HomeMy WebLinkAbout310383_Permit Renewal Application 2019_20190410State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of' Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 31-0383 Certificate Of Coverage Number: AWS310383 2. Facility Name: Mac Farms. LLC 5-7 3. Landowner's Name (same as on the Waste Management Plan): e v MA-c_ /?I11 S LLC' 4. Landowner's Mailing Address: 618 Kermit Warren Rd City: Mount Olive State: NC Zip: 28365 Telephone Number: 919-738-7059 Ext. E-mail: 5. Facility's Physical Address: 161 Jones Turner Rd City: Mount Olive State: NC Zip: 28365 6. County where Facility is located: Duplin 7. Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): Presta a Farms Inc 10. Operator Name (OIC): John Robert McClenn\ Phone No.: 919-658-0314 OIC #: 989922 . Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operation Types: Operations Type Swine - Feeder to Finish Allowable Count 2,160 Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers d R APR 032,019 vorwousay .a. 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) LAGOON#1 /1'Q$' CAe.i 5'4.3N1't.31 6299cD 19.00 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed In the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov RE,CSIVEEINCDRCJDWR APR 032019 We rQuaUW Resion^i nOtratirS Section [ attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Name: f 5 LL C /' �ohA /614-f tie: - Prrr,x-A- /�j�MS Gif .T 9t1late: Signature: � F � � - - Name: Signature: Name: Signature: Title: Date: Title: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 WASTE UTILIZATION PLAN Monday, February 27, 2017 Producer : Farm Name : Telephone # : Type of Operation : Number of Animals : Application Method: MAC Farms, LLC MAC Farms 5-7 31-383 618 Kermit Warren Rd Mt. Olive,NC 28365 (919) 738-7387 Feeder to Finish Swine 2160 hogs design capacity Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This,waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 of 9 AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 2160 hogs X 1.9 tons waste/hogs/year = 4104 tons AMOUNT OF PLANT AVAILABLE NITROGEN (PAN) PRODUCED PER YEAR 2160 hogs X 1.7 Ibs PAN/hogslyear = 3672 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE NIACRE N/ACRE USED TIME 71248 1 AUTRYVILLE ALL BC 4.695 230.055 0 4.76f 1095.06 MAR-SEP 71248 - 1 AUTRYVILLE ALL SG 1 50 0 4.76jj1 238 SEP-MAY TOTALS: 1333.06 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 of 9 TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) TRACT FIELD SOIL TYPE &CLASS- CROP YIELD LBS AW COMM ACRES LBS AW APPLIC. DETERMINING PHASE CODE N/ACRE N/ACRE USED TIME 1905 1 NORFOLK 0-2% BH 6.5 299 0 3.671 1097.33 MAR-SEP 1905 1 NORFOLK 0-2% SG 1 50 0 3.67! 183.5 SEP-MAY 1905 4 AUTRYVILLE ALL BP 4.695 230.055 0 6.541 1504.56 MAR-SEP 1905 4 AUTRYVILLE ALL SG 1 50 0 6.54ii 327 SEP-MAY TOTALS: 3112.39 Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CROP UNITS LBS NIUNIT •BC HYBRID BERMUDAGRASS-CONTROLLED GRAZED TONS 50 BH HYBRID BERMUDAGRASS-HAY TONS 50 BP HYBRID BERMUDAGRASS-PASTURE TONS 50 SG SMALL GRAIN OVERSEEDED AC 50 Page 3 of 9 TOTALS FROM TABLES 1 AND 2 ACRES LBS AW N USED TABLE 1 4.761 1,333 TABLE 2 10.211 3,112 TOTALS: 14.97 4,445 AMOUNT OF N PRODUCED: *** BALANCE 3,672 -773 *** This number must be Tess than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 799.2 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.58 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION FIELD CROP RATE (in/hr) AMT (inches) -4 TRACT 1905 1905 1905 1905 71248 71248 4 _1 1 SOIL TYPE NORFOLK 0-2% NORFOLK 0-2% AUTRYVILLE ALL AUTRYVILLE ALL AUTRYVILLE ALL AUTRYVILLE ALL * This is the maximum application amount allowed for the nitrogen allowed for the crop is not over applied. In many amount shown cannot be applied because the nitrogen lim application amount shown can be applied under optimum SG BH SG BP SG BC 0.50 0.50 0.60 0.60 0.60 0.60 *1 *1 *1 *1 *1 *1 soil assuming the amount of situations, the application itation. The maximum soil conditions. Page 4 of 9 NARRATIVE OF OPERATION Plan utilizes the latest nitrogen co -efficient and RYE rates. Page 5 of 9 PLANS & SPECIFICATIONS 1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil Toss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from anv perennial stream or river (other that an irriaation ditch or canal. Animal waste Page 6 of 9 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied 'closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the Iandownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 of 9 NAME OF FARM: MAC Farms 5-7 31-383 OWNER / MANAGER AGREEMENT I (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: MAC Far j s, LLC SIGNATURE: Lt6 NAME OF MANAGER (if different fro ` owner): ATE: ,)� 1 .. 1 please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (91i0) 385-1000 SIGNATURE: 7� DATE: 7-//' Page 9 of 9 Assisted by • ". U.S. OEPARTM ENT OF AG R IC IJI-T1J RE SOI0NSERVATION SERVICE /-j11R CONSERVATION PLAN MAP Owner T. &r ‘.911 Operator County CXyl;A State oN C Approximate acres 2?. Cooperating with 010/; Wo.+c, 1.• .41 r s..enerstrefutsnunaiall1101.1.14..LILIIIMOJOIf,. SCS•CPA -16 2 -el Approximate scale D ate S7_2.,* /94 64 0 Conservation District Plan identification Photo number 1!( E1(245e 4 USDA Soil Conservation Service , 1 "= 225 GREY VO 7__ /VS ,r EGA\ February 27, 2017 t Duplin County GIS 1:2,528 0 0.02 0.04 0.08 mi [ 1 5 i 5 5 5 l 0 0.0325 0.065 0.13 km Source Farmstead Animal body surfaces Floor surfaces Swine Farm Waste Management Odor Control Checklist Cause • Swine production • BMPs to Minimize Odor 0' Vegetative or wooded buffers; 0commended best management practices; l3 Good judgment and common sense •__ Duty manure -covered_ animals __ ❑_ _.Dr�]i crors • Wet manure -covered floors Manure collection pits • Urine; • Partial microbial decomposition Ventilation exhaust fans • Volatile gases; Dust Indoor surfaces Flush tanks • Dust Site Specific Practices L7—Slo oors; Waterers located over slotted floors; ❑ Feeders at high end of solid floors; ❑ Scrape manure buildup from floors; O Underfloor ventilation for drying ❑ Frequent manure removal by flush, pit recharge, or scrape; ❑ erfloor ventilation fa F naintcnance; EErr ' • t air movement Washdown between groups of animals; O Feed additives; O Feeder covers; O Feed delivery downspout extenders to feeder covers • Agitation of recycled lagoon liquid while tanks are filling Flush alleys Pit recharge points Lift stations • Agitation during wastewater conveyance O Flush tank covers; O Extend fill lines to near bottom of tanks with anti -siphon vents O Underfloor flush with underfloor ventilation • Agitation of recycled lagoon liquid while pits are filling • Agitation during sump tank filling and drawdown O Extend recharge lines to near bottom of pits with anti-sip!-an-v{Sni} O Sump tank covers Outside drain collection • Agitation during wastewater or junction boxes conveyance O Box covers AMOC - November 11, 1996, Page 3 Source End of drainpipes at lagoon Lagoon surfaces Cause • Agitation during wastewater conveyance BMPs to Minimize Odor Site Specific Practices ❑ Extend discharge point of pipes underneath l Illiquid level • Volatile gas emissions; • Biological mixing; • Agitation ❑ Proper lagoon liquid capacity; O Correct lagoon startup procedures; O Minimum surface area -to -volume ratio; ❑ Minimum agitation when.pumping; ❑ Mechanical aeration; • P en biological additives Irrigation sprinkler nozzles Storage tank or basin surface • High pressure agitation; • Wind drift Irrigate on dry days with little or no wind; ❑ MiniMijj:Lwam. recommended operating pressure;. Plump intake near lagoon liquid surface; ❑ Pump from second -stage lagoon Settling basin surface • Partial microbial decomposition; • Mixing while filling; • Agitation when emptying ❑ Bottom or midlevel loading; ❑ Tank covers; ❑ Basin surface mats of solids; ❑ Proven biological additives or oxidants • Partial microbial decomposition; • Mixing while filling; • Agitation when emptying Manure, slurry or sludge spreader outlets Uncovered manure, slurry or sludge on field ,s.utfases _ Dead animals • Agitation when spreading; • Volatile gas emissions ❑ Extend drainpipe outlets underneath liquid level; ❑ Remove settled solids regularly O Soil injection of slurry/sludges; ❑ Wash residual manure from spreader after use; ❑ Proven biological additives or oxidants • Volatile gas emissions while drying ❑ Soil injection of slurry/sludges ❑ Soil incorporation within 48 hrs.; ❑ Spread in thin uniform layers for rapid drying; ❑ Proven biological additives or oxidants Dead animal disposal pits Incinerators • Carcass decomposition • Carcass decomposition Proper disposition of carcasses ❑ Complete covering of carcasses in burial pits; ❑ Proper location/construction of disposal pits • Incomplete combustion O Secondary stack burners AMOC - November 11, 1996, Page 4 Source Cause BMPs to Minimize Odor Site Specific Practices Standing water around facilities • Improper drainage; • Microbial decomposition of organic matter 0 Grade and landscape such that water drains away from facilities Manure tracked onto public roads from farm access • Poorly maintained access roads 0 Farm access road maintenance Additional Information : Available From : Swine Manure Management ; 0200 RuleBMP Packet Swine Production Farm Potential Odor Sources and Remedies ; EBAE Fact Sheet Swine Production Facility Manure Management: Pit Recharge - Lagoon Treatment ; EBAE 128-88 Swine Production Facility Manure Management: Underfloor Flush - Lagoon Treatment ; EBAE 129-88 Lagoon Design and Management for Livestock Manure Treatment and Storage ; EBAE 103-83 Calibration of Manure and Wastewater Application Equipment ; EBAE Fact Sheet Controlling Odors from Swine Buildings ; PIH-33 Environmental Assurance Program ; NPPC Manual Options for Managing Odor ; a report from the Swine Odor Task Force Nuisance Concerns in Animal Manure Management: Odors and Flies ; PRO107, 1995 Conference Proceedings NCSU, County Extension Center NCSU - BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - BAE NCSU - Swine Extension NC Pork Producers Assoc NCSU Agri Communications Florida Cooperative Extension AMOC - November 11, 1996, Page 5 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Liquid Systems Flush Gutters • Accumulation of solids 1! Flush system is designed and operated sufficiently to remove accumulated solids from ters as designed. Reiriavelbridgnag ofaceumulated solids at discharge Lagoons and Pits • Crusted Solids o Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crustiw' of solids to a depth of no more than 6 - 8jhes over more than 30% of surface. Excessive Vegetative • Decaying vegetation n Maintain vegetative control along banks of Growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders • Feed Spillage 0 Design, operate and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage. O Clean up spillage on a routine basis (e.g., 7 - 10 day interval during summer; 15-30 day interval during winter). Feed Storage • Accumulations of feed residues 0 Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). O Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. AMIC - November I I, 1996, Page 1 EMERGENCY ACTION PLAN PHONE NUMB F.,S— DWQ qD "/''�v EMERGENCY MANAGEMENT SYSTEM 0 �4 - ',6 SWCD v0 �� 3 ty NRCS ' ` . , This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. 'You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Ca11 a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D:_ Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. 1 ' December 18, 1996 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water. Quality) regional office; Phone - - . After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number c. Instruct EMS to contact local Health Department. d. Contact CES, phone number - - , local SWCD office phone number - - and local NRCS office for advice/technical assistance phone number - - . 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: - - - b. Contractors Address: c. Contractors Phone: 2 December 18, 1996 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: � "'k. C''`4^ b. Phone: _ f 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair e the system,astesandfroreassess the g agate management plan to keep problems with release 1 3 December 18, 1996 1-1EET 1 4 2 OPERA7ION AND MAINTFAIANflF. PLAN This lagoon is designed for waste tleatr.ent 4iermanent etorage) an0 180 days f temporary storage. The Lime required for the plaiined fluid level (permanent and tempefa:y eterege) to be reached may vary due to site cofditions, weather, floehing eperations, and the amoufit of fresh water added to'the system. The designed t (1) waste from included is et The volume of fairly constan rainfall will .Jte a factor to volume must a A maximum pumping and th buildings). begin pumping, tu indicate wh to stop pumpin Pumping can be elevations for weather, soils runoff or leas Land applicati method of diep center pivot, Laken when app -mporary storage eeneicte of 180 days storage fot: animals.and (2) e.eeeec rainfall after evaporation. 'Also rage fo'r Lh 25year - 24 hour storm for the locatipn. .aste generated fi • , given number of animals will be throughout t1 if free year to year, but excess ary fromyear to year. ":.!:e 25 year rainfall will 4t consider in 6:-1 0C1(1 peping eycle, but thie storage aYs tion ifedete;mined deeign to begin is usually the Le•tle 'invert of pipe(s) frum f the outlet pipe je ro:t inetalled at the elevation to a perlilflt mafkl-; ri pumpiel0 should t:eg.e. An elevation must be eetablished to maintain lag,e,e tie.Leont depth. installed at this elevation started:or stepped dl ony Lime between these two operating convenience site crop, sand equipeent :LI, order ting. n of eeal. une, ying eonditione permit, In as to apply waste withou waste water is reeegnized as an acceptable Method of applie:ition include solid set, and traveling gun irrigation. Care should be waste to peevent damAge to crops. The following items are to be car -d out: 1. it is stro charged to 1/2 start-up. Pre WaSte enteling covered with e flush building be used for fi 2. The attach plan recommend -- before land ep Begin temp Leaches the el vation 51.3 ae meiked by out when the f uid leveili reaches elevation storage, less 15 yr- 24 hr stoi ri, euntaine 833595.1 gallofs. giv recommended that 1,e tieetment layuufi be pie - its capacity to prevent eeoseive odors during c.;hargira -reduces the eofIcentration of the initial the lageori thereby ,educing odors. Solids should bE fluent at all timee. When piecharging ie complete, with reeycled lagJen liquid. Flesh w. ei should nOt shing after initial filling. d waste utilization plan shall be followed. This sampling. and testing of waste (see attachment) licaLiun. rary storage pump -out of the lagoon when fluid level, pelmanent StLqi auihp- 48.0 This tempurally 1114e3 eubic feet of 4. The reeomm on (1) inch <a inch per hour. SHEET 2 or 2 ended maximum amount Lc, apply per irrigation .is id the r e,co m nnied maximum application rats i;_: 6?i. ,i Reie: tO Uu waste utilization plan .for fur ther riot .ils. 5. Keep vegetation on the eml.idr,iCfi:� i?t and areas adjacent to the lagoon mowed annually. Vegetatioi, should be fertilized as needed to maintain a igorous Stand. 6. Repair any erodL'd titea :,;. u: A.::S damaged by rodents and establish it v Sgetatioi,. 7. All surfac outlets. 8. Keep a rnirr waste utilizat not be applied residence or w manner not to 9. The Clear, pollutants int Environment, H mental Managern .runoff.is Lo be diverted from the lagoon to stable mum of 4'3 feet. of grass vegetated buffer around on field8 ad jat_,er,t to perennial streams. Waste wil in oper, iL i:_Le. . .;u!_ pump within 200 feet of a this: 100 fee.'t of A well. Waste shall be applied in a each other pc upei ty aril public right-of-ways. cater Act. uf 1977 pi oliibit ' the discharge of waters of the United States. The Department of alth, aril) N�tui.:I Reources, Division of Envie i,- nt, has the responsibility for enforcing this law. Primary El Seco dary Version —November 26, 2018 Mortality Management Methods Indicate which methodfs) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Routine Mortality Burial these feet beneath the surface of the ground within 24 hours'of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.'. 06-403). The bottom of the burial pit should be at least one foot above the seasonal high :^.e'e table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .02CO3 Rerdering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compgost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Writter approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also :eco emended for all animal operations. This plan outlines farm" -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • in The event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399,4. AC r ;rKTil5 t_ L C. by Signatu e of Far Owner/Manager 17) Signature of Technical Specialist Date Date :aLo :Grl_y !1oryan(ASBUILT)unLy: fluplirl ance tu nearest residence (other' than owiie . AVERAGE LIVE. "EIGHT (ALW) 1-1-ih•E:..i•i LW' to finish) 1•117 1C+:_. O sows :arruw tu feeder) i.1.;. 216E ht,,od (finishing only) 135 lbw. O rdi.':+w LC. wean) ;. 433 IL&,. ( 10-2ad (wean L•_I feeder) x 30othel :. D te: 11/14/95 Total Average Live W.iynt = 0 feet 0 lbs O lbs 291600 lbs 0 lbs O lbs O lbs 291600 lbs 2. MINIMUM REOUIREP TREATMENT VOLUME OF LAGOON 291600 lbs. ALW x Tie;itrii rJ. +JI+_J :^F)/lb. ALW T ?,it.o nt Volun)e(CF)/lb. ALW - r, .;, • ALW 291600 cubic feet ST'.DRACE ri L.U'1E FOR SLUDGE ACCUMULATION V+_+lume - 0 cubic feet 4. TOTAL DESIGNED VOLUME irltdr.• L!'If'+ length (feet) _.__. 320 I;l...; width(feet)0 r ..I 'ladevotion (feet) .4 0 501 t II of 1 agc on elevation (feet) 40.1 Fr .�•e boar u (feet) `. r Side slupes (inside lagoon) 2.8 . 1 Total design volume using prisrnoidal formula SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 2.n 2.8 2.8 2. 8 ; £s . ;= 197.8 11.9 AREA OF TOP LENGTH * WIDTH = 218.8 197.8 AREA OF BOTTOM LENGTH * WIDTH 252.2 131.2 AREA OF MIDSECTION LENGTH * WIDTH * 4 285.5 164.5 63058.64 (AREA OF TGP) 33073.306 (AREA OF BOTTOM) 187822 (AREA OF FIDSECTION * 4) CU. FT. _ (AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM) * DEPTH/6 63058.6 187823.0 33073.3 2.0 Total Designed Volume Available =563177.31 CU. FT. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: 1.._.g _.;, (top e:ei Length w W: ,it,1e - 330.0 209.0 68970.0 ;square LuiidingE: (roof and lot water 0.0 square feet ::i=sc:: ibe this area. TOTAL DA 68970. 0 square fe:--rr. De::;.igt, temporary storage period it, '.t 180 days. 5A . Volt:me of waste produced Feces & urine production in gal . / da f., .'" ALW 1.27 Volume = 291600 lbs. ALW/135 lbs ,:1 W - . gal/day 180 days Volume = 532656 gals. or 71210.7 cuLi_ feet 'ti'o.:uifier of wash water L. the amount of it ::II 'nr,;f.e, :..0 �: ,. , 'n ....•.. ilO fluors Of volume .fier:h, water used for a flus!) system -t=.,, water. Flush systems I.hrii t'r•i.:ilculate the lagoon, watez al _ ,`._'`fur in SA. Volume = 0.0 gallons/day 180 days; storage/7.48 gallons per CF Veelume = 0.0 cubic feet 527. V'.. uli?i= of rainfall in excers of t='Vapulrsti._., Use period of time when rainfall exceeds e'vapof atiuri by largest amount. 180 day: excess rainfall 7.0 inches Volume = 7.0 inches . DA / 12 inches pei foot Volume = 40232.5 cubic feet 5D. Volume of 25 yeur - 24 how storm a... VuLume = 7. 5 inches / 12 inches per foot • DA Volume - 43106.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 3A. 71211 cubic feet SB. 0 cubic .feet 5C. 40233 cubic feet TOTAL 134349 cubic feet :::UMMARY Temporary storage Rainfall in excess of eva,r.olation,------- LJ year - 24 hour rainfall------. Side lope Inside Lop length., --- Inside top width ---- Top of dike elevation,-,1" Bottom of lagoon elevation. - Total required volume=====.==A,===--.,=-.:-.> Actual design volume=== -====,,=..=-:- Seasonal high watertable elevatien Stop pumping elev.- - be > ol = to the SHWT Must be > or Lc rt-. treat. el Required minimum treatment volue- - - Volume at stop pumping elevaLJoi:-- Start pumping elev.- ----- - be aL bottom of fieebo,:d , Actual volume less 25 yr - 24 hi Volume at start pumping elevation , Required volume tu be puitiped=-:-- Actual volume to be pumped=-=,===,-- ,...— Min. thickness of soi] line: 'whih .= BY: DATE: .5-17h: - - - APPPfl:2' NOTE: SEE ATTACHED WASTE UTILIZATION PLAN 180 days 7.0 inches 7.5 inches 2.0 feet 2.8 : 1 330.0 feet 209.0 feet 54.0 feet 40.1 feet 446149 cu. ft. C,.1 fL. 0.0 feet 48.0 feet 0.0 feet .-> 46.1 feet 291600 cu. ft. 333417 cu. ft. 51.3 feet -=> 520071 cu. ft. -=> 519741 cu. ft. - -> 111443 cu. ft. - 186324 cu. ft. 2.0 fL COMMENTS: Rec-41( /,, RECEIVEDINCDSODWR APR 0 3 Zet Viwyerelsiti Ser017 vOurri 5D. Volume of 25 year - 24 hour storm Volume = Volume = 7.5 inches / 12 inches per foot * DA 43106 cubic feet 5E. Additional volume as follows: TOTAL REQUIRED TEMPORARY STORAGE 5A. 71211 cubic feet 5B. 0 cubic feet 5C. 40233 cubic feet 5D. 43106 cubic feet 5E. 0 cubic feet TOTAL 154549 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall during wettest period of storage===> 7.0 inches Evaporation during storage period==== > 0.0 inches 25 year - 24 hour rainfall > 7.5 inches Freeboard----= > 1.0 feet Side slopes===== ___ > 2.8 : 1 Inside top length > 330.0 feet Inside top width > 209.0 feet Top of dike elevation = > 54.0 feet Bottom of lagoon elevation > 40.1 feet Total required volume > 446149 cu. ft. Actual design volume > 627693 cu. ft. Seasonal high watertable elevation (SHWT)===> 0.0 feet Stop pumping elev. > 48.0 feet Must be > or = to the SHWT elev. > 0.0 feet Must be > or = to min. req. treatment el.=> 46.1 feet Required minimum treatment volume > 291600 cu. ft. Volume at stop pumping elevation > 333417 cu. ft. Start pumping elev. > 51.3 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume less 25 yr: 24 hr. rainfall==> 584587 cu. ft. Volume at start pumping elevation > 519741 cu.•ft. Required volume to be pumped = > 111443 cu. ft. Actual volume planned to be pumped > 186324 cu. ft. Min. thickness of soil liner when required==> 2,0 feet 7. DESIGNED BY: APPROVED BY: DATE: DATE: NOTE: SEE ATTACHED WASTE UTILIZATION PLAN COMMENTS: L / J Li P ".„Low . /I //0s OPERATION & MAINTENANCE PLAN Proper lagoon liquid management should be a year-round priority. It is es important to manage levels so that you do not have problems during extended raiialny and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as the thunderstorm season in the sum that at the first signs of plant growth in the later winter/early spring, irrrigationl accmeans ording to a farm waste management plan should be done whenever the land is dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigate does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilizer applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled, This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes ---look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes • Lagoon surface ---look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment ---look for: 1. settlement, cracking, or "jug" holes 2. side slope stability ---slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon darn with heavyequipment is a serious undertaking with potentially serious consequences and shoulnot be conducted unless recommended by an appropriate technical expert. Transfer Pumps ---check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure, You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height ZWEDINCMODIVR J'032019 w iU1fty ►regional m;. Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of' the lining. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon Iiquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity, Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well, Practice water conservation ---minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the Iagoon Management: Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge. ▪ Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. ▪ Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: proper lagoon sizing, mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, have more odor, and ▪ require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-Iine operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure ---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) Lagoon liquid levels ---high levels are a safety risk. Failure to inspect and maintain the dam, • Excess surface water flowing into the lagoon. • Liner integrity ---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure.