Loading...
HomeMy WebLinkAbout090170_Permit Renewal Application 2019_20190410State of North Carolina Department of Environmental Quality Division of Water Resources Animal Waste Management Systems Request for Certification of Coverage Facility Currently covered by an Expiring Sate Non -Discharge General Permit On September 30, 2019, the North Carolina State Non -Discharge General Permits for Animal Waste Management Systems will expire. As required by these permits, facilities that have been issued Certificates of Coverage to operate under these State Non -Discharge General Permits must apply for renewal at least 180 days prior to their expiration date. Therefore, all applications must be received by the Division of Water Resources by no later than April 3, 2019. P/ease do not leave any question unanswered. Please verify all injornmtian and make any necessary corrections below. Application must be signed and dated by the Perntiltee. 1. Farm Number: 09-0170 Certificate Of Coverage Number: AWS090170 2. Facility Name: Farm #30 3. Landowner's Name (same as on the Waste Management Plan): Murphy -Brown LLC 4. Landowner's Mailing Address: PO Box 856 City: Warsaw State: NC Telephone Number: 910-293-3434 Ext. E-mail: 5. Facility's Physical Address: City: Clarkton 6. County where Facility is located: Bladen 7. Farm Manager's Name (if different from Landowner): David C Nordin 8. Farm Manager's telephone number (include area code): 910-293-5330 Ext. 9. Integrator's Name (if there is not an Integrator, write "None"): Murphy -Brown LLC 10. Operator Name (OIC): Darryl Ray Fowler Phone No.: 910-645-6887 11. Lessee's Name (if there is not a Lessee, write "None"): 12. Indicate animal operation type and number: Zip: 28398-0856 Current Permit: Operation Types: KWe or'\�_-5K\shin cz.\c, GUM State: NC Operations Type Allowable Count Swine - Farrow to Wean 2,000 Zip: 28433 OIC #: 985992 Swine Cattle Dry Poultry Other Types Wean to Finish Dairy Calf Non Laying Chickens Horses - Horses Wean to Feeder Dairy Heifer Laying Chickens Horses - Other Farrow to Finish Milk Cow Pullets Sheep - Sheep Feeder to Finish Dry Cow Turkeys Sheep - Other Farrow to Wean Beef Stocker Calf Turkey Pullet Farrow to Feeder Beef Feeder Boar/Stud Beef Broad Cow Wet Poultry Gilts Other Non Laying Pullet Other Layers 13. Waste Treatment and Storage Lagoons (Verify the following information is accurate and complete. Make all necessary corrections and provide missing data.) Structure Name Estimated Date Built Liner Type (Clay, Synthetic, Unknown) Capacity (Cubic Feet) Estimated Surface Area (Square Feet) Design Freeboard 'Redline' (Inches) 1 3730 Ig93_ IA0.9 Gb._ 11'An\Sic\ 1 tr3Sr0 19,q Mail one (1) copy of the Certified Animal Waste Management Plan (CA\VMP) with thi completed and signed application as required by NC General Statutes 143-215.10C(d) to the address below. The CAWMP must include the following components: 1. The most recent Waste Utilization Plan (WUP) sinned by the owner and a certified technical specialist containing: a. The method by which waste is applied to the disposal fields (e.g. irrigation, injection, etc.) b. A map of every field used for land application (for example: irrigation map) c. The soil series present on every land application field d. The crops grown on every land application field e. The Realistic Yield Expectation (RYE) for every crop shown in the WUP f. The maximum PAN to be applied to every land application field g. The waste application windows for every crop utilized in the WUP h. The required NRCS Standard specifications 2. A site map/schematic 3. Emergency Action Plan 4. Insect Control Checklist with chosen best management practices noted 5. Odor Control Checklist with chosen best management practices noted 6. Mortality Control Checklist with selected method noted - Use the enclosed updated Mortality Control Checklist 7. Lagoon/storage pond capacity docutnentation (design, calculations, etc.) Please be sure the above table is accurate and complete. Also provide any site evaluations, wetland determinations, or hazard classifications that may be applicable to your facility. 8. Operation and Maintenance Plan If your CAWMP includes any components not shown on this list, please include the additional components with your submittal. (e.g. composting, digesters, waste transfers, etc.) As a second option to mailing paper copies of the application package, you can scan and email one signed copy of the application and all the CAWMP items above to: 2019PermitRenewal*nedenr.gov I attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that, if all required parts of this application are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application may be subject to civil penalties up to $25,000 per violation. (18 U.S.C. Section 1001 provides a punishment by a fine of not more than $10,000 or imprisonment of not more than 5 years, or both for a similar offense.) Printed Name of Signing Official (Landowner, or if multiple Landowners all landowners should sign. If Landowner is a corporation, signature should be by a principal executive officer of the corporation): Y Name: CI�V...� r�,L..l�C. Title: `01,./3 i €. ( Signature: Date: -3 - lc)® 1 Name: Title: Signature: Date: Name: Title: Signature: Date: THE COMPLETED APPLICATION SHOULD BE SENT TO THE FOLLOWING ADDRESS: NCDEQ-DWR Animal Feeding Operations Program 1636 Mail Service Center Raleigh, North Carolina 27699-1636 Telephone number: (919) 707-9100 E-mail: 2019PermitRenewal@ncdenr.gov FORM: RENEWAL -STATE GENERAL 02/2019 ANIMAL WASTE MANAG ..: PLAN cf T rICATSON PCR Y'ZN Ci. f-ANDED FESOLCTs Please retu = the convleted form to the Division of Sava of=natal Management at the address on tha ravenae side of this fora. :me of farm (Please print) : NO .wy, `( »Cid4, /A/G Me,k #30 .. ddress • yf7 ' an, Phone .: /01-4f309R' County: iJ4_ Farm Location: Latitude and Longitude:a°j2'„10"/...r �f"° (required) . Also. please attach a copy of a county road map with lccation identified. Type of operation (swine. layer, dairy, etc.). .W/Nc Design capacity (number of animals) : 210o ac k)-utt4N Average size of operation (12 month population, avg.): Z000 GA.eeoal-AA5M1 Average acreage needed for land application of waste (acres): 36.0 Technical Specialist Certification As a technical specialist designated by the North Carolina Soil and Water Conservation Commission pursuant to 1SA NCAC 6F .000S, I certify that the new or expanded animal waste management system as installed for the farm named above has an animal waste management plan that meets the design, construction, operation and maintenance standards and specifications of the Division of Environmental Management and the USDA -Soil Conservation Service and/or the North Carolina Soil and Water Conservation Commission pursuant to 15A NCAC 2H.0217 and 1SA NCAC 6F .0001-.0005. The following elements and their corresponding minimum criteria-haue_been_verified by me or other designated technical specialists and are included in the plan as applicable: minimum separations (buffers); liners or equivalent for lagoons or waste storage ponds; waste storage capacity; adequate quantity and amount of land for waste utilization (or use of third party); access or ownership of proper waste application equipment; schedule for timing of applications; application rates; loading rates; and the control of the discharge of pollutants from stor water runoff events less severe than the 25-year, 24-hour storm. Nana of Technical Specialist (Please printl Jimmy R. Vinson !filiation: Brown's of Carolina, Inc. ldress (A--- •pn avr, T. _ 7R1CA Phone No. Qil.91 -16fl Signatur •�/ ,� ! Date: S20'76 avea=vsov+._.� QWaer/Xanayar Q .coat (we) understand the operation and maintenance procedures established in the approved animal waste management plan for the farm named above and will implement these procedures. I (we) know- that any additional expansion to the existing design capacity of the waste treatment and storage system or construction of new facilities will require a new certification to be submitted to the Division of Environmental Management before the new animals are stocked. I (we) also understand that there must be no discharge of animal waste from this system to surface waters of the state either through a man-made conveyance or through runoff from a scorn event less severe than the 2S-year, 24-hour storm. The approved plan will be filed at the farm and at the office of the local Soil and Water Conservation District. yn{ ' sane of 'nand Owner (Please Print) : ,.et2it 1S afalit14 .M/C.." Signature: - -. Date: Nerve of Manager, fl differ from owner (please print), Signature: • Date: 5T z 6 r %G Tote: A change in land ownership requires notification or a new certification (if the approved plan is changed) to be submitted to the Division of Environmental Management within 60 days of a title transfer. DEM USE ONLY:ACNEWA B00119090123 800101100837 Murphy -Brown, LLC 1/13/2017 NUTRIENT UTILIZATION PLAN 2822 Hwy 24 West P.O. Box 856 Warsaw, NC 28398 Grower(s): Murphy - Brown, LLC Farm Name: 3730 (Old BOC 30); Fac. No:9-170 County: Bladen Farm Capacity: Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 2000 Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation The waste from your animal facility must be land applied at a specified rate to prevent pollution of surface water and/or groundwater. The plant nutrients in the animal waste should be used to reduce the amount of commercial fertilizer required for the crops in the fields where the waste is to be applied. This waste utilization plan uses nitrogen as the limiting nutrient. Waste should be analyzed before each application cycle. Annual soil tests are strongly encouraged so that all plant nutrients can be balanced for realistic yields of the crop to be grown. Several factors are important in implementing your waste utilization plan in order to maximize the fertilizer value of the waste and to ensure that it is applied in an environmentally safe manner: 1. Always apply waste based on the needs of the crop to be grown and the nutrient content of the waste. Do not apply more nitrogen than the crop can utilize. 2. Soil types are important as they have different infiltration rates, leaching potentials, cation exchange capacities, and available water holding capacities. 3. Normally waste shall be applied to land eroding at less than 5 tons per acre per year. Waste may be applied to land eroding at 5 or more tons per acre annually, but less than 10 tons per acre per year providing that adequate filter strips are established. 4. Do not apply waste on saturated soils, when it is raining, or when the surface is frozen. Either of these conditions may result in runoff to surface waters which is not allowed under DWQ regulations. 5. Wind conditions should also be considered to avoid drift and downwind odor problems. 6. To maximize the value of the nutrients for crop production and to reduce the potential for pollution, the waste should be applied to a growing crop or applied not more than 30 days prior to planting a crop or forages breaking dormancy. Injecting the waste or disking will conserve nutrients and reduce odor problems. 1of11 This plan is based on the waste application method shown above. If you choose to change methods in the future, you need to revise this plan. Nutrient levels for different application methods are not the same. The estimated acres needed to apply the animal waste is based on typical nutrient content for this type of facility. In some cases you may want to have plant analysis made, which could allow additional waste to be applied. Provisions shall be made for the area receiving waste to be flexible so as to accommodate changing waste analysis content and crop type. Lime must be applied to maintain pH in the optimum range for specific crop production. This waste utilization plan, if carried out, meets the requirements for compliance with 15A NCAC 2H .0217 adopted by the Environmental Management Commission. AMOUNT OF WASTE PRODUCED PER YEAR ( gallons, ft3, tons, etc.): Capacity Type Waste Produced per Animal Total 2000 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 3203 gaVyr 3861 gal/yr 10478 gal/yr 191 gal/yr 927 gal/yr 6,406,000 gal/yr gal/yr gal/yr gal/yr gal/yr Total 6,406,000 gal/yr AMOUNT OF PLANT AVAILABLE NITROGEN PRODUCED PER YEAR (Ibs): Capacity Type Nitrogen Produced per Animal Total 2000 Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish 3.8436 Ibs/yr 6.9498 Ibs/yr 18.8604 Ibs/yr 0.3438 Ibstyr 1.6686 lbs/yr 7,687 Ibstyr Ibs/yr Ibs/yr Ibs/yr Ibs/yr Total 7,687 Ibstyr Applying the above amount of waste is a big job. You should plan time and have appropriate equipment to apply the waste in a timely manner. LAND UTILIZATION SUMMARY The following table describes the nutrient balance and land utilization rate for this facility Note that the Nitrogen Balance for Crops indicates the ratio of the amount of nitrogen produced on this facility to the amount of nitrogen that the crops under irrigation may uptake and utilize in the normal growing season. Total Irrigated Acreage: Total N Required 1st Year: Total N Required 2nd Year: Average Annual Nitrogen Requirement of Crops: Total Nitrogen Produced by Farm: Nitrogen Balance for Crops: 27.31 9001.19 0.00 9,001.19 7,687.20 (1,313.99) The following table describes the specifications of the hydrants and fields that contain the crops designated for utilization of the nitrogen produced on this facility. This chart describes the size, soil characteristics, and uptake rate for each crop in the specified crop rotation schedule for this facility. 2 of 11 Reception Area Specifications Tract Field Irrigated Soil 1st Crop Time to 1st Crop 1st Crop Lbs N/Ac Lbs N Total Ibs N Acreage Type Code Apply Yield lbs N/Unit Residual /Ac Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Code Apply Yield Ibs N/Unit Residual /Ac Utilized Total Lbs N/Ac Total lbs N Utilized T11125 1 3.69 Lynchburg C Mar -Sept 5.5 43 236.5 872.685 L Sept -Apr 1 5D 50 184.5 286.5 1057.185 T11125 2 2.9 Lynchburg C Mar -Sept 5.5 43 236.5 685.85 L Sept -Apr 1 50 50 145 286.5 830.85 T11125 3 1.89 Lynchburg C Mar -Sept 5.5 43 236.5 446.985 L Sept -Apr 1 50 50 94.5 286.5 541.485 T11125 4 5.63 Goldsboro C Mar -Sept 6.5 46 299 1683.37 L Sept -Apr 1 50 50 281.5 349 1964.87 T11125 5 4.17 Goldsboro C Mar -Sept 6.5 46 299 1246.83 L Sept -Apr 1 50 50 208.5 349 1455.33 T11125 6 5.2 Goldsboro C Mar -Sept 6.5 46 299 1554.8 L Sept -Apr 1 50 50 260 349 1814.8 T11125 7 3.83 Goldsboro C Mar -Sept 6.5 46 299 1145.17 L Sept -Apr 1 50 50 191.5 349 1336.67J Optional w/Lease Cromartie 1 L1 30 Norfolk D Feb15-June 138.0 0.95 15 116.1 3483 * 0 0 116.1 3483 Optional Crops Cromartie L1 30 Norfolk N Sept -Apr 60.0 2.09 125.4 3762 0 0 125.4 3762 Cromartie L1 30 Norfolk 0 Apr-Sept15 35.0 3.91 136.85 4105.5 0 0 136.85 4105.5 Cromartie L1 30 Norfolk M Mar15-Aug 55.0 1.78 97.9 2937 0 0 97.9 2937 Cromartie L1 30 Norfolk F Mar15-July 875.0 0.089 77.875 2336.25 0 0 77.875 2336.25 Cromartie L1 30 Norfolk S Sept -Apr 1.0 100 100 3000 0 0 100 3000 Cromartie L1 30 Norfolk CC Sept -Apr 1.0 30 30 900 0 0 30 900 G Atkinson L2 8.8 Na/NoB 0 Feb15-June 142.5 0.915 15 115.3875 1015.41 0 0 115.3875 1015.41 )ptional Crops G Atkinson L2 8.8 Na/NoB N Sept -Apr 59.5 1.975 117.5125 1034.11 0 0 117.5125 1034.11 G Atkinson L2 8.8 Na/NoB 0 Apr-Sept15 36.0 3.875 139.5 1227.6 0 0 139.5 1227.6 G Atkinson L2 8.8 Na/NoB M Mar15-Aug 57.0 1.695 96.615 850.212 0 0 96.615 850.212 G Atkinson L2 8.8 Na/NoB F Mar15-July 829.0 0.078 64.662 569.0256 0 0 64.662 569.0256 G Atkinson L2 8.8 Na/NoB S Sept -Apr 1.0 100 100 880 ' 0 0 100 880 G Atkinson L2 8.8 Na/NoB CC Sept -Apr 1.0 30 30 264 0 0 30 264 LAtkinson L3 7.26 Na/NoB D Feb15-June 142.5 0.915 15 115.3875 837.7133 0 C 115.3875 837.7133 )ptional Crops L Atkinson L3 7.26 Na/NoB N Sept -Apr 59.5 1.975 117.5125 853.1408 ' 0 0 117.5125 853.140E L Atkinson L3 7.26 Na/NoB 0 Apr-Sept15 36.0 3.875 139.5 1012.77 0 0 139.5 1012.77 L Atkinson L3 7.26 NaJNoB M Mar15-Aug 57.0 1.695 96.615 701.4249 0 0 96.615 701.4249 L Atkinson L3 7.26 Na/No8 F Mar15-July, 829.0 0.078 64.662 469.4461 0 0 64 662 469.4461 L Atkinson L3 7.26 Na/NoB S Sept -Apr 1.0 100 100 726 0 0 100 726 L Atkinson L3 7.26 Na/NoB CC Sept -Apr 1.0 30 30 217.8 0 0 30 217.8 Note: All PAN applied to cover crop must be deducted from following crops starting PAN rate. Totals: 27.31 7635.69 1365.5 9001.19 3(a) 0f 11 Reception Area Specifications Tract Field Irrigated Soil lst Crop Time to 1st Crop 1st Crop Lbs N/Ac Lbs N Total lbs N Acreage Type Code Apply Yield Ibs N/Unit Residual /Ac Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Code Apply Yield lbs N/Unit Residual /Ac Utilized Total Lbs N/Ac Total 10s N Utilized Totals: 0 0 0 0 3(b) of 11 This plan does not include commercial fertilizer. The farm should produce adequate plant available nitrogen to satisfy the requirements of the crops listed above. The applicator is cautioned that P and K may be over applied while meeting the N requirements. In the future, regulations may require farmers in some parts of North Carolina to have a nutrient management plan that addresses all nutrients. This plan only addresses nitrogen. In interplanted fields ( i.e. small grain, etc, interseeded in bermuda), forage must be removed through grazing, hay, and/or silage. Where grazing, plants should be grazed when they reach a height of six to nine inches. Cattle should be removed when plants are grazed to a height of four inches. In fields where small grain, etc, is to be removed for hay or silage, care should be exercised not to let small grain reach maturity, especially late in the season (i.e. April or May). Shading may result if small grain gets too high and this will definately interfere with stand of bermudagrass. This loss of stand will result in reduced yields and less nitrogen being utilized. Rather than cutting small grain for hay or silage just before heading as is the normal situation, you are encouraged to cut the small grain earlier. You may want to consider harvesting hay or silage two to three times during the season, depending on the time small grain is planted in the fall. The ideal time to interplant small grain, etc, is late September or early October. Drilling is recommended over broadcasting. Bermudagrass should be grazed or cut to a height of about two inches before drilling for best results. CROP CODE LEGEND Crop Code Crop Lbs N utilized / unit yield A Barley 1.6 Ibs N / bushel B Grazed Bermudagrass 37.5 Ibs N / ton C Hybrid Bermudagrass Hay 50 Ibs N / ton D Corn - Grain 1.25 Ibs N / bushel E Corn - Silage 12 Ibs N / ton F Cotton 0.12 Ibs N / Ibs lint G Grazed Fescue 37.5 Ibs N / ton H Fescue Hay 50 Ibs N / ton I Oats 1.3 Ibs N / bushel J Rye 2.4 Ibs N / bushel K Grazed Overseed 50 Ibs N / acre L Overseed Hay 50 Ibs N / acre M Grain Sorghum 2.5 Ibs N / cwt N Wheat 2.4 Ibs N / bushel O Soybean 4.0Ibs N / bushel P Pine Trees 40 Ibs N / acre / yr S Small Grain 100 Ibs N / acre / yr CC Cover Crop 30 Ibs N / acre / yr Acres shown in the preceding table are considered to be the usable acres excluding required buffers, filter strips along ditches, odd areas unable to be irrigated, and perimeter areas not receiving full application rates due to equipment limitations. Actual total acres in the fields listed may, and most likely will be, more than the acres shown in the tables. See attached map showing the fields to be used for the utilization of animal waste. 4 of 11 SLUDGE APPLICATION: The following table describes the annual nitrogen accumulation rate per animal in the lagoon sludge Farm Specifications PAN/yr/animal Farm Total/yr 2000 Farrow to Wean 0.84 Farrow to Feeder 1 Farrow to Finish 4.1 Wean to Feeder 0.072 Feeder to Finish 0.36 1680 The waste utilization plan must contain provisions for periodic land application of sludge at agronomic rates. The sludge will be nutrient rich and will require precautionary measures to prevent over application of nutrients or other elements. Your production facility will produce approximately 1680 pounds of plant available nitrogen per year will accumulate in the lagoon sludge based on the rates of accumulation listed above. If you remove the sludge every 5 years, you will have approximately 8400 pounds of plant available nitrogen to utilize. Assuming you apply this PAN to hybrid bermuda grass hayland at the rate of 300 pounds of nitrogen per acre, you will need 28 acreas of land. If you apply the sludge to corn at a rate of 125 pounds per acre: you will need 67.2 acres of land. Please note that these are only estimates of the PAN produced and the land required to utilize that PAN. Actual values may only be determined by sampling the sludge for plant available nitrogen content prior to application Actual utilization rates will vary with soil type, crop, and realistic yield expectations for the specific application fields designated for sludge application at time of removal. APPLICATION OF WASTE BY IRRIGATION: The irrigation application rate should not exceed the intake rate of the soil at the time of irrigation such that runoff or ponding occurs. This rate is limited by initial soil moisture content, soil structure, soil texture, water droplet size, and organic solids. The application amount should not exceed the available water holding capacity of the soil at the time of irrigation nor should the plant available nitrogen applied exceed the nitrogen needs of the crop. If surface irrigation is the method of land application for this plan, it is the responsibility of the producer and irrigation designer to ensure that an irrigation system is installed to properly irrigate the acres shown in the preceding table. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. *This is the maximum application amount allowed for the soil assuming the amount of nitrogen allowed for the crop is not over applied. In many situations, the application amount shown cannot be applied because of the nitrogen limitation. The maximum application amount shown can be applied under optimum soil conditions. Your facility is designed for >180 days of temporary storage and the temporary storage must be removed on the average of once every 6 months. In no instance should the volume of the waste stored in your structure be within the 25 year 24 hour storm storage or one foot of freeboard except in the event of the 25 year 24 hour storm. It is the responsibility of the producer and waste applicator to ensure that the spreader equipment is operated properly to apply the correct rates to the acres shown in the tables. Failure to apply the recommended rates and amounts of nitrogen shown in the tables may make this plan invalid. Call your technical specialist after you receive the waste analysis report for assistance in determining the amount of waste per acre and the proper application prior to applying the waste. 5 of 11 Application Rate Guide The following is provided as a guide for establishing application rates and amounts. Soil Application Rate Application Amount Tract Hydrant Type Crop in/hr * inches T11125 1 Lynchburg C 0.65 1 T11125 2 Lynchburg C 0.65 1 T11125 3 Lynchburg C 0.65 1 T11125 4 Goldsboro C 0.4 1 T11125 5 Goldsboro C 0.4 1 T11125 6 Goldsboro C 0.4 1 T11125 7 Goldsboro C 0.4 1 Optional w/Lei Cromartie L1 Norfolk D 0.5 1 Optional Croi Cromartie L1 Norfolk N 0.5 1 Cromartie L1 Norfolk 0 0.5 1 Cromartie L1 Norfolk M 0.5 1 Cromartie L1 Norfolk F 0.5 1 Cromartie L1 Norfolk S 0.5 1 Cromartie L1 Norfolk CC 0.5 1 r crop must be deduct€ G Atkinson L2 Na/NoB D 0.4 1 Optional Croi G Atkinson L2 Na/NoB N 0.4 1 G Atkinson L2 Na/NoB 0 0.4 1 G Atkinson L2 Na/NoB M 0.4 1 G Atkinson L2 Na/NoB F 0.4 1 G Atkinson L2 Na/NoB S 0.4 1 G Atkinson L2 Na/NoB CC 0.4 1 L Atkinson L3 Na/NoB D 0.4 1 Optional Croi L Atkinson L3 Na/NoB N 0.4 1 L Atkinson L3 Na/NoB 0 0.4 1 L Atkinson L3 Na/NoB M 0.4 1 L Atkinson L3 Na/NoB F 0.4 1 L Atkinson L3 Na/NoB S 0.4 1 L Atkinson L3 Na/NoB CC 0.4 1 #REF! 6 of 11 Additional Comments: This plan is based on new PAN production rates and crop yield rates as listed on the Nutrient Management website. This plan shows the solid set fields converting back to bermuda hay/small grain overseed. Fields are to be sprigged with bermuda in Spring 2013. Optional fields L2 & L3 will be applied on through pump and haul. 7 of 11 NUTRIENT UTILIZATION PLAN CERTIFICATION Name of Farm: 3730 (Old BOC 30); Fac. No:9-170 Owner: Murphy - Brown, LLC Manager: Owner/Manager Agreement: I/we understand and will follow and implement the specifications and the operation and maintenance procedures established in the approved animal waste nutrient management plan for the farm named above. I/we know that any expansion to the existing design capacity of the waste treatment and/or storage system, or construction of new facilities, will require a new nutrient management plan and a new certification to be submitted to DWQ before the new animals are stocked. 1/we understand that I must own or have access to equipment, primarily irrigation equipment, to land apply the animal waste described in this nutrient management plan. This equipment must be available at the appropriate pumping time such that no discharge occurs from the lagoon in the event of a 25 year 24 hour storm. I also certify that the waste will be applied on the land according to this plan at the appropriate times and at rates which produce no runoff. This plan will be filed on site at the farm office and at the office of the local Soil and Water Conservation District and will be available for review by NCDWQ upon request. Name of Facility Owner: Signature: Murphy - Brown, LLC Name of Manager (if different from owner): Signature: Date Name of Technical Specialist: Affiliation: Address: Telephone: Signature: Date Toni W. King Murphy -Brown, LLC. 2822 Hwy 24 West, PO Drawer 856 Warsaw, NC 28398 (910) 293-3434 8 of 11 NUTRIENT UTILIZATION PLAN 1 2 REQUIRED SPECIFICATIONS Animal waste shall not reach surface waters of the state by runoff, drift, manmade conveyances, direct application, or direct discharge during operation or land application. Any discharge of waste which reaches surface water is prohibited. There must be documentation in the design folder that the producer either owns or has an agreement for use of adequate land on which to properly apply the waste. If the producer does not own adequate land to properly dispose of the waste, he/she shall provide evidence of an agreement with a landowner, who is within a reasonable proximity, allowing him/her the use of the land for waste application. It is the responsibility of the owner of the waste production facility to secure an update of the Nutrient Utilization Plan when there is a change in the operation, increase in the number of animals, method of application, recieving crop type, or available land. 3 Animal waste shall be applied to meet. but not exceed, the nitrogen needs for realistic crop yields based upon soil type, available moisture, historical data, climatic conditions, and level of management, unless there are regulations that restrict the rate of applications for other nutrients. 4 Animal waste shall be applied to land eroding less than 5 tons per acre per year. Waste may be applied to land eroding at more than 5 tons per acre per year but less than 10 tons per acre per year provided grass filter strips are installed where runoff leaves the Feld (See USDA, NRCS Field Office Technical Guide Standard 393 - Filter Strips). 5 Odors can be reduced by injecting the waste or disking after waste application. Waste should not be applied when there is danger of drift from the land application field. When animal waste is to be applied on acres subject to flooding, waste will be soil incorporated on conventionally tilled cropland. When waste is applied to conservation tilled crops or grassland, the waste may be broadcast provided the application does not occur during a season prone to flooding (See "Weather and Climate in North Carolina" for guidance). 7 Liquid waste shall be applied at rates not to exceed the soil infiltration rate such that runoff does not occur offsite or to surface waters and in a method which does not cause drift from the site during application. No ponding should occur in order to control odor and flies. 8 Animal waste shall not be applied to saturated soils, during rainfall events, or when the 9 of 11 NUTRIENT UTILIZATION PLAN 9 REQUIRED SPECIFICATIONS (continued) Animal waste shall be applied on actively growing crops in such a manner that the crop is not covered with waste to a depth that would inhibit growth. The potential for salt damage from animal waste should also be considered. 10 Nutrients from waste shall not be applied in fall or winter for spring planted crops on soils with a high potential for leaching. Waste/nutrient loading rates on these soils should be held to a minimum and a suitable winter cover crop planted to take up released nutrients. Waste shall not be applied more than 30 days prior to planting of the crop or forages breaking dormancy. 11 12 13 14 15 16 Any new swine facility sited on or after October 1, 1995 shall comply with the following: The outer perimeter of the land area onto which waste is applied from a lagoon that is a component of a swine farm shall be at least 50 feet from any residential property boundary and canal. Animal waste, other than swine waste from facilities sited on or after October 1, 1995, shall not be applied closer than 25 feet to perennial waters. Animal waste shall not be applied closer than 100 feet to wells. Animal waste shall not be applied closer than 200 feet of dwellings other than those owned by the landowner. Waste shall be applied in a manner not to reach other property and public right-of-ways. Animal waste shall not be discharged into surface waters, drainageways, or wetlands by discharge or by over -spraying. Animal waste may be applied to prior converted cropland provided the fields have been approved as a land application site by a "technical specialist". Animal waste shall not be applied on grassed waterways that discharge directly into water courses, and on other grassed waterways, waste shall be applied at agronomic rates in a manner that causes no runoff or drift from the site. Domestic and industrial waste from washdown facilities, showers, toilets, sinks, etc., shall not be discharged into the animal waste management system. 10of11 NUTRIENT UTILIZATION PLAN 17 18 19 REQUIRED SPECIFICATIONS (continued) A protective cover of appropriate vegetation will be established on all disturbed areas (lagoon embankments, berms, pipe runs, etc.). Areas shall be fenced, as necessary, to protect the vegetation. Vegetation such as trees, shrubs, and other woody species, etc., are limited to areas where considered appropriate. Lagoon areas should be kept mowed and accessible. Berms and structures should be inspected regularly for evidence of erosion, leakage, or discharge. If animal production at the facility is to be suspended or terminated, the owner is responsible for obtaining and implementing a "closure plan" which will eliminate the possibility of an illegal discharge, pollution and erosion. Waste handling structures, piping, pumps, reels, etc., should be inspected on a regular basis to prevent breakdowns, leaks and spills. A regular maintenance checklist should be kept on site. 20 Animal waste can be used in a rotation that includes vegetables and other crops for direct human consumption. However, if animal waste is used on crops for direct human consumption, it should only be applied pre -plant with no further applications of animal waste during the crop season. 21 Highly visible markers shall be installed to mark the top and bottom elevations of the temporary storage (pumping volume) of all waste treatment lagoons. Pumping shall be managed to maintain the liquid level between the markers. A marker will be required to mark the maximum storage volume for waste storage ponds. 22 Waste shall be tested within 60 days of utilization and soil shall be tested at least annually at crop sites where waste products are applied. Nitrogen shall be the rate -determining nutrient, unless other restrictions require waste to be applied based on other nutrients, resulting in a lower application rate than a nitrogen based rate. Zinc and copper levels in the soil shall be monitored and alternative crop sites shall be used when these metals approach excessive levels. pH shall be adjusted and maintained for optimum crop production. Soil and waste analysis records shall be kept for a minimum of five years. Poultry dry waste application records shall be maintained for a minimum of three years. Waste application records for all other waste shall be maintained for a minimum of five years. 23 Dead animals will be disposed of in a manner that meets North Carolina regulations. 11 of 11 Information Parcels y a >;Y USTax Data PIN: 121800226750 Owner Name 1: ATKINSON GEORGE JR Owner Name 2: Owner Address: 141-16 230TH PLACE DeedBootc 323 DeedPage: 727 Owner City. LAUREITON Owner State: NY 0eedYear 1992 OeedAcres: 9.55 Owner Zip: 11413 PlatBoolc A99 PlatPage: 999 SalesAmmount: 0 Map Acres: 9.55 more County Boundary Name: 0 xY Bladen Legend • Information Parcels xv o USTax Data Yl a/f1 (-) PIN: 121800323805 Owner Name 1: ATKINSON LAFAYETTE Owner Name 2: Owner Address: PO BOX 1085 o r� / lyA DeedBook: 323 DeedPage: 718 Owner City: CLARKTON Owner State: NC OeedYear 1992 OeedAcres: 12.09 Owner Zip: 28433.1085 PratBoolc A99 PlatPage: 999 SalesAmounl: 0 Map Acres: 12.09 more County Boundary Name: Ate) XY Madan 29 SPRINKLERS 3. 3.53 ACACRESS �A r-35 LE- SPRITIKIJERS 5. SRO ACRES IT.Lnl�k' Om CAPPED HYDRANT rr- 26 SpRINja 3.69 ACRES BOC #30 °wine96mn FM Ant Photos Brawn's alterollna Technics: Santee ClepahnerS Axioms)! MB00107010478 NORTH CAROLINA FARM NUTRIENT APPLICATION AGREEMENT BLADEN COUNTY THIS FARM SPRAYLAND AGREEMENT made and entered into this the q day of February 2013, b and between t�.eaoeQ Q -A (hereinafter referred to as "Owner"), 23v0 tteuLyt. 1014 , NC .2-2�F.n. and MURPHY-BROWN, LLC (hereinafter referred to as "Tenant"), 2822 Hwy. 24/50 West, Warsaw, NC 28398. WHERAS, Owner is the owner and/or has power of attorney for certain land in B laden County, North Carolina and being further shown as PIN # 122800522990 in the Bladen County Tax Office, containing 30.0 acres more or less. See attached Bladen County Map showing subject property outlined in red. AND WHEREAS, Tenant desires to irrigate the approximately 30.0 acres of cleared land to transfer nutrients and effluent from our Farm 30 swine facility to designated farm nutrient application fields. AND WHEREAS, Owner and Tenant have negotiated such terms, conditions and stipulations and now desire to memorialize the same as established by the terms, conditions and stipulations as hereinafter set forth. NOW, THEREFORE, for and in consideration of the Premises, the sum of Ten Dollars ($10.00) in hand paid to each party by the other, the receipt and sufficiency of which hereby is acknowledged and by the mutual promises, covenants and conditions contained herein, the parties hereby do hereby covenant, stipulate and agree as follows: 1. TERM OF THE LEASE: The initial term of this Lease shall be for a period of one (1) year commencing the 8th day of February, 2013 (the "Inception Date"), and ending the 31" day of December 31m, 2013, with the option to extend the lease for an additional one year period on the same terms and conditions of the initial lease thereof, provided that each party agrees to such, and all other conditions of this lease have been complied with. 2. PAYMENT: Tenant agrees to pay the landowner $25 per acre for pumping rights, 30 acres times $25 would equal an annual pumping rights payment of $750.00 3. ENVIRONMENTAL: Tenant shall not permit, allow, or cause any act to be performed or any practice to be adapted or followed in and about the Premises which shall cause or be likely to cause injury or damage to any person or to said Premises or to other property or any persons. In addition to Owner's other remedies, Tenant agrees to indemnify and hold Owner harmless from against any and all loss, liabilities, damages, injuries, interest, deficiencies, fines, penalties, costs, expenses attorney(s)' fees and costs of investigation and clean up including, without limitation, to claims, suits and proceeding by Federal, State, County and local governmental authorities with respect to, or as a direct or indirect result of the presence on or under, or the escape, seepage, leakage, spillage, discharge, emission, discharging or releasing from, the property any wastewater effluent, if such occurs, during the term of this lease, 4. STRUCTURAL CHANGES / SOIL TEST: Tenant shall not construct any additional improvements upon the premises. Tenant agrees to lime the leased property as needed, as shown on annual soil test. Tenant also agrees to keep the PH balance the same at end of lease as it was shown at beginning of lease, 5. PROPERTY TAXES: Owner will be responsible for all county and state property taxes due on the property. 6. ASSIGNMENT AND SELLING OF PREMISES: Tenant shall have the right to assign this lease or to sublet the Lease. Owner shall have full authority to assign this lease, to mortgage, lease or sell his property. Tenant agrees to subordinate this Lease to such mortgage, lease or sale. The Owner and the Tenant have a right to terminate this lease, provided that either party gives a six-month notice in writing to the other party. 7. BINDING EFFECT: This Agreement shall be binding upon the parties, their heirs, assigns, personal representatives and successors in interest. This Agreement may be executed in one or more counterparts each of which shall be deemed to be an original. AGREED to this the 7 day of Atf4. , 2013. (OWNER) �, Q --.. . i mot• 0. 13393"8 MURPHY-BROWN LLC, (TENANT) (SEAL) (SEAL) Grower: 3730 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date' 02/25/09 County: Bladen Sheet 1 of 7 ANAEROBIC WASTE LAGOON DESIGN FARM INFORMATION Farm Population: Nursery: 0 Wean to Finish: 0 Finishing: 0 Farrow to weanling: 2000 Hd. Farrow to feeder: 0 Farrow to finish: 0 Boars: 0 Storage Period: 180 Days 25 Yr. / 24 Hr Storm Event 7.5 In. "Heavy Rain" Factor Rainfall in Excess of Evaporation 7.0 In. Additional Water Usage: 0 Additional Drainage Area: 0 LAGOON INFORMATION Is Lagoon Designed as an Irregular Shape? (Y/N) N Does Operator Want Emergency Spillway? (Y/N) N Was This Design Built Prior to Sept. 1996? (Y/N) Y Is Drain Tile Req'd to Lower SHWT? (Y/N) N Seasonal High Water Table Elev: 45.20 Ft. Freeboard: 1.0 Ft. Emergency Spillway Flow Depth: Side Slopes: 3 :1 (H:V) Inside Top Length: 620.0 Ft. Inside Top Width: 299.0 Ft. Top of Dike Elevation: Depth 49.00 Ft. Finished Bottom Elevation: 10.00 Ft. 39.00 Ft. Start Pump Elevation: 19.92 In. 47.34 Ft. Stop Pump Elevation: 45.6 In. 45.20 Ft. LAGOON VOLUME REQUIRED VOL. Storm Stor = Temporary = Permanent = Total Volume = 115863 (Cu.Ft.) 319621 (Cu.Ft.) 866000 (Cu.Ft.) 1,301,484 (Cu.Ft.) DESIGN VOLUMES % REQ'D. 116,951 (Cu.Ft.) 365,301 (Cu.Ft.) 925,266 (Cu.Ft.) 1,407,519 (Cu.Ft.) 1/2 Treatment Volume = 1/2 Treatment Volume Elevation = 90 Temporary Storage Volume Elevation = 433,000 (Cu.Ft.) 42.46 Ft. 46.11 Ft. Min. Required Liner Thickness Lagoon Surface Area: (Inside TOD) 100.94% 114.29% 106.84% 108.15% 78.53 In. 34.65 In. 1.5 Ft. 185,380 S.F. Murphy -Brown, LLC Engineering P.O. Box 856 ,Warsaw, NC 28398 (910) 293-3434 Elevation (FT.) 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 Grower: 3730 Address: PO Box 856 Warsaw, NC 28398 County: Bladen Designed By: KBW Checked By: DSE Date: 02/25/09 Sheet 2 of 7 BASE VOLUME: ACTUAL DESIGN VOLUME CALCULATIONS iCu. Ft. LAGOON STAGE -AREA VOLUMES Contour Area (SF) 133,840 138,670 143,572 148,546 153,592 158,710 163,900 169,162 174,496 179,902 185,380 These volumes were calculated Incr. Vol. (Cu. FT) 136,255 141,121 146,059 151,069 156,151 161,305 166,531 171,829 177,199 182,641 Cumul. Vol. (Cu. FT) 0 136,255 277,376 423,435 574,504 730,655 891,960 1,058,491 1,230,320 1,407,519 1,590,160 using the vertical average end area method. TOTAL REQD VOL 1,301,484 CF CUMULATIVE VOL. ZONE VOL. 108.15% END PUMP = = = = START PUMP = _ MAX STORAGE _ 45.20 47.34 48.00 FT FT FT 925,266 CF TR'MT 1,290,568 CF TEMP 1,407,519 CF STORM 925,266 365,301 116,951 106.84% 114.29% 100.94% Murphy -Brown, LLC Engineering P.O. Box 856 ,Warsaw, NC 28398 (910) 293-3434 Grower: 3730 Address: PO Box 856 Warsaw, NC 28398 County: Bladen Designed By: KBW Checked By: DSE Date: 02/25/09 Sheet 3 of 7 MINIMUM REQUIRED VOLUME CALCULATIONS Permanent Storage: Required Treatment Volume: Animal Type Capacity * ALW * (cu.ft./Ib = Total Nursery 0 30 1.00 0 Wean to Finish 0 115 1.00 0 Finishing 0 135 1.00 0 Farrow to weanling 2,000 433 1.00 866,000 Farrow to feeder 0 522 1.00 0 Farrow to finish 0 1,417 1.00 0 Boars 0 400 1.00 0 Total Requi ed Treatment Volume (cu. f .)_ Sludge Storage Volume: 866,000 AnimafType Capacity * ALW * (cu.fl./Ib) = Total Nursery 0 30 0.00 0 Wean to Finish 0 115 0.00 0 Finishing 0 135 0.00 0 Farrow to weanling 2,000 433 0.00 0 Farrow to feeder 0 522 0.00 0 Farrow to finish 0 1,417 0.00 0 Boars 0 400 0.000 0 Total Required Sludge Storage Volume (cu. ft.)= Temporary S oracle Volume: Manure Production: 0 Animal Type Capacity * Sto. Period J./day = Total Nursery 0 180 0.30 0 Wean to Finish 0 180 1.17 0 Finishing 0 180 1.37 0 Farrow to weanling 2,000 180 4.39 1,581,893 Farrow to feeder 0 180 5.30 0 Farrow to finish 0 180 14.38 0 Boars 0 180 4.06 0 Total Manure Production (gals.)= Total Manure Production (cu.ft.)= Excess Fresh Water: 1,581,893 211,483 Animal Type Capacity * Sto. Period d./day = Total Nursery 0 180 0.00 0 Wean to Finish 0 180 0.00 0 Finishing 0 180 0.00 0 Farrow to weanling 2,000 180 0.00 0 Farrow to feeder 0 180 0.00 0 Farrow to finish 0 180 0.00 0 Boars 0 180 0.00 0 Total Fresh Water Excess (gals.)= Total Fresh Water Excess (cu.ft.)= 0 0 Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 3730 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 02/25/09 County: Bladen Sheet 4 of 7 Temporary Storage Volume: (Cont.} Rainfall in Excess of Evaporation: Vol.=(Lagoon Surface Area + Additional Drainage Area)* Rainfall / 121n./ft Vol.= (185380 sq.ft. + 0 sq.ft.) * 7 in. /12 in./ft. Total Required Volume for Rainfall in Excess of Evap. (cu.ft.)= Storm Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) * 25Yr./24Hr. Storm(in) / 12in./ft. Vol.= (185380 sq.ft + 0 sq.ft.) * 7.5 in. /12 in./ft. Total Required Volume for 25Yr./24Hr. Storm Event (cu.ft)= "Heavy Rain" Storage: Vol.=(Lagoon Surf. Area + Addt'I Drainage Area) " "Heavy Rain" Factor (in) / 12in./ft. Vol.= (185380 sq.ft + 0 sq.ft.) * 0.0 in. /12 in./ft. Total Required Volume for "Heavy Rain" (cult.) = (for Extended Periods of Chronic Rainfall) Additional Water Storage: No Additional Water Storage is Required 0 Total Required Storm Storage (25Yr. / 24Hr. Storm + 'Heavy Rain')= Total Required Temporary Storage (Manure Prod. + Excess Fr. Water + Rainfall Excess + Additional Water Storage) = Total Required Permanent Storage (Treatment + Sludge) = TOTAL REQUIRED VOLUME = 1301484 (CU.FT.) 108,138 115,863 115,863 (CU.FT) 319,621 (CU.FT) 866,000 (CU.FT) 0 0 Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 3730 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 02/25/09 County: Bladen Sheet 5 of 7 LAGOON DESIGN SUMMARY Top of Dike Elevation Emergency Spillway Crest Elevation Top of 25Yr. / 24Hr. Storm Storage Top of "Heavy Rain" Storage Start Pump Elevation End Pump Elevation Top of Sludge Storage Seasonal High Watertable Elev. Finished Bottom Elevation Inside Top Length Inside Top Width Side Slopes Lagoon Surface Area Min. Liner Thickness (if required) Freeboard Depth Temporary Storage Period Zone Depths: TOTAL DESIGN VOLUME = 1407519 (CU.FT.) Treatment / Sludge Storage Zone Depth Temporary Storage Zone Depth Freeboard / Storm Storage Zone Depth Total Lagoon Depth 49.00 FT. Not Al Applicable 48.00 FT. Not Applicable 47.34 FT. 45.20 FT. Not Applicable 45.20 FT. 39.00 FT. 620.00 FT. 299.00 FT. 3:1 H:V 185,380 SF 1.5 FT. 1.00 FT. 180 Days 6.2 FT. 2.1 FT. 1.7 FT. 10.0 FT. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: Address: County: 3730 PO Box 856 Warsaw, NC 28398 Bladen Designe KBW Checke( DSE Date: 02/25/09 Sheet 6 of 7 ZONE ELEVATIONS TOP OF DIKE ELEV = 49.00 STRT PMP EL.= 47.34 END PMP EL. = 45.20 TOP OF STORM ELEV = 48.00 TOP OF TEMP STORAGE ELEV = 47.34 TOP OF TREAT ELEV = 45.20 FINISHED BOTTOM ELEV = 39.00 SHWT = 45.20 Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 Grower: 3730 Designed By: KBW Address: PO Box 856 Checked By: DSE Warsaw, NC 28398 Date: 02/25/09 County: Bladen Sheet 7 of 7 This livestock waste treatment lagoon is designed in accordance with the United States Natural Resources Conservation Service PRACTICE STANDARD 359- WASTE TREATMENT LAGOON, revised prior to June, 1996. Emergency Spillway: An Emergency Spillway is not required. NOTE: See attached Waste Utilization Plan DESIGNED: 4 � � DATE: "2/ Z. S7/p mil-' COMMENTS: This design is update of start and stop pump elevations and to show the 1/2 treatment volume level for sludge storage. This design does not supercede the original certification of the farm. Murphy -Brown, LLC Engineering P.O. Box 856, Warsaw NC 28398 (910) 293-3434 System Calibration Information presented in manufacturer's charts are based on average operation conditions with relatively new equipment. Discharge rates and application rates change over time as equipment gets older and components wear. In particular, pump wear tends to reduce operating pressure and flow. With continued use, nozzle wear results in an increase in the nozzle opening which will increase the discharge rate while decreasing the wetted diameter. You should be aware that operating the system differently than assumed in the design will alter the application rate, diameter of coverage, and subsequently the application uniformity. For example, operating the system with excessive pressure results in smaller droplets, greater potential for drift, and accelerates wear of the sprinkler nozzle. Clogging of nozzles can result in pressure increase. Plugged intakes or crystallization of mainlines will reduce operating pressure. Operating below design pressure greatly reduces the coverage diameter and application uniformity. For the above reason, you should calibrate your equipment on a regular basis to ensure proper application rates and uniformity. Calibration at least once every three years is recommended. Calibration involves collecting and measuring flow at several locations in the application area. Any number of containers can be used to collect flow and determine the application rate. Rain gauges work best because they already have a graduated scale from which to read the application amount without having to perform additional calculations. However, pans, plastic buckets, jars, or anything with a uniform opening and cross-section can be used provided the liquid collected can be easily transferred to a scaled container for measuring. For stationary sprinklers, collection containers should be located randomly throughout the application area at several distances from sprinklers. For traveling guns, sprinklers should be located along a transect perpendicular to the direction of pull. Set out collection containers 25 feet apart along the transect on both sides of the gun cart. You should compute the average application rate for all nonuniformity of the application. On a windless day, variation between containers of more than 30 percent is cause for concern. You should contact your irrigation dealer or technical specialist for assistance. *Reprinted for Certification Training for Operations of Animal Waste Management Systems Manual 1 OPERATION & MAINTENANCE PLAN Proper lagoon management should be a year-round priority. It is especially important to manage levels so that you do not have problems during extended rainy and wet periods. Maximum storage capacity should be available in the lagoon for periods when the receiving crop is dormant (such as wintertime for bermudagrass) or when there are extended rainy spells such as a thunderstorm season in the summertime. This means that at the first sign of plant growth in the later winter / early spring, irrigation according to a farm waste management plan should be done whenever the land in dry enough to receive lagoon liquid. This will make storage space available in the lagoon for future wet periods. In the late summer / early fall the lagoon should be pumped down to the low marker (see Figure 2-1) to allow for winter storage. Every effort should be made to maintain the lagoon close to the minimum' liquid level as long as the weather and waste utilization plan will allow it. Waiting until the lagoon has reached its maximum storage capacity before starting to irrigated does not leave room for storing excess water during extended wet periods. Overflow from the lagoon for any reason except a 25-year, 24-hour storm is a violation of state law and subject to penalty action. The routine maintenance of a lagoon involves the following: • Maintenance of a vegetative cover for the dam. Fescue or common bermudagrass are the most common vegetative covers. The vegetation should be fertilized each year, if needed, to maintain a vigorous stand. The amount of fertilized applied should be based on a soils test, but in the event that it is not practical to obtain a soils test each year, the lagoon embankment and surrounding areas should be fertilized with 800 pounds per acre of 10-10-10, or equivalent. • Brush and trees on the embankment must be controlled. This may be done by mowing, spraying, grazing, chopping, or a combination of these practices. This should be done at least once a year and possibly twice in years that weather conditions are favorable for heavy vegetative growth. NOTE: If vegetation is controlled by spraying, the herbicide must not be allowed to enter the lagoon water. Such chemicals could harm the bacteria in the lagoon that are treating the waste. Maintenance inspections of the entire lagoon should be made during the initial filling of the lagoon and at least monthly and after major rainfall and storm events. Items to be checked should include, as a minimum, the following: Waste Inlet Pipes, Recycling Pipes, and Overflow Pipes -- look for: 1. separation of joints 2. cracks or breaks 3. accumulation of salts or minerals 4. overall condition of pipes 2 Lagoon surface -- look for: 1. undesirable vegetative growth 2. floating or lodged debris Embankment -- look for: 1. settlement, cracking, or "jug" holes 2. side slope stability -- slumps or bulges 3. wet or damp areas on the back slope 4. erosion due to lack or vegetation or as a result of wave action 5. rodent damage Larger lagoons may be subject to liner damage due to wave action caused by strong winds. These waves can erode the lagoon sidewalls, thereby weakening the lagoon dam. A good stand of vegetation will reduce the potential damage caused by wave action. If wave action causes serious damage to a lagoon sidewall, baffles in the lagoon may be used to reduce the wave impacts. Any of these features could lead to erosion and weakening of the dam. If your lagoon has any of these features, you should call an appropriate expert familiar with design and construction of waste lagoons. You may need to provide a temporary fix if there is a threat of a waste discharge. However, a permanent solution should be reviewed by the technical expert. Any digging into a lagoon dam with heavy equipment is a serious undertaking with potentially serious consequences and should not be conducted unless recommended by an appropriate technical expert. Transfer Pumps -- check for proper operation of: 1. recycling pumps 2. irrigation pumps Check for leaks, loose fittings, and overall pump operation. An unusually loud or grinding noise, or a large amount of vibration, may indicate that the pump is in need of repair or replacement. NOTE: Pumping systems should be inspected and operated frequently enough so that you are not completely "surprised" by equipment failure. You should perform your pumping system maintenance at a time when your lagoon is at its low level. This will allow some safety time should major repairs be required. Having a nearly full lagoon is not the time to think about switching, repairing, or borrowing pumps. Probably, if your lagoon is full, your neighbor's lagoon is full also. You should consider maintaining an inventory of spare parts or pumps. • Surface water diversion features are designed to carry all surface drainage waters (such as rainfall runoff, roof drainage, gutter outlets, and parking lot runoff) away from your lagoon and other waste treatment or storage structures. The only water that should be coming from your lagoon is that which comes from your flushing (washing) system pipes and the rainfall that hits the lagoon directly. You should inspect your diversion system for the following: 1. adequate vegetation 2. diversion capacity 3. ridge berm height 3 Identified problems should be corrected promptly. It is advisable to inspect your system during or immediately following a heavy rain. If technical assistance is needed to determine proper solutions, consult with appropriate experts. You should record the level of the lagoon just prior to when rain is predicted, and then record the level again 4 to 6 hours after the rain (assumes there is no pumping). This will give you an idea of how much your lagoon level will rise with a certain rainfall amount (you must also be recording your rainfall for this to work). Knowing this should help in planning irrigation applications and storage. If your lagoon rises excessively, you may have an overflow problem from a surface water diversion or there may be seepage into the lagoon from the surrounding land. Lagoon Operation Startup: 1. Immediately after construction establish a complete sod cover on bare soil surfaces to avoid erosion. 2. Fill new lagoon design treatment volume at least half full of water before waste loading begins, taking care not to erode lining or bank slopes. 3. Drainpipes into the lagoon should have a flexible pipe extender on the end of the pipe to discharge near the bottom of the lagoon during initial filling or another means of slowing the incoming water to avoid erosion of the lining. 4. When possible, begin loading new lagoons in the spring to maximize bacterial establishment (due to warmer weather). 5. It is recommended that a new lagoon be seeded with sludge from a healthy working swine lagoon in the amount of 0.25 percent of the full lagoon liquid volume. This seeding should occur at least two weeks prior to the addition of wastewater. 6. Maintain a periodic check on the lagoon liquid pH. If the pH falls below 7.0, add agricultural lime at the rate of 1 pound per 1000 cubic feet of lagoon liquid volume until the pH rises above 7.0. Optimum lagoon liquid pH is between 7.5 and 8.0. 7. A dark color, lack of bubbling, and excessive odor signals inadequate biological activity. Consultation with a technical specialist is recommended if these conditions occur for prolonged periods, especially during the warm season. Loading: The more frequently and regularly that wastewater is added to a lagoon, the better the lagoon will function. Flush systems that wash waste into the lagoon several times daily are optimum for treatment. Pit recharge systems, in which one or more buildings are drained and recharged each day, also work well. 4 • Practice water conservation --- minimize building water usage and spillage from leaking waterers, broken pipes and washdown through proper maintenance and water conservation. • Minimize feed wastage and spillage by keeping feeders adjusted. This will reduce the amount of solids entering the lagoon. Management: • Maintain lagoon liquid level between the permanent storage level and the full temporary storage level. • Place visible markers or stakes on the lagoon bank to show the minimum liquid level and the maximum liquid level. (Figure 2-1). • Start irrigating at the earliest possible date in the spring based on nutrient requirements and soil moisture so that temporary storage will be maximized for the summer thunderstorm season. Similarly, irrigate in the late summer / early fall to provide maximum lagoon storage for the winter. • The lagoon liquid level should never be closer than 1 foot to the lowest point of the dam or embankment. • Don not pump the lagoon liquid level lower than the permanent storage level unless you are removing sludge. • Locate float pump intakes approximately 18 inches underneath the liquid surface and as far away from the drainpipe inlets as possible. • Prevent additions of bedding materials, long-stemmed forage or vegetation, molded feed, plastic syringes, or other foreign materials into the lagoon. • Frequently remove solids from catch basins at end of confinement houses or wherever they are installed. • Maintain strict vegetation, rodent, and varmint control near lagoon edges. • Do not allow trees or large bushes to grow on lagoon dam or embankment. • Remove sludge from the lagoon either when the sludge storage capacity is full or before it fills 50 percent of the permanent storage volume. • If animal production is to be terminated, the owner is responsible for obtaining and implementing a closure plan to eliminate the possibility of a pollutant discharge. Sludge Removal: Rate of lagoon sludge buildup can be reduced by: 5 • proper lagoon sizing, • mechanical solids separation of flushed waste, • gravity settling of flushed waste solids in an appropriately designed basin, or • minimizing feed wastage and spillage. Lagoon sludge that is removed annually rather than stored long term will: • have more nutrients, • have more odor, and • require more land to properly use the nutrients. Removal techniques: • Hire a custom applicator. • Mix the sludge and lagoon liquid with a chopper - agitator impeller pump through large - bore sprinkler irrigation system onto nearby cropland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; mix remaining sludge; pump into liquid sludge applicator; haul and spread onto cropland or forageland; and soil incorporate. • Dewater the upper part of lagoon by irrigation onto nearby cropland or forageland; dredge sludge from lagoon with dragline or sludge barge; berm an area beside lagoon to receive the sludge so that liquids can drain back into lagoon; allow sludge to dewater; haul and spread with manure spreader onto cropland or forageland; and soil incorporate. Regardless of the method, you must have the sludge material analyzed for waste constituents just as you would your lagoon water. The sludge will contain different nutrient and metal values from the liquid. The application of the sludge to fields will be limited by these nutrients as well as any previous waste applications to that field and crop requirement. Waste application rates will be discussed in detail in Chapter 3. When removing sludge, you must also pay attention to the liner to prevent damage. Close attention by the pumper or drag -line operator will ensure that the lagoon liner remains intact. If you see soil material or the synthetic liner material being disturbed, you should stop the activity immediately and not resume until you are sure that the sludge can be removed without liner injury. If the liner is damaged it must be repaired as soon as possible. Sludge removed from the lagoon has a much higher phosphorus and heavy metal content than liquid. Because of this it should probably be applied to land with low phosphorus and metal levels, as indicated by a soil test, and incorporated to reduce the chance of erosion. Note that if the sludge is applied to fields with very high soil -test phosphors, it should be applied only at rates equal to the crop removal of phosphorus. As with other wastes, always have your lagoon sludge analyzed for its nutrient value. 6 The application of sludge will increase the amount of odor at the waste application site. Extra precaution should be used to observe the wind direction and other conditions which could increase the concern of neighbors. Possible Causes of Lagoon Failure Lagoon failures result in the unplanned discharge of wastewater from the structure. Types of failures include leakage through the bottom or sides, overtopping, and breach of the dam. Assuming proper design and construction, the owner has the responsibility for ensuring structure safety. Items which may lead to lagoon failures include: • Modification of the lagoon structure -- an example is the placement of a pipe in the dam without proper design and construction. (Consult an expert in lagoon design before placing any pipes in dams.) • Lagoon liquid levels -- high levels are a safety risk. • Failure to inspect and maintain the dam. • Excess surface water flowing into the lagoon. • Liner integrity -- protect from inlet pipe scouring, damage during sludge removal, or rupture from lowering lagoon liquid level below groundwater table. NOTE: If lagoon water is allowed to overtop the dam, the moving water will soon cause gullies to form in the darn. Once this damage starts, it can quickly cause a large discharge of wastewater and possible dam failure. 7 EMERGENCY ACTION PLAN PHONE NUMBERS DIVISION OF WATER QUALITY (DWQ) EMERGENCY MANAGEMENT SERVICES (EMS) SOIL AND WATER CONSERVATION DISTRICT (SWCD) NATURAL RESOURCES CONSERVATION SERVICE (NRCS) COOPERATIVE EXTENSION SERVICE (CES) Wt ko - av,a- U1(,0 Ito -2?'- - 3`15-1 ffit),_;�;�:s -z4S'l \\ll—<s-?-._t-\ ( i This plan will be implemented in the event that wastes from your operation are leaking, overflowing or running off site. You should not wait until wastes reach surface waters or leave your property to consider that you have a problem. You should make every effort to ensure that this does not happen. This plan should be posted in an accessible location for all employees at the facility. The following are some action items you should take. 1. Stop the release of wastes. Depending on the situation, this may or may not be possible. Suggested responses to some possible problems are listed below. A. Lagoon overflow - possible solutions are: a) Add soil to berm to increase elevation of dam. b) Pump wastes to fields at an acceptable rate. c) Stop all flow to the lagoon immediately. d) Call a pumping contractor. e) Make sure no surface water is entering lagoon. B. Runoff from waste application field -actions include: a) Immediately stop waste application. b) Create a temporary diversion to contain waste. c) Incorporate waste to reduce runoff. d) Evaluate and eliminate the reason(s) that cause the runoff. e) Evaluate the application rates for the fields where runoff occurred. C. Leakage from the waste pipes and sprinklers - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Close valves to eliminate further discharge. d) Repair all leaks prior to restarting pumps. D. Leakage from flush systems, houses, solid separators - action include: a) Stop recycle pump. b) Stop irrigation pump. c) Make sure siphon occurs. d) Stop all flow in the house, flush systems, or solid separators. E. Leakage from base or sidewall of lagoon. Often this is seepage as opposed to flowing leaks - possible action: a) Dig a small sump or ditch from the embankment to catch all seepage, put in a submersible pump, and pump back to lagoon. b) If holes are caused by burrowing animals, trap or remove animals and fill holes and compact with a clay type soil. c) Have a professional evaluate the condition of the side walls and the lagoon bottom as soon as possible. 8 2. Assess the extent of the spill and note any obvious damages. a. Did the waste reach surface waters? b. Approximately how much was released and for what duration? c. Any damage notes, such as employee injury, fish kills, or property damage? d. Did the spill leave the property? e. Does the spill have the potential to reach surface waters? f. Could a future rain event cause the spill to reach surface waters? g. Are potable water wells in danger (either on or off the property)? h. How much reached surface waters? 3. Contact appropriate agencies. a. During normal business hours call your DWQ regional office; Phone #, After hours, emergency number: (919) 733-3942. Your phone call should include: your name, facility number, telephone number, the details of the incident from item 2 above, the exact location of the facility, the location or direction of the movement of the spill, weather and wind conditions. The corrective measures that have been under taken, and the seriousness of the situation. b. If the spill leaves property or enters surface waters, call local EMS phone number. c. Instruct EMS to contact local Health Department. d. Contact CE's phone number, local SWCD office phone number and the local NRCS office for advice / technical assistance phone number. 4. If none of the above works call 911 or the Sheriff's Department and explain your problem to them and ask the person to contact the proper agencies for you. 5. Contact the contractor of your choice to begin repair or problem to minimize offsite damage. a. Contractors Name: Murphy Brown, LLC b. Contractors Address: P.O. Box 856 Warsaw, NC 28398 c . Contractors Phone: (910)293-3434 6. Contact the technical specialist who certified the lagoon (NRCS, Consulting Engineer, etc.) a. Name: Kraig Westerbeek b. Phone: (910) 293 - 5330 Implement procedures as advised by DWQ and technical assistance agencies to rectify the damage, repair the system, and reassess the waste management plan to keep problems with release of wastes from happening again. 9 INSECT CONTROL CHECKLIST FOR ANIMAL OPERATIONS Source Cause BMP's to Minimize Odor Site Specific Practices (Liquid Systems) Flush Gutters Accumulation of solids (✓) Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed. () Remove bridging of accumulated solids at discharge Lagoons and Pits Crusted Solids (✓) Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6-8 inches over more than 30% of surface. Excessive Decaying vegetation (V)Maintain vegetative control along banks of Vegetative Growth lagoons and other impoundment's to prevent accumulation of decaying vegetative matter along waters edge on impoundments perimeter. (Dry Systems) Feeders Feed Spillage () Design, operate and maintain feed systems (e.g.. bunkers and troughs) to minimize the accumulation of decaying wastage. () Clean up spillage on a routine basis (e.g. 7-10 day interval during summer; 15-30 day interval during winter). Feed Storage Accumulation of feed residues () Reduce moisture accumulation within and around immediate perimeter of feed storage areas by insuring drainage away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products). () Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed. Animal Holding Accumulation of animal () Eliminate low area that trap moisture along fences Areas wastes and feed wastage and other locations where waste accumulates and disturbance by animals is minimal. () Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e. inspect for and remove or break up accumulated solids as needed). MIC — November 11, 1996 10 Dry Manure Handling Accumulations of animal () Remove spillage on a routine basis (e.g. 7-10 day Systems wastes interval during summer; 15-30 days interval during winter) where manure is loaded for land application or disposal. () Provide for adequate drainage around manure stockpiles () Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed. The issues checked () pertain to this operation. The landowner / integrator agrees to use sound judgment in applying insect control measures as practical. I certify the aforementioned insect control Best Management Practices have been reviewed with me. (Landowner Signature) For more information contact the Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC -- November 11, 1996 11 SWINE FARM WASTE MANAGEMENT ODOR CONTROL CHECKLIST Source Cause BMP's to Minimize Odor Site Specific Practices Farmstead Swine production (1)Vegetative or wooded buffers: (1)Recommended best management practices; (v)Good judgment and common sense Animal body surfaces Dirty manure ( )Dry floors covered animals Floor surfaces Wet manure -covered floors (v)Slotted floors; (v)Waterers located over slotted floors; (V)Feeders at high end of solid floors; (v)Scrape manure buildup from floors; ( )Underfloor ventilation for drying Manure collection Urine pits Partial microbial decomposition (v)Frequent manure removal by flush, pit recharge or scrape ( )Underfloor ventilation Ventilation Volatile gases exhaust fans Dust (v)Fan maintenance; (1)Efficient air movement Indoor surfaces Dust (✓)Washdown between groups of animals ( )Feed additives; ( )Feeder covers; ( )Feed delivery downspout extenders to feeder covers Flush Tanks Agitation of recycled lagoon liquid while tanks are filling ( )Flush tank covers ( )Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys Agitation during waste ( )Underfloor flush with underfloor water conveyance ventilation Pit recharge points Lift stations Agitation of recycled lagoon liquid while pits are filling ( )Extend recharge lines to near bottom of pits with anti -siphon vents Agitation during sump ( )Sump tank covers tank filling and drawdown Outside drain collection or junction boxes Agitation during waste ( )Box Covers water conveyance End of drain Agitation during waste pipes at lagoon water underneath lagoon liquid level ( )Extend discharge point of pipes Lagoon surfaces Volatile gas emissions (V)Proper lagoon liquid capacity Biological mixing (v)Correct lagoon startup procedures Agitation ( )Minimum surface area -to -volume ratio (v)Minimum agitation when pumping ( )Mechanical aeration ( )Proven biological additives Irrigation sprinkler High pressure agitation (1)Irrigate on dry days with little or no wind nozzles Wind draft (v)Minimum recommended operation pressure (V)Pump intake near lagoon liquid surface ( )Pump from second -stage lagoon AMOC -- November 11, 1996 12 Storage tank or basin surface Partial microbial ( )Bottom or midlevel loading decomposition Mixing while ( )Tank covers filling Agitation when emptying( )Basin surface mats of solids ( )Proven biological additives or oxidants Settling basin Partial microbial decom- ( )Extend drainpipe outlets underneath liquid surface position Mixing while filling level Agitation when emptying ( )Remove settled solids regularly Manure, slurry or sludge spreader outlets Agitation when spreading Volatile gas emissions ( )Soil injection of slurry/sludges ( )Wash residual manure from spreader after use ( )Proven biological additives or oxidants Dead animals Carcass decomposition ( )Proper disposition of carcasses Dead animal Carcass decomposition ( )Complete covering of carcasses in burial pits disposal pits ( )Proper location / construction of disposal pits Incinerators Incomplete combustion ( )Secondary stack burners Standing water around facilities improper drainage Microbial decomposition of organic matter (v)Farm access road maintenance away from facilities Manure tracked Poorly maintained access (/)Farm access road maintenance onto public roads roads from farm access Additional Information: Available From: Swine Manure Management 0200 Rule / BMP Packet NCSU-County Extension Center Swine Production Farm Potential Odor Sources and Remedies, EBAE Fact Sheet NCSU-BAE Swine Production Facility Manure Management:Pit Recharge --Lagoon Treatment:EBAE128-88NCSU-BAE Swine Production Facility Manure Management:Underfloor Fluse-Lagoon Treatment 129-88NCSU-BAE Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE103-83NCSU-BAE Calibration of Manure and Wastewater Application Equipment EBAE Fact Sheet NCSU-BAE Controlling Odors from Swine Buildings; PIH-33 NCSU-Swine Extension Environmental Assurance Program: NPPC Manual NC Pork Producers Assoc Options for Managing Odor; a report from the Swine Odor Task Force NCSU Agri Communication Nuisance Concerns in Animal Manure Management: Odors and Flies; PR0101, Florida Cooperative Extension 1995 Conference Proceedings The issues checked ( ) pertain to this operation. The landowner / integrator agrees to use sound judgment in applying odor control measures as practical. I certify the aforementioned odor control Best Management Practices have been reviewed with me. ndowner Signature) 13 Insect Control Checklist for Animal Operations Source Cause BMPs to Control Insects Site Specific Practices Flush gutters • Accumulation of solids Lagoons and pits • Crusted solids Excessive vegetative • Decaying vegetation growth X X Liquid Systems Flush system is designed and operated sufficiently to remove accumulated solids from gutters as designed Remove bridging of accumulated solids at discharge Maintain lagoons, settling basins and pits where pest breeding is apparent to minimize the crusting of solids to a depth of no more than 6 to 8 inches over more than 30 percent of surface Maintain vegetative control along banks of lagoons and other impoundments to prevent accumulation of decaying vegetative matter along water's edge on impoundment's perimeter. Dry Systems Feeders • Feed spillage AMIC — November 11, 1996, page 1 Design, operate, and maintain feed systems (e.g., bunkers and troughs) to minimize the accumulation of decaying wastage Clean up spillage on a routine basis (e.g., 7- to 10-day interval during summer; 15- to 30-day interval during winter) Insect Control Checklist for Animal Operations Source Feed storage Cause • Accumulations of feed residues X X BMPs to Control Insects Reduce moisture accumulation within and around immediate perimeter of feed storage areas by ensuring drainage is away from site and/or providing adequate containment (e.g., covered bin for brewer's grain and similar high moisture grain products) Inspect for and remove or break up accumulated solids in filter strips around feed storage as needed Site Specific Practices Animal holding areas • Accumulations of animal wastes and feed wastage Dry manure handling systems • Accumulations of animal wastes X X Eliminate low areas that trap moisture along fences and other locations where waste accumulates and disturbance by animals is minimal Maintain fence rows and filter strips around animal holding areas to minimize accumulations of wastes (i.e., inspect for and remove or break up accumulated solids as needed) Remove spillage on a routine basis (e.g., 7- to 10- day interval during summer; 15- to 30-day interval during winter) where manure is loaded for land application or disposal Provide for adequate drainage around manure stockpiles Inspect for and remove or break up accumulated wastes in filter strips around stockpiles and manure handling areas as needed For more information contact: Cooperative Extension Service, Department of Entomology, Box 7613, North Carolina State University, Raleigh, NC 27695-7613. AMIC — November 11, 1996, page 2 Swine Farm Waste Management Odor Control Checklist Source Farmstead Cause • Swinc production X X X BMPs to Minimize Odor Vegetative or wooded buffers Recommended best management practices Good judgment and common sense Site Specific Practices Animal body surfaces • Dirty manure -covered animals X Dry floors Floor surfaces • Wet manure -covered floors X X X X Slotted floors Waterers located over slotted floors Feeders at high end of solid floors Scrape manure buildup from floors Underfloor ventilation for drying Manure collection pits • Urine • Partial microbial decomposition X X Frequent manure removal by flush, pit recharge, or scrape Underfloor ventilation Ventilation exhaust fans • Volatile gases • Dust X X Fan maintenance Efficient air movement Indoor surfaces • Dust X X Washdown between groups of animals Feed additives Feeder covers Feed delivery downspout extenders to feeder covers Flush tanks • Agitation of recycled lagoon liquid while tanks are filling Flush tank covers Extend fill lines to near bottom of tanks with anti -siphon vents Flush alleys • Agitation during wastewater conveyance AMOC — November 11, 1996, page 1 Underfloor flush with underfloor ventilation Swine Farm Waste Management Odor Control Checklist Source Pit recharge points Lift stations Outside drain collection or junction boxes Cause • Agitation of recycled lagoon liquid while pits are filling • Agitation during sump tank filling and drawdown • Agitation during wastewater conveyance BMPs to Minimize Odor Extend recharge lines to near bottom of pits with anti -siphon vents Sump tank covers Box covers Site Specific Practices End of drainpipes at lagoon Lagoon surfaces • Agitation during wastewater conveyance • Volatile gas emissions • Biological mixing • Agitation X X X Extend discharge point of pipes underneath lagoon liquid level Proper lagoon liquid capacity Correct lagoon startup procedures Minimum surface area -to -volume ratio Minimum agitation when pumping Mechanical aeration Proven biological additives Irrigation sprinkler nozzles • High pressure agitation • Wind drift X X X Irrigate on dry days with little or no wind Minimum recommended operating pressure Pump intake near lagoon liquid surface Pump from second -stage lagoon Storage tank or basin surface • Partial microbial decomposition • Mixing while filling • Agitation when emptying AMOC — November 11, 1996, page 2 Bottom or midlevel loading Tank covers Basin surface mats of solids Proven biological additives or oxidants Swine Farm Waste Management Odor Control Checklist Source Cause Settling basin surface • Partial microbial decomposition Manure, slurry, or sludge spreader outlets • Mixing while filling • Agitation when emptying • Agitation when spreading • Volatile gas emissions BMPs to Minimize Odor Extend drainpipe outlets underneath liquid level Remove settled solids regularly Soil injection of slurry/sludges Wash residual manure from spreader after use Proven biological additives or oxidants Site Specific Practices Uncovered manure, slurry, or sludge on field surfaces • Volatile gas emissions while drying Soil injection of slurry/sludges Soil incorporation within 48 hours Spread in thin uniform layers for rapid drying Proven biological additives or oxidants Dead animals • Carcass decomposition X Proper disposition of carcasses Dead animal disposal • Carcass decomposition pits Complete covering of carcasses in burial pits Proper location/construction of disposal pits Incinerators • Incomplete combustion Secondary stack burners Standing water around • Improper drainage facilities • Microbial decomposition of organic matter Manure tracked onto • Poorly maintained access roads public roads from farm access x X Grade and landscape such that water drains away from facilities Farm access road maintenance AMOC — November 11, 1996, page 3 Additional Information: Available From: Swine Manure Management; .0200 Rule/BMP Packet Swine Production Farm Potential Odor Sources and Remedies; EBAE Fact Sheet Swine Production Facility Manure Management: Pit Recharge— Lagoon Treatment; EBAE 128-88 Swine Production Facility Manure Management: Underfloor Flush— Lagoon Treatment; EBAE 129-88 Lagoon Design and Management for Livestock Manure Treatment and Storage; EBAE 103-83 Calibration of Manure and Wastewater Application Equipment; EBAE Fact Sheet Controlling Odors from Swine Buildings; PIH-33 Environmental Assurance Program; NPPC Manual Options for Managing Odor; a report from the Swine Odor Task Force Nuisance Concerns in Animal Manure Management: Odors and Flies; PROI07, 1995 Conference Proceedings AMOC — November 11, 1996, page 4 NCSU, County Extension Center NCSU— BAE NCSU— BAE NCSU— BAE NCSU— BAE NCSU— BAE NCSU— Swine Extension N.C. Pork Producers Assoc. NCSU Agricultural Communications Florida Cooperative Extension Primary Secondary Mortality Management Methods Indicate which method(s) will be implemented. When selecting multiple methods indicate a primary versus secondary option. Methods other than those listed must be approved by the State Veterinarian. Routine Mortality Version —November 26, 2018 Burial three feet beneath the surface of the ground within 24 hours of knowledge of animal n n death. The burial must be at least 300 feet from any flowing stream or public body of water (G.S.106-403). The bottom of the burial pit should be at least one foot above the seasonal high water table. Attach burial location map and plan. n n Landfill at municipal solid waste facility permitted by NC DEQ under GS 15A NCAC 13B .0200. n n Rendering at a rendering plant licensed under G.S. 106-168.7. nn Complete incineration according to 02 NCAC 52C .0102. n n A composting system approved and permitted by the NC Department of Agriculture & Con- sumer Services Veterinary Division (attach copy of permit). If compost is distributed off -farm, additional requirements must be met and a permit is required from NC DEQ. n n In the case of dead poultry only, placing in a disposal pit of a size and design approved by the NC Department of Agriculture & Consumer Services (G.S. 106-549.70). n n Any method which, in the professional opinion of the State Veterinarian, would make possible the salvage of part of a dead animal's value without endangering human or animal health. (Written approval by the State Veterinarian must be attached). nMass Mortality Plan Mass mortality plans are required for farms covered by an NPDES permit. These plans are also recommended for all animal operations. This plan outlines farm -specific mortality man- agement methods to be used for mass mortality. The NCDA&CS Veterinary Division sup- ports a variety of emergency mortality disposal options; contact the Division for guidance. • A catastrophic mortality disposal plan is part of the facility's CAWMP and is activated when numbers of dead animals exceed normal mortality rates as specified by the State Veterinarian, • Burial must be done in accordance with NC General Statutes and NCDA&CS Veterinary Division regulations and guidance. • Mass burial sites are subject to additional permit conditions (refer to facility's animal waste management system permit). • In the event of imminent threat of a disease emergency, the State Veterinarian may enact additional temporary procedures or measures for disposal according to G.S. 106-399.4. ti 3 -zcs- 1q Signature of Farm Owner/Manager Date 3_ zt- 101 Signature of Technical Specialist Date