Loading...
HomeMy WebLinkAboutNCC202743_NOT Closeout Documents (4)_20240208 PROJECT Sunset Grove Phase 2 CHATHAM COUNTY NORTH C A R O L I N A PERMIT# 2018-03373 l �� INSPECTION 1/19/2024 CERTIFICATE DATE OF COMPLETION Chatham County INSPECTOR Franky Sykes Watershed Protection Department THIS CERTIFICATE OF COMPLETION CERTIFIES THAT: • Final Inspection is Approved The project has been inspected by a Chatham County erosion control inspector. Under the referenced permit(s), the site is found to be in compliance with the approved plans and the Chatham County Soil Erosion and Sedimentation Control Ordinance. Inspection Comments All temporary erosion control measures have been removed and permanent ground cover sufficient to restrain erosion has been established. Final conversion of stormwater BMPs is completed. • Land Disturbing Permit(s) Closed The referenced permit(s) have been closed. • NCDEQ DEMLR Self-Inspections Suspended No additional erosion and sediment control self-inspections are required. • Coverage Under NCG010000 Terminated The referenced project is released from coverage and requirements of the NPDES General Stormwater Permit for Construction Activities (NCG010000) issued by the NCDEQ Division of Energy,Mineral, and Land Resources. Erosion Control Final Inspections Form Rev 1,March 2018 Page 1 of 1