Loading...
HomeMy WebLinkAbout710052_Permit Renewal Application 2019_20190410State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates °of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least . 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 71-0052 Certificate Of Coverage Number: AWS710052 2. Facility Name: M & D°Sow Farm 3. Landowner's Name (same as on the Waste Management Plan): James Michael Hone 4. Landowner's Mailing Address: _ 826 Chancey Rd City: Clinton State: NC Telephone Number: 910-592-1173 Ext. Zip28328-7114 E-mail: 5. Facility's Physical Address: 353 Tessie Walker Rd City: Bureaw 6. County where Facility is located: Pender 7. Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): 10. Operator Name (OIC): James Michael Ho e 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine - Farrow to Wean 1,000 Operatl Tvu�s: State: NC Zip: 28425 Murnhv-Brow LLC Phone No.: 910-592-1173 OIC #: 988088 Swine Cattle Wean to Finish DrY Poultry Other es Dairy Calf Non Laying Chickens Wean to Feeder Dairy Heifer Horses - Horses Farrow to Finish Laying Chickens Horses - Other Milk Cow Pullets Feeder to Finish Dry Cow Sheep - Sheep Farrow to Wean Turkeys Sheep - Other Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Gilts Wet Poultry Other Non La Other ying Pullet Layers firagftrigrzaz.,,,,,„„, Quali 'ram_ ROY COOPER Governor MICHAEL S. REGAN Sermrarp LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality February 27, 2019 James Michael Hope M&DSow Farm 826 Chancey Rd Clinton, NC 28328-7114 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: ation tate Your facility is currently approved for operation of the under new anof malhe wasermal operation eStOateerNon-DischargeoGeneral Permitsareavailable which expire on September 30, 2019. Copies at htlpsa/deL.nc.aov/about/divisions/water-resources/water-uualil\-reeional-operations/afo, or by writing or calling: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In or.er to ss re v'o.r contin.ed cover e u •er th- tate Non-Dis hare General Pe its- you must ub it an ril3 2019 ermit co erase to he Divis on. nc used ou will find a "Re ue t for Ce ificate o Coverage Facilit urrentl4 Cover �% an rrn ririna State Non -Discharge nen d l one Permit 1 co of a of tcthe nCert►fied uAnieal oWastt d Mana ement rPi etumedAC&WMP Please note that ou must completed nd signed vnlication form, A list of it inclu ed in the AWMP can b fund on aye 2 0 the rev wal annlicat� i eriod ecified may Failure to request renewal of your coveraeunderunder aageneral valtd generalmit permihrwould time constpute a volat n of NCGSresult in a 143 21511rl and could resultOperation of your facility without coverage result in assessments of civil penalties of up to S25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Enclosures cc (w/o enclosures): Sincerely, heat. .n for Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Wilminpt n Regional Office, Water Quality Regional Operations Section Pender County Soil and Water Conservation District AFOG Section Central Files - AWS710052 jj wnL C Nc-tt ,ara a Depsottrert of E^v rer perto C-a t. 13'v a at oaf teeter ResotrcaS ��N9 1' 512 N. Se abut' St- 1163E N'i' Sen ee 2erter 1 Re a it , harti. :vo r a 27S99-1S3S r 919.7079300 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (inches) /1 s tl Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by tiC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), i ned by th own and a certified technical s ecialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection. etc.) b. .A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application tield g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is your facility. complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may he 8. Operation and Maintenance Plan accurate and applicable to If your CAWMP includes any components not shown on this list, please include the additional components with yow- submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAW:sIP items above to: 2019PermitRenewalriencdenr.gov RECEMIZICD221DVIIR APR 03.019 vir++et,. Qunllto, Rey a I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides . a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: .. �5 v .,�/ ITO/ti-'--� Title: Signature: n te: �.I7i 1 19 Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) LAGOON #1 20.40 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed bi the owner and a certified technical specialist containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the Wr ro f The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your -CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov WASTE UTILIZATION PLAN Friday, March 28, 2014 ; ph d X s_ 7-1r Producer : Mike Hope Farm Name : M & D Sow Farm 71-52 826 Chancey Rd Clinton,NC 28328 Telephone # : (910) 592-1173 Type of Operation : Farrow to Weanling Swine Number of Animals : l000 sows design capacity Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 1000 sows X 6.1 tons waste/sows/year = 6100 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 1000 sows X 5.4 Ibs PAN/sows/year = 5400 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS - CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE ^6863 T 1 -- N/ACRE N/ACRE USED _. _ NORFOLK O-2% - - TIME 6863 BH 6•5 325 0 2.67[ 867.75 MAR-SEP ._- -._- _ 1 NORFOLK 0-2% SG -- - 6864 1 NORFOLK O-2% 1_ 75 0 2.671 200.25 SEP-MAY 6864 BC 4.88 244 0 14.941 3645.36 MAR-SEP 1 NORFOLK 0-2% SG 6863 1AW NORFOLK 0-2% 1 75 0 14.94, 1120.5 SEP-MAY 6863 1AW NORFOLK 0 2% BFi 4.88 244 0 1.33 324.52 MAR-SEP ^ _ 6864 1AW 0-2% SG 1 75 0 1.33` 99.75 SEP-MAY 6864- 'NORFOLK BC 4.88 244 0 4.02' -_ _ 1AW_ 'NORFOLK_0-2% SG 980 88 MAR-SEP � 6864 2 'NORFOLK 0-2% -- 1 _ 75 0 4.02� 301.5 SEP-MAY 6864 2AW NORFOLK FC 3 131.1 0 3.751 491.625. SEP-AUG 0 2%-- FC 3 131.1 0 1.071 140.277 SEP-AUG TOTALS: 8172.41 - Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) There are no Acres Leased Indicates that this field is being overseeded (Le. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen Tess any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CROP BC HYBRID BERMUDAGRASS-CONTROLLED GRAZED UNITS LBS NIUNIT BH HYBRID BERMUDAGRASS-HAY TONS 50 SG SMALL GRAIN OVERSEEDED TONS 50 _ FC TALL FESCUE -CONTROLLED GRAZED AC 50 TONS 50 edl;cza APR 032019 Regional w quality Olme 008 &WW1 Page 3 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW 'TABLE 1 N USED 1—_ 27.78 8,172 TOTALS: 27 78- 8,172 AMOUNT OF N PRODUCED: 5,400 *** BALANCE -2,772 *** This number must be Tess than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautions measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 880 pounds of plant available nitrogen (PAN) sludge that will need to be removed on a periodic basis. This figure is PAN wheenr in the broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.56 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. TRACT FIELD SOIL TYPE APPLICATION APPLICATION 6863 -1, -IAW CROP RATE (in/hr) AMT (inches) INORFOLK 0-2% SG '6863 _ 1, IAW NORFOLK 0-2% 0.50 *1 "6864 -1, -taw ° BH 0.50 *1 NORFOLK O-2 /o 6864 2, ZAW'NORFOLK SG i 0.50 *1 - 0-2 116864 1, IAW INORFOLK 0-2% BC I 0.50 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Page 4 NARRATIVE OF OPERATION Acreages, nitrogen rates & RYE's are from the previous Waste Utilization Plan for this farm developed by Greer Moore on 2-15-06 and are "grandfathered". The only change is Field 2 icreased in acreage due to the conversion of pulls 6A & 6B form fescue to coastal bermuda. The October 2017 update for winter annual nitrogen application has been added for all fields except for pull 58 in field 1, tract 6864 which stays at the old rate for the 17-18 crop year but will change to the new rate for 18-19. Page 5 Updated Crop Management Practices for Bermuda This document, as approved by the interagency October 10, document, a, herebyg y Nutrient Management Comm' Practices for Select Forages Used in Waste Mana Committee on modified the July 13, 1998 Memorandum "Crop Management the application window protocol for the 100 lb Nitrogen t and application Rn s, as protocol as winter smallBement". This for botth Cereal updatesRye g PAN rate both grains. • Farms utilizing the 100 Ibs./ac PAN rate for the oversee more than 50 lbs./ac PAN from October 1 through December 50 lbs./ac PAN from Januarydare allowed to apply no ug • Applications made during the months of Dee tuber and January cannot exceed the March 31. 31 and no more than combined total of 25 lbs./ac PAN for the two -month period. • The last application of animal waste is to be applied to the bermuda crop September 30. • The PAN rate for grazed systems must be reduced by2 a prior to All other requirements of the July 13, 1998 Memorandum continue to apply. Those 5 /o. requirements include but are not limited to: • Cereal rye and annual ryegrass should be planted b pc opportunity to get winter growth. Y tober 15 to provide the best • A harvest is required prior to heading or April 7, whichever cereal rye and annual ryegrass. This is necessary to minimize or shading of emerging bermuda and reducingits yield. comes first, for both bermuda, additional harvest of annual To favor the potential tctiofn of canopy reaches 12-15 inches height ryegrass will be required when the • ryegrass These management requirements shall also apply to over seeded winter small grain. Nov 16, 2017 • PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil loss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from anv perennial stream or river (other that an irrigation ditch or canal. Animal waste Page 6 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the Iandownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, Teaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 NAME OF FARM: M & D Sow Farm 71-52 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Mike Hope SIGNATURE: ,"`// DATE: NAME OF MANAGER (if different from owner): SIGNATURE: please print DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (910)-1000 SIGNATURE: DATE: Page e or- -r 134-g 1 111117:77:, - At. t 4' .---.--- - , - /-.2.4/ ..t -., t ' ,....,.. i -i 11--5- i 7.12 1 y, f Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead • Swine Production Vegetative or wooded buffers; CAR commended best management practices; ©' Good judgement and common sense Animal body surfaces Floor surfaces Dirty manure -covered animals Ca/ Dry floors • Wet manure -covered floors Manure collection pits • Urine; • Partial microbial decompositio Ventilation exhaust fat • Volatile gases; • Dust GP/Slotted floors; CAW terers located over slotted floors; a F ers at high end of solid floors; Scrape manure buildup from floors; ❑ Underfloor ventilation for drying --Frequent manure removal by flush, pit recharge, or scrape; ❑ Underfloor ventilation G4,0K maintenance; a Efficient air movement Indoor surfaces • Dust hdown between groups of animals; Fd additives; Fcovers; Feed delivery downspout extenders to feeder covers Flush tanks • Agitation of recycled lagoon liquid while tanks are filling ❑ Flush tank covers; D Extend fill to near bottom of tanks with anti -siphon vents Flush alleys • Agitation during wastewater conveyance Underfloor flush with underfloor ventilate Pit recharge points Lift stations • Agitation of recycled lagoon liquid while pits are filling • Agitation during sump tank AMOC - November 11, 1996, Page 3 ❑ Extend recharge lines to near bottom of pits with anti -siphon vents ❑ Sump tank covers Source Cause filling and drawdown BMPs to Minimize Odor Site Specific Practices Outside drain • Agitation during wastewater ❑ Box covers collection or junction conveyance boxes End of drainpipes at • Agitation during wastewater lagoon conveyance Lagoon surfaces Extend discharge point of pipes underneath lagoon liquid level over lagoon liquid capacity; Correct lagoon startup procedures; ►Minimum surface area -to -volume ratio; Minimum agitation when pumping; 0 Mechanical aeration; nv n h'ol 'cal additi es Irrigation sprinkler • High pressure agitation; irrigate on dry days with little or no wind: nozzles • Wind drift ®/ • Volatile gas emission; • Biological mixing; • Agitation Storage tank or basin • surface • Settling basin surface • ❑ Rasin surface mats of solids: 'Proven hiolnvicat arldiHvrc or oxidant • 0 Extend drainpipe outlets underneath • liquid level; • f'1 Remove settled solids regularly /M�'�imum recommended operating pressure: ►� Pump intake near lagoon liauid surface: 0 Pumn from second stage lagoon ❑ Tank covers: Partial microbial decompositioi 0 Bottom or midlevel loading: Mixing while filling; Agitation when emptying Partial microbial decompositioi Mixing while filling; Agitation when emptving Manure, slurry or • Agitation when spreading; sludge spreader • Volatile gas emissions outlets Uncovered manure, • Volatile gas emissions while slurry or sludge on drying field surfaces AMOC - November 11, 1996, Page 4 n Soil injection of slurry/sludges; n i.Wash residual manure from spreader after use Pf Proven biological additives or oxidants n Soil injection of slurry/sludges; n Soil incorporation within 48 hrs.; n Spread in thin uniform lavers for ranid drvinp WProven hioloviral additives or oxidants l Source Cause BMPs to Minimize Odor Site Specific Practices Dead animals • Carcass decomposition Dead animal disposal pits • Carcass decomposition Incinerators • Incom ■lete combustion ler dis osition of carcasses Complete covering of carcasses in burial pits; roper location/construction of disposal pits Standing water around facilities • Improper drainage; • Microbial decomposition of organic matter onda stack burners Grade and landscape such that water drains away from facilities Mud tracked onto public roads from farm access • Poorly maintained access roar CY Farm access road maintenance Additional Information Swine Manure Management; .0200 Rule/BMP Packet Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment; EBAE 128-88 Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment; EBAE 129-88 Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-88 Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet Controlling Odors from Swine Buildings; PIH-33 Environmental Assurance Program: NPPC Manual Options for Managing Odor; a report from the Swine Odor Task Force Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings AMOC - November 11, 1996, Page 5 Available From: NCSU, County Extension Center NCSU - BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - Swine Extension NC Pork Producers Assoc. NCSU - Agri Communications Florida Cooperative Extension Insect Control Checklist for Animal Operations Source Cause BMPs to Minimize Insects Site Specific Practices Liquid Systems Flush Gutters • Accumulation of Solids O"- Flush system is designed and operated /{sufficiently to remove accumulated solids C' IZem3eri oaccumulated solids at discharp Lagoons and Pits • Crusted Solids 3---"Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - 8 inches over more than 30 % of surface. Excessive Vegetative • Decaying vegetation Growth 7' Maintain vegetative control along banks of lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. — / 17ri. Sv Iemc _ Feeders • Feed Spillage 13' Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the cv,Asumulatioil of decaying wastage. an up spillage on a rmnrie Dams (e.g., 7 -10 day interval during summer; 15-30 day interval during winter). Feed Storage • Accumulation of feed residue AMIC - November 11, 1996, Page 1 34 Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away /from site and/or providing adequate C' ins eecctt,,�int ' coveredj, eaikpr brewer's dcc� u1ate nas n r str ps'around tee storage as needed. Source Cause BMPs to Minimize Insects Site Specific Practices Animal Holding Areas • Accumulations of animal wastes and feed wastage Eliminate low areas that trap moisture along fences and other locations where y�ste accumulates and disturbance by [YIu lbri i aLs and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed. Dry Manure Handling • Accumulations of animal was L 1emove spillage on a routine basis (e.g., Systems 7-10 day interval during summer;15-30 day interval during winter) where manure IgrhAidactictrditOlViliiVittittit Qiltdiii sal. manure stockpiles. O ,Inspect for an remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613 AMIC - November 11,1996, Page 2 QY/' {j //-- O � CP c„1,3„8, me EMERGENCY ACTION PLAN PHONE NT TMRER S 272 9W DWQ/62 — .3�',1 = f 100 EMERGENCY MANAGEMENT SYSTEM ,fo _ ; ; /o SWCD NRCS 9 iD- : ,S e".. 5' t / iJ This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators -action include: 1 December 18, 1996 a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. e. Repair all leaks prior to restarting pumps. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to the lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a firture ram event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - . After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS phone number c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number , and local MRCS office for advice/technical assistance phone number - - . 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 2 December 18, 1996 5. Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: AtI I/a dirkt b. Contractors Address: aWI 116,d(� c. Contractors Phone: 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc. V aSati a. Name: u r nw _ b. Phone: 7/0 - ,257 - 7/z3 ,r 3 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 3 December 18, 1996 Version —November 26, 2018 kVortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality El El Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rerdering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Signature of Farm Owner/Manager ., 7 ate Signature of Technical Specialist Date -4:72Y,44,_ ef- opERAToR:............ 10..ktfel. Please review the attached plan ald specifiations carefu/ly. Reta this plan for your use 4nd recor.s. It is strongly recommended that Ace,"/".0144) youp'your .contractor, and Soil Conservation Servico personnel are in agreement *.; bo how the waste lagoon is to be constructed. The Soil .sullservation Service personne/ will meet with ail concerned parties i walk over the site to eNplain all flags and markings. it is importar that everyone understand what is e%pected so that final construction meets plans and specification and the job can be certified for paymen (if cost -sharing is invo/ved). The pad dimensions and grades are the best estimate. The BUILDER or CON-r1 is RESPONSIBLE for fine./ layout and design of the pads. Th 1 Conservation Service personne/ will assist in a limited capacity, treatment ji;L:lo.2.Q. as its mjj.,Lor. concern is the proper design and construction of the wast The ctua/ amount of material required for pads and dam may vary from the timates. Tfriti, jil will attempt to ba/ance cuts and fills as close as ible. If additionai material is required after nogutiate on the price and location of borrow area. construction. is complete on the lagoon, the contractor and owner will 01.:(ft-: 1.::Qidion Requrement: cu. ft. ,,.. 4- Es t i i 0 vi : .3.41/./...9..q..3._ci yUs. : Dikv.: _......1---:;__L--.......„... Ration ,T.k7WIAN041441 A 11* L;!liglia:Lu" i't.. ft. Job Cias pa to Des gned 2y: Design Approva — 2 E---x 04t.c..K. 7 36 3 -T1-"I'‘-• 4--)a°4' 4 ''&-e r 5/t) cok, 33'aC57ct 1)4 6-P.ca,..-• 0 (*vet- p f•tvteAs. Fpcki`f c 44: • 6 c AA/44 ScdtPt cl-6cLt.ke- cA .6.`"? AA 5 peratu:ir-: J . Humphrey County: Perlder - Date : 12/ 13/91 i stance to nearest residence (other than owner): 2800.0 feet STEADY STATE LIVE WEIGHT 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows ( farrow to feeder) x 522 lbs. = 0 lbs 0 Mead (finishing only) x 135 Ibs. = 0 lbs 1000 sows (farrow to wean) x 4:33I lbs. = 4:3: ()cj0 lbs 0 head (wean to feeder-) x 30 lbs. = 0 I b s TOTAL STEADY STATE LIVE WEIGHT (SSLW) MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 433000 lbs. SSLW x Treatment Volume(C:F)/ 1b. SSLW Treatment Volurne(C:F)/Its. SSLW= 1 C:F/lb. SSLW Volume = 433000 cubic feet 433000 1 bs STORAGE VOLUME FCIR SLUDGE ACC:UMULATII:IN ,e caws e Volume C�.C� cubic feet / / l!/ 6 g93 #07 e �. iTAL DESIGN VOLUME J _Q s{ eP ° Inside top length 290.0 feet ; Inside top width 290.0 feet Top of dike at elevation 4_,.0 feet Freeboard 11 .feet p Side slopes .0 : 1 (Inside lagoon) Total design lagoon liquid level at elevation 47.0 feet Bottom of lagoon elevation 7.0 feet Seasonal h i 3I-i water table elevation 37.0 - feet Total design volume using pr-ismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE',:_ LENGTH WIDTH DEPTH 3.0 _.C, 3.0 3.0 284.0 28 AREA OF TOP LENGTH * WIDTH = 2814.0 2=:4.0 AREA OF BOTTOM LENGTH * WIDTH = 224.0 224.0 AREA OF MIDSECTION LENGTH * WIDTH * 4 254.0 254.0 R I%, I6 . 0 (AREA OF TOP) 50176.0 (AREA OF BOTTOM) 2580r1,4.0 (AREA OF MIDSECTION * 4) CU. FT. = CAREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 =;Or_,56. 0 2Fi ('?e;4.0 5017A.0 1.7 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 64:3140 CU. FT. . TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 290.0 290.0 84100.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 84100.0 square feet Design temporary storage period to be 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 .. Vo|ume = 433000 Lbs. SSLW * CF of Waste/Lb./Day * 180 days Volume = 105741 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Vo|ume = 0.0 gallons/day * 180 days stora8e/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 49058.3 cubic feet 5D. Volume of 25 year - 24 hour storm Vo|ume = 7.5 inches / 12 inches per foot * D AY Volume = 52562.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 105741 cubic feet 58. 0 cubic feet 5C. 49058 cubic feet 5D. 52563 cubic feet TOTAL 207362 cubic feet � SUMMARY Total required volume 640362 cubic feet Total design volume avail. 648160 cubic feet Min. req. treatment volume plus sludge accumulation 433000 cubic feet At eIev. 44.2 feet ; Volume is 435419 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 595598 cubic feet At elev. 46.2 ; Volume is 592532 cubic feet (start pumping) Seasonal high water table elevation 0.0 feet DESIGNED BY: APPROVED BY: Ac'-, DATE: DATE: - NOTE: SEE ATTACHED WASTE UTILIZATION PLAN OPERATION & MAINTENANCE PLAN Proper lagoon liquid management should be a year-round priority. I important to manage levels so that you do not have problems duringt is especially wet periods, extended rainy and Maximum storage capacity should be available in the lagoon forperiods receiving crop is dormant (such as wintertime for bermudagrass) or when extended rainy spells such as the thunderstorm season in the when the that at the first signs of plant growth in the later winter/earl spring, there are a farm wastefirst management l plan should done whenever the land ing, irrigation rri This moods a farm lagoon li u�d. y P g� outoording to q This will make storage space available innthe lagoon fork future wet periods. In the late summer/early fall the lagoon should be pumped down marker (see Figure 2-1) to allow for winter storage. Every effort should maintain the lagoon close to the minimum liquid level as longa p to the low utilization plan will allow it.be made to s the weather and waste Waiting until the lagoon has reached its maximum storage capacity irrigate does not leave room for storing excess water during extend ed Overflow from the lagoon for anyreason before starting to state law and subject to penalty ationexcept a 25- wet ps a violation Year, 24-hour storm is a violation of The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. .Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, eeded, to maintain a vigorous stand. The amount of fertilizer applieed should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allow the lagoon water. Such chemicals could harm the bacteria in the lagoon that the waste.allowed to enter are treating Maintenance inspections of the entire lagoon should be made during the initial the lagoon and at least monthly and after major rainfall and storm events. Itfilling of checked should include, as a minimum, the following; ms to be Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ---look for: 1. separation of joints 2. cracks or breaks 3, accumulation of salts or minerals 4, overall condition of pipes 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam, If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps ---check for proper operation on 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps, Lagoon surface ---look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment ---look for: 1. settlement, cracking, or "jug" holes 2. side slope stability ---slumps or bulges 3. wet or damp areas on the back slope Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1, adequate vegetation 2. diversion capacity 3. ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural Iime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. • Management: Practice water conservation ---minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon . Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge. Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. . Frequently remove solids from catch basins at end of confinement houses or wherever they are installed, • Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. . Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. . If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by. proper lagoon sizing, mechanical solids separation of flushed waste, ▪ gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will; • have more nutrients, have more odor, and ▪ require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. ▪ Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors, Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, dam. Assuming proper design and construction, the owner haresponsibility for ensuring structure safety. Items which may lead to lagoon failures include: Modification of the lagoon structure ---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels ---high levels are a safety risk. Failure to inspect and maintain the dam. Excess surface water flowing into the lagoon. ▪ Liner integrity ---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure.