Loading...
HomeMy WebLinkAbout240001_Permit Renewal Application 2019_20190410 State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non-Discharge General Permit On September 30, 2019, the North Carolina State Non-Discharge General Permits for Animal Waste Management Systems will expire. As required by these pennits, facilities that have been issued Certificates of Coverage to operate under these State Non-Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3,2019. Please do not leave any question unanswered.. Please verify all information and make any necessary corrections be1mv. Application must be signed and dated by the Permtittee. 1. Farm Number: 24-0001 Certificate Of Coverage Number: AWS240001 2. Facility Name: Fann 3417 3. Landowner's Name(same as on the Waste Management Plan): Murphy-Brown LLC 4. Landowner's Mailing Address: PO Box 856 City: Warsaw State: NC Zip: 28398-0856 Telephone Number: 910.293-3434 Ext. E-mail: kraiowa%at-rbgakQmumhv reawdla.eem 5. Facility's Physical Address: 6910 Batten Burney Rd City: Whiteville State: NC Zip: 28472 6. County where Facility is located: Columbus 7, Farm Managers Name(if different from Landowner): g, Farm Manager's telephone number(include area code): 910-293-3434 Ext. 9. Integrator's Name(if there is not an Integrator,write"None"): Muruhv-Brown LLC 10. Operator Name(OIC): James C.Smith Phone No.: 910-271-0932 OIC#: 17907 11. Lessee's Name(if there is not a Lessee,write"None"): 12. Indicate animal operation type and number: Current Permit: Operations Type Allowable Count Swine-Farrow to Wean 2,400 Swine-Feeder to Finish 10,008 Operation Types: Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses-Horses Wean to Feeder Dairy Heifer Laying Chickens Horses-Other Farrow to Finish Milk Cow Pullets Sheep-Sheep Feeder to Finish Dry Cow Turkeys Sheep-Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Paull" Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Estimated Liner Type Estimated Design Freeboard Structure Date (Clay,Synthetic, Capacity Surface Area "Redline' Name Built Unknown) (Cubic Feet) (Square Feet) (Inches) FINISHER no, _\0fk C. C�k I xA0,6CCO sow , c 1 a. 19y a t S oo 1 9 .9 Mail one (1) copy of the Certified Animal Waste Management Plan (CAWMP) with this completed and signed application as required by NC General Statutes 143-215.IOC(d)to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan(WUP),signed by the owner and a certified technical specialist,containing: a. The method by which waste is applied to the disposal fields(e.g.irrigation,injection,etc.) b. A map of every field used for land application(for example:irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation(RYE)for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP It. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted-Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity documentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g.composting,digesters,waste transfers,etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewalCaancderingov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all .required supporting information and attachments are not included,this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes,any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation,signature should be by a principal executive officer of the corporation): Name: ���'C-� rl �..�...�-. Title:,_ Signature: Date: Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh,North Carolina 27699-1636 Telephone number:(919)707-9100 E-mail:2019PermitRenewal@ncdenr.gov FORM: RENEWAL-STATE GENERAL 02/2019 I Animal Waste Management Plan Certification (Please type or print all Information that does not require a signature) General Information: Name of Farm: Farm 3417 Facility No: 24-001 Owner(s)Name: Murphy Brown LLC Phone No: 910-2 33-3434 Mailing Address: P.O. Box 856 Warsaw, NC 28398 Farm Location: County Farm is located in: Columbus Latitude and Longitude: 34 25'00"/ 79 21'26" Integrator: Murphy Brown Please attach a copy of a county road map with location identified and described below(Be specific: road names, directions, milepost, etc.). Red Hill Rd. Between Clarkton and Whiteville Operation Description: Type of Swine No.of Animals Type of Poultry No.ofAnimals Type of Cattle No.of Animals -.Wean to Feeder El Layer ❑ Dairy Ly eeder to Finish 10,008 Pullets LJ Beef Farrow to Wean 2,400 0 Farrow to Feeder I� Farrow to Finish Wean to Finish I� Gilts 0 Boars Acreage Available for Application: 154.24 Required Acreage: 154.24 Number of Lagoons/Storage Ponds: 2 Total Capacity: 3 413 rgE't Cubic Feet(it3) Are subsurface drains present on the farm: Yes or No (please circle one) If YES: are subsurface drains present in the area of the LAGOON or SPRAY FIELD (please circle one) #i#*f*f***Rf RRiiftRRlflfff R!!ii#fi1*Mllfhit#i*iiiN#**f*1RH#Rff#*RR!##RR#i#fiii****ii*liiii!*#f*Ri*1f1f111f#11###R*R11ff#lffi#*R##** Owner/Manager Agreement (we) verify that all the above information is correct and will be updated upon changing. I (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know that any expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) understand that there must be no discharge of animal waste from the storage or application system to surface waters of the state either directly through a man-made conveyance or from a stone event less severe than the 25- year, 24- hour storm and there must not be run-off from the application of animal waste. I (we) understand that run-off of pollutants from lounging and heavy use areas must be minimized using technical standards developed by the Natural Resources Conservation Service. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. I (we) know that any modification must be approved by a technical specialist and submitted to the Soil and Water Conservation District prior to implementation. A change in land ownership requires written notification to DEM or a new certification (if the approved plan is changed)within 60 days of a title transfer. Name of Land Owner: Murph r w LLC Signature:. > Date: \O— M_Zp )fig Name of Manager( erent from owner): Signature: Date AWC-- August 1, 1997 1 Technical Specialist Certification I. As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 6F .0005. 1 certify that the animal waste management system for this farm named above has an animal waste management plan that meets or exceeds standards and specifications of the Division of Environmental Management (DEM) as specified in 15A NCAC 2H.201 and the USDA-Natural Resources Conservation Service (NRCS) and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 15A NCAC 6F .0001.0005. The following elements are included in the plan as applicable. While each category designates a technical specialist who may sign each certification (SD, SI, WUP, RC, 1), the technical specialist should only certify parts for which they are technically competent. ll. Certification of Design A) Collection. Storage, Treatment System Check t appropriate box 23 Existing facility without retrofit (SD or WUP) Storage volume is adequate for operation capacity: storage capability consistent with waste utilization requirements. 0 New,expanded or retrofitted facility (SD) Animal waste storage and treatment structures, such as but not limited to collection systems, lagoons and ponds, have been designed to meet or exceed the minimum standards and specifications. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agency): P.O. Box 856,Warsaw, NC 2839f Phone No.:(910)293-3434 Signature: `� , V , Date: ka _ yy--Z oil B) Land Application Site(WUP) The plan provides for minimum separations(buffers);adequate amount of land for waste utilization; chosen crop is suitable for waste management hydraulic and nutrient loading rates. Name of Technical Specialist (Please Print): Toni King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Age cy): P.O. Box 856, War aw, NC 2839E Phone No..(910)293-3434 Signature: L� - .._t Dale: �o _1�k C) Runoff Controls from Exterior Lots Check the aJ7Propriate box LJ FBCIIItV without exterior lots (SD or WUP or RC) This facility does not contain any exterior lots. El Facility with exterior lots (RC) Methods to minimize the run off of pollutants from lounging and heavy use areas have been designed in accordance with technical standards developed by NRCS. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Age y): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: _ � Date: t0— t�-1—Zoly AWC--August 1, 1997 2 D). Application and Handling Equipment Check the prmpnate box Existina or expanding facility with existing waste application equigment(WUP or 1) Animal waste application equipment specified in the plan has been either field calibrated or evaluated in accordance with existing design charts and tables and is able to apply waste as necessary to accommodate the waste management plan: (existing application equipment can cover the area required by the plan at rates not to exceed either the speed hydraulic or nutrient loading rates. A schedule for timing of applications has been established; required buffers can be maintained and calibration and adjustment guidance are contained as part of the plan). ❑ New, expanded or existing facility without existing waste application eauioment for spray irrigation (1) Animal waste application equipment specified in the plan has been designed to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specified hydraulic or nutrient loading rates; a schedule for timing of applications has been established: required buffers can be maintained: calibration and adjustment guidance are contained as part of the plan). 0 New, expanded or existing facility without existing waste application equipment for land spreading not using spray irrigation. (WUP or 1) Animal waste application equipment specified in the plan has been selected to apply waste as necessary to accommodate the waste management plan: (proposed application equipment can cover the area required by the plan at rates not to exceed either the specked hydraulic or nutrient loading rates: a schedule for timing of applications has been established; required buffers can be maintained: calibration and adjustment guidance are contained as a part of the plan). Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown LLC Date Work Completed: Address(Agency): P.O. Box 856,Warsaw, NC 2839E Phone No.:(910) 293-3434 Signature: _19D _ Date: (O- ty—ZOI t o E) Odor Control, Insect Control Mortality ManaWnent and Emergency Action Plan (SD SI, WUP RC or I) The waste management plan for this facility includes a Waste Management Odor Control Checklist, an Insect Control Checklist, a Mortality Management Checklist and an Emergency Action Plan. Sources of both odors and insects have been evaluated with respect to this site and Best Management Practices to Minimize Odors and Best Management Practices to Control Insects have been selected and included in the waste management plan. Both the Mortality Management Plan and the Emergency Action Plan are complete and can be implemented by this facility. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agency : P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: - 1 _ Date: gyp— Le F) Written Notice of New or Expanding Swine rm The following signature block is only to be used for new or expanding swine farms that begin construction after June 21, 1996. If the facility was built before June 21, 1996, when was it constructed or last expanded I (we)certify that I(we)have attempted to contact by certified mail all adjoining property owners and all property owners who own property located across a public road, street or highway from this new or expanding swine farm. The notice was in compliance with the requirements of NCGS 106-805. A copy of the notice and a list of property owners notified is attached. Name of Land Owner. Signature: Date: Name of Manager(if different from owner): Signature: Date AWC --August 1, 11997 3 Ill. Certification of Installation A) Collection, Storage Treatment Installation New,expanded or retrofitted facility (SI) Animal waste storage and treatment structures, such as but not limited to lagoons and ponds, have been installed in accordance with the approved plan to meet or exceed the minimum standards and specifications. For existing facilities without retrofits, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address(Agency): Phone No.: Signature: Date: B) Land Application Site(WUP) Check the app date box The cropping system is in place on all land as specified in the animal waste management plan. 0 Conditional Approval: all required land as specified in the plan is cleared for planting: the cropping system as specified in the waste utilization plan has not been established and the owner has committed to establish the vegetation as specified in the plan by (month/day/year); the proposed cover crop is appropriate for compliance with the waste utilization plan. El Also check this box if appropriate If the cropping system as specified in the plan can not be established on newly cleared land within 30 days of this certification,the owner has committed to establish an interim crop for erosion control: Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address (Age cy): P.O. Box 856rWaaw, NC 2839E Phone No.:(910)293-3434 Signature: _�`, rs Date: \o I1F--LO I l This following signature block is only to be used when the box for conditional approval in III. B I (we) certify that I (we) have committed to establish the cropping system as specked in my (our) waste utilization plan, and if appropriate to establish the interim crop for erosion control, and will submit to DEM a verification of completion from a Technical Specialist within 15 calendar days following the date specified in the conditional certification. I (we) realize that failure to submil this verification is a violation of the waste management plan and will subject me(us)to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date AWC --August 1, 1997 4 C) Runoff Controls from Exterior Lots (RC) Facility with exterior lots Methods to minimize the run off of pollutants from lounging and heavy use area have been installed as specified in the plan. For facilities without exterior lots, no certification is necessary. Name of Technical Specialist (Please Print): Affiliation Date Work Completed: Address(Agency): Phone No.: Signature: Date: D) Application and Handling Equipment Installation (WUP or 1) Check the appropriate ck Animal waste application and handling equipment specified in the plan is on site and ready for use; calibration and adjustment materials have been provided to the owners and are contained as part of the plan. E3 Animal waste application and handling equipment specified in the plan has not been installed but the owner has produced leasing or third party application and has provided a signed contract: equipment specified in the contract agrees with the requirements of the plan: required buffers can be maintained: calibration and adjustment guidance have been provided to the owners and are continued as part of the plan. Conditional approval: Animal waste application and handling equipment specified in the plan has been purchased and will be on site and installed by (month/daylyear); there is adequate storage to hold the waste until the equipment is installed and until the waste can be land applied in accordance with the cropping system contained in the plan; and calibration and adjustment guidance have been provided to the owners and are contained as part of the plan. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address (Age cy): P.O. Box 856, Warsaw, NC 2839E Phone No.:(910)293-3434 Signature: Date: \ - \y-ZOI " The following signature block is only used 'hen the box for conditional approval in 111 D above has been checked. I (we) certify that I (we) have committed to purchase the animal waste application and handling equipment as specified in my (our)waste management plan and will submit to DEM a verification of delivery and installation from a Technical Specialist within 15 days following the date specified in the conditional certification. I (we) realize that failure to submit this verification is a violation of the waste management plan and will subject me (us) to an enforcement action from DEM. Name of Land Owner: Signature: Date: Name of Manager(if different from owner): Signature: Date E)Odor Control, Insect Control and Mortality Management(SD SI WUP RC or 1) Methods to control odors and insects as specified in the Plan have been installed and are operational. The mortality management system in the Plan has also been installed and is operational. Name of Technical Specialist (Please Print): Toni W. King Affiliation Murphy-Brown, LLC Date Work Completed: Address(Agen ): P.O. Box 856, Warsaw, NC 2839E Phone No..(910)293-3434 Signature: Date: AWC --August 1, 1997 5 Please return the completed form to the Division of Water Quality at the following Address: Department of Environment Health and Natural Resources Division or Water buality Water Quality! ection,t om liance Group P.O. B x 28535 Raleigh, NC 27626-0535 Please remember to submit a copy of this form along with the complete Animal Waste Management Plan to the local Soil and Water Conservation District Office and to keep a copy in your files with your Animal Waste Management Plan. AWC--August 1, 1997 6 Murphy-Brown, LLC 6/8/2017 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 NUTRIENT UTILIZATION PLAN Grower(s): Murphy-Brown, LLC dba Smithfield Hog Production Farm Name: 3417;AWS240001 County: Columbus Permit Capacity: Farrow to Wean 2400 Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish 10008 Gilts Boars Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less.than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils,when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWR regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1of11 This plan is based on the waste application method shown above. If you choose to change methods in the future,you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made,which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be Flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out,meets the requirements for compliance with 15A NCAC 2H.0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR (gallons,W,tons,etc.): Capacity Type Waste Produced per Animal Total 2400 Farrow to Wean 3203 gaVyr 7,687,200 galtyr Farrow to Feeder 3861 gaVyr galtyr Farrow to Finish 10478 gaVyr galtyr Wean to Feeder 191 gaVyr galtyr Wean to Finish 776 gaVyr galtyr 10008 Feeder to Finish 927 gaVyr 9,277,416 galtyr Gilts 1015 gaVyr gal/yr Boars 2950 gaVyr gaVyr Total 16,964,616 galtyr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced perAnimal Total 2400 Farrow to Wean 3,84 Ibs/yr 9,216 Ibs/yr Farrow to Feeder 6.95 Ibs/yr Ibsryr Farrow to Finish 18.86 Ibs/yr Ibs/yr Wean to Feeder 0.34 Ibs/yr Ibs/yr Wean to Finish L4 Ibs/yr Ibs/yr 10008 Feeder to Finish 1.67 Ibs/yr 16,713 Ibs/yr Gilts 1.83 lbs/yr Ibs/yr Boars 5.33 lbs/yr Ibs/yr Total 25,929 Ibs r Appying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: 153.87 Total N Required let Year: 35394.36 Total N Required 2nd Year: 25235.66 Average Annual Nitrogen Requirement of Crops: 30,315,01 Total Nitrogen Produced by Farm: 25.929.36 Nitrogen Balance for Crops: (4,385.65) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size. soil characteristics,and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 11 Reception Area Specifications Year 1 of a 2 year crop rotation Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs N/Ac Lbs N Total lbs N 2nd Crop rime to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total lbs N Total coral lbs N Acrea e Type Code A 1 Yield lbs N/Unit Residual /Ac Utilized Code Apply Yield lbs N/Unit Residual fAc Utilized Lbs N/AO Utilized T767 Zone 5.47 Nos C Mar-Sept SA 46 294.4 1610.368 L Se -Apr Sepl-Apr 1 50 50 2]3.5 344.4 1883.868 P67 Zone 5.38 Was C Mar-Sept 5.4 49 264.6 1423.548 L Sept-Apr i 50 50 269 314.6 1692.548 P67 3 4.22 NOB D FablSJune 135.0 D.95 128.25 541.215 N Sept-Apr 59 2.09 123.31 520.3682 251.56 1061.583 T767 4 4.59 NOB D Feb15June 13&0 0.95 75 113.25 519.8175 N Sept-Apr 59 2.09 123.31 565.9929 236.56 1085.81 T767 5 5.41 NOB D Fab75June 135.0 0.95 15 113.25 612.6825 N t- r 59 2.09 123.31 667.1071 236,56 1279.79 T767 6 6.97 Nos D Feb15-June 135.0 0.95 15 113.25 789.3525 N Sept-Apr 59 2.09 123.31 859.4707 236.56 1640823 T767 7 6.97 Nos D FebiSJune 135.0 0.95 15 113.25 789.3525 N Se -A r 59 2.09 123.31 859.4707 236.56 1648.823 T767 8 0.7 NOB D FebiSJune 135.0 0.95 15 113.25 79.275 N Se - 59 2.09 123.31 86.317 236.56 165.592 P67 Zone 9 3.46 NOB C Mar-Sept 6.4 46 294.4 1018.624JNSept-Apr r 1 50 50 173 3 1.4 1191.624 P67 Zone 10 3.78 NOB C Mar-Se 6.4 46 294.4 1112.832Sept-Apr 1 50 50 189 344.4 1301.832 P67 Zone 11 4.58 Nos C Mar-Set 6A 46 294.4 1348.352 - r 1 50 50 229 344.4 1577.352 Pfi7 Zone 12 4.37 Nos C Mar-Set 64 46 294.4 1286.528 - r 1 50 50 218.5 344.4 1505.028 P67 Zone 13 5.4 Nos C MarSe 6.4 46 294.4 1589.76 - r 1 50 50 270 344.4 1859.76 P67 14 4.95 Gt 0 Febl SJune 132.0 0.9 15 103.8 513. 11 - r 45 1A3 86.85 429.9075 190.65 943.7175 P67 15 6.24 Gt D Feb15-June 132.0 0.9 15 103.8 647.712 - r 45 1A3 86.85 541.944 190.65 1189.656 T767 16 6.24 Gt 0 Febl-June 132.0 0.9 15 103.8 647.712 - r 45 1.93 86.85 541.944 190.65 1189.656 T767 17 5.77 Gt D Febl SJune 1320 0.9 15 103.8 59B.926 - r 45 1.93 86.85 W1.1245 190.65 1100.051 T767 18 0.73 Noe D Febl SJune 135.0 0.95 15 113.25 82.6725 r 59 2.09 123.31 90.0163 236.56 172.6888 T767 19 4.51 NOB D Febl5June 135.0 0.95 15 113.25 510.7575 r 59 209 123.31 556.1281 236.56 1066.886 T767 20 5.01 NOB D Febl5June 135.0 0.95 15 113.25 567.3825 r 59 209 123.31 617.7831 236.56 1185.166 P67 21 5.77 NOB D Febl5June 135.0 0.95 15 113.25 653.4525 N Se - 59 2.09 123.31 711.4987 236.56 1364.951 T767 22 1.02 Was D Febl 5-June 88.0 1.02 1 15 1 74.76 76.2552 1 N Sept-Apr 39 2.32 90.48 92.2896 165.24 168.5648 T767 23 3.47 Was D Febi SJune 88.0 1.02 15 74.76 254.9316 N 39 2.32 90.48 308.5368 165.24 563.4684 P67 24 4.45 Wag D Fabl SJune 88.0 1.02 15 74.76 332.682 N 39 2.32 90.48 402.636 165.24 735.318 P67 25 5.54 Was D Febl SJune 88.0 1.02 15 74.76 414.1704 N I. 39 2.32 90.48 501.2592 165.24 915.42 66 T787 26 5.02 Was D FablSJun 88.0 1.02 15 74.76 375.2952 N 39 2.32 90.48 454.2096 165.24 829.5048 T767 27 3.57 was D Feb15-June $8.0 1.02 15 74.76 266.8932 N39 2.32 90.48 323.0136 165.24 689.9068 T767 28A 3.16 Was D Febl5Juns 88.0 1.02 15 74.76 236.2416 N 39 232 90.48 285.9168 165.24 622.1584 P67 28B 6.97 WaB D Fetl SJune 88.D 1.02 15 74.76 521.0772 N 39 2.32 90.48 630.6456 165.24 1151.723 Pfi7 29 4.81 Was 0 Febl 5-June 88.0 1.02 15 74.76 359.5956 N 39 232 90.48 435.2088 165.24 794.8044 P67 30 1.57 Was D Febl SJune Be.O 1.02 15 74.76 117.3732 N 39 2.32 90.4E 142.0536 165.24 259.4268 P67 Sub 3A5 3.18 Nos D Febl5June 135.0 0.95 15 113.25 360.135 N 59 2.09 123.31 392.1258 236.66 752.2608 P67 Sub 6,7,8 1.56 Nos D Febt SJune 135.0 0.95 15 113.25 176.67 N 59 2.09 123.31 192.3636 236.56 369.0336 P67 Subl4l7 2.1 Gt D Febl SJune 1320 0.9 15 103.8 217.98 N Set r 45 1.93 86.85 182.385 190.65 400.365 T767Sub1S25 1.96 NoB/Was D Fabl5June 111S 0.98 15 94.27 184.7692 N Sept-Apr 49 2.2 107.8 211.288 202.07 396.0572 T767 Sub 2S3D 5.03 WaB D Fabl5Juna 88.0 1.02 15 74.76 376.0428 N Sept-Apr 39 2.32 90.46 455.1144 165.24 831.1572 Optimal Crops: Row crop 0elds only) T767 An An S Se PA r 1.0 100 100 0 T767 An An CC Se t-A r 1.0 30 30 0 Note:Amount applied to cover crop must be deducted from following crops staNn AN rate if if Totals: 153.87 21214.24 14180.12 35394.36 3(a)of I Reception Area Specifications Year 2 or a 2 year crop rotation Tract Field Irrigated Soil tat Crop Time to 1sl Crop 1st Crop Lbs N/Ae Lips N Total lea N 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Tetal Ibs N Total Total Ibs N Acme e Type Code Apply Yield Ibs N/Unit Residual IAc Utilized Code Apply Yield Ibs N/Unit Residual /Ac Utilized Lbs N/Ac Utilized P67 Zone 1 5.47 Nos C Mar-Set 6.4 46 294.4 1610.368 L Se -A r 1 50 50 273.5 344.4 1883.868 P67 Zone 2 5.38 Was C Mar-Set 51 49 264.E 1423.548 L Se -A r 1 50 50 269 314.8 1692.548 T767 3 4.22 Nos O A r-Sa 5 34.0 3.91 132.94 561.0068 0 0 132.99 561.0068 P67 4 4.59 NO 0 A r-Se t75 34.0 3.91 132.94 610.1946 0 0 132.94 670.1946 P67 5 5.41 NOB O S 15 34.0 3.91 132.94 719.2054 0 0 132.94 719.2554 P67 6 6.97 NOB O Sa 5 34.0 3.91 132.94 926.5918 0 0 132.94 926.5918 T767 7 6.97 Nos O A Se 5 34.0 3.91 132.94 926 5918 0 0 132.94 926.5918 T767 8 0.7 NOB O Se t15 34.0 3.91 132.94 93.058 0 0 132.94 26.591 P67 Zone 9 3.46 Nob C MarSe t 6.4 46 294.4 1018.624 L - r 1 50 50 173 344.4 1191.624 T767 Zone 10 3.78 NOB C Mar-Se 6.4 46 294.4 1112+832 L r 1 50 50 169 344.4 t301.832 P67 Zone 11 4.58 NOB C Mar-Se 6.4 46 294.4 1348.352 L r 1 50 50 229 344.4 1577.352 Pfi7 Zone 12 4.37 NoB C Mar-Set 6.4 46 294.4 1286.528 L Sept-Apr 1 50 50 218.5 344.4 1505D28 P67 Zone 73 5.4 NOB C Mar-Sept 8.4 46 294.4 1589.76 L Sept-Apr 1 5p 50 270 344.4 1859.78 P67 14 4.95 Gt O A Sa 5 34.0 3.87 131.58 fi51.321 0 0 131.58 651.321 P67 15 6.24 Gt O .Se 15 34.0 3.87 131.58 821.0592 0 0 131.58 821.0592 T767 16 6.24 Gt 0 A Se 15 34.0 3.87 131.58 821.0592 0 0 131.58 821,0592 P67 17 5.77 Gt O rSe 75 34.0 3.87 131.58 759+2156 0 0 131.58 759+2166 P67 18 0.73 NoB O rSe 15 34.0 3.91 132.94 97.0462 0 0 132.94 97.0462 P67 19 4.51 NOB 0 rSe 15 34.0 3.91 132.94 5W.5594 0 0 132.94 599.55 2 T767 20 5.01 Nos O A rS 15 34.0 3.91 132.94 666.0294 0 0 132.94 599.5594 P87 21 5.77 NOB O rSe 15 34.0 3.91 132.94 767.0638 0 0 132.94 767,0638 P67 22 1.02 WaB 0 A rSeptl5 23.0 3.98 91.54 93.3708 0 0 91.54 93+3708 P67 23 3.41 WaB O rSa t15 23.0 3.98 91.54 312.1514 0 0 91.54 312+1514 P67 24 4.45 Was O r-Sept15 23.0 3.98 91.54 407.353 0 0 91.54 407.353 P67 25 5.54 WaB O rSe US 23.0 3.98 91.54 SOZ1316 0 0 91.54 507.t3t6 P67 25 5.02 Was 0 Apr-Sept1S 23.0 3.98 91.54 459.5308 0 0 91.54 459,5308 T767 27 3.57 Was 0 A"eptl5 23.0 3.98 91.54 326.7978 0 0 91.54 326.7978 P67 28A 3.16 Wa8 O AprSaptlS 23.0 3.98 91.64 289.2664 0 0 91.54 289.2634 T767 28B 6.97 was O AprSeptl5 23.0 3.98 91.54 638.0338 0 0 91.54 638.0338 T767 29 4.81 WaE7 O A Septl5 23.0 3.98 91.54 440.3074 0 0 91.54 440.3074 T767 30 1.57 Was O A r.Sept15 23.0 3.98 91.54 143.7178 0 0 91.54 143.7178 T767 Sub 3,4.5 3.18 NOB 0 Apr-SePrI5 34.0 3.91 1 132.94 422.7492 0 0 132.94 422.7492 T767 Sub 6,7,8 1.56 Nos O 1 AprSeptlsi 34.0 3.91 132.94 207.3864 0 0 132.94 207.3864 T767 Sub14-17 2.1 Gt 0 1 Apr-Septi5l 34.0 3.87 131.58 276.318 1 0 0 131.58 276.318 1`767 Sut,18-2,51 1.96 1 NoS/WaS O rSe t15 28.5 3.94 112.29 220+0884 0 0 11229 220.0884 P67 Sub 25-30 5.03 Was O A rSeptlS 23.0 3.98 91.54 460.4462 0 0 91.54 460.4462 Totals: 153.87 23613.66 1822 25275.86 3(b)of 11 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future,regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields(i.e.small grain,etc, interseeded in bermuda),forage must be removed through grazing,hay,and/or silage. Where grazing,plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage,care should be exercised not to let small grain reach maturity,especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definitely interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation,you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season,depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc,is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Description-Harvested As A Barley Grain Crop B Grazed Hybrid Bermudagrass Pasture/Grazed C Hybrid Bermudagrass Hay Hay BIC Comb. Hybrid Bermudagrass Graze/Hay Combination D Corn-Grain Grain Crop E Corn-Silage Silage F Cotton Cotton Lint G Grazed Fescue Pasture/Grazed H Fescue Hay Hay I Oats Grain Crop J Rye Grain Crop K Grazed Overseed Pasture/Grazed (Seeded in Bermudagrass) L Overseed Hay Hay(Seeded in Bermudagrass) M Grain Sorghum Grain Crop N Wheat Grain Crop 0 Soybean Grain Crop P Pine Trees Pine Trees S Small Grain Grain Crop/Hay (After Grain Crop) CC Cover Crop Not Harvested; Bumed/Disked In Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4of11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/ r/animal Farm Total! r 2400 Farrow to Wean 0.8 1920 Farrow to Feeder 0.96 Farrow to Finish 3.9 Wean to Feeder 0.07 Wean to Finish 0.27 10008 Feeder to Finish 0.34 3402.72 Gills 0.39 Boars 0.55 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 5322.72 pounds of plant available nitrogen per year and will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years,you will have approximately 26613.6 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre,you will need 88 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre,you will need 212,9088 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type,crop,and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure,soil texture,water droplet size,and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. `This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations,the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for>180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one fool of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5of11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop in/hr inches T767 Zone 1 NoB C 0.5 1 T767 Zone 2 WaB C 0.6 1 T767 3 NoB D 0.5 1 T767 4 NoB D 0.5 1 T767 5 NoB D 0.5 1 T767 6 NoB D 0.5 1 T767 7 NoB D 0.5 1 T767 8 NoB D 0.5 1 T767 Zone 9 NoB C 0.5 1 T767 Zone 10 NoB C 0.5 1 T767 Zone 11 NoB C 0.5 1 T767 Zone 12 NoB C 0.5 1 T767 Zone 13 NoB C 0.5 1 T767 14 Gt D 0.5 1 T767 15 Gt D 0.5 1 T767 16 Gt D 0.5 1 T767 17 Gt D 0.5 1 T767 18 NoB D 0.5 1 T767 19 NoB D 0.5 1 T767 20 NoB D 0.5 1 T767 21 NoB D 0.5 1 T767 22 WaB D 0.6 1 T767 23 WaB D 0.6 1 T767 24 WaB D 0.6 1 T767 25 WaB D 0.6 1 T767 26 WaB D 0.6 1 T767 27 WaB D 0.6 1 T767 28A WaB D 0.6 1 T767 28B WaB D 0.6 1 T767 29 WaB D 0.6 1 T767 30 WaB D 0.6 1 T767 Sub 3,4,5 NoB D 0.5 1 T767 Sub 6,7,8 NoB D 0.5 1 T767 Sub14-17 Gt D 0.5 1 T767 Sub18-25 NOBNVaB D 0.5 1 T767 Sub 25-30 WaB D 0.6 1 ptional Crops: (Row cn T767 Any Any S 0.5 1 T767 Any Any cc 0.5 1 3r crop must be deducts 6of11 Additional Comments: This plan revised to reflect the removal of two sprinklers and change of one sprinkler from full circle to part circle in zone 9 due to a secondary containment being built in that zone. All other parameters remained the same. 7of11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: 3417; AWS240001 Owner: Murphy-Brown, LLC dba Smithfield Hog Production Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWR before the new animals are stocked. I/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWR upon request. Name of Facility Owner: Murphy-Brown, LLC dba Smithfield Hog Production Signature: Zg1Z4- . Date Name of Manager(if different from owner): Signature: Date Name of Technical Specialist: M. Kevin Weston Affiliation: Smithfield Hog Production Division Address: 2822 Hwy 24 West,PO Drawer 856 Warsaw, NC 28398 Telephone: (910) 293-3434 Signature: Date 8of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 1 Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. 2 There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet, but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the field (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. 6 When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the surface is frozen. 9of11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 9 Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. 12 Animal waste shall not be applied closer than 100 feet to wells. 13 Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. 14 Waste shall be applied in a manner not to reach other property and public right-of-ways. 15 Animal waste shall not be discharged into surface waters, drainageways,or wetlands by discharge or by over-spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses,and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. 16 Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 10 of 11 NUTRIENT UTILIZATION PLAN REQUIRED SPECIFICATIONS 17 A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion,leakage,or discharge. 18 If animal production at the facility is to be suspended or terminated,the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. 19 Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns,leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption,it should only be applied pre-plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate-determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 Farm 3417 Hydrant Acres AWS240001 5.47 Spray Fields 3 5.38 4.22 4 4.59 5 5.41 6 6.9/ 7 6.97 8 0.70 9 3.46 10 3.78 r 11 4.58 12 4.37 13 5 40 14 4.9595 15 6.24 16 6.24 M 17 5.77 18 0.73 19 4.5' 20 5.01 21 5./7 23 .41 4 y 24 .a5 25 5 54 26 5.02 27 3.57 tiad 288 6.97 29 4.81 30 1.57 Total 140.04 J _� �kEVIN Gr r r GRAPHIC SCALE �w .me • 00N19 �EiIGMk0. y ! S•�'INI/1.LQ• ( 01 PEST I uwh - 500 ft. 6/8/2017 Ik L4 .�j� ].U��t�c"y��.�`�r..4•'��,�'r���.-�� �r a^F?'9'y�. - 11} : �g♦.j��)" �dr� � �-LS't rY�� -r v. 7F t� K�ti<{ L, i ��"Y f'���"��i'�,•�'tx 'a �Se, � I,t, �_: r �.e sa xc' r- .<:t r Y a� , 1 / RWl r�. f� Property NRCSSoils 1 1 11 11 - 1 Waterbody Connector Playa Ditchj i� 1 •1 --- Pipeline Lake/Pond Stream Reservoir --- Artificial Path Swampmarsh e Coastline Estuary �- NUTRIENT UTILIZATION PLAN AMENDMENT Grower(s): Murphy-Brown, LLC Farm Name: Farm 3417 Facility 24-1 County: Columbus Farm Ca acit : Farrow to Wean 2,400 Farrow to Feeder Farrow to Finish Wean to Feeder Wean to Finish Feeder to Finish 10,008 Boars Storage Structure: Anaerobic Lagoon Storage Period: >180 days Application Method: Irrigation This amendment allows the producer to extend the application window through October 7,2018 to the soybeans at this facility in accordance with the attached agronomist recommendations. c6 Owner/Manager Date Ci- \Z — \`6 Technical Speci list Date CAWMP Amendment Farm: 3 lw Date: This amendment extends the pumping window on all soybeans on this farm. Soybean planting was delayed a minimum of 30 days due to wet weather affecting field conditions. Crop physiological development allows for an extension to the pumping window through October 7, 2018. Use good judgement regarding pumping and do not pump if soils become saturated from rainfall during this extension period. Do not apply more PAN than allowed by the CAWMP. IJ2.=. Manager: Date: Certified Agronomist: ,� �� / ate: Certification Number:_ '1414L&7 rower: 34171 Designedy: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Population: Nursery: --------- --------- 0 Wean to Finish: ------------------- 0 Finishing: -----------------•• 0 Farrow to wean ling: ---................ 2400 Hd. Farrow to feeder: ------------------- 0 Farrow to finish: -------------- --- 0 Boars: -------------- ---- 0 Storage Period: ------------------- 180 Days 25 Yr. /24 Hr Storm Event ------------------- 7.6 In. "Heavy Rain" Factor Not Applicable Rainfall in Excess of Evaporation ------------------- 7.0 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N) ------------ N Does Operator Want Emergency Spillway? (Y/N) ------------ N Was This Design Built Prior to Sept. 1996? (Y/N) ------------ Y Is Drain Tile Req'd to Lower SHWT? (Y/N) ---------- N Seasonal High Water Table Elev: ----------------- 40.00 Ft. Freeboard: -------........... 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Side Slopes: ----------------- - 3 :1 (H:V) Inside Top Length: ------------------- 770.0 Ft. Inside Top Width: ------------------- 280.0 Ft. Top of Dike Elevation: ---------------• Depth 48.30 Ft. Finished Bottom Elevation: ---------------• 11.00 Ft. 37.30 Ft. Start Pump Elevation: --------------- 19.92 In. 46.64 Ft. Stop Pump Elevation: -------------- 43.92 In. 44.64 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES %Rill StormStor= 134760 (Cu.Ft.) 136,756 (Cu.Ft.) 101.49% Temporary= 379546 (Cu.Ft.) 398,246 (CLI.Ft.) 104.93% Permanent= 1039200 (Cu.Ft.) 1,259,670 (Cu.Ft.) 121.22% Total Volume= 1,653,496 (Cu.Ft.) 1,794,673 (Cu.Ft.) 115.52% 112 Treatment Volume= 519,600 (Cu.Ft.) 112 Treatment Volume Elevation= 41.83 Ft. 77.67 In. 90 Temporary Storage Volume Elevation= 45.40 Ft. 34.85 In. Min, Required Liner Thickness ------------------- 1.6 Ft. Lagoon Surface Area: (Inside TOD) ------------------- 215,600 S.F. ------------- Murphy-Brown, LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293.3434 rower: 34171 Designed y: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: Cu. Ft. LAGOON STAGE-AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 37.30 150,656 0 38.00 154,529 106,815 106,815 39.00 160,124 157,326 264,141 40.00 165,790 162,957 427,098 41.00 171,528 168,659 595,757 42.00 177,339 174,434 770,191 43.00 183,221 180,280 950,471 44.00 189,176 186,198 1,136,669 45.00 195,202 192,189 1,328,858 46.00 201,300 198,251 1,527,110 47.00 207,471 204,386 1,731,495 48.00 213,713 210,592 1,942,087 48.30 215,600 64,397 2,006,484 These volumes were calculated usina the vertical average end area method. TOTAL REQD VOL 1,553,496 CF CUMULATIVE VOL. ZONE VOL. 115.52% END PUMP = = _ = 44.64 FT 1,259,670 CF TR'MT 1,259,670 121.22% START PUMP = = 46.64 FT 1,657,916 CF TEMP 398,246 104.93% MAX STORAGE = 47.30 FT 1,794,673 CF STORM 136,756 101.49% Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434 Grower: 34171 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: mma ype apacily TIEW (cu. .71b) Toe Nursery 0 30 1.00 0 Wean to Finish 0 115 1.00 0 Finishing 0 135 1,00 0 Farrow toweanling 2,400 433 1.00 1,039,200 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Required Treatment Volume(cu.ft.)= 1,039,200 Sludge Storage Volume: tnimal Type Capacity ALWcu. = ota Nurse 0 30 0.00 0 Wean to Finish 0 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weeTHng 2,400 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume(cu.ft.)= 0 Temporary Storage Volume: Manure Production: mma y Capacity Sto. Period d./clay)=Total Nursery 0 180 0.30 0 Wean to Finish 0 180 1.17 0 Finishing 0 180 1.37 0 Farrowtoweanling 2,400 180 4.39 1,898,272 Farrow to feeder 0 180 5.30 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= 1,898,272 Total Manure Production (tuft.)= 253,780 Excess Fresh Water: nima aCapacity Sto. Period d./day)=Total Nursery 0 180 0.00 0 Wean to Finish 0 180 0.00 0 Finishing 0 180 0.00 0 Farrow toweanling 2,400 180 0.00 0 Farrow to feeder 0 180 0.00 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess(gals.)= 0 Total Fresh Water Excess(cu.ft.)= 0 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 34171 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 4 of 7 Temporary Storage Volume: (Cont.) Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area+Additional Drainage Area)" Rainfall/12in./ft Vol.= (215600 sq.ft. + 0 sq.ft.) . 7 in. /121n./ft. Total Required Volume for Rainfall in Excess of Evap.(cu.ft.)= 126,767 Storm Storage: Vol.=(Lagoon Surf.Area+Addt'I Drainage Area)"25Yr./24Hr.Storm(in)/12in./ft. Vol.= (215600 sq.ft + 0 sq.ft.) ' 7.5 in. /12 in./ft. Total Required Volume for 25Yr./241-1r.Storm Event(cu.ft)= 134,760 "Heavy Rain"Storage: Vol.=(Lagoon Surf.Area+Addt'I Drainage Area) *"Heavy Rain"Factor(in)/12in./ft. Vol.= (216600 sq.ft + 0 sq.ft.) ` 0.0 in. /12 in./ft. Total Required Volume for"Heavy Rain"(cu.ft.)= 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr./241-1r. Storm +'Heavy Rain')= 134,760 (CU.FT) Total Required Temporary Storage (Manure Prcd. +Excess Fr.Water+Rainfall Excess+Additional Water Storage)= 379,546 (CU.FT) Total Required Permanent Storage (Treatment+ Sludge) = 1,039,200 (CU.FT) TOTAL REQUIRED VOLUME=1653496(CU.FT.) Murphy-Brown, LLC Engineering P.O. ox 856, Warsaw NC 28398 (910) 293-3434 Grower: 34171 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation ------------------- 48.30 FT. Emergency Spillway Crest Elevation ------------------ Not ApApplicable Top of 25Yr./241-1r. Storm Storage ------------------ 47.30 FT. Top of"Heavy Rain"Storage ------------------- Not Applicable Start Pump Elevation ------------------- 46.64 FT, End Pump Elevation ---------------- 44.64 FT. Top of Sludge Storage ------------------- Not Applicable Seasonal High Watertable Elev. ----............. 40.00 FT. Finished Bottom Elevation ------------------ 37.30 FT. Inside Top Length ------—---------- 770.00 FT, Inside Top Width -------------- 280.00 FT. Side Slopes —---------------- 3:1 H:V Lagoon Surface Area —--------------- 215,600 SF Min. Liner Thickness(if required) —-------------- 1.6 FT. Freeboard Depth ------------ 1.00 FT. Temporary Storage Period ------------------ 180 Days TOTAL DESIGN VOLUME= 1794673(CU.FT.) Zone Depths: Treatment/Sludge Storage Zone Depth---------- 7.3 FT. Temporary Storage Zone Depth -------- 2.0 FT. Freeboard/Storm Storage Zone Depth --------- 1.7 FT. Total Lagoon Depth ---------- 11.0 FT. Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434 Grower: 34171 Designe KBW Address: PO Box 856 Checke(DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 6 of 7 ZONE ELEVATIONS TOP OF DIKE ELEV= 48.30 / \ TOP OF STORM ELEV=47.30 / \ STRT PMP EL.= 46.64 \ TOP OF TEMP STORAGE ELEV=46.64 / END PMP EL. =44.64 \ TOP OF TREAT ELEV=44.64 SHWT=40.00 1 / \_ _/ FINISHED BOTTOM ELEV= 37.30 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 34171 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan (N CARO` ', SEAL DESIGNED: _ 023994 DATE: �7D S. COMMENTS: This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)293-3434 rower: 34173 Designedy: KBW Address: PO Box 856 Checked By: DSE Warsaw, INC 28398 Date: 08/03/16 County: Columbus Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Population: Nursery: ------------------ 0 Wean to Finish: ------------------- 0 Finishing: ------------------- 10008 Hd. Farrow to weaning: ------------------- 0 Farrow to feeder: ------------------- 0 Farrow to finish: ------------------- 0 Boars: ------------------- 0 Storage Period: ------------------- 137 Days 25 Yr. /24 Hr Storm Event ------------------- 7.5 In. "Heavy Rain" Factor Rainfall in Excess of Evaporation ------------------- 7.0 In. Additional Water Usage: ------------------- 0 Additional Drainage Area: ------------------- 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N)------------ N Does Operator Want Emergency Spillway? (Y/N)------------ N Was This Design Built Prior to Sept. 1996? (Y/N)------------ Y Is Drain Tile Req'd to Lower SHWT? (YIN) ------------ N Seasonal High Water Table Elev: ------------------- 35.00 Ft. Freeboard: ------------------- 1.0 Ft. Emergency Spillway Flow Depth: Not Applicable Side Slopes. ------------------- 3 :1 (H:V) Inside Top Length: ------------------ 500.0 Ft. Inside Top Width: 440.0 Ft. Top of Dike Elevation: -- Depth 41.50 Ft. Finished Bottom Elevation: ---------------- 11.00 Ft. 30.50 Ft. Start Pump Elevation: --------------- 19.8 In. 39.85 Ft. Stop Pump Elevation: --------------- 42 In. 38.00 Ft. LAGOON VOLUME REQUIRED VOL. DESIGN VOLUMES % REQ'D. Storm Stor= 137500 (Cu.Ft.) 138,533 (Cu.Ft.) 100.75% Temporary= 379457 (Cu.Ft.) 380,955 (Cu.Ft.) 100,39% Permanent= 1351080 (Cu.Ft.) 1,358,825 (Cu.Ft.) 100.57% Total Volume = 1,868,037 (Cu.Ft.) 1,878,314 (Cu.Ft.) 100.55% 112 Treatment Volume= 675,540 (Cu.Ft.) 1/2 Treatment Volume Elevation= 34.47 Ft. 84.41 In. 90 Temporary Storage Volume Elevation = 38.44 Ft. 36.77 In. Min. Required Liner Thickness ------------------- 1.6 Ft. Lagoon Surface Area: (Inside TOD) ------------------- 220,000 S.F. Murphy-Brown, LLC Engineering P.O. Box 856,Warsaw,NC 28398 (910)293-3434 rower: 34173 Uesignedy: Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 2 of 7 ACTUAL DESIGN VOLUME CALCULATIONS BASE VOLUME: r, Cu. Ft. LAGOON STAGE-AREA VOLUMES Contour Elevation (FT.) Area SF Incr. Vol. (Cu. FT) Cumul. Vol. (Cu. FT) 30.50 162,316 0 31.00 164,749 81,766 81,766 32.00 169,669 167,209 248,975 33.00 174,661 172,165 421,140 34.00 179,725 177,193 598,333 35.00 184,861 182,293 780,626 36.00 190,069 187,465 968,091 37.00 195,349 192,709 1,160,800 38.00 200,701 198,025 1,358,825 39.00 206,125 203,413 1,562,238 40.00 211,621 208,873 1,771,111 41,00 217,189 214,405 1,985,516 41.50 220,000 109,297 2,094,814 These volumes were calculated using the vertical average end area method. TOTAL REQD VOL 1,868,037 CF CUMULATIVE VOL. ZONE VOL. 100.55% END PUMP = = = = 38.00 FT 1,358,825 CF TR'MT 1,358,825 100.57% START PUMP = = : 39.85 FT 1,739,780 CF TEMP 380,955 100.39% MAX STORAGE = 40.50 FT 1,878,314 CF STORM 138,533 100.75% Murphy-Brown,LLC Engineering P.O.Box 856,Warsaw,NC 28398 (910)293-3434 Grower: 34173 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: l�nimal Type Capacity ALW (cuft/lb) = o a Nursery 0 30 1.00 0 Wean to Finish 0 115 1.00 0 Finishing 10,008 135 1.00 1,351,080 Farrow to weanling 0 433 1.00 0 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1.417 1.00 0 Boars 0 400 1.00 01 Total Required Treatment Volume(cu.ft.)= 1,351,080 Sludge Stora a Volume: nnimal Type apscity cu. . = ots Nursery 0 30 0.00 0 Wean to Finish 0 115 0.00 0 Finishing 10,008 135 0.00 0 Farrow to weanling 0 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume(cu.ft.)= 0 Temporary Storage Volume: Manure Production: �knimal Type Capacity Sto. Period J./day)= o a Nursery 0 137 0.30 0 Wean to Finish 0 137 1.17 0 Finishing 10,008 137 1.37 1,878,402 Farrow to weanling 0 137 4.39 0 Farrow to feeder 0 137 5.30 0 Farrow to finish 0 137 14.38 0 Boars 0 137 4.06 0 Total Manure Production (gals.)= 1,878,402 Total Manure Production (cu.ft.)= 251,123 Excess Fresh Water: Animal ype Capacity Sto. Period I./day)= ota Nursery 0 137 0.00 0 Wean to Finish 0 137 0.00 0 Finishing 10,008 137 0.00 0 Farrow to weaning 0 137 0.00 0 Farrow to feeder 0 137 0.00 0 Farrow to finish 0 137 0.00 0 Boars 0 137 0.00 0 Total Fresh Water Excess (gals.)= 0 Total Fresh Water Excess (cu.ft.)= 0 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 34173 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 4 of 7 Temporary Storage Volume: (Cont.) Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area+Additional Drainage Area) .Rainfall/ 12in./ft Vol.= (220000 sq.ft. + 0 sq.ft.) ' 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap.(cu.ft.)= 128,333 Storm Storage: Vol.=(Lagoon Surf. Area+Addt'I Drainage Area)'25Y0241-1r. Storm(in)/12in./ft. Vol.= (220000 sq.ft + 0 sq.ft.) • 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr.Storm Event(cu.ft)= 137,500 "Heavy Rain"Storage: Vol.=(Lagoon Surf.Area+Addt'I Drainage Area)*"Heavy Rain"Factor(in)/ 12in./ft. Vol.= (220000 sq.ft + 0 sq.ft.) ' 0.0 in. /12 in./ft. Total Required Volume for"Heavy Rain"(cu.ft.) = 0 (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 0 Total Required Storm Storage (25Yr. /241-1r. Storm+'Heavy Rain')= 137,600 (CU.FT) Total Required Temporary Storage (Manure Prod. + Excess Fr. Water+ Rainfall Excess+Additional Water Storage)= 379,457 (CU.FT) Total Required Permanent Storage (Treatment+Sludge) = 1,351,080 (CU.FT) TOTAL REQUIRED VOLUME= 1868037(CU.FT.) Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910)2 3-3434 Grower: 34173 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation —---------------- 41.50 FT. Emergency Spillway Crest Elevation —--------------- Not AlApplicable Top of 25Yr. /24Hr. Storm Storage —--------------- 40.50 FT. Top of"Heavy Rain"Storage —---------------- Not Applicable Start Pump Elevation —---------------- 39.85 FT. End Pump Elevation ---------------- 38.00 FT. Top of Sludge Storage —----------------- Not Applicable Seasonal High Watertable Elev, —----—--------- 35.00 FT. Finished Bottom Elevation —---------------- 30.50 FT. Inside Top Length —-------------- 500.00 FT. Inside Top Width ................. 440.00 FT. Side Slopes —--------------- 3:1 H:V Lagoon Surface Area ---------------- 220,000 SF Min. Liner Thickness(if required) ------------- 1.6 FT. Freeboard Depth ---------------- 1.00 FT. Temporary Storage Period --------------- 137 Days TOTAL DESIGN VOLUME=1878314(CU.FT.) Zone Depths: Treatment/Sludge Storage Zone Depth----------- 7.5 FT. Temporary Storage Zone Depth ---------- 1.9 FT. Freeboard/Storm Storage Zone Depth --------- 1.7 FT. Total Lagoon Depth ------- 11.0 FT. Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 93-3434 Grower: 34173 Designe KBW Address: PO Box 856 Checker DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 6 of 7 ZONE ELEVATIONS TOP OF DIKE ELEV=41.50 / \ TOP OF STORM ELEV=40.50 / 1 STRT PMP EL.= 39.85 \ TOP OF TEMP STORAGE ELEV= 39.85 / END PMP EL. = 38.00 \ TOP OF TREAT ELEV= 38.00 SHWT= 35.00 FINISHED BOTTOM ELEV= 30,50 Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28396 (910) 293-3434 Grower: 34173 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 08/03/16 County: Columbus Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359-WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. `,jinn uq, NOTE: See attached Waste Utilization Plan �OQ�oe3s SEAL DESIGNED: 023994 �y DATE: D 3 d •,�9(iID S COMMENTS: This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Murphy-Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. 'Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual 1 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer/early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or"jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper- agitator impeller pump through large- bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator, haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag-line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can o be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil-test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure-- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels-- high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the dam. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) U -_1 03- EMERGENCY MANAGEMENT SERVICES (EMS) �\o- la 10 UCot SOIL AND WATER CONSERVATION DISTRICT (SWCD) a\o - la�la-a3`1`L NATURAL RESOURCES CONSERVATION SERVICE (NRCS) -6'A"6 COOPERATIVE EXTENSION SERVICE (CES) C(t0-- LOL-0 - (o(-b' This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation,this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow- possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field-actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. C) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s)that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers-action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators-action include: a) Stop recycle pump. b) Stop irrigation pump. C) Make sure siphon occurs. d) Stop all flow in the house,flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks- possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals,trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger(either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice/technical assistance phone number. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Murphy Brown. LLC b. Contractors Address: P.O. Box 856, Warsaw, NC 28398 c . Contractors Phone: (910)293-3434 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910) 293 -5330 7. Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (✓)Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. ( ) Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (✓)Maintain lagoons,settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30%of surface. Excessive Decaying vegetation (v)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. (Dry Systems) Feeders Feed Spillage () Design,operate and maintain feed systems(e.g.. bunkers and troughs)to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis(e.g.7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed () Reduce moisture accumulation within and around residues immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment(e.g.,covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e.inspect for and remove or break up accumulated solids as needed). MIC—November 11, 1996 10 Dry Manure Handling Accumulations of animal ()Remove spillage on a routine basis(e.g.7-10 day Systems wastes interval during summer; 15-30 days interval during winter)where manure is loaded for land application or disposal. ()Provide for adequate drainage around manure stockpiles ()Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked ( ) pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC-- November 11, 1996 11 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production (V)Vegetative or wooded buffers: (V)Recommended best management practices; (V)Good judgment and common sense Animal body Dirty manure ()Dry floors surfaces covered animals Floor surfaces Wet manure-covered (,')Slotted floors; floors (,')Waterers located over slotted floors; (-')Feeders at high end of solid floors; (V)Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine (V)Frequent manure removal by flush,pit pits recharge or scrape Partial microbial ( )Underfloor ventilation decomposition Ventilation Volatile gases (,)Fan maintenance; exhaust fans Dust (V)Efficient air movement Indoor surfaces Dust (✓)Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled ( )Flush tank covers lagoon liquid while tanks ( )Extend fill lines to near bottom of tanks are filling with anti-siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge Agitation of recycled ()Extend recharge lines to near bottom of points lagoon liquid while pits pits with anti-siphon vents are filling Lift stations Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain Agitation during waste ( )Box Covers collection or water conveyance junction boxes End of drain Agitation during waste ( )Extend discharge point of pipes pipes at lagoon water underneath lagoon liquid level Lagoon surfaces Volatile gas emissions (V)Proper lagoon liquid capacity Biological mixing (V)Correct lagoon startup procedures Agitation ( )Minimum surface area-to-volume ratio (V)Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (✓)Irrigate on dry days with little or no wind nozzles Wind draft (v)Minimum recommended operation pressure (V)Pump intake near lagoon liquid surface ( )Pump from second-stage lagoon AMOC—November 11, 1996 12 Storage tank or Partial microbial ( )Bottom or midlevel loading basin surface decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure, slurry or Agitation when spreading ( )Soil injection of slurry/sludges sludge spreader Volatile gas emissions ( )Wash residual manure from spreader after use outlets ( )Proven biological additives or oxidants Dead animals Carcass decomposition ( )Proper disposition of carcasses Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location/construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water improper drainage (V)Farm access road maintenance around facilities Microbial decomposition of away from facilities organic matter Manure tracked Poorly maintained access (,')Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule/BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge--Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( ) pertain to this operation. The landowner/ integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. (Landowner Signature) 13 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Liquid Systems Flush gutters Accumulation of solids Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed ❑ Remove bridging of accumulated solids at discharge Lagoons and pits • Crusted solids Maintain lagoons,settling basins and pits where Ex I pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 to 8 inches over more than 30 percent of surface Excessive vegetative • Decaying vegetation Maintain vegetative control along banks of X growth lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders Feed spillage El bunkers operate,and maintain feed systems(e.g., bunkers and troughs)to minimize the accumulation of decaying wastage ❑ Clean up spillage on a routine basis(e.g., 7-to 10-day interval during summer; 15-to 30-day interval during winter) AMIC—November 11, 1996, page 1 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Feed storage • Accumulations of feed residues X Reduce moisture accumulation within and around immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment(e.g., covered bin for brewer's grain and similar high moisture grain products) Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed Animal holding areas Accumulations of animal wastes Eliminate low areas that trap moisture along and feed wastage El fences and other locations where waste accumulates and disturbance by animals is minimal Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes(i.e., inspect for and remove or break up accumulated solids as needed) Dry manure handling • Accumulations of animal wastes ❑ Remove spillage on a routine basis(e.g.,7-to 10- systems day interval during summer; 15-to 30-day interval during winter)where manure is loaded for land application or disposal ❑ Provide for adequate drainage around manure stockpiles ❑ Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service,Department of Entomology, Box 7613,North Carolina State University,Raleigh,NC 27695-7613. AMIC—November 11, 1996, page 2 Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Farmstead . Swine production Vegetative or wooded buffers X X Recommended best management practices FIGood judgment and common sense X Animal body surfaces . Dirty manure-covered animals F]I Dry floors _Floor surfaces . Wet manure-covered floors I ^ Slotted floors Waterers located over slotted floors X Feeders at high end of solid floors X Scrape manure buildup from floors Underfloor ventilation for drying Manure collection pits . Urine I I Frequent manure removal by flush,pit recharge, rXior scrape • Partial microbial decomposition F Underfloor ventilation Ventilation exhaust . Volatile gases I❑` Fan maintenance fans X . Dust Efficient air movement X Indoor surfaces . Dust FI Washdown between groups of animals ❑ Feed additives X ❑ Feeder covers Feed delivery downspout extenders to feeder covers Flush tanks . Agitation of recycled lagoon El tank covers liquid while tanks are filling Extend fill lines to near bottom of tanks with anti-siphon vents Flush alleys . Agitation during wastewater ❑ Underfloor flush with underfloor ventilation conveyance AMOC—November 11, 1996, page 1 Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Pit recharge points . Agitation of recycled lagoon Extend recharge lines to near bottom of pits with liquid while pits are filling anti-siphon vents Lift stations . Agitation during sump tank Sump tank covers filling and drawdown Outside drain . Agitation during wastewater ❑ Box covers collection orjunction conveyance boxes End of drainpipes at . Agitation during wastewater Extend discharge point of pipes underneath lagoon conveyance El lagoon liquid level Lagoon surfaces . Volatile gas emissions 7X I Proper lagoon liquid capacity . Biological mixing Fx] Correct lagoon startup procedures . Agitation X Minimum surface area-to-volume ratio X Minimum agitation when pumping ❑ Mechanical aeration 171 Proven biological additives Irrigation sprinkler . High pressure agitation Irrigate on dry days with little or no wind nozzles . Wind drift Minimum recommended operating pressure X Pump intake near lagoon liquid surface X 71 Pump from second-stage lagoon Storage tank or basin . Partial microbial decomposition ❑ Bottom or midlevel loading surface . Mixing while filling ❑ Tank covers . Agitation when emptying ❑ Basin surface mats of solids ❑ Proven biological additives or oxidants AMOC—November 11, 1996, page 2 Swine Farm Waste Management Odor Control Checklist Source Cause BMPs to Minimize Odor Site Specific Practices Settling basin surface • Partial microbial decomposition Extend drainpipe outlets underneath liquid level • Mixing while filling H Remove settled solids regularly • Agitation when emptying Manure, slurry, or . Agitation when spreading ❑ Soil injection of slurry/sludges sludge spreader outlets • Volatile gas emissions ❑ Wash residual manure from spreader after use I I Proven biological additives or oxidants Uncovered manure, . Volatile gas emissions while 1-1Soil injection of slurry/sludges slurry,or sludge on drying field surfaces ❑ Soil incorporation within 48 hours ❑ Spread in thin uniform layers for rapid drying I I Proven biological additives or oxidants Dead animals . Carcass decomposition I ^— Proper disposition of carcasses Dead animal disposal • Carcass decomposition ❑ Complete covering of carcasses in burial pits pits 1-1 Proper location/construction of disposal pits Incinerators . Incomplete combustion F— Secondary stack homers Standing water around . Improper drainage Grade and landscape such that water drains away facilities ❑X from facilities • Microbial decomposition of organic matter Manure tracked onto . Poorly maintained access roads Farm access road maintenance public roads from farm ❑X access AMOC—November 11, 1996, page 3 Additional Information: Available From: Swine Manure Management; .0200 Rule/BMP Packet NCSU, County Extension Center Swine Production Farm Potential Odor Sources and Remedies;EBAE Fact Sheet NCSU—BAE Swine Production Facility Manure Management: Pit Recharge—Lagoon Treatment; EBAE 128-88 NCSU—BAE Swine Production Facility Manure Management: Underfloor Flush—Lagoon Treatment;EBAE 129-88 NCSU—BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 NCSU—BAE Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet NCSU—BAE Controlling Odors from Swine Buildings; PIH-33 NCSU—Swine Extension Environmental Assurance Program;NPPC Manual N.C. Pork Producers Assoc. Options for Managing Odor;a report from the Swine Odor Task Force NCSU Agricultural Communications Nuisance Concerns in Animal Manure Management: Odors and Flies; PROI07, 1995 Conference Proceedings Florida Cooperative Extension AMOC—November 11, 1996, page 4 Version—November 26,2018 Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian, Primary Secondary Routine Mortality Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal ❑ a death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should beat least one foot above the seasonal high water table.Attach burial location map and plan. El ❑ Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. a ❑ Rendering at a rendering plant licensed under G.S. 106-168.7. ❑ ❑ Complete incineration according to 02 NCAC 52C .0102. ❑ ❑ A composting system approved and permitted by the NC Department of Agriculture&Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off-farm, additional requirements must be met and a permit is required from NC DEC. ❑ ❑ In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture&Consumer Services (G.S. 106-549.70). ❑ El the method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). ❑ Mass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm-specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options;contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian. • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact / additional temporary procedures or measures for disposal according to G.S. 106.399.4. _ �'G �• ( Qr� 3 - ate-k9 Signature of Farm Owner/Manager Date Signature of Technical Specialist Date t f417- 1 -aid� -H,F ,t � 1 9 2'!FARM 34172 BJC 17 417- 1 Dead Hde A (Max Depth 68") 31 e'.f % 341 r -3 Dead Hole , 417-3 Dead Hole A (Max Depth 6-0") j t 0 F-., ,F2 1 34173 E3 0 : 17 WWWWWO 3417 - 3 Fin skiing