Art,
I've reviewed the info below and added responses to your questions below.
Attached is the site plan from the approved permit drawings, the 202 LF of 24' encasement pipe (open cut) is not
depicted at Permit Site 2. The proposed shift (red line) would be a parallel impact in Buffer Zone 1 and would require
additional justification for approval as outlined in the Jordan Lake Buffer Rules -Table of Uses, Page 16 (attached).
I'd recommend evaluation of options for installation which are located outside of the stream buffer.
Let me know what additional assistance I can provide.
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch
North Carolina Department of Environmental Quality
919-707-9111 office
Ryan.Conchilla@deg.nc.gov
D�E QNORTH CAROLINA
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: King, Art C <acking@ncdot.gov>
Sent: Wednesday, February 14, 2024 12:50 PM
To: Conchilla, Ryan <ryan.conchilla@deg.nc.gov>
Subject: FW: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft
Rya n,
I need to ask a question.
Please see the attached plan drawing showing the relocation of the proposed 24 inch non-JS drainage pipe (new location
in red) to eliminate a conflict with the proposed pedestrian culvert. The pipe is being moved by 12 ft. from buffer zone 2
into buffer zone 1.
My question is does the placement of the pipe in the buffer area matter in a case like this when the adjacent stream that
requires the buffer is inside of a culvert? Yes, a buffer would still be required from the stream. Have the buffer impacts
already been accounted for with the permit for the culvert? The Zone 2 Buffer impacts for the 202LF of encasement
pipe (open cut) do not appear to have been included in the previous modification.
Thanks,
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 621-6100 office
910 690-6581 cell
acking mclot.gov
121 Dot Drive
Carthage, NC 28327
From: Talbert, Marty R <mrtalbert@ncdot.gov>
Sent: Wednesday, February 14, 2024 10:58 AM
To: King, Art C <acking@ncdot.gov>; Kent Jackson <kiackson@pittsboronc.gov>; Jeff Harris <jharris@pittsboronc.gov>;
Young, Joshua M <jmyoung@ncdot.gov>; Pettus, Martin <mpettus@ncdot.gov>
Cc: Phillips, Michael G <mgphillips@ncdot.gov>
Subject: FW: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft
Please review and provide comments back by no later than the 23rd please. If you have nay questions feel free to call
me.
Thanks
Marty
Marty R Talbert
Assistant Resident Engineer — Lee County
North Carolina Department of Transportation
919-579-5273 office
919-777-4640 mobile
mrtalberta-ncdot.gov
1112 Bragg Street
Sanford, NC 27331
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Patrick Schweitz<pschweitz@fredsmithcompany.net>
Sent: Wednesday, February 14, 2024 9:52 AM
To: Talbert, Marty R <mrtalbert@ncdot.gov>; Phillips, Michael G <mgphillips@ncdot.gov>
Cc: Martin Lehmann, PE<mlehmann@fredsmithcompany.net>; Jason Verno <jverno@fredsmithcompany.net>
Subject: [External] C204872 Chatham Co. (Chatham Park Way Extension) - RFI#03 24" Encasement Pipe Shft
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
M a rty,
Please see attached RFI#03 — 24" Encasement Pipe Shift per your discussion with Martin earlier. Let us know if you have
any questions.
Thanks!
Patrick Schweitz
Project Engineer
Fred Smith Company
701 Corporate Center Drive Suite 195 1 Raleigh, NC 27607
P 984.363.7041
NOTICE: This electronic mail message is intended exclusively for the individual or entity to whom it is addressed. This
message, together with any attachment, may contain confidential, proprietary, and/or privileged information. Any views,
opinions or conclusions expressed in this message are those of the individual sender and do not necessarily reflect the
views of Fred Smith Company or its affiliates. Any unauthorized review, use, printing, copying, retention, disclosure or
distribution is strictly prohibited. If you have received this message in error, please immediately advise the sender by reply
email and delete all copies of this message.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.