HomeMy WebLinkAbout20210334 Ver 1_More Info Received_20240106From: debbiew75(&charter.net
To: Currey, Gregory E CIV USARMY CESAD (USA)
Subject: RE: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina
Date: Tuesday, August 8, 2023 4:41:12 PM
Hey Greg,
All in water structures have been constructed and the only dredging that has taken place to
date is the area surrounding slips 9 thru 24. The highground work has not been completed yet
either.
Debbie
From: "Currey, Gregory E CIV USARMY CESAD (USA)"
<Gregory.E.Currey@usace. army.mil>
To: <debbiew75@charter.net>
Sent: Mon, Aug 07 2023 03:57 PM
Subject: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina
Oh, did you mean the original drawings?
From: debbiew75@charter.net <debbiew75@charter.net>
Sent: Monday, August 7, 2023 4:54 PM
To: Currey, Gregory E CIV USARMY CESAD (USA) <Gregory.E.Currey@usace.army.mil>
Subject: RE: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina
Hey Greg,
I just confirmed with the marina that the only work that has been completed thus far is the
docks and slips highlighted in yellow and the dredging in the same area.
Debbie
From: "Currey, Gregory E CIV USARMY CESAD (USA)"
<Gregory.E. Currey&usace.army.mil>
To: <debbiew75(acharter.net>
Sent: Mon, Aug 07 2023 01:35 PM
Subject: RE: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina
Has any of this work ben completed?
From: debbiew75&charter.net <debbiew75n,charter.net>
Sent: Sunday, August 6, 2023 7:11 PM
To: Currey, Gregory E CIV USARMY CESAD (USA) <Gregory.E.Curreygusace.army.mil>
Subject: [Non-DoD Source] RE: RE: FW: 2001-01160 Holden Beach Marina
See below.
From: <debbiew75n.charter.net>
Reply -To: <debbiew75n.charter.net>
To: "Currey, Gregory E CIV USARMY CESAD (USA)"
<Gregory.E.Currey usace.army.mil>
Sent: Mon, Jul 17 2023 05:22 PM
Subject: RE: FW: 2001-01160 Holden Beach Marina
Hey Greg,
Yes everything is current and the cross -hatched area is the area for maintance dredging. Let
me know if you need anything else.
Debbie
From: "Currey, Gregory E CIV USARMY CESAD (USA)"
<Gregorv.E.Currey .usace.army.mil>
To: <debbiew75&charter.net>
Sent: Mon, Jul 17 2023 04:10 PM
Subject: FW: 2001-01160 Holden Beach Marina
Hey Debbie, did you ever address this request. If so, I missed it.
Greg
From: Currey, Gregory E CIV USARMY CESAD (USA)
Sent: Thursday, May 4, 2023 11:27 AM
To: debbiew75&charter.net
Subject: 2001-01160 Holden Beach Marina
Hi Debbie, I still need to process the renewal and transfer for this permit. Can you answer the
following?
Is this project narrative still current:
Reference your application for a Department of the Army permit to to re -construct the Holden Beach
Marina. The proposal is to rebuild the floating dock structure located east of Drop Zone #1. Storm
damage from recent hurricanes has made many of the floating docks and boatlifts unusable. Starting
from the bulkhead on the east side of Drop Zone #1, a 10' x 48' access pier will extend south leading
to a gangway off the east side of the pier. The gangway will lead to a 10' x 252' floating dock which
will run parallel with the AIWW. Seven 4' x 30' finger piers and one 6' x 30' finger pier will run
perpendicular to the AIWW and contain 14 formal boatslips. At the waterward end of the 6' x 30'
finger pier, a 6' x 32' finger pier will run parallel to the AIWW with room for 2 formal boatslips. The
existing concrete tie pilings associated with the eastern docking facility will be removed and 7 new
tie pilings will be driven between all of the perpendicular finger piers except at Slip #10. The
existing 2 boatlifts at Slips #21 & #22 will also be removed and not replaced. As proposed, the total
number of wet slips for the marina will be reduced from 25 to 24. This docking facility will cover or
shade 4,2012 square feet of estuarine Waters of the US.
Also, a new 2' x 45' section of concrete bulkhead would be installed approximately 2.5' waterward of
the existing wall. No wetlands are located within this area. Furthermore, the proposal is to conduct
maintenance dredging within the original and previously authorized footprint down to a final depth
of-6' (MLW). ). The bucket -to -barge operation would remove approximately 1,795 cu. yd. (48,465
square feet) of material from Drop Zone #1 & #2 as well as from within the previously authorized
footprint east of Drop Zone #1. All proposed dredging would remain a minimum of 10' from Coastal
Wetlands and connect to deeper waters. All spoil material would be transported via dump truck to an
approved lot located adjacent to 1256 Cedar Landing Rd. SW and 3461 Holden Beach Rd.
Are the attached drawings still current? Does the cross -hatched area indicate the maintenance
dredging area?
Also an FYI. I'm still waiting on a new 401.
Greg
Greg Currey
Regulatory Project Manager
USACE, Wilmington
69 Darlington Ave.
Wilmington, NC 28403
PH 910-251-4707