Loading...
HomeMy WebLinkAbout20200533_C204872 Chatham Co_ (Chatham Park Way Extension) - RFI#03 24_ Encasement Pipe ShftCarpenter, Kristi From: Conchilla, Ryan Sent: Wednesday, February 14, 2024 3:25 PM To: King, Art C Subject: 20200533_C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft Attachments: 20200533 Ver 3_TIP_R-5930_ChathamParkWayNorth_IP_Modification_Request_.pdf; 15a ncac 02b .0267.pdf Art, I've reviewed the info below and added responses to your questions below. Attached is the site plan from the approved permit drawings, the 202 LF of 24' encasement pipe (open cut) is not depicted at Permit Site 2. The proposed shift (red line) would be a parallel impact in Buffer Zone 1 and would require additional justification for approval as outlined in the Jordan Lake Buffer Rules -Table of Uses, Page 16 (attached). I'd recommend evaluation of options for installation which are located outside of the stream buffer. Let me know what additional assistance I can provide. Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch North Carolina Department of Environmental Quality 919-707-9111 office Ryan.Conchilla@deg.nc.gov D�E QNORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: King, Art C <acking@ncdot.gov> Sent: Wednesday, February 14, 2024 12:50 PM To: Conchilla, Ryan <ryan.conchilla@deg.nc.gov> Subject: FW: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft Rya n, I need to ask a question. Please see the attached plan drawing showing the relocation of the proposed 24 inch non-JS drainage pipe (new location in red) to eliminate a conflict with the proposed pedestrian culvert. The pipe is being moved by 12 ft. from buffer zone 2 into buffer zone 1. My question is does the placement of the pipe in the buffer area matter in a case like this when the adjacent stream that requires the buffer is inside of a culvert? Yes, a buffer would still be required from the stream. Have the buffer impacts already been accounted for with the permit for the culvert? The Zone 2 Buffer impacts for the 202LF of encasement pipe (open cut) do not appear to have been included in the previous modification. Thanks, Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 621-6100 office 910 690-6581 cell acking mclot.gov 121 Dot Drive Carthage, NC 28327 From: Talbert, Marty R <mrtalbert@ncdot.gov> Sent: Wednesday, February 14, 2024 10:58 AM To: King, Art C <acking@ncdot.gov>; Kent Jackson <kiackson@pittsboronc.gov>; Jeff Harris <jharris@pittsboronc.gov>; Young, Joshua M <jmyoung@ncdot.gov>; Pettus, Martin <mpettus@ncdot.gov> Cc: Phillips, Michael G <mgphillips@ncdot.gov> Subject: FW: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft Please review and provide comments back by no later than the 23rd please. If you have nay questions feel free to call me. Thanks Marty Marty R Talbert Assistant Resident Engineer — Lee County North Carolina Department of Transportation 919-579-5273 office 919-777-4640 mobile mrtalberta-ncdot.gov 1112 Bragg Street Sanford, NC 27331 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Patrick Schweitz<pschweitz@fredsmithcompany.net> Sent: Wednesday, February 14, 2024 9:52 AM To: Talbert, Marty R <mrtalbert@ncdot.gov>; Phillips, Michael G <mgphillips@ncdot.gov> Cc: Martin Lehmann, PE<mlehmann@fredsmithcompany.net>; Jason Verno <jverno@fredsmithcompany.net> Subject: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. M a rty, Please see attached RFI#03 — 24" Encasement Pipe Shift per your discussion with Martin earlier. Let us know if you have any questions. Thanks! Patrick Schweitz Project Engineer Fred Smith Company 701 Corporate Center Drive Suite 195 1 Raleigh, NC 27607 P 984.363.7041 NOTICE: This electronic mail message is intended exclusively for the individual or entity to whom it is addressed. This message, together with any attachment, may contain confidential, proprietary, and/or privileged information. Any views, opinions or conclusions expressed in this message are those of the individual sender and do not necessarily reflect the views of Fred Smith Company or its affiliates. Any unauthorized review, use, printing, copying, retention, disclosure or distribution is strictly prohibited. If you have received this message in error, please immediately advise the sender by reply email and delete all copies of this message. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.