Loading...
HomeMy WebLinkAboutSW1190702_Email_20230522 Peck, Kaitlin From:Farkas, Jim J Sent:Monday, May 22, 2023 4:33 PM To:mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com; michelle.dove@greshamsmith.com Cc:Smith, Mike M Subject:RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Attachments:Add Info 5-22-23.pdf Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on February 21, 2023. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Farkas, Jim J Sent: Monday, January 23, 2023 3:37 PM To: mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com; michelle.dove@greshamsmith.com Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on October 25, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. 1 Thank you Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 25, 2022 11:44 AM To: mreisman@flyavl.com; nathan.hudgens@greshamsmith.com; amber.henson@greshamsmith.com; michelle.dove@greshamsmith.com Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW1221002 Asheville Regional Airport Terminal Modernization and Expansion Good morning, We received your post-construction stormwater permit application for the above mentioned project on 10/25/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW1221002 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 2 3