HomeMy WebLinkAbout20070776 Ver 2_Stormwater Plans_20071106[~ w~ET~M
November 5, 2007
401 Oversite/Express Review Permitting Unit
NCDENR -Division of Water Quality
Pazkview Building
2321 Crabtree Boulevard, Suite 250
Raleigh, North Carolina 27604
Attention: Ms. Cyndi B. Karoly, Supervisor
Re: Waynesville Commons, Haywood County
Deaz Ms. Kazoly:
PAID
Enclosed herewith in two separate UPS packages, please find our submittal for the storm water
express review program. We have included the following in our submittal:
1. Check in the amount of $2,000.00
2. Three copies of the application form
3. Signed and Notarized Inspection and Maintenance Agreements for:
a. Dry Extended Detention Basin
b. Grass Swale
c. Sand Filer
d. Bioretention
4. Three copies of the Supplements for:
a. Dry Extended Detention Basin
b. Sand Filter A
c. Sand Filter B
d. Bioretention Cell
e. Grassed Swale
5. One copy of the Storm Water Management and Soil Erosion Control Report
6. Three copies of the construction plans (with specificafions on the plan sheets).
Please review the attached to make sure we have a complete submittal and please contact us if you
have any questions regazding our submittal at 1.828.687.9500.
Sincerely,
WAbE TRIM, INC.
az es J. Chris E
Associate
cjc
CDW2009-01 E
wteim:projectwise~Doaimen[sU.and Developme~rt~PmjectslCdw2009~01e~Docs\Storm Water~State 401\Submittal Cover I.ettw
Enclosures (2 packages)
cc: Mr. David Scarnati, Cedarwood Development, Inc.
Ex.Q o'1 - o ~ ~~ v Z
Wade Trim, Inc. 828.687.9500
Two Town Square Boulevard 828.687.4090 fax
Suite 245 www.wadetrim.com
Asheville, NC 28803
OFFICE USE ONLY
Date Received Fee Paid Permit Number(s)
~x D7 -0'1'1 ~ 2
State of North Carolina
Department of Environment and Natural Resources p
Division of Water Quality 401/ Wetlands Unit
EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM
This form maybe photocopied for use as an original
I. GENERAL INFORMATION p ~ ~ (g ({~ ~ D
1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): !~ ~+ ~Q07
NOV 6
~i_ay~esvil l e ('nmmnn~ Rota; l Aaan~i atas ~ TLC
2. Owner/Signing Official's name and title (person legally responsible for facility and compliance): in+r:ilANO$J~NDS7~ORM~NJ~1bR°
David A. Scamati ~ t ~~°~ ~-~
3. Owner Mailing Address for person listed in item 2 above:
1765 Merriman Road
City: Akron State: Ohio Zip: 44313
Phone Number: (330 1 8"i6-9971 FaxNumber•(3_0 ) 864-8094 Email Address:dscarnati(acedarwood.com
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Waynesville Commons
5. Location of Project (street address):
2150 South Main Street
City: Waynesville
6. Directions to project (from nearest major intersection):
Intersection of South Main Street & Hyatt Creek Road
County: Haywood
7. Latitude: 35.4669
Longitude: -83.0092
of project
8. Contact person who can answer questions about the project:
Name: Charles Christy Telephone Number: (828
Fax Number : 828-687-4090 Email Address : cchristy
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal
687-9500
adetrim.com
Modification
9/2004 Version 1.0 Page 1 of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density High Density X Redevelopment General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater -Other
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project .
Bio Basins, Extended Dry, Grass Swoles, Sand Filters
2. Stormwater runoff from this project drains to the French Broad
3. Total Project Area: 40 acres
5. How many drainage areas does the project have? ~
River basin.
4. Project Built Upon Area: 80
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
See attached table.
Basin Information Drainage Area 1 Drainage Area 2
Receiving Stream Name
Receiving Stream Class
Drainage Area
Existing Impervious* Area
Proposed Impervious*Area
Impervious* Area (total)
Impervious* Surface Area Drainage Area 1 .Drainage Area 2
On-site Buildings
On-site Streets
On-site Parking
On-site Sidewalks
Other on-site
Off-site
Total: Total:
* Impervious area is derned as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewa/tcs, gravel areas, etc.
9/2004 Version 1.0 Page 2 of 4
7. How was the off-site impervious area listed above derived? N/A
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General
Certification numbers~ee attached table as issued by the Division of Water Quality. These
covenants may not be changed or deleted without the consent of the State.
2. No more than Gee attachPrl square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built-upon area in excess of the permitted amount requires a modifted water quality certiftcation prior to construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they. will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified
for this project. The forms are located on the 401/wetlands unit website.
Bioretention Worksheet
Dry Detention Worksheet
Level Spreader Worksheet
Grassed Swale Worksheet
Extended Detention Wetland /Pocket Wetland Worksheet
Wet Detention Worksheet
9/2004 Version 1.0 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the DWQ Central Office.
Please indicate that you have provided the following required information by initialing in the space provided
next to each item. Initals
• Original and two copies of the Express Review Stormwater Management Application
• Signed and notarized Operation and Maintenance Agreement
• Three copies of the applicable Supplement Form(s) for each BMP
• Application processing fee (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Three copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, fmished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands and streams delineated, or a note on plans that none exist
- Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm);
Mailing
City:
Phone:
VIII. APPLICANT'S CERTIFICATION
State:
Fax:
Zip:
I, (print or type name of person listed in General Information, item 2) P!~ ~ , SCar.t a.`~"~
certify that the information included on this application form is, to the best of my knowledge, correct and that the project
will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants
will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000
Signature: ~ Date: ~~ ~ ~~
9/2004 Version 1.0 Page 4 of 4
Waynesville Commons, Waynesville, NC -Permit Application Attachment
nr vnnri•rT rT~r>rnrzraeTTnrT _ rrPm its Ta1,1P
Basin Information Draina e Area 2S Draina e Area 4S Draina e Area SS Draina e Area 6S Draina e Area 7S Draina e Area 8S
Receivin Stream Name Richland Creek Allen's Creek Allen's Creek Richland Creek Allen's Creek Richland Creek
Receivin Stream Class C, B, Trout C, B, Trout C, B, Trout C, B, 'F~arzt C, B, Trout C, B, Trout
Draina e Area (sft) 384,147 304,909 216,238 105,230 164,322 184,267
Existin Im ervious Area sft 338,049 274,418 205,426 105,230 156,106 184,267
Pro osed Im ervious Area (total, sft) 378,427 284,909 216,238 105,230 164,322 184,267
Im ervious Surface Area 378,427 284,909 216,238 105,230 164,322 184,267
On-site Buildin s 104,101 184,267
On-site Streets 0
On-site Parkin 105,230 0
On-site Sidewalks 0
Other On-site 0 0 0 0 0 0
Off-site 0 0 0 0 0 0
TOTALS 378,427 284,909 216,238 105,230 164,322 184,267
IV. DEED RESTRICTIONS AND PROTECTIVE CONVENANTS
Item #l
To Be Determined
Item #2 -Development Table
Lot # Lot Size (Acre) Allowable built-u on Area Acre) Allowable
1 1.11 0.888 80%
2 4.36 3.488 80%
3 1.99 1.592 80%
4 1.81 1.448 80%
5 12.45 9.960 80%
6 16.40 13.12 80%
OFFICE USE ONLY
Date Received Fee Paid Permit Number(s)
~x o1 - o~~c~ V2
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality 401/ Wetlands Unit
EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM
This form maybe photocopied for use as an original
I. GENERAL INFORMATION D ~ ~ ~ ~ V ~2 D
1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): ZoQl
~ay~eGVi 1 1 P ('nmmnnG RPtai 1 Ass~~~ ayes ~ LLC NUV
~NR - iNATER QUALITY
2. Owner/Signing Official's name and title (person legally responsible for facility and compliance):,~,,,,~µ~gTplt-AW,ATfR6RAN~
David A. Scarnati
3. Owner Mailing Address for person listed in item 2 above:
1765 Merriman Road
City: Akron State: Ohio Zip: 44313
Phone Number: (330 1 8'~h-9971 Fax Number: ( 0 1 864-8094 Email Address:dscarnati cedarwood. com
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Waynesville Commons
5. Location of Project (street address):
2150 South Main Street
City: Waynesville
County: Haywood
6. Directions to project (from nearest major intersection):
Intersection of South Main Street & Hyatt Creek Road
7. Latitude: 35.4669 Longitude: -83.0092
of project
8. Contact person who can answer questions about the project:
Name: Charles Christy Telephone Number: (828 ) 687-9500
Fax Number : 828-687-4090 Email Address : cchristy@wadetrim. com
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
9/2004 Version 1.0 Page 1 of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density High Density X Redevelopment General Permit Other
4. Additional Project Requirements (check applicable blanks):
CAMA Major X Sedimentation/Erosion Control _404/401 Permit NPDES Stormwater -Other
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project .
Bio Basins, Extended Drv, Grass Swoles, Sand Filters
2. Stormwater runoff from this project drains to the French Broad
3. Total Project Area: 40 acres 4. Project Built Upon Area:
5. How many drainage areas does the project have? ~
River basin.
80
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
See attached table.
Basin Information Drainage Area 1 Drainage Area 2
Receiving Stream Name
Receiving Stream Class
Drainage Area
Existing Impervious* Area
Proposed Impervious*Area
Impervious* Area (total)
Impervious* Surface Area Drainage Area 1 Drainage Area 2
On-site Buildings
On-site Streets
On-site Parking
On-site Sidewalks
Other on-site
Off-site
Total: Total:
* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
9/2004 Version 1.0 Page 2 of 4
7. How was the off-site impervious area listed above derived? N/A
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General
Certification numbers e e a t t a h e d table as issued by the Division of Water Quality. These
covenants may not be changed or deleted without the consent of the State.
2. No more than G a a c h P ~ square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built-upon area in excess of the permitted amount requires a modified water quality certification prior to construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified
for this project. The forms are located on the 401/wetlands unit website.
Bioretention Worksheet
Dry Detention Worksheet
Level Spreader Worksheet
Grassed Swale Worksheet
Extended Detention Wetland /Pocket Wetland Worksheet
Wet Detention Worksheet
9/2004 Version 1.0 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the DWQ Central Office.
Please indicate that you have provided the following required information by initialing in the space provided
next to each item. Initals
• Original and two copies of the Express Review Stormwater Management Application
• Signed and notarized Operation and Maintenance Agreement
• Three copies of the applicable Supplement Form(s) for each BMP
• Application processing fee (payable to NCDENR)
• Detailed narrative description of stormwater treatment/management
• Three copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands and streams delineated, or a note on plans that none exist
- Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm);
Mailing Address:
City:
Phone:
State:
Fax:
VIII. APPLICANT'S CERTIFICATION
Zip:
I, (print or type name of person listed in General Information, item 2) id p- - S C o~r'/10.,~
certify that the information included on this application form is, to the best of my knowledge, correct and that the project
will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants
will be recorded, and that the proposed project complies with the requirements of I SA NCAC 2H .1000
l
Date: < < ~ Ol?
9/2004 Version 1.0 Page 4 of 4
Waynesville Commons, Waynesville, NC -Permit Application Attachment
TTT_ PR(~IRC'T TNFnRMATTnN -item #6 Table
Basin Information Draina e Area 2S Draina e Area 4S Draina e Area 55 Draina e Area 6S Draina e Area 7S Draina e Area 8S
Receivin Stream Name Richland Creek Allen's Creek Allen's Creek Richland Creek Allen's Creek Richland Creek
Receivin Stream Class C, B, Trout C, B, Trout C, B, Trout C, B, Trout C, B, Trout C, B, Trout
Draina. e Area (sft 384,147 304,909 216,238 105,230 164,322 184,267
Existin Im ervious Area sft 338,049 274,418 205,426 105,230 156,106 184,267
Pro osed Im ervious Area (total, sft) 378,427 284,909 216,238 105,230 164,322 184,267
Im ervious Surface Area 378,427 284,909 216,238 105,230 164,322 184,267
On-site Buildin s 104,101 184,267
On-site Streets 0
On-site Parkin 105,230 0
On-site Sidewalks 0
Other On-site 0 0 0 0 0 0
Off-site 0 0 0 0 0 0
TOTALS 378,427 284,909 216,238 105,230 164,322 184,267
IV. DEED RESTRICTIONS AND PROTECTIVE CONVENANTS
Item #1
To Be Determined
Item #2 -Development Table
Lot # Lot Size Acre) Allowable built-u on Area (Acre) Allowable
1 1.11 0.888 80%
2 4.36 3.488 80%
3 1.99 1.592 80%
4 1.81 1.448 80%
5 12.45 9.960 80%
6 16.40 13.12 80%
OFFICE-USE ONLY
Date Received Fee Paid . Permit Number(s)
~x o '1- a'1'1 Y
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality 401/ Wetlands Unit
EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM
This form maybe photocopied for use as an original
I. GENERAL INFORMATION 0 ~ "-'
1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): NU ~ 6 Z~O7
~lavnQS~~i7 1 P ('nmm~nG RPtai 1 AcGnri atPS LLr
~ ^~MR WA7E(3S3.UALI7Y
YVETlAND3 AND STORMNf11Tt_R BRANCH
2. Owner/Signing Official's name and title (person legally responsible for facility and compliance):
David A. Scarnati
3. Owner Mailing Address for person listed in item 2 above:
1765 Merriman Road
City: Akron State: Ohio Zip: 44313
Phone Number: (330 ) 8"ih-9971 Fa~cNumber•(_30 ) 864-80 4 EmailAddress:dscarnati cedarwood.com
4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Waynesville Commons
5. Location of Project (street address):
2150 South Main Street
City: Waynesville County: Haywood
6. Directions to project (from nearest major intersection):
Intersectinn of South Main Street & Hyatt Creek Road
7. Latitude: 35.4669 Longitude: -83.0092 of project
8. Contact person who can answer questions about the project:
Name: Charles Christy Telephone Number: (828 ) 687-9500
Fax Number : 828-687-4090 Email Address : cchristy@wadetrim. com
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
9/2004 Version 1.0 Page 1 of 4
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density High Density X Redevelopment General Permit Other
4. Additional Project Requirements (check applicable blanks):
_CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES Stormwater -Other
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project .
Bio Basins, Extended Dry, Grass Swoles, Sand Filters
2. Stormwater runoff from this project drains to the French Broad River basin.
3. Total Project Area: 40 acres 4. Project Built Upon Area:
5. How many drainage areas does the project have? ~
80
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
See attached table.
Basin Information Drainage Area 1 Drainage Area 2
Receiving Stream Name
Receiving Stream Class
Drainage Area
Existing Impervious* Area
Proposed Impervious*Area
Impervious* Area (total)
Impervious" Surface Area Drainage Area 1 Drainage Area 2
On-site Buildings
On-site Streets
On-site Parking
On-site Sidewalks
Other on-site
Off-site
Total: Total:
"Impervious area is delined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
9/2004 Version 1.0 Page 2 of 4
7. How was the off-site impervious area listed above derived? N/A
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General
Certification numbers e e attached table as issued by the Division of Water Quality. These
covenants may not be changed or deleted without the consent of the State.
2. No more than G ~ c }, P ~ square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, briclr stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be frlled in, piped, or altered except as necessary to provide driveway crossings.
4. Built-upon area in excess of the permitted amount requires a modifted water quality certification prior to construction.
S. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they, will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified
for this project. The forms are located on the 401/wetlands unit website.
Bioretention Worksheet
Dry Detention Worksheet
Level Spreader Worksheet
Grassed Swale Worksheet
Extended Detention Wetland /Pocket Wetland Worksheet
Wet Detention Worksheet
9/2004 Version 1.0 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the DWQ Central Office.
Please indicate that you have provided the following required information by initialing in the space provided
next to each item. Initals
• Original and two copies of the Express Review Stormwater Management Application
• Signed and notarized Operation and Maintenance Agreement
• Three copies of the applicable Supplement Form(s) for each BMP
• Application processing fee (payable to NCDENR)
• Detailed narrative description of stonnwater treatment/management
• Three copies of plans and specifications, including:
- Development/Project name
- Engineer and firm
- Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, fmished floor elevations
- Details of roads, drainage features, collection systems, and stonnwater control measures
- Wetlands and streams delineated, or a note on plans that none exist
- Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm):,
Mailing Address:,
City:
Phone:
VIII. APPLICANT'S CERTIFICATION
State:
Fax:
Zip:
I, (print or type name of person listed in General Information, item Z) D a J i d ~ ~ 5 f ~ f Yl a-~
certify that the information included on this application form is, to the best of my knowledge, correct and that the project
will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants
will be recorded, and that the proposed project complies with the requirements of ISA NCAC 2H .1000
Signature: A%~ (J~/,S
9/2004 Version 1.0 Page 4 of 4
Date: << /
Waynesville Commons, Waynesville, NC -Permit Application Attachment
III. PROJECT INFORMATION -Item #6 Table
Basin Information Draina a Area 2S Draina e Area 4S Draina e Area SS Draina a Area 6S Draina e Area 7S Draina e Area 8S
Receivin Stream Name Richland Creek Allen's Creek Allen's Creek Richland Creek Allen's Creek Richland Creek
Receivin Stream Class C, B, Trout C, B, Trout C, B, Trout C, B, Trout C, B, Trout C, B, Trout
Draina e Area sft) 384,147 304,909 216,238 105,230 164,322 184,267
Existin I ervious Area sft 338,049 274,418 205,426 105,230 156,106 184,267
Pro osed Im ervious Area (total, sft) 378,427 284,909 216,238 105,230 164,322 184,267
Im ervious Surface Area 378,427 284,909 216,238 105,230 164,322 184,267
On-site Buildin s 104,101 184,267
On-site Streets 0
On-site Parkin 105,230 0
On-site Sidewalks 0
Other On-site 0 0 0 0 0 0
Off-site 0 0 0 0 0 0
TOTALS 378,427 284,909 216,238 105,230 164,322 184,267
IV. DEED RESTRICTIONS AND PROTECTIVE CONVENANTS
Item #1
To Be Determined
Item #2 -Development Table
Lot # Lot Size Acre) Allowable built-u on Area Acre) Allowable
1 1.1 l 0.888 80%
2 4.36 3.488 80%
3 1.99 1.592 80%
4 1.81 1.448 80%
5 12.45 9.960 80%
6 16.40 13.12 80%
Dry Extended Detention Basin ~->C P fl'1- 011 1, V 2
Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
The dry extended detention basin system is defined as the dry detention basin, outlet
structure, pretreatment including forebays and the vegetated filter if one is provided.
This system (check one):
® does ^ does not
This system (check one):
^ does ®does not
incorporate a vegetated filter at the outlet.
incorporate pretreatment other than a forebay.
Important maintenance procedures:
- The drainage area will be managed to reduce the sediment load to the dry
extended detention basin.
- Immediately after the dry extended detention basin is established, the vegetation
will be watered twice weekly if needed until the plants become established
(commonly six weeks).
- No portion of the dry extended detention pond will be fertilized after the first
initial fertilization that is required to establish the vegetation.
- I will maintain the vegetation in and around the basin at a height of
approximately six inches.
- Once a year, a dam safety expert will inspect the embankment.
After the dry extended detention basin is established, it will be inspected once a quarter
and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in
a Coastal County). Records of inspection and maintenance will be kept in a known set
location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential roblem: How I will remediate the roblem:
The entire BMP Trash/debris is resent. Remove the trash/debris.
The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to
extended detention erosive gullies have formed. remove the gully, and then plant a
basin ground cover and water until it is
established. Provide lime and a
one-time fertilizer a lication.
BMP element: Potential roblem: How I will remediate the roblem:
The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the
Swale a licable . sediment off-site.
The pipe is cracked or Replace the pipe.
otherwise damaged (if
a licable .
Erosion is occurring in the Regrade the Swale if necessary to
Swale (if applicable). smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future roblems with erosion.
The forebay Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth possible. Remove the sediment and
(see diagram below). dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or Provide additional erosion
riprap is displaced. protection such as reinforced turf
matting or riprap if needed to
revent future erosion roblems.
Weeds are present. Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
Brain.
The main treatment area Sediment has accumulated Search for the source of the
and reduced the depth to 75% sediment and remedy the problem if
of the original design depth possible. Remove the sediment and
(see diagram below). dispose of it in a location where it
will not cause impacts to streams or
the BMP. Revegetate disturbed
areas immediately with sod
(preferred) or seed protected with
securel staked erosion mat.
Water is standing more than Check outlet structure for clogging.
5 days after a storm event. If it is a design issue, consult an
a ro riate rofessional.
Weeds and noxious plants are Remove the plants by hand or by
growing in the main wiping them with pesticide (do not
treatment area. s ra
BMP element: Potential roblem: How I will remediate the roblem:
The embankment Shrubs or trees have started Remove shrubs or trees
to row on the embankment. immediate) .
Grass cover is unhealthy or Restore the health of the grass cover
erodin - consult a rofessional if necessa
Signs of seepage on the Consult a professional.
downstream face.
Evidence of muskrat or Use traps to remove muskrats and
beaver activity is present. consult a professional to remove
beavers.
An annual inspection by an Make all needed repairs.
appropriate professional
shows that the embankment
needs re air.
The outlet device Clogging has occurred. Clean out the outlet device. Dispose
of the sediment off-site.
The outlet device is dama ed Re air or re lace the outlet device.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
The measuring device used to determine the sediment elevation shall be such that it will
give an accurate depth reading and not readily penetrate into accumulated sediments.
When the basin depth reads 2_0 feet in the main pond, the sediment shall be removed.
When the basin depth reads 2.0 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
ill in the blanks)
Temporary Pool Elevation 2754.64
Sediment Removal
Bottom
2752.00 ~ Te pora Pool emporar}
- - - - - - - - - - - - - - - - - olume Sediment Removal Elevation 2751.00 Volume
i 2750.00 25/0 -------------------------------------------- ------
Sediment Bottom Elevation 2749.00 25% e~
Storage Stc
FOREBAY MAIN POND
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: David A. Scarnati
Title: Director of Development
Address:1765 Merriman Road Akron OH 44313 __
Date: /~ / ~ /6
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, ~ i I 1 A , C, ~ 115 ~l , a Notary Public for the State of
{'1 ~' (~ , County of ~ U ~ l~'1 ~ ~" , do hereby certify that
Q a v ; d /~ . ~ C ~ (~1 ~ -}; personally appeared before me this ~ St
day of NOU~embe~r 20 ,and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
fi
f ' j sfiq
g ;, n..
E~~;~y;,, :?e
~!~
'~lr~e`~ c3,~
SEAL
Cam- a . C~~~,
Jilt ~-. Janson
Notary Public
State of Ohio
~Y Cc~rnmissian Expires July
l5~ Z~~~
My commission expires
~ x p o'1- o ~ ~ tp Y 2
Grassed Swale Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
- The drainage area of the grassed Swale will be carefully managed to reduce the
sediment load to the grassed swale.
- After the first-time fertilization to establish the grass in the swale, fertilizer will
not be applied to the grassed Swale.
The grassed swale will be inspected once a quarter. Records of inspection and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential roblem: How I will remediate the roblem:
The entire length of the Trash/ debris is present. Remove the trash/ debris.
Swale
Areas of bare soil and/or Regrade the soil if necessary to
erosive gullies have formed. remove the gully, and then re-sod
(or plant with other appropriate
species) and water until established.
Provide lime and aone-time
fertilizer a lication.
Sediment covers the grass at Remove sediment and dispose in an
the bottom of the Swale. area that will not impact streams or
BMPs. Re-sod if necessar .
Vegetation is too short or too Maintain vegetation at a height of
lon a roximatel six inches.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: David A. Scamati
Title: Director of Development
Address:1765 Merriman Road Akron OH 44313
Phone:330-836-9971
Signature:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, ~ ~ I 1 .~ • ~ ~ fl 5Qn , a Notary Public for the State of
0 ~; Y; , County of ~U m m i ~" , do hereby certify that
~a V i ~ ~ ~ 5C ~ f f1z -~-i personally appeared before me this ~ `'-~
day of ~~~~~(C ~ b e ~- Z~ ~ ,and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
r.:~.-
~~F~,
2~ P ~!, ~! ~: ' ~''
,.y '~ 0G j
a F
9ti F'OF O
Q ~
SEAL Jill ~• Janson
Notary Public
State of Ohio
~Y ~t~irtet~ission Expires July ~ 5~ ~( l ~
My commission expires
~7 - 0'1'1 ~ V ~-
Sand Filter Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
- The drainage area will be carefully managed to reduce the sediment load to the
sand filter.
- Once a year, sand media will be skimmed.
- The sand filter media will be replaced whenever it fails to function properly after
vacuuming.
The sand filter will be inspected quarterly and within 24 hours after every storm event
greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and
maintenance will be kept in a known set location and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential roblem: How I will remediate the roblem:
The entire BMP Trash/debris is resent. Remove the trash/debris.
The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as
(if applicable) avement surface. soon as ossible.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to
sand filter erosive gullies have formed. remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer a lication.
Vegetation is too short or too Maintain vegetation at a height of
lon a roximatel six inches.
The flow diversion The structure is clogged. Unclog the conveyance and dispose
structure of an sediment off-site.
The structure is damaged. Make any necessary repairs or
replace if damage is too large for
re air.
The pretreatment area Sediment has accumulated to Search for the source of the
a depth of greater than six sediment and remedy the problem if
inches. possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
revent future erosion roblems.
Weeds are resent. Remove the weeds, referabl b
hand. If a pesticide is used, wipe it
on the plants rather than svravinQ.
BMP element: Potential roblem: How I will remediate the roblem:
The filter bed and Water is ponding on the Check to see if the collector system
underdrain collection surface for more than 24 is clogged and flush if necessary. If
system hours after a storm. water still ponds, remove the top
few inches of filter bed media and
replace. If water still ponds, then
consult an ex ert.
The outflow spillway Shrubs or trees have started Remove shrubs and trees
and pipe to row on the embankment. immediate) .
The outflow pipe is clogged. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
revent future erosion roblems.
The outflow i e is dama ed. Re air or re lace the i e.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: David A. Scamati
Title: Director of Development
Address:1765 Merriman Road Akron OH 44313
Phone:330-836-9971
., _ .,
Signature:
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, ~' ~ I ` I /.~ . ~ a n 5 nr~ , a Notary Public for the State of
('~ h,~ ~ , County of ~ U rYl (Yl ~ + , do hereby certify that
Si~
V , G~ ~ ~ J ~~'r n ~~ personally appeared before me this
day of ~ OJP m be r , `ZO ~ ,and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
?~,,~ 3
,~
~ ~~
~'
~ ~ b~,^f~,~~
~ `rf..~.: °~
~- ~ r
~-~
SEAL Jill !i. Janson
Notary Public
State of Ohio
My Commission Expires July ~ ~~ Z ~ ~ I
My commission expires
~~-o11c~Y2,
Bioretention Inspection and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important inspection and maintenance procedures:
- Immediately after the bioretention cell is established, the plants will be watered
twice weekly if needed until the plants become established (commonly six
weeks).
- Snow, mulch or any other material will NEVER be piled on the surface of the
bioretention cell.
- Heavy equipment will NEVER be driven over the bioretention cell.
- Special care will be taken to prevent sediment from entering the bioretention cell.
- Once a year, a soil test of the soil media will be conducted.
After the bioretention cell is established, I will inspect it once a month and within 24
hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of inspection and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element: Potential roblems: How I will remediate the roblem:
The entire BMP Trash/debris is resent. Remove the trash/debris.
The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to
bioretention cell erosive gullies have formed. remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer a lication.
The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the
stone verge or swale a licable . sediment off-site.
The pipe is cracked or Replace the pipe.
otherwise damaged (if
a licable .
Erosion is occurring in the Regrade the swale if necessary to
Swale (if applicable). smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future roblems with erosion.
Stone verge is clogged or Remove sediment and clogged
covered in sediment (if stone and replace with clean stone.
a licable .
BMP element: Potential roblems: How I will remediate the roblem:
The pretreatment area Flow is bypassing Regrade if necessary to route all
pretreatment area and/or flow to the pretreatment area.
llies have formed. Restabilize the area after radin .
Sediment has accumulated to Search for the source of the
a depth greater than three sediment and remedy the problem if
inches. possible. Remove the sediment and
restabilize the retreatment area.
Erosion has occurred. Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
revent future erosion roblems.
Weeds are present. Remove the weeds, preferably by
hand.
The bioretention cell: Best professional practices Prune according to best professional
vegetation show that pruning is needed practices.
to maintain optimal plant
health.
Plants are dead, diseased or Determine the source of the
dying. problem: soils, hydrology, disease,
etc. Remedy the problem and
replace plants. Provide aone-time
fertilizer application to establish the
ground cover if a soil test indicates
it is necessar .
Tree stakes/wires are present Remove tree stake/wires (which
six months after lantin can kill the tree if not removed .
The bioretention cell: Mulch is breaking down or Spot mulch if there are only random
soils and mulch has floated away. void areas. Replace whole mulch
layer if necessary. Remove the
remaining much and replace with
triple shredded hard wood mulch at
a maximum de th of three inches.
Soils and/or mulch are Determine the extent of the clogging
clogged with sediment. -remove and replace either just the
top layers or the entire media as
needed. Dispose of the spoil in an
appropriate off-site location. Use
triple shredded hard wood mulch at
a maximum depth of three inches.
Search for the source of the
sediment and remedy the problem if
ossible.
An annual soil test shows that Dolomitic lime shall be applied as
pH has dropped or heavy recommended per the soil test and
metals have accumulated in toxic soils shall be removed,
the soil media. disposed of properly and replaced
with new lantin media.
BMP element: Potential roblems: How I will remediate the roblem:
The underdrain system Clogging has occurred. Wash out the underdrain system.
(if a licable
The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of
the sediment off-site.
The dro inlet is dama ed Re air or re lace the dro inlet.
The receiving water Erosion or other signs of Contact the NC Division of Water
damage have occurred at the Quality 401 Oversight Unit at 919-
outlet. 733-1786.
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Print name: David A. Scarnati
Title: Director of Development
Address:1765 Merriman Road Akron OH 44313
Phone:330-836-9971
Signature:
Date: r~ 1 ~ ~n?
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, ~ ~~ l I A • V ~ r15Jr~ , a Notary Public for the State of
h;~ , County of w (YllYl i `~' , do hereby certify that
a ~ ersonall a eared before me this ~ 5f
pa~,~ ~• ~C~.rn~, h p y pp
day of N ov e ~ b~ r ~d (~ ,and acknowledge the due execution of the
forgoing wet detention basin maintenance requirements. Witness my hand and official
seal,
~~,;; ;a ~_::~
~ r, ~°`'Y'~ ti
l F tP
Q ~irnae~~
SEAL
Jill A. Janson
Notary Public
M commission ex fires State of Ohio ~~ zQ I
Y p A4y-66~-+sste+j-Expn~es
_-----
Permit No. ~ X' ~ ~ ~ - O
(to be provided by DWQ)
~~~
~~~~~
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
DRY EXTENDED DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Iii) must be printed, tilled out and submitted along with all the required information.
o~oF wnrFROc
> ~
O r
f. PRO.IECT INFORMATION
Project name Waynesville Commons
Contact person Charles Christy
Phone number 828-687-9500
Date 111212007
Drainage area number 5S, 7S
II. DESIGN INFORMATION
Site Characteristics
: ~
2
~
Drainage area 380,560.00 ft
_-`~- ~
`
> <' a
Impervious area 350,178.00 ftz
Impervious 0.92
Design rainfall depth 1.0 in
Peak Flow Calculations
Is pre/post control of the 1-yr, 24-hr peak flow required? N (Y or N)
1-yr, 24-hr rainfall depth in
Rational C, pre-development (unitless)
Rational C, post-development (unitless)
Rainfall intensity: l-yr, 24-hr storm inmr
Pre-development 1-yr, 24-hr peak flow ft3/sec
Post~evelopment 1-yr, 24-hr peak flow ft3/sec
PrelPost 1-yr, 24-hr peak control ft3/sec
Storage Volume: Non-SR Waters
Design volume 27,849 ft3 , ~ ~ '
Sediment storage volume provided 21,905 ft3 OK ~'°
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth in
Pre-development 1-yr, 24-hr runoff volume ft3
Post-development 1-yr, 24-hr runoff volume ft3
Basin Design Parameters
Drawdown time days
SHWT elevation fmsl
Basin bottom elevation 2748.00 fmsl
f OK ~(~
~
~ ~~
Storage elevation 2754.00 msl .-
Basin side slopes 3 :1 OK
Top elevation 2755.00 fmsl OK
Freeboard provided 1.00 ft OK '7°
Basin Bottom Dimensions
Basin length 226 ft
Basin width 50 ft
Length to width ratio 3 :1 OK
Additional Information
Total runoff volume captured by basin 8.05 ac-in Forebay is not required
Forebay provided Y (Y or N)
Is basin in a recorded drainage easement? ~ Y (Y or N) OK
Does basin capture all runoff at ultimate build-out? Y (Y or N) OK
Is a sediment depth indicator included? Y (Y or N) OK
Does the basin include a drain? Y (Y or N) OK
Form SW401-Dry Extended Detention Basin-Rev.1 Parts I. & II. Design Summary, Page 1 of 1
Permit
(to be provided by DWQ)
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page! Plan
Initials Sheet No.
~~ LI ~ L3 1. Plans (1" - 50' or larger) of the entire site showing:
3 , ( - Design at ultimate build-out,
-Off-site drainage (if applicable),
-Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
-Pretreatment system,
-High flow bypass system,
- Maintenance access,
- Recorded drainage easement and public right of way (ROW),
-Overflow device, and
- Boundaries of drainage easement.
C~ ~ 3. 1 2. Plan details (1" = 30' or larger) for the bioretention cell showing:
3 , ~ -Basin dimensions
~(~ !/~ -Pretreatment system,
-High flow bypass system,
-Maintenance access,
-Outlet structure,
- Overflow device,
-Flow distribution detail for basin inflow, and
-Vegetation speafications.
LSD 2 • I 3. Section view of the dry detention basin (1" = 20' or larger) showing:
3 , ( -Side slopes, 3:1 or lower,
-Pretreatment and treatment areas, and
-Inlet and outlet structures.
~L ~ • ~ - b •~ 4. An assurance that the installed system will meet design specifications upon initial operation once the
project is complete and the entire drainage area is stabilized.
C.~~ .d ~ (, • 3 5. A constnu~ion sequence that shows how the dry detention basin will be protected from sediment until the
entire drainage area is stabilized.
(/ ~ ~Cpsr}' 6. The supporting calculations.
L~ L ~~' 7. A copy of the signed and notarized inspection and maintenance (I&M) agreement.
~C~~ ~lrE 8. A copy of the deed restriction.
Form SW401-Dry Extended Detention Basin-Rev.1 Part III. Required Items Checklist, Page 1 of 1
Permit Number:
(to be provided by DWQ)
OF W A rFA
~~ Oy
y r
~~~ > -'
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section 111) and the I&M Agreement (Section IV)
1. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
Date November 2, 2007
Drainage area number 4S -Sand Filter A
II. DESIGN INFORMATION
Site Characteristics
Drainage area (Ap) 304,909 ft OK ~ ~ ,~;, `~ ~ .f ~ ~
Impervious area 284,909 ftz
Impervious (IA) 93.4%
Design rainfall depth 1.0 in
Peak Flow Calculations
Does this project require pre/post control of the 1-yr 24-hr peak flow? N Y or N
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity in/hr
Pre-development 1-yr, 24-hr runoff ft3/sec
Post-development 1-yr, 24-hr runoff ft3/sec
Pre/Post 1-yr, 24-hr peak control ft3/SeC
Storage Volume
Design volume
Adjusted water quality volume (WQVndi)
Volume contained in the sedimentation basin and on top of the sand filter
Maximum head on the sedimentation basin and sand filter (hM~r;nee)
Average head on the sedimentation basin and sand filter (hA)
Runoff Coefficient (Rv)
Type of Sand Filter
Open sand filter?
If this is an open sand filter: The clearance between the bottom of the sand
filter and the SHWT (ds~)
Closed/pre-cast sand filter?
If this is a closed sand filter: The clearance between the bottom of the sand
filter and the SHWT (dsHwr)
If this is a closed, underground closed sand filter: The clearance between
the surface of the sand filter and the bottom of the roof of the underground
structure (ds~)
22,639 ft3 '~
16,979 ft3 // OK
49,032
3.58 ft OK ~ t} ~ 1~, vv-~x ~ \'~'~
4 ft __. ~
0.89 (unitless~ _i
N YorN
ft
Y YorN
~ _
2 ft - ~'~ ~ ~~ ~z., ~3y„~ ~.~
1..~ ~ ~ 1 ~1~~-!! ~~~~ ~~' ~~
7ft
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 1 of 3
`` '7~ ~
'~ -~ - _ ~ ~
< Permit Number:
s. } -'
`< j ~ ~_
j
~ (to be provided by OWQ)
Sedimentation Basin ~~•~~ •~~~
) -
Surface area of sedimentation basin (A < ~"
~ftz ~ ~ ~ ;; ~ ~~ i) (, ~( ~=
OK
S ~~~ `~~ )
Sand Filter ~
Surface area of sand filter (Ar) 13,600 ftz OK
Depth of the sand media filter bed (dF) 4 ft ~ ;
Coefficient of permeability for the sand filter (k) 6 (ft/day) " ''
Time to drain the sand filter (t) 6.66 hours OK
Time to drain the sand filter (t) 0.28 days
Additional Information
Does volume in excess of the design volume bypass the sand filter? Y Y or N
Is an off-line flow-splitting device used? Y Y or N OK
Does volume in excess of the design volume flow evenly distributed through a N Y or N Excess volume must pass through filter.
vegetated filter?
0 ft a~'~~„a~~/o/ for /D c~. ~x~=ss
What is the length of the vegetated filter? a~C r -~/o w S .
Does the design use a level spreader to evenly distribute flow? N Y or N Show how flow is evenly distributed.
~~ ~ ~'rP ~ Giy~ d ~ rLET"
Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Y Y or N
Is the BMP located at least 100ft from water supply wells? Y Y or N
Are the vegetated side slopes equal to or less than 3:1 Y Y or N OK
Is the BMP located in a recorded drainage easement with a recorded access Y Y or N OK
easement to a public Right of Way (ROW)? e
What is the width of the sedimentation chamber/forebay (Ws~)? 4 ft OK ~ ~~ ~ `''
What is the depth of sand over the outlet pipe? 4 ft OK
-~~ ~ ~ '~~~~
Figure 1: Open Sand Filter
tieiluttrutatt" tt ti:wJ Fillri
t"'h;uuber ~ '6;uul,ri
lur Fi~trb.n-~ ~---~~'-----------~
ilPipe E 11F
t~HWI'
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
Lt-Sim ti~ul `: Sra~rn~al~h~ IL•_h R-ales Tal~lr
"..........`j'fSed ...
Permit Number:
(to be provided 6y DWQ)
Figure 2: Closed Sand Filter
~',,.a. v,,~lc-
_ ~~ eu
)~~.~~-
~~'~-,~ei hurl
F1~n•.
f',iu.refc I,~i nthei
>'ht~.nn al niate~ial~
/l
I1t•5thi Si~rl
tiaa:onabh Hi_b
\~ ate TaUle
\`';dct
C'olla. tad
~ : ~~ ~~
;~cdwirutahm~ ~'hamhri ~Raeba~ 1 i Saint F~Itai ~'6and~ei
~. i fr.n:y : , iu:..y-,:.. ~, Trapped .c _~ Is
4;r irc~:. f".~n:r1
~~ Sed
Form SW401-Sand Filter-Rev.t Parts I and II. Project Design Summary, Page 3 of 3
Permit No.
(to be provided by DWQ)
11L REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the
agent may initial below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
~~~ 3 ~~ 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
~~ -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
" 3 , g chamber
3 .(o -Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (R0111~,
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
-Boundaries of drainage easement.
3 •a 2. Plan details (1" = 50' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
-Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROIIV),
- Design at ultimate build-out,
- Off-site drainage (ff applicable), and
ee~~ -Boundaries of drainage easement.
3 •c~ 3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
- Depth of sand filter media
- Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level(s)
- Outlet pipe, and
-Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
L applicable)
L on1 4. Supporting calculations (including drainage calculations)
~~ 5. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Filter-Rev.1 Part Itl, Page 1 of 1
~~- ~ •'
w~~
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information.
Permit Number:
(to be provided by DWQ)
O~O~ W ATF9QG
~ y
>_ ~
O T
L PROJECT' INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
Date N vember 2, 2007 /^
Drainage area number '1S. 2 , w v~ - `'
Site Characteristics
Drainage area
Impervious area
Percent impervious
Design rainfall depth
~~4
~~.
384,147 ftz --'~~~
378,427 ft
98.5%
1.0 inch
.~
~,
~~
~ ~~~~ C ~~
E
C..C~.~
Peak Flow Calculations
Is pre/post control of the 1-yr, 24-hr peak flow required?
1-yr, 24-hr runoff depth
1-yr, 24-hr intensity
Pre-development 1-yr, 24-hr peak flow
Post-development 1-yr, 24-hr peak flow
Pre/Post 1-yr, 24-hr peak control
Storage Volume: Non-SR Waters
Design volume
Ponding depth of water
Ponding depth of water
Surface area of the top of the bioretention cell
Length:
Width:
-or- Radius
Storage Volume: SR Waters
1-yr, 24-hr depth
Pre-development 1-yr, 24-hr runoff
Post-development 1-yr, 24-hr runoff
Minimum volume required
Volume provided
Soils Report Summary
Drawdown time, ponded volume
Drawdown time, to 24 inches below surface
Drawdown time, total:
In-situ soil:
Soil type
Soil permeability
Planting media soil:
Soil type
Soil permeability
Soil composition
Sand (by weight)
N (Y or N)
In
in/hr
ft3/sec
ft3/sec
ft3/sec
~.1
24,75 ft3
24 ches
\~ CY~C~.I ~ 1 "` e0.41U~1~i
Insufficient Ponding dept . -' P
2.00 ft -~E1r:u,z.c~. ~Z ~`^ ~
18,425.0 ft2 OK
226 ft OK
89 ft OK
ft
in
ft3
ft3
ft3
ft3
6 hr OK
24 hr OK
30 hr
Sandy Loam
6.00 in/hr ~~- ~+
./
ASTM 5268
6.00 inlhr OK `~
87% OK
Forth SW401-Bioretention-Rev.1 Parts I and II. Design Summary, Page 1 of 2
Permit Number:
(to be provided by DWQ)
Fines (by weight)
Organic (by weight)
Phosphorus Index (P-Index)
Basin Elevations
Temporary pool elevation
Planting elevation (top of the mulch)
Bottom of the cell
Planting depth
Depth of mulch
SHWT elevation
Are underdrains being installed?
How many clean out pipes are being installed?
What factor of safety is used for sizing the underdrains? (See
BMP Manual Section 12.3.6)
Additional distance between the bottom of the planting media and
the bottom of the cell to account for underdrains
Bottom of the cell required
Distance from bottom to SHWT
Type of bioretention cell (answer "Y" to only one of the two
following questions):
Is this a grassed cell?
Is this a cell with trees/shrubs?
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
10% OK
3% OK
100%
20 (unitless) OK
2754 fmsl OK
2752 fmsl
2750 fmsl
2ft
4 inches OK
1 fmsl OK
Y (Y or N) e
ti
2 2q ~ Insufficjent number of clean out pipes provided.
6 c(iti~fc9-~..
1 ft ``~~
2749 fmsl
2748 ft OK
Total
Y (Y or N) OK
N (Y or N) ~
~ ~j
89 ~~ OK ~~
Does volume in excess of the design volume bypass the Y or N e, ''`~
(Y ) ,c,~ C ~ti cU,
~__ . ~
bioretention cell? - --- ---__.
Does volume in excess of the design volume flow evenly distributed ~ i _
throw have etated filter? N (Y or N) ~xcess_v9lume must.pass throw h
9 9 J~ES/Gti1 (/DL /0 cy~• a c ~ o~t,~.v c>lo-~e~
What is the length of the vegetated filter? 0 ft E K~eSS OJ~vo-~/e~'S
Does the design use a level spreader to evenly distribute flow? ~' N (Y or N) Show how flow is evenly distributed.
~,
is the BMP located at least 30 feet from surface waters (50 feet if
SA waters)?
Is the BMP located at least 100 feet from water supply wells?
Are the vegetated side slopes equal to or less than 3:1?
Is the BMP located in a recorded drainage easement with a
recorded access easement to a public Right of Way (ROW)?
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development in
the future?
Are the slopes draining to the bioretention cell greater than 20%?
Is the drainage area permanently stabilized?
`' Pretreatment Jsed
(Indicate Type Used with an "X" in the shaded cell)
Gravel and grass
(flinches gravel followed by 3-5 ft of grass)
Grassed Swale
Forebay
~.
jz~P ~Zfl-P vvT4er~
Y (Y or N)
Y (Y or N) OK
Y (Y or N) OK ~~" va~~
5.21 ft/sec ~ lnsufficien ' et velocity unless energy dissipating devices are
being used. fZl~ ~~ @ /Nr,GT' v~:
-~ -_.
N (Y or N)
N (Y or N) OK
Y (Y or N) OK
X OK
X
X
~~! -~
~ ~~~ { 1,
:~ x
~ L-
~_ - ---~
;` 1.--~.
~ ~~
~,
~~ ~~
Forrn SW401-Bioretention-Rev.1 Part>g (and II. Design Summary, Page 2 of 2
PerrnR No:
(to 6e assigned 6y DWQ)
IU. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
T~ ~ • ~ 1. Plans (1' - 50' or larger) of the entire site showing:
- Design at ultimate build-out,
- Off-site drainage ('rf applicable),
3 -Delineated drainage basins (include Rational C coeffident per basin); l°r~,~J~,e. lfi cr~1 '~ ~ ~ ~~
~ '• 3 -Cell dimensions,
-Pretreatment system,
-High flow bypass s stem, ~.._._ ._.._._.__
~ -_ am'"" I~t-enance a~ ___ ~p
- eco ralnage easement and oublic right of way (R- OW~ ~~~
-Clean out pipe locations, 'p T~L~c~. sz
- Ove ow device an 11
- ndaries of drainage easement. ~~--°
C~~L 3•~ 2. Plan details (1" = 30' qr larger) for the bioretention cell showing: >^j~~. ~ 5 :fie., ~-~.~ax.1 ~~"
-Cell dimensions / ~ ~;F,•~~ ,v~ ~J ~a~!~ ~ ~
- re~ystem, - a fi ~-~za~,~ ~ I al~el~<<
Wyk ~ •~ ,High flow bypass system,
r~c~ Maintenance access, t '
C,~ ~'` -,Recorded drainage easerr~nt and public right of way (ROW), c ~ c~.~S~~? ~~ e ~ ~4~v"aJ i ~ `c~.
Ste, z_/ - Design at ultimate build-out, ~ S4~rz. ~ 3 ~
- Ofi site drainage ('rf applicable),
-Clean out pipe locations,
-Overflow device, and
- Boundaries of drainage easement.
~~~ ~~~ 3 •~ 3. Section view of the bioretention cell (1" = 20' or larger) showing:
-Side slopes, 3:1 or lower
- Underdrain system (if applicable), and
- Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, muk:h depth, fill media O~
depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), ~<<~ ~o e:~~~
SHWT level(s), and overflow structure)
\~
"~ .~~~
L I - ~3 4. A soils report that is based upon an actual field investigatice, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing 8 submitting the soils o ~ 'p ~ cater b ~k ~"
investigation request form. County soil maps are not an acceptable source of sons information. All 1
~ elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in
`~ , .~,~('~ situ soil musf~ncl~d?:._
`~''Cw~ / -Soil permeability, _. __.__
--_.
a~~- esx-s~~ - Soil composition (% sand, % fines, % organic), and\)
~ - 3 2~- P-' deX. -- _- ___i .
~pv YY
~~ 5. A detailed planting plan (1' = 20' or larger) prepared by a qualified individual showing:
- A variety of suitable species,
-Sizes, spadng and locations of plantirgs,
-Total quantity of each type of plant spedfied, (~
- A land detail Cave ~ v~,t ~l~' y T~~Q,~~ . ~ ~
y ~,~ -The source nursery for the plants, an V
.. ~-~ ~~t-~~us'ti V•~~ .f d=ud Je~,. F
requir_emenis.taestabhstrTi`ege on.
G~ L ~ ~ 6. An assurance that the installed system will meet design spedfications upon initial operation once the 5~n.~t ~- • 3
project is complete and the entire drainage area is stabilized.
(r~ ~' ~~ • 7. A rprrstruction sequer~ that shows how the bioretention cell will be proteded from sediment until the
entire drainage area is stabilized.
~L ~ off 8. The supporting calculations (induding underdrain calculations, if applicable). `2;~~'-1"~~
~~ ~`~,
~ 1 ~ 9. A co of the reed and notarized ins on and maintenance I&M regiment. ~
1~ ~~ PY ~9 P~ ( ) a9 ~ ~fjciS. ,,~
~~~ .~
G G ~~~ 10. A copy of the deed restridion.
~~~~
Form SW401-Bioreterrtion-Rev.1 PaA III, Page 1 of 1
Permit Number:
• (to be provided by DWQ)
o~ F W A tF9QG
~~ ~ ~
~~~~ ~ -i
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section 111) and the I&M Agreement (Section IV)
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-698-9500
Date November 2, 2007
Drainage area number 6S -Sand Filter B
II. DESIGN INFORMATION
Site Characteristics
Drainage area (Ao) 105,230 ftz OK ~, ~°'F.. ~ ~%'~
Impervious area 105,230 ft
Impervious (IA) 100.0%
Design rainfall depth 1.0 in
Peak Flow Calculations
Does this project require pre/post control of the 1-yr 24-hr peak flow?
1-yr, 24-hr runoff depth
1-yr, 24-hr intensify
Pre-development 1-yr, 24-hr runoff
Post-development 1-yr, 24-hr runoff
Pre/Post 1-yr, 24-hr peak control
Storage Volume
Design volume
Adjusted water quality volume (WQVAa;)
Volume contained in the sedimentation basin and on top of the sand filter
Maximum head on the sedimentation basin and sand filter (hM~cFiller)
Average head on the sedimentation basin and sand filter (h,~
Runoff Coefficient (Rv)
Type of Sand Finer
Open sand filter?
If this is an open sand filter: The clearance between the bottom of the sand
filter and the SHWT (dam)
Closed/pre-cast sand filter?
If this is a closed sand filter: The clearance between the bottom of the sand
filter and the SHWT (ds;.;,,~)
If this is a closed, underground closed sand filter: The clearance between
the surface of the sand filter and the bottom of the roof of the underground
structure (ds~)
N YorN
in
in/trr
ft3/sec
ft3/sec
ft3/sec
8,331 ft3 .~
6,248 ft3 OK
30,659
4.35 ft OK
1.09 ft !.__.__.~ r~~
0.95 (unitiess) ~
N YorN
ft
Y YorN
Oft
7.65 ft
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 1 of 3
Permit Number:
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (AS) 48 ft2 OK
Sand Filter
Surface area of sand filter (AF) 7,000 ft2 OK
Depth of the sand media filter bed (dF) 3 ft
Coefficient of permeability for the sand filter (k) 6 (ft/day)
Time to drain the sand filter (t) 4.76 hours OK
Time to drain the sand filter (t) 0.20 days
Additional Information
Does volume in excess of the design volume bypass the sand filter? Y
Is an off-line flow-splitting device used? N
Does volume in excess of the design volume flow evenly distributed through a N
vegetated filter'?
YorN
Y or N Insufficient flow splitter.
YorN
What is the length of the vegetated filter? 0 ft
Does the design use a level spreader to evenly distribute flow? N Y or N
Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Y Y or N
Is the BMP located at least 100ft from water supply wells? Y Y or N
Are the vegetated side slopes equal to or less than 3:1 Y Y or N
Is the BMP located in a recorded drainage easement with a recorded access Y Y or N
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chambedforebay (W~)? 4 ft
What is the depth of sand over the outlet pipe? 3 ft
Figure 1: Open Sand Filter
tieihuieutahon ti,w~l Fillri
~.'h;unber ~ 'L.uul Sri
ilp,pe ilp
~~HWr
Excess volume must pass through filter.
~.d~,v~fe ~~~ ~~ ~~ ~.
~~ cGSS o /*-~-~/a ws
Show how flow is evenly distributed.
OK
OK
OK
OK
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
1u-tiihi S+~~I; Seg.<ounldtHi~_h R~alei T.ihlr
`~fSed
Permit Number:
(to be provided by DWQ)
\`, eu
>~~.,,~
n eiland
Fl~~.~r
'x;.
C'ona ctc I of ntltei
?hirhual matenal` /
Lrtirtu ti.,d
tira~ouahh' Hieh
R'atei Table
`,l atn ~
~ 'ol le. re+I
figure 2: Closed Sand Filter
_. -_'~,
` ~_ ti am
j
-...\ E i
1:1' tt
itlet t~~},e
~ ..............: i~
pace
i~IFipe iIg
~..:
~HWT
~--rJ; ~-y--~
Sedw~eutahin~ +'han~bn iRneba~'1 ~ Saud Filfei ~ 'hambei
« sea
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3
Permit No.
(to be provided by DWQ)
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the
agent may initial below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
~~ 3 • ~ 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
(/~ ~ , d -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
- Flow splitting device,
- Recorded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
- Boundaries of drainage easement.
G~lr ~ 2. Plan details (1" = 50' or larger) for the sand filter showing:
?~ b -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
~
3
~ -Boundaries of drainage easement.
"
'
L7 ~ or larger) showing:
= 20
3. Section view of the sand filter (1
~ . 3w -Depth(s) of the sedimentation chamber and sand filter chamber,
-Depth of sand filter media
-Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level(s)
-Outlet pipe, and
- Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable)
(.5L ~~" 4. Supporting calculations (including drainage calculations)
c.3L c o ~ 5. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Filter-Rev.1 Part fll, Page 1 of 1
Permit Number:
(to be provided by DWQ)
O~OF W ATF9pG
~~~ ~
_ _ > ~
NCDENR ~ T
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
This form must be tilled out, printed and submitted.
The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information.
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
Date November 2, 2007
Drainage area number 1S
II. DESIGN INFORMATION
Site Characteristics
Drainage area 19,875 ftZ
Impervious area 17,745 ftz
Percent impervious 89.3%
Design rainfall depth 1.0 inch
Peak Flow Calculations
10-yr, 24-hr runoff depth 3.77 in
10-yr, 24-hr intensity 4.56 in/hr
Post-development 10-yr, 24-hr peak flow 1.92 ft3/sec
Velocity
Maximum non-erosive velocity (peak 10-year storm) 5.5 ft/sec
Soil characteristics (enter "x" below)
Sand/silt (easily erodible)
Clay mix (erosion resistant) X
Grass Type (enter "x" below)
Bermuda
Tall fescue
Bahiagrass
Kentucky bluegrass X
Grass-legume mixture
Swale type: Fill out one of the options below:
Option 1: Curb Outlet Swale: N (Y or N)
Maximum velocity
Side slopes :1
Swale length ft
Option 2: Conveyance Swale, Seeking Pollutant Credit N (Y or N)
Maximum velocity for 10-yr storm ftisec
Side slopes :1
Swale length ft
Option 3: Conveyance Swale, Not Seeking Pollutant Credit: Y (Y or N)
Maximum velocity 4.2 OK
Side slopes 3 :1 OK
Form SW401-Grassed Swale-Rev.1 Parts I and II. Project Design Summary, Page 1 of 2
Permit Number:
(to be provided by DWQ)
Swale Characteristics
Swale Shape: Enter an "x" in the appropriate cell below:
Trapezoidal
Parabolic
V-shaped
Width of the bottom of the swale
Width of the top of the swale
Maintenance agreement: Is this included in the application?
This design is for the following design option:
Option 1: Curb outlet Swale
Option 2: Conveyance Swale, seeking pollutant credit
Option 3: Conveyance Swale, not seeking pollutant credit
AddRional Information
Is the swale sized for all runoff from ultimate build-out?
Is the BMP located in a recorded drainage easement with a
recorded access easement to a public Right of Way (ROW)?
What is the distance from the bottom of the swale to the SHWT?
What is the ground level elevation?
What is the elevation of the bottom of the swale?
What is the SHWT elevation?
What is the longitudinal slope of the Swale?
What is the depth of freeboard?
2 ft
19 ft
Y (Y or N)
N
N
N
Yes OK
Yes (Y or N) OK
0.4 ft OK
2760.9 fmsl
2759.0 fmsl
2758.6 fmsl
0.1 % OK
0.1 ft OK
Form SW401-Grassed Swale-Rev.1 Parts I and II. Project Design Summary, Page 2 of 2
Permit No:
(to be assigned by DWQ)
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
~~ !• ~ 1. Plans (1" + 50' or larger) of the entire site showing:
~ ~ -Design at ultimate build-out,
~, ~ -Off-site drainage (if applicable),
- Delineated drainage basins (include Rational C coefficient per basin),
- Swale dimensions (width, length, depth),
- Maintenance access,
- Recorded drainage easement and public right of way (ROW),
-Grass species, and
- Boundaries of drainage easement.
(~5G .3 • ~ 2. Plan details (1" = 50' or larger) for the grassed Swale showing:
L ~ ~ ~ 3 -Swale dimensions (width, length, depth),
- Maintenance access,
- Recorded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
- Grass species,
- Off-site drainage (rf applicable),and
- Boundaries of drainage easement.
~S L 3 `~ 3. Section view of the grassed swale (1" = 20' or larger) showing:
-Side slopes,
- Longitudinal slope,
- Freeboard
- Swale dimensions, and
- SHWT level(s)
C (, ~ 4. Supporting calculations (including maximum velocity calculations for applicable storms)
~~ L - i. 3 5. An assurance that the installed system will meet design specifications upon initial operation once the
(~ _~ -~, .3 project is complete and the entire drainage area is stabilized.
~_ (~ •~ ' ~- ~ 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized.
~% 7. The supporting calculations (including underdrain calculations, if applicable).
~,"SG ~~ 8. A copy of the signed and notarized inspection and maintenance (I&M) agreement.
(, v ~ ~ 9. A copy of the deed restriction.
SW401-Grassed Swale-Rev.1 Part III, Page 1 of 1
- Permit No.
/rooeP~vidednrowctl
oF ~~rarF~
~~ Q~
~c
y ~
~~
MWATER MANAGEMENT PERMIT APPLICATION FORM
T
~_
NCDENR Y
S
OR
o
401 CERTIFICATION APPLICATION FORM
DRY EXTENDED DETENTION BAStN SUPPLEMENT
This foml must be filled out, printed and submitted.
The Required Items Checklist (Part ll!) must be printed, filled out and submitted along with alt the required infomlation.
1. PROJECT INFORMATfON
Project name Waynesville Commons
Contact p~~ Charles Christy
Phone number 828.687-9500
Date 11/2/2007
Drainage area number 5S, 7S '
tl. DESIGN tNFORMIATtON
Site Characteristics
Drainage area 380,560.00 ft2
Impervious area 350,178.00 ft2
Impervious 0.92
Design rainfall depth 1.0 in
Peak Flow Calculations
Is pre/post control of the 1-yr, 24-hr peak fhnn+ required? N (Y or N)
1-yr, 24-hr rainfall depth in
Rational C, pre~evelopment (unitless)
Rational C, pmt-development (unitless)
Rainfall intensity:1-yr, 24-hr storm in/hr
Pre-development 1-yr, 24-hr peak fkwv fts/sec
Post-devekopment 1-yr, 24-hr peak flow ft3/sec
Pre/Post 1-yr, 24-hr peak control ft3/sec
Storage Volume: Non-SR Waters
Design volume 27,849 ft3
Sediment storage volume provided 21,905 ft3 C>~<
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth in
Pre-development 1-yr, 24-hr runoff volume ft3
Pmt-development 1-yr, 24-hr runoff volume ft3
Basin Design Parameters
Drawdown time days
SHWT elevation 6nsl
Basin bottom elevation 2748.00 fmsl i~;
Storage elevation 2754.00 fmsl
Basin side slopes 3 :1 ;?I<
Top elevation 2755.00 fmsl iJf~:
Free~ard provided 1.00 ft C `K
Basin Bottom Dimensions
Basin length 226 ft
Basin width 50 ft
Length to width ratio 3 :1 C'K
Additional Information
Total runoff volume captured by basin 8.05 ac-in oret~ay is not rcclr.iirecj
Forebay provided Y (Y or N)
Is basin in a recorded drainage easement? ~ Y (Y or N) C1K
Does basin capture afl runoff at ultimate build-out? Y (Y or N) Oi+:
Is a sediment depth indicator included? Y (Y or N) ~~K
Does the basin indude a drain? Y (Y or N) r~i<.
Forth SW401Ary Extended Detention Basin-Rev.1 Parts I. & 11. Design Summary, Page 1 of 1
Permit No.
(to be provided by DWQ)
111. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applican# has designated an agent, the agent may initial below. ff a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
(~~ LI ~ ~3 1. Plans (1° - 50' or larger) of the entire site showing:
3 , ( -Design at ultimate build-out,
-Off-site drainage (if applicable),
-Delineated drainage basins (indude Rational C coeffident per basin),
-Basin dimensions,
- Pretreatment system,
-High flow bypass system,
- Maintenance access,
-Recorded drainage easement and public right of way (ROW},
- Overflow device, and
- Boundaries of drainage easement
L ~ 3 • I 2. Plan details (1' = 30' or larger) for the bioretention cell showing:
~ , 7 -Basin dimensions
G{ - L~ -Pretreatment system,
-High flow bypass system,
-Maintenance access,
- Outlet structure,
-Overflow device,
-Flow distribution detail for basin inflow, and
-Vegetation specifications.
LSD 2 • I 3. Section view of the dry detention basin (1" = 20' or larger) showing:
3 , ( -Side slopes, 3:1 or lower,
- Pretreatrnent and treatment areas, and
-Inlet and outlet structures.
(~ L (~ . 6 - L -~ 4. An assurance that the installed system will meet design specifications upon initial operation once the
project is complete and the entire drainage area is stabilized.
(.~~ .d ~ t; • 3 5. A construction sequence that shows how the dry detention basin will be protected from sediment until the
entire drainage area is stabilized.
_~~''-~ 6. The supporting calculations.
i/~ ~ ~~ 7. A copy of the signed and notarized inspection and maintenance {I&M} agreement.
~~~ ~!%t t_t= 8. A copy of the deed restriction.
Form SW401-Dry Extended Detention Basin-Rev.1 Part 111. Required Hems Checklist, Page 1 of 1
Permit Number.
(to be provided by DWQ)
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out on line, printed and submitted with all of the required information.
Make sure fo also fill out and submit the Required Items Checklist (Section lll) and the !&M Agreement (Section It>J
o f ~'~~ n 7-FR
o~.ry' ~qG
> LJ~r`r
O <
1. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
p~ November 2, 2007
Drainage area number 4S -Sand Filter A
II. DESIGN INFORMATION
Site Characteristics
Drainage area (Ao) 304,909 ftz OK
Impervious area 284,909 f~
°1° Impervious (IA) 93.4%
Design rainfall depth 1.0 in
Peak Flow Cak:ulations
Does this project require pre/post control of the 1-yr 24-hr peak flow? N Y or N
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity inlttr
Pre-development 1-yr, 24-hr rurroff ft3/sec
Post-development 1-yr, 24-hr runoff ft3/sec
PrelPost 1-yr, 24-hr peak control ft3/sec
Storage Volume
Design volume 22,639 ft3
Adjusfied water quality volume (WQV,~ 16,979 it3
Volume contained in the sedimentation basin and on top of the sand filter. 49,032
Maximum head on the sedimentation basin and sand filter (h~~) 3.58 ft
Average head on the sedimentation basin and sand filter {h~ 4 ff
Runoff Coeffident (Rv) 0.89 (unitiess)
Type of Sand Fitter
Open sand filter? N Y or N
If this is an open sand filter. The clearance between the bottom of the sand ft
filter and the SHWf (dam)
Closedfpre-cast sand filter? Y Y or N
ff this is a dosed sand filter: The clearance between the bottom of the sand 2 ff
filter and the SHWf (dam)
ff this is a closed, underground dosed sand filter. The clear~tce between
the surface of the sand filter and the bottom of the roof of the underground 7 tt
structure (dam}
OK
OK
Form SW401-Sand Filter-Rev.1 Parts I and !!. Project Design Summary, Page 1 of 3
Permit Number.
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (As)
Sand Filter
Surface area of sand filter (AF)
Depth of the sand media filter bed (dF)
Coefficient of permeability for the sand filter (k)
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additiona I Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line flow-splitting device used?
Does volume in excess of the design volume flow evenly distributed through a
vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
Is the BMP located at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamberfforebay (W~)?
What is the depth of sand over the outlet pipe?
Figure 1: Open Sand Filter
Secluueutahon
C'han-ber
1 ar Foreba~-t
R-r u
Floe'
t -_-~ - -
r~
t r
i tt
In-Sih~ Sail :` Sea~nnaUh`. Hi_'h ~~~~ler Tabk
j s„,,
96 ftZ OK
13,600 ft OK
Oft
6 (ft/day)
6.66 hours OK
0.28 days
Y YorN
Y Y or N OK
N Y or N Excess volume must pass through filter.
~~ --~
0 ft _ -~ ,r ~,~~ vv s .
~
N Y or N is evenly distributed.
Show how flow
'
Y YorN
Y YorN
Y Y or N OK
Y Y or N OK
Oft OK
Oft OK
Sand Filtr+
t'6ttu~l,r~
+:~ntlet Ytpe
---- -- --
~ .
..~..., ''?c
__.___~.
.__- ..:-:T..~ ..............i
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
Permit Number.
(to be provided by DWQ)
i •
Figure 2: Closed Sand Filter
~~`'~~ ~-, Cot'u 111afc
~S •eu. .. ~-... ~ -
Ff0~6- ~' -~ ... 5allr)
;,;,
~~..` ....T.....; ..:
- ~~ I
Coucrctc for othn \ ~ "f"i
~hv.hlral nntcriat> '". _ ..:....~ ..............................c
•~ ~.
\.. a .
Li-Sihl Soil 11 If sti~JT
sCnouabn-Hi~r
~'. titer Table
1Catcr 5eduucntatimr Chamber IF1Freb.lcl ':aud Filter C'hmubel
iFi~cy sclimerts, l Trnaped~r~ds
(~'olltcted nrgan:r_s. Defmsj
:j.._ ......
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3
Permit No.
(to be provided by DWQ)
EII. REQUIRED ITEMS CHECKLIST
Please indicate the page ar plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the
agent may initial below. g a r~uireme~ has not been met, attach justiftcation.
Initials Pagel Plan
Sheet No.
~~~ 3 •~ 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
3.3 -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
?~ , g chamber
~ .(p -Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROVIr),
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
-Boundaries of drainage easement.
~f~ 3 •a 2. Plan details (1" = 50' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
- Flow splitting device,
- Recorded drainage easement and public right of way (ROVI~,
- Design at ultimate build-out,
-Off--site drainage (if applicable), and
3 8 -Boundaries of drainage easement.
3. Section view of the sand fitter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand fitter chamber,
- Depth of sand filter media
-Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level{s}
- Outlet pipe, and
-Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable)
i, o~ 4. Supporting calculations (including drainage calculations}
~~ 5. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Filter-Rev.1 Part ttl, Page 1 of 1
Permit Number.
(fo be provided by DWQ)
i
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
i'his form must be filled out online, printed and submitted with all of the required information.
Make sure fo also fill out and submit the Required Items Checklist (Section 111) and the 18M Agreement (Section ll~
o~CF .nJ qa-FAQG
~ ~
a
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number
Date
Drainage area number
828-698-9513fl
November 2, 2007
6S -Sand Filter B
!I. DESIGN INFORMATION
Site Characteristics
Drainage area (Ao) 105,230 ft OK
tmpervious area 105,230 ftz
Impervious (I,~ 100.0%
Design rainfall depth 1.0 in
Peak Flow Cak:uNations
Does this project require pre/post control of the 1-yr 24-hr peak flow? N Y or N
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity inlhr
Pre-developrr~nt 1-yr, 24-hr runoff ft3/sec
Post-development 1-yr, 24-hr runoff ft3/sec
Pre/Post 1-yr, 24-hr peak control ft~/sec
Storage Volume
Design volume 8,331 ft3
Adjusted water qualitlr volume (WQV,~ 6,248 ft3
Volume contained in the sedimentation basin and on top of the sand filter. 30,659
Maximum head on the sedimentation basin and sand filter (h~F~,) 4.35 ft
Average head on the sedimentation basin and sand filter (h~ 1.09 ft
Runoff Coefficient (Rv) 0.95 (unitiess)
Type of Sand Filter
Open sand filter? N Y or N
If this is an open sand filter: The clearance between the bottom of the sand ft
filter and the SHWT (dam)
Closed/pre-cast sand filter? Y Y or N
If this is a closed sand filter. The clearance between the bottom of the sand 4 ft
filter and the SHWT (dam)
tf this is a closed, underground closed sand filter: The deararlce ~tween
the surface of the sand fitter and the bottom of the roof of the underground 7.65 ft
structure (dam)
OK
OK
Form SW401-Sand Filter-Rev.i Parts I and Il. Project Design Summary, Page 1 of 3
Permit Number.
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (As) 48 ftZ OK
Sand Filter
Surface area of sand filter (AF) 7,000 ft OK
Depth of the sand media filter bed (dF) 3 ft
Coefficient of permeability for the sand filter (k) 6 (fUday)
Time to drain the sand filter (t) 4.76 hours OK
Time to drain the sand filter (t) 0.20 days
Additional Information
Does volume in excess of the design volume bypass the sand filter? Y Y or N
Is an off-line flow-splitting device used? N Y or N Insufficient flow splitter.
Does volume in excess of the design volume flow evenly distributed through a N Y or N F~ccess volume must pass through filter.
vegetated filter? i.,i .,,,.-_~_.. ;. J,, ~~~ ,:u ~,,,,
~~ ~
What is the len th of the ve etated filter?
9 9 0 ft _ '
~, , ~~--;-
Does the design use a level spreader to evenly distribute flow? N Y or N Show how flow is evenly distributed.
' ' ~~ ~ '
Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Y Y or N
Is the BMP localed at least 100ft from water supply wells? Y Y or N
Are the vegetated side slopes equal to or less than 3:1 Y Y or N OK
Is the BMP located in a recopied drainage easement with a recorded access Y Y or N OK
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamberfforebay (W~)? 4 ft OK
What is the depth of sand over the outlet pipe? 3 ft OK
Figure 1: Open Sand Filter
Sediweutat/ou
1_'h;unber
1 or Foreba~~ 1
«ell'
Fl latr
I tt ,
Sand F~Itrr
1:'6aullrrl
IJUtlrt ~115e
,..,e ~ th
............................r .-
_' ft
. t.. _
to-Situ Sl~il Srasouabh@ Hrvh R'aler Tahlr
'•ti s:,.l
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
Permit Number:
(to be provided 6y DWQ)
Figure 2: Closed Sand Filter
_.. ~
`
~
~
\.\\
_
~
~~ <rutlef Pipe
1
i ~
'- - I r
, ..
~ ..
C'onc,ctc tm other ~ ~. I'•.;.. 5
ahvchualn,aten~li ~~•~ ` ',
:,
.~ .
----a•....~.... ............•
~
Li-S~hr Soil 1' it ~.sxs~tr
Sea?m-aUh' HiJ~
~.t'ater Tnhle
Scdm~entaNou Chand,n iF.iieb:r, ~ ~ ':an,t Filter C'6aiubei
~t ~tCl
iH~-ry ser3in:rnts,
Wrapped Sofidsi
(:bllecterl Or~ucs. C~~ns}
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3
Permit No.
(to be provided .ay DWQ)
lil. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. ff the applicant has designated an agent, the
agent may initial below. tt a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
~~ 3 • ~ 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
U, ~ , d -System dimensions (length, width, and depth) for both the sedirner-tation chamber and the fitter
chamber
- Maintenance access,
- Flow splitting device,
- Recorded drainage easelr~nt and public right of way (ROW),
-Design at ultimate build-out,
- Off-site drainage ('rf applicable), and
- Boundaries of drainage easement.
G~~ ~ 2. Plan details (1" = 50' or larger) for the sand filter showing:
3 b -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
-Off site drainage (rf applicable), and
- Boundaries of drainage easement.
C-7~i 3 ~ ~ 3. Section view of the sand filter (1" = 20' or larger) showing:
~ . 3 w -Depth(s) of the sedimentation chamber and sand filter chamber,
-Depth of sand filter media
-Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level{s)
- Outlet pipe, and
-Clearance from the surface of the sand filter to the bottom of the roof of the underground structure {if
applicable}
C.S~' ~~ 4. Supporting calculations (including drainage calculations}
~ ~L c o ~' S. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Filter-Rev.1 Part III, Page 1 of 1
Permit Number:
(to be provided by DWQ)
• 0~[O~VJ'A T~FRQG
> L,/W~ _{
NCDENR Q
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill j must be printed, filled out and submitted along with a!1 of the required information.
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
Date
Drainage area number
November 2, 2007
1S, 2S
11. DESIGN INFORMATION
Site Characteristics
Drainage area 384,147 ftz
Impervious area 378,427 ftz
Percent impervious 98.5°k
Design rainfall depth 1.0 inch
Peak Flow Calculations
Is prelpost control of the 1-yr, 24-hr peak fbw required? N (Y or N)
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity inlhr
Pre-deveopment 1-yr, 24-hr peak flow ft3lsec
Post-development 1-yr, 24-hr peak flow ft3/sec
PrelPost 1-yr, 24-hr peak control ff3lsec
Storage Volume: Non-SR Waters
Design volume 24,752.0 ft3
Pending depth of water 24 inches Insuffit~ent ponding depth.
Ponding depth of water 2.00 ft
Surface area of the top of the b"roretention cell 18,425.0 ftz OK
Length: 226 ff OK
Width: 89 ft OK
-or- Radius ft
Storage Volume: SR Waters
1-yr, 24-hr depth in
Pre-development 1-yr, 24-hr runoff ft3
Post-development 1-yr, 24-hr runoff ft3
Minimum voturra' required ft3
Volume provided ft3
Soils Report Summary
Drawdown time, ponded volume 6 hr OK
Drawdown time, to 24 inches below surface 24 hr OK
Drawdown time, total: 30 hr
IR-SitU SDlL'
Soil type Sandy Loam
Soil permeability 6.00 inihr
Planting media soil
Soil type ASTM 5268
Soil pem~eability 6.00 inihr OK
Soil composition
Sand (by weight) 87% OK
Forth SW401-Bioretention-Rev.1 Parts f and !1. Design Summary, Page 1 of 2
Permit Number.
(to be provided by DWQ)
% Fines (by weight}
°/o Organic (by weight)
Phosphorus Index (P-Index)
Basin Elevations
Temporary pool elevation
Planting elevation (top of the mulcts)
Bottom of the cell
Planting depth
Depth of mulch
SHWT elevation
10% OK
3% OK
Total: 100%
20 (unities) OK
2754 fmsl OK
2752 fmsl
2750 frrssl
2tt
4 inches OK
1 fmsl OK
Are underdrains being installed? Y (Y or N)
How many dean out pipes are being installed? 2
What factor of safety is used for sizing the underdrains? (See 6
BMP Manual Section 12.3.6)
Additional distance between the bottom of the planting media and 1 ft
the bottom of the cell to account for underdrains
Bottom of the cell required 2749 fmsl
Distance from bottom to SHWT 2748 tt
Type of bioretention cell (answer "Y" to only one of the two
following questions):
tsthis a grassed cell? Y (Y or N)
Is this a cell with trees/shrubs? N (Y or N)
Planing Plan
Number of tree species 8
Number of shrub spades 89
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
Y
(Y or N)
bioretention cell?
Does volume in excess of the design volume flow evenly distributed N (Y or N)
through a vegetated fitter?
What is the length of the vegetated filter? 0 tt
Does the design use a level spreader to evenly distribute flow? N (Y or N)
Is the BMP located at least 30 feet from surface waters (50 feet if
Y
(Y or N)
SA waters)?
Is the BMP located at least 100 feet from water suppty wells? Y (Y or N)
Are the vegetated side slopes equal to or less than 3:1? Y (Y or N)
Is the BMP [orated in a recerded drainage easement with a
Y
(Y or N)
recorded access easement to a public Right of Way (ROW)?
Inlet velocity (from treatment system) 5.21 itlsec
Is the area surrounding the cell likely to undergo development in N (Y or N)
the future?
Are the sopes draining to the bioretention cell greater than 20%? N (Y or N)
Is the drainage area permanently stabilized? Y (Y or N)
Pretreatment Used
(Indicate Type Used with an "X" in the shaded cell)
Gravel and grass
(flinches gravel followed by 3-5 it of grass) X
Grassed Swale X
Forebay X
Insufficient number of dean out pipes provided.
OK
OK
OK
OK
Excess volume must pass through titter.
p~si~,~l (/o~ /a cN. a ~ ~ oit,~v ~~e.~
Show how flow is evenly distributed.
jz~P ~~ v~r~er~
D /~/'-~jo c..r~
OK
OK
Insuffcent inlet velocity unless energy dissipating devices are
being used. /2/ p /~ ~ @ /Nrc'7"
OK
OK
OK
Form SW401-BioretenSon-Rev. t Parts I and Il. Design Summary, Page 2 of 2
Permit No:
(to be assigned by OWQ)
IU. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can !~ found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to
indicate the folla+ring design requirerrrents have been met If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
/. O 1. Plans (1' - 50' or larger) of the entire site showing:
2 . d -Design at ultimate build-out,
3 , p -Off-site drainage (if applicable),
L / -L 3 -Delineated drainage basins (inducts Rational C coeffident per basin),
- Cell dirricnsro~,
- Pretreatrnent system,
- High flow bypass system,
- Maintenance access,
- Recorded drainage easement and pubfic right of way (ROW),
-Clean out pipe locations,
- Overflow device, and
- Boundaries of drainage easement
~~ 3 ~ ~ 2. Plan details (1' = 30' or larger) for the bioretention cell showing:
b - Cell dirr~nsiau
'"
3 '~ - Pretreatment system,
- High flaw bypass system,
-Maintenance accPSS,
- Recerded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
-Off-site drainage frf applicable),
-Clean art pipe locations,
- Overflow device, acrd
-Boundaries of drainage easement
~S~ ~ •$ 3. Section view of the bioretention cell (1' = 20' or larger) showing:
-Side slopes, 3:1 or lower
- Underdrain system ("tf applicable), and
- Baretention cell layers [ground level and slope, Pre-treatment, ponding depth. muk;h depth, fill media
depth, washed sand, fitter fabric (or droking stone if applipble), #57 stone, underdrair>s {if applicabth),
SHWf level(s), and overflow stnxtture]
L I - ~ 3 4. A soil report ttrat is based upon an actual field investigation, soil borings, and infiltration tests. The
resuNs of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County sal maps are nat an acceptable source of soils 'rnfom>ation. All
elevations shall be in feet mean sea level (firrsl). Results of sals tests of both the planting sal and the in
situ soil must krdude:
-Sal pemreability,
- Sal composition (% sand, % fines, % organic), and
_(~ ~!
(~ L 3 - P-index.
5. A detailed planting plan {1' = 20' ~ larger) prepared by a qualif~d individual showing:
- A variety of suitable speaes,
-Sizes, spacing and locations of plantings,
-Total quantity ~ each type of plant specified.
- A planting detail,
- The source nursery for tfre plants, and
- Fertil¢er and waterug requirements to establish vegetation.
G~ L ~ 6. An assurance that the instaNed system wdl meet design speafications upon initial operation once the
project is complete and the entire drainage area is stabilzed.
G' L LrvLL ~ • 3 7. A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized.
~~ ~ off 8. The supporting calarlatior>s (indlyding underdrain calculations, 'If applcable).
(,(S(% ~( I- %/ 9. A copy of the signed and notarized inspection and maintenance (18~M) agreement
G ~ ~ vl Gt ~G 10. A copy of the deed restriction.
Form SW401-BioreteMion-Rev.t Part III, Page 1 of 1
Permit Number.
(to be provided by DWQJ
O~O~ W AT~~QG
~ y
.~ra~ p r
NCDEt~t
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information.
1. PROJECT INFORMATION
Project name Waynesville Commons
Gontact name Charles Christy
Phone number $28-687-9500
Date
Drainage area number
November 2, 2007
1S
I!. DESIGN INFORMATION
Site Characteristics
Drainage area 19,875 ftz
Impervious area 17,745 ftz
Percent impervious 89,30
Design rainfall depth 1.0 inch
Peak Flow Calculations
10-yr, 24-hr runoff depth 3.77 in
10-yr, 24-hr intensity 4.56 inmr
Post-development 10-yr, 24-hr yak flow 1.92 it3/sec
Velocity
Maximum non-erosive velocity (peak 10-year storm) 5.5 ft/sec
So17 charaderis6cs (enter "x"below)
Sand/silt (easily erodible)
Clay mix (erosion resistant) X
Grass Type (enter "x" bebw)
Bermuda
Tall fescue
Bahiagrass
Kentucky bluegrass X
Grass-legume mbcture
Swale type: FII out one of the options below:
Option 1: Curb Outlet Swale: N (Y or N)
Maximum velocity
Side sbpes :1
Swale length ft
Option 2: Conveyance Swab. Seeking Pollutant Credit: N (Y or N)
Maximum vekxtity for 10-yr storm ftfsec
Side slopes :1
Swale length ft
Option 3: Conveyance Swale. Not Seeking Polhutant Credit Y (Y or N)
Maximum velocity 4.2 OK
Side slopes 3 :1 OK
Forth SW401-Grassed Swale-Rev.1 Parts I and II. Project Design Summary, Page 1 of 2
Permit Number.
(to be provided by DWQ)
Swale Characteristics
Swale Shape: Enter an "x" in the appropriate cell below:
Trapezoidal
Parabolic X
V-shaped
Width of the bottom of the swale 2 ft
Width of the top of the Swale 19 ft
Maintenance agreement: Is this included in the application? Y (Y or N)
This design is for the following design option:
Option 1: Cuff outlet swale N
Option 2: Conveyance swale, seeking polutant credit N
Option 3: Conveyance swale, not seeking pollutantcredit N
Additional Information
Is the swale sized for all runoff from ultimate build-out? Yes OK
Is the BMP located in a recorded drainage easement with a Yes (Y or N) OK
recorded access easement do a public Right of Way (ROW)?
What is the distance from the bottom of the Swale to the SHWT? 0.4 ft OK
What is the ground level elevation? 2760.9 fmsl
What is the elevation of the bottom of the swale? 2759.0 fmsl
What is the SHWT elevation? 2758.6 fmsl
What is the longitudinal slope of the swale? 0.1 °k OK
What is the depth of freeboard? 0.1 ft OK
Forth SW401-Grassed Swale-Rev.1 Parts I and 11. Project Design Summary, Page 2 of 2
Permit No:
(to be assigned by DWQ)
III. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justfication.
Initials
~.i ~-
C~ )'C;
l.lv
Page! Plan
Sheet No.
' ~' 1. Plans (1' + 50' or larger) of the entire site showing:
~% -Design at ultimate build-out,
5 , ~ -Off-site drainage (if applicable),
-Delineated drainage basins (include Rational C coefficient per basin),
- Swale dimensions (width, length, depth),
- Maintenance access,
- Recorded drainage easement and public right of way (ROW),
-Grass species, and
-Boundaries of drainage easement.
~ - ~ 2. Plan details (1' = 50' or larger) for the grassed swale showing:
~ j - ~ ; -Swale dimensions (width, length, depth),
- Maintenance access,
-Recorded drainage easement and public right of way (ROW),
- Design at ultimate build-out,
- Grass species,
- Off-site drainage (if applicable),and
-Boundaries of drainage easement.
7 ~~ 3. Section view of the grassed swale (1' = 20' or larger) showing:
-Side slopes,
- Longitudinal slope,
- Freeboard
-Swale dimensions, and
- SHWT level(s)
~`
_1L~ ~ t_
~, 0 4..3
C~ 1 ~ 2~;
"~ ~
4. Supporting calculations (including maximum velocity calculations for applicable storms)
5. An assurance that the installed system will meet design specifications upon initial operation once the
project is complete and the entire drainage area is stabilized.
6. A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized.
7. The supporting calculations (including underdrain calculations, if applicable).
8. A copy of the signed and notarized inspection and maintenance (1&M) agreement.
9. A copy of the deed restriction.
SW401-Grassed Swale-Rev.1 Part III, Page 1 of 1
Permit No.
(to be provided by DWQ)
~~_~T
~~~~
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
004 tNATfROG
O Y
401 CERTIFICATION APPLICATION FORM
DRY EXTENDED DETENTION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The ReQuired Items Checklist (Part Ill) musf be printed, filled out and submitted along wdh all the required infom7ation.
1. PROJECT INFORMATION
Project name Waynesville Commons
Contact person Charles Christy
Phone number 828.687-9500
Date 11/2/2007
Drainage area number 5S, 7S '
II. DESIGN INFORMATION
Site Characteristics
Drainage area 380,580.00 ft
Impervious area 350,178.00 ft
Impervious 0.92
Design rainfall depth 1.0 in
Peak Flow Calculations
Is prelpost control of the 1-yr, 24-hr peak flow required? N (Y or N)
1-yr, 24-hr rainfall depth in
Rational C, txe-devebpn~nt (unitless)
Rational C, pmt-development (unitless)
Rainfall intensity: l-yr, 24-hr storm inlhr
Pre~evelopment 1-yr, 24-hr peak flow ft3lsec
Post-development 1-yr, 24-hr peak flow ft3/sec
Pre/Post 1-yr, 24-hr peak control fY'lsec
Storage Volume: Non-SR Waters
Design volume 27,849 ft3
Sediment storage volume provided 21,905 ft3 C~i<
Storage Volume: SR Waters
1-yr, 24-hr rainfall depth in
Pre~tevelopment 1-yr, 24-hr runoff volume ft3
Post-development 1-yr, 24-hr runoff volume ft3
Basin Design Parameters
Drawdown time days
SHWT elevation fmsl
Basin bottom elevation 2748.00 fmst !;~k:
Storage elevation 2754.00 fmsl
Basin side slopes 3 :1 <~K
Top elevation 2755.00 fmsl i~K
Freeboard provided 1.00 ft (?k;
Basin Bottom Dimensions
Basin length 228 ft
Basin width 50 ft
Length to width ratio 3 :1 C'K
Additional Information
Total runoff volume captured by basin 8.05 ac-in =.,r. bay is r~oi r~ c~u+red
Forebay provided Y (Y or N)
Is basin in a recorded drainage easement? ~ Y (Y or N) OAK
Does basin capture all runoff at uiGmate build-out? Y CY or N) CP
Is a sediment depth indicator included? Y (Y or N) ~!I<
Does the basin include a drain? Y (Y or N) i7K
Form SW401-Dry Extended Detention Basin-Rev.1 Parts I.8 tf. Design Summary, Page 1 of 1
Permit No.
(to be provided by DWQ)
lil. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designs#ed an agent, the agent may initial below. ff a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
- , '..,.= Lt - L3 1. plans (1" - 50' or larger) of the entire site showing:
3 , ( -Design at ultimate build-out,
-Off-site drainage (if applicable),
-Delineated drainage basins (include Rational C coefficlent per basin),
-Basin dimensions,
- Pretreatment system,
-High flow bypass system,
- Maintenance access,
-Recorded drainage easement and public right of way (ROW),
-Overflow device, and
- Boundaries of drainage easement.
L L' 3 ~ I 2. Plan details (1' = 30' or larger) for the bioretention cell showing:
3 , 7 -Basin dimensions
L(- l.~ -Pretreatment system,
-High flow bypass system,
-Maintenance access,
- Outlet structure,
-Overflow device,
-Flow distribution detail for basin inflow, and
-Vegetation speclfications.
L5l/ 2 - I 3. Section view of the dry detention basin (1° = 20' or larger) showing:
3 , ( -Side slopes, 3:1 or Tower,
-Pretreatment and treatment areas, and
-Inlet and outlet structures.
(~(~ (~.0 - G -~ 4, An assurance that the installed system will meet design specifications upon initial operation once the
project is complete and the entire drainage area is stabilized.
C.~~' .d ~ (a • 3 5. A construction sequence that shows how the dry detention basin will be protected from sediment until the
entire drainage area is stabilized.
~~'~' 6. The supporting calculations.
L~ ~ 2~,_~`f ' 7. A copy of the signed and notarized inspection and maintenance (I&M) agreement.
~ic7~C-~ ,~f . ~1 r~t= 8. A copy of the deed restriction.
Form SW401-Dry E~dended Detention Basin-Rev.1
Part III. Required Items Checklist, Page 1 of 1
Permit Number.
(to be provided by DWQ)
~~
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be felted out on line, printed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section t1J) and the t&M Agreement (Section IV)
OCCY V'! F•. T ~RQG
_U ~
? y
C 't
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number
Date
Drainage area number
828-687-9500
November 2, 2007
4S -Sand Filter A
II. DESIGN INFORMATION
Site Characteristics
Drainage area (Ao) 304,909 ftz OK
Impervious area 284,909 ftz
Impervious (IA) 93.4%
Design rainfall depth 1.0 in
Peak Flow Calculations
Does this project require pre/post control of the 1-yr 24-hr peak flow? N Y or N
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity inlttr
Pre-development 1-yr, 24-hr runoff ft3/sec
Post-development 1-yr, 24-hr runoff ft3/sec
PreJPost 1-yr, 24-hr peak control ft3/sec
Storage Volume
Design volume 22,639 ft3
Adjusted water quality volume (WQV~ 16,979 tt3 OK
Volume contained in the sedimentation basin and on top of the sand filter. 49,032
Maximum head on the sedimentation basin and sand filter (h~~r) 3.58 tt OK
Average head on the sedimentation basin and sand filter (h~ 4 tt
Runoff Coeffident (Rv) 0.89 (unitiess)
Type of Sand Fitter
Open sand filter? N Y or N
If this is an open sand filter. The dearance between the bottom of the sand tt
filter and the SHWT (dam)
Closed/pre-cast sand filter? Y Y or N
ff this is a closed sand filter: The dearance between the bottom of the sand 2 tt
filter and the SHWT (dam)
ff this is a dosed, underground dosed sand filter. The dearance beiween
the surface of the sand filter and the bottom of the roof of the underground 7 tt
structure (dam)
Form SW401-Sand Flter-Rev.1 Parts 1 and II. Project Design Summary, Page 1 of 3
4 Sedimentation Basin
Surface area of sedimentation basin (As)
Sand Filter
Surface area of sand filter (AF)
Depth of the sand media filter bed (dF)
Coefficient of permeability for the sand filter (k)
Time to drain the sand filter (t)
Time to drain the sand filter (t)
Additional Information
Does volume in excess of the design volume bypass the sand filter?
Is an off-line flow-splitting device used?
Does volume in excess of the design volume flow evenly distributed through a
vegetated filter'?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow?
Is the BMP located at least 30ft from surface waters (50ft if SA waters)?
Is the BMP localed at least 100ft from water supply wells?
Are the vegetated side slopes equal to or less than 3:1
Is the BMP located in a recorded drainage easement with a recorded access
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamberfforebay (Vtls~)?
What is the depth of sand over the outlet pipe?
Figure 1: Open Sand Filter
Flo«-
i
Sednueirtafion Saud Firtet
t.'LamUer C'hau~ber
i or F~~rrba~~ s
R"eu
. ----- t
i
l
tt
=` ft
LrSih~ S~ti~l c Sea~ouablt': Hi_•I~ Rater Tahle
.................................
tit sP~a
96 ft OK
13,600 ftz OK
Oft
6 (ft/day)
6.66 hours OK
0.28 days
Y YorN
Y Y or N OK
N YorN
Oft
N YorN
Y YorN
Y YorN
Y YorN
Y YorN
Oft
Oft
Permit Number:
(to be provided byOWQ)
Excess volume must pass through filter.
Show how flow~is event' distributed.
OK
OK
OK
OK
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
Permit Number:
(to be provided by DWQ)
Figure 2: Closed Sand Filter
'„\ \` ~ ~' Co~'u Lir atc;
\Cou _
F7nts ~- ~ ~ - Sand
\_\\~ \ \~~~\ r_~uflct Yipe
-\~~~r~
,~p-,e~
FI ~ ~ ~ 1 .. .....................
~.
~, 1
?i2" fi..
C'oua ete for otLcr \~ T•--, . ,~ ~-
~hn: heal materialf ~ F.- `'
..
Li-Sihr Sod t' tt ~ '3H6JT
Sea~anabl~- Hi J~
tz atu Table
\;-ata Seduuentation C'haurUer (F~Freb.r, ~ `- tiaud Filter C6awbet
iHes~ry >elvr;en:s. (Trspped Sotds~
C'olleeked pr~ru~s. Debns}
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3
Permd No.
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirements have been met. if the appl'ICant has designated an agent, the
agent may initial bebw. ff a requirement has not been met, attach justification.
initials Pagel Plan
Sheet No.
~~~ 3 •~ 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries
3.3 -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
3 , F3 chamber
3 .(o -Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROVI~,
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
3 a
~f~ -Boundaries of drainage easement.
2. Plan details (1" = 50' or larger) for the sand filter showing:
- System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
- Flow splitting device,
- Recorded drainage easement and public right of way (RO111r),
- Design at ultimate build-out,
- Off-site drainage (if applicable), and
3 8 -Boundaries of drainage easement.
3. Section view of the sand filter (1" = 20' or larger) showing:
- Depth(s) of the sedimentation chamber and sand filter chamber,
-Depth of sand filter media
-Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level{s)
-Outlet pipe, and
-Clearance from the surface of the sand filter to the bottom of the roof of the underground structure ('If
applicable) _
L o~ 4. Supporting ca~ulations (including drainage ca~ulations)
'- 1 ~ 5. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Fitter-Rev.1 Part Ill, Page 1 of 1
Permit Number.
(to be provided by DWQj
NCDENR
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
SAND FILTER SUPPLEMENT
This form must be filled out online, prinfed and submitted with all of the required information.
Make sure to also fill out and submit the Required Items Checklist (Section Jtl) and the 18M Agreement (Section tl~
o=off .,n! ATF~QG
> ~
O
I. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-698-9500
Date November 2, 2007
Drainage area number 6S -Sand Ffter B
ff. DESIGN INfORMATION
Site Characteristics
Drainage area (Ao) 105,230 ftz OK
Impervious area 105,230 ftz
Impervious (IA} 100.0%
Design rainfall depth 1.0 in
Peak Flow Calculations
Dces this project require prelpost control of the 1-yr 24-hr peak flow? N Y or N
1-yr, 24hr runoff depth in
1-yr, 24hr intensity in/ttr
Pre-developrr~rtt 1-yr, 24hr runoff ft Is~ec
Post-development 1-yr, 24-hr runoff ft3/sec
PrelPast 1-yr, 24hr peak control ft3/sec
Storage Volume
Design volume 8,331 ft3
Adjusted water quality volume (WQV,~ 6,248 ft3 OK
Volume contained in the sedirr~ntafion basin and on top of the sand filter. 30,659
Maximum head on the sedimentation basin and sand filter (h~~} 4.35 ft OK
Average head on the sedimentation basin and sand filter (h!~ 1.09 ft
Runoff Cceffident (Rv) 0.95 (unitless)
Type of Sand Filter
Open sand filter'? N Y or N
ff this is an open sand filter. The clearance between the bottom of the sand ft
fitter and the SHWT (dam)
Closedlpre-cast sand filter? Y Y or N
If this is a dosed sand filter. The clearance between the bottom of the sand 4 ft
fitter and the SHWT (dam}
ff this is a dosed, underground dosed sand filter. The clearance between
the surface of the sand fitter and the bottom of the roof of the underground 7.65 ft
structure (dam)
Forth SW401-Sand Filter-Rev.i Parts I and If. Project Design Summary. Page 1 of 3
Permit Number.
(to be provided by DWQ)
Sedimentation Basin
Surface area of sedimentation basin (As) 48 ftz OK
Sand Filter
Surface area of sand filter (AF) 7,000 flz OK
Depth of the sand media filter bed (dF) 3 ft
Coefficient of permeability for the sand filter (k) 6 (ft/day)
Time to drain the sand filter (t) 4.76 hours OK
Time to drain the sand filter (t) 0.20 days
Additional Information
Does volume in excess of the design volume bypass the sand filter? Y
Is an off-line flow-splitting device used? N
Does volume in excess of the design volume flow evenly distributed through a N
vegetated filter?
YorN
Y or N Insufficient flow splitter.
YorN
What is the length of the vegetated filtel? 0 ft
Does the design use a level spreader to evenly distribute flow? N Y or N
Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Y Y or N
Is the BMP localed at least 100ft from water suppty wells? Y Y or N
Are the vegetated side slopes equal to or less than 3:1 Y Y or N
Is the BMP located in a recorded drainage easement with a recorded access Y Y or N
easement to a public Right of Way (ROW)?
What is the width of the sedimentation chamberfforebay (W~)? 4 ft
What is the depth of sand over the outlet pipe? 3 ft
Figure 1: Open Sand Filter
Seilunentahi'° ti;md Filtrr
~-'ltomber ~ 'h:uuhri
(ur Foreba~• 1
Floe- ~Ce° ~.~udet Pipe
i - - - i. ..
i ~~ ._~___..-l,_.
. ~~ tt ___ _ ~` tt _ -. __ ......
ii
_-T_ -_-- __ _~..
Iu-Sda Soil `: Sras~.nmblk Hr_h ~~-aler Tablr
i f~Fipe '• c1F
..~....
..g.
E ~_~..,~_,i.
F~ccess volume must pass through filter.
Show how flow is evenly distributed.
OK
OK
OK
OK
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 2 of 3
Permit Number.
(to be provided by DWQ)
Figure 2: Closed Sand Filter
,. , .. ,.
\, ~ ~ C ovcr i~l atc?
j:1..t" .. ~,!~,~ -~ -.... till()
~~~~\ ~~,
~- etlami
~~ i
~~ ~ i '
. t_
...
C'on: rctc f or ether j'~, \., "•,_; •. ~ ~°'- ~ -
shixhualnlatenaU ~~•~ f. - -._~:....f ... ....................t
Lr SRU Soil ~~ ^~_ t' H `::xcrr
Sca..ouabh-Hi11-
!~`ater Table
ficdmlentat~ou Chamber iF.ireb:~; ~ '• ':aud Fillet C'hambel
\t.`atct (Hc,:ry sr9ia: r~3>, f Ttapprd SoLds
('olleiteil Or~c, Debn:)
-~` s.,,~....
Form SW401-Sand Filter-Rev.1 Parts I and II. Project Design Summary, Page 3 of 3
Permit No.
(to be provided by DWQ)
111. REQUIRED STEMS CNECKI.IST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal
package will result in a request for additional information. This will delay final review and approval of the project. Initial
in the space provided to indicate the following design requirerr~nts have been met. If the applicant has designated an agent, the
agent may initial below. tt a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet Mo.
~~ 3 • ~ 1. Plans (1 ° - 5tY or larger) of the entire site with labeled drainage area boundaries
U' ~ , d -System dimensions (length, width, and depth) for both the sedimentation chamber and the fitter
chamber
- Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROW),
-Design at ultimate build-out,
-Off-site drainage ('rf applicable), and
- Boundaries of drainage easement.
G~~ ~ 2. Plan details (1" = 50' or larger) far the sand filter showing:
?~ b -System dimensions (length, width, and depth) for both the sedimentation chamber and the filter
chamber
- Maintenance access,
-Flow splitting device,
- Recorded drainage easement and public right of way (ROW),
-Design at ultimate build-out,
- Off-site drainage (rf applicable), and
-Boundaries of drainage easement.
C-~ti ~ • ~ 3. Section view of the sand filter (1" = 20' or larger) showing:
~ . 3w - Depths} of the sedimentation chamber and sand filter chamber,
-Depth of sand filter media
-Connection between the sedimentation chamber and the sand filter chamber,
- SHWT level(s)
- Outlet pipe, and
-Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if
applicable)
c,SG ~ ~" 4. Supporting calculations (including drainage calculations)
c.SL c o ~ 5. Signed and notarized inspection and maintenance agreement
Form SW401-Sand Filter-Rev.1 Part III, Page 1 of 1
Permit Number:
(to be provided by DWQ)
O~pF GMAT FRpG
y 9
> y
NCDENR Q
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
BIORETENTION CELL 5UPPLEMENT
This form must be filled out printed and submitted.
The Required -tems Checlslisf (Part Ill) must be printed, filled out and submitted along with all of the required information.
f. PROJECT INFORMATION
Project name Waynesville Commons
Contact name Charles Christy
Phone number 828-687-9500
Date
Drainage area number
November 2, 2007
1S, 2S
It. DESIGN INFORMATION
Site Characteristics
Drainage area 384,147 ftz
Impervious area 378,427 ftz
Percent impervious 98.5%
Design rainfall depth 1.0 inch
Peak Flow Calculations
Is prelpost control of the 1-yr, 24-hr peak flow required? N (Y or N)
1-yr, 24-hr runoff depth in
1-yr, 24-hr intensity in/hr
Pre-devebprrrent 1-yr, 24-hr peak flow ft3/sec
Post-developrr~nt 1 yr, 24-hr peak flow ft3/sec
Pre/Post 1-yr, 24fir peak control ft3/sec
Storage Volume: Non-SR Waters
Design volume 24,752.0 ft3
Ponding depth of water 24 inches Insufficient ponding depth.
Ponding depth of water 2.00 ff
Surface area of the top of the bioretention cell 18,425.0 ftz OK
Length: 226 ft OK
Width: 89 ft OK
-or- Radius ft
Storage Volume: SR Waters
1-yr, 24fir depth in
Pre-development 1-yr, 24-hr runoff ft3
Post-development 1-yr, 24-hrrunoff ft3
Minimum volume required ft3
Volume provided ft3
Soils Report Summary
Drawdown time, ponded volume 6 hr OK
Drawdown time, to 24 inches below surface 24 hr OK
Drawdown time, total: 30 hr
!n-situ soiL•
Soil type Sandy Loam
Soil pem~eablity 6.00 in/hr
Planting media soil
Soil type ASTM 5268
Soil pemteability 6.00 in/hr OK
Soil composition
°!o Sand (by weight) 87% OK
Fonn SW401-Bioretention-Rev.1 Parts f and II. Design Summary, Page 1 of 2
Permft Number.
(to be provided by DWQ)
°~ Fines (by weight)
Organic (by weight)
Phosphorus Index (P-Index)
Basin Elevations
Temporary pool elevation
Planting elevation (top of the mulch)
Bottom of the cell
Planting depth
Depth of mulch
SHWT elevation
Are underdrains being installed?
10% OK
3% OK
Total: 100°l0
20 (unitiess} OK
2754 fmsl OK
2752fms1
2750 fmsl
2tt
4 inches OK
1 fmsl OK
How many dean out pipes are being installed?
What factor of safety is used for sizing the underdrains? (See
BMP Manual Section 12.3.6)
Additional distance between the bottom of the planting media and
the bottom of the cell to account for underdrains
Bottom of the cell required
Distance from bottom to SHWT
Type of bioretention ceA (answer "Y" ro only one of the two
folbwing questions):
Isthis a grassed cell?
Is this a cell with trees/shrubs?
Planting Plan
Number of tree species
Number of shrub species
Number of herbaceous groundcover species
Additional Information
Does volume in excess of the design volume bypass the
bioretention cell?
Does volume in excess of the design volume flow evenly distributed
through a vegetated filter?
What is the length of the vegetated filter?
Does the design use a level spreader to evenly distribute flow/?
Is the BMP Dated at least 30 feet from surface waters (50 fee# 'rf
SA waters)?
Is the BMP kx;aled at least 100 feet from water supply wells?
Are the vegetated side slopes equal to or less than 3:1?
Is the BMP boated in a recorded drainage easement with a
recorded access easerr~r-t to a public Right of Way (ROW)?
Inlet velocity (from treatment system)
Is the area surrounding the cell likely to undergo development in
the future?
Are the slopes draining to the bioretention cell greater than 20~°?
Is the drainage area permanently stabilized?
Pretreatment Used
(Indicate Type Used with an "X" in the shaded celt)
Gravel and grass
(flinches gravel followed by 3-5 tt of grass)
Grassed swale
Forebay
Y (Y or N)
2 Insufficient number of clean out pipes provided.
6
1tt
2749fmsl
2748 tt OK
Y (Y or N) OK
N (Y or N)
8 OK
89 OK
Y (Y or N)
N (Y or N)
Oft
N (Y or N)
Y (Y or N)
Y (Y or N)
Y (Y or N)
Excess volume must pass through fitter.
Show how flow is evenly distributed.
~~n ~fM v~r~~r~
OK
Y (Y or N) OK
5.21 ft/sec Insufficent inlet vetodty unless energy dissipating devices are
being used. ~2/~ ~ ~ @ /til(~'T'
N (Y or N)
N (Y or N) OK
Y (Y or N) OK
X OK
X_
X
Fonn SW401-8ioretention-Rev.1 Parts I and II. Design Summary, Page 2 of 2
Pemlit No:
(to be assigned by DWQ)
IU. REQUtRfD ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project Infial in the space provided to
indicate the folbwing design requirements have been met If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Pagel Plan
Initials Sheet No.
T~ I.O 1. Plar~ (1' - 50' or larger) of the entire sifie showing:
2 . D - Design at ultimate build-out,
3 , p -Off-site drainage (if applicable).
L ~ ' L 3 -Delineated drainage basins (include Rational C coetficlent per basin),
- Cell dimensior>s,
- Pretreatment systhm,
-High flow bypass system,
-Maintenance access,
-Recorded drainage easement and public right ~ way (BONN),
-Clean out pipe locations,
-Overflow device, and
- Boundaries of drainage easement
~~L 3 ~ ~ 2. Plan details {1 • = 30' ~ larger) for the bioretention cell shoti+ring:
2 a - CeN dimensior>s
3 ~~ - Pretreatment system,
- Hgh flow bypass system,
-Maintenance access,
- Recorded drainage easerr~nt and public right of way (BONN),
- Design at ultimate buikf-out,
-Off-site drainage {if applicable),
- Clean out pipe locations,
- Overflow devise, and
-Boundaries of drainage easement
~~~ 3 •~ 3. Section vi~v of the bioretention cell (1" = 20' or larger) showing:
- Side slopes, 3:1 or lower
- Urrderdrain system (if applicable), and
- Bioretention ceN layers (ground level and slope, Pre-treatment, Ponding depth, mush depth, fill media
depth. washed sarxi, fitter fabric (or cl>olarg stone 'IF appligble), #57 stone, undendrair~ (if applipble),
SHVVT level(s), and overflow stnx~urej
..~G ~ 1- ~ ~ 4. A soils report that is based upon an actual field investigation, sail borings, arxi infithation tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of ~i~ infomration. All
elmratiorrs shah be in feet mean sea lew:l (frrrsl). Resufls of soils tests of both the planting soil and the in
situ soil must include:
-Soil permeability,
- Sal r~mposition (% sand. % fines, % organic), and
,_(1' ~
~ (- L ~ - P--
5. A detailed planting plan (1' = 20' or larger) pr~ared by a qualified individual showing:
- A variety of suitable specles,
-Sizes, spaclng and locations of plantings,
-Total quantity of each type of plant specified,
- A planting detail,
-The source nursery for the plants, and
- Fertil¢er and watering requirements to establish vegetation.
G~ L C ~~ 6. An assurance brat the installed system will rrre~ design speclflca6orrs upon initial operation once the
Project is complete and the entire drainage area is stablTzed.
~~ ~' Cr9 _i1.=~ • 3 7. A construction sequence that stows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized.
~ ~ of ~" 8. The supporting ca~rrlations (including underdrain cakrrlations, if applicable).
(/,S C~ ~(L % 9. A copy of the signed and notarized inspection and rrraintenance (I&M) agreement
G U j Vl GI 1.~ 10. A copy of the deed restriction.
Form SW401-Bioretention-Rev.1 Part III, Page 1 of 1
Permit Number:
(to be provided by DWQ)
r
O~O~ tTJ A TF9OG
~~ ~ r
~
~~~ ~
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
401 CERTIFICATION APPLICATION FORM
GRASSED SWALE SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must also be 611ed out, printed and submitted along with all of the required information.
f. PROJECT INFORMATION
Project name WaynesviNe Commons
Contact name Charles Christy
Phone number 828-687-9500
Date November 2, 2007
Drainage area number 1S
II. DESIGN INfORMATION
Site Characteristics
Drainage area 19,875 ft
Impervious area 17,745 ftz
Percent impenrious 89.3% %
Design rainfall depth 1.0 inch
Peak Flow Calculations
10-yr, 24-hr runoff depth 3.77 in
10-yr, 24a1r intensity 4.56 inr'hr
Post-development 10-yr, 24-hr peak flow 1.92 fC~/sec
Velocity
Maximum non-erosive vek>cify (peak 10-year storm) 5.5 ft/sec
Soil characteristics (enter "x" beknv)
Sand/sift (easily erodible)
Clay mix (erosion resistant) X
Grass Type (enter "x" below)
Bermuda
Tall fescue
Bahiagrass
Kentucky bluegrass X
Grass-legume mixture
Swale type: Fill out one of the options below:
Option 1: Curb Outlet Swale: N (Y or N)
Maximum vekociiy
Side slopes :1
Swale length tt
Option 2: Conveyance Swab. Seeking Pollutant Credit N (Y or N)
Maximum vekx~iy for 10-yr storm ft/sec
Side slopes :1
Swale length ft
Option 3: Conveyance Swale, Nof Seeking Pollutant Credit Y (Y or N)
Maximum velocity 4.2 OK
Side slopes 3 :1 OK
Form SW401-Grassed Swale-Rev.1 Parts 1 and II. Project Design Summary, Page 1 of 2
Permit Number.
(to be provided by DWQ)
~ r
Swale Characteristics
Swale Shape: Enter an 'x" in the appropriate cell below:
Trapezoidal
Parabolic
V-shaped
Width of the bottom of the swale
Width of the top of the Swale
Maintenance agreement: Is this included in the application?
This design is for the following design option:
Option 1: Curb outlet swats
Option 2: Conveyance Swale, seeking pollutant credit
Option 3: Conveyance Swale, not seeking pollutant txedtt
Additional Inforrrration
Is the Swale sized for all runoff from ultimate build-out?
Is the BMP located in a recorded drainage easement with a
recorded access easement to a public Right of Way (ROW)?
What is the distance from the bottom of the swats to the SHWT?
What is the ground level elevation?
What is the elevation of the bottom of the Swale?
What is the SHWT elevation?
What is the longitudinal slope of the swats?
What is the depth of freeboard?
n
2 tt
19 tt
Y (Y or N)
N
N
N
Yes
Yes (Y or N)
0.4 it
2760.9 fmsl
2759.0 fmsl
2758.6 fmsl
0.1 °k
U.7 tt
OK
OK
OK
OK
OK
Form SW401-Grassed Swale-ftev.l Parts 1 and II. Project Design Summary, Page 2 of 2
Permit No:
- (to be assigned by DWQ)
Itl. REQUIRED ITEMS CHECKLIST
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package
will result in a request for additional information. This will delay final review and approval of the project. Initial in the space
provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial
below. If a requirement has not been met, attach justification.
Initials Pagel Plan
Sheet No.
-~ ~- ' ="' 1. Plans (1" + 50` or larger) of the entire site showing:
~% -Design at ultimate build-out,
j , `~ -Off-site drainage (if applicable),
-Delineated drainage basins (include Ratronal C coefficient per basin),
- Swale dimensions (width, length, depth),
-Maintenance access,
- Recorded drainage easement and public right of way (ROWj,
-Grass species, and
- Boundaries of drainage easement.
(~~ ~ L 3 - ~ 2. Plan details (1' = 50' or larger) for the grassed swale showing:
~, j - ~ ; -Swale dimensions (width, length, depth),
- Maintenance access,
- Recorded drainage easement and public right of way (ROW),
- Design at ummate build-out,
-Grass species,
- Off-site drainage (ifi applicable),and
-Boundaries of drainage easemen#.
(, } ~:, <~
~
3. Section view of the grassed swale (1" = 20' or larger) showing:
- Side s~pes,
- Longitudinal slope,
-Freeboard
-Swale dimensions, and
- SHWT level(s)
5 L 4. Supporting calculations (including maximum velocity calculations for applicable storms)
r ~,'t L~ L j- t- ~ 5. An assurance that the installed system will meet design specifications upon initial operation once the
(, .~~ 4, . 3 project is complete and the entire drainage area is stabilized.
,1.ZC: i~ •~ ~ ~ - ~ 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the
entire drainage area is stabilized.
C~ 1 ~ ^v: 7. The supporting calculations (including underdrain calculations, if applicable).
~~ ~ 8. A copy of the signed and notarized inspection and maintenance (I&M) agreerr{ent.
(;;T v . ~~ ~~ 9. A copy of the deed restriction.
SW401-Grassed Swale-RevJ Part {II, Page 1 of 1