Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310849_Permit Renewal Application 2019_20190410
State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Pemits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 31-0849 Certificate Of Coverage Number: AWS3 10849 2. Facility Name: Sidney Cavenaugh Farrar 3. Landowner's Name (same as on the Waste Management Plan): ,fis istv-Foline 5jet he i Jo-r-c xt t;'Q.J ,,e3Ll iA 4. Landowner's Mailing Address: 1t4 6 Sidney Cavenaugh Ln City: Wallace State: NC Zip: 28466 Ito a�1 51o4), Telephone Number: 940 285 5264 Ext E-mail: 5. Facility's Physical Address: 387 Bear Pond Rd City: Richlands State: NC Zip: 28574 6. County where Facility is located: Duplin 7. Farm Manager's Name (if different from Landowner): Sidney Jordan Cavenaugh 8. Fann Manager's telephone number (include area code): 910-271-5264 Ext. 9. Integrator's Name (if there is not an Integrator, write "None"): Mu.plrv-Brown LLC 9Ce3 -QCrt EoCr�x-C 5•d ` JcMcu- eav&/vaus„ix 10. Operator Name (OIC): Therm heDur4-8r J Phone No.: OIC H: -20i2o 11. Lessee's Name (if there is not a Lessee, write "None"): 99, o g a-i 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine - Feeder to Finish 2,880 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard 'Redline" (Inches) I IR911 0-lat' 6/49511 56,628.0 19.50 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted S. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov 1 attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be retumed to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: S C vu43, )0.cd n NA/ estj\ Title: 0Iil�yl P.7( Signature: 7 r t��''y 6"� �—✓ Date: 4 —I — Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality February 27, 2019 Christy Elmer Cavenaugh Sidney Cavenaugh Farm 136 Sidney Cavenaugh Ln Wallace, NC 28466 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available at https://deq.nc.gov/about/divisions/water-resources/water-uuality-regional-operations/afo or by writing or calling: NCDEQ-D W R Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In order to assure your continued coverage under the State Non -Discharge General Permits, you must submit an application for permit coverage to the Division. Enclosed you will find a "Request for Certificate of Coverage Facility Currently Covered by an Expiring State Non -Discharge General Permit." The application form must be completed, signed and returned by April 3. 2019. Please note that you must include one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with the completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Sincerely, lJ� Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Enclosures cc (w/o enclosures): Wilmington Regional Office, Water Quality Regional Operations Section Duplin County Soil and Water Conservation District AFOG Section Central Files - AWS310849 Murphy -Brown LLC D �. North Caroline 0epertment of Environmental Quality a 0ivison of Water Resources ``i�1 512 N. SalisburySt. 1 1636 Me I Service Center 1 Raleigh, North Caroline 27699.1636 "' - " * 919.707 9000 Operator: Theron Sheppard` County: Duplin Distance to nearest residence (other than owner): 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) 0 sows (farrow to feeder) 2880 head (finishing only) 0 sows (farrow to wean) 0 head (wean to feeder) Describe other: x 1417lbs. x 522 lbs. x 135 lbs. x 433 Ibs. x 30 Ibs. Total Average Live Weight = 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON vate: 09/28/94 1200.0 feet 0 lbs 0 lbs 388800 Ibs = 0lbs 0 lbs 0 Volume = 388800 Ibs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/Ib. ALW Volume = 388800 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet)---- ------- ----- Inside top width (feet) ----------------- Top of dike elevation (feet) ------- Bottom of lagoon elevation (feet) ---------- Freeboard (feet) ---------------------- Side slopes (inside lagoon) --------- Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 3.0 3.0 3.0 3.0 AREA OF TOP LENGTH * WIDTH = 271.0 254.0 AREA OF BOTTOM LENGTH * WIDTH = 205.0 188.0 AREA OF MIDSECTION LENGTH * WIDTH *4 238.0 221.0 388800 Ibs R4 O° / J t'P w rne02 o o free 277.0 260.0 49.0 37.0 1.0 3.0:1 LENGTH WIDTH DEPTH 271.0 254.0 11.0 68834 (AREA OF TOP) 38540 (AREA OF BOTTOM) 210392 (AREA OF MIDSECTION *4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 68834.0 210392.0 38540.0 1.8 Total Designed Volume Available = 582571 CU. FT. 5. TEMPORARY STORAGE ,,eQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 277.0 260.0 72020.0 square feet Buildings (roof and lot water) 0.0 square feet Describe this area. TOTAL DA 72020.0 square feet Design temporary storage period to be 5A. Volume of waste produced Feces & urine production in gal./day per 135 Ib. ALW Volume = Volume = 5B. Volume of wash water 180 days. 1.37 388800 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days 710208 gals. or 94947.6 cubic feet This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in * DA / 12 inches per foot Volume = 42011.7 cubic feet 7.0 inches 5D. Volume of 25 year - 24 hour storm Volume = 7.5 inches / 12 inches per foot * DA Volume = 45012.5 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 94948 cubic feet 5B. 0 cubic feet 5C. 42012 cubic feet 5D. 45013 cubic feet TOTAL 181972 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall in excess of evaporation > 7.0 inches 25 year - 24 hour rainfall > 7.5 inches Freeboard > 1.0 feet Side slopes > 3.0 : 1 Inside top length > 277.0 feet Inside top width > 260.0 feet Top of dike elevation > 49.0 feet Bottom of lagoon elevation > 37.0 feet Total required volume > 570772 cu. ft. * Actual design volume > 582571 cu. ft. " A Seasonal high watertable elevation (SHWT)===> A9:0 feet LSO C l °.J Stop pumping elev. > 45.0, feet " Must be > or = to the SHWT elev. > 46. feet- 1.0.1, 7 Must be > or = to min. req. treatment el.=> 43.0 feet Required minimum treatment volume > 388800 cu. ft. Volume at stop pumping elevation > 389920 cu. ft. Start pumping elev. > 47.2 feet - " Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr.- 24 hr. rainfall==> 537559 cu. ft. Volume at start pumping elevation > 528506 cu. ft. Required volume to be pumped > 136959 cu. ft. " Actual volume planned to be pumped > 138586 cu. ft. " Min. thickness of soil liner when required==> 1.8 feet r .tc 7. DESIGNED BY: 4LC?r�F�t�� it, �G-2f;.�'< <'-"APPROVED BY: F. Et i DATE: 7- -JS 7 / DATE: /6//7/ 7 n NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: BEFORE BEGINNING EXCAVATION LANDOWNER IS ADVISED TO CONTACT ULOCO TO ASSURE THAT UNDERGROUND UTILITIES ARE NOT DESTROYED 1-800-632-4949 SCS DOES NOT CERTIFY THAT EXCAVATION AND FILL VOLUMES ARE CORRECT S. (BET 1 OF 2 SPECIFICATIONS FOR CONSTRUCTION OF WASTE TREATMENT LAGOONS FOUNDATION PREPARATION: The foundation area of the lagoon embankment and building pad shall be cleared of trees, logs, stumps, roots, brush, boulders,sod and rubbish. Satisfactory disposition will be made of all debris. The topsoil from the lagoon and pad area should be stripped and stockpiled for use on the dike and pad areas. After stripping, the foundation area of the lagoon embankment and building pad shall be thoroughly loosened prior to placing the first lift of fill material to get a good bond. EXCAVATION AND EARTHFILL PLACEMENT: The completed excavation and earthfill shall conform to the lines, grades, and elevations shown on the plans. Earthfill material shall be free of material such as sod, roots, frozen soil, stones over 6 inches in diameter, and other objectionable material. To the extent they are suitable, excavated materials can be used as fill. The fill shall be brought up in approximately horizontal layers not to exceed 9 inches in thickness when loose and prior to compaction. Each layer will be compacted by complete coverage with the hauling and spreading equipment or standard tamping roller or other equivalent method. Compaction will be considered adequate when fill material is observed to consolidate to the point that settlement is not readily detectible. NOTE THE SPECIAL REQUIREMENTS FOR PLACEMENT OF LINERS IN THE LINER SECTION OF THIS SPECIFICATION. The embankment of the lagoon shall be installed using the more impervious materials from the required excavations. Construction of fill heights shall include 5 percent for settlement. Dikes over 15 feet in height and with an impoundment capacity of 10 acre-feet or more fall under the jurisdiction of the NC Dam Safety Law. The height is defined as the difference in elevation from the constructed height to the downstream toe of the dike. Precautions shall be taken during construction to prevent excessive erosion and sedimentation. LINER: THE MINIMUM REQUIRED THICKNESS SHALL BE NOTE: LINERS (PARTIAL OR FULL) ARE REQUIRED WHEN THE ATTACHED SOILS INVESTIGATION REPORT SO INDICATES OR WHEN UNSUITABLE MATERIAL IS ENCOUNTERED DURING CONSTRUCTION. A TYPICAL CROSS SECTION OF THE LIN IS INCLUDED IN THE DESIGN WHEN LINERS ARE REQUIRED BY THE SOILS REPOR' When areas of unsuitable material are encountered, they will be over - excavated below finish grade to the specified depth as measured perpendicular to the finish grade. The foundation shall be backfilled as specified to grade with a SCS approved material (ie - CL,SC,CH). REFER TO THE SOILS INVESTIGATION INFORMATION IN THE PLANS FOR SPECIAL CONSIDERATIONS. EET 2 OF 2 Soil liner material shall come from an approved borrow area. The minimum water content of the liner material shall be optimum moisture content which relates to that moisture content when the soil is kneaded in the hand it will form a ball which does not readily separate. Water shall be added to borrow as necessary to insure proper moisture content during placement of the liner. The moisture content of the liner material shall not be less than optimum water content during placement. The maximum water content relates to the soil material being too wet for efficient use of hauling equipment and proper compaction. Proper compaction of the liner includes placement in 9 inch lifts and compacted to at least 90 percent of the maximum ASTM D698 Dry Unit Weight of the liner material. When smooth or hard, the previous lift shall be scarified and moistened as needed before placement of the next lift. The single most important factor affecting the overall compacted perme- ability of a clay liner, other than the type of clay used for the liner, is the efficient construction processing of the compacted liner. The sequence of equipment use and the routing of equipment in an estab- lished pattern helps assure uniformity in the whole placement and compaction process. For most clay soils, a tamping or sheepsfoot roller is the preferable type of compaction equipment. The soil liner shall be protected from the discharge of waste outlet pipes. This can be done by using some type of energy dissipator(rocks) or using flexible outlets on waste pipes. Altematives to soil liners are synthetic liners and bentonite sealant. When these are specified, additional construction specifications are included with this Construction Specification. CUTOFF TRENCH: A cutoff trench shall be constructed under the embankment area when shown on a typical cross section in the plans. The final depth of the cutoff trench shall be determined by observation of the foundation materials. VEGETATION: All exposed embankment and other bare constructed areas shall be seeded to the planned type of vegetation as soon as possible after construc- tion according to the seeding specifications. Topsoil should be placed on areas of the dike and pad to be seeded. Temporary seeding or mulch shall be used if the recommended permanent vegetation is out of season dates for seeding. Permanent vegetation should be established as soon as possible during the next period of approved seeding dates. REMOVAL OF EXISTING TILE DRAINS When tile drains are encountered, the tile will be removed to a minimum of 10 feet beyond the outside toe of slope of the dike. The tile trench shall be backfilled and compacted with good material such as SC, CL, or CH. SHEET 1 OF 2 OPERA - NI AND MAINTENANCE PLAN This lagoon is designed for waste treatment (permanent storage) and 180 days of temporary storage. The time required for the planned fluid level (permanent and temporary storage) to be reached may vary due to site conditions, weather, flushing operations, and the amount of fresh water added to the system. The designed temporary storage consists of 180 days storage for: (1) waste from animals and (2) excess rainfall after evaporation. Also included is storage for the 25 year - 24 hour storm for the location. The volume of waste generated from a given number of animals will be fairly constant throughout the year and from year to year, but excess rainfall will vary from year to year. The 25 year rainfall will not be a factor to consider in an annual pumping cycle, but this storage volume must always be available. A maximum elevation is determined in each design to begin pumping and this is usually the outlet invert of pipe(s) from building(s). If the outlet pipe is not installed at the elevation to begin pumping, a permanent marker must be installed at this elevation to indicate when pumping should begin. An elevation must be established to stop pumping to maintain lagoon treatment depth. Pumping can be started or stopped at any time between these two elevations for operating convenience as site conditions permit, such as weather, soils, crop, and equipment in order to apply waste without runoff or leaching. Land application of waste water is recognized as an acceptable method of disposal. Methods of application include solid set, center pivot, guns, and traveling gun irrigation. Care should be taken when applying waste to prevent damage to crops. The following items are to be carried out: 1. It is strongly recommended that the treatment lagoon be pre - charged to 1/2 its capacity to prevent excessive odors during start-up. Pre -charging reduces the concentration of the initial waste entering the lagoon thereby reducing odors. Solids should be covered with effluent at all times. When precharging is complete, flush buildings with recycled lagoon liquid. Fresh water should not be used for flushing after initial filling. 2. The attached waste utilization plan shall be followed. This plan recommends sampling and testing of waste (see attachment) before land application. 3. Begin temporary storage pump -out of the lagoon when fluid level reaches the elevation 47.2 as marked by permanent marker. Stop pump - out when the fluid level reaches elevation 45.0 . This temporary storage, less 25 yr- 24 hr storm, contains 136959 cubic feet or 1024455 gallons. SHEET 2 OF 2 4. The recommended maximum amount to apply per irrigation is one (1) inch and the recommended maximum application rate is 0.3 inch per hour. Refer to the waste utilization plan for further details. 5. Keep vegetation on the embankment and areas adjacent to the lagoon mowed annually. Vegetation should be fertilized as needed to maintain a vigorous stand. 6. Repair any eroded areas or areas damaged by rodents and establish in vegetation. 7. All surface runoff is to be diverted from the lagoon to stable outlets. 8. Keep a minimum of 25 feet of grass vegetated buffer around waste utilization fields adjacent to perennial streams. Waste will not be applied in open ditches. Do not pump within 200 feet of a residence or within 100 feet of a well. Waste shall be applied in a manner not to reach other property and public right-of-ways. 9. The Clean Water Act of 1977 prohibits the discharge of pollutants into waters of the United States. The Department of Environment, Health, and Natural Resources, Division of Environ- mental Management, has the responsibility for enforcing this law. SEEDING SPECIFICATIONS AREA TO BE SEEDED: 6.0 ACRES USE THE SEED MIXTURE INDICATED AS FOLLOWS: 3 60.0 LBS. FESCUE GRASS AT 60 LBS./ACRE (BEST SUITED ON CLAYEY OR WET SOIL CONDITIONS) SEEDING DATES: SEPTEMBER 1 TO NOVEMBER 30 FEBRUARY 1 TO MARCH 30 0.0 LBS. RYE GRAIN AT 30 LBS./ACRE (NURSERY FOR FESCUE) 0.0 LBS. 'PENSACOLA' BAHIA GRASS AT 60 LBS./ACRE (SEE FOOTNOTE NO. 1) SEEDING DATES: MARCH 15 TO JUNE 15 0.0 LBS. HULLED COMMON BERMUDA GRASS AT 8 LBS./ACRE (SUITED FOR MOST SOIL CONDITIONS) SEEDING DATES: APRIL 1 TO JULY 31 40.0 LBS. UNHULLED COMMON BERMUDA GRASS AT 10 LBS./ACRE SEEDING DATES: JANUARY 1 TO MARCH 30 160.0 LBS. RYE GRASS AT 40 LBS./ACRE (TEMPORARY VEGETATION) SEEDING DATES: DECEMBER 1 TO MARCH 30 LBS. APPLY THE FOLLOWING: 6000.0 LBS. OF 10-10-10 FERTILIZER (1000 LBS./ACRE) 12.0 TONS OF DOLOMITIC LIME (2 TONS/ACRE) 600.0 BALES OF SMALL GRAIN STRAW (100 BALES/ACRE) ALL SURFACE DRAINS SHOULD BE INSTALLED PRIOR TO SEEDING. SHAPE ALL DISTURBED AREA IMMEDIATELY AFTER EARTH MOVING IS COMPLETED. APPLY LIME AND FERTILIZER THEN DISK TO PREPARE A 3 TO 4 INCH SMOOTH SEEDBED. APPLY SEED AND FIRM SEEDBED WITH A CULTIPACKER OR SIMILAR EQUIPMENT. APPLY MULCH AND SECURE WITH A MULCH ANCHORING TOOL OR NETTING. 1. PENSACOLA BAHIAGRASS IS SLOWER TO ESTABLISH THAN COMMON BERMUDA GRASS. WHEN USING BAHIA, IT IS RECOMMENDED THAT 8 LBS./ACRE OF COMMON BERMUDA BE INCLUDED TO PROVIDE COVER UNTIL BAHIAGRASS IS ESTABLISHED. DOGWOOD FARMS, INC. Clinton, North Carolina /442. TYPICAL VIEW OF A ONE -STAGE LAGOON SYSTEM Confinement Building Top Width 42, i ' , / Settled Top Elevation (/�f,Q Pit " Pipe (Needs to be adequately supported) OUTLET PIPE ELEV. 97,2 I I II �1I SS 93 : SS 3' / \4 TREATMENT 11 Bottom Elevation 3 y, n LAGODNI Depth = /4,a SS 3 : / r Ca m rctki CJCi / t1(/)<if• Sf -GL W?a-Fe ri(i;1 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent. is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual 1 o proper lagoon sizing, o mechanical solids separation of flushed waste, o gravity settling of flushed waste solids in an appropriately designed basin, or o minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: o have more nutrients, o have more odor, and o require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. o Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. o Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. o Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 o Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. o Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: o Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. o Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). o Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. o The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. O Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. © Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. o Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. o Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. o Maintain strict vegetation, rodent, and varmint control near lagoon edges. o Do not allow trees or large bushes to grow on lagoon dam or embankment. o Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. o If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or "jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalis, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 c MERGE CY ACTOON RAH PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) q10 • rtl' 15 EMERGENCY MANAGEMENT SERVICES (EMS) a li -- SOIL AND WATER CONSERVATION DISTRICT (SWCD) ► -nI o NATURAL RESOURCES CONSERVATION SERVICE (NRCS) �f0 _.aa- lap-° COOPERATIVE EXTENSION SERVICE (CES) D,- 'l " y 3 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters ►or leave your property to consider that you have a problem. You should make every to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks possible action: rsible a) Dig a small sump or ditch from the embankment to catch all seepage, put in a subrne pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. 8 The application of sludge will increase the amount of odor at the waste application sae. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels -- high levels are a safety risk. o Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7 c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice / technical assistance phone number. 4. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: '2re.S' eXOf 'av1VV\S b. Contractors Address: c . Contractors Phone: 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: b. Phone: 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids «I Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. () Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids I^ Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. Excessive Decaying vegetation (✓)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage pc) Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation of decaying wastage. $ Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed residues Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). jQ Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal ()' Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). NIA MIC -- November 11, 1996 10 Dry Manure Handling Accumulations of animal ( ) Remove spillage on a routine basis (e.g. 7-10 day Systems wastes interval during summer; 15-30 days interval during winter) where manure is loaded for land application I or disposal. ' V I ( ) Provide for adequate drainage around manure stockpiles () Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked ( ) pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. Landowner Sig For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC -- November 11, 1996 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production Vegetative or wooded buffers: )Recommended best management practices; )Good judgment and common sense Animal body surfaces Dirty manure '(4Dry floors covered animals Floor surfaces Wet manure -covered floors (;z)Slotted floors; (sk)Waterers located over slotted floors; (()Feeders at high end of solid floors; (- )Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine ()(IFrequent manure removal by flush, pit pits recharge or scrape Partial microbial ( )Underfloor ventilation decomposition Ventilation Volatile gases exhaust fans Dust lFan maintenance; ( Efficient air movement Indoor surfaces Dust (' 3Washdown between groups of animals t )Feed additives; ( )Feeder covers; (*Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled ( )Flush tank covers lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks are filling with anti -siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled'Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti -siphon vents are filling Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain collection or junction boxes Agitation during waste ( )Box Covers water conveyance End of drain Agitation during waste thExtend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions CrkProper lagoon liquid capacity Biological mixing *Correct lagoon startup procedures Agitation )Minimum surface area -to -volume ratio )Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (Irrigate on dry days with little or no wind nozzles Wind draft (Minimum recommended operation pressure Pump intake near lagoon liquid surface ( )Pump from second -stage lagoon AMOC -- November 11, 1996 12 Storage tank or basin surface Partial microbial ( )Bottom or midlevel loading decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants' Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure, slurry or sludge spreader outlets Agitation when spreading Volatile gas emissions ( )Soil injection of slurry/sludges ( )Wash residual manure from spreader after use ( )Proven biological additives or oxidants Dead animals Carcass decomposition ?)()Proper disposition of carcasses Dead animal disposal pits Carcass decomposition ( )Complete covering of carcasses in burial pits ( )Proper location / construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water around facilities improper drainage (`)Farm access road maintenance Microbial decomposition of away from facilities organic matter Manure tracked Poorly maintained access (giFarm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule / BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge --Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( ) pertain to this operation. The landowner / integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. l an ( andowner Sig ure) 13 31 84 01 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Version —November 26, 2018 Primary Secondary Routine Mortality El El Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. El El Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. El El Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. El El A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. El ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). 0 ❑ Any method which, in the professional opinionof the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be.done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. ignature of Farrrl'owner/Manager CAr k >Q�ItQ,t Date 14-i‘al Signature of Technical Specialist Date Notification of Change of Ownership Animal Waste Management Facility (Please type or print all information that does not require a signature) In accordance with the requirements of 15A NCAC 2T .1304(c) and 15A NCAC 2T .1305(d) this form is official notification to the Division of Water Resources (DWR) of the transfer of ownership of an Animal Waste Management Facility. This form must be submitted to DWR no later than 60 days following the transfer of ownership. General Information: I n i +q Previous Name of Farm: ' 1C11 1,e 1 ("A_vyeA �C Fa-'�►' n Facility No: I a`pl I Ch KI s�-�/ lit V G k Phone No:"! 1 b 0 q-�19'� Previous Owner(s) Name: ��,,//�� ! � 1 New Owner(s) Name: S i t" Vl t Y V Pal Phone No: 9/0 `- A-71- c O L New Farm Name (if applicable): S i(1t V1(_ c1O. k/ e--Cr11 .F-c-r0/1 Mailing Address: 1,VA �l i .3`VC-Via—Li— if) L-17i , k }1 110 0-e-'1 !NfC �� -Ili' (-0P _ Farm Location: Latitude and Longitude: _„757 cl - TT to? J 77 0 County: Du� II r/i Please attach a copy of a county road map with location identified, and provide the location address and driving directions below (Be specific: road names, directions, milepost, etc.): 1.26CC C be_a 'r G-A_ ded, necex .1 r\-f-exs-ec `O-Y\ aL1-.(-t.) 0A.1p,it ss e_Ar•et_i: 12c/6ack sL.0a_vvi p 1 ci. Operation Description: Type of Swine No. of Animals Type of Swine No. of Animals Type of Cattle No. of Animals ❑ Wean to Feeder ❑ Gilts 0 Dairy ❑ Wean to Finish 0 Boars 0 Beef i. Feeder to Finish (A88 Q ❑ Farrow to Wean Type of Poultry No. of Animals ❑ Farrow to Feeder 0 Layer ❑ Farrow to Finish 0 Pullets Other Type of Livestock: Number of Animals: Acreage Available for Application: 115 Required Acreage: MeeiS Pi-1N ► etzi /re Grefrl+.5 Number of Lagoons / Storage Ponds: 1 Total Capacity: Cubic Feet (ft3) ************************************************************************************ Owner / Manager Agreement operation and I (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the op maintenance procedures established in the Certified Animal Waste Management Plan (CAWMP) for the farm named above and will implement these procedures. I (we) know that any modification or expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a permit modification before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a storm event less severe than the 25-year, 24-hour storm and there must not be run-off from the application of animal waste. I (we) understand that this facility may be covered by a State Non -Discharge Permit or a NPDES Permit and completion of this form authorizes the Division of Water Resources to issue the required permit to the new land owner.� Name of Previous Land Owner: ( Cr"(er4%rd' 5717' --4/e-4Ie�-1 Signature: �.v...;- t4. / � Date: 1 _ ti , Name of New Land Owner: S i(iriz (at/en uv7 { Signature: 5 Name of Manager (if different from owner): Date: "7-' Signature: Date: Please sign and return this form to: Animal Feeding Operations N. C. Division of Water Resources Water Quality Regional Operations Section 1636 Mail Service Center Raleigh, NC 27699-1636 June 12, 2015 Google Maps https://www.google.com/maps/Cv34.759265,-77.685931,1396m... Kv b wee, ess Cree_k/ ck s Loa4Acte Rd, Map data ©2019 500 ft 1 of 1 7/30/19, 11:34AM WASTE UTILIZATION PLAN NITROGEN ONLY & ANIMAL WASTE ONLY PLAN PRODUCER: Sidney Cavenaugh LOCATION: Cavenaugh Farm Facility 31-849, Bear Pond Rd. TELEPHONE: 910-289-6223 134 Sidney Cavenaugh Lane, Wallace, NC 28466 TYPE OPERATION: Swine Finishing NUMBER OF ANIMALS: 2,880 (Design Capacity) The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special precautions, waste may be applied to land eroding at up to 10 tons per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for analysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 WASTE UTILIZATIONPLAN Amount of Waste Produced Per Year (gallons, ft, tons, etc.) 2,880 animals X 927 (gal) waste/animal per year= 2,669,760 (gal) waste/year Amount of Plant Available Nitrogen (PAN) Produced Per Year 2,669,760 gallons x Guide Std. 633) 1.8 Ib.s PAN/1000 gallons irrigated or broadcas 4,806 lbs. PAN/year. (PAN from N.C. Tech Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner The following acreage will be needed for waste application based on the crop to be grown and surface application: Tract Field No. Soil Tvae Table 1: Crop ACRES OWNED BY PRODUCER Lbs. N Per Acre Acres Lbs. N Utilized Month of Application 72435 1 FoA Bermuda (G) 207 2.15 445.05 3/1-9/30 72435 1 FoA Small Grain (G) 75 2.15 161.25 see attached 72435 2 FoA Bermuda (G) 207 1.56 322.92 3/1-9/30 72435 2 FoA Small Grain (G) 75 1.56 117 see attached 72435 Pivot AuB Bermuda (G) 202.5 8.83 1788.075 3/1-9/30 72435 Pivot AuB Small Grain (G) 75 8.83 662.25 see attached 72435 8 AuB Bermuda (G) 202.5 2.97 601.425 3/1-9/30 72435 8 AuB Small Grain (G) 75 2.97 222.75 see attached 72435 9 AuB Bermuda (G) 202.5 1.99 402.975 3/1-9/30 72435 9 AuB Small Grain (G) 75 1.99 149.25 see attached Total 4,872.95 PAN Surplus/Deficit *This N is from animal waste only. if nutrients from other sources such as commercial fertilizer ate applied, they must be accounted for. N must be based on realistic yield expectation. NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirements. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 fe •C/ 1 Updated Crop Management Practices for Bermuda Winter Overseed This document, as approved by the Interagency Nutrient Management Committee on October 10, 2017, hereby modified the July 13, 1998 Memorandum "Crop Management Practices for Select Forages Used in Waste Management". This modification updates the application window protocol for the 100 lb Nitrogen PAN rate for both Cereal Rye and Annual Ryegrass, as well as winter small grains. • Farms utilizing the 100 lbs./ac PAN rate for the overseed are allowed to apply no more than 50 lbs./ac PAN from October 1 through December 31 and no more than 50 lbs./ac PAN from January 1 through March 31. • Applications made during the months of December and January cannot exceed the combined total of 25 lbs./ac PAN for the two -month period. • The last application of animal waste is to be applied to the bermuda crop prior to September 30. • The PAN rate for grazed systems must be reduced by 25%. All other requirements of the July 13, 1998 Memorandum continue to apply. Those requirements include but are not limited to: • Cereal rye and annual ryegrass should be planted by October 15 to provide the best opportunity to get winter growth. • A harvest is required prior to heading or April 7, whichever comes first, for both cereal rye and annual ryegrass. This is necessary to minimize the potential for shading of emerging bermuda and reducing its yield. To favor the production of bermuda, additional harvest of annual ryegrass will be required when the ryegrass canopy reaches 12-15 inches height. • These management requirements shall also apply to overseeded winter small grain. Approved by 1217 Interagency Committee Nov 16, 2017 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS 1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of waste, he/she shall provide a copy of an agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase ih the number of animals, method of utilization, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land that is eroding at 5 or more tons, but less than 10 tons per acre per year providing grass filter strips are installed where runoff leaves the field. (See FOTG Standard 393 - Filter Strip). 5 Odors can be reduced by ejecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6 When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weatherand Climate in North Carolina" for guidance.) 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in orderto control odor orflies. 8 Animal waste shall not be applied to saturated soils, during raihfall events, or when the surface Page 5 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhbit growth. The potential for salt damage from animal waste should also be considered. 10 11 12 the landowner. 13 Waste shall be applied in a manner not to reach other property and public right-of-ways. 14 Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days priorto planting of the crop or forages breaking dormancy. Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other than an irrigation ditch or canal. Animal waste other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25feet to perennial waters. (See Standard 393- Filter Strips). Animal waste shall not be applied closerthan 100 feet to wells. Animal waste shall not be applied cbser than 200 feet of dwellings other than those owned by Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted wetlands provided they have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly nto water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a 15 mannerthat causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, snks, etc., shall not be discharged into the animal waste management system. Page 6 WASTE UTILIZATION PLAN REQUIRED SPECIFICATIONS (continued) 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced as necessary to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. 18 If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementng a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. Waste handling structures, piping pumps, reels, etc., should be inspected on a regular basis to 19 prevent breakdowns, leaks and spills. A regular maintenance checklist should be kepton site. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human 20 consumption it should only be applied pre -plant with no further applications animal waste during the crop season. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintan the liquid level between the markers. A marker will be required to mark 21 the maximum storage volume forwaste storage ponds. Waste shall be tested withn 60 days of utilization and soil shall be tested at least once every three years at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels n the soil shall be monitored and alternative crop sites shall be used when these metal approach excessive levels. pH shall be adjusted for 22 optimum crop production and mantained. Soil and waste analysis records shall be kept for three years for state general permits. Poultry dry waste application records shall be maintained for three (3) years. Waste applicatbn records for all other waste shall be maintained forthree (3) years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. Page 7 WASTE UTILIZATION PLAN WASTE UTILIZATION PLAN AGREEMENT Name of Fame: Owner/ Manager Agreement Cavenaugh Farm Facility 31-849 I (we) understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environment Management (DEM) before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state from a storm event less severe than the 25-year, 24-hour storm. The approved plan will be filed on -site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by DEM upon request. Name of Facility Owner: Sidney Cavenaugh (Please print) Signature: Name of Manager (If different from owner): Date: Signature: Date: Name of Technical Specialist: (Pleaseprint) Amanda Hatcher Affiliation: NCCES-Duplin County Center Address (Agency): PO Box 949 Kenansville, NC 28349 (910) 296-2143 Signature: Date: 7/30/19 Page 8 NARRATIVE Realistic yield expectations Fields 1 & 2 Bermudagrass 6 tons/acre Small grain overseed 1 ton/acre Pivot, Fields 8 & 9 Bermudagrass 5.5 tons/acre Small grain overseed 1 ton/acre This WUP is written based on an irrigation design completed by Mr. Billy Hall and Greg Swain. If any of these fields are cut for hay, the following nitrogen rates apply: Fields 1 & 2 Bermudagrass 276 Ibs N/acre Small grain overseed 100 Ibs N/acre Pivot, Fields 8 & 9 Bermudagrass 270 Ibs N/acre Small grain overseed 100 Ibs N/acre Estimated Sludge Accumulation: 135 gallons of sludge/animal/year x 2,880 animals = 388,800 gallons sludge produced/year Approximately 10.2 Ibs PAN/1,000 gallons sludge (broadcast or irrigate) Approximately 12.24 Ibs PAN/1,000 gallons sludge (soil incorporated or injected) At 388,800 gal sludge/yr and 10.2 Ibs PAN/1,000 gal sludge = 3,966 Ibs PAN in sludge/year If applied to corn at 150 Ibs PAN/ac, need about 27 acres of land for application. **Refer to current state general permit for guidelines** Data to write this plan was taken from http://nutrients.soil.ncsu.edu/ which meets current NRCS standards (590) The irrigation application factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. IRRIGATION APPLICATION FACTORS TRACT FIELD SOIL SERIES APPLICATION RATE (in/hr) APPLICATION AMOUNT (in 72435 1 Foreston (FoA) 0.5 1 72435 2 Foreston (FoA) 0.5 1 72435 Pivot Autryville (AuB) 0.6 1 72435 8 Autryville (AuB) 0.6 1 72435 9 Autrvville (AuB) 0.6 1 Wendover Ln 910-590-5179 DATE:7/7/2019 WETTABLE/EFFECTIVE WETTABLE ACREAGE FOR SIDNEY CAVANAUGH CENTER PIVOT 7/8/2019 NEW CENTER PIVOT IN EXISTING SPRAYFIELD PIVOT # Type Spk Coverage Length Full Spk Ac. Pivot Off Ac. Net Spk Ac. Full Endgun @ 90% Endgun Off Ac Net Endgun Ac. Total Wettable Ac. 1 1 Tower + Endgun 300 6.49 0.00 6.49 3.01 0.67 2.34 8.83 NOTES: 1. Calculations based on layout information from Brock Equipment Co. and verified w/Sampson GIS Data. Center Pivot Information provided by Brock Equipment via Reinke Irrigation design. 2. Wetted Acreage based on machine/sprinkler length and 90% of endgun radius for active spray areas only. 3. Operator must take precautions and observe irrigation evente to prevent runuoff from overapplication, spray drift, etc. Application should not occur in over 5 mph winds or on frozen or saturated soils. 4. OPERATOR MUST VERIFY REQUIRED SETBACKS AND VERIFY CORRECT START/STOP LOCATIONS OF ENDGUN OPERATION. Si. e \ 01111111111►►►►01,i S o SEALti ° • ° 16415 uoo°- 7/ Date