HomeMy WebLinkAbout310639_Permit Renewal Application 2019_20190410State of North Carolina
Department of Environmental Quality
Division of Water Resources
Animal Waste Management Systems
Request for Certification of Coverage
Facility Currently covered by an Expiring Sate Non -Discharge General Permit
On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will
expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State
Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications
must be received by the Division of Water Resources by no later than April 3, 2019.
Please do not leave any question unanswered. Please verify all information and make any necessary corrections below.
Application must be signed and dated by the Pernrittee.
1. Farm Number: 31-0639 Certificate Of Coverage Number: . AWS310639
2. Facility Name: William Norris Farm
3. Landowner's Name (same as on the Waste Management Plan): William Norris
4. Landowner's Mailing Address: PO Box 96
City: Teaches,
Telephone Number:
qv) 28y-5-4-12
910-285-2767-E7a.
State: NC Zip: 28464
E-mail: hoggs3@hotmail.com
5. Facility's Physical Address: 262 Leighton Hall Rd
City: Harrells State: NC Zip: 28444
6. County where Facility is located: Duplin
7. Farm Manager's Name (if different from Landowner): William Norris
g, Farm Manager's telephone number (include area code): 910-289-5526 Ext.
9. Integrators Name (if there is not an Integrator, write "None"):
10. Operator Name (OIC): William H. Norris
1. Lessee's Name (if there is not a Lessee, write "None"):
12. Indicate animal operation type and number:
Current Permit: Operations Type Allowable Count
Swine - Wean to Feeder 7,800
Operation Tyner:
Swine Cattle Dry Poultn' Other Types
Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses
Wean to Feeder Dairy Heifer Laying Chickens Horses - Other
Farrow to Finish Milk Cow Pullets Sheep - Sheep
Feeder to Finish Dry Cow Turkeys Sheep - Other
Farrow to Wean Beef Stocker Calf Turkey Pullet
Farrow to Feeder Beef Feeder
Boar/Stud Beef Broad Cow Wet Poultry
Gilts Other Non Laying Pullet
Other Layers
Murphy -Brown LLC
Phone No.: 910-532-4038 OIC it: 18419
13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary
corrections and provide missing data.)
Structure
Name
Estimated
Date
Built
Liner Type
(Clay, Synthetic,
Unknown)
Capacity
(Cubic Feel)
Estimated
Surface Area
(Square Feet)
Design Freeboard
"Redline"
(Inches)
#1
I[[q]]ra
r Attl.
la-13),4
1ctallp
19.50
q2
-Ida
CAclt..
►ail t-SI
19
19.50
a3
►qqa-
Cites\
11a1-51
Lai
F1 X6k)
19.50
Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with thi completed and signed application
as required by NC General Statutes 143-215.10C(d) to the address below.
The CAWMP must include the following components:
I. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical specialist containing:
a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.)
b. A map of every field used for land application (for example: irrigation map)
c. The soil series present on every land application field
d. The crops grown on every land application field
e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP
f The maximum PAN to be applied to every land application field
g. The waste application windows for every crop utilized in the WUP
h. The required NRCS Standard specifications
2. A site map/schematic
3. Emergency Action Plan
4. Insect Control Checklist with chosen best management practices noted
5. Odor Control Checklist with chosen best management practices noted
6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist
7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and
complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to
your facility.
8. Operation and Maintenance Plan
If your CAWMP includes any components not shown on this list, please include the additional components with your submittal.
(e.g. composting, digesters, waste transfers, etc.)
As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the
application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov
I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that,
if all required parts of this application are not completed and that if all required supporting information and attachments are not
included, this application package will be returned to me as incomplete.
Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement,
representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C.
Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for
a similar offense.)
Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a
corporation, signature should be by a principal executive officer of the corporation):
Name: �// to I 1 . /a//v O a (CIE Title:✓ -
Signature:
Name: Title:
Signature: Date:
Name: Title:
Signature: Date:
THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
E-mail: 2019PermitRenewal@ncdenr.gov
FORM: RENEWAL -STATE GENERAL 02/2019
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary " w°
LINDA CULPEPPER NORTH CAROLINA
Director Environmental Quality
February 27, 2019
William Norris
William Norris Farm
PO Box 96
Teachey, NC 28464
Subject: Application for Renewal of Coverage for Expiring State General Permit
Dear Permittee:
Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits,
which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available
at https://deq.nc.gov/about/divisions/water-resources/water-quality-regional-operations/afo or by writing or calling:
NCDEQ-DWR
Animal Feeding Operations Program
1636 Mail Service Center
Raleigh, North Carolina 27699-1636
Telephone number: (919) 707-9100
In order to assure your continued coverage under the State Non -Discharge General Permits. you must submit an application for
permit coverage to the Division. Enclosed you will find a "Request for Certificate of Coverage Facility Currently Covered by an
Expiring State Non -Discharge General Permit." The application form must be completed. signed and returned by April 3. 2019.
Please note that you must include one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with the
completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal
application form.
Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty.
Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could
result in assessments of civil penalties of up to $25,000 per day.
If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel
free to contact the Animal Feeding Operations Branch staff at 919-707-9100.
Enclosures
cc (w/o enclosures):
Sincerely,
Jon Risgaard, Section Chief
Animal Feeding Operations and Groundwater Section
Wilmington Regional Office, Water Quality Regional Operations Section
Duplin County Soil and Water Conservation District
AFOG Section Central Files - AWS310639
Murphy -Brown LLC
DE
North Carolina Department of Environmental Quality i Di ision of Water Resources
512 N. SeYsbury St. i 1636 Mail Service Center 1 Releagh, North Caroline 27699.1636
"�''�" 919.707.9000
/ea Le lot 7 r-
f(P /CW))
a A -Cc i t9 Li,/ »(tP,
Nutrient Management Plan For Animal Waste Utilization
07-05-2006
This plan has been prepared for:
Norris Farm
Bill Norris
PO Box 96
Teachey, NC 28464
This plan has been developed by:
Greer Moore
Clear Run Farms Consulting Services
PO Box 338
Harrells, NC 28444
(910) 5,32-4493
Anc
Developer Signature
Type of Plan: Nitrogen Only with Manure Only
Owner/Manager/Producer Agreement
I (we) understand and agree to the specifications and the operation and maintenance
procedures established in this nutrient management plan which includes an animal
waste utilization plan for the farm named above. I have read and understand the
Required Specifications concerning animal waste management that are included with
this plan.
Signature (owner) Date
Signature (manager or producer) Date
This plan meets the minimum standards and specifications of the U.S. Department of
Agriculture - Natural Resources Conservation Service or the standard of practices
adopted by the Soil and Water Conservation Commission.
Plan Approved By l2 144zn c
7-S-4
Technical Specialist Signature Date
572587 Database Version 3.1 Date Printed: 07-05-2006 Cover Page 1
Nutrients applied in accordance with this plan will be supplied from the
following source(s):
Commercial Fertilizer is not included in this plan.
S5
Swine Nursery Lagoon Liquid waste generated 1,489,800 gals/year by a
7,800 animal Swine Nursery Lagoon Liquid operation. This production
facility has waste storage capacities of approximately 180 days.
Estimated Pounds of Plant Available Nitrogen Generated per Year
Broadcast
3431
Incorporated
5893
Injected
6490
Irrigated
3730
ActuakPAN Applied
(Pounds)
Actual Volume Applied
(Gallons)
Volume Surplus/Deficit
(Gallons)
Year 1
3,898.80
1,557,341
-67,541
e
Note: In source ID, S means standard source, U means user defined source..
865647 Database Version 3.1 Date Printed: 08-22-2006 Source Page 1 of 1
Narrative
*** Application window for Bermuda Pasture/Hay cutting(s) is 3/01 - 9/30, please be careful to note this
because your prior NUP allowed irrigating on BH/BP through Oct 31 st. Your PAN rate of 235 lbs/ac
was grandfathered from prior NUP, which there is a copy of the prior NUP attatched. It is very
important to keep crop yield records (all hay cuttings).
865647 Database Version 3.1 Date Printed: 08-22-2006 Narrative Page I of 1
The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic
Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown,
where available.
Planned Crops Summary
Tract
Field
Total
Acres
Useable
Acres
Leaching
Index (LI)
Soil Series
Crop Sequence
RYE
0010
A
7.98
7.98
N/A
Autryville
Small Grain Overseed
1.0 Tons
Hybrid Bermudagrass Pasture
5.5 Tons
0010
B
5.70
5.70
N/A
Autryville
Small Grain Overseed
1.0 Tons
Hybrid Bermudagrass Pasture
5.5 Tons
PLAN TOTALS:
13.68 13.68
LI
Potential Leaching
Technical Guidance
2
Low potential to contribute to soluble
nutrient leaching below the root zone.
None
>= 2 &
<= 10
Moderate potential to contribute to
soluble nutrient leaching below the root
zone.
Nutrient Management (590) should be planned.
> 10
High potential to contribute to soluble
nutrient leaching below the root zone.
Nutrient Management (590) should be planned. Other conservation practices that
improve the soils available water holding capacity and improve nutrient use efficiency
should be considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based
Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter
Strips (393) and Riparian Forest Buffers (39I ).
OCCCA'7
natahac, v,.re;,.., xI vnvnnnK
The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of
cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields of the crops to be grown, their nutrient requirements,
and proper timing of applications to maximize nutrient uptake.
This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure
other by-products, commercial fertilizer and residual from previous crops. An estimate of the quantity of solid and liquid waste that will be applied on each field
order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is
included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation.
Tract
Field
Source
ID
Soil Series
Total
Acres
Use.
Acres
Crop
^
RYE
Apolic.
Period
Nitrogen
PA
Nutrient
Regd
(lbs/A)
Comm.
Fert.
Nutrient
Applied
(lbs/A)
Res.
(lbs/A)
Apphc.
Method
Manure
PA
Nutrient
Applied
(lbs/A)
Liquid
ManureA
pplied
(acre)
Solid
Manure
Applied
(acre)
Liquid
Manure
Applied
(Field)
Solid
Manure
Applied
(Field)
N
N
N
N
1003
gal/A
Tons
1000 gals
tons
0010
A
S5
Autryville
7.98
7.98
Small Grain Overseed
1.0 Tons
10/1-3/31
50
0
0
Irrig.
50
19.97
0.00
159.38
0.01
0010
A
S5
Autryville
7.98
7.98
Hybrid Bermudagrass Pasture
5.5 Tons
*3/1-9/30
*235
0
0
lrrig.
235
93.87
0.00
749.07
0.01
0010
B
S5
Autryville
5.70
5.70
Small Grain Overseed
1.0 Tons
10/1-3/31
50
0
0
lrrig.
50
19.97
0.00
113.84
0.01
0010
B
S5
Autryville
5.70
5.70
Hybrid Bermudagrass Pasture
5.5 Tons
*3/1-9/30
*235
0
0
lrrig.
235
93.87
0.00
535.05
0.01
Total Applied, 1000 gallons
1,557.34
Total Produced, 1000 gallons
1,489.80
Balance, 1000 gallons
-67.54
Total Applied, tons
0.01
Total Produced, tons
0.01
Balance, tons
0.01
Notes: 1. In the tract column, - symbol means leased, otherwise, owned.
2. Symbol * means user entered data.
865647 Database Version 3.1 Date Printed: 8/22/2006
WUT Page 1 of 1
The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies
with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in
runoff. This table provides the maximum application rate per hour that may be applied to each field selected to
receive wastewater. It also lists the maximum application amount that each field may receive in any one application
event.
Irrigation Application Factors
Tract
Field
Soil Series
Application Rate
(inches/hour)
Application Amount
(inches)
0010
A
Autryville
0.60
1.0
0010
B
Autryville
0.60
1.0
The following Lagoon Sludge Nitrogen Utilization table provides an estimate of the number of acres needed for
sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen
concentrations for each source, the number of animals in the facility and the plant available nitrogen application
rates shown in the second column.
Lagoon sludge contains nutrients and organic matter remaining after treatment and application of the effluent. At
clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the
priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be 1 imiting. Since
nutrient levels are generally very high, application of sludge must be carefully applied.
Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be
used for sludge application. If this is not possible, care should be taken not to load effluent application fields with
high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water
moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also
be a concern.
Lagoon Sludge Nitrogen Utilization Table
Crop
Maximum
PA-N Rate
lb/ac
Maximum Sludge
Application Rate
1000 gal/ac
Minimum Acres
5 Years Accumulation
Minimum Acres
10 Years Accumulation
Minimum Acres
15 Years Accumulation
Swine Nursery Lagoon Sludge - Standard
Corn 120 bu
150
13.16
19.85
39.71
59.56
Hay 6 ton R.Y.E.
300
26.32
9.93
19.85
29.78
Soybean 40 bu
160
14.04
18.61
37.22
55.84
865647 Database Version 3.1 Date Printed: 08-22-2006 Sludge Page 1 of 1
The Available Waste Storage Capacity table provides an estimate of the number of days of storage
capacity available at the end of each month of the plan. Available storage capacity is calculated as the
design storage capacity in days minus the number of days of net storage volume accumulated. The start
date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in
the plan at which storage volume in the lagoon or holding pond is equal to zero.
Available storage capacity should be greater than or equal to zero and less than or equal to the design
storage capacity of the facility. If the available storage capacity is greater than the design storage
capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated.
If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design
storage volume of the structure. Either of these situations indicates that the planned application interval
in the waste utilization plan is inconsistent with the structure's temporary storage capacity.
Source Name
Swine Nursery Lagoon Liquid
Design Storage Capacity (Days)
Start Date
9/1
180
Plan Year
Month
Available Storage Capacity (Days) *
i
1
68
1
2
53
1
3
67
1
4
68
1
5
100
I
6
133
1
7
165
1
8
165
1
9
166
i
10
I48
1
11
131
I
12
107
* Available Storage Capacity is calculated as of the end of each month.
865647 Database Version 3.1 Date Printed: 08-22-2006 Capacity Page 1 of 1
Crop Notes
The following crop note applies to field(s): A, B
Small Grain: CP, Mineral Soil, medium leachable
In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from
October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for
each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable
seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the
initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and
rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is
essential. Review the NCSU Official Variety "green book" and information from private companies to
select a high yielding variety with the characteristics needed for your area and conditions. Apply no more
than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at
this time. The remaining N should be applied during the months of February -March.
The following crop note applies to field(s): A, B
Bermudagrass: CP, Mineral Soil, Moderately Well Drained.
Adaptation: Well -adapted.
In the Coastal Plain, hybrid bermudagrass sprigs can be planted Mar. 1 to Mar. 31. Cover sprigs 1" to 3"
deep (1.5" optimal). Sprigs should be planted quickly after digging and not allowed to dry in sun and
wind. For Coastal and Tifton 78 plant at least 10 bu/ac in 3' rows, spaced 2' to 3' in the row. Generally a
rate of 30 bu/ac is satisfactory to produce full groundcover in one or two years under good growing
conditions. Tifton 44 spreads slowly, so use at least 40 bu/ac in 1.5' to 2' rows spaced 1' to 1.5' in row.
For broadcast/disked-in sprigs use about 60 bu/ac. Soil test for the amounts of lime, phosphorus,
potassium and micronutrients to apply preplant and for annual maintenance. Apply 60 to 100 lb/ac N in
the establishment year in split applications in April and July. For established stands apply 180 to 240
lb/ac N annually in split applications, usually in April and following the first and second hay cuts.
Reduce N rates by 25% for grazing. Refer to NCSU Technical Bulletin 305 Production and Utilization
of Pastures and Forages in North Carolina for more information or consult your regional agronomist or
extension agent for assistance.
865647 Database Version 3.1 Date Printed: 08-22-2006 Crop Note Page I of I
Required Specifications For Animal Waste Management
1. Animal waste shall not reach surface waters of the state by runoff, drift,
manmade conveyances, direct application, or direct discharge during
operation or land application. Any discharge of waste that reaches surface
water is prohibited.
2. There must be documentation in the design folder that the producer
either owns or has an agreement for use of adequate land on which to
properly apply the waste. If the producer does not own adequate land to
properly dispose of the waste, he/she shall provide evidence of an
agreement with a landowner, who is within a reasonable proximity,
allowing him/her the use of the land for waste application. It is the
responsibility of the owner of the waste production facility to secure an
update of the Nutrient Management Plan when there is a change in the
operation, increase in the number of animals, method of application,
receiving crop type, or available land.
3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs
for realistic crop yields based upon soil type, available moisture, historical
data, climatic conditions, and level of management, unless there are
regulations that restrict the rate of applications for other nutrients.
4. Animal waste shall be applied to land eroding less than 5 tons per acre
per year. Waste may be applied to land eroding at more than 5 tons per
acre per year but less than 10 tons per acre per year provided grass filter
strips are installed where runoff leaves the field (see USDA, NRCS Field
Office Technical Guide Standard 393 - Filter Strips).
5. Odors can be reduced by injecting the waste or by disking after waste
application. Waste should not be applied when there is danger of drift
from the land application field.
6. When animal waste is to be applied on acres subject to flooding, waste
will be soil incorporated on conventionally tilled cropland. When waste is
applied to conservation tilled crops or grassland, the waste may be
broadcast provided the application does not occur during a season prone
to flooding (see "Weather and Climate in North Carolina" for guidance).
865647 Database Version 3.1 Date Printed: 8/22/2006 Specification Page 1
15. Animal waste shall not be discharged into surface waters, drainageways,
or wetlands by a discharge or by over -spraying. Animal waste may be
applied to prior converted cropland provided the fields have been
approved as a land application site by a "technical specialist". Animal
waste shall not be applied on grassed waterways that discharge directly
into water courses, and on other grassed waterways, waste shall be
applied at agronomic rates in a manner that causes no runoff or drift
from the site.
16. Domestic and industrial waste from washdown facilities, showers, toilets,
sinks, etc., shall not be discharged into the animal waste management
system.
17. A protective cover of appropriate vegetation will be established on all
disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas
shall be fenced, as necessary, to protect the vegetation. Vegetation such as
trees, shrubs, and other woody species, etc., are limited to areas where
considered appropriate. Lagoon areas should be kept mowed and
accessible. Berms and structures should be inspected regularly for
evidence of erosion, leakage, or discharge.
18. If animal production at the facility is to be suspended or terminated, the
owner is responsible for obtaining and implementing a "closure plan"
which will eliminate the possibility of an illegal discharge, pollution, and
erosion.
19. Waste handling structures, piping, pumps, reels, etc., should be inspected
on a regular basis to prevent breakdowns, leaks, and spills. A regular
maintenance checklist should be kept on site.
20. Animal waste can be used in a rotation that includes vegetables and other
crops for direct human consumption. However, if animal waste is used on
crops for direct human consumption, it should only be applied pre -plant
with no further applications of animal waste during the crop season.
21. Highly visible markers shall be installed to mark the top and bottom
elevations of the temporary storage (pumping volume) of all waste
treatment lagoons. Pumping shall be managed to maintain the liquid level
between the markers. A marker will be required to mark the maximum
storage volume for waste storage ponds.
865647 Database Version 3.1 Date Printed: 8/22/2006 Specification Page 3
22. Waste shall be tested within 60 days of utilization and soil shall be tested
at least annually at crop sites where waste products are applied. Nitrogen
shall be the rate -determining nutrient, unless other restrictions require
waste to be applied based on other nutrients, resulting in a lower
application rate than a nitrogen based rate. Zinc and copper levels in the
soils shall be monitored and alternative crop sites shall be used when
these metals approach excessive levels. pH shall be adjusted and
maintained for optimum crop production. Soil and waste analysis
records shall be kept for a minimum of five years. Poultry dry waste
application records shall be maintained for a minimum of three years.
Waste application records for all other waste shall be maintained for five
(5) years.
23. Dead animals will be disposed of in a manner that meets North Carolina
regulations.
865647 Database Version 3.1 Date Printed: 8/22/2006 Specification Page 4
Norris Farm Irrigation Specifications
Field A
Al 1.14 acres
A2 1.14 acres
A3 1.14 acres
A4 1.14 acres
A5 1.14 acres
A6 1.14 acres
A7 1.14 acres
Total = 7.98 acres
(All sprinklers in each zone (entire Field A) are run at same time for uniform coverage.)
Field B
B1 1.14 acres
B2 1.14 acres
B3 1.14 acres
B4 1.14 acres
B5 1.14 acres
Total= 5.7 acres
(All sprinklers in each zone (entire Field B) are run at same time for uniform coverage.)
7-5-4
William Norris Farm
Fac 31-639
RISER LOCATION MAP
Scale 1 :15 ' APPRO
31-- 9
Version —November 26, 2018
Mortality Management Methods
Indicate which method(s) will be implemented.
When selecting multiple methods indicate a primary versus secondary option.
Methods other than those listed must be approved by the State Veterinarian.
Primary Secondary Routine Mortality
0 El
Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal
death. The burial must be at least 300 feet from any flowing stream or public body of water
(G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal
high water table. Attach burial location map and plan.
El El Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC
13B.0200.
El71 Rendering at a rendering plant licensed under G.S. 106-168.7.
ElComplete incineration according to 02 NCAC 52C .0102.
Q El A composting system approved and permitted by The NC Department of Agriculture & Con-
sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm,
additional requirements must be met and a permit is required from NC DEQ.
•
In the case of dead poultry only, placing in a disposal pit of a size and design approved by the
NC Department of Agriculture & Consumer Services (G.S. 106-549.70).
Q a Any method which, in the professional opinioneof the State Veterinarian, would make possible
the salvage of part of a dead animal's value without endangering human or animal health.
(Written approval by the State Veterinarian must be attached).
Mass Mortality Plan
Mass mortality plans are required for farms covered by an NPDES permit. These plans are
also recommended for all animal operations. This plan outlines farm -specific mortality man-
agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup-
ports a variety of emergency mortality disposal options; contact the Division for guidance.
• A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated
when numbers of dead animals exceed normal mortality rates as specified by the State
Veterinarian.
• Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary
Division regulations and guidance.
• Mass burial sites are subject to additional permit conditions (refer to facility's animal
waste management system permit).
• In the event of imminent threat of a disease emergency, the State Veterinarian may enact
additional temporary procedures or measures for disposal according to G.S. 106-399.4.
&A
Signature of Farm Owner/Manager
o-e a mom,
Date
y Iq
Signature of Technical Specialist Date
EMERGENCY ACTION PLAN
PHONE NUMBERS
DIVISION OF WATER QUALITY (DWQ)
EMERGENCY MANAGEMNET SERVICES (EMS)
SOIL AND WATER CONSERVATION DISTRICT (SWCD)
NATURAL RESOURCES CONSERVATION SERVICE (NRCS)
COOPERATIVE EXTERSION SERVICE (CES)
9/45- 315 - 316o
9fl
z-4(.'Zit.9
This plan will be implemented in the event that wastes from your operation are leaking,
overflowing or running off site. You should not wait until wastes reach surface waters
or leave you property to consider that you have a problem. You should make every
effort to ensure that this does not happen. This plan should be posted in an accessible
location for all employees at the facility. The following are some action items you should
take.
1. Stop the release of wastes. Depending on the situation, this may ore may not be
possible. Suggested responses to some possible problems are listed belwo.
A. Lagoon overflow -possible solutions are:
a. Add soil to berm to increase elevation of dam.
b. Pump wastes to fields at an acceptable rate.
c. Stop all flows to the lagoon immediately.
d. Call a pumping contractor.
e. Make sure no surface water is entering lagoon.
B. Runoff from waste application field -actions include:
a. Immediately stop waste application.
b. Create a temporary diversion to contain waste.
c. Incorporate waste to reduce runoff.
d. Evaluate and eliminate the reason(s) that cause the runoff.
e. Evaluate the application rates for the fields where runoff occurred.
C. Leakage from the waste pipes and sprinklers -action include:
a. Stop recycle pump.
b. Stop irrigation pump.
c. Close valves to eliminate further discharge.
d. Repair all leaks prior to restarting pumps.
D. Leakage from flush systems, houses, solid separators -action include:
a. Stop recycle pump.
b. Stop irrigation pump.
c. Make sure siphon occurs.
d. Stop all flows in the house, flush systems, or solid separators.
E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed
to flowing leaks -possible action:
a. Dig a small sump or ditch from the embankment to catch all
seepage, put in a submersible pump, and pump back to lagoon.
b. If holes are caused by burrowing animals, trap or remove animals and fill
holes and compact with a clay type soil.
c. Have a professional evaluate the condition of the side walls and lagoon
bottom as soon as possible.
1
2. Assess the extent of the spill and note any obvious damages.
a. Did the waste reach any surface waters?
b. Approximately how much was released and for what duration?
c. Any damage notes, such as employee injury, fish kills, or property damage?
d. Did the spill leave the property?
e. Does the spill have the potential to reach surface waters?
f. Could a future rain event cause the spill to reach surface waters?
g. Are potable water wells in danger (either on or off the property)?
h. How much reached surface waters?
3. Contact appropriate agencies.
a. During normal business hours call your DWQ regional office; Phone - -. After
hours, emergency number: 919-733-3942. Your phone call should include: your
name, facility number, telephone number, the details of the incident from item 2
above, the exact location of the facility, the location or direction of movement of
the spill, weather and wind conditions. The corrective measures that have been
under taken, and the seriousness of the sitution.
b. If spill leaves property or enters surface waters, call local EMS phone number.
c. Instruct EMS to contact local Helath Department.
d. Contact CEs, phone number - , local SWCD office phone number - -, and local
NRCS office for advice/technical assistance phone number - -.
4. If none of the above works call 911 or the Sheriff's Department and explain you
problem to them and ask the person to contact the proper agencies for you.
5. Contact the contractor of your choice to begin repair or problem to minimize off -
site damage.
a. Contractors Name:
b. Contractors Address:
c. Contractors Phone:
5y fAa•.5
Ra Der 1 4sMGlls 7J.C. '- 4'9
9/6- ¶) .-
6. Contact the technical specialist who certified the lagoon (NRCS, Consulting
Engineer, etc.)
a. Name:
b. Phone:
GA'\
—531--iz11-(
7. Implement procedures as advised by DWQ and technical assistance agencies to
rectify the damage, repair the system, and reassess the waste managment plan to
keep problems with release of wastes from happening again.
2
INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS
Source Cause BMP's to Minimize Odor Site Specific Practices
(Liquid Systems)
Flush Gutters Accumulation of solids
lyflush system is designed and operated
sufficiently to remove accumulated
so lds from gutters es designed.
(),iemove bridging of accumulated solids et
disc arge
Lagoons and Pits Crusted Solids
.{Maintain lagoons, settling basins and
pits where pest breeding is apparent to
minimize the crusting of solids to a depth
of no more than 6-8 inches over more than
30% of surface.
Excessive Vegetative Decaying vegetation
Growth
{d'flaintain vegetative control along banks of
lagoons and other impoundments to prevent
accumulation of decaying vegetative matter
along water's edge on impoundment's perimeter.
(DrOystems)
Feeders Feed Spillage J.) Design, operate end maintain feed systems (e.g.,
bunkers and troughs) to minimize the accumulation
?IA -buoying wastage.
Clean up spillage on a routine basis (e.g. 7-10 day
interval during summer; 15-30 day interval during winter).
Feed Storage Accumulations of feed residues
11y46duce moisture accumulation within and around
immediate perimeter of feed storage areas by
insuring drainage away from site and/or providing
adequate containment (e.g., covered bin for
brewer's grain and similar high moisture grain
prod .
nspect for and remove or break up accumulated
solids in filter strips around feed storage as needed.
Animal Holding Areas Accumulations of animal wastes
and feed wastage
Yr-Eliminate low area that trap moisture along fences
and o locations where waste accumulates and
disturbance by animals is minimal.
1 Maintain fence rows and filter strips around animal
holding areas to minimize accumulations of wastes
(i.e. inspect for and remove or break up accumulated
solids as needed).
AMIC--November 11, 1996
Dry Manure Handling Accumulations of animal wastes /move spillage on a routine basis (e.g. 7-10 day
Systems interval during summer; 15-30 days interval during
yiirtter) where manure is loaded for land application
or disposal.
() Pr a for adequate drainage around manure stockpiles.
Inspect for and remove or break up accumulated wastes
in filter stripes around stockpiles and manure handling
areas as needed.
The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying
insect control measures as practical.
I certify the aforementioned insect control Best Management Practices have been reviewed with me.
an. owner Signature)
For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC
27695-7613.
AMIC--November 11, 1996
Source
SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST
Cause
BMP's to Minimize Odor
Site Specific Practices
Farmstead
Swine production
n VegetativeVor wooded buffers;
W'Hecommerded beet management
practices;
6Yt tod judgment and common sense
Animal body surfaces Dirty manure -covered animals
Floor surfaces
Wet manure -covered floors
-O Dry floors
( 1 Slotted floors;
(I Waterers located over slotted floors;
(1 Feeders at high end of solid floors;
(1 S5r_epe manure buildup from floors;
nderfloor ventilation for drying
Manure collection pits Urine
Parital micorbial decomposition
^O Frequent manure removal by flush,pit
recharge,or scrape
(-Wndderfloor ventilation
Ventilation exhaust fans Volatile gases;
Dust
,14YFen maintenance;
ficient air movement
Indoor surfaces
Dust
-(1 Washdown between groups of animals
(1 Feed additives;
(( I�Feeder covers;
(11Feed delivery downspout extenders to
feeder covers
Flush tanks
Agitation of recycled lagoon
liquid whiles tanks are filling
(1 Flush tank covers
• $-Esitend fill lines to near bottom of
tanks with anti -siphon vents
Flush alleys
Agitation during wastewater
conveyanance
(1 Underfloor flush with underfloor
ventilation
Pit recharge points
Agitation of recycled lagoon
liquid while pits are filling
end rechard lines to near bottom of
pits with anti -siphon vents
Lift stations
Agitation during sump tank filling
and drawdown
(1 Sump tank covers
Outside drain collection Agitation during wastewater
or junction boxes
conveyance
(1 Box covers
End of drainpipes at lagoon Agitation during wastewater
11-Extend discharge point of pipes
underneath lagoon liquid level
Lagoon surfaces
Volatile gas emissions
Biological mixing
Agitation
(LI-Proper lagoon liquid capacity
c 1Correct lagoon startup procedures
'I 1 um surface area -to -volume ratio
1 Minimum agitation when pumping
( 1 Mechanical aeration
(1 Proven biological additives
Irrigation sprinkler nozzles High pressure agitation
Wind draft
fl Irri on dry days with little or no wind
um recommended operation pressure
1 P take near lagoon liquid surface
1 Pump from second -stage lagoon
AMOC--November 11, 1996
Storage tank or basin
surface
Partial microbial decomposition
Mixing while filling
Agitation when emptying
() Bottom or midlevel loading
O Tank covers
(1 Basin surface mats of solids
() Proven biological additives or oxidants
Settling basin surface
Partial micobial decomposition
Mixing while filling
Agitation when emptying
O Extend drainpipe outlets underneath liquid
level
(1 Remove settled solids regularly
Manure, slurry or sludge Agitation when spreading
spreader outlets Volatile gas emissions
() Soil injection of slurry/sludges
(1 Wash residual manure from spreader after use
() Proven biological additives or oxidants
Uncovered manure, slurry
or sludge on field surfaces
Volatile gas emissions while drying
(1 Soil infection of slurry/sludges
(1 Soil incorporation within 48 hours
(1 Spread In thin uniform layers for rapid drying
(1 Proven biological additives or oxidants
Dead animals
Carcass decomposition
Proper disposition of carcasses
Dead animal disposal
pits
Carcass decomposition
(-)Complete covering of carcasses in burial pits
(„)-Proper location/construction of disposal pits
Incinerators
Incomplete combustion ( ) Secondary stack burners
Standing water around
facilities
Improper drainage
Microbial decomposition of
organic matter
J....)--Gcade and landscape such that water drains
away from facilities
Manure tracked onto public Poorly maintained access roads arm access road maintenance
roads from farm access
Additional Information:
Available From:
Swine Manure Management; 0200 Rule/BMP Packet
Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet
Swine Production Facility Manure Management: Pit Recharge --Lagoon Treatment; EBAE 128-88
Swine Production Facility Manure Management: Underfloor Fluse--Lagoon Treatment; EBAE 129-88
Lagoon Desig and Management for Livestock Manure Treatment end Storage; EBAE 103-83
Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet
Controlling Odors from Swine Buildings; PIH-33
Environmental Assuranc Program: NPPC Manual
Options for Managing Odor; a report from the Swine Odor Task Force
Nuisance Concerns in Animal Manure Management: Odors and Flies; PRO107, 1995 Conference Proceedings
NCSU-County Extension Center
NCSU-BAE
NCSU-BAE
NCSU-BAE
NCSU-BAE
NCSU-BAE
NCSU-Swine Extension
NC Pork Produces Assoc
NCSU Agri Communications
Florida Cooperative Extension
The issues checked ( ) pertain to this operation. The landowner/integrator agrees to use sound judgment in applying
odor control measures as practical.
I certify the aforementioned odor control Best Managment Practices have been re iew
'th me.
andbwner Signature)
AMOC--November 11, 1996
System Calibration
Information presented in manufacturer's charts are based on average operation
conditions with relatively new equipment. Discharge rates and application rates
change over time as equipment gets older and components wear. In particular,
pump wear tends to reduce operating pressure and flow. With continued use,
nozzle wear results in an increase in the nozzle opening which will increase the
discharge rate while decreasing the wetted diameter.
You should be aware that operating the system differently than assumed in the
design will alter the application rate, diameter of coverage, and subsequently the
application uniformity. For example, operating the system with excessive pressure
results in smaller droplets, greater potential for drift, and accelerates wear of the
sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged
intakes or crystallization of mainlines will reduce operating pressure. Operating
below design pressure greatly reduces the coverage diameter and application
uniformity.
For the above reason, you should calibrate your equipment on a regular basis to
ensure proper application rates and uniformity. Calibration at least once every
three years is recommended. Calibration involves collecting and measuring flow at
several locations in the application area. Any number of containers can be used to
collect flow and determine the application rate. Rain gauges work best because
they already have a graduated scale from which to read the application amount
without having to perform additional calculations. However, pans, plastic buckets,
jars, or anything with a uniform opening and cross-section can be used provided
the liquid collected can be easily transferred to a scaled container for measuring.
For stationary sprinklers, collection containers should be located randomly
throughout the application area at several distances from sprinklers. For traveling
guns, sprinklers should be located along a transect perpendicular to the direction
of pull. Set out collection containers 25 feet apart along the transect on both
sides of the gun cart. You should compute the average application rate for all
nonuniformity of the application. On a windless day, variation between containers
of more than 30 percent is cause for concern. You should contact your irrigation
dealer or technical specialist for assistance.
'Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual
OPERATION & MAINTENANCE PLAN
Proper lagoon liquid management should be a year-round priority. It is especially
important to manage levels so that you do not have problems during extended rainy and
wet periods.
Maximum storage capacity should be available in the lagoon for periods when the
receiving crop is dormant (such as wintertime for bermudagrass) or when there are
extended rainy spells such as the thunderstorm season in the summertime. This means
that at the first signs of plant growth in the later winter/early spring, irrigation according to
a farm waste management plan should be done whenever the land is dry enough to
receive lagoon liquid. This will make storage space available in the lagoon for future wet
periods. In the late summer/early fall the lagoon should be pumped down to the low
marker (see Figure 2-1) to allow for winter storage. Every effort should be made to
maintain the lagoon close to the minimum liquid level as long as the weather and waste
utilization plan will allow it.
Waiting until the lagoon has reached its maximum storage capacity before starting to
irrigate does not leave room for storing excess water during extended wet periods.
Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of
state law and subject to penalty action.
The routine maintenance of a lagoon involves the following:
Maintenance of a vegetative cover for the dam.
Fescue or common bermudagrass are the most common vegetative
covers. The vegetation should be fertilized each year, if needed, to
maintain a vigorous stand. The amount of fertilizer applied should be
based on a soils test, but in the event that it is not practical to obtain
a soils test each year, the lagoon embankment and surrounding areas
should be fertilized with 800 pounds per acre of 10-10-10, or
equivalent.
Brush and trees on the embankment must be controlled. This may be
done by mowing, spraying, grazing, chopping, or a combination of
these practices. This should be done at least once a year and
possibly twice in years that weather conditions are favorable for
heavy vegetative growth.
NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter
the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating
the waste.
Maintenance inspections of the entire lagoon should be made during the initial filling of
the lagoon and at least monthly and after major rainfall and storm events. Items to be
checked should include, as a minimum, the following:
Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ---look for:
1. separation of joints
2. cracks or breaks
3. accumulation of salts or minerals
4. overall condition of pipes
Lagoon surface ---look for:
1. undesirable vegetative growth
2. floating or lodged debris
Embankment ---look for:
1. settlement, cracking, or "jug" holes
2. side slope stability ---slumps or bulges
3. wet or damp areas on the back slope
4. erosion due to lack of vegetation or as a result of wave action
5. rodent damage
Larger lagoons may be subject to liner damage due to wave action caused by strong
winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam.
A good stand of vegetation will reduce the potential damage caused by wave action. If
wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be
used to reduce the wave impacts.
Any of these features could lead to erosion and weakening of the dam. If your lagoon has
any of these features, you should call an appropriate expert familiar with design and
construction of waste lagoons. You may need to provide a temporary fix if there is a threat
of a waste discharge. However, a permanent solution should be reviewed by the
technical expert. Any digging into a lagoon dam with heavy equipment is a serious
undertaking with potentially serious consequences and should not be conducted unless
recommended by an appropriate technical expert.
Transfer Pumps ---check for proper operation of:
1. recycling pumps
2. irrigation pumps
Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding
noise, or a large amount of vibration, may indicate that the pump is in need or repair or
replacement.
NOTE: Pumping systems should be inspected and operated frequently enough so that you
are not completely "surprised" by equipment failure. You should perform your pumping
system maintenance at a time when your lagoon is at its low level. This will allow some
safety time should major repairs be required. Having a nearly full lagoon is not the time
to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full,
your neighbor's lagoon is full also. You should consider maintaining an inventory of spare
parts or pumps.
Surface water diversion features are designed to carry all surface
drainage waters (such as rainfall runoff, roof drainage, gutter outlets,
and parking lot runoff) away from your lagoon and other waste
treatment or storage structures. The only water that should be
coming from your lagoon is that which comes from your flushing
(washing) system pipes and the rainfall that hits the lagoon directly.
You should inspect your diversion system for the following:
1. adequate vegetation
2. diversion capacity
3. ridge berm height
Identified problems should be corrected promptly. It is advisable to inspect your system
during or immediately following a heavy rain. If technical assistance is needed to
determine proper solutions, consult with appropriate experts.
You should record the level of the lagoon just prior to when rain is predicted, and then
record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will
give you an idea of how much your lagoon level will rise with a certain rainfall amount
(you must also be recording your rainfall for this to work). Knowing this should help in
planning irrigation applications and storage. If your lagoon rises excessively, you may
have an inflow problem from a surface water diversion or there may be seepage into the
lagoon from the surrounding land.
Lagoon Operation
Startup:
1. Immediately after construction establish a complete sod cover on bare soil
surfaces to avoid erosion.
2. Fill new lagoon design treatment volume at least half full of water before
waste loading begins, taking care not to erode lining or bank slopes.
3. Drainpipes into the lagoon should have a flexible pipe extender on the
end of the pipe to discharge near the bottom of the lagoon during initial
filling or another means of slowing the incoming water to avoid erosion of
the lining.
4. When possible, begin loading new lagoons in the spring to maximize
bacterial establishment (due to warmer weather).
5. It is recommended that a new lagoon be seeded with sludge from a healthy
working swine lagoon in the amount of 0.25 percent of the full lagoon
liquid volume. This seeding should occour at least two weeks prior to the
addition of wastewater.
6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below
7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of
lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid
pH is between 7.5 and 8.0.
7. A dark color, lack of bubbling, and excessive odor signals inadequate
biological activity. Consultation with a technical specialist is recommended
if these conditions occur for prolonged periods, especially during the warm
season.
Loading:
The more frequently and regularly that wastewater is added to a lagoon, the better the
lagoon will function. Flush systems that wash waste into the lagoon several times daily are
optimum for treatment. Pit recharge systems, in which one or more buildings are drained
and recharged each day, also work well.
Practice water conservation ---minimize building water usage and
spillage from leaking waterers, broken pipes and washdown through
proper maintenance and water conservation.
Minimize feed wastage and spillage by keeping feeders adjusted. This
will reduce the amount of solids entering the lagoon
Management:
Maintain lagoon liquid level between the permanent storage level and
the full temporary storage level.
• Place visible markers or stakes on the lagoon bank to show the
minimum liquid level and the maximum liquid lever (Figure 2-1).
• Start irrigating at the earliest possible date in the spring based on
nutrient requirements and soil moisture so that temporary storage
will be maximized for the summer thunderstorm season. Similarly,
irrigate in the late summer/early fall to provide maximum lagoon
storage for the winter.
The lagoon liquid level should never be closer than 1 foot to the lowest
point of the dam or embankment.
Do not pump the lagoon liquid level lower that the permanent storage
level unless you are removing sludge.
Locate float pump intakes approximately 18 inches underneath the liquid
surface and as far away from the drainpipe inlets as possible.
Prevent additions of bedding materials, long-stemmed forage or vegetation,
molded feed, plastic syringes, or other foreign materials into the lagoon.
Frequently remove solids from catch basins at end of confinement houses or
wherever they are installed.
Maintain strict vegetation, rodent, and varmint control near lagoon edges.
Do not allow trees or large bushes to grow on lagoon dam or embankment.
Remove sludge from the lagoon either when the sludge storage capacity is
full or before it fills 50 percent of the permanent storage volume.
If animal production is to be terminated, the owner is responsible for
obtaining and implementing a closure plan to eliminate the possibility of a
pollutant discharge.
Sludge Removal:
Rate of lagoon sludge buildup can be reduced by:
proper lagoon sizing,
mechanical solids separation of flushed waste,
gravity settling of flushed waste solids in an appropriately designed basin, or
minimizing feed wastage and spillage.
Lagoon sludge that is removed annually rather than stored long term will:
have more nutrients,
have more odor, and
require more land to properly use the nutrients.
Removal techniques:
Hire a custom applicator.
Mix the sludge and lagoon liquid with a chopper -agitator impeller
pump through large -bore sprinkler irrigation system onto nearby cropland;
and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; mix remaining sludge; pump into liquid sludge applicator; haul
and spread onto cropland or forageland; and soil incorporate.
Dewater the upper part of lagoon by irrigation onto nearby cropland or
forageland; dredge sludge from lagoon with dragline or sludge barge; berm
an area beside lagoon to receive the sludge so that liquids can drain back
into lagoon; allow sludge to dewater; haul and spread with manure spreader
onto cropland or forageland; and soil incorporate.
Regardless of the method, you must have the sludge material analyzed for waste
constituents just as you would your lagoon water. The sludge will contain different
nutrient and metal values from the liquid. The application of the sludge to fields will be
limited by these nutrients as well as any previous waste applications to that field and crop
requirement. Waste application rates will be discussed in detail in Chapter 3.
When removing sludge, you must also pay attention to the liner to prevent damage. Close
attention by the pumper or drag -line operator will ensure that the lagoon liner remains
intact. If you see soil material or the synthetic liner material being disturbed, you should
stop the activity immediately and not resume until you are sure that the sludge can be
removed without liner injury. If the liner is damaged it must be repaired as soon as
possible.
Sludge removed from the lagoon has a much higher phosphorus and heavy metal content
than liquid. Because of this it should probably be applied to land with low phosphorus
and metal levels, as indicated by a soil test, and incorporated to reduce the chance of
erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it
should be applied only at rates equal to the crop removal of phosphorus. As with other
wastes, always have your lagoon sludge analyzed for its nutrient value.
The application of sludge will increase the amount of odor at the waste application site.
Extra precaution should be used to observe the wind direction and other conditions which
could increase the concern of neighbors.
Possible Causes of Lagoon Failure
Lagoon failures result in the unplanned discharge of wastewater from the structure. Types
of failures include leakage through the bottom or sides, overtopping, and breach of the
dam. Assuming proper design and construction, the owner has the responsibility for
ensuring structure safety. Items which may lead to lagoon failures include:
Modification of the lagoon structure ---an example is the placement of a pipe
in the dam without proper design and construction. (Consult an expert in
lagoon design before placing any pipes in dams.)
Lagoon liquid levels ---high levels are a safety risk.
Failure to inspect and maintain the dam.
Excess surface water flowing into the lagoon.
Liner integrity ---protect from inlet pipe scouring, damage during sludge
removal, or rupture from lowering lagoon liquid level below groundwater
table.
NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause
gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge
of wastewater and possible dam failure.
Operator:Norris #3 County: Duplin Date: 08/19/96
Distance to nearest residence (other than owner): 900.0 feet
AVERAGE LIVE WEIGHT (ALW)
O sows (farrow to finish) x 1417 lbs.
0 sows (farrow to feeder) x 522 lbs.
t'6 head (finishing only) x 135 lbs.
O sows (farrow to wean) x 433 lbs.
2600 head (wean to feeder) x 30 lbs.
Describe other .
Total Average Live Weight =
MINIMUM REQUIRED TREATMENT VOLUME OF-- LAGOON
Volurne = 78000 lbs. ALW x Treatment Volurne(Cf- )/lb. ALW
Treatment Volume(CF)/lb. ALW = 1 C'/11i- ALW
Volume = 78000 cubic feet
STORAGE VOLUME FOR SLUDGE ACCUMULATION
Volurne
0.0 cubic feet
TOTAL DESIGNED VOLUME
Inside top length (feet) --
Inside top width (feet) --------
Top of dike elevation (feet)-----
Bottorn of lagoon elevation (feet) ----
Freeboard (feet)
Side slopes (inside lagoon)---
--
Total design volume using prismoidal formula
SS/END1
3.0
SS/END2 SS/SIDE1 `35/SID02
3.0 3.0 3.0
AREA OF TOP
LENGTH * WIDTH =
144.0 124.0
AREA OF B01(OM
LENGTH x. WIDTH =
81.0 61.0
AREA OF MIDSECTION
LENGTH t WIDTH 4
112.5 92.5
LENGTH
144.0
150.0
130.0
50.5
39.0
1 .0
3.0
O lbs
O lbs
O lbs
O lbs
78000 lbs
0
78000 lbs
WIDTH DEPTH
124.0 10.5
17856 (AREA OF TOP)
4941 (AREA OF BOTTOM)
41625 (AREA OF MIDSECTION 4)
CU. FT. = [AREA TOP (4*AREA MIDSECTION) + AREA BOTTOM]
17856.0 41625.0 4941.0
DEPTH/6
1.8
Total Designed Volume Available = 112739 CU. FT.
TEMPORARY STORAGE REQUIRED
DRAINAGE AREA:
Lagoon (top of dike)
Length * Width =
150.0 130.0 19500.0 square feet
Buildings (roof and lot water)
0.0 square feet
TOTAL DA 19500.0 square feet
Design temporary storage period to be 90 days.
Volurne of waste produced
Feces & urine production in gal./day per 135 1b. ALW 1.37
Describe this area.
Volume = 78000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 90 days
Volume = 71240 gals. or 9524.1 cubic feet
5B. Volume of wash water
This is the amount of fresh water used for washing floors or volume
of fresh water used for a flush system. Flush systems that recirculate
the lagoon water are accounted for in 5A.
Volurne = 0.0 gallons/day * 90 days storage/7.48 gallons
per CF
Volume = 0.0 cubic feet
5C. Volume of rainfall in excess of evaporation
Use period of time when rainfall exceeds evaporation by largest amount.
90 days excess rainfall 7.5 inches
Volume = 7.5 in t DA / 12 inches per foot
Volume = 12187.5 cubic feet
Volume of 25 year - 24 hour storm
Volume = 7.5 inches / 12 inches per foot * DA
Volume = 12187.5 cubic feet
NOTAL REQUIRED TEMPORARY STORAGE
5A. 9524 cubic feet
5B. 0 cubic feet
5C. 12188 cubic feet
5D. 12183 cubic feet
TOTAL 33899 cubic feet
SUMMARY
Temporary storage period==-------- =_____> 90 days
Rainfall in excess of evaporation===== ___> 7.5 inches �(
25 year - 24 hour rainfall __=_=_____=-> 7.5 inches ittp
Freeboard — 1 1.0 feet
Si e slopes===='------___-------- °--`-------, 3.0 1
150.0 feet
130.0 feet
Top of dike elevation======== =========::_=:===_ 50.5 feet
Bottom of lagoon elevation-----__ _____) 39.0 feet
Total required volume- = 111899 cu. ft. *
Actual design volurne===— ___:__ _ _:=> 112739 cu . ft. *
Seasonal high watertable elevation (SHWT)===> 43.0 feet
Stop pumping elev.----- 47.4 feet *.
Must be > or = to the SHWT e1ev.--------____=> 43.0 feet
Must be > or = to ruin. req. treatment el.=> 45.0 feet
Required minimum treatment volume============> 78000 cu. ft.
Volume at stop pumping elevation=====-========> 78675 cu. ft.
Start pumping elev.====_ ) 48.8 feet *
Must be at bottom of freeboard & 25 yr. rainfall
Actual volume less 25 yr.- 24 hr. rainfall==> 100551 cu. ft.
Volume at start pumping elevation=========-__==_> 100629 cu. ft.
Required volume to be pumped=====- -----__--==> 21712 cu. ft. *
Actual volurne planned to be pumped======_= => 21954 cu. ft. *
Min. thickness of soil liner when requit d=_) 1.7 tect
DESIGNED BY: APPROVED BY:'
DATE: DATE:
NOTE: SEE ATTACHED IWASt(TE UTILIZATrION PLAN II II rr
COMMENTS: ►+5- ia:l1" dCbig4 a3i(l .sm. 0- St1.1Jd.A0.d�
_ANj specs. n 9a elms a4
T Ct r €iJ} pqo( .4
51.2 4sswf /kJ - So.o
b.4 565
So.?
Avg LE.,�l.— iso,o
Avg, LJ:d4l, - / /0,
j`P EI�J. — 50,0
({e Kb.h Of V ^ 39,0
S: dE 51, ES - a � : I
1,1 on:5
s
As-
Uaoo 11te4 *iU¢5f cti
•_Dp :rator:No'I'ri #2 County: Dupl;i.n
{ f = 01/04/97
Distance to nearest residence ( other i':.h an owner): 1100.0 feet
1. AVERAGE LIVE WEIGHT (r^IL.W )
O sows (farrow to finish) 1417 lbs.
.a
O sows (farrow to f eede r) E,22 lbs.
O head (finishing only) x 135 lbs.
O sows (farrow to wean) x 433 lbs.
I
2600 head ( wean to feeder) x 30 lbs.
Deco ib:-: other
Total Average Live Weight _.
MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 78000 lbs. ALW x Treatment Vo.lurne( CF )/ib . ALW
Treatment Volume( F) /lb ALW - 1 Cr /ll: ALW
C, r � s.� . ry �.. 1 ; .
Volume = 70000 cubic feet
STORAGE VOLUME FOR SLUDGE ACCUMULATION
Volurne = 0,0 cubic feet
1. TOTAL DESIGNED VOLUME
Inside top length (feet )_...- ..-._._
Inside top width (fleet)..._...____...._...__.___w....._..__.._......._.._.
Top of dike elevation (feet) ----
Bottom of lagoon elevation ( feet)--- _._.__ _. .
I 1 c„is CJ CII LI ( 1 eCGt )._._._Y.. .... . ..._.
Side slopes (inside iag.ocrn )--•___.._.-...._._._...._.......
Tt: ta.l. design n volume using prismoidal formula
5S/END1 /E_ND2 OS/SIDL1 ::,:,/ 7:DE_ W LENGTH
... 3.0 3.0 3.0 144.00
AREA OF. TOP
LENGTH * WIDTH
144.0 134.0
AREA OF BOTTOM
LENGTH r' WIDTH ==
81.0 71,0
AREA OF MIDSECTION
LENGTH :r: WIDTH 4
11L.5 102.5
150.0
140.0
53.0
41.5
1.0
3.0 • 1
WIDTH
134.0
O lbs
O lbs
O lb:
O lbs
78000 lbs
0
78000 lbs
DEPTH
10.5
192')6 AREA OF TOP)
5751 ( AREA OF BOTTOM)
46125 ( AREA OF MIDSECTION * 4 )
CU. FT. _ [AREA TOP -4 (4*AREA MIDSECTION) 1- AREA BOTTOM] DEPTH/6
19296.0 46125.0 5751.0 1,8
Total Designed Volurne Available = 124551 CU. FT.
TEMPORARYSTORAGE' RE00I:. L
DRA].G0 AREA:
Lasoon ( top of di ks
Length t Width =
150.0 140.0 21000.0 square feet.
E�ul dl ng 0_1 and lot water)
0.0 square feet
TOTAL DA 21000.0 square feet
'c il.Fjil temporary stoic., n purled to be 180 days.
Volume of waste: produced
urine production in gal./day per 135 lb. ALW 1.37
Volume
Volume
Descj ib: tjlo arvo.
78000 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days
142480 gals. or 19048.1 cubic fact
la. Volume of wash water
This is the amount of fresh water used for washing floors or volume
of fresh water used for a flush system. Flush syslsystems that recirculate
the lagoon water are accounted for in 5A.
Volume -- 0.0 nallons/day * 100 days tc/cu-c/% _ lb pal.LGno
per Cr
V o l u m, -= 0.0 cubic fee t
Va:.
u,.uru� of � �,�i��-,11 in
Use Duo l d Ci'i time when rainfall cxcceds etion hi 1urgest. amount.
100 criyiu exceGsrainfall = 7 .5 inches
Volume _ in DA / 12 inches per foot
Volume; = 13130.0 cubic feet
50Volum� 01 2-r, yoar
Z4 |)uu/ oL^I
7� iochnu
Yo|vmc - l-,l2��O cu�i, f�eL
TOlAL 8EAUlK[D
�UMMA8Y
TDMP00AKY 5T0RAGE
l9040 cubic f(�oL
O �-ubio fzotl
13l�� cubic feot
12125 cubic fr�Au
45298 cubic f�tt
Temrnrory atorage pariod========--- ===========,
Rainfall in oxcaaa of evapnrution==�========>
23 y0a/ - 24
Fremboard=======�=��====��====��============)
'UO dayo
7� inchao //
���
1 f�^ ^
0 1
�faot
Inoido top 15O.0 fe�t
Inoide tVP 140.0 /oet
lop of dikp8 f*at
BotL("m of 41 f"ot
Tutal raq;rlume===�===================) 12-'298 cu� ft.
A�tu^l d�ai5n vVlum»======�=================> oV. fL
�oaa�nml �i�� wu�artubla elavatioo (�UWT)==�> 47.0 teat
fa�L
c||WT �\m�======�===� 47� {eut
Muut be > or = to min. raq���atwar.t
�o4oi/�d m�I!imum t/euCm�n�7U C,OO
Yy|um� a� otvp �umPing �y|�
�1uuL hw at bo& 2� )rraioful|
Actual volume l�oo Z� yr �4 �r/oiofall==) ]1l��� ^� f�
YoluIf) o el� umL448 oofC
Requirad volymo to 3Z173 cufC.
Actuul volome plannc�d :-o bc pumpcd=``========> JJ)53 cv �L
^ _ /�
Mi�ot|�iok�nao �f uoil lioo`� whon /eot
oqyirod�=> l7 f
A�3�
. D['IGN[D 8Y� /--L AITT 0YED KY:
DATE: /-4C-?-1 DAT[:
NOTE: CEE ATTAC|IL[ WT[ UTlLTZATL)N
C0MMENT��
Operator:Norris #1 County: Duplin Date: 08/19/96
Distance to nearest residence (other than owner): 1000.0 feet
1. AVERAGE LIVE WEIGHT (ALW)
O sows (farrow to finish) x 1417 lbs.
Q-sows (farrow to feeder) x 522 lbs.
t-O head (finishing only) x 135 lbs.
O sows (farrow to wean) .. 433 lbs.
2600 head (wean to feeder) x 30 lbs.
Describe other
Total Average Live Weight =
MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON
Volume = 78000 lbs. ALI1 x Treatment Volurne(CF)/lb. ALW
Treatment Volume(CF)/1h. ALW = 1 CF"/lh. ALW
Volume = 78000 cubic feet
STORAGE VOLUME FOR SLUDGE ACCUMULATION
Volume :. 0.0 cubic twat
TOTAL DESIGNED VOLUME
Inside top length (feet) -----
Inside top width (feeet)-- ---
Top of dike elevation (feet) ------
Bottom of lagoon elevation (feet) ---
Freeboard (feet.)-___._.
Side slopes (inside lagoon )----------
Total design volume using prismoidal formula
SS/END1
3.0
150.0
140_0
49.5
37.5
1
SS/END2 SS/SIDr:1 SS/SID52 LENGTH WIDTH
3.0 3.0 3.0 14 .o 124.0
AREA OF TOP
LENGTH WIDTH
144.0 134.0
ARL;, cTifiGgoi
LENGTH lc WIDTH =
. 0 68.0
AREA OF MIDSECTION
LENGTH t WIDTH 1- 4
111.0 101.E
O lbs
O .l b<>
O lbs
O lbs
7r:000 lbs
0
78000 lbs
DEPTH
11.0
5204 ( AREA Or- BOTTOM
44044 (AREA 4 MIDSTCliON T 1
CU. FT. = [AREA TOP i (4*AREA MIDSECTION) + AREA BOTTOM]
19296.0
44844.0 5304.0
DEPTH/6
1.8
Total Designed Volume Available = 127314 CU. FT.
5. TEMPORARY STORAGE REQUIRED
DRAINAGE AREA:
1,aboon (top of dike)
Length * Width =
150.0 140.0 21000.0 square feet
Buildings (roof and lot water)
0.0 square feet Describe this area.
TOTAL DA 21000.0 square feat
Design temporary storage period to be 180 days.
Volume of waste produced
Feces & urine production in gal./day per 135 lb. ALW 1.37
Volume = 78000 lbs. ALW/135 lbs_ ALW * 1.37 gal/day 180 days
Volume = 142480 gals. or 19048.1 cubic feet
Volume of wash water
This is the amount of fresh water used for washing floors or volume
of fresh water used for a flush system. Flush systems that recirculate
the lagoon water are accounted for in 5A.
Volume = 0.0 gallons/day t
180 days storage/7.48 gallons
per CF
Volume 0.0 cubic feet
Volume of rainfall in excess of evaporation
Use period of time when rainfall exceed evaporation by largest amount.
180 excess rainfall
Volume = 2.5 in t DA / 12 inches:;
Volume = 13125.0 cubic feet
7.5 tLtIC.
SD. Volume of 25 year - 24 hour storm
Volume = 7.5 inches / 12 inches per foot
Volume = 13125.0 cubic feet
TOTAL REQUIRED TEMPORARY STORAGE
SA.
5B.
5C.
5D.
19048
0
13125
13125
cubic
cubic
cubic
cubic
feet
feet
feet
feet
TOTAL 45298 cubic feet
SUMMARY
Temporary storage period ----------
Rainfall in excess of evaporation== = --- _>
25 year - 24 hour rainfall=-===----------------->
Inside ' - _================== == = top l�ng�h==----------�------�----_---->
Top of dike elevation----------------======----------->
Bottom of lagoon elevation==================>
Total required volurne-------------------_-_____=>
Seasonal high watertable elevation (SHWT)= =>
Must be > or = to the SHWT
Must be > or = to min. req. treatment el.=>
Required minimumtr•eatmcnt volume-:=::--_-____-_._=>
Volume at stop purnping elevation============>
Start purnping elev.===:__ __r: __---: __ ______-:___ ___ _)
Must be at bottom of freeboard & 25 yr. rainfall
Actual volurne less.25 yr.-- 24 hr. rainfall =) 114109 cu. ft.
Volume at start pumping elevation--------____==<> 112405 cu. ft.
Required volume to be pumped - _ 32173 cu. tt.
Actual volume planned to be pumped===========> 34328 cu. ft.
i.8 feet
DA
Min. thickness of soil liner when required==>
DESIGNED BY:
As-
DATE: /4- cj.?
APPROVED BY:
DATE:
NOTE: SEE ATTACHED WASTE UTILIZATION PLAN
COMMENTS: A l✓L d%(( v..EC1
al�c 44mv
180 days
7.5 inches fl
7.5 inches›
1.0 feet
3.0 : 1
150.0 feet
140.0 feet
49.5 feet
37.5 feet
123298 cu. ft.
127314 cu. ft.
42.0 feet
45.6 feet
42.0 feet
43.5 feet
78000 cu. ft.
78077 cu. ft.
47.7 feet
5PEC5. 04a'=,u
CON $kuc1. . 'Z'