Loading...
HomeMy WebLinkAbout20210334 Ver 1_More Info Received_20240106From: debbiew75(&charter.net To: Currey, Gregory E CIV USARMY CESAD (USA) Subject: RE: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina Date: Tuesday, August 8, 2023 4:41:12 PM Hey Greg, All in water structures have been constructed and the only dredging that has taken place to date is the area surrounding slips 9 thru 24. The highground work has not been completed yet either. Debbie From: "Currey, Gregory E CIV USARMY CESAD (USA)" <Gregory.E.Currey@usace. army.mil> To: <debbiew75@charter.net> Sent: Mon, Aug 07 2023 03:57 PM Subject: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina Oh, did you mean the original drawings? From: debbiew75@charter.net <debbiew75@charter.net> Sent: Monday, August 7, 2023 4:54 PM To: Currey, Gregory E CIV USARMY CESAD (USA) <Gregory.E.Currey@usace.army.mil> Subject: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina Hey Greg, I just confirmed with the marina that the only work that has been completed thus far is the docks and slips highlighted in yellow and the dredging in the same area. Debbie From: "Currey, Gregory E CIV USARMY CESAD (USA)" <Gregory.E. Currey&usace.army.mil> To: <debbiew75(acharter.net> Sent: Mon, Aug 07 2023 01:35 PM Subject: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina Has any of this work ben completed? From: debbiew75&charter.net <debbiew75n,charter.net> Sent: Sunday, August 6, 2023 7:11 PM To: Currey, Gregory E CIV USARMY CESAD (USA) <Gregory.E.Curreygusace.army.mil> Subject: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina See below. From: <debbiew75n.charter.net> Reply -To: <debbiew75n.charter.net> To: "Currey, Gregory E CIV USARMY CESAD (USA)" <Gregory.E.Currey usace.army.mil> Sent: Mon, Jul 17 2023 05:22 PM Subject: RE: FW: 2001-01160 Holden Beach Marina Hey Greg, Yes everything is current and the cross -hatched area is the area for maintance dredging. Let me know if you need anything else. Debbie From: "Currey, Gregory E CIV USARMY CESAD (USA)" <Gregorv.E.Currey .usace.army.mil> To: <debbiew75&charter.net> Sent: Mon, Jul 17 2023 04:10 PM Subject: FW: 2001-01160 Holden Beach Marina Hey Debbie, did you ever address this request. If so, I missed it. Greg From: Currey, Gregory E CIV USARMY CESAD (USA) Sent: Thursday, May 4, 2023 11:27 AM To: debbiew75&charter.net Subject: 2001-01160 Holden Beach Marina Hi Debbie, I still need to process the renewal and transfer for this permit. Can you answer the following? Is this project narrative still current: Reference your application for a Department of the Army permit to to re -construct the Holden Beach Marina. The proposal is to rebuild the floating dock structure located east of Drop Zone #1. Storm damage from recent hurricanes has made many of the floating docks and boatlifts unusable. Starting from the bulkhead on the east side of Drop Zone #1, a 10' x 48' access pier will extend south leading to a gangway off the east side of the pier. The gangway will lead to a 10' x 252' floating dock which will run parallel with the AIWW. Seven 4' x 30' finger piers and one 6' x 30' finger pier will run perpendicular to the AIWW and contain 14 formal boatslips. At the waterward end of the 6' x 30' finger pier, a 6' x 32' finger pier will run parallel to the AIWW with room for 2 formal boatslips. The existing concrete tie pilings associated with the eastern docking facility will be removed and 7 new tie pilings will be driven between all of the perpendicular finger piers except at Slip #10. The existing 2 boatlifts at Slips #21 & #22 will also be removed and not replaced. As proposed, the total number of wet slips for the marina will be reduced from 25 to 24. This docking facility will cover or shade 4,2012 square feet of estuarine Waters of the US. Also, a new 2' x 45' section of concrete bulkhead would be installed approximately 2.5' waterward of the existing wall. No wetlands are located within this area. Furthermore, the proposal is to conduct maintenance dredging within the original and previously authorized footprint down to a final depth of-6' (MLW). ). The bucket -to -barge operation would remove approximately 1,795 cu. yd. (48,465 square feet) of material from Drop Zone #1 & #2 as well as from within the previously authorized footprint east of Drop Zone #1. All proposed dredging would remain a minimum of 10' from Coastal Wetlands and connect to deeper waters. All spoil material would be transported via dump truck to an approved lot located adjacent to 1256 Cedar Landing Rd. SW and 3461 Holden Beach Rd. Are the attached drawings still current? Does the cross -hatched area indicate the maintenance dredging area? Also an FYI. I'm still waiting on a new 401. Greg Greg Currey Regulatory Project Manager USACE, Wilmington 69 Darlington Ave. Wilmington, NC 28403 PH 910-251-4707