetation,
Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where
considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms
and structures should be inspected regularly for evidence of erosion, leakage or discharge.
*18. If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "closure plan" which will eliminate the
possibility of an illegal discharge, pollution and erosion,
*19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be
kept on site.
20. Animal waste can be used in a rotation that includes vegetables and other crops for
direct human consumption. However, if animal waste is used on crops for direct human
consumption, it should only be applied as a preemergence with no other applications of
animal waste during the crop season.
*21. Highly visible markers shall be installed to mark the top and bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to mark
the maximum storage volume fpr waste storage ponds.
22. Waste shall be tested within 60 days of utilization and soil shall be tested at least
annually at crop sites where waste products are applied. Nitrogen shall be the rate -
determining element. Zinc and copper levels in the soils shall be monitored and alternative
crop sites shall be used when these metals approach excessive levels. pH shall be adjusted
for optimum crop production amd maintained. Soil and waste analysis records shall be kept
for five (5) years. Poultry dry waste application records shall be maintained for three (3)
years, Waste application records for all other waste shall be maintained for five (5) years.
23. Dead animals will be disposed of in a manner that meets North Carolina Department of
Agriculture regulations.
* Liquid Systems Page 8 of 10
. NAME OF FARM: Underwood Farms 82-37
OWNER I MANAGER AGREEMENT
I (we) understand and will follow and implement the specifications and the operation and
maintenance precedures estalished in the approved animal waste utilization plan for the farm
named above. I (we) know that any expansion to the existing design capacity of the waste
treatment and/or storage system or construction of new facilities will require a new utilization
plan and a new certification to be submitted to DEM before the new animals are stocked.
I (we) understand that I must own or have acces to equipment, primarily irrigation equipment,
to land apply the animal waste described in this waste utilization plan. This equipment must
be available at the appropriate pumping time such that no discharge occurs from the lagoon
in a 25-year 1 -day storm event. I also certify that the waste will be applied on the land
according to this plan at the appropriate times and at rates that no runoff occurs.
NAME OF FACILITY OWNE , Underwood Farms
.0
SIGNATURE. DATE
frol��
NAME OF MANAGER (if different from owner):
please print
SIGNATURE: DATE:
NAME OF TECHNICAL SPECIALIST: Curtis Barwick
AFFILIATION: Barwick Ag Services
ADDRESS (AGENCY): 103 Country Club Circle
Clinton, NC 28328
(91 385 000
SIGNATURE: DATE:
Page 10 of 10
fX,
. , 'I- . " �� 1�� ,
kAj
�P.5� IA4
it,
iij,
P'� ,
O"M
;EiLl I"
"kj
7j
. o",
�4.
AMR
4!oj
p
1,4
tr
IV
t A
lf4 41 ill
M. 4',
JP
kkk
le
J..f,
"IX
auurce
Swine Farm Waste Management Od,6r Clntrol Checklist
BMPs to Minimilzei Odor
Mirmstead 0 Swine production er -Vcgetativeor'woodcd buffers; cc Specinc Practices
0" Recommended best . management practices;
00"Good judgment and common sen's*e
Animal body surfaces o Dirty ipanure-coveredanimal Ffloors.
collection pits
Wet manure-covercd, floors
40 urine;
Partial microbial criecomposition
0" S-folled floors;
Gle"W"'aterers loc'
ated over slotted floors;
0 Feeders at high end of solid floors;
a _1�c manure buildup from floors,
0' U�Orfloor ventifation for'drying
Frcquc ' nt manitre removal by flush, pit recharge.
or scrape;
Uiderfloor v'chlifallon
Ventilation exhaust fans Volatile ef Fan maintenance;
gases;
Dust
71��Icicnl air movement
surjaces. a Dust
Or� Waslidown between groti.ps.of animals;
6 Feed'additives-,
Cl Ye,<.(ek covers;
C;r Feed -delivery downspout extenders to feeder
Flush tanks
Agitation of-recycicd lagoon
13
covers
Flush lank vers;
liquid while tanks are filling
P
Extend rill Ries to near b6tiom oftan'ks with
t -siphon vents
Flush alleys'
-Agitation during wastdwaicr
(3
Underfloor flush will; undcrfloor vicnlilalion
conveyance
Pit recharge points
Agitation of recycled lagoon
13
Extend recharge lines to-ndar bottom of pits
liquid while pits are rifling
willi and-sipho' ve*
n fits
'Lift stations
Agitation during tu ' mp lank
11
Sump. -lank covers
filling and drk.w.down
Outside drain collection Agitation during wastewater -
0 Box c'
dr.ju'n'ctioa boxes cony . eyance pvcr3
AMOC - Noiimber' It, 1906, Pagd.3
Source Cause xjMPs to Minimize. Odor Site Speciric Practices
Standidg water around * Improper drainage; rade and landscape such that water drains
facilities 0 Microbial decomposition of away from facilities
organic' matter
Won trocked onto 0 Poorly mainthined access rouids: 2r Farm access road maint
Cnance
public roids from farm
access
Additional Infonnation
Swine -'Manure Mana'ement;. 0200 Rule/BMP Packet
9
Swine Production Farm Potential Odor.gources and Remedies; EBAE Fact Sheet
Swine"Production Facility Manure Management: Pit Recharge - Lagoon Trcailment; EBAE 128-88
Swine Production Facility Manure Management: ' Unddrfloor Flush - Lagoon Treatment'; -EBAE 129-88
Lagoon Design and. Managem�nt for Livestock'Manure Treatment and Storage ;. E-BAE 103-83
dalibraflon of Manure and Wastewater Application Eqiiipmcnt ; EBAE Faet Sheet.
Controlling Odors from Swine Buildings; PIH-33
Envirahmental Assurance Program ; NPPC Manual
Options f6f Managing Odor; 'a report -from the Swine Odor Task Force
Nuilanice Concerns in Animal Manure Management: Odors and Plies; PRO] 07, 1995 Conference Proceedings
AMOC- - Novern ber 11, 1996, Page 5
Available From :
NCSU, County Extension Center
NCSU-BAE
NCSU-BAE
NCSU-BAE
NCSU-BAE
NCSU - BAE
NCSU - Swine Extension
NC Pork Producers Assoc
NCSU Agri Communications
Florida Cooperative Extension
Insect Control Checklist for Animal Operations
Source Cause BMP:s to Control Insects Site Specific Practices
Liquid Systems
Flush Gutters Accumulation of solids a—lliih system is designed and operated
sufficiently to remove accumulated solids from
gutters as designed.
&-'Ke—t�ove bridging of accumulated solids at
discharge
Lagoons and Pits Crusted Solids 43-1ga-intain lagoons, settling basins and pits where
pest breeding is apparent to minimize the
crusting of solids to a depth of no more than 6 -
9 inches over more than 30% of surface.
fin—essivc Vegetative Decaying vegetation -Er—Maintain vegetative control along banks of
Growth lagoons and other impoundments to prevent
ccumulation of decaying vegetative matter
long wateesedge on impounchnent!s perimeter.
Dry Systems
Feeders Feed Spillage 4PI—Ve-sign, operate and maintain feed systems (e.g.,
bunkers and troughs) to minimize the
accumulation of decaying wastage.
-fT_71ean up spillage on a routine basis (e.g., 7 - 10
day interval during summer; 15-30 day interval
during winter).
Feed Storage Accumulations of feed residues JR—R-e-44-ce moisture accumulation witfiin and
around immediate perimeter of feed storage
areas by insuring drainage away from site
and/or providing adequate containment (e.g.,
covered bin for breweesgrainandsimilar high
moisture grain products).
0 Inspect for and remove or break up accumulated
solids in filter strips around feed storage as
needed.
AMIC -November 11, 1996, Page I
�� -,a F)
SAMPSON COUNTY
EMERGENCY ACTION PLAN
DIVISION OF WATER QUALITY (DWQ)
EMERGENCY MANAGEMENT SERVICES (EMS)
SOIL & WATER CONSERVATION Dfl3TRICT (SWCD)
NATURAL RESOURCES CONSERVATION SERVICE (NRCS)
COOPERATIVE EXTENSION SERVICE (CES)
910-486-1541
910-592-8996
910-592-7963
910-592-7963
910-592-7161
This plan will be implemented in the event that wastes from your
operation are leaking, overflowing, or running off the site. You should
NOT wait until wastes reach surface waters or leave your property to
consider that you have a problem. You should make every effort to
ensure that this does not happen. This plan should be posted in an
accessible location for all employees at the facility. The following
are some action items you should take.
1. Stop the release of wastes. Depending on the situation, this may
or may not be possible. Suggested responses to problems are
listed below:
A. Lagoon overflow -possible solutions are:
a. Add soil to berm to increase elevation of dam, any
permanent alteration of the dam should be approved by a
qualified technical specialist.
b. Pump wastes to field at an acceptable rate.
c. Stop�all additional flow to the lagoon -hold waste in the
house if possible.
d. Call a pumping contractor.
e. Make sure no surface water is entering lagoon.
B. Runoff from waste application field -action include:
a. Immediately stop waste application.
b. Create a temporary diversion or berm to contain the
waste.
c. Incorporate waste to reduce further runoff.
d. Evaluate and eliminate the reason(s) that caused the
runoff.
e. Evaluate the application rates for the fields where
runoff occurred.
C. Leakage from the waste pipes and sprinklers -action include:
a. Stop recycle (flushing system) pump.
b. Stop irrigation pump.
c. Close valves to eliminate further discharge.
e. Repair all leaks prior to restarting pumps.
D. Leakage from flush system, houses, solids separators -actions
include:
a. Stop recycle (flushing system) pump.
b. Stop irrigation pump.
c. Make sure no siphon effect has been created.
d. Stop all flows in the house, flush systems, or solid
separators.
e. Repair all leaks prior to restarting pumps.
E. Leakage from base or sidewall of lagoon. Often this is seepage
as opposed to flowing leaks-possibie action:
a. Dig a small sump or ditch to catch all seepage. put in a
submersible pump, and pump back into lagoon.
b. If holes are caused by burrowing animals, trap or remove
animals and fill holes and compact with a clay type soil.
c. Have a professional evaluate the condition of the side
walls and the lagoon bottom as soon as possible.
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach any surface waters?
b. Approximately how much was released and for what
duration",
c. Any damage noted, such as employee injury, fish kills, or
property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface
waters?
f. Could a future rain event cause the spill to reach
surface waters?
g. Are potable water wells in danger (either on or off of
the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours, call your DWO (Division of
Water Quality) regional office, at 910-486-1541, after
hours, emergency number:919-733-3942. Your phone call
should include: YOUR NAME, FACILITY, TELEPHONE NUMBER,
THE DETAILS OF THE INCIDENT FROM ITEM #2 ABOVE, THE
EXACT LOCATION OF THE FACILITY, AND -THE LOCATION OR
DIRECTION OF MOVEMENT OF THE SPILL, WEATHER AND WIND
CONDITIONS. THE CORRECTIVE MEASURES THAT HAVE BEEN UNDER
TAKEN, AND THE SERIOUSNESS OF THE SITUATION.
b. If spill leaves property or enters Surface waters, call
local (EMS) Emergency Management Services at
910-592-8996.
c. Instruct EMS to contact local Health Department.
d. Contact local SAMPSON Soil and Water Conservation
District (SWCD), Natural Resources Conservation Service
(NRCS) office at 910-592-7963 and Cooperative Extension
Service (CES) at 910-592-7161 for advice/technical
assistance.
4. If none of the above works call V11 or the sheriffs Department
and explain your problem to them and ask that person to contact
the proper agencies for you.
5. Cbntact the contractor of your choice to begin re'pair of the
problem to minimize off -site damage.
a. Contractor=- Name:
b. Contractors Address:
c. Contractors Phone: 5 1 7'-!� 717
6. Contact the technical specialist who certified the lagoon (NRCS,
Con5ulting Engineer, etc.)
a.'Name; t 44,4u
b. Phone:
7. Implement procedures as advised by DWQ and technical assistance
agencies to rectify,the damage, repair the system, and reassess
the waste management plan to keep problems with release of wastes
from happening -again.
S. If you are a contract swine grower associated with a swine
company integrator, contact the company representative at
1-910-592-5771
�1) 04- QVI. Sion—NOVember26, 2028
MOrtality Management Methods
Wh6l, s,--1e;7r ind'cate which method6s) wfll be imPlemented.
Met�00,;c�!�g Multiple methods indicate
then thOse-fisted must be .9 a Prir"aIY versus secondaty Option.
ppro ved by ti7e St&te Veterinarlan.
Primary Secondary Routme Mortality
'.1"ee feet beneath the SUrfaCe Of the ground within 24 hours of knowledge of animal
7- he burial must be at least 300 feet from any flowingstream or public body of water
(G.S. � 0-�:-403). The bottom of the burial Pit should be at least one foot abov the seasonal
�Ii '- %"F` 7',ab!e. Attach burial location map and plan,
andfil; at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
11 B '
13, -027'.
at a rendering plant licensed under G,S, 106-168,7.
COr"Olete Incineration according to 02 NCAC 52C .0 102.
A cOMPOsting system approved and permitted by the NC Department of Agriculture & Con-
surner Services Veterinary Division (attach copy of permit). if compost I
add'�Ional requirements must be met and a permit is required from NC 8 distributed off -farm,
DEQ.
In, the case of dead Poultry only, placing in a disposal pit of a size and design approved by the
NC Depar:ment of Agriculture & Consumer Services (G.S. 106-649.70).
Any -ne—od which, in the Professional opinion of the State Veterinarian, would make possible
the s' iiva'�e of part of a dead animal's value without endangering human or animal health.
(Writte- a;)provai by the State Veterinarian must be attached),
13 Mass Mortality Plan
Mass . mortality p:ans are required for farms covered by an NPIDES Permit. These plans are
also raccrr mended for all animal operations. This plan outlines farm -specific mortality man-
agerren' methods to be used for mass mortality. The NCDA&CS Veterinary Division sup�
Ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is Part of the
facility's CAWMP and is activated
rumbers of dead animals exceed normal mortality rates as
erinarlan. specified by the State
• Buria! Must be done in accordance with NC General Statutes and NCDA&CS Veterinary
D;vision regulations and guidance.
• Mass burial sites are subject to additional permit conditions (refer to facility,$ animal
waste management -system permit),
", the event of imminent threat of a disease emergency, the State Veterinarian may enact
,abuditionall temporary prooe u s or measures for disposal according to G.S. 106-399.4.
Signat��e of Farm Owner/Manager Date
Sign@ture of Technical Specialist Date
� ierator:WESLEY HERRING
County:
SAMPSON
Date:
5/11/94
Distance to nearest residence (other
than
owner):
1450.0
feet
1. AVERAGE LIVE WEIGHT
(ALW)
0 sows (farrow to
finish)
x
1417
lbs. =
0
ibs
0 sows (farrow to
feeder)
x
522
lbs. =
0
lbs
0 head (finishing
only)
x
135
lbs. =
0
lbs
0 sows (farrow to
wean)
x
433
lbs. =
0
lb�
6080 head (wean to feeder)
x
30
lbs. =
182400
lbs
Describe other :
:
0
'
182400
lbs
Total Average
Live Weight =
-
2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 182400 lbs. ALW x Treatment Volume(CFVlb. AL�
Treatment Volume(CF)/lb. ALW = 1 CT/lb. ALW
Volume = 182400 cubic feet
3. STORAGE VOLUME FOR SLUDGE ACCUMULATION
SLUDGE ACCUMULATION NOT COMPUTED
Volume = 0.0 cubic feet AT OWNERS REQUEST. REMOVE SLUDGE
AS NEEDED.
4. TOTAL DESIGNED VOLUME
Inside top length (feet) ---------------------
Inside top width (feet) ----------------------
Top of dike elevation (feet) -----------------
Bottom of lagoon elevation (feet) ------------
Freeboard (feet) -----------------------------
Side slopes (inside lagoon)------------------
^
Total design volume using prismoidal formula
SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH
3.0 3.0 3.0 3.0 244.0
250.0
160.0
45.0
33.A
1.0
3.0
WIDTH DEPTH
154.0 11.;
AREA OF
TOP
LENGTH
* WIDTH =
244.0
154.0
37576
(AREA
OF
TOP)
AREA OF
BOTTOM
LENGTH
* WIDTH =
178.0
88.0
15664
(AREA
OF
BOTTOM)
AREA OF
MIDSECTION
LENGTH
* WIDTH * 4
211.0
121.0
102124
(AREA
OF
MIDSECTION * A)
CU. FT.
= [AREA TOP +
(4*AREA MIDSECTION)
+
AREA BOTTOM] * DEFTH/�
�--°
37576.0
102124.0
15664.0 1'
Total Designed Volume Available = 284834 CU. FT.
/
/
IN TEMPORARY STORAGE REQUIRED
DRAINAGE AREA:
Lagoon (top of dike)
Length * Width =
250.0 160.0 40000.0 square feet
Buildings (roof and lot water)
0.0 square feet
Describe this area.
TOTAL DA 40000.0 square feet
Design temporary storage period to be
180 days.
5H.
Volum= of waste produced
Feces & urine production in gal./day per
135 lb. ALW 1.37
Volume = 182400 lbs. ALW/135 lbs. ALW *
1.37 gal/day 180 days
Volume = 333184 gals. or 44543.3 cubic
feet
^~^_WB.
Volume of wash water
This is the amount of fresh water used for
washing floors or volume
of fresh water used for a flush system.
Flush systems that recirculat
the lagoon water are accounted for in 5A.
Volume = 0.0 gallons/day * ^
180 days storage/7.48 gallon�
per CF
Volume = 0.0 cubic feet
5C.
Volume of rainfall in excess of evaporation
Use period of time when rainfall eNceeds
evaporation by largest amount
180 days excess rainfall =
7.0 inches
Volume = 7.0 in * DA / 12 inches per
foot
Volume = 23333.3 cubic feet
~—ijD. Volume of 25 year - 24 hour storm
Volume = 7.0 inches / 12 inches per foot * DA
Volume = 23333.3 cubic feet
TOTAL REQUIRED TEMPORARY STORAGE
5A. 44543 cubic feet
5B. 0 cubic feet
5C. 23333 cubic feet��-r"^�
5D. 23333 cubic feetz��"~^-
TOTAL 91210 cubic feet
6. SUMMARY
Temporary storage period====================>
180
days
Rainfall in excess of evaporation===========>
7.0
inches
25 year - 24 hour rainfall==================>
7.0
inches"V
Freeboard===================================>
1.0
feet. -ye,
Side slopes=================================>
3.0
: 1
Inside top length===========================>
250.0
feet
~~ Inside top width============================>
160.0
feet
Top of dike eIevation�======================>
45.0
feet
Bottom of lagoon elevation==================>
33.0
feet
Total required volume=======================)
273610
cu. ft.
*
Actual design volume========================>
284834
cu. ft.
*
Seasonal high watertable elevation (SHWT)===>
22.6
feet
��.
S
Stop pumping e�ev.===============�==========>
41.2
-�
feet ����`��`'^
Must be > or = to the SHWT e1ev!==========>
32.6
feet
Must be > or = to min. req. treatment el.=>
39.0
+eet
Required minimum treatment volume===========>
182400
cu. ft.
Volume at stop pumping elevation============>
188719
cu. ft.
Start pumping
43.3
feet
*
Must be at bottom of freeboard & 25yr. rainfall
Actual volume less 25 yr.- 24 hr. rainfall==>
261501
cu. ft.
Volume at start pumping elevation===========>
259112
cu. ft.
Required volume to be pumped================>
67877
cu. ft'
*
Actual volume planned to be pumped==========>
70393
cu. ft.
*
Min, thickness of soil liner when required==>
1.8
feet
7. DESIGNED BY:*9JK44..' APPROVED BY:
, -^DATE:
''Win-
DATE:
NOTE: SEE ATTACHED WASTE UTILIZATION PLAN
COMMENTS:
OPERATION & MAINTENANCE PLAN
Proper lagoon liquid management should be a year-round priority. It is especially
Important to manage levels so that you do not have problems during extended rainy and
wet periods,
Maximum storage capacity should be available in the lagoon for periods when the
receiving crop is dormant (such as wintertime for bermudagrags) or when there are
extended rainy spells such as the thunderstorm season in the summertime, This means
that at the first signs of plant growth in the later winter/early spring, irrigation according to
a farm waste management plan should be done whenever the land is dry enough to
receive lagoon liquid. This will make storage space available in the lagoon for future wet
periods, In the late summer/early fall the lagoon should be pumped down to the low
marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste
utilization plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to
irrigate does not leave room for storing excess water during extended wet periods.
Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of
state law and subject to penalty action.
The -routine maintenance of a lagoon involves the following
Maintenance of a vegetative cover for the dam.
Fescue or common bermudagrass are the most common vegetative
covers. The vegetation should be fertilized each year, if needed, to
maintain a vigorous stand. The amount of fertilizer applied should be
based on a soils test, but in the event that it is not practical to obtain
a soils test each year, the lagoon embankment and surrounding areas
should be fertilized with 800 pounds per acre of 10- 10- 10, or
equivalent.
Brush and trees on the embankment must be controlled. This may be
done by mowing, spraying, grazing, chopping, or a combination of
these practices. This should be done at least once a year and
possibly twice in years that weather conditions are favorable for
heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter
the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating
the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of
the lagoon and at least monthly and after major rainfall and storm events. Items to be
checked should include, as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ... look for-
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
Lagoon surface --- look for-
1. undesirable vegetative growth
2. floating or lodged debris
Embankment --- look for:
I . setflement, cracking, or "jug" holes
2. side slope stability --- slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack of vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a threat
of a waste discharge, However, a permanent solution should be.reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be- conducted unless
recommended by an appropriate technical expert.
Transfer Pumps --- check for proper operation of:
I . recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need or repair or
replacement.
NOTE; Pumping systems should be inspected and operated frequently enough so that you
are not completely "surpri, by equipment failure. You should perform your pumping
tj
system maintenance at a Z'when your lagoon is at its low level. This will allow some
safety time should major repairs be required. Having a nearly full lagoon is not the time
to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full,
your neighbor's lagoon is full also. You should consider maintaining an inventory of spare
parts or pumps.
Surface water diversion features are designed to carry aU surface
drainage waters (such as rainfall runoff, roof drainage, gutter outlets,
and parking lot runoff) away from your lagoon and other waste
treatment or storage structures. The only water that should be
coming from your lagoon is that which comes from your flushing
(washing) system pipes and the rainfall that hits the lagoon directly.
You should inspect your diversion system for the following:
I . adequate vegetation
2. diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise -with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an inflow problem from a surface water diversion or there may be seepage into the
lagoon from the surrounding land.
Lagoon Operation
Startup:
Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before
waste loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the
end of the pipe to discharge near the bottom of the lagoon during initial
filling or another means of slowing the incoming water to avoid erosion of
the lining.
4. When possible, begin loading new lagoons in the spring to maximize
bacterial establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon
liquid volume. This seeding should occour at least two weeks prior to the
addition of wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below
7.0, add agricultural lime at the rate of I pound per 1000 cubic feet of
lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid
pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate
biological activity, Consultation with a technical specWist is recommended
if these conditions occur for prolonged periods, especially during the warm
season.
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily are
optimum for treatment, Pit recharge systems, in which one or more buildings are drained
and recharged each day, also work well.
Practice water conservation-- minimize building water usage and
spillage from leaking waterers, broken pipes and washdown through
proper maintenance and water conservation.
Minimize feed wastage and spillage by keeping feeders adjusted. This
will reduce the amount of solids entering the lagoon
Management:
Maintain lagoon liquid level between the permanent storage level and
the full temporary storage level.
Place visible markers or stakes on the lagoon bank to show the
minimum liquid level and the maximum liquid lever (Figure 2-1).
Stan irrigating at the earliest possible date in the spring based on
nutrient requirements and soil moisture so that temporary storage
will be maximized for the summer thunderstorm season. Similarly,
irrigate in the late summer/early fall to provide maximum lagoon
storage for the winter.
The lagoon liquid level should never be closer than I foot to the lowest
point of the dam or embankment.
Do not pump the lagoon liquid level lower that the permanent storage
level unless you are removing sludge.
Locate float pump intakes approximately 18 inches underneath the liquid
surface and as far away from the drainpipe inlets as possible.
Prevent additions of bedding materials, long-stemmed foFage or vegetation,
molded feed, plastic syringes, or other foreign materials into the lagoon.
Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
Maintain strict vegetation, rodent, and varmint control near lagoon edges.
Do not allow trees or large bushes to grow on lagoon dam or embankment.
Remove sludge from the lagoon either when the sludge storage capacity is
full or before it fills 50 percent of the permanent storage volume.
If animal production is to be terminated, the owner is responsible for
obtaining and implementing a closure plan to eliminate the possibility of a
pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
Proper lago-on sizing,
mechanical solids separation of flushed waste,
gravity settli f flushed waste solids in an appropriately designed basin, or
minimizing flowastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
have more nutrients,
have more odor, and
require more land to properly use the nutrients.
Removal techniques:
Hire a custom applicator.
Mix the sludge and lagoon liquid with a chopper -agitator impeller
pump through large -bore sprinkler irrigation- s-ystem- onto nearby cropland;
and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; mix remaining sludge; pump into liquid sludge applicator; haul
and spread onto cropland or foragela,nd; and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; dredge sludge from lagoon with dragline or sludge barge; berm
an area beside lagoon to receive the sludge so that liquids can drain back
into lagoon; allow sludge to dewater; haul and spread with manure spreader
onto cropland or forageland; and soil incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage. Close
attention by the pumper or drag -line operator will ensure that the lagoon liner remains
intact. If you see soil material or the synthetic liner material being disturbed, you should
stop the activity immediately and not resume until you are sure that the sludge can be
removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus
and metal levels, as indicated by a soil test, and incorporated to reduce the chance of
erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it
should be applied only at rates equal to the crop removal of phosphorus. As with other
wastes, always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure. Types
of failures include leakage through the bottom or sides, overtopping, and breach of the
dam, Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
Modification of the lagoon structure --- an example is the placement of a pipe
in the dam without proper design and construction. (Consult an expert in
lagoon design before placing any pipes in dams.)
Lagoon liquid levels ---high levels are a safety risk.
Failure to inspect and maintain the dam.
Excess surface water flowing into the lagoon.
Liner integrity --- protect from inlet pipe scouring, damage during sludge
removal, or rupture from lowering lagoon liquid level below groundwater
table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge
of wastewater and possible dam failure.