Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
310111_Permit Renewal Application 2019_20190410
State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. Please do not leave any question unanswered Please verify all information and make any necessary corrections below. Application must be signed and dated by the Permittee. 1. Farm Number: 31-0111 Certificate Of Coverage Number: AWS310111 2. Facility Name: Cedar Fork Farms 3. Landowner's Name (same as on the Waste Management Plan): Heber Harris Raynor 4. Landowner's Mailing Address: 386 Edmond Brinson Rd City: Beulaville State: NC Zip: 28518 Telephone Number: 910-298-4433 Ext. E-mail: 5. Facility's Physical Address: 995 Fountaintown Rd City: Beulaville State: NC Zip: 28518 6. County where Facility is located: Duvlin 7. Farm Manager's Name (if different from Landowner): 8. Farm Manager's telephone number (include area code): 9. Integrator's Name (if there is not an Integrator, write "None"): Carolina and Howard Farms LLC 10. Operator Name (OIC): Heber Harris Ra% nor Phone No.: 910-298-4433 OIC #: 998816 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Current Permit: Operation Types: Operations Type Allowable Count Swine - Wean to Feeder 3,840 Swine Cattle Dry Poultry Other Types, Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultn Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) i Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard "Redline" (Inches) LAGOON # 1 19.00 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), signed In the owner and a certified technical specialist, containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov t 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name LAGOON #1 Estimated Date Built 1190 Liner Type (Clay, Synthetic, Unknown) C._it, Capacity (Cubic Feet) Estimated Surface Area (Square Feet) 3 a- a ov Design Freeboard "Redline" (Inches) 19.00 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP), sinned by the owner and a certified technical specialist containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal@ncdenr.gov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties' up" in ..$25,000"per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): �ry Name: ire e✓- TI a Title: V`-v-'3/" Signature: Date: Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov los FORM: RENEWAL -STATE GENERAL 02/2019 ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality February 27, 2019 Heber Hams Raynor Cedar Fork Farms 386 Edmond Brinson Rd Beulaville, NC 28518 Subject: Application for Renewal of Coverage for Expiring State General Permit Dear Permittee: Your facility is currently approved for operation under one of the Animal Waste Operation State Non -Discharge General Permits, which expire on September 30, 2019. Copies of the new animal waste operation State Non -Discharge General Permits are available at https://deq.nc.gov/about/divisions/water-resources/water-uualii-reiional-operations/afo or by writing or calling: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 In order to assure your continued coverage under the State Non -Discharge General Permits, you must submit an application for permit coverage to the Division. Enclosed % ou will find a "Request for Certificate of Coverage Facility Currently Covered by an Expiring State Non -Discharge General Permit." The application form must be completed. signed and returned bti April 3. 2019. Please note that you must include one (11 copy of the Certified Animal Waste Management Plan (CAWMPI with the completed and signed application form. A list of items included in the CAWMP can be found on page 2 of the renewal application form. Failure to request renewal of your coverage under a general permit within the time period specified may result in a civil penalty. Operation of your facility without coverage under a valid general permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $25,000 per day. If you have any questions about the State Non -Discharge General Permits, the enclosed application, or any related matter please feel free to contact the Animal Feeding Operations Branch staff at 919-707-9100. Enclosures cc (w/o enclosures): Sincerely, Jon Risgaard, Section Chief Animal Feeding Operations and Groundwater Section Wilmington Regional Office, Water Quality Regional Operations Section Duplin County Soil and Water Conservation District AFOG Section Central Files - AWS310111 Carolina and Howard Farms LLC North12.Saline Department of MadEnService ntalCenter Quality I Di, Nor Cf Wolin Resources 512 N. Salisbury 5t. I 1636 Service Center � Raleigh, North Carolina 27699-11636 919.7079000 WASTE UTILIZATION PLAN Monday, May 06, 2013 ID11417-0 3 _ Producer : Heber Raynor Farm Name : Cedar Fork Farms 31-111 386 Edmond Brinson Rd. Beulaville,NC 28518 Telephone # : (910) 290-3209 Type of Operation : 7Wean to Feede• Swine Number of Animals : 3840 pigs L±:-sign capacity Application Method: frngation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner. Always apply waste based on the needs of the crop to be grown and the nutrient contents of the waste. Do not apply more nitrogen than the crop can utilize. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and avaialable water holding capacities. Normally waste shall not be applied to land eroding at greater than 5 tons per acre per year. With special pre -cautions, waste may be applied to land eroding at up to 10 tons per acre per year. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DEM regulations. Wind conditions should also be considered to avoid drift and downwind odor problems. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied to bare ground not more than 30 days prior to planting. Injecting the waste or disking will conserve nutrients and reduce odor problems. This plan is based on waste application through irrigation for this is the manner in which you have chosen to apply your waste. If you choose to inject the waste in the future, you need to revise this plan. Nutrient levels for injecting waste and irrigating waste are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. Acreage requirements should be based on the waste analysis report from your waste management facility. Attached you will find information on proper sampling techniques, preparation, and transfer of waste samples to the lab for ananlysis. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. Page 1 of 9 6662 '* 1 :FORESTON ALL 6662 i* 1 FORESTON ALL 6662 ;* 1 !FORESTON ALL 6662 1 iFORESTON ALL 7656 ,* 2 1FORESTON ALL ! 7656 1* 2 TFORESTON ALL 7656 1* 2 (FORESTON ALL 7656 1* 2 IFORESTON ALL 7658, r* 3 IFORESTON ALL 7656 ;* 3 FORESTON ALL 7656 * 3 FORESTON ALL 7656 * 3 TFORESTON ALL 7656 i* 5 1FORESTON ALL 7656 1* 5 ,FORESTON ALL 7656 ;* 5 1FORESTON ALL 7656 !* 5 FORESTON ALL AMOUNT OF WASTE PRODUCED PER YEAR (gallons, ft3, tons, etc.) 3840 pigs X .4 tons waste/pigs/year = 1536 tons AMOUNT OF PLANT AVAILABLE i14ITkOGEN (PAN) PRODUCED PER YEAR 3840 pigs X .48 Ibs PAN/pigs/ye = 1843.2 PAN/year Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. The following acreage will be needed for waste application based on the crop to be grown, soil type and suface application. TABLE 1 : ACRES OWNED BY PRODUCER TRACT FIELD SOIL TYPE &CLASS - CROP DETERMINING PHASE CODE c W SB WA C W SB WA C W SB WA C W SB WA YIELD LBS AW COMM ACRES LBS AW APPLIC. N/ACRE N/ACRE USED TIME 120 138 0: 13.54 1868.52 MAR-JUN 55 114.95 0 13.54 1556.42 SEP-APR 34 132.94 0 13.54 1 50 0 13.54 120 138 0 3.38 55 115.005 0 3.38 34 132.94 0 3.38 1 50 0. 3.38 1800.01,APR-SEP 15 677, SEP-ARP 466.44, MAR-JUN 388.717 SEP-APR 449.3371APR-SEP 15 169 SEP-ARP 120 138 0 5.26 725.88, MAR-JUN 55 115.005 0 5.26 604.926- SEP-APR 34 132.94 0 5.26 699.264iAPR-SEP 15 1 50 0 5.26 263! SEP-ARP 120 138 0 1.95 269.1 MAR-JUN 55 115.005 0 1.95 224.26; SEP-APR 34 132.94 0 1.9 259 a P SEP 15 50 . _ 01.9 : 97.5 RP TOTAL .: 5259.30 Indicates that this field is being overseeded (i.e. interplanted) or winter annu summer annuals. * Indicates a Crop Rotation NOTE: The applicator is cautioned that P and K may be over applied while meeting the N requirments. Beginning in 1996 the Coastal Zone Management Act will require farmers in some eastern counties of NC to have a nutrient management plan that addresses all nutrients. This plan only addresses Nitrogen. Page 2 of 9 TABLE 2 : ACRES WITH AGREEMENT OR LONG TERM LEASE (Agreement with adjacent landowners must be attached.) (Required only if operator does not own adequate land. See required specifications 2.) There are no Acres Leased Indicates that this field is being overseeded (i.e. interplanted) or winter annuals follow summer annuals. * Indicates a Crop Rotation * Acreage figures may exceed total acreage in field due to overseeding. **Lbs AW N (animal waste nitrogen) equals total required nitrogen less any commercial nitrogen (COMM N) supplied. The following legend explains the crop codes used in TABLES 1 and 2 above: CROP CODE CORN SB SOYBEANS IW ; WHEAT I NA WINTER ANNUALS CROP UNITS LBS N/UNIT BUSHELS 1.25 BUSHELS 4 AC 100 Page 3 of 9 TOTALS FROM TABLES 1 AND 2 (TABLE 1 TOTALS: _ 24,13-6;259'~ AMOUNT OF N PRODUCED 1,843 *** BALANCE -3,416 *** This number must be Tess than or equal to 0 in order to fully utilize the animal waste N produced. Acres show in each of the preceeding tables are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. NOTE: The Waste Utilization Plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nurturient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 291.84 pounds of plant available nitrogen (PAN) per year in the sludge that will need to be removed on a periodic basis. This figure is PAN when broadcasting the sludge. Please be aware that additional acres of land, as well special equipment, may be needed when you remove this sludge. See the attached map showing the fields to be used for the utilization of waste water. APPLICATION OF WASTE BY IRRIGATION The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. Your facility is designed for 180 days of temporary storage and the temporary storage must be removed on the average of once every 5.92 months. In no instance should the volume of waste being stored in your structure be within 1.6 feet of the top of the dike. If surface irrigation is the method of land application for this plan, it is the responsiblity of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in Tables 1 and 2. Failure to apply the recommended rates and amounts of Nitrogen shown in the tables may make this plan invalid. ACRES LBS AW N USED The following table is provided as a guide for establishing application rates and amounts. APPLICATION APPLICATION TRACT FIELD SOIL TYPE CROP RATE (in/hr) AMT (inches) 6662 -1 FORESTON ALL WA 0.50 *1 *1 FORESTON ALL W 0.50 ! *1 *1 FORESTON ALL SB 0.50 *1 *1 FORESTON ALL C 0.50 *1 -2,-3,-5 FORESTON ALL WA 0.50 *1 *2, *3, *5 FORESTON ALL W 0.50 *1 *2, *3, *5 FORESTON ALL SB _ 0.50 *1 7656 *2, *3, *5 IFORESTON ALL 1 C 0.50 *1 * This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. 6662 6662 6662 7656 7656 7656 Page 4 of 9 NARRATIVE OF OPERATION Acreages for Tract 6662 are from a previous design. Acreages for Tract 7656 are from an irrigation design completed by Geg Swain on 3-28-16. Page 5 of 9 PLANS & SPECIFICATIONS 1. Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. Illegal discharges are subject to assessment of civil penalties of $10,000 per day by the Division of Water Quality for every day the discharge continues. 2. The Field Office must have documentation in the design folder that the producer either owns or has long term access to adequate land to properly dispose of waste. If the producer does not own adequate land to properly dispose of waste, he shall provide NRCS with a copy of a written agreement with a landowner who is within a reasonable proximity, allowing him/her the use of the land for waste application for the life expectancy of the production facility. It is the responsibility of the owner of the facility to secure an update of the Waste Utilization Plan when there is a change in the operation, increase in the number of animals, method of utilization, or available land. 3. Animal waste shall be applied to meet, but not exceed, the Nitrogen needs for realistic crop yields based on soil type, available moisture, historical data, climate conditions, and level of management, unless there are regulations that restrict the rate of application for other nutrients. 4. Animal waste may be applied to land that has a Resource Management System (RMS) or an Alternative Conservation System (ACS). If an ACS is used the soil Toss shall be no greater than 10 tons per acre per year and appropriate filter strips will be used where runoff leaves the field. These filter strips will be in addition to "Buffers" required by DEM. (See FOTG Stantard 393 - Filter Strips and Standard 390 Interim Riparian Forest Buffers). 5. Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the irrigation field. 6. When animal waste is to be applied on acres subject to flooding, it will be soil incorporated on conventionally tilled cropland. When applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding. (See "Weather and Climate in North Carolina" in the NRCS Technical Reference - Environment file for guidance.) *7. Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control conditions conducive to odor or flies and to provide uniformity of application. 8. Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9. Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. 10. Waste nutrients shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of a crop on bare soil. 11. Any new swine facility sited on or after October 1, 1995 shall comply with the following: the outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and from any perennial stream or river (other that an irriaation ditch or canal. Animal waste Page 6 of 9 other than swine waste from facilities sited on or after October 1, 1995), shall not be applied closer than 25 feet to perennial waters. (See Standard 393 - Filter Strips) 12. Animal waste shall not be applied closer than 100 feet to wells. 13. Animal Waste shall not be applied closer than 200 feet of dwellings other than those owned by the Iandownwer. 14. Waste shall be applied in a manner not to reach other property and public right - of ways. 15. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted croplands provided they have been approved as a land application site by a "technical specialist". Animal waste should not be applied on grassed waterways that discharge directly into water courses, except when applied at agronomic rates and the application causes no runoff or drift from the site. *16. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. *17. A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). If needed, special vegetation shall be provided for these areas and shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc. are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Lagoon berms and structures should be inspected regularly for evidence of erosion, leakage or discharge. *18. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. *19. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, Teaks, and spills. A regular maintenance checklist should be kept on site. 20. Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied as a preemergence with no other applications of animal waste during the crop season. *21. Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume fpr waste storage ponds. 22. Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate - determining element. Zinc and copper levels in the soils shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted for optimum crop production amd maintained. Soil and waste analysis records shall be kept for five (5) years. Poultry dry waste application records shall be maintained for three (3) years. Waste application records for all other waste shall be maintained for five (5) years. 23. Dead animals will be disposed of in a manner that meets North Carolina Department of Agriculture regulations. * Liquid Systems Page 7 of 9 May 21 2016 05r15PM HP Fax page 2 NAME OF FARM; Cedar Fork Farm 31-111 OWNER / MANAGER AGREEMENT (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. 1 (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before The new animals are stocked. (we) understand that I must own or have saes to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day storm event. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER:. Heber Raynor SIGNATURE,• DATE: 3-'-/1 NAME OF MANAGER (if diffagmt from owner): %ie,�e_.Y please print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 (910) 385-1 0 SIGNATURE:'� DATE: 5-62r:/‘ Page 9 of 9 I PULL # WIDTH LENGTH ACRES 1 234 575 3,09 2 234 575 3.09 3 234 513 2.76 4 234 682 3,66 5 117 350 0,94 TOTAL PULLS = 5 TOTAL ACRES = 13.54 90Z EXTERIOR PULLS FOR 0260 70X. INTERIOR PULLS FOR 0260 ACRES = WIDTH X LENGTH / 43,560 AGRIMENT SERVICES INC. WASTE MANAGEMENT CONSULTANTS P_O_ BOX 1096 BEULAVI T E NC 28518 (252) 568-2648 711WABIE ACRES BBERPBErATION TITLE: HUNTER FARM FARMER: CHARLES HUNTER BY: JONTHAN MILLER CK. BY: GENO KENNEDY DATE: 5- 21- 99 CODES:T-6662 FARM #: 31-111 SCALE: 1"=400f DRAWING #: 1 OF 1 NOTES: 1. IRRIGATION LAYOUT BASED ON DUPUN COUNTY GIS MAPS AND INFORMATION PROVIDED BY BARWICK AG SERVICES. 2. LAYOUT AND SPACING FOR TRAVELER PULL BASED ON 0.87' RING OPERATED O 60 psi. AND USING CAUBRATED WETTED DIAMETER 240, LANE SPACING 180' - 757E SPACING. NO LAND APPLICATION DURING RAINFALL, FROZEN GROUND, OR WIND > 5 mph. 4. TRAVEL LANE AND RISERS SHOULD BE ACCURATELY LOCATED TO PREVENT APPLICATION IN BUFFERS. ! i I, f'` WO' Pull l° 1 l 335' Pu119 240' DIA. f' SPRAY PATTERN NEW HYDRANT TRAVEL LANE 8 _555' Pull 0 545' PO_ �IEXISTING RISERS (�■VA 001ttinCluq �y,. ,��`,, q'�y • lff ‘�.1.4� A FynrxlLtr o z ....... swap L • r 500' Pull Oft fir, R. GREGORY SWAIN, P.E. 305 Wendover Ln. Wilmington, NC 28411 910-590-5179 CEDAR FORK FARM IRRIGATION DESIGN DATE: 3/27/16 k SCALE: 1" = 300' CALCULATED EFFECTIVE WETTED ACREAGE (NEW SPRAYFIELDS) FOR CEDAR FORK FARM, Mr. Heber Raynor PULL TYPE 1PULL LENGTH EFFECT. WIDTH MIDDLE ACRES START END TOTAL 6 N75+ 500.0 158.0 1.81 0.14 0.00 1.95 7 NE75 545.0 183.6 2.30 0.31 0.00 2.61 8 NE75 555.0 183.6 2.34 0.31 0.00 - 2.65 9 NE75 335.0 183.6 1.41 0.31 0.00 1.72 10 EE70 320.0 183.6 1.35 0.31 0.00 1.66 TOTAL WETTED ACREAGE: 10.59 NOTES: 1. DIMENSIONS BASED ON ESTIMATED SCALED MAP FROM DUPLIN CO. GIS 2. WETTED ACREAGE FOR START ENDS AND STOP ENDS ARE TAKEN FROM CAWMP WETTED ACREAGE 3. ALL CALCULATIONS BASED ON 0.87" RING IN SR100 GUN AND CALIBRATED WETTED DIA 240'. 180' LANE SPACING. 4. EFFECTIVE SPRAY WIDTHS BASED ON NEW FIELD DESIGN STANDARDS. I5.OPERATOR MUST TAKE PRECAUTIONS AND OBSERVE IRRIGATION EVENTS TO PREVENT RUNOFF FROM OVERAPPLICATION, SPRAY DRIFT, ETC. APPLICATION SHOULD NOT OCCUR IN OVER 5 mph WINDS OR ON FROZEN OR SATURATED SOILS. 6. OPERATOR MUST VERIFY REQUIRED SETBACKS AND MARK LANES TO ENSURE ACCURATE APPLICATION. 7. SYSTEM SHOULD BE CALIBRATED AND OPERATED TO DESIGN SPECIFICATIONS, OR DESIGN MUST BE MODIFIED TO ACCOMMODATE CHANGES. R. Gregory Swain, P.E. 305 Wendover Ln Wilmington, NC 28411 (910) 590-5179 0b/24/2b'lb 01:39F'M 91029E1838B RAYNOR FARM SERVICES PAGE 01/01 May 21 2016 05r15FM HP Fax page 2 NAME OF FARM: Cedar Fork Fauns 31-111 OWNER 1 MANAGER AGREEMENT (we) understand and will follow and implement the specifications and the operation and maintenance precedures estalished in the approved animal waste utilization plan for the farm named above. I (we) know that any expansion to the existing design capacity of the waste treatment and/or storage system or construction of new facilities will require a new utilization plan and a new certification to be submitted to DEM before the new animals are stocked. I (we) understand that I must own or have acces to equipment, primarily irrigation equipment, to land apply the animal waste described in this waste utilization plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in a 25-year 1-day stomi event. I also certify that the waste will be applied on the land acconiing to this plan at the appropriate times and at rates that no runoff occurs. NAME OF FACILITY OWNER: Heber Raynor SIGNATURE;, DATE: .3 f Ar-ii NAME OF MANAGER (if ditikfent from owner): e eey"- aN pie a print SIGNATURE: DATE: NAME OF TECHNICAL SPECIALIST: Curtis Barwick AFFILIATION: Barwick Ag Services ADDRESS (AGENCY): 103 Country Club Circle Clinton, NC 28328 ("( (910) 385-10 0 SIGNATURE: _4_4- 4 DATE: .54'2%l'a Paga 9 of 9 Animal body surfaces Floor surfaces Swine Farm Waste Management Odor Control Checklist Source Cause _ _ BMsPsPtoy �^� Farmstead • Minimize Odor ~�� _ _ ` - Swine production Cr Vegetative or wooded buffers Site Specific Practices CYRecommended best management practices GYGood judgment and common sense C Dry floors Manure collection pits • Dirty manure -covered animals • Wet manure -covered floors C•a''Slotted floors - - - Waterers located over slotted floors tia- Feeders at high end of solid floors ©'Scrape manure buildup from floors 0 Underfloor ventilation for drying • erFrequent manure removal by flush, pit recharge, • Urine Ventilation exhaust • fans • Indoor surfaces Flush tanks Partial microbial decomposition Volatile gases Dust Dust Agitation of recycled lagoon liquid while tanks are filling or scrape O Underfloor ventilation Bran maintenance a -Efficient air movement Ci}-"Washdown between groups of animals a -Teed additives O Feeder covers fcrFeed delivery downspout extenders to feeder covers O Flush tank covers Extend fill lines to near bottom of tanks with anti -siphon vents •_0 4,18 �f1 Source 'End of drainpipes at lagoon Cause • Agitation during wastewater conveyance Lagoon surfaces lIrrigation sprinkler nozzles Storage rank or basin surface Sealing basin surface Manure, slurry or sludge spreader outlets [-/ncovered manure, slurry or sludge on field surfaces Dead animals • Volatile gas emissions; • Biological mixing; • Agitation • l ligh pressure agitation; • Wind drill Extend discharge point of pipes underneath lagoon liquid level E Proper lagoon liquid capacity, t V Correct lagoon startup procedures; Er Minimum surface area -to -volume ratio; Er -Minimum agitation when pumping; O Mechanical aeration; W.-Proven biological additives • Partial microbial decomposition; • Mixing while filling; • Agitation when emptying • Partial microbial decomposition; • Mixing while filling; • Agitation when emptying • Agitation when spreading; • Volatile gas emissions • Volatile gas emissions while drying o Carcass decomposition Dead animal disposal pits Incinerators 3 Carcass decomposition �lrrigate on dry days with li LI►ttle or no wind; Q--Minimum recommended operating pressure; fir -Pump intake near lagoon liquid surface; Cl Pump from second -stage lagoon Bottom or midlevel loading; — — O Tank covers; O Basin surface mats of solids; Proven biological additives or oxidants Extend drainpipe outlets underneath liquid level; Remove settled solids regularly Soil injection of slurry/sludges; - Wash residual manure front spreader after use; L l roven biological additives or oxidants Soil injection of slurry/sludges - — O'Soil incorporation within 98 hrs.; Cr—Spread in thin uniform layers for rapid drying; ©Proven biological additives or oxidants Incomplete c& .bustion Et —Proper disposition of carcasses - - tComplele covering of carcasses in burial pits; O Proper location/construction of disposal piss 0 Secondary stack burners SiteSpecific Praefi s ) Source Cause Standing water around • Improper drainage; facilities Microbial decomposition of organic matter Manure tracked onto — • Poorly maintained access roads public roads from farm access _ IJMPs to Minimize Odor ge Grade and landscape such that water drains away from facilities Fans access road maintenance Additional information : Swine Manure Management ; 0200 Rule/DMP Packet - — Swine Production Farm Potential Odor Sources and Remedies ; EBAE Fact Sheet Swine Production Facility Mature Management: Pit Recharge - Lagoon Treatment ; EBAE 128-88 Swine Production Facility Manure Management: Underfloor Flush » Lagoon Treatment ; EBAE 129-88 Lagoon Design and Management for Livestock Manure Treatment and Storage ; EBAE 103-83 Calibration of Manure and Wastewater Application Equipment ; EBAE Fact Sheet Controlling Odors from Swine Buildings ; PI1-I-33 Environmental Assurance Program ; NPPC Manual Options For Managing Odor ; a repot from the Swine Odor Task Force Nuisance Concerns in Animal Manure Management: Odors and Flies ; PRO107, 1995 Conference Proceedings { Available From : NCSU, County Extension Center NCSU -13AE NCSU - BAE NCSU BAE NCSU- BAE NCSU - BAE NCSU - Swine Extension NC Pork Producers Assoc NCSU Agri Communications Florida Cooperative Extension Insect Control Checklist for Animal Operations I:InA flutters • Accumulation of solids f dgouns and Pits • (.lusted Solids l et't Il•1 'a Site Specific Practices Flush system is designed and operated sufficiently to rernove accumulated solids from utters as designed. 11VRemove bridging of accumulated solids at discharge Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 - inches over more than 30% of surfat:e. I:r ctaaivr Vegetative !)ccaying vegetation itowth Maintain vegetative control along hanks of lagoons and other impoundments to prevent accunudation of decaying vegetative matter --- —' —--,_`-- - -- along water's edge on impoundment's perimeter. Dry Systems -1)csign, operate and maintain feed ___ (e.g., r---- hunkers and troughs) to minimize the /accwulation of decaying wastage. f ('lean up spillage on a routine basis (e.g., 7 - 1(1 day interval during slimmer; 15-30 day interval fieiluring winter). teduce moist+ere accumulation within and around immediate perimeter of feed swinge areas by insuring drainage away lion) site and/or providing adequate containment (e.g., covered hin for brewer's grain and similar high moisture grain products). f7 Inspect for and remove or break up ac:t•iarndated solids in lifter strips around feed storage as needed. • feed Spillage Feed Storage • Accuuullations of feed residues AN.. Ntiv-cnthcr 11, 1906, Page 1 ve Animal 1Io it b Are Cause ----- -- Accunlulations ofanintal wastes BMps to Cot l Insects Eliminate low areas that trap moisture along and feed wastage fences and other locations where waste accumulates and disturbance by animals is minimal. n Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as 5' Maniac!Maniac Ilau(lling Systenls • Accumulations of animal wastes needed). n Remove spillage �~ on a routine basis (e.g., 7. 10 day interval during summer; 15-30 day interval during winter) where manure is loaded for land application or disposal. f l Provide for adequate drainage around rlta(Itlre stockpiles. n Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and For mote inl�tnn:riun contact the Cooperative Extension Service, Department__ of Entomology, manure handling areas as needed. Ifelci,h TJl' 2 1la 1.5-?nl 3., 6) � Box 7613, Ninth Carolina State t lrrivr•(sity, AMR: - November 11, 1996, Page 2 Site Specific practices 21-111 cr EMERGENCY ACTION PLAN PHONE NUMBER S DWQ 9/0-'7f4 -9LiS EMERGENCY MANAGEMENT SYSTEM 49/0 -194 - a. / Go SWCD 910- 3 3s-- 31 NRCS 334-- 3i acf This plan will be implemented in the event that wastes from your operation are leaking, overflowing, or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1 Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow -possible solutions are: a. Add soil to berm to increase elevation of dam. b. Pump wastes to fields at an acceptable rate. c. Stop all flows to the lagoon immediately. d. Call a pumping contractor. e. Make sure no surface water is entering lagoon. B: Runoff from waste application field -actions include: a. Immediately stop waste application. b. Create a temporary diversion to contain waste. c. Incorporate waste to reduce runoff. d. Evaluate and eliminate the reason(s) that caused the runoff. e. Evaluate the application rates for the fields where runoff occurred. C: Leakage from the waste pipes and sprinklers -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Close valves to eliminate further discharge. d. Repair all leaks prior to restarting pumps. D:. Leakage from flush systems, houses, solid separators -action include: a. Stop recycle pump. b. Stop irrigation pump. c. Make sure no siphon occurs. d. Stop all flows in the house, flush systems, or solid separators. December 18, 1996 e. Repair all leaks prior to restarting pumps. E: Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a. Dig a small sump or ditch away from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b. If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c. Have a professional evaluate the condition of the side walls and lagoon bottom as soon as possible. 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach any surface waters? b. Approximately how much was released and for what duration? c. Any damage noted, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off of the property)? h. How much reached surface waters? 3: Contact appropriate agencies. a. During normal business hours, call your DWQ (Division of Water Quality) regional office; Phone - - . After hours, emergency number: 919-733-3942. Your phone call should include: your name, facility, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If spill leaves property or enters surface waters, call local EMS Phone number - c. Instruct EMS to contact local Health Department. l SWCD office phone number - - d. Contact CES, phone number - - and local NRCS office for advice/technical assistance phone number - - . 4: If none of the above works call 911 or the Sheriffs Department and explain your problem to them and ask that person to contact the proper agencies for you. 5: Contact the contractor of your choice to begin repair of problem to minimize off -site damage. a. Contractors Name: b. Contractors Address: c. Contractors Phone: 2 December 18, 1996 6: Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: C).44virL b. Phone: no 3K-ioao 7: Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 3 December 18, 1996 3/-111 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Primary Secondary Routine Mortality El El o O 0 ❑ o CI El o❑ Version —November 26, 2018 Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. Rendering at a rendering plant licensed under G.S. 106-168.7. Complete incineration according to 02 NCAC 52C .0102. A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). Any method which, in the professional opinionhof the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mr_.ftality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be,done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. Si natur of Far W Owner/er g}t Signature of Technical Specialist 3 Date /71--/ Date Operator: Heber Raynor County: Duplin Date: Distance to nearest residence (other than owner): 1000.0 feet 1. AVERAGE LIVE WEIGHT (ALW) 0 sows (farrow to finish) x 1417 lbs. = 0 Ibs 0 sows (farrow to feeder) x 522 Ibs. = 0 Ibs 0 head (finishing only) x 135 Ibs. = 0 Ibs 0 sows (farrow to wean) x 433 Ibs. = 0 Ibs 3840 head (wean to feeder) x 30 lbs. = 115200 Ibs Describe other : 0 Total Average Live Weight = 115200 lbs 2. MINIMUM REQUIRED TREATMENT VOLUME OF LAGOON Volume = 115200 lbs. ALW x Treatment Volume(CF)/Ib. ALW Treatment Volume(CF)/Ib. ALW = 1 CF/Ib. ALW Volume = 115200 cubic feet 3. STORAGE VOLUME FOR SLUDGE ACCUMULATION Volume = 0.0 cubic feet 4. TOTAL DESIGNED VOLUME Inside top length (feet) Inside top width (feet)---- ------ Top of dike elevation (feet) Bottom of lagoon elevation (feet)— ------ --- Freeboard (feet) Side slopes (inside lagoon) Total design volume using prismoidal formula 230.0 140.0 51.0 41.0 1.0 3.0 1 SS/END1 SS/END2 SS/SIDE1 SS/SIDE2 LENGTH WIDTH DEPTH 3.0 3.0 3.0 3.0 224.0 134.0 9.0 AREA OF TOP LENGTH *WIDTH = 224.0 134.0 AREA OF BOTTOM LENGTH *WIDTH = 170.0 80.0 AREA OF MIDSECTION LENGTH *WIDTH *4 197.0 107.0 30016 (AREA OF TOP) 13600 (AREA OF BOTTOM) 84316 (AREA OF MIDSECTION * 4) RECEIVEDNCT:WNR NPR ®3 2019 WaterlatY AgdionsIcartrzf CU. FT. = [AREA TOP + (4*AREA MIDSECTION) + AREA BOTTOM] * DEPTH/6 30016.0 84316.0 13600.0 1.5 Total Designed Volume Available = 191898 CU. FT 5. TEMPORARY STORAGE REQUIRED DRAINAGE AREA: Lagoon (top of dike) Length * Width = 230.0 140.0 32200.0 square feet Buildings (roof and lot water) 0.0 square feet TOTAL DA 32200.0 square feet Design temporary storage period to riod to b e 5A. Volume of waste produced Feces & urine production in gal./day per 135 Ib. ALW Volume = Volume = 5B. Volume of wash water Describe this area. 180 days. 1.37 115200 lbs. ALW/135 lbs. ALW * 1.37 gal/day 180 days 210432 gals. or 28132.6 cubic feet This is the amount of fresh water used for washing floors or volume of fresh water used for a flush system. Flush systems that recirculate the lagoon water are accounted for in 5A. Volume = 0.0 gallons/day * 180 days storage/7.48 gallons per CF Volume = 0.0 cubic feet 5C. Volume of rainfall in excess of evaporation Use period of time when rainfall exceeds evaporation by largest amount. 180 days excess rainfall Volume = 7.0 in * DA / 12 inches per foot Volume = 18783.3 cubic feet 5D. Volume of 25 year - 24 hour storm 7.0 inches Volume = 7.0 inches / 12 inches per foot * DA Volume = 18783.3 cubic feet TOTAL REQUIRED TEMPORARY STORAGE 5A. 28133 cubic feet 5B. 0 cubic feet 5C. 18783 cubic feet 5D. 18783 cubic feet TOTAL 65699 cubic feet 6. SUMMARY Temporary storage period > 180 days Rainfall in excess of evaporation > 7.0 inches 25 year - 24 hour rainfall > 7.0 inches Freeboard > 1.0 feet Side slopes > 3.0 : 1 Inside top length > 230.0 feet Inside top width > 140.0 feet Top of dike elevation > 51.0 feet Bottom of lagoon elevation > 41.0 feet Total required volume > 180899 cu. ft. Actual design volume > 191898 cu. ft. Seasonal high watertable elevation (SHWT)===> 44.0 feet Stop pumping elev. > 47.6 feet Must be > or = to the SHWT elev. > 44.0 feet Must be > or = to min. req. treatment el.=> 47.0 feet Required minimum treatment volume > 115200 cu. ft. Volume at stop pumping elevation > 125880 cu. ft. Start pumping elev. > 49.4 feet Must be at bottom of freeboard & 25 yr. rainfall Actual volume Tess 25 yr.- 24 hr. rainfall==> 173115 cu. ft. Volume at start pumping elevation > 173125 cu. ft. Required volume to be pumped > 46916 cu. ft. Actual volume planned to be pumped > 47245 cu. ft. Min. thickness of soil liner when required==> 1.5 feet 7. DESIGNED BY: / ` ►t A13PROVED BY. DATE: a DATE: NOTE: SEE ATTACHED WASTES UTILIZATION PLAN COMMENTS: �/ a'' 21-11.1 OPERATION & MAINTENANCE PLAN Proper lagoon liquid management should be a year-round priority, It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as the thunderstorm season in the summertime, This means that at the first signs of plant growth in the later winter/early spring, irrigation according to a farm waste management plan should be done whenever the land is dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods, In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigate does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action, The routine maintenance of a lagoon involves the following: Maintenance of a vegetative cover for the dam, Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilizer applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the Iagoon that are treating the waste. Maintenance inspections of the entire lagoon should be the lagoon and at least monthly and after major rainfall checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and 1. separation of joints 2. cracks or breaks 3, accumulation of salts or minerals 4. overall condition of pipes made during the initial filling of and storm events, Items to be Overflow Pipes ---look for: - Lagoon surface ---look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment ---look for: 1. settlement, cracking, or "jug" holes 2. side slope stability ---slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack of vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert, Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps ---check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need or repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low Ievel. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing , or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures, The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an inflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste Ioading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occour at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8,0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well, • Management: Practice water conservation ---minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation, Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid lever (Figure 2-1). ▪ Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer/early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. ▪ Do not pump the lagoon liquid level lower that the permanent storage level unless you are removing sludge, Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. ▪ Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. Maintain strict vegetation, rodent, and varmint control near lagoon edges. Do not allow trees or large bushes to grow on lagoon dam or embankment. Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. ▪ If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by ▪ proper lagoon sizing, • mechanical solids separation of flushed waste, ▪ gravity settling of flushed waste solids in an appropriately designed basin, or minimizing feed wastage and spillage, Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and ▪ require more land to properly use the nutrients. Removal techniques: Hire a custom applicator. Mix the sludge and lagoon liquid with a chopper -agitator impeller pump through large -bore sprinkler irrigation system onto nearby cropland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3, When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphores, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure ---an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) Lagoon liquid levels ---high levels are a safety risk. Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. Liner integrity ---protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon Iiquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the darn, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure.