HomeMy WebLinkAbout710100_Permit Renewal Application 2019_20190410State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at (east 180 days prior to their expiration date. Therefore, all applications
must be received by the Division of Water Resources by no later than April 3, 2019.
Please do not leave any question unanswered. Please verify all information and retake any necessary corrections below.
Application must he signed and dated by the Permittee.
I. Farm Number: 71-0100 Certificate Of Coverage Number: AWS7I0I00
2. Facility Name: Vincent C. King K-9
3. Landowner's Name (same as on the Waste Management Plan): Vincent Craig King
4. Landowner's Mailing Address: 126 Garland King Rd
City: Teachev
Telephone Number:
910-285-2692 Ext.
5. Facility's Physical Address: 6486 NC Hwy I I
State: NC Zip: 28464-9736
E-mail:
City: Willard State: NC Zip: 28478
6. County where Facility is located: Fender
7. Farm Manager's Name (if different from Landowner): Craig King, Jr
8. Farm Manager's telephone number (include area code): QwQs-11:)20_r:,-r I IO —.'7 i_ 1 f -{
9. Integrator's Name (if there is not an Integrator. write "None"): Murphv-Brown LLC
la Operator Name (OIC): Vincent Craig King Jr.
Lessee's Name (if there is not a Lessee, write "None"):
12. Indicate animal operation type and number:
Current Permit:
Operation Types:
Operations Type
Swine - Feeder to Finish
Swine Cattle
Wean to Finish Dairy Calf
Wean to Feeder Dairy Heifer
Farrow to Finish Milk Cow
eerier to Finish Dry Cow
Farrow to Wean Beef Stocker Calf
Farrow to Feeder Beet' Feeder
Boar/Stud Beef Broad Cow Wet Poultry
Gilts Other Non Laying Pullet
Other Layers
Phone No.: 910-285-2692 OIC #: 990014
Allowable Count
Dry Poultry Other ivnes
Non Laying Chickens Horses - Horses
Laying Chickens Horses - Other
Pullets Sheep - Sheep
Turkeys Sheep - Other
Turkey Pullet
13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary
corrections and provide missing data.)
Structure
Name
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
Feet)
Estimated
Surface Area
(Square Feet)
Design Freeboard
"Redline"
(inches)
I
/Pf
efa
�(yCubic
0 p 5T
/ L(i
26.00
Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application
as required by NC General Statutes 143-215.10C(d) to the address below.
The CAWMP must include the following components:
I. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection. etc.)
b. A mapof every field used for land application (for example: irrigation map)
c. The soil 'series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f. The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2. A site map/schematic
3. Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and
complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to
your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, waste transfers, etc.)
As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the
application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. l understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement,
representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C.
Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for
a similar offense.)
Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a
corporation. ignature should be by a principal executiiveeoofficer of the corporation):
Name: �f ) ri Title: (%(j/t).
Signature: ,1 Date:
Name: Title:
Signature: Date:
Name: Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
E-mail: 20I9PcrmitRenewalr ncdenr.gov
FORM: RENEWAL -STATE GENERAL 02/2019
ROY COOPER 1
Governor
MICHAEL S. REGAN -�
Secretary 44,pF
LINDA CULPEPPER NORTH CAROLINA
Director Environmental Quality
February 27, 2019
Vincent Craig King
Vincent C. King K-9
126 Garland King Rd
Teachey, NC 28464-9736
Subject: Application for Renewal of Coverage for Expiring State General Permit
Dear Pennittee:
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits,
tvhich expire on September 30. 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available
at httos://deq.nc.gov/about/divisions/water-resources/water-quality-regional-operations/afo or by writing or calling:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh. North Carolina 27699-1636
Telephone number: (919) 707-9100
In order to assure your continued coverage under the State Non -Discharge General Permits, you must submit an application for
permit coverage to the Division. Enclosed you will find a "Request for Certificate of Coverage Facility Currently Covered by an
Expiring State Non -Discharge General Permit." The application form must be completed. signed and returned by April 3, 2019.
Please note that you must include one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with the
completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal
application form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could
result in assessments of civil penalties of up to $25,000 per day.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel
free to contact the Animal Feeding Operations Branch staff at 919-707-9100.
Enclosures
cc (w/o enclosures):
Sincerely.
Jon Risgaard, Section Chief
Animal Feeding Operations and Groundwater Section
Wilmington Regional Office. Water Quality Regional Operations Section
Pender County Soil and Water Conservation District
AFOG Section Central Files - AWS710100
Murphy -Brown I.LC
North Caro:naDepartment ofEnv.ronmenta:Qua' ty ( Chysion of WaterRasouro s
512 N. S. sbury St. 11636 Ma.Servos Center ( Ra egh., North Cato'.ina 27699-1636
919.707.9000
Version --November 26, 2018
Mortality Management Methods
Indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
El Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table. Attach burial location map and plan.
❑ Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
13B .0200.
Rendering at a rendering plant licensed under G.S. 106-168.7.
DEl Complete incineration according to 02 NCAC 52C .0102.
El El A composting system approved and permitted by the NC Department of Agriculture & Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm,
additional requirements must be met and a permit is required from NC DEQ.
El fl in the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture & Consumer Services (G.S. 106-549.70).
D ❑ Any method which, in the professional opinion of the State Veterinarian, would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm -specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency, the State Veterinarian may enact
dditional temporary procedures or measures for disposal according to G.S. 106-399.4.
./a
ii--/-//
Signatur of Farm Owner/Manager Date
L—N01,.. U.) . \c,-• 3 - D..71 - 1.6'N
Signature of Technical Specialist Date
j
PRODUCER: Craig King K-9 Finisher
LOCATION: S.R. 1313; Pender County
TELEPHONE: 910-285-2692
TYPE OPERATION: Feeder - Finish
NUMBER OF ANIMALS: 1440
(Design Capacity)
The waste from your animal facility must be land applied at a specified rate to prevent pollution
of surface and/or groundwater. The plant nutrients in the animal waste should be used to
reduce the amount of commercial fertilizer required for the crops in the fields where the waste
is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient Waste
should be analyzed before each application cycle. Annual soil tests are strongly encouraged
so that all plant nutrients can be balanced for realistic yields of the crop to be grown.
Several factors are important in implementing your waste utilization plan in order to maximize
the fertilizer value of the waste and to ensure that it is applied in an environmentally safe
manner. Always apply waste based on the needs of the crop to be grown and the nutrient
content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are
important as they have different infiltration rates, leaching potentials, cation exchange
capacities, and available water holding capacities. Normally waste shall not be applied to land
eroding at greater than 5 tons per acre per year. With special precautions, waste may be
applied to land eroding at up to 10 tons per year. Do not apply waste on saturated soils, when
it is raining, or when the surface is frozen. Either of these conditions may result in runoff to
surface waters which is not allowed under DEM regulations. Wind conditions should also be
considered to avoid drift and downwind odor problems. To maximize the value of nutrients for
crop production and to reduce the potential for pollution, the waste should be applied to a
growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the
waste or disking will conserve nutrients and reduce odor problems.
The estimated acres needed to apply the animal waste is based on typical nutrient content for
this type of facility. Acreage requirements should be based on the waste analysis report from
your waste management facility. Attached you will find information on proper sampling
techniques, preparation, and transfer of waste samples to the lab for analysis.
This waste utilization plan, if carried out, meets the requirements for compliance with 15A
NCAC 2H.0217 adopted by the Environmental Management Commission.
Page 1
`C o ��r. I� III�iiLlr.�i111 �U���l IO1-r
Amount of Waste Produced Per Year (gallons. ft. tons. etc.)
1,440 animals X 12
(tons) waste/animal/year = 2,736 (tons) waste/year.
Amount of Plant Available Nitrogen (PAN) Produced Per Year
1,440 animals X 2.$
Guide Std. 633)
lbs. PAN/animal/year = 3,312 lbs. PAN/year. (PAN from N.C.
Tech
Applying the above amount of waste is a big job. You should plan time and have appropriate
equipment to apply the waste in a timely manner
The following acreage will be needed for waste application based on the crop to be grown and
surface application:
Table 1: ACRES OWNED BY PRODUCER
Tract
Field
No.
Soil
Type
Crop Lbs. N Acres Lbs. N Month of
Per Acre T^. 0 Utilized
Application
1,2,3
LS
Soybeans
152
6. 0
5502.4
Tate _ c -i-
1,2,3
LS
Corn
150
3 .20
5430
, 4.,,h _ _, r
1,2,3
LS
Cotton
96
. 0
3475.2
-(',,4„t _ SN�
** OPTIONAL**
0
Small Grain
50
36.20
1810
5ef-f_ — Apri
1i%e l'k>'L
0
0
0
0
0
0
0
Total 36.20 3,475.20
*This N is from animal waste only. If nutrients from other sources such as commercial fertilizer are
applied, they must be accounted for. N must be based on realistic yield expectation.
NOTE: The applicator is cautioned that P and K may be over applied while meeting the N
requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some
eastern counties of North Caroline to have a nutrient management plan that addresses all nutrients.
This plan only addresses Nitrogen.
Page 2
WASTE: UTILIZATION PLAN
Table 2: ACRES WITH AGREEMENT OR LONG TERM LEASE
(Agreement with adjacent landowner must be attached)
(Required only if operator does not own adequate land [see
Required Specification 2])
Tract Field Soil Crop Lbs. N Acres Lbs. N Month of
No. Type Per Acre" Utilized Application
" See footnote for Table 1.
Total
Totals from above Tables
Acres Lbs. N
Utilized
Table 1
Table 2
Total
Amount of N Produced
Surplus or Deficit
36.20
3,475
0.00
36.20
3,475
3,312
(163)
NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at
agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over
application of nutrient or other elements.
Page 3
See attached map showing the fields to be used for the utilization of waste water.
Application of Waste by Irrigation
Crop
Field
No.
Soil Type
Application
Rate (In/Hr)
Application
Amount (In.)
1,2,3
Ls
Row Crops
0.4
.5-1.0
THIS TABLE IS NOT NEEDED IF WASTE IS NOT BEING APPLIED BY IRRIGATION, HOWEVER A SIMILAR TABLE WILL
BE NEEDED FOR DRY LITTER OR SLURRY.
Your facility is designed for 180 days of temporary storage and the temporary storage must
be removed on the average of once every 6 MONTHS. In no instance should the volume of
waste being stored in your structure exceed Elevation *see lagoon design.
_Call the local Natural Resources Conservation Service (formerly Soil Conservation Service) or Soil
and Water Conservation District office after you receive the waste analysis report for assistance in
determining the amount per acre to apply and the proper application rate prior to applying the
waste.
Narrative of operation: Grower may plant any of the crops listed on the fields shown in a
given calender year. Nutrients applied to small grain may be deducted from the beginning
PAN balance of the following crop and disked in a green manure.
Page 4
�L Tf O1��l 11LJ i��
REQUIRED SPECIFICATIONS
1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade
conveyances, direct application, or direct discharge during operation or land application.
Any discharge of waste which reaches surface water is prohibited.
2 There must be documentation in the design folder that the producer either owns or has an
agreement for use of adequate land on which to properly apply the waste. If the producer
does not own adequate land to properly dispose of waste, he/she shall provide a copy of
an agreement with a landowner who is within a reasonable proximity, allowing him/her the
use of the land for waste application. It is the responsibility of the owner of the facility to
secure an update of the Waste Utilization Plan when there is a change in the operation,
increase in the number of animals, method of utilization, or available land.
3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop
yields based on soil type, available moisture, historical data, climatic conditions, and level
of management, unless there are regulations that restrict the rate of application for other
nutrients.
4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste
may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per
year providing grass filter strips are installed where runoff leaves the field. (See FOTG
Standard 393 - Filter Strip).
5 Odors can be reduced by injecting the waste or disking after waste application. Waste
should not be applied when there is danger of drift from the irrigation field.
6 When animal waste is to be applied on acres subject to flooding, it will be soil incorporated
on conventionally tilled cropland. When applied to conservation tilled crops or grassland,
the waste may be broadcast provided the application does not occur during a season
prone to flooding. (See 'Weather and Climate in North Carolina" for guidance.)
7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff
does not occur offsite or to surface waters and in a method which does not cause drift
from the site during application. No ponding should occur in order to control odor or flies.
8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the
surface is frozen.
Page 5
rriA
REQUIRED SPECIFICATIONS
(continued)
9 Animal waste shall be applied on actively growing crops in such a manner that the crop is
not covered with waste to a depth that would inhibit growth. The potential for salt damage
from animal waste should also be considered.
10 Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a
high potential for leaching. Waste nutrient loading rates on these soils should be held to a
minimum and a suitable winter cover crop planted to take up released nutrients. Waste
shall not be applied more than 30 days prior to planting of the crop or forages breaking
dormancy.
11 Any new swine facility sited on or after October 1, 1995 shall comply with the following:
The outer perimeter of the land area onto which waste is applied from a lagoon that is a
component of a swine farm shall be at least 50 feet from any residential property boundary
and from any perennial stream or river (other than an irrigation ditch or canal. Animal
waste other than swine waste from facilities sited on or after October 1, 1995), shall not be
applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips).
12 Animal waste shall not be applied closer than 100 feet to wells.
13 Animal waste shall not be applied closer than 200 feet of dwellings other than those
owned by the landowner.
14 Waste shall be applied in a manner not to reach other property and public right-of-ways.
15 Animal waste shall not be discharged into surface waters, drainageways, or wetlands by
discharge or by over -spraying. Animal waste may be applied to prior converted wetlands
provided they have been approved as a land application site by a "technical specialist".
Animal waste shall not be applied on grassed waterways that discharge directly into water
courses, and on other grassed waterways, waste shall be applied at agronomic rates in a
manner that courses no runoff or drift from the site.
16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall
not be discharged into the animal waste management system.
Page 6
h , 4:Niir1LIv21 \ ,firc,t�vl
REQUIRED SPECIFICATIONS
(continued)
17 A protective cover of appropriate vegetation will be established on all disturbed areas
(lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to
protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc.,
are limited to areas where considered appropriate. Lagoon areas should be kept mowed
and accessible. Berms and structures should be inspected regularly for evidence of
erosion, leakage or discharge.
18 If animal production at the facility is to be suspended or terminated, the owner is
responsible for obtaining and implementing a "closure plan" which will eliminate the
possibility of an illegal discharge, pollution and erosion.
19 Waste handling structures, piping pumps, reels, etc., should be inspected on a regular
basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be
kept on site.
20 Animal waste can be used in a rotation that includes vegetables and other crops for direct
human consumption. However, if animal waste is used on crops for direct human
consumption it should only be applied pre -plant with no further applications animal waste
during the crop season.
21 Highly visible markers shall be installed to mark the top and bottom elevations of the
temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be
managed to maintain the liquid level between the markers. A marker will be required to
mark the maximum storage volume for waste storage ponds.
22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually
at crop sites where waste products are applied. Nitrogen shall be the rate -determining
element. Zinc and copper levels in the soil shall be monitored and alternative crop sites
shall be used when these metal approach excessive levels. pH shall be adjusted for
optimum crop production and maintained. Soil and waste analysis records shall be kept
for five years. Poultry dry waste application records shall be maintained for three (3)
years. Waste application records for all other waste shall be maintained for five (5) years.
23
Dead animals will be disposed of in a manner that meets North Carolina regulations.
Page 7
‘r-Af/A: = l,f' ill f.i ',';\ i1 kc')'01 i F l.;:\
WASTE UTILIZATION PLAN AGREEMENT
Name of Farm: K-9 Finisher - Craig King
Owner/ Manager Agreement
I (we) understand and will follow and implement the specifications and the operation and
maintenance procedures established in the approved animal waste utilization plan for the
farm named above. I (we) know that any expansion to the existing design capacity of the
waste treatment and storage system or construction of new facilities will require a new
certification to be submitted to the Division of Environment Management (DEM) before the
new animals are stocked. I (we) also understand that there must be no discharge of
animal waste from this system to surface waters of the state from a storm event less
severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm
office and at the office of the local Soil and Water Conservation District and will be
available for review by DEM upon request.
Name of Facility Owner:
(Please print)
Signature:
Craig King
Name of Manager (If different from owner):
Signature:
7€2,
Name of Technical Specialist: (Please print)
Date: /O - /s- d
Date: /O —/ S o 1
Kraig A. Westerbeek
Affiliation: Murphy Family Farms
Address (Agency): P.O. Box 759
Rose Hill, NC 28458
Signature: 1 Date: l b _ 10- 0i
Page 8
Animal Waste Management Plan Certification
(Please type or print all information that does not require a signature)
or . Expanded (please circle one)
General Information:
Name of Farm: KING FARMS
Owner(s) Name:
Mailing Address:
Farm Location: County Farm is located in: PENDER
'Latitude and Longitude: 34° 40' 07" / 77° 57' 49"
Please attach a copy of a county road map with location identified and describe below (Be specific: road
names, directions, milepost, etc.): Take U. S. Hwy. 117 south from Wallace for 4 miles, turn
right on S. R.. No. 1314 and go 1.3 miles, turn left on S. R. No. 1313 and go 0.7 mile:
site on the left.
Facility No:
MIMP
Vincent Craig King
126 Garland King Rd, Teachey, NC 28464
Operation Description:
Type of Swine No. of Animals
3 Wean to Feeder
feeder to Finish 2880
3 Farrow to Wean
D Farrow to Feeder
D Farrow to Finish
Type of Poultry
0 Layer
0 Pullets
No. of Animals
Phone No: 910-285-2692
Type of Cattle No. of Animals
0 Dairy
• 0Beef
Other Type of Livestock Number of Animals:
Acreage Available for Application: 91. 3 Required Acreage: . 36.2
Cubic Feet (ft3)
Number of Lagoons / Storage Ponds : 1 Total Capaci : 865250
Are subsurface drains present on the farm: YES or NO (please circle one)
If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one)
exxxxxxx*x* **hex*******X******************************************xa'cxykie***** :***•'.e***
Owner / Manager Agreement
I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and
maintenance procedures established in the approved animal waste management plan for the farm named above; and will
implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and
storage system or construction of new facilities will require a new certification to be submitted to the Division of
Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal
waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or
from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal
waste. 1 (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical
standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the
office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical
specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership
requires written notification to DE:NA or a new cenificat'9n (if the approve plan is changed) within 60 days of a title transfer.
T ) C r: W7: J/'4, f i d9
f l�
Dame of Land}O�l_ner ` � � _ / % I F
I J Date: /_ 3G ..1 -7
(111* Signature. ✓v�'L�L,
b � U
Name of Manager(if different from owne
Signature: Date:
AWC -- January I. 1997 1
Technical Specialist Certification
1*. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A
NCAC 6F .0005, I certify that the animal waste management system for the farm named above has an animal waste %
management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM)k
as specified in 1SA NCAC 2H.0217 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North
Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 1SA NCAC 6F .0001-.0005. The
following elements are included in the plan as applicable. While each category designates a technical specialist who may
sign each certification (SD, SI, WUP, RC, I), the technical specialist should only certify parts for which they are technically
competent.
II. Certification .of Design
A) Collection, Storage, Treatment System
Check the appropriate box
0 Existing facility without retrofit (SD or WUP)
Storage volume is adequate for operation capacity; storage capability consistent with waste utilization
requirements.
lir New. expanded or retrofitted facility (SD)
Animal waste storage and treatment structures, such as bu t limited to collection systems, lagoons and ponds,
have been designed to meet or exceed the minimumd+tcifications.
o �,4,
Name of Technical Specialist (Please Print): atl$ ri453/0, Qa �
Y 9:
Affiliation: (4. c i tcYcl e is. suit_ r 2
Address(Agency): R. t34.x 169a KeVIQveittA, N1122ZAIP
Signature:
B) Land Application Site (WUP)
The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is
suitable for waste management; hydraulic and nutrient loading rates.
oostsfsP//tf.
nca,
Name of Technical Specialist (Please Print): M _•
Affiliation:
Phone No.: 91a -Z4c- %tie
4 typ�.• iti'‘o.
., Date: 4 2.9191
''l•, a_ .•• oYD PP
A . 1r L yci -5 C E . .• '. ti �. �, �.•
Address(Agency):',4. 3or� 1d9P lS�s�.� l`e� `rd c 8Z8,3414.- Phone No.: 91d - Z9(,- 1176
Signature: Date: 4 jz 4 (97
C) Runoff Controls from Exterior Lots ` ' °;VGIN '•� �,�
Check the appropriate box �.` ..'�f 1 �i r� �� ;•►ti`'�
0 Facilitv.without exterior lots (SD or WUP or RC)
This.facility does not contain any exterior lots.
0 Facility with exterior lots (RC)
Methods to minimize the run off of pollutants from lounging and heavy use areas have been
accordance with technical standards developed by NRCS.
designed in
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency): Phone No.:
Signature: Date:
AWC -- January 1, 1997
D). Application and Handling Equipment
Check the appropriate box
0 Fxisting or expanding facility with existing waste application equipment (WUP or I)
A'►N Animal waste application equipment specified in the plan has been either field calibrated or evaluated in
accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the
waste management plan: (existing application equipment can cover the area required by the plan at rates not to
exceed either the specified hydraulic or nutrient loading rates, a schedule for timing of applications has been
established; required buffers can be maintained and calibration and adjustment guidance are contained as•part of
the plan).
&1/ New. expanded, or existing facility without existing waste application equipment for spray
irrigation. (I)
Animal waste application equipment specified in the plan has been designed to apply waste as necessary to
accommodate the waste management plan; (proposed application equipment can cover the area required by the
plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of
applications has been established; required buffers can be maintained; calibration and adjustment guidance are
contained as part of the plan).
0 New, expanded. or -existing facility without existing waste application equipment for land
spreading not using spray irrigation. (WUP or I)
Animal waste application equipment specified in the plan has been selected to apply waste as necessary to
accommodate the waste management plan; (proposed application equipment can cover the area required by the
plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of
applications has been established; required buffers wibt attr*intained; calibration and adjustment guidance are
contained as part of the plan). CA ♦,���YPio, ' A` ,
•,...•.e,• /y
•♦ ••�eaSIo •�.
Name of Technical Specialist (Please Print): , m1 �,LL�� % aS
I SEAL r
Affiliation: M: c1�./A �.e‘cs.to+ = t 12273
Address(Agency): Via, Sex id9a l<cwia0�\4••{V 7$ . Phone No.: 916-24G- 10 n
Signature: ./� ,,,;.�' , •'• G�NE.••Pt•
$•`� Date: .jZ9 9/
E) Odor Control, Insect Control. Mortality Management and Emergency Action Plan (SD.
SI• WUP, RC or I)
The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect. Control
Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects
have been evaluated with respect to this site and Best Mariiigement Practices to Minimize Odors and Best
Management Practices to Control Insects have been selec�(xPah'•'in �IGded•in the waste management plan. Both the
Mortality Management Plan and the Emergency Action,Pl d can be implemented by this facility.
•Name of Technical Specialist (Please Print): lam`: 0. /1/�'
Affiliation: M , i^ Ctsr l A sv .j c P ; 4 SEAL 9r
Address(Agency): I o • Nc 1 34r- • Phone No.: Q i 2 96- 1170
Signature:•'• �ti�!�1�LQ''•� Date:-1Z9/97
F) Written Notice of New or Expanding Swine Farm '���,iYD��`�
The following signature block is only to be used for new or expanding swine farms that begin construction after June
21,1996. If the facility was built before June 21, 1996, when was it constructed or last expanded
I (we) certify that I (we) have attempted to contact by certified mail all adjoining property owners and all property owners
who own property located across a public road. street. or highway from this new or expanding swine farm. The notice was in
compliance with the requirements of NCGS 106-S05. A copy of the notice and a list of the property owners notified is
attached.
Nance of Land Iwner : / et:-'/v') (. 1`1
Signature: C �G ' �t� /..... / Date:
Name of Manager(if different from owner);
Signature Date:
AWC -- January 1, 1997
3
III. Certification of Installation
A) Collection Sfora e Treatment Installation
ems'ex anded or retrofitted facility (SI)
Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in
accordance with the approved plan to meet or exceed the minimum standards and specifications.
For existing facilities without retrofits, no certification is necessary.
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency):
Signature: Phone No.:
Date:
B) Land Application Site (WUP)
Check the appropriate box
0 The cropping system is in place on all land as specified in the animal waste management plan.
Conditional Approval: all required land as specified in the plan is cleared for planting;the cropping system
as specified in the waste utilization plan has not been established and the owner has committed to esta
vegetation as specified in the plan by
for compliance with the wasteutilization plan. (month/day/year); the proposed cover cropis bush the
a PPropriate
0 Also check this box if appropriate
if the cropping system as specified in the plan can not be established on newly cleared land within 30 days
of this certification, the owner has committed to establish an interim crop for erosion control; c;
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency):
Signature: _Phone No.:
above has been checked.
This following Date:
d signature block is only to be used when the box for conditional approval P in III. B
I (we) certify that I (we) have committed to establish the cropping
if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification system as specified in my (our) waste utilization plan, and
Technical Specialist within 15 calendar days following the date specified in the conditional certification.
actioncito submit this verification is a violation of the waste management plan and will subject men of completion from a
ur from DEM. (us)on• 1 realize that
to an enforcement
Name of Land Owner :
Signature:
Name of Nlanager(if different from owner): Date:
Signature:
Date:
AWC -- January 1, 1997
' C) Runoff Controls from Exterior Lots (RC)
Facility with exterior lots
Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified
in the plan.
For facilities without exterior lots, no certification is necessary.
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency): Phone No.:
Signature: Date:
D) Application and Handling Equipment Installation (WUP or I)
Check the appropriate block
❑ Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration
and adjustment materials have been provided to the owners and are contained as part of the plan.
Cl Animal waste application and handling equipment specified in the plan has not been installed but the owner
has proposed leasing or third party application and has provided a signed contract; equipment specified in the
contract agrees with the requirements of the plan; required buffers can be maintained; calibration and
adjustment guidance have been provided to the owners and are contained as part of the plan.
❑ Conditional approval: Animal waste application and handling equipment specified in the plan has been
purchased and will be on site and installed by (month/day/year); there is adequate storage to
hold the waste until the equipment is installed and until the waste can be land applied in accordance with the
cropping system contained in the plan; and calibration and adjustment guidance have been provided to the
owners and are contained as part of the plan.
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency): Phone No.:
Signature: Date:
The following signature block is only to be used when the box for conditional approval in III D •
above has been checked.
I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment -as
specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation
from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I
(we) realize that failure to submit this verification is a violation of the waste management plan and will subject me
(us) to an enforcement action from DEM.
Name of Land Owner :
Signature: Date:
Name of 1\lanager(if different from owner):
Signature: Date:
E) Odor Control, Insect Control and Mortality Management (SD. SI, WUP, RC or I)
Methods to control odors and insects as specified in the Plan have been installed and are operational. The
mortality management system as specified in the Plan has also been installed and is operational.
Name of Technical Specialist (Please Print):
Affiliation:
Address(Agency): Phone No.:
Signature: Date:
AWC -- January I. 1997 5
Please return the completed form to the Division of Water Quality at the following address:
Department of Environment, Health, and Natural Resources
Division Of Water Quality
Water Quality Section, Compliance Group
P.O. Box 29535 '
Raleigh, NC 27626-0535
Please also remember to submit a copy of this form along with the complete Animal Waste
Management Plan to the local Soil and Water Conservation District Office and to keep a copy in
your files with your Animal Waste Management Plan.
AWC -- January 1, 1997 6
III. Certification of Installation
A)Collection, Storage, Treatment Installation
t4ew, expanded or retrofitted facility (SI)
Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed
in accordance with the approved plan to meet or exceed the minimum standards and specifications.
For existing facilities without retrofits, no certification is necessary.
Name of Technical Specialist (Plea e 'tint � � � .l 'r •V'k L P,am
Affiliation M. a .. € � V' i Date Work Completed: 10(G (Q 2
6
Address (Agency): C. 14,(� ait�� ('c Phone No.: qra -24C- �t-j�Signature: /l'i�� �•° era ��~ Date: l� 6 (9 R
B) Land Application Site (WUP) r" 4n051,301 44
Check the appropriate box
li The cropping system is in place on all land as specified in the animal waste management plan.
O Conditional Approval: all required land as specified in the plan is cleared for planting; the cropping system
as specified in the waste utilization plan has not been established and the owner has committed to establish the
vegetation as specified in the plan by (month/day/year); the proposed cover crop is
appropriate for compliance with the wasteutilization plan.
o Also check this box if appropriate
if the cropping system as specified in the plan can not be established on newly cleared land within 30 days
of this certification, the owner has committed toeptabllrkli an interim crop for erosion control;
fro
Name of Technical Specialist (Please Print * . '� ,, c, '
Affiliation M, 0,1,4 i�1a,�s P. r M;;l �: ate ork Completed: lor& 19.9
;11�Address(Agency): 'Pc�S 4x 1NF�1 K saN!�,� �C° $ 1. Phone No.: 9 t4 - 7.9`- n-[ t<
Signature: ww ° c�), �: ff t .'�- ' `': Date. 'CI L VA
This following signature block is only to be used When the•box for conditional approval in M. B
above has been checked.
I (we) certify that I (we) have committed to establish the cropping system as specified in my (our) waste utilization plan,
and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion
from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we)
realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an
enforcement action from DEM.
Name of Land Owner:
Signature: Date:
Name of Manager (if different from owner):
Signature: Date:
AWC -- August 1,1997 4
(4.4,
.)C) Runoff Controls from Exterior Lots (RC) r4 j N
Facility with exterior lots
Methods to minimize the run off of pollutants from lounging and heavy use areas have been installed as specified
in the plan.
For facilities without exterior lots, no certification is necessary.
Name of Technical Specialist (Please Print):
Affiliation Date Work Completed:
Address (Agency): Phone No.:
Signature: Date:
D) Application and Handling Equipment Installation (WUP or I)
Check the appropriate block
❑ Animal waste application and handling equipment specified in the plan is on site and ready for use;
calibration and adjustment materials have been provided to the owners and are contained as part of the plan.
❑ Animal waste application and handling equipment specified in the plan has not been installed but the owner
has proposed leasing or third party application and has provided a signed contract; equipment specified in
the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and
adjustment guidance have been provided to the owners and are contained as part of the plan.
Ci Conditional approval: Animal waste application and handling equipment specified in the plan has
been purchased and will be on site and installed by �f �199 (month/day/year); there is adequate
storage to hold the waste until the equipment is installed and until the waste can be land applied in
accordance with the cropping system contained in the plan; and calibration and adjustment guidance have
been provided to the owners and are cdntauined•as pag of the plan.
Name of Technical Specialist (Please, r t� • j s' �i' i� c\ ,� s
Affiliation Mi. FL et „sr Yam, ' ,Date Work Completed:
Phone No.: cha - Z.K• c rt
Date: • 16/6198
Address (Agency): Fes. eb.), 16/8, Ii(42$1 I
Signature:
c
ws Ar'
�jc
The following signature block is only 6134$L4Iie box for conditional approval in III D
,
above has been checked.I (we) certify that 1 (we) have committed to purchase the animal waste application and handling equipment as
specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation
from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I
(we) realize that failure to submit this verification is a violation of the waste management plan and will subject me
(us) to an enforcement action from DEM.
Name of Land wner: C ; A U41111"-
Signature:
Name ofM:nager (' differe.• ' m owner):
Signature: Date:
E) Odor Control, Insect Control and Mortality Management (SD, SI, WUP, RC or 1)
Methods to control odors and insects as specified in the Plan have been installed and are operational. The
mortality management system as specified in the Plan.has also been installed and is operational.
Name of Technical Specialist (Please Prig
.'r1:.;R
Date: AP - G - I S
Affiliation P'1, F .d ..,,&,,giS`; ti ls1;.. �' .pate Work Completed: t6f 4'Jc
w
Address (Agency): 26, c4m1. (b9 , 2 e . 2 A�, c h v Phone No.: 90-246-1ti
Signature:
AWC -- August 1, 1997
• f ai
Date: I o 14 �4$
Please return the completed form to the Division of Water Quality at the following address:
Department of Environment, Health, and Natural Resources
Division Of Water Quality
Non -Discharge Branch, Compliance Unit
P.O. Box 29535
Raleigh, NC 27626-0535
Please also remember to submit a copy of this form along with the complete Animal Waste
Management Plan to the local Soil and Water Conservation District Office and to keep a copy
in your files with your Animal Waste Management Plan.
AWC -- August 1, 1997 6
fiHDO
EMERGENCY ACTION PLAN
PHONE NUMBERS
DIVISION OF WATER QUALITY (DWQ)
EMERGENCY MANAGEMENT SERVICES (EMS)
SOIL AND WATER CONSERVATION DISTRICT (SWCD)
NATURAL RESOURCES CONSERVATION SERVICE (NRCS)
COOPERATIVE EXTENSION SERVICE (CES)
(Ito) 3. 5 - 3q 0
_AI D.10
c1D) ascc - 43c
La c) a -1 D-35
This plan will be implemented in the event that wastes from your operation are leaking,
overflowing or running off site. You should not wait until wastes reach surface waters or
leave your property to consider that you have a problem. You should make every effort to
ensure that this does not happen. This plan should be posted in an accessible location
for all employees at the facility. The following are some action items you should take.
1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested
responses to some possible problems are listed below.
A. Lagoon overflow - possible solutions are:
a) Add soil to berm to increase elevation of dam.
b) Pump wastes to fields at an acceptable rate.
c) Stop all flow to the lagoon immediately.
d) Call a pumping contractor.
e) Make sure no surface water is entering lagoon.
B. Runoff from waste application field -actions include:
a) Immediately stop waste application.
b) Create a temporary diversion to contain waste.
c) Incorporate waste to reduce runoff.
d) Evaluate and eliminate the reason(s) that cause the runoff.
e) Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinklers - action include:
a)
b)
c)
d)
Stop recycle pump.
Stop irrigation pump.
Close valves to eliminate further discharge.
Repair all leaks prior to restarting pumps.
D. Leakage from flush systems, houses, solid separators - action include:
a)
b)
c)
d)
Stop recycle pump.
Stop irrigation pump.
Make sure siphon occurs.
Stop all flow in the house, flush systems, or solid separators.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks -
possible action:
a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible
pump, and pump back to lagoon.
b) If holes are caused by burrowing animals, trap or remove animals and fill holes and
compact with a clay type soil.
c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon
as possible.
8
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach surface waters?
b. Approximately how much was released and for what duration?
c. Any damage notes, such as employee injury, fish kills, or property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger (either on or off the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours call your DWQ regional office; Phone #, After hours,
emergency number: (919) 733-3942. Your phone call should include: your name, facility
number, telephone number, the details of the incident from item 2 above, the exact location
of the facility, the location or direction of the movement of the spill, weather and wind
conditions. The corrective measures that have been under taken, and the seriousness of
the situation.
b. If the spill leaves property or enters surface waters, call local EMS phone number.
c. Instruct EMS to contact local Health Department.
d. Contact CE's phone number, local SWCD office phone number and the local NRCS
office for advice / technical assistance phone number.
4. If none of the above works call 911 or the Sheriffs Department and explain your problem to
them and ask the person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage.
a. Contractors Name: Murphy Family Farms
b. Contractors Address: P.O. Box 759, Rose Hill. NC 28458
c . Contractors Phone: (910)289-2111
6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.)
a. Name: Kraig Westerbeek
b. Phone: (910) 289 - 2111
7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the
damage, repair the system, and reassess the waste management plan to keep problems
with release of wastes from happening again.
INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids
(1) Flush system is designed and operated
sufficiently to remove accumulated
solids from gutters as designed.
() Remove bridging of accumulated solids at
discharge
Lagoons and Pits Crusted Solids
(1) Maintain lagoons, settling basins and
pits where pest breeding is apparent to
minimize the crusting of solids to a depth
of no more than 6-8 inches over more than
30% of surface.
Excessive Decaying vegetation (1)Maintain vegetative control along banks of
Vegetative Growth lagoons and other impoundment's to prevent
accumulation of decaying vegetative matter
along water's edge on impoundment's perimeter.
(Dry Systems)
Feeders Feed Spillage () Design, operate and maintain feed systems (e.g..
bunkers and troughs) to minimize the accumulation
of decaying wastage.
() Clean up spillage on a routine basis (e.g. 7-10 day
interval during summer; 15-30 day interval during winter).
Feed Storage Accumulation of feed
residues
() Reduce moisture accumulation within and around
immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment (e.g., covered bin for
brewer's grain and similar high moisture grain
products).
() Inspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences
Areas wastes and feed wastage and other locations where waste accumulates and
disturbance by animals is minimal.
() Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e. inspect for and remove or break up accumulated
solids as needed).
MIC — November 11, 1996
10
Dry Manure Handling Accumulations of animal ( ) Remove spillage on a routine basis (e.g. 7-10 day
Systems wastes interval during summer; 15-30 days interval during
winter) where manure is loaded for land application
or disposal.
( ) Provide for adequate drainage around manure stockpiles
() Inspect for and remove or break up accumulated wastes
in filter strips around stockpiles and manure handling
areas as needed.
The issues checked () pertain to this operation. The landowner / integrator agrees to use
sound judgment in applying insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been
reviewed with me.
(Landowner Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box
7613, North Carolina State University, Raleigh, NC 27695-7613.
AMIC — November 11, 1996
11
SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST
Source
Cause BMP's to Minimize Odor Site Specific Practices
Farmstead
Swine production
(i)Vegetative or wooded buffers:
(i)Recommended best management
practices;
(v)Good judgment and common sense
Animal body
surfaces
Dirty manure
covered animals
( )Dry floors
Floor surfaces
Wet manure -covered
floors
(1)Slotted floors;
(1)Waterers located over slotted floors;
(1)Feeders at high end of solid floors;
(1)Scrape manure buildup from floors;
( )Underfloor ventilation for drying
Manure collection Urine
pits
Partial microbial
decomposition
(v)Frequent manure removal by flush, pit
recharge or scrape
( )Underfloor ventilation
Ventilation
exhaust fans
Volatile gases (1)Fan maintenance;
Dust (v)Efficient air movement
Indoor surfaces
Dust
(✓)Washdown between groups of animals
( )Feed additives;
( )Feeder covers;
( )Feed delivery downspout extenders to
feeder covers
Flush Tanks
Agitation of recycled
lagoon liquid while tanks
are filling
( )Flush tank covers
( )Extend fill lines to near bottom of tanks
with anti -siphon vents
Flush alleys
Agitation during waste ( )Underfloor flush with underfloor
water conveyance ventilation
Pit recharge
points
Agitation of recycled
lagoon liquid while pits
are filling
( )Extend recharge lines to near bottom of
pits with anti -siphon vents
Lift stations
Agitation during sump ( )Sump tank covers
tank filling and drawdown
Outside drain
collection or
junction boxes
Agitation during waste ( )Box Covers
water conveyance
End of drain
pipes at lagoon
Agitation during waste ( )Extend discharge point of pipes
water underneath lagoon liquid level
Lagoon surfaces Volatile gas emissions
Biological mixing
Agitation
(/)Proper lagoon liquid capacity
(i)Correct lagoon startup procedures
( )Minimum surface area -to -volume ratio
(i)Minimum agitation when pumping
( )Mechanical aeration
( )Proven biological additives
12
Irrigation sprinkler High pressure agitation (1)Irrigate on dry days with little or no wind
nozzles Wind draft (1)Minimum recommended operation pressure
(/)Pump intake near lagoon liquid surface
( )Pump from second -stage lagoon
AMOC — November 11, 1996
Storage tank or Partial microbial
basin surface decomposition Mixing while (
filling Agitation when emptying(
(
)Bottom or midlevel loading
)Tank covers
)Basin surface mats of solids
)Proven biological additives or oxidants
Settling basin
surface
Partial microbial decom- ( )Extend drainpipe outlets underneath liquid
position Mixing while filling level
Agitation when emptying ( )Remove settled solids regularly
Manure, slurry or Agitation when spreading
sludge spreader Volatile gas emissions
outlets
( )Soil injection of slurry/sludges
( )Wash residual manure from spreader after use
( )Proven biological additives or oxidants
Dead animals
Carcass decomposition ( )Proper disposition of carcasses
Dead animal
disposal pits
Carcass decomposition ( )Complete covering of carcasses in burial pits
( )Proper location / construction of disposal pits
Incinerators Incomplete combustion ( )Secondary stack burners
Standing water
around facilities
improper drainage (1)Farm access road maintenance
Microbial decomposition of away from facilities
organic matter
Manure tracked Poorly maintained access (v)Farm access road maintenance
onto public roads roads
from farm access
Additional Information: Available From:
Swine Manure Management 0200 Rule / BMP Packet NCSU-County Extension Center
Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE
Swine Production Facility Manure Management:Pit Recharge —Lagoon Treatment:EBAE128-88NCSU-BAE
Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE
Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE
Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE
Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension
Environmental Assurance Program: NPPC Manual NC Pork Producers
Assoc
Options for Managing Odor, a report from the Swine Odor Task Force NCSU Agri Communication
Nuisance Concems in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension
1995 Conference Proceedings
The issues checked ( ) pertain to this operation. The landowner / integrator agrees to
use sound judgment in applying odor control measures as practical.
I certify the aforementioned odor control Best Management Practices have been reviewed
with me.
(Landowner Signature)
13
MORTALITY MANAGEMENT METHODS
(Check which method(s) are being implemented)
) Burial three feet beneath the surface of the ground within 24 hours after
knowledge of the death. The burial will be at least 300 feet from any flowing
stream or public body of water.
(✓ ) Rendering at a rendering plant licensed under G. S. 106 -168.7
( ) Complete incineration
( ) In the case of dead poultry only, placing in a disposal pit of a size and design
approved by the Department of Agriculture.
) Any method which in the professional opinion of the State Veterinarian would
make possible the salvage of part of a dead animal's value without endangering
human or animal health. (Written approval of the State Veterinarian must be
attached)
14
System Calibration
Information presented in manufacturer's charts are based on average operation
conditions with relatively new equipment. Discharge rates and application rates change
over time as equipment gets older and components wear. In particular, pump wear tends
to reduce operating pressure and flow. With continued use, nozzle wear results in an
increase in the nozzle opening which will increase the discharge rate while decreasing the
wetted diameter.
You should be aware that operating the system differently than assumed in the design will
alter the application rate, diameter of coverage, and subsequently the application
uniformity. For example, operating the system with excessive pressure results in smaller
droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging
of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines
will reduce operating pressure. Operating below design pressure greatly reduces the
coverage diameter and application uniformity.
For the above reason, you should calibrate your equipment on a regular basis to ensure
proper application rates and uniformity. Calibration at least once every three years is
recommended. Calibration involves collecting and measuring flow at several locations in
the application area. Any number of containers can be used to collect flow and
determine the application rate. Rain gauges work best because they already have a
graduated scale from which to read the application amount without having to perform
additional calculations. However, pans, plastic buckets, jars, or anything with a uniform
opening and cross-section can be used provided the liquid collected can be easily
transferred to a scaled container for measuring.
For stationary sprinklers, collection containers should be located randomly throughout the
application area at several distances from sprinklers. For traveling guns, sprinklers
should be located along a transect perpendicular to the direction of pull. Set out
collection containers 25 feet apart along the transect on both sides of the gun cart. You
should compute the average application rate for all nonuniformity of the application. On a
windless day, variation between containers of more than 30 percent is cause for concern.
You should contact your irrigation dealer or technical specialist for assistance.
*Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual
OPERATION & MAINTENANCE PLAN
Proper lagoon management should be a year-round priority. It is especially important to manage
levels so that you do not have problems during extended rainy and wet periods.
Maximum storage capacity should be available in the lagoon for periods when the receiving crop is
dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a
thunderstorm season in the summertime. This means that at the first sign of plant growth in the
later winter / early spring, irrigation according to a farm waste management plan should be done
whenever the land in dry enough to receive lagoon liquid. This will make storage space available in
the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down
to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization
plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does
not leave room for storing excess water during extended wet periods. Overflow from the lagoon for
any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action.
The routine maintenance of a lagoon involves the following:
• Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass
are the most common vegetative covers. The vegetation should be fertilized each
year, if needed, to maintain a vigorous stand. The amount of fertilized applied should
be based on a soils test, but in the event that it is not practical to obtain a soils test
each year, the lagoon embankment and surrounding areas should be fertilized with
800 pounds per acre of 10-10-10, or equivalent.
• Brush and trees on the embankment must be controlled. This may be done by
mowing, spraying, grazing, chopping, or a combination of these practices. This
should be done at least once a year and possibly twice in years that weather
conditions are favorable for heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon
water. Such chemicals could harm the bacteria in the lagoon that are treating the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon
and at least monthly and after major rainfall and storm events. Items to be checked should include,
as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for:
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
Lagoon surface -- look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment -- look for:
1. settlement, cracking, or "jug" holes
2. side slope stability -- slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack or vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a
threat of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps -- check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need of repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that
you are not completely "surprised" by equipment failure. You should perform your
pumping system maintenance at a time when your lagoon is at its low level. This will
allow some safety time should major repairs be required. Having a nearly full lagoon is
not the time to think about switching, repairing, or borrowing pumps. Probably, if your
lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an
inventory of spare parts or pumps.
• Surface water diversion features are designed to carry all surface drainage
waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot
runoff) away from your lagoon and other waste treatment or storage
structures. The only water that should be coming from your lagoon is that
which comes from your flushing (washing) system pipes and the rainfall that
hits the lagoon directly. You should inspect your diversion system for the
following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an overflow problem from a surface water diversion or there may be seepage into
the lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before waste
loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the
pipe to discharge near the bottom of the lagoon during initial filling or another
means of slowing the incoming water to avoid erosion of the lining.
4. When possible, begin loading new lagoons in the spring to maximize bacterial
establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon liquid
volume. This seeding should occur at least two weeks prior to the addition of
wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add
agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume
until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate biological
activity. Consultation with a technical specialist is recommended if these
conditions occur for prolonged periods, especially during the warm season.
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily
are optimum for treatment. Pit recharge systems, in which one or more buildings are
drained and recharged each day, also work well.
• Practice water conservation --- minimize building water usage and spillage from
leaking waterers, broken pipes and washdown through proper maintenance and water
conservation.
• Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the
amount of solids entering the lagoon.
Management:
• Maintain lagoon liquid level between the permanent storage level and the full
temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the minimum liquid level
and the maximum liquid level. (Figure 2-1).
• Start irrigating at the earliest possible date in the spring based on nutrient
requirements and soil moisture so that temporary storage will be maximized for the
summer thunderstorm season. Similarly, irrigate in the late summer / early fall to
provide maximum lagoon storage for the winter.
• The lagoon liquid level should never be closer than 1 foot to the lowest point of the
dam or embankment.
• Don not pump the lagoon liquid level lower than the permanent storage level unless
you are removing sludge.
• Locate float pump intakes approximately 18 inches underneath the liquid surface and
as far away from the drainpipe inlets as possible.
• Prevent additions of bedding materials, long-stemmed forage or vegetation, molded
feed, plastic syringes, or other foreign materials into the lagoon.
• Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
• Maintain strict vegetation, rodent, and varmint control near lagoon edges.
• Do not allow trees or large bushes to grow on lagoon dam or embankment.
• Remove sludge from the lagoon either when the sludge storage capacity is full or
before it fills 50 percent of the permanent storage volume.
5
• If animal production is to be terminated, the owner is responsible for obtaining and
implementing a closure plan to eliminate the possibility of a pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
• proper lagoon sizing,
• mechanical solids separation of flushed waste,
• gravity settling of flushed waste solids in an appropriately designed basin, or
• minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
• have more nutrients,
• have more odor, and
• require more land to properly use the nutrients.
Removal techniques:
• Hire a custom applicator.
• Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large -
bore sprinkler irrigation system onto nearby cropland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix
remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or
forageland; and soil incorporate.
• Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland;
dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon
to receive the sludge so that liquids can drain back into lagoon; allow sludge to
dewater; haul and spread with manure spreader onto cropland or forageland; and soil
incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage.
Close attention by the pumper or drag -line operator will ensure that the lagoon liner
remains intact. If you see soil material or the synthetic liner material being disturbed, you
should stop the activity immediately and not resume until you are sure that the sludge can
6
be removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus and
metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion.
Note that if the sludge is applied to fields with very high soil -test phosphors, it should be
applied only at rates equal to the crop removal of phosphorus. As with other wastes,
always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure.
Types of failures include leakage through the bottom or sides, overtopping, and breach of
the dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
• Modification of the lagoon structure -- an example is the placement of a pipe in the dam
without proper design and construction. (Consult an expert in lagoon design before
placing any pipes in dams.)
• Lagoon liquid levels — high levels are a safety risk.
• Failure to inspect and maintain the dam.
• Excess surface water flowing into the lagoon.
• Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or
rupture from lowering lagoon liquid level below groundwater table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large
discharge of wastewater and possible dam failure.
7
GoA -
Mkc
-
Ingraom,
no A