Loading...
HomeMy WebLinkAbout20240254 Ver 1_NCDOT-CSX Wilmington Rail Curve Realignment - USACE Permit Drawing Set_20240109CSX TRANSPORTATION, INC. WILMINGTON, NEW FIANOVER COUNTY NORTH CAROLINA CURVE REALIGNMENT MP SE 362.50 UPGRADES BRIDGE ACB 244.42 RENEWAL BRIDGE ACB 247.40 RENEWAL W119htsoo1g „ WILMINGTON, NC 361 362 wl l e,9 363 364 e, ar9oal Airport L r 244 O p`245 NEW HANOVER COUNTY �0 p 246 MP SE 362.50000**�'� UPGRADES CURVE REALIGNMENT' �0 p 248 c L0 BRIDGE ACB 244.42 RENEWAL p 249 _ Eaglels1— I II 13RUNSWICK O pe reg,c wyclgn COUNTY 247 BRIDGE ACB 9�6 247.40 RENEWAL Wilmington VICINITY MAP NOT TO SCALE LJA Rail, LLC L.14 3600 W Sam Houston Parkway S Phone 713.953.5200 Suite 600 Fax 713.953.5026 Houston, Texas 77042 FRN - F-1386 FLORENCE ZONE WILMINGTON SUBDIVISION MP ACB 243.8 TO MP ACB 244.3 (CURVE REALIGNMENT) EROSION CONTROL DATE: SEPTEMBER 13, 2023 PEMBROKE,NC A - RR WEST EC-1 '\ WILMINGTON, NC RR E4S+ \ \ 7 �ER IL— c% U EC-07 '��� � '-E�-11112 EC-O8 ...........EC-09_ T X \ i INSERT SCALE: I" - 400' RE / V A 0\ \ "°"`° " —I—N ENGINEERING DEPARTMENT VAL. SEC. AWN ar CSX TRANSPORTATION, INC. DESIGN & CONSTRUCTION FCHECKED JACKSONVILLE, FLORIDA V.11,N.C./11 Lr, an6p�P PEov[o ev [ = 7 LJA Rail, LLC ��� V 081'38 l�Y\I fZi J -11A S-H—lDn aerkneys Pnona 711HIs111 HH„u 0 Fax T13.Y53No26' auLv ia.zozs �• ��� �1�_1—�„�T—a 7ae1 Tau-r-_�aF 400 0 4000o0' GRAPHIC SCALE HOFIZ. 1" = 400' T NO. PROPOSED WILMINGTON CURVE REALIGNMENT NO, SUB: WILMINGTON ZONE: FLORENCE EC -Os WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA HEET N0. 0 5 KEY MAP AS SHOWN E 3 PEMBROKE, NC WILMINGTON, NC A— —I RR WEST RR EAST REAVVE ( REPLACE WI THE97SL f NOF�NEWHTRACK u a D °(1� • D — —r 1— _ — — 40IN7ENANCE DNLY. NO GROUND DISTURBANCE) D °' 1416 Lf OF EXISTING ( p / AI AACB A fNATOf E EXIST INRETIRED .A WETLA S` m oc, 'NO 6901INO,IS7URBQANCf1 ( ( EXISTING SE MAIN "� --. _ ��i�°— fTD REMAIN) — EXISTING > WETLANDS-- i E- w�''}'i �7 o CT ° 'EXISi NGr— �� V'_ ETL NDSQ p ° P �i �`�\qp�¢ /✓ �� �y `i `� � OA - "4' G4 off' �e -3° •. ,`,♦ t'II—� �"'�Q --LEI —_�I I I I = 91f ~ Dp ..�♦ o ,I --I _�a`.�"m INSTALL SILK FENCE I —` / Qd IWACT INS1 NCE , `EXISTING'B�fdi hb- . "v�4r� r Lf S ELECTRIC LI ES / INSTALL S/L 7 FENCE (TY / •�EXIS LDW AR / 235' _ yasww-G'"" TALL SIL J /L NO IMPA T \—� — LTG PROPOSED GRADING RM. - 0, 04 AC 'PROPOSED 570CK PILE - _ LAil OPO (TYP.1 c �����_ PROPOSED DITCH � TEMP. = O.OI AC FLOW LINE I IYP.) 1 TALL IOSED _ __ _ _ _ - - S/17 ( � 7 PAD — — — — CSX R/W v /INS ALL o /� / \ f PROPOSED MAIN _ / EXISTING ACE MAIN \ � � INSTALL PROPOSED 47" RCP COL VERi � SILT F NCf / �/ / � 17D REMAIN) SILT FENCE ISEE DRAWING CO-01) iY / / / t� EXISTING WETLANDS STREAM IMP CI PR SEO 36" Q 41"RCP CULVERT WNSIRUCITON STAGING 1000 100' 200' = 76 LF AND STORAGE AREA (50' x 100') INSTALL SILT FENCE PLAN GRAPHIC SCALE HORIZ. 1" = 100' ENTRANT CONSTRDC7IDN ENTRANCE/EXIT LEGEND GRADING LIMIT FILL - MAINLINE - — — — — — EXISTING TRACK GRADING LIMIT CUT - MAINLINE - — — —cu*— — — PROPOSED TRACK NOTES WETLAND AREA SHIFT TRACK I. INSTALL SILT FENCING OVER AND AROUND TOP OF ALL PROPOSED CULVERTS. PERMANENT WETLAND IMPACT CSX RIGHT OF -WAY — 2. INSTALL SILT FENCING ALONG STREAM BANKS FOR ALL STREAMS WITHIN PROJECT _ GRADED ROOD LIMITS OF DISTURBANCE. EXISTING STREAM AREA r J LIMITS OF DISTURBANCE — 3. STOCKPILE/STAGING AREAS,CONCRETE WASHOUTS,ANO DEDICATED AREAS FOR DEMOLITION. CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE LIMITS STREAM IMPACT AREA PROPOSED DITCH FLOW LINE - — ► — - — ► — - OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS, AND SURFACE WATER BODIES. EXISTING BUILDINGRUM EXISTING FLOW LINE ---► 4. TERMINAL ENDS OF SILT FENCE (SDI-S) SHALL EXTEND A MINIMUM OF 10-FT PAST PROPOSED FLOW LINE THE PROPOSED LIMIT OF DISTURBANCE. UNLESS OTHERWISE SHOWN, TERMINATE ENDS } OF SILT FENCE BY TURNING UPHIL IA -HOOK) INTO RAILROAD EMBANKMENT, OR XXX SLOPE, FOR A MINIMUM OF 6-FT. MILEPOST 5. VEGETATED AREAS NOT ESSENTIAL TO THE CONSTRUCTION OF THE PROJECT WILL BE PRESERVED AND MAINTAINED. 6. RIPARIAN STREAM BUFFERS SHALL BE DELINEATED AND CLEARLY NARKED OFF AT THE PROJECT SITE WITH FLAGS, TAPE, OR SIMILAR MARKING DEVICE. 7. IMMEDIATELY AFTER ESTABLISHMENT OR CONSTRUCTION ENTER/EXIT, ALL PERIMETER EROSION CONTROL AND STORM WATER MANAGEMENT SHALL BE INSTALLED AS EROSION CONTROL LEGENDS SHOWN ON THE PLANS. SEDIMENT FENCE (SF) . . . ROLLED EROSION E)RECP� 8. INITIAL PERIMETER BMPS AND SEDIMENT STORAGE MUST BE INSTALLED AND CONTROL PRODUCT INPLEMENTED PRIOR TO CONDUCTING ANY OTHER CONSTRUCTION ACTIVITIES, EXCEPT TENPORARY GRAVEL FOR ACTIVITIES REQUIRED TO INSTALL THE INITIAL CONTROL BMPS. CONSTRUCTION ENTER/EXIT (CE) CONSTRUCTION ROAD -CRS- STABILIZATION 9. TOTAL VEGETATED AREA 2.9 ACRES. ROCK PIPE INLET PROTECTION (RPIPI TEMPORARY SEEDING i5 COMPOST SOCK (CS) Aj PERMANENT SEEDING PS CHECK OAM (CO) OUST CONTROL DC 1—, R' ENGINEERING DEPARTMENT CONTRACT NO. VAL. SEC. PROPOSED WILMINGTON CURVE REALIGNMENT ar CSXTRANSPORTATION,INC. DESIGN & CONSTRUCTION DRAWING No. SUB WILMINGTON ZONE FLORENCE o ar JACKSONVILLE, FLORIDA V.11,N.C./11 EC-07 WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA NOT FOR CONSTRUCTION ° F° R° V08138 RevisioN eT No. N/�� L 11 Rai,,LLc L�� D EROSION CONTROL PLAN SHEET Ell[rY\IfZi 3eaTwsart,HoIs,o. Pe�K»ems Pnola Tla.as3sxoo scnLe STA-5-24.61 TO STA 23-00 1 6ui�690 ssT13.N ➢26' AS SHOWN OTT RT«R�PTinNM�l ,E �D�r,a.zoz3 �.. ..M T�_,��Ta.a1.a1 tau.R.,_,aF MP ACR �43 R1 TO MP ACR 944.34 PEMBROKE,NC A — RR WEST � TRAINSPD S I RfCPN07 OAM O lTYPTC�7 OUIR lSP c o�p �-<n N 25a o �o WE d RELY SE MAIN ,V O 7 SEEN 7 TS PS DC (TO REMA]NJ O M SZ°o �ECPaI o Q '•� � S -.<T � _ a �e� �o _� ° Sze � I I G , o o a CHECK OA DR COMP0 IE SOCKS L A - -CRS= -C TYPICAL A REOUIRED SPACIN61 TS PS DC 3�0 OC PS TS •— DAM RPIP EC!' PROPOSED GRADING LIMI S (7YP 1 ( 0 SF) RPIP ATE O 7 fT \J / Sf -HIIDK CR- ` _ _ ` PROPOSED 0/TCH FL DW [1 E IIYP. F J- DDR AlN Sf J-HOOK CHECK DAM RPIP AT IPRAP °�-- '. OC PS i5 ' - TS PS DC DC PS TS `27 JCRS A 7 o ECP, SEE ND7f B—�— WILMINGTON, NC RR EAST T Q IS R � °O a I � SZ m CO U O T L; ACT Cl LLJ 04 AC g 0 = 0.01 AC Z O COAIPOSI If S ICKS O CD l IRED SPAC NI �o Z DC PS iS � Q / ECP, SEE NO f B ro � < - ECIP - . 18 2 -1� Li Li Z LJ 24 fCK DAM_ (n - DDK RS- _ / -9 F--------- CHECK DAM ---- ---- — — ---- E WWI _ 2X RECP H s CH K OSITE SOCKS SF J-H RECP, S E CSX fl/w f i Ip S EP 7f 8 \ NN�� `� (IYPICAL(�7 REOUIRED SPACIA`q 02, 171 / 0 SFJ �h VAIAAA a d D�% }�� Q DC PS TS PEEP, Sff NOTE H N�w 41pNOVER �O v DC PS TS TS PS DC BARD F EDUCA ION PRDPU(SESED QDRAWING RCP CCJ-01) CHECK DAM INSTALL CDNSIRUCTIDN ENTRANCE/EK/7 PLAN Rplp 50' 0 50' 100 SF J-HDOK (TIE INTD 5F1 LEGEND: GRAPHIC SCALE- HORIZ. 1" = 50' E GRADING LIMIT FILL - MAINLINE - - -- GRADING LIMIT CUT - MAINLINE - - -- EXISTING TRACK WETLAND AREA PROPOSED TRACK NOTES c� PERMANENT WETLAND IMPACT SHIFT TRACK 1. INSTALL SILT FENCING OVER AND AROUND TOP OF ALL PROPOSED CULVERTS. 11. SURPLUS SOIL MATERIAL SHALL BE PLACED IN THE EXCESS MATERIAL PLACEMENT CSX RIGHT OF _ AREAS (ENPA) AS APPROVED BY CSXT AND DEPICTED ON PROJECT PLANS. SILT EXISTING STREAM AREA r 2. INSTALL SILT FENCING ALONG STREAM BANKS FOR ALL STREAMS WITHIN PROJECT FENCE WILL BE PLACED AT THE TOE OF ALL MATERIAL STOCKPILE AREAS,UNTIL GRADED ROAD LIMITS OF DISTURBANCE. FINAL GRADING PAID STABILIZATION OF THE EMPA. E STREAM IMPACT AREA LIMITS OF DISTURBANCE _ 3. STOCKPILE/STAGING AREAS, CONCRETE WASHOUTS, AND DEDICATED AREAS FOR 12. STOCKPILE GRADING SHALL BE ADJUSTED DURING CONSTRUCTION BASED ON ACTUAL 3 DEMOLITION, CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE LIMITS EARTHWORK BALANCE FOR THE SITE, TO PREVENT LOCALIZED PENDING, AND TO z PROPOSED VEGETATED AREA PROPOSED DITCH FLOW LINE - - ► - - - ► - - OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FEET AWAY FROM STORM PROMOTE POSITIVE DRAINAGE. DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS, AND SURFACE WATER BODIES. EXISTING FLOW LINE 13. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN EXISTING BUILDING _ 4. TERMINAL ENDS OF SILT FENCE 6DRS) SHALL EXTEND A MINIMUM OF 10-FT PAST PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PROPOSED FLOW LINE THE PROPOSED LIMIT OF DISTURBANCE. UNLESS OTHERWISE SHOWN. TERMINATE ENDS PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS FOR } OF SILT FENCE BY TURNING UPHIL 0-HOOK) INTO RAILROAD EMBANKMENT, OR PERIMETER AREAS AND SLOPES GREATER THAN 3HTIV AND NO MORE THAN XXX SLDPE,FOR A MINIMUM OF 6-FT FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. MILEPOST 5. VEGETATED AREAS NOT ESSENTIAL TO THE CONSTRUCTION OF THE PROJECT WILL 14. PERMANENT STABILIZATION MEANS WHEN ALL SOIL DISTURBING ACTIVITY ARE BE PRESERVED AND MAINTAINED. COMPLETED AND EXPOSED SOILS HAVE BEEN STABILIZED WITH A VEGETATIVE COVER WITH A DENSITY OF AT LEAST 80X OR COVERED WITH A STRUCTURAL 6. RIPARIAN STREAM BUFFERS SHALL BE DELINEATED AND CLEARLY MARKED OFF AT STABILIZATION METHOD. PERMANENT PERENNIAL VEGETATION MAY INCLUDE THE USE THE PROJECT SITE WITH FLAGS, TAPE, OR SIMILAR NARKING DEVICE. OF SOD, SHRUBS AND GROUND COVER PLANTS MIXED WITH MULCHING, AGGREGATE LG OR OTHER LANDSCAPING TECHNIQUES. STRUCTURAL METHODS INCLUDE CONCRETE, PE 7. FOR ALL CULVERT CROSSINGS, EXISTING FLOW SHALL BE DIVERTED AROUND WORK ASPHALT, RETAINING WALL OR OTHER STABILIZATION TECHNIQUES. THE AREAS TO THE EXTENT THAT WILL ENABLE WORK TO BE CONDUCTED IN THE EROSION CONTROL LEGEND: DflY, SEDIMENT FENCE SF) . . . ROLLED EROSION �RECIP 8. PROPOSED SLOPES GREATER THAN 3:1 RE QUIRE GROUND STABILIZATION WITHIN 7 CONTROL PRODUCT DAYS OF LAND DISTURBANCE ACTIVITY. SEE NCGOI GROUND STABILIZATION AND TEMPORARY GRAVEL MATERIALS HANCiING,EC-P3. CONSTRUCTION ENTER/EXIT (CE) CONSTRUCTION ROAD STABILIZATION -CRS- 9. CEMPOST SOCK AND CHECK DAM SPACING PER DETAIL SHEETS EC-16 AND EC-21. _ ROCK PIPE INLET PROTECTION (RPIPI TEMPORARY SEEDING i5 10. STOCKPILE/Si AGING AREAS, CONCRETE WASHOUTS, PAID DEDICATED AREAS FOR DEMOLITION. CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE PROJECT LIMITS OF DISTURBANCE AND LOCATED AT LEAST 25-FEET AWAY FROM STORM COMPOST SOCK CS) Aj PERMANENT SEEDING PS DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS. AND SURFACE WATER BODIES. CHECK DAM CD) DUST CONTROL DC SIGNED Rv ENGINEERING DEPARTMENT CONTRACT NO. vq1. SEC. PROPOSED WILMINGTON CURVE REALIGNMENT DIASN ar CSX TRANSPORTATION, INC. &CONSTRUCTION DRAWING NO. SUB:WILMINGTON ZONE:FLORENCE CIECIED ar JACKSONVILLE, FLORIDA V.11,N.C./11 EC-oa WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA NOT FOR CONSTRUCTION „a soo-a `E°`°R° L /r�4 J V08138 REVISION o. ` Vv�i�ldi J LJARail,LLc LJ� 0 8 EROSION CONTROL PLAN SHEET J llAla HU11N,R,Ik,.ys Ph.le1XHI.5111 scnLE STA-5-24.61 TO STA 8-00 s�i�aoo Eex Tla.ysasoze AS SHOWN a= RT„ ROTT �RIPTIRti DPP JULY 14.2°23 .. ..- U���_���T.-1T 1 1E ,_,aF MP ACR 94..81 TO MP ACR C44.06 E 3 PEMBROKE,NC A- pRR WEST I� CSX i ANS@OATAi ION TWACY Cfl o d O 0, � � o i5 P'. m RFE CD n � U O ICJ O CD z h PROPOSED S CDU C� z SF J-HO! 3: i �3L 0f23P 8^7- ri_._.._._. _.�._._._._ zD- „ W LiJ LLJcn \ l _ U LEGEND GRADING LINK FILL - MAINLINE GRADING LINK CUT - MAINLINE WETLAND AREA EXISTING STREAM AREA STREAM IMPACT AREA PROPOSED VEGETATED AREA EXISTING BUILDING XXX EROSION CONTROL LEGEND. SEDIMENT FENCE SF) . . . TENPORARY GRAVEL CONSTRUCTION ENTER/EXIT (CE) ROCK PIPE INLET PROTECTION (RPIP) COMPOST SOCK CS) Aj CHECK DAM CD) 14 EXISTING TRACK PROPOSED TRACK SHIFT TRACK CSX RIGHT OF -WAY GRADED ROAD LIMITS OF DISTURBANCE PROPOSED DITCH FLOW LINE EXISTING FLOW LINE PROPOSED FLOW LINE ROLLED EROSION CONTROL PRODUCT CONSTRUCTION ROAD STABILIZATION TEMPORARY SEEDING PERMANENT SEEDING OUST CONTROL @RECP@ -CRS- i5 PS DC CONS TROCI MN STAGING AND STORAGE AREA (50' x 100') NOTES 1. INSTALL SILT FENCING OVER AND AROUND TOP OF ALL PROPOSED CULVERTS 2. INSTALL SILT FENCING ALONG STREAM BANKS FOR ALL STREAMS WITHIN PROJECT LIMITS OF DISTURBANCE. 3. STOCKPILE/STAGING AREAS, CONCRETE WASHOUTS, AND DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE LIMITS OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS, AND SURFACE WATER BODIES. 4. TERMINAL ENDS OF SILT FENCE 6131-S) SHALL EXTEND A MINIMUM OF 10-FT PAST THE PROPOSED LIMIT OF DISTURBANCE. UNLESS OTHERWISE SHOWN. TERMINATE ENDS OF SILT FENCE BY TURNING UPHIL (J-HOOK) INTO RAILROAD EMBANKMENT, OR SLOPE, FOR A MINIMUM OF 6-FT. 5. VEGETATED AREAS NOT ESSENTIAL TO THE CONSTRUCTION OF THE PROJECT WILL BE PRESERVED AND MAINTAINED. 6. RIPARIAN STREAM BUFFERS SHALL BE DELINEATED AND CLEARLY MARKED OFF AT THE PROJECT SITE WITH FLAGS, TAPE, OR SIMILAR NARKING DEVICE. 7. FOR ALL CULVERT CROSSINGS, EXISTING FLOW SHALL BE DIVERTED AROUND WORK THE AREAS TO THE EXTENT THAT WILL ENABLE WORK TO BE CONDUCTED IN THE DRY, 8. PROPOSED SLOPES GREATER THAN 3:1 RE QUIRE GROUND STABILIZATION WITHIN 7 DAYS OF LAND DISTURBANCE ACTIVITY. SEE NCGOI GROUND STABILIZATION AND MATERIALS HANCCING.EC-23. 9. COMPOST SOCK AND CHECK DAM SPACING PER DETAIL SHEETS EC-16 AND EC-21. 10. STOCKPILE/STAGING AREAS, CONCRETE WASHOUTS, AND DEDICATED AREAS FOR DEMOLITION. CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE PROJECT LIMITS OF DISTURBANCE AND LOCATED AT LEAST 25-FEET AWAY FROM STORM DRAIN INLETS, TEMPORARY DIVERSIONS, CHARNELS. AND SURFACE WATER BODIES. "__ 'y ENGINEERING DEPARTMENT VAL. SEC. AWN By CSX TRANSPORTATION, INC. DESIGN & CONSTRUCTION FCHECKED JACKSONVILLE, FLORIDA V.11,N.C./11 Lr, an6po-'P PEovED ev N/�� 7 LJA Rail, LLC .11 V o 8 1'3 8 IILLl�Y\IfZi J 3 11A Sam Ho IDo Pelkneys Phone'I13.&53.5- 6uiR690 Fax �13.Y53N... �uw ,a. zozs �• ��- u„��_,,,�,e�a zee, Fau.r.,_,aF WILMINGTON, NC RR EAST TL ANDS lll� E �• o0 11. SURPLUS SOIL MATERIAL SHALL BE PLACED IN THE EXCESS MATERIAL PLACEMENT AREAS (EMPA) AS APPROVED BY CSXT AND DEPICTED ON PROJECT PLANS. SILT FENCE WILL BE PLACED AT THE TOE OF ALL MATERIAL STOCKPILE AREAS, UNTIL FINAL GRADING AND STABILIZATION OF THE EMPA. 12. STOCKPILE GRADING SHALL BE ADJUSTED DURING CONSTRUCTION BASED ON ACTUAL EARTHWORK BALANCE FOR THE SITE, TO PREVENT LOCALIZED PONDING, AND TO PROMOTE POSITIVE DRAINAGE. 13. STABILIZATION MEASURES SHALL BE NTIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS FOR PERIMETER AREAS AND SLOPES GREATER THAN 3HTIV AND NO MORE THAN FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. 14. PERMANENT STABILIZATION MEANS WHEN ALL SOIL DISTURBING ACTIVITY ARE COMPLETED AND EXPOSED SOILS HAVE BEEN STABILIZED WITH A VEGETATIVE COVER WITH A DENSITY OF AT LEAST 80X OR COVERED WITH A STRUCTURAL STABILIZATION METHOD. PERMANENT PERENNIAL VEGETATION MAY INCLUDE THE USE OF SOD,SHRUBS AND GROUND COVER PLANTS MIXED WITH MULCHING, AGGREGATE OR OTHER LANDSCAPING TECHNIQUES. STRUCTURAL METHODS INCLUDE CONCRETE, ASPHALT, RETAINING WALL OR OTHER STABILIZATION TECHNIQUES. PROPOSED WILMINGTON CURVE REALIGNMENT ° SUB: WILMINGTON ZONE: FLORENCE EC-09 WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA o. EROSION CONTROL PLAN SHEET G 9 STA 8a00 TO STA 23.00 AS SHOWN AJP A('R ')AA (1F TO AJP A('R ')AA 3d PEMBROKE, NC WILMINGTON, NC A- --op. RR WEST RR EAST O v o pro a�° Q T AN Q IS �O/'T o o ° 0 •° ° I 0 O C a o WW[E �.I!NQy�% 747 0" /7 a� E X n aC7 9 L o� G$Oo a Op A ETI Si I NG ° �v v = p `�L' D 4 PR P GN LiUSE T CAL f(R All ° o o `n}WKEXf1TL'JF-NLP1S • WETLANDS E - I- ISTBRB EAS °�/- XY3il G R L T IS ING B Cp o o p D R D� C `O°� I REOUI � �ETL AND D �� g PROP BZ' llyG°L /k�FyS dA'PaIQ 6 I s/i ��� ° o p — � � 1 � v • Q � � / � F L PR �o NE GINA O� ° cz D 421 moo c a O71 — —� @XISbI NG ° PRBP�Sf� BdB@ry 7CH °P�[I O p WETLANDS o q o p °' ° o WE iL ANBS O OIaSBQ O a o SE 362.47 0" o ° a o BRYDEN ROBERT L ANN . STAPLETONoTEAAR9NA ° V •v a ep o D o e o a o - o a - PROP�E�Y L Q, 60 g, 0 vD ° o °o o a O Sl\ a 11ti ° PLAN 50 ° ° 100 GRAPHIC SCALE: HEAR, 1" = 50' LEGEND GRADING LIMIT FILL - MAINLINE - - - -FALL- - - EXISTING TRACK GRADING LIMIT CUT - MAINLINE - - - -cu*- - - CSX RIGHT OF -WAY - NOTES c� WETLAND AREA GRADED ROAD 1. INSTALL SILT FENCING OVER AND AROUND TOP OF ALL PROPOSED CULVERTS. 11. SURPLUS SOIL MATERIAL SHALL BE PLACED IN THE EXCESS MATERIAL PLACEMENT LIMITS OF DISTURBANCE _ AREAS (ENPA) AS APPROVED BY CSXT AND DEPICTED ON PROJECT PLANS. SILT PERMANENT WETLAND IMPACT 2. INSTALL SILT FENCING ALONG STREAM BANKS FOR ALL STREAMS WITHIN PROJECT FENCE WILL BE PLACED AT THE TOE OF ALL MATERIAL STOCKPILE ME AS, UNTIL PROPOSED DITCH FLOW LINE - - ► - - - ► - - LIMITS OF DISTURBANCE. FINAL GRADING AND STABILIZATION OF THE EMPA. E TEMPORARY WETLAND IMPACT EXISTING FLOW LINE 3. STOCKPILE/STAGING AREAS, CONCRETE WASHOUTS, AND DEDICATED AREAS FOR 12. STOCKPILE GRADING SHALL BE ADJUSTED DURING CONSTRUCTION BASED ON ACTUAL 3 _ DEMOLITION, CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE LIMITS EARTHWORK BALANCE FOR THE SITE, TO PREVENT LOCALIZED PONDING, AND TO z PROPOSED VEGETATED AREA PROPOSED FLOW LINE OF DISTURBANCE AND SHOULD BE LOCATED AT LEAST 50 FEET AWAY FROM STORM PROMOTE POSITIVE DRAINAGE. DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS, AND SURFACE WATER BODIES. + 13. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN 4. TERMINAL ENDS OF SILT FENCE 6DRS) SHALL EXTEND A MINIMUM OF 10-FT PAST PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR XXX THE PROPOSED LIMIT OF DISTURBANCE. UNLESS OTHERWISE SHOWN. TERMINATE ENDS PERMANENTLY CEASED, BUT IN NO CASE MORE THAN SEVEN (7) DAYS FOR MILEPOST OF SILT FENCE BY TURNING UPHIL (J-HOOK) INTO RAILROAD EMBANKMENT, OR PERIMETER AREAS AND SLOPES GREATER THAN SKIN AND NO MORE THAN SLOPE, FOR A MINIMUM OF 6-FT. FOURTEEN (14) DAYS FOR OTHER AREAS AFTER WORK HAS CEASED. 5. VEGETATED AREAS NOT ESSENTIAL TO THE CONSTRUCTION OF THE PROJECT WILL 14. PERMANENT STABILIZATION MEANS WHEN ALL SOIL DISTURBING ACTIVITY ARE BE PRESERVED AND MAINTAINED. COMPLETED AND EXPOSED SOILS HAVE BEEN STABILIZED WITH A VEGETATIVE COVER WITH A DENSITY OF AT LEAST BOX OR COVERED WITH A STRUCTURAL 6. RIPARIAN STREAM BUFFERS SHALL BE DELINEATED AND CLEARLY MARKED OFF AT STABILIZATION METHOD. PERMANENT PERENNIAL VEGETATION MAY INCLUDE THE USE THE PROJECT SITE WITH FLAGS, TAPE, OR SIMILAR NARKING DEVICE. OF SOD,SHRUBS AND GROUND COVER PLANTS MIXED WITH MULCHING, AGGREGATE OR OTHER LANDSCAPING TECHNIQUES. STRUCTURAL METHODS INCLUDE CONCRETE, 7. FOR ALL CULVERT CROSSINGS, EXISTING FLOW SHALL BE DIVERTED AROUND WORK ASPHALT, RETAINING WALL OR OTHER STABILIZATION TECHNIQUES. THE AREAS TO THE EXTENT THAT WILL ENABLE WORK TO BE CONDUCTED IN THE EROSION CONTROL LEGEND: DRY. SEDIMENT FENCE SF) ... ROLLED EROSION �RECP� 8. PROPOSED SLOPES GREATER THAN 3:1 RE QUIRE GROUND STABILIZATION WITHIN 7 CONTROL PRODUCT DAYS OF LAND DISTURBANCE ACTIVITY. SEE NI GROUND STABILIZATION AND TEMPORARY GRAVEL MATERIALS HANCiING,EC-23. CONSTRUCTION ENTER/EXIT (CE) CONSTRUCTION ROAD -CRS- STABILIZATION 9. COMPOST SOCK AND CHECK DAM SPACING PER DETAIL SHEETS EC-16 AND EC-21. _ ROCK PIPE INLET PROTECTION (RP TEMPORARY SEEDING i5 10. STOCKPILE/STAGING AREAS, CONCRETE WASHOUTS, AND DEDICATED AREAS FOR DEMOLITION. CONSTRUCTION, AND OTHER WASTES ARE TO BE WITHIN THE PROJECT LIMITS OF DISTURBANCE AND LOCATED AT LEAST 25-FEET AWAY FROM STORM COMPOST SOCK CS) Aj PERMANENT SEEDING PS DRAIN INLETS, TEMPORARY DIVERSIONS, CHANNELS. AND SURFACE WATER BODIES. CHECK DAM (CD) DUST CONTROL DC ENGINEERING DEPARTMENT CONTRACT NO. vq1. SEC. PROPOSED WILMINGTON CURVE REALIGNMENT ar CSX TRANSPORTATION, INC. DESIGN &CONSTRUCTION DRAWING NO. SUB: WILMINGTON ZONE: FLORENCE CIECIED ar JACKSONVILLE, FLORIDA V.11,N.C./11 EC 10 WILMINGTON, NEW HANOVER COUNTY, NORTH CAROLINA r �4 1 LJA Rail, LLc V08138 REVISION o. NOT FOR CONSTRUCTION DATE°°`° °° L C�7fi J L�� G G EROSION CONTROL PLAN SHEET L J 6a]NSarti Houston Perk»e 5 Phone 13.& S20a GALE N°I�s°° ass°� ns SHOWN MP SE 362.50 UPGRADES °= RT„ R°TT RTTRRIPTI°ti °PP JULY ,°.D°z3 .. ... U���_��� Ta-a T 1 TRti. ,_,Rl