HomeMy WebLinkAbout20211267 Ver 2_Design/Maps/Site Plans Revised_20240212Homewood, Sue
From: Pitner, Andrew
Sent: Monday, February 12, 2024 3:59 PM
To: Homewood, Sue
Subject: FW: [External] Long Creek Greenway and Stream Enhancement - Phase 3 (DWR #
202112678 v2 & SAW-2023-00047): Stream Crossing Modification
Attachments: Fig 5.2_LongCreekP3_PCN_Impacts_Crossing_Adjustment_Mclntyre_Creek. pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Andrew Pitner, P.G. - Andrew. Pitner(a�ncdenr.aov
Division of Water Resources - Water Quality Regional Operations
Mooresville Regional Office (MRO)
North Carolina Department of Environment & Natural Resources
610 East Center Avenue, Suite 301, Mooresville, NC 28115
MRO Main Phone: (704) 663-1699
Direct Office Phone: (704) 235-2180
MRO Fax: (704) 663-6040
DWR website: http://www.ncwater.org
NOTICE: Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
From: Ian Eckardt <ieckardt@wildlandseng.com>
Sent: Monday, February 12, 2024 3:24 PM
To: 'Dailey, Samantha J CIV USARMY CESAW (USA)' <Samantha.J.Dailey@usace.army.mil>; Pitner, Andrew
<andrew.pitner@deg.nc.gov>
Subject: [External] Long Creek Greenway and Stream Enhancement - Phase 3 (DWR #202112678 v2 & SAW-2023-
00047): Stream Crossing Modification
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Hey Sam & Andrew,
Construction has started on Long Creek Greenway and Stream Enhancement Phase 3 (DWR #20211267 v2 & SAW-
2023-00047) and the contractor let us know that installation of one of the temporary stream crossings is not
feasible at its current location on McIntyre Creek. We'd therefore like to shift the crossing 50 to 100 feet
downstream of the permitted location (see attached figure for location). The shift would result in an additional
temporary impact along McIntyre Creek because temporary impact S15 is still necessary to remove an existing
golf cart bridge.
Would the additional impact require a permit modification? If so, what documentation (GIS figure, etc.) would be
sufficient to document the adjustment?
Thanks,
Ian Eckardt, PWS I Senior Environmental Scientist
0:704.332.7754 x108 M: 704.517-4988