Peck, Kaitlin
From:Farkas, Jim J
Sent:Monday, May 22, 2023 4:33 PM
To:mreisman@flyavl.com; nathan.hudgens@greshamsmith.com;
amber.henson@greshamsmith.com; michelle.dove@greshamsmith.com
Cc:Smith, Mike M
Subject:RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion
Attachments:Add Info 5-22-23.pdf
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
for the subject project on February 21, 2023. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
Thank you
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: Farkas, Jim J
Sent: Monday, January 23, 2023 3:37 PM
To: mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com;
michelle.dove@greshamsmith.com
Cc: Smith, Mike M <michael.smith@ncdenr.gov>
Subject: RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion
Good Afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application
th
for the subject project on October 25, 2022. A review of that information has determined that the application is not
complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free
to contact me. My contact information is listed below.
1
Thank you
Jim Farkas
State Stormwater Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-3646
Jim.farkas@ncdenr.gov
From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>
Sent: Tuesday, October 25, 2022 11:44 AM
To: mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com;
michelle.dove@greshamsmith.com
Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>
Subject: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion
Good morning,
We received your post-construction stormwater permit application for the above mentioned project on 10/25/2022.
Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per
statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the
“State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form,
but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures
that the files are properly named in the electronic repository and it helps expedite the review process.
Please type in permit #: SW1221002
If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646.
Thank you,
Margie DeBerry
Environmental Specialist, Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9209
margie.deberry@ncdenr.gov
2
3