Loading...
HomeMy WebLinkAbout310387_Permit Renewal Application 2019_20190410State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered. Please verify all information and make any necessary corrections below. Application Hurst be signed and dated by the Permittee. 1. Farm Number: 31-0387 Certificate Of Coverage Number: AWS310387 2. Facility Name: Wendy Evans Farm 3. Landowner's Name (same as on the Waste Management Plan): Seth Torrans Quinn 4. Landowner's Mailing Address: 218 J B Stroud Rd City: Magnolia State: NC Zip: 28453 Telephone Number: 910-289-7671 Ext. E-mail: sethquinn(i!centurylink.net 5. Facility's Physical Address: Brinson Rd City: Magnolia State: NC Zip: 28453 6. County where Facility is located: Duplin 7. Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): Murphy -Brown LLC 10. Operator Name (OIC): j ii Jr. Phone No.: 9 C ®904 OIC #: Y§B- 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operation Types: Operations Type Allowable Count Swine - Feeder to Finish 2,160 Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) "' I 1 13 CtcW 93GJ%O S6 6 /9 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed by the owner and a certified technical snecialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: �' j • `1/4, et Title: Signature: ' ' � �` Date: 'ttl+t\,c. Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 ROY COOPER Governor MICHAEL S. REGAN Secrerary LINDA CULPEPPER Director Seth Torrans Quinn Wendy Evans Farm 218 J B Stroud Rd Magnolia, NC 28453 NORTH CAROLINA Environmental Quality Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: February 27, 2019 Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available at https://dea.nc.gov/about/divisions/water-resources/water-quality-regional-operations/afo or by writing or calling: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In order to assure your continued coverage under the State Non -Discharge General Permits, you must submit an application for permit coverage to the Division. Enclosed you will find a 'Request for Certificate of Coverage Facility Currently Covered bv an Expiring State Non -Discharge General Permit." The application form must be completed, signed and returned bv April 3. 2019. Please note that you must include one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with the completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Enclosures cc (w/o enclosures): Sincerely, Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Wilmington Regional Office, Water Quality Regional Operations Section Duplin County Soil and Water Conservation District AFOG Section Central Files - AWS310387 Murphv-Brown LLC North Carolina Department of Environmental Quality I Division of Water Resources 7rj 512 N. Salisbury St. 11636 bail Service Center I Raleigh, North Carolina 27699-1636 """` 919.7079000 Nutrient Management Plan For Animal Waste Utilization 03-07-2018 This plan has been prepared for: BP Farm i el 3 kir) Seth T Quinn 218 JB Stroud Rd Magnolia, NC 28453 910-289-7671 This plan has been developed by: Billy W Houston Duplin Soil & Water Conservation 165 Agriculture Dr. Suite B Kenansville, NC 28349 910-296-2120 X-3 Developer Signature Type of Plan: Nitrogen Only with Manure Only Owner/Manager/Producer Agreement I (we) understand and agree to the specifications and the operation and maintenance procedures established in this nutrient management plan which includes an animal waste utilization plan for the farm named above. I have read and understand the Required Specifications concerning animal waste management that are included with this plan. /1,47 Signature (owner) Date Signature (manager or producer) Date This plan meets the minimum standards and specifications of the U.S. Department of Agriculture - Natural Resources Conservation Service or the standard of practices adopted by the Soil and Water Conservation Commission. Plan Approved By: 6 .- 72 7/9 J) 7 Technical Specialist Signature Date 954540 Database Version 4.1 Date Printed: 03-07-2018 Cover Page 1 Nutrients applied in accordance with this plan will be supplied from the following source(s): Commercial Fertilizer is not included in this plan. S7 Swine Feeder -Finish Lagoon Liquid waste generated 2,002,320 gals/year by a 2,160 animal Swine Finishing Lagoon Liquid operation. This production facility has waste storage capacities of approximately 180 days. Estimated Pounds of Plant Available Nitrogen Generated per Year Broadcast 3609 Incorporated 4331 Injected 4331 Irrigated 3609 Max. Avail. PAN (lbs) * Actual PAN Applied (lbs) PAN Surplus/ Deficit (lbs) Actual Volume Applied (Gallons) Volume Surplus/ Deficit (Gallons) Year 1 3,609 4376 -767 2,427,557 -425,237 Note: In source ID, S means standard source, U means user defined source. * Max. Available PAN is calculated on the basis of the actual application method(s) identified in the plan for this source. 954540 Database Version 4.1 Date Printed: 03-07-2018 Source Page 1 of 1 Narrative WUP Revised To Reflect Change Of Ownership. If Pearl Millett is cut for Hay a PAN rate of 270LbsN/Ac may be used in place of the 202LbsN/Ac in WUT table. For the Smallgrain Crop NO More Than 38 LbsN/Ac should be applied fron October 1st to December 31st. The remaining 38 LbsN/Ac May Be Applied From Janurary 1st to March 31st. Total PAN applied Should Not Exceed 76 LbsN/Ac 954540 Database Version 4.1 Date Printed: 03-07-2018 Narrative Page 1 of I The table shown below provides a summary of the crops or rotations included in this plan for each field. Realistic Yield estimates are also provided for each crop in the plan. In addition, the Leaching Index for each field is shown, where available. Planned Crops Summary Tract Field Total Acres Useable Acres Leaching Index (LI) Soil Series Crop Sequence RYE 1535 PI 3.39 3.39 N/A IAutryville Pearl Millett, Pasture 5.0 Tons Rye, Grain *45 bu. 1535 P2 3.47 3.47 N/A IAutryville Pearl Millett, Pasture 5.0 Tons Rye, Grain *45 bu. 1535 P3 2.48 2.48 N/A IAutryville Pearl Millett, Pasture 5.0 Tons Rye, Grain *45 bu. 1535 P4 2.64 2.64 N/A IAutryville Pearl Millett, Pasture 5.0 Tons 1535 1535 P5 P6 1.46 2.30 1.46 2.30 PLAN TOTALS: 15.74 15.74 N/A IAutryville N/A Autryville Rye, Grain Pearl Millett, Pasture Rye, Grain Pearl Millett, Pasture Rye, Grain *45 bu. 5.0 Tons *45 bu. 5.0 Tons *45 bu. LI Potential Leaching Technical Guidance < 2 Low potential to contribute to soluble nutrient leaching below the root zone. None >= 2 & <= 10 Moderate potential to contribute to soluble nutrient leaching below the root zone. Nutrient Management (590) should be planned. > 10 High potential to contribute to soluble nutrient leaching below the root zone. Nutrient Management (590) should be planned. Other conservation practices that improve the soils available water holding capacity and improve nutrient use efficiency should be considered. Examples are Cover Crops (340) to scavenge nutrients, Sod -Based Rotations (328), Long -Term No -Till (778), and edge -of -field practices such as Filter Strips (393) and Riparian Forest Buffers (391). 954540 Database Version 4.1 Date Printed 3/7/2018 NOTE: Symbol * means user entered data. PCS Page I of 1 The Waste Utilization table shown below summarizes the waste utilization plan for this operation. This plan provides an estimate of the number of acres of cropland needed to use the nutrients being produced. The plan requires consideration of the realistic yields ofthe crops to be grown, their nutrient requirements, and proper timing of applications to maximize nutrient uptake. This table provides an estimate of the amount of nitrogen required by the crop being grown and an estimate of the nitrogen amount being supplied by manure or other by-products, commercial fertilizer and residual from previous crops. An estimate ofthe quantity of solid and liquid waste that will be applied on each field in order to supply the indicated quantity of nitrogen from each source is also included. A balance of the total manure produced and the total manure applied is included in the table to ensure that the plan adequately provides for the utilization of the manure generated by the operation. Waste Utilization Table Year 1 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Reqd (lbs/A) Comm Pert. Nutrient Applied pbs/A) Res. (lbs/A) - Applic. Method Manure PA Nutrient Applied (lbs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N IOW gal/A Tons 1000 gals tons 1535 P1 S7 Autryville 3.39 3.39 Pearl Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 Irrig. 202 112.07 0.00 379.90 0.00 1535 PI S7 Autryville 3.39 3.39 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 Irrig. 76 42.16 0.00 142.93 0.00 1535 P2 S7 Autryville 3.47 3.47 Pear] Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 Irrig. 202 112.07 0.00 388.87 0.00 1535 P2 S7 Autryville 3.47 3.47 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 brig. 76 42.16 0.00 146.31 0.00 1535 P3 S7 Autryville 2.48 2.48 Pearl Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 Irrig. 202 112.07 ' 0.00 277.92 0.00 1535 P3 S7 Autryville 2.48 2.48 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 Irrig. 76 42.16 0.00 104.57 0.00 1535 P4 S7 Autryville 2.64 2.64 Pearl Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 trig. 202 112.07 0.00 295.85 0.00 1535 P4 S7 Autryville 2.64 2.64 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 Irrig. 76 42.16 0.00 111.31 0.00 1535 P5 S7 Autryville 1.46 1.46 Pearl Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 Irrig. 202 112.07 0.00 163.62 0.00 1535 P5 S7 Autryville 1.46 1.46 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 Irrig. 76 42.16 0.00 61.56 0.00 1535 P6 S7 Autryville 2.30 2.30 Pearl Millett, Pasture 5.0 Tons 4/1-9/15 202 0 0 Irrig. 202 112.07 0.00 257.75 0.00 1535 P6 S7 Autryville 2.30 2.30 Rye, Grain *45 bu. 9/1-3/31 *76 0 0 Irrig. 76 42.16 0.00 96.98 0.00 954540 Database Version 4.1 Date Printed: 3/7/2018 WUT Page 1 of 2 Waste Utilization Table 1 cal 1 Tract Field Source ID Soil Series Total Acres Use. Acres Crop RYE Applic. Period Nitrogen PA Nutrient Redd (Ibs/A) Comm Fert. Nutrient Applied (Ibs/A) Res. Obs/A) Applic. Method Manure PA Nutrient Applied (Ibs/A) Liquid ManureA pplied (acre) Solid Manure Applied (acre) Liquid Manure Applied (Field) Solid Manure Applied (Field) N N N N 1000 gal/A Tons 1000 gals tons Total Applied, 1000 gallons 2,427.56 Total Produced, 1000 gallons 2,002.32 — Balance, 1000 gallons -425.24 Total Applied, tons 0.00 Total Produced, tons 0.00 Balance, tons 0.00 ores: 1. In the tract column, — symbol means leased, otherwise, owned. 2. Symbol * means user entered data. 954540 Database Version 4.1 Date Printed: 3/7/2018 WUT Page 2 of 2 The Irrigation Application Factors for each field in this plan are shown in the following table. Infiltration rate varies with soils. If applying waste nutrients through an irrigation system, you must apply at a rate that will not result in runoff. This table provides the maximum application rate per hour that may be applied to each field selected to receive wastewater. It also lists the maximum application amount that each field may receive in any one application event. Irrigation Application Factors Tract Field Soil Series Application Rate (inches/hour) Application Amount (inches) 1535 P1 Autryville 0.60 1.0 1535 P2 Autryville 0.60 1.0 1535 P3 Autryville 0.60 1.0 1535 P4 Autryville 0.60 1.0 1535 P5 Autryville 0.60 1.0 1535 P6 Autryville 0.60 1.0 954540 Database Version 4.1 Date Printed 3/7/2018 NOTE: Symbol * means user entered data. IAF Page 1 of 1 The following Lagoon Sludge Nitrogen Utilization table provides an estimate ofthe number of acres needed for sludge utilization for the indicated accumulation period. These estimates are based on average nitrogen concentrations for each source, the number of animals in the facility and the plant available nitrogen application rates shown in the second column. Lagoon sludge contains nutrients and organic matter remaining after treatment and application ofthe effluent. At clean out, this material must be utilized for crop production and applied at agronomic rates. In most cases, the priority nutrient is nitrogen but other nutrients including phosphorous, copper and zinc can also be limiting. Since nutrient levels are generally very high, application of sludge must be carefully applied. Sites must first be evaluated for their suitability for sludge application. Ideally, effluent spray fields should not be used for sludge application. If this is not possible, care should be taken not to load effluent application fields with high amounts of copper and zinc so that additional effluent cannot be applied. On sites vulnerable to surface water moving to streams and lakes, phosphorous is a concern. Soils containing very high phosphorous levels may also be a concern. Lagoon Sludge Nitrogen Utilization Table Crop Maximum PA-N Rate lb/ac Maximum Sludge Application Rate 1000 gal/ac Minimum Acres 5 Years Accumulation Minimum Acres 10 Years Accumulation Minimum Acres 15 Years Accumulation Swine Feeder -Finish Lagoon Sludge - Standard Corn 120 bu 150 14.69 24.26 48.53 72.79 Hay 6 ton R.Y.E. 300 29.38 12.13 24.26 36.40 Soybean 40 bu 160 15.67 22.75 45.49 68.24 954540 Database Version 4.1 Date Printed: 03-07-2018 Sludge Page 1 of 1 The Available Waste Storage Capacity table provides an estimate of the number of days of storage capacity available at the end of each month of the plan. Available storage capacity is calculated as the design storage capacity in days minus the number of days of net storage volume accumulated. The start date is a value entered by the user and is defined as the date prior to applying nutrients to the first crop in the plan at which storage volume in the lagoon or holding pond is equal to zero. Available storage capacity should be greater than or equal to zero and less than or equal to the design storage capacity of the facility. If the available storage capacity is greater than the design storage capacity, this indicates that the plan calls for the application of nutrients that have not yet accumulated. If available storage capacity is negative, the estimated volume of accumulated waste exceeds the design storage volume of the structure. Either of these situations indicates that the planned application interval in the waste utilization plan is inconsistent with the structure's temporary storage capacity. Available Waste Storage Capacity Source Name Start Date Swine Feeder -Finish Lagoon Liquid 9/1 Design Storage Capacity (Days) 180 Plan Year Month Available Storage Capacity (Days) * 1 1 2 1 3 1 4 5 6 1 7 1 8 9 1 10 1 11 12 * Available Storage Capacity is calculated as of the end of each month. 167 156 142 170 180 180 180 180 180 166 153 140 954540 Database Version 4.1 Date Printed: 03-07-2018 Capacity Page 1 of 1 Required Specifications For Animal Waste Management 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste that reaches surface water is prohibited. 2. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Management Plan when there is a change in the operation, increase in the number of animals, method of application, receiving crop type, or available land. 3. Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4. Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (see USDA, MRCS Field Office Technical Guide Standard 393 - Filter Strips). 5. Odors can be reduced by injecting the waste or by disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (see "Weather and Climate in North Carolina" for guidance). 954540 Database Version 4.1 Date Printed: 3/7/2018 Specification Page 1 7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the soil surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10. Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11. Any new swine facility sited on or after October 1,1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1,1995, shall not be applied closer that 25 feet to perennial waters. 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14. Waste shall be applied in a manner not to reach other property and public right-of-ways. 954540 Database Version 4.1 Date Printed: 3/7/2018 Specification Page 2 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by a discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. 18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution, and erosion. 19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 954540 Database Version 4.1 Date Printed: 3/7/2018 Specification Page 3 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina regulations. 954540 Database Version 4.1 Date Printed: 3/7/2018 Specification Page 4 Crop Notes The following crop note applies to field(s): P1, P2, P3, P4, P5, P6 Rye, Grain: CP, Mineral Soil, medium leachable In the Coastal Plain, oats and barley should be planted from October 15-October 30; and rye from October 15-November 20. For barley, plant 22 seed/drill row foot and increase the seeding rate by 5% for each week seeding is delayed beyond the optimum time. See the seeding rates table for applicable seeding rate modifications in the current NCSU "Small Grain Production Guide". Also, increase the initial seeding rate by at least 10% when planting no -till. Oats should be planted at 2 bushels/acre and rye at 1-1 1/2 bushels/acre. Plant all these small grains at 1-1 1/2" deep. Adequate depth control is essential. Review the NCSU Official Variety "green book" and information from private companies to select a high yielding variety with the characteristics needed for your area and conditions. Apply no more than 30 lbs/acre N at planting. Phosphorus and potash recommended by a soil test can also be applied at this time. The remaining N should be applied during the months of February -March. The total N is dependent on the soil type. Plant samples can be analyzed during the growing season to monitor the nutrient status of the oats, barley and rye. Timely management of diseases, insects and weeds are essential for profitable oat, barley and rye production. The following crop note applies to field(s): P1, P2, P3, P4, P5, P6 Pearl Millett: No Comment 954540 Database Version 41 Date Printed: 03-07-2018 Crop Note Page 1 of 1 TIVIIUiiNITIVA AG Opp ThadingiMaaltlit More Dr/vB Toijto �St Tm be �44-e,arf5�G4167 r9m.9vaq ae cw Godlays, Aniir ': Waste Management Plan Cerf cation (Please ., tie or print all information that does not require _-ignature) €xistin or New or Expanded ` (please circle one) ` ` • General Information: Name of Farm: LJ��Q7tjb y g•t/fh✓S Owner(s) Name: lNc/0t1 1✓f}NS Mailing Address: 707 /; thijL /A,e/nr /444 /ij4 ,✓oi4, Ak. ,385/6-3 Farm Location: County Farm is Located in: D oPt/n1 Latitude and Longitude:3y° S3'g/3"/ 76r• O/' 4/9" Please attach a copy of a county road map with location identified and describe below (Be specific: road names, directions, milepost, etc.): 5/2 4-/9 zit OFF or RIty 903 iE7WEEA/ /i/%CIA101/A• V' /XFitI4n/St4t-LC Facility No: 3 I --an_ Phone No: 9/o Zi9 2/7/ Operation Description: l pe of Swine No. of Animals Wean to Feeder f Feeder to Finish 2160 Farrow to Wean Farrow to Feeder Farrow to Finish Type of Poultry No. of Animals 0 Layer 0 Pullets Other Type of Livestock: Type of Cattle No. of Animals 0 Dairy 0 Beef Number of Animals: Additional Design Capacity: Acreage Available for Application: > 25 Required Acreage: 2 2• a Number of Storage Ponds : I Total Capacity: L/3l0 26 0 Cubic Feet (ft3) Are subsurface drains present on the fain: YES or NO (please circle one) If YES: are subsurface drains present in the area of the GOON or SPRAY FIELD (please circle one) aiia3iisiYa+R*******************************kEi Ua i*****Yi?sin *apt ae ays tii,a#a iaa aH aa,a Owner / Manager Agreement I (we) verify that all the above information is correct and will be updates upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) latow that any expansion to the existing design capacity of the waste treatment and storage system oc construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals an stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either diretly.ghmus xi a& conveyance or from a star= event less severe than the 2S-year. 24-hour storm and then: must not be run-off from the application of animal • waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be Med at the farm and at the office of the local Soil and Water Conservation District I (we) }cow that any modification must be approved by a technical specialist and submitted co the Soil and Water Coase; tadaa District prior to impiementzdon. A change in land ownership requires written notification to DEVI or a new certification (If the approved plan is changed) within 60 days of a title transfer. Name of Land 0 Signature: Name of Manager(if different from owner): Signature: Date: AWC — January 1,1997 1 Tr -hnical Specialist Certific I As a technical specialist designated by the Norih Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005, I certify that the animal waste management system for the farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEio as specified in 15A NCAC 2H.0_17 and the USDA -Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2110217 and 1SA NCAC 6F .0001-.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, 1), the technical specialist should only certify parts for which they are technically competen[. II. Certification of Design A) Collection. Storage. Treatment System Check the appropriate box Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity; storage capability consistent with waste utilization requirements. O New. expanded or retroficted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems. Iag000s and ponds, have been desired to meet or exceed the minimum standards and specificadohs. Name of Techhical Specialist (Please Print): L///YI/t1 y , $^/for/, /Sea)(/J' OFefrochibit Affiliation: Po Box IS 7 Ali1x'rnpc/ /1/C Z%399 Addres enc ): Phone No.: 9/0 296 /F03 Signature: Date: S " 21- B) Land Application Site (WOT) The plan provides for minimum separations (buffers); adequate amount of land for waste utilization; chosen crop is suitable for waste management; hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print): tTirin'ly 1//NJon/ Affiliation: BROIvx/J OF ('ifxd(e r/,¢/ /,{Je, Address( Age ): Po ok 7 h)i¢cfift) '/t/C 71.39f Phone No.: 9/0 796 /foa Signature - 114/vt C) Runoff C rois froL Exterior Lots Check the app,roprtare box pe Facility without exterior lots (SD or WUP or RC) This facility Bees not contain any exterior Lots. 0 Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by MRCS. • Name of Technical Specialist (PIease Print): 0 My /f • (//.UilAS Affiliation: Date: 3- `%/- nI Addre s(Ag- cy): Phone No.: Signature: , ,U11t/� �// �i/f� Date: SC 2-f/7 AWC — ja 3 ID). Application and Hand"fig Eau jpment Cheek the appropriate box Existing, or expanding facility with existing waste application equipment (WUP or I) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and cables and is able to apply waste as accessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at races not to exceed either the specified hydraulic or nutrient loading races, a schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). Q New. expanded. or existing facility without existing waste application equipment for spray irrigation. (I) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or autrieat loading rates; a schedule for timing of applications has been established; required buffers can be mainuned; calibration and adjustment guidance are contained aspaaof the plan). 2 New. expanded. or existing facility without existina waste apolication equipment for land spreading, nor using sprav irrigation. (WUP or I) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan; (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading races; a schedule for timing of applications has been established; required buffers can be maintained; calibration and adjustment guidance are contained as part of the plan). Name of Technical Specialist (Please Print): T/t�'t'ly 16,Via, Affiliation: Addressgen ): Mn t • Phone No.: Signature: Daze:-.C..2/- 1 , E) Odor Control. Insect Control. Mortality 141anaaement and Emergency Action Plan (SD. SI, WUP. RC or Il Tne waste management plan for this facility includes a Waste Management Odor Coneol Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Play Sources of both odors and insecs have been evaluated with respect to this site and Best Management Practices to ivlinimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mcrthlity Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): 07,1My 4 t/gipm./ Affiliation: Addre(A galley): Signature. Phone No.: Date: S �� l• F) Written (i.Ice of New or Expanding Swine Farm The following signature block is only to be used for new or expanding swine farms that begin construction after June 21,1996. If the facility was built before June 21,1996, when was it constructed or last expanded 5- 2 S- 93 I (we) certify that 1 (we) have attempted to contact by certified mail all adjoining property owners and all property owners who own property located acoss a public road, street or highway from this new or expanding swine farm. The nod= was in compliance with the requirements of NCGS 106.805. A copy of the notice and a list of the propery owners notified is attached. Name of Land Owner : Signature: Date: Name of Manager(if different from owner): Signature Date: AWC — January 1,1997 3 III. Certification of Installation A) Collection. Storage. Treatment Installation • New. expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have beta installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits certification is necessary Name of Technical Specialist (Please Print)• Affiliation: Address(Agency): Phone No.: Signature: Date: B) Land Aoolication Site (WUP) Check the appropriate box The cropping system is in place on all Iand as specified in the animal waste management plan. 0 Conditional Approval: all required land as specified in the plan is cleared for planting: the copping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/Year); the proposed cover crop is appropriate for compliance with the waseutilizatioo plan. 0 Also check this box if appropriate if the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification, the owner has committedtoestablish an interim crop for erosion control: Name of Technical Specialist (Please Print): 0-/n,ny $4/do,d Affiliation: r Addressr =�n� Phone No.: Signature:: 2�y�y Date: - 2/-9 % This follow ; signatur a block is only to be used when the box for conditional approval in III. B above has been checked. I (we) certify that I (we) have comruaed to establish the cropping system as specified in my (our) waste unlizador. plan, and if appropriate to establish the interim crop for erosion control. and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the coodidonal certification. I (we) realize that failure to submit this verification is a violation of the waste managemeat plan and will subject me (us) to an enforcement action fora DEM. Name of Land Owner : Signature: Date: Name of Manager(if different from owner): Signature: Date: AWC —January 1, 1997 4 C) Runoff Controls from F•''ri r o (RC) Facility with exteriot •ts Methods to minimize. the run off of pollutants from lounging and heavy use areas have been installed as specified in the plan. For facilities without exterior lots, certification is nece . Name of Technical Specialist (Please Print): Affiliation: Address(Agency): Phone No.: Signature: Date: D) Application and Handling Equipment Installation (411UP or I) Check the appropriate block • . 1+iststt'wzste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. ❑ Animal waste application and handling equipment specified in the plan has not been installed but the owner has proposed !easing or third party application and has provided a signed contract; equipment specified in the contract agrees with the requirements of the plan; required buffers can be maintained; calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. ❑ Conditional approval: Animal waste application and handling eguipmeat specified in the plan has been purchased and will be on site and installed by (month/day/year); there is adequate storage to bold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. -� �� Name of Technical Specialist (Please Print): Snin'iy /C Y N'fOA) Affiliation: Address ncy): Phone No.: Signature: Date: S Li .9 % The following signature`block is only to be used when the box for conditional approval in III D above has been checked. I (we) certify that 1 (we) have committed to purchase the animal waste application and handling equipment as specified in my (our) waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within IS calendar days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner : Signature: Date: Name of Manager(if different from owner): Signature: • Date: E) Odor Control. Insect Control and Mortality Manazement (SD, SI, WLTP. RC or I) Methods to control odors and insects as specified in the Plan have been installed and are operationaL The mortality management system as specified in the Plan has t o been installed and is operational. Name of Technical Specialist (Please Print): J /44,4y (J✓m✓ s et_ Affiliation: �_ / Address(Agenc : Phone No.:• Sisnatur .•Date:______ 'AWC — Jan ,1,1 5 Please return the completer .orm to the.Division of Water Quality ac the following address: Department of Environment, Health, and Natural Resources Division Of Water Quality Water Quality Section, Compliance Group P.O. Box 29535 . Raleigh, NC 27626-0535 • Please also remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC — January I,1997 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual 1 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or "jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator • Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels -- high levels are a safety risk. • Failure to inspect and maintain the dam, • Excess surface water flowing into the lagoon. • Liner integrity — protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTENSION SERVICE (CES) coo -1q to -la is 4to - 2,4(4-i�-0o kb—a91.-atao Otto — DR tr at-e ono -at -aW3 This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. A. B. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. Runoff from waste application field -actions include: a) b) c) d) e) Immediately stop waste application. Create a temporary diversion to contain waste. Incorporate waste to reduce runoff. Evaluate and eliminate the reason(s) that cause the runoff. Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility,•the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice / technical assistance phone number. If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Murphy Brown, LLC b. Contractors Address: P.O. Box 856, Warsaw, NC 28398 c . Contractors Phone: j910)293-3434 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910) 293 - 5330 Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (✓) Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. ( ) Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (✓) Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. Excessive Decaying vegetation (1)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along waters edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed residues () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). MIC — November 11, 1996 10 Dry Manure Handling Accumulations of animal () Remove spillage on a routine basis (e.g. 7-10 day Systems wastes interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. () Provide for adequate drainage around manure stockpiles () Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked () pertain to this operation. The landowner / integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. 4l7 (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC -- November 11, 1996 11 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production (v)Vegetative or wooded buffers: (1)Recommended best management practices; (1)Good judgment and common sense Animal body surfaces Dirty manure covered animals ( )Dry floors Floor surfaces Wet manure -covered floors (V)Slotted floors; (V)Waterers located over slotted floors; (1)Feeders at high end of solid floors; (V)Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine (V)Frequent manure removal by flush, pit pits recharge or scrape ( )Underfloor ventilation Partial microbial decomposition Ventilation exhaust fans Volatile gases (V)Fan maintenance; Dust (✓)Efficient air movement Indoor surfaces Dust (✓)Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled lagoon liquid while tanks are filling ( )Flush tank covers ( )Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge points Agitation of recycled lagoon liquid while pits are filling ( )Extend recharge lines to near bottom of pits with anti -siphon vents Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain collection or junction boxes Agitation during waste ( )Box Covers water conveyance End of drain Agitation during waste pipes at lagoon water ( )Extend discharge point of pipes underneath lagoon liquid level Lagoon surfaces Volatile gas emissions Biological mixing Agitation (v)Proper lagoon liquid capacity (1)Correct lagoon startup procedures ( )Minimum surface area -to -volume ratio (1)Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation nozzles Wind draft (V)Irrigate on dry days with little or no wind (V)Minimum recommended operation pressure (V)Pump intake near lagoon liquid surface ( )Pump from second -stage lagoon AMOC — November 11, 1996 12 Storage tank or basin surface Partial microbial ( )Bottom or midlevel loading decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin surface Partial microbial decom- ( )Extend drainpipe outlets underneath liquid position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure, slurry or sludge spreader outlets Agitation when spreading Volatile gas emissions ( )Soil injection of slurry/sludges ( )Wash residual manure from spreader after use ( )Proven biological additives or oxidants Dead animals Carcass decomposition ( )Proper disposition of carcasses Dead animal disposal pits Carcass decomposition ( )Complete covering of carcasses in burial pits ( )Proper location / construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water around facilities improper drainage (✓)Farm access road maintenance Microbial decomposition of away from facilities organic matter Manure tracked Poorly maintained access (1)Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule / BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge --Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIFI-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( ) pertain to this operation. The landowner / integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. (Landowner Signature) 13 Version —November 26, 2018 • Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality Q El Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. El Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. 7( El Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. QA composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. El D In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). ❑ ❑ Any method which, in the professional opinioneof the State Veterinarian, wouldmake possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). El Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be:done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. 3lathy Date 3-as-t9 f Technical Specialist Date Operator:Wendy Evans County: Duplin Date: 05/25/93' Distance to nearest residence (other than owner): 1500.0 feet 1. STEADY STATE LIVE WEIGHT 0 sows (farrow to finish) x 1417 lbs. = 0 lbs 0 sows (farrow to feeder) x 522 lbs. = 0 lbs 2160 head (finishing only) Is: 135 lbs. = 291600 lbs 0 sows (:.arrow to wean) x 433 lbs. = 0 lbs 0 head (wean to feeder) x 30 lbs. = 0 lbs TOTAL STEADY STATE LIVE WEIGHT (SSLW) 291600 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 291600 lbs. SSLW x Treatment Volume(CF)/lb. SSLW Treatment Volume(CF)/lb. SSLW= 1 CF/lb. SSLW Volume = 291600 cubit feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGN VOLUME Inside top length 285.0 feet ; Inside top width 210.0 feet Top of dike a'. .-vation 49.0 feet Freeboard 1.0 feet ; Side slopes 3.0 : 1 (Inside lagoon) Total design ...on liquid level at elevation 43.0 feet Bottom of lagoon elevation 33.0 feet Seasonal high water table elevation 44.0 feet Total design volume using prismoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 279.0 204.0 10.00 AREA OF TOP LENGTH * WIDTH = 279.0 204.0 AREA OF BOTTOM LENGTH * WIDTH = 219.0 144.0 AREA OF MIDSECTION LENGTH * WIDTH * 4 249.0 174.0 56916 (AREA OF TOP) 31536 (AREA OF BOTTOM) 173304 (AREA OF MIDSECTION 4) CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] 56916.0 173304.0 31536.0 DEPTH/6 1.7 VOLUME OF LAGOON AT TOTAL DESIGN LIQUID LEVEL = 436260 CU. FT. 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 285.0 210.0 59850.0 square feet Buildings (roof and lot water) Length * Width = 0.0 0.0 0.0 square feet TOTAL DA 59850.0 square feet Design temporary storage period to he 180 days. 5A. Volume of waste produced Approximate daily production of manure in CF/LB SSLW 0.00136 Volume = Volume = 291600 Lbs. SSLW * CF of Waste/Lb./Day * 180 days 71384 cubic feet 5B. Volume of wash water This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall = 7.0 inches Volume = 7.0 in * DA / 12 inches per foot Volume = 34912.5 cubic feet 5D. Volume of 25 year - 24 hour storm Volume = e 7l.5 'nches / 12 inches per foot * DA Volume = 37406.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 71384 cubic feet 5B. 0 cubic feet 5C. 34913 cubic feet 5D. 37406 cubic feet TOTAL 143702 cubic feet 6. SUMMARY Total required volume 435302 cubic feet Total design volume avail. 436260 cubic feet Min. req. treatment volume plus sludge accumulation 291600 cubic fr_ At elev. 45.2 feet ; Volume is 287992 cubic feet (end pumping) Total design volume less 25yr-24hr storm is 398854 cubic feet At elev. 47.3 feet ; Volume is 397125 cubic feet (start pumping) Seasonal high water table elevation 44.0 feet 7. DESIGNED BY: APPROVED BY: .,yj DATE: 15 ' d S -cc"? c? DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN