Loading...
HomeMy WebLinkAboutSW5210401_As Builts_20240215 State Stormwater Management Permit No. SW5210401 AS-BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. BCheck here if this is a partial certification. Section/phase/SCM#? Check here if this is part of a Fast Track As-built Package Submittal. Printed Name Duke Energy Progress, LLC Attn. Alan Lewis Signature I, (,to e� Lydoya— k f'LIDS a Notary Public in the State o �p✓ CC�y 0 L tha County of W 0-k e ,do hereby certify that Atct-vt Lew r—�- personally appeared before me this y f k day of IUD t/IP M6 e✓ ,20 and acknowledge the due execution of this as-built certification. SEAL *my, Witness my hand and official seal NDY CORDOVA-NICKELS NOTARY PUBLIC WAKE COUNTY,NC Commission Expires q 2p My commission expires 2.J Permittec's Certification NCAC .1042(4) Completed/ N/A Provided A. DEED RESTRICTIONS/BUA RECORDS 1. The deed restrictions and protective covenants have been recorded and Y or N contain the necessary language to ensure that the project is maintained n/a consistent with the stormwater regulations and with the permit conditions. 2. A copy of the recorded deed restrictions and protective covenants has been Y or N n/a provided to the Division. 3. Records which track the BUA on each lot are being kept. (See Note 1) Y or N n/a B. MAINTENANCE ACCESS 1. The SCMs are accessible for inspection,maintenance and repair. Y or N n/a 2. The access is a minimum of 10 feet wide. Y or N n/a 3. The access extends to the nearest public right-of-way. Y or N n/a C. EASEMENTS 1. The SCMs and the components of the runoff collection/conveyance system Y or N n/a are located in recorded drainage easements. 2. A copy of the recordedplat(s) is provided. Y or N n/a D. SINGLE FAMILY RESIDENTIAL LOTS-Plats for residential lots that Y or N have an SCM include the following: 1. The specific location of the SCM on the lot. Y or N n/a 2. A typical detail for the SCM. Y or N n/a 3. A note that the SCM is required to meet Stormwater regulations and that the lot owner is subject to enforcement action as set forth in NCGS 143 Article Y or N n/a 21 if the SCM is removed, relocated or altered without prior approval. E. OPERATION AND MAINTENANCE AGREEMENT Y or N 1. The O&M Agreement is referenced on the final recorded plat. Y or N n/a 2. The O&M Agreement is recorded with the Register of Deeds and appears in y or N n/a the chain of title. F. OPERATION AND MAINTENANCE PLAN—maintenance records are being kept in a known set location for each SCM and are available for review. 1' o116 M G. DESIGNER'S CERTIFICATION FORM—has been provided to the or N Division. Note 1-Acceptable records include ARC approvals,as-built surveys,and county tax records. Note: Low Density Dispersed Flow only. No SCMs required. Page 1 of 9 State Stormwater Management Permit No. SW5210401 AS-BUILT DESIGNER'S CERTIFICATION GENERAL MDC I hereby state that I am a licensed professional and I certify by my signature and seal below,that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets the below listed General MDC found in NCAC 02H.1050 in accordance with the permit documents,plans and specifications on file with or provided to the Division, except as noted on the"AS- BUILT"drawings,such that the intent of the stormwater rules and statutes has been preserved. Check here if this is a partial certification. Section/phase/SCM#? Check here if this is a part of a Fast-Track As-Built Package Submittal per.1044(3). Check here if the designer did not observe the construction,but is Wdifying the project. Check here if pictures of the SCM are provided. Printed Name David C. Revoir, PE Signature NC Registration Number 026959 Date_ CO- SEAL: Consultant's Mailing Address. Appian Consulting Engineers, PA PO Box 7966 City/State/ZIP Rocky Mount, NC 27804 Phone Number 252.972.7703 2604 s' Q` �(� Onsultant's Email address: ® '• t�IN . ;; drevoir@appianengineers.com iD Circle N if the'as-built value differs from the Plan. If N is circled,provide an explanation on Page 2. OO N/E=not evaluated(provide explanation on page 2) ON/A=not applicable to this SCM or project. Consultant's Certification NCAC.1003((3)&General MDC.1050 OAs-built ON/E ON/A A. TREATMENT REQUIREMENTS 1. The SCM achieves runoff treatment. Y or N n/a 2. The SCM achieves runoff volume match. Y or N n/a 3. Runoff from offsite areas and/or existing BUA is bypassed. Y or N n/a 4. Runoff from offsite areas and/or existing BUA is directed into Y or N the permitted SCM and is accounted for at the full build-out n/a potential. 5. The project controls runoff through an offsite permitted SCM Y or N n/a that meets the re uirements of the MDC. 6. The net area of new BUA increase for an existing project has Y or N been accounted for at the appropriate design storm level. n/a 7. The SCM(s)meets all the specific minimum design criteria. Y or N n a B. VEGETATED SETBACKS/BUA 1. The width of the vegetated setback has been measured from Y or N the normal pool of impounded waters,the MHW line of tidal waters, or the top of bank of each side of rivers or streams. 2. The vegetated setback is maintained in grass or other or N vegetation. 3. BUA that meets the requirements ofNCGS 143-214.7(132)(2) Y or N n/a is located in the setback. 4. BUA that does not meet the requirements of NCGS 143-214.7 Y or N (b2)(2)is located within the setback and is limited to: a. Publicly funded linear projects(road,greenway sidewalk) n/a b. Water-dependent structures C. Minimal footprint uses(utility poles, signs,security lighting and a urtenances 5. Stormwater that is not treated in an SCM is released at the or N edge of the setback and allowed to flow through the setback as dispersed flow. Page 3 of 9 State Stormwater Management Permit No. SW5210401 DAs-built OO N/E Oa N/A C. STORMWATER OUTLETS—the outlet handles the peak flow y or N n/a from the 10 year storm with no downslo e erosion. D. VARIATIONS 1. A variation (alternative)from the stormwater rule provisions y or N n/a has been implemented. 2. The variation provides equal or better stormwater control and y or N n/a equal or better protection of surface waters. E. COMPLIANCE WITH OTHER REGULATORY PROGRAMS has been met. Y or N F. SIZING-the volume of the SCM takes the runoff from all surfaces into account and is sufficient to handle the required storm Y or N n/a depth. G. CONTAMINATED SOILS—infiltrating SCM's are not located Y or N n/a in or on areas with contaminated soils. H. SIDE SLOPES l. Vegetated side slopes are no steeper than 311:1 V. or N 2. Side slopes include retaining walls, gabion walls, or other Y or � surfaces that are steeper than 3H:IV. 01 3. Vegetated side slopes are steeper than 3H:1V(provide y or supporting documents for soils and vegetation). I. EROSION PROTECTION 1. The inlets do not cause erosion in the SCM. Y or N n/a 2. The outlet does not cause erosion downslope of the discharge Y or N n/a point during the peak flow from the 10 year storm. J. EXCESS FLOWS—An overflow/bypass has been provided. Y or N n/a K. DEWATERING—A method to drawdown standing water has Y or N n/a been provided to facilitate maintenance and inspection. L. CLEANOUT AFTER CONSTRUCTION—the SCM has been Y or N n/a cleaned out and converted to its approved design state. M. MAINTENANCE ACCESS 1. The SCM is accessible for maintenance and repair. Y or N n/a 2. The access does not include lateral or incline slopes>3:1. Y or N n/a N. DESIGNER QUALIFICATIONS(FAST-TRACK PERMIT)— The designer is licensed under Chapters 89A, 89C, 89E, or 89F of Por N the General Statutes. Provide an explanation for every MDC that was not met, and for every item marked"N/A"or"N/E", below. Attach additional pages as needed: Note: Low Density Dispersed Flow only. No SCMs required. Page 4 of 9 State Stormwater Management Permit No. SW5210401 AS-BUILT DESIGNER'S CERTIFICATION FOR LOW DENSITY PROJECTS I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in 15A NCAC 02H.1003, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the"AS-BUI LT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section or phase ❑ Check here if this is part of a Fast-Track As-Built Package Submittal per 15A NCAC 02H .1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ❑ Check here if pictures of the project are provided. Printed Name David C. Revoir, PE Signature NC Registration Number 26959 Date Consultant's Mailing Address: SEAL: Appian Consulting Engineers, PA PO Box 7966 City: Rocky Mount State: NC Zip; 27804 Phone: 25 972.7703 onsultant's Email address: a�a� ,�. � .eq<,�, �° �`� drevoir@appianengineers.com O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 3. OO N/E= Not Evaluated (provide explanation on page 2). ON/A= Not Applicable to this project/plan. Consultant's Certification (MDC 15A NCAC 02H .1003) Project Density and Built-Upon AreaOAs-built OO N/E OO N/A 1. The project has areas of high density based on natural drainage Y or area boundaries, variations in land use or construction phasing. 0 2. The project's built-upon area does not exceed the maximum limit Y r N specified in the permit. Dispersed Flow OAs-built ON/E OO N/A 1. The project maximizes dispersed flow through vegetated areas Y r N and minimizes channelized flow. Page 5 of 9 State Stormwater Management Permit No. SW5210401 Vegetated Conveyances OAs-built ON/E ON/A 1. Stormwater that is not released as dispersed flow is transported Y or N by vegetated conveyances. (% 2. The project has a minimal amount of non-vegetated conveyances Y or N n/a to reduce erosion. 3. Other than minimal piping under driveways and roads, no piping Y or N n/a has been added beyond what is shown on the approved plans. 4. Side slopes are no steeper than 3H:1V. OYor N 5. The conveyance does not erode in response to the peak flow from or N the 10-year storm. Curb outlet systems(if applicable) OAs-built ON/E ON/A 1. The swale or vegetated area can carry the peak flow from the Y or N n/a 10-year storm at a non-erosive velocity. 2. The longitudinal slope of the swale or vegetated areas does not Y or N n/a exceed 5%. 3. The swale has a trapezoidal cross-section and a minimum bottom Y or N n/a width of two feet. 4. The minimum length of the swale or vegetated area is 100 feet. Y or N n/a 5. Side slopes are no steeper than 3H:1V. Y or N n/a 6. The project utilizes treatment swales designed per Section .1061 Y or N n/a in lieu of the curb outlet system requirements. Vegetated Setbacks (if applicable) OAs-built ON/E ON/A 1. The width of the vegetated setback is at least 50'. OY or N 2. The width of the vegetated setback has been measured from the normal pool of impounded waters, the MHW line of tidal waters, or N or the top of bank of each side of rivers or streams. 3. The vegetated setback is maintained in grass or other vegetation. or N 4. BUA that meets the requirements of NCGS 143-214.7(b2)(2) is Y or N n/a located in the setback. 5. BUA that does NOT meet the requirements of NCGS 143- 214.7(b2)(2) is located within the setback and is limited to: a. Publicly-funded linear projects (road, greenway, or sidewalk) n/a b. Water dependent structures Y or N c. Minimal footprint uses such as poles, signs, utility appurtenances, and security lights. 6. The amount of BUA within the setback is minimized, and Y or N n/a channeling of the runoff from the BUA has been avoided. 7. Stormwater is not discharged (via swale or pipe) through a vegetated setback. Stormwater is released at the edge of the Y or N setback and allowed to flow through the setback as dispersed flow. Page 6 of 9 State Stormwater Management Permit No. SW5210401 Outlets OAs-built ON/E ON/A 1. Stormwater outlets do not cause erosion downslope of the Y or N discharge point during the peak flow from the 10-year storm. Variations (DAs-built ON/E ON/A 1. The project has variations from the MDC that were not previously Y or N n/a approved. (Modification may be required.) Deed restrictions (if applicable) (DAs-built ON/E Os N/A 1. Deed restrictions are recorded and ensure that the project and the BUA will be maintained in perpetuity consistent with the Y or N n/a permit, approved plans, and specifications. For Subdivisions Only (Residential or Commercial) (DAs-built ON/E Os N/A 1. The number of platted lots is consistent with the approved plans. Y or N n/a 2. The project area is consistent with the approved plans. Y or N 3. The layout of the lots and streets is consistent with the approved Y or N plan. 4. The width/radius of streets, paved accesses, cul-de-sacs and Y or N sidewalks is consistent with the approved plan. 5. No piping, other than those minimum amounts needed under a Y or N driveway or under a road, has been added. 6. The lot grading, road grading, vegetated conveyances, piping, Y or N inverts, and elevations are consistent with the approved plans. Provide an explanation below for every MDC that was not met, and for every item marked "N/A"or "N/E."Attach additional pages as needed. Low-Density Disperse Flow only. No SCMs required. No BUA within riparian buffer/setbacks. Page 7 of 9