Loading...
HomeMy WebLinkAbout20150839 Ver 1_More Info Received_20151007From: Kaylie Yankura <kaylie@cwenv.com> Sent: Wednesday, October 07, 2015 4:35 PM To: Price, Zan (George); Alexander, Tasha L SAW Cc: Rebekah Newton Subject: FW: Additional Information Request - Maple Trace - Buncombe County - DWR 15-0839 Attachments: 739—Maple Trace Impact Drawings.pdf, 739_Maple Trace_ Updated Deli neation_Fic17.pdf Zan and Tasha, Please reference the Additional Information Request regarding Maple Trace and the following the responses: Please provide additional information on how the proposed water line and culvert installations will occur in accordance with Condition 6 of Water Quality Certification No. 3884 and 3890 (Work in the Dry). Please provide the proposed construction sequence and any applicable details (e.g. cofferdams or other diversion structures) to ensure compliance with this condition. [15A NCAC 02H .0506(b)(2) & (b)(3)] Please reference the attached Impact Drawings — Figure 3.5, Coffer Darn Detail. 2. Please provide the proposed permanent and temporary seed mix to be used in impacted areas adjacent to streams and wetlands. [15A NCAC 02H .0506(b)(2) & (c)(2)] The seed rnix will be the carne as the rnix approved per the site's erosion and sediment control plan. 3. Please update the site plan to include the most recent jurisdictional determination approved by the Army Corps of Engineers. [15A NCAC 02H .0502(b)] We are currently working on obtaining an overall site plan (Attachment A in the application) that reflects current jurisdictional information. However, the updated wetland data has been added to Impact Map (Figure 3.1). Additional questions that were presented during the JD site walk are addressed below: 1. Will there be any upgrades to the bridge crossing Reem's Creek? Yes, NCDOT will be widening the existing bridge as a separate project. 2. What is the slope on the proposed culvert at the stream crossing? The slope on the culvert is 10.43% which matches the existing grades. 3. Will there be any clearing within the trout buffer (other than where impacts are proposed)? None is proposed by the owner. 4. Will culverts on site be HDPE or RCP? The piping will all be HDPE. The headwalls will be precast concrete. 5. Is the proposed stream crossing in the same location as the existing log crossing (the log crossing is labeled as a culvert on our delineation maps)? The proposed strearn crossing is located at the existing log/culver location. Tasha: Attached is an updated Stream and Wetland Delineation Map (Figure 7) that includes an additional wetland (Wetland 9) that was identified during the site visit. Zan: I will forward you the updated overall site plan once we receive this information. Please contact me if you have any questions or concerns. Thanks, Kaylie Yankura MMl� 32 Clayton Street Asheville, NC 28801 Office: 828-698-9800 Mobile: 724-994-8917 kaylie cwenv.com From: Price, Zan (George) [mai Ito: Zan. Price@ncdenr.gov] Sent: Friday, September 25, 2015 3:16 PM To: Rebekah Newton; Kaylie Yankura Cc: Alexander, Tasha L SAW; Montalvo, Sheri A; Leslie, Andrea J Subject: Additional Information Request - Maple Trace - Buncombe County - DWR 15-0839 The Division of Water Resources (DWR) has performed a review of a 401 Water Quality Certification application received on August 19, 2015 for the above referenced project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: Please provide additional information on how the proposed water line and culvert installations will occur in accordance with Condition 6 of Water Quality Certification No. 3884 and 3890 (Work in the Dry). Please provide the proposed construction sequence and any applicable details (e.g. cofferdams or other diversion structures) to ensure compliance with this condition. [15A NCAC 02H .0506(b)(2) & (b)(3)] Please provide the proposed permanent and temporary seed mix to be used in impacted areas adjacent to streams and wetlands. [15A NCAC 02H .0506(b)(2) & (c)(2)] Please update the site plan to include the most recent jurisdictional determination approved by the Army Corps of Engineers. [15A NCAC 02H .0502(b)] Please respond to this request by October 26, 2015. If all of the requested information is not received by the response due date, the DWR will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the DWR for approval, including a complete application package and the appropriate fee. Contact me if you have any questions or concerns. Zan Price, P.E. NCDEQ- Division of Water Resources Water Quality Regional Operations Section Assistant Regional Supervisor - Asheville Regional Office 2090 U.S. Hwy. 70 Swannanoa, N.C. 28778 ph.: 828-296-4500 fax: 828-299-7043 email: zan.price@ncdenr.gov website: www.ncwaterguality.org Need help with other DEQ permits? http://porta1.ncdenr.org/web/deao/permit-directory Notice: Per Executive Order No. 150, all emoils sent to and from this account are subject to the North Carolina Public Records Law and may be disclosed to third parties. WGLA Engineering, PLLC WETLAND & CONSULTING ENGINEERS & LAND PLANNERS STREAM IMPACTS NC License No: P -1342 Maple Trace - Phase 1 O 214 N. King Street Buncombe County IN, (828)687 -7177 Hendersonville, NC 28792 North Carolina wgla.com FIGURE 3.0 Job #: 14122 Date: 10106/15 Scale: I " = 2000' PROPOSED 20 LF TEMPORARY STREAM IMPACT PROPOSED - WATER MAIN EXTENSION REEK ONO CMS -C / i i � / IZ, �/ PROPOSED 240 S.F. �s LINEAR - - WETLAND / IMPACT J PROJECT BOUNDARY /---------- - - - - -- i _ PROPOSED \\ \ � ° ��" Ir $t• STORM WATER-, _ it POND ` &a G-5 iqu :i _ p PROPOSED �I $fin �iiY in "� d q. ar 130 LF STREAM — —�_ It IMPACT °= Ri aa tl ss aaStl1- 9- 66tl 16� paaw a Ila g _P1, >li_ aa� x -- �� �� it% it ° I its \ SU�vIMARY PROPOSED PERMANENT WETLAND IMPACTS \A CA% /''% SQ. FT. ( 240± S.F.) of io °�i�'% o E SS Big= PROPOSED PERMANENT P-E a iminciry o STREAM IMPACTS NoMr G6iistiustion 130 LF / *oI GINE� °° J PROPOSED TEMPORARY STREAM IMPACTS << /AM� R �`�� I :.... :.:. :::.::.::::::: 20 LF WGLA Engineering, PLLC WETLAND & CONSULTING ENGINEERS & LAND PLANNERS STREAM IMPACTS NC License No: P -1342 Maple Trace - Phase I FIGURE 3.1 214 N. King Street Buncombe County Job #: 14122 Hendersonville, NC 28792 (828) 687 -7177 North Carolina Date: 10/06/15 w*4 .�A wgla.com Scale: I" = 200' NOTE: MATTING SHALL BE COIR FIBER, 750 GRAM PER SQ. METER WITH NOMINAL 0.50 IN. OPENING SIZE. ANCHOR MATTING IN 8" TRENCH � 1' MIN. a SMOOTH SURFACE, REMOVE ALL DEBRIS AND SEED /MULCH BEFORE PLACING MATTING MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWNSTREAM /DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN MATTING ANCHORED 1' BELOW STREAM BED WGLA Engineering, PLLC CONSULTING ENGINEERS & LAND PLANNERS NC License No: P -1342 t King Street Hendersonville, nville, NC 28792 (828) 687 -7177 ICA wglaxom STREAM BED EXTEND MATTING A MIN. OF DEPTH T1VAR] ES BELOW STREAM BED. 1 / PROPOSED UTILITY PIPE LINE Maple Trace - Phase I Buncombe County North Carolina CARPI FESSj O° 0 0 . ,oL ' Nof for Rstruetion oN STREAM BANK STABILIZATION FIGURE 3.3 Job #: 14122 Date: 10/06/15 Scale: N.T.S. z 0 U) 0:� w LLI > �w N Z Z RUN�oF Of Z = �0 H m X w - � r z EXISTING 0 in PROFILE w FF Uj � m Ld, r - III —III \\--PROPOSED F=: PROFILE RIP RAP & FILTER FABRIC DEPTH VARIES 1 WGLA Engineering, PLLC CONSULTING ENGINEERS & LAND PLANNERS NC License No: P -1342 214 King Street Hendersonville, NC 28792 (828) 687 -7177 EJA wgla.com Maple Trace - Phase I Buncombe County North Carolina PROPOSED UTILITY PIPE LINE °CARo���'% 11 =0 0 � FEoSSip��� ° �� ° ° ° Not f& ddffstiuetion J� STREAM BANK STABILIZATION FIGURE 3.4 Job #: 14122 Date: 10/06/15 Scale: N.T.S. 2:1 SIDE SLOPES W.S. ELEV. TEMPORARY SOIL COFFER WIDTH = STREAM WIDTH DAM TO CROSS STREAM INSTALL TEMPORARY CONCRETE 2.00 �� JERSEY TYPE BARRIER AROUND SOIL POLY FABRIC ENTIRE FILL COFFER DAM 2.00'± STREAM BOTTOM ... ... ... ... ... ... .. L ... . ... ... ... ... i DUCTILE IRON PIPE (SEE RIVER CROSSING ENCASEMENT DETAIL) NOTES: WORK IN- STREAM AND WITHIN A 25 -FOOT BUFFER ZONE IS PROHIBITED DURING THE TROUT SPAWNING PERIOD OF OCTOBER 15 THROUGH APRIL 15 TO PROTECT THE EGG AND FRY STAGES FROM SEDIMENTATION. VEGETATION SHOULD BE PRESERVED AS MUCH AS POSSIBLE. TREES THAT MUST BE REMOVED SHOULD BE CUT NEAR GROUND LEVEL, LEAVING THE STUMP AND ROOTS IN THE BANK FOR STABILITY. USE NATURAL MATERIALS AS MUCH AS POSSIBLE TO RESTORE THE STREAM BANK AT THE CROSSING. RIP RAP SHALL BE LIMITED TO THE NORMAL HIGH WATER MARK. ALL MECHANIZED EQUIPMENT OPERATED IN OR NEAR SURFACE WATERS SHALL BE REGULARLY INSPECTED AND MAINTAINED TO PREVENT CONTAMINATION OF STREAM FROM FUELS, LUBRICANTS, HYDRAULIC FLUIDS, AND OTHER TOXIC MATERIALS. ALL SOIL IS TO BE REMOVED AND THE STREAM CHANNEL FLOOR STABILIZED BEFORE JERSEY BARRIERS ARE REMOVED. COFFER DAM DETAIL N.T.S. �o ESS��� %�; Pro do ry 0 Not for Cdkstpuetion NciNE�V�J�,: WGLA Engineering, PLLC COFFER DAM CONSULTING ENGINEERS & LAND PLANNERS DETAIL NC License No: P -1342 Maple Trace - Phase I FIGURE 3.5 214 N. King Street Buncombe County Job #: 14122 Hendersonville, NC 28792 A V�� North Carolina Date: 10/06/15 (828) 687.7177 � j �� wglaxom Scale: N.T.S. Delineation Boundary Potentially jurisdictional wetlands and waters identified on this map have been located within sub -meter accuracy utilizing a Trimble mapping grade Global Positioning System (GPS) and the subsequent differential correction of that data. GPS points may demonstrate uncorrectable errors due to topography, vegetative cover, and/or multipath signal error. Note: The illustrated wetland and stream locations are approximate. These areas have been flagged in the field; however, they have not been surveyed. Although Clearwater Environmental Consultants, Inc. (CEC) is confident in our assessment, the US Army Corps of Engineers (Corps) is the only agency that can make final decisions regarding jurisdictional wetland and waters of the US delineations. Therefore, all preliminary determinations are subject to change until written verification is obtained. CEC strongly recommends that written verification be obtained from the Corps prior to closing on the property, beginning any site work, or making any legal reliance on this determination. This map was prepared by CEC using the best information available to CEC at the time of production. This map is for informational purposes only and should not be used to determine precise boundaries, roadways, property boundary lines, nor legal descriptions. This map shall not be construed to be an official survey of any data depicted. Source Data: Topo is from Buncombe County. Maple Trace ( +/- 67 AC) Potentially Jurisdictional Water Netland (AC) Streams (LF) I y W 1 0.002 S1 84 (a7 1 W2 0.04 S2 757 t0I W3 0.01 S3 1,155 i W4 0.003 S4 451 W5 0.004 S5 88 W6 0.002 i W7 0.02 W8 0.004 W9 0.006 Total 0.091 Total 2,535 I Legend * Wetland Data Form Culvert Stream Wetland Linear Wetland Delineation Boundary Contours I I Project# 739 Buncombe County, North Carolina CLearWater 32 Clayton Street Asheville, North Carolina 28801 �I II �I it IL- -� I I I I I /i 0 125 250 500 Feet Stream & Wetland Delineation Map Delineated July 29, 2015 Figure 7