Loading...
HomeMy WebLinkAboutWQ0029859_Application (FTSE)_20080625L. Z 0 H a 0 U. 0 H Q V J IL IL a ►M _0 H a 0 U. Z W IL r1, USE THE TAB KEY TO MOVE FROM FIELD TO FIELD! Application Number: n (to be completed by DWG)�V 1. Owner/Permittee: 1 a. South Granville Water and Sewer Authority (SGWASA} Full Legal Name (company, municipality, HOA, utility, etc.) 1 b. Lindsay L. Mize -Executive Director J Signing Official Name and Title (Please review 15A NCAC 2T .0106 (b) for authorized signing officials!) 1c. The legal entity who will own this system is: ❑ Individual ❑ Federal ® Municipality ❑ 1d. e. Butner Corporation ❑ Other (specify): Mailing Address City 1f. _ _ North Carolina _ 1g. 27509 State Zip Code J 1 h. _ 919-574-4068 71j. 919-575-4652 Ili. Imize s asa.o - Telephone Facsimile _ E-mail - 2. Pr_o_iec_t (Facility) Information: 2a. "note Phase 3 2b. Granville Brief Project Name (permit will refer to this name) Where Project is Located ;' 3. ----County Contact Person: __ r 3a. Tracy Parrott - Project Manager Name and Affiliation of Someone Who Can Answer Questions About this Application 't. J Z 3b. 919-732-3883 - be racy.parrott@summit-engineer.com_ Phone Number E-mail I. Project is ❑ New ® Modification (of an existing permit) If Modification, Permit No.: WQ 0029859 :2. Owner is ® Public (skip to Item 8(3)) ❑ Private (go to Item 2(a)) 2a. If private, applicant will be: 12b. If sold, facilities owned by a (must choose one) ❑ Retaining Ownership (i.e. store, church, single office, etc.) or ❑ Public Utility (Instruction C) ❑ Leasing units (lots, townhomes, etc. - skip to Item S(3)) ❑ Homeowner Assoc./Developer (Instruction D) ❑ Selling units (lots, townhomes, etc. - go to Item B(2b)) :3. South Granville Water and Sewer Authority Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project Aa. SGWASA Wastewater Treatment Plant _ 4b. NC 0026824 Name of WWTF WWTF Permit No. 5a. SGWASA T 5b. 8" ® Gravity c. WQ 0022593 Owner of Downstream Sewer Receiving Sewer Size ❑ Force Main Permit # of Downstream Sewer (Instruction E) 6. The origin of this wastewater is (check all that apply): 0 % Domestic/Commercial ® Residential Subdivision ❑ Retail (Stores, shopping centers) [IApartments/Condominiums ❑ institution 0 %Industrial (attach ❑ Mobile Home Park ❑ Hospital description.) ❑ School ❑ Church (RO: contact your Regional Office ❑ Restaurant ❑ Nursing Home Pretreatment staff) ❑ Office ❑ Other (specify): 100% single-family residence - _eg , ;4A --,,. 7. Volume of wastewater to be allocated or permitted for this particular project: oaIlDns per day *Do not Include future flows or previously permitted allocations 8. If the permitted flow is zero, indicate why: ❑ Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit No. ❑ Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) FTA12107 7: Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item 13(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7). Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f). Phase 3 = (61 single-family houses) x 360gpd = 21,960gpd (** Original allocation was for 26,040gpd based on preliminary design. Final design yields fit lots and requires 21,960gpd**) 10. Summary of Sewer Lines to be Permitted (attach additional sheets if necessary) Size (inches) 8 Length (feet) 3,985 New Gravity or Additional Force Main Gravity 1. Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Station Location ID Design Flow (MGD) Station Location ID chosen - as shown on plans/map for Operational Point Power Reliability Option GPM @TDH 1 -permanent generator w1ATS; Force Main Size Force Main Length 2 - portable generator w1MTS chosen - as shown on plans/map for Design Flow Operational Point Power Reliability Option (MGD) GPM @TDH 1 - permanent generator w1ATS; Force Main Size Force Main Length 2 - portable generator wlMTS Pump Station Location ID, Design Flow (MGD) (self chosen - as shown on plans/map for reference) Operational Point Power Reliability Option GPM @TDH 1 - permanent generator w1ATS; Force Main Size Force Main Length 2 - portable generator w/MTS 12. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? ❑ Yes ® No If Yes, permit number of 2"d treatment facility _ '(RO — if "yes" to 13,12 please contact the Central Office PERCS Unit) 13. Does the sewer system comply with the Minimum Design Criteria for the Fast Track Permitting of Pump Stations and Force Mains (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable? ® Yes ❑ No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION FTA 12/07 �14. Have the following permits/certifications been submitted for approval for the system or project to be served? WetlandfStream Crossings - General Permit or 401Certification? ❑ Yes ❑ No ® NIA Sedimentation and Erosion Control Plan? ® Yes ❑ No ❑ NIA Stormwater? ® Yes ❑ No ❑ NIA 15. Does this project include any high priority lines, [see 15A NCAC 02T .0402 (2)] involve aerial lines, siphons, or interference manholes)? These lines will be considered high Priority and must be checked once every six months Check if Yes: ❑ and provide details 1. OwnerlPermittee's Certification: (Signature of Signing Official and Project Name) 1, Linsay L. Mize, attest that this application for Wynn -gate Phase 3 has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per viola_tlon. la. ig�nlng Official Signature Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY TO OTHER UTILITIES, DESIGN CALCULATIONS. ETC. REFER TO 15A NCAC 02T .0305 Z O Q2. Professional Engineer's Certification: (Signature of Design Engineer and Project Name) V 1, Tracy Parrott attest that this application for Wynn -gate Phase 3 has been reviewed by me and is accurate, complete LL and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February W 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June t.± 1, 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10, 000 as well as civil penalties up to $25, 000 per violation. 2a. Tracy Parrott, PE ���++�+� i i►'iii { Professional Engineer Name ` •ES51 �% 2b. Summit Consulting Engineers Engineering FirmSEAL 9f _ 2c. 1000 Corporate Drive, Suite 101 23100 Mailing Address - 2d. Hillsborough 2e. NC 2f. 27278 City ! state f zip ,yN L 2g. 91 23 3883 2h, 919-732-6676 2i. tracy.parrott@summit- Tel ne Facsimile engineer.com �al/" PE Seal, ignature � ate FTA 12/07 I pF W A T� JUN 2 ! State of North Carolina _ Department f Environment �O G ...........-�------- Dep ent o Env�ro ent and Natural Resources C R RALEIGH REGi0h,,L OM Division of Water Quality 4 � Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE - 10i07) Project Applicant Name: Tracy Parrott, PE — Summit Consulting Project Name for which flow is being requested: Wynngate Phase III More than one FTSE-10107 may be requited for a single project if the owner of the WWTP is not responsible for- all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: South Granville Water and Sewer Authority b. WWTP Facility Permit #: NC 0026824 All flows are in MGD c. WWTP facility's permitted flow 5.50 d. Estimated obligated flow not yet tributary to the WWTP 1.659 e. WWTP facility's actual avg. flow 2.10 f. Total flow for this specific request .021960 g. Total actual and obligated flows to the facility 3.781 h. Percent of permitted flow used 68.75 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP Pump Station Name Approx. Capacity, MGD Approx. Current Avg. (Finn/Design) Daily Flow, MGD East Middleton Drive 0.2592 .0339 III. Certification Statement: I, Lindsay L. Mize, certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II for which �O the responsible party. Signature of this form indicates acceptance of this Official Signature Date Instructions for: Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—10/07) Section I a. WWTP` Facility -Name: Enter the name of the WWTP that will receive the wastewater flow. b. WWTP Facility Permit M Enter the NPDES or Non -Discharge number for the WWTP receiving the wastewater flow. c. WWTP facility'syermitted flow, MGD: From WWTP owner's NPDES or Non -Discharge permit. d. Estimated obligated flow not vet tributary to the WWTP, MGD: This includes flows allocated to other construction projects not yet contributing flow to the collection system. Flows allocated through interlocal agreements or other contracts not yet contributing flow to the collection system are also included. For POTWs that implement a pretreatment program, include flows allocated to industrial users who may not be using all of their flow allocation. Please contact your Pretreatment Coordinator for information on industrial flow tributary to your WWTP. As of January 15, 2008 the POTW should have reviewed flow allocations made over the last two years and reconciled their flow records, to the best of their ability, so it is known how much flow has been obligated and is not yet been made tributary to the WWTP, in accordance with local policies and procedures employed by the reporting entity. The obligated flow not yet tributary plus actual flow will be reconciled annually for systems at less than 60% of permitted flow used. Annual updates shall be submitted to the appropriate Regional Office by January 15 of each year and cover the previous calendar year. Semi -Annual updates shall be required when the percent of permitted flow used reaches 60%. Semi- annual time period are defined as January 1 through June 30 and July 1 through December 31. Semi- annual updates shall be submitted to the appropriate Regional Office by July 15 and January 15 of each year. Quarterly updates shall be required when the percent of permitted flow used reaches 80'.0. Quarters are defined as Qtrl (Jan -Feb -Mar); Qtr2 (Apr -May -Jun); Qtr3 (Jul -Aug -Sep); Qtr4 (Oct -Nov -Dec). Quarterly updates shall be submitted to the appropriate Regional Office by April 15, July 15, October 15 and January 15 of each year. e. WWTP facility's actual avg. flow, MGD: Previous 12 month average. f. Total flow for this specific request, MGD: Enter the requested flow volume. g. Total actual and obligated flows to the facility, MGD Equals [d + e - f] h. Percent of permitted flow used: Equals [(g / c)*100] For example: On January 15 a POTW with a permitted flow of 6.0 MGD, reported to the Regional Office that there is 0.5 MGD of flow that is obligated but not yet tributary. The annual average flow for 2007 is 2.7 MGD. The first Form FTSE-10,'07 submitted after January 15, 2008 may have numbers like this: c. — 6.0 MGD d. = 0.5 MGD e. = 2.7 MGD f. = 0.015 MGD g. = 3.215 MGD h. = 53.6 % The next Form FTSE-10107 may be updated like this: c. = 6.0 MGD d. = 0.515 MGD e. — 2.73 MGD f. = 0.102 MGD g. = 3.349 MGD h. — 55.8 % Each subsequent Form FTSE-10 `07 will be updated in the same manner. Section II List the name, approximate pump station firm (design) capacity and approximate current average flow (previous 12 months) through the pump station for each pump station that will be impacted by the proposed sewer extension project. Include the proposed flow for this project and other flows that have been approved for the pump station but are not yet tributary. Firm (design) capacity is the design average daily flow of the pump station as calculated by the design engineer or the station capacity with the largest pump out of service as per the Minimum Design Criteria if the design capacity is unknown. Section III Form FTSE-10/07 must be signed by the appropriate official as per 15A NCAC 02T .0106. JUN 2 6 2D South Granville Water and Se\,,fer authority October 19. 200 Board Board s:& Mir. Bob Anderson Miem 3DG VVvnnoa.e Associates, 1 1 C Ron 7000 S;Y Forks Road, Suite 115 AMOOOd, Paieigh, NC 2 `- 1 5 Chaff-� �n Subject: Preiirninary A:location Request — 1�Vynn'-gate Pthase .I€ Ken � Ray, � \rime 23,040 ga;ions per day of 1'�rat2r and SeIv r Chair ,pan Wynnga -e Subdivision P' a e 11 � S Granville County Cave Currin Jack i . Da\i' Dear Mr.. ,nderson: i,-r, t;s-an At its Octo',cr 1 i, rnceting the SGV\f',SA 3oard approved your pteiirninary allocation request ±or the subject project. ".s aer the SGEft�=;5`; k!ioca ion _-n Lane policy You -k-nftst s'..bmit to the SSW'. =t Clerl' a itC'-,":�'.� lu C a Cit�C)i in the Eocar amount of s8,208.00 by Ootober 21, 2DCE. The SG1'VASA Clerk's maiiing Smoak address is listed belevr, the physical address is Creed -moor City Hladl, Miasonic ,avenue, Creedmoor, Worth Caro!ins. Within six (0) months, the SGWASA Apri! 11, 200S regular meeting, BDG Wynngate Associates, ! ! C must submit to the C—%-:W,^-,SA Clark a request for l=€nal Allocation. This final allocation r?gJest must contain all of the appropriate documentation as re` --rancid lrtrithin the SG.WAS.4 ^,ll�CatiOn Policy (ses attached) and specif icaNy Sections S and 7. The information included in this final allocation request shall soaci-icaliy include but vtrill not be limited to the follolA'ing: Final Allocation request form completely tilled out v\rith all appropriate signatures. A final allocation check in the amount of t4-3,572.00. Copies of all local government planning and Toning approva!s. Copies of all other local government approvals or permits (i.e. tIo' acceptance letters, erosion/sedimentation control, roadv+vay improvements, etc.) .Staff Members ! inds2v L Di,eCior Jim Wre-)z_. ALtornev Sand -a artier, Cie-k C!O SGVVAS r:ier*, P. C. Box .765, Creedmoor, NC %7;z22 (919)529-3332 r ti 1919) 529-3092 Mr. Anderson October 19, 2005 Page 2 of 2 Final construction dra\,\ring prepared by a registered land surveyor \with --- ti-dui(;times-drat rrrrrb�-a^i `rprolfessional engineer, • Copies of all Stag and=ederal PermitLs:'r,pprovals whic`1 may inclide but are not limited to CORPS of -Engineers, Division of \'Aster Quality, Division of Public Water Supply, and pp-ooriate locum—anta=ion from NICDO i showing road design approval. ?lease be advised that this list is not exhaustive and it is your responsibility :0 pry\!Ile all information a5 Qudined l 4 he Sl:'iVrIkS.A foocat€on ooFIcy. if you rave any questions regarQl;ig he Sou: ,l Crab\!€i; 1r\�cter and ewe ",�thority'S Allocatioi� Poiici! �ieaSe CQnt?Ct s ++C 3t ( ) '3i 5i5 . Sincerely, Lindsay ! . r\liZ$ ;:acuL;ve Director C: Sandra Harper, SGVVASA Clark %.i jLjp k %J L S koj UNITED STATES STATE OF N01 scy� DEPARTMENT OF THE INTERFOR i)EPARTMEt#T OF NATURAL P GEOLOGICAL SURVEY PALE10H, NOF Yet.rw. P36*07'30axea 7F s' ju 17 ve ,I'!F ��, ry� � - +� � � [1' �' � .f'/jam/-ry — -I �k }ll _�'� -� h'• �j I 3 �ab.riN' �I I � i -}r!" �y .� i- y j+• { • 'GlSK� .Cp ..max:-*' :7/ Lan A wI QQ SUMMIT CONSULTING May 13, 2008 Mr. Barry Herzberg Environmental Engineer NCDENR - DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 ENGINEERING ■ ARCHITECTURE ■ SURVEYING Subject: Wynngate Subdivision — Phase III, Granville County Sewer Revision; Modification of Permit #WQ 0029859 Mr. Herzberg: E DENR RALEIGH REGIO"lt,l Please find enclosed for your review and approval a Fast -Track Application for permit modification on Wynngate Subdivision -Phase III. Revised plans for an alternate sewer routing have been reviewed and approved by South Granville Water & Sewer Authority and the application (Form FTA 12i07) has been executed accordingly. Also included it an executed Flow Tracking 1 Acceptance for Sewer Extension Permit Application (Form FTSE 10/07). The original Phase III sewer permit was issued on February 27, 2006. At that time, Granville County was the owner of the existing sewer system serving this area. Since that time, the sewer infrastructure has been transferred by agreement to South Granville Water and Sewer Authority. Thus the referenced applications have been generated accordingly. The original sewer design as permitted provided for the main to be aligned along proposed Road A, with gravity flow from west to east. This yielded the shortest, most direct collection system routing for Phase III. However, this routing opposed some portions of the existing topography, resulting in deeper mains to achieve the west -to -east gravity flow. Following issuance of the referenced permit, further field investigation of the site indicated significant blasting and rock excavation would be required to install the sewer mains as designed. The owner requested our firm analyze an alternate routing to avoid the deeper installations and associated rock excavation. A revised routing was designed for gravity sewer flow that generally follows the proposed street profiles and natural topography. An outfall was added along the lower side of Phase III parallel to the stream to collect flow from the street mains. This revision results in an increase in total length of main, as reflected in the application, but eliminates the deeper installations. In addition to avoiding the deep mains and mass rock, it is felt that the revised routing will result in a collection system that is more easily serviced and maintained. 1000 Corporate Drive • Suite 101 • Hillsborough, NC 27278 Telephone (919) 732-3883 • Fax (919) 732-6676 www.summit-engi,neer.com 314-A North Madison Boulevard • Roxboro, NC 27573 Telephone (336) 599-3900 • Fax (336) 599-7226 Your assistance with and approval of this modification is greatly appreciated. Should you have any questions regarding this information, please contact me at (919) 732-3883 (office) or (919) 201-5723 (mobile). Best Regards, SUMMIT CONSULTING, PLLC Engineering — Aecture -- Surveying >& PArrott, PE ect Manager SUMMIT CONSULTING ENGINEERING ■ ARCHITECTURE ■ SURVEYING June 25, 2008 Mr. Barry Herzberg Environmental Engineer NCDENR-DWQ Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Re: Wynngate Subdivision Phase III Fast -Track Application. Modification of Permit #WQ0029859 Dear Mr. Herzberg: Please find the Fast -Track Application, and additional submittal materials, for your review and approval of Wynngate Phase III. Modifications have been made to the sewer design after the original application was approved. Therefore, we are resubmitting the Fast -Track Application with a new application review fee of $480.00. Included with this submittal are the following: • (1) Original Fast -Track Application, plus (1) copy. • (1) Flow Tracking/Acceptance for Sewer Extension Permit Application. • (1) Copy of SGWASA preliminary allocation request letter • (1) Copy of USGS map. • (1) Check for $480. Please approve the modified Fast -Track Application, and send me a copy of the approval letter at your earliest convenience. If you have any questions, or require additional information, please contact me at (919) 732- 3883. Thank you for your time concerning this project. Sincerely, SUMMIT CONSULTING ENGINEERS, PLLC Alan Pytcher, Planner {i� 0 ? Land Development Group Summit Consulting pENR fu+i-EICH P,cGIC �__. J 1863 t/Phase III/DWQ-Sewer Letter.doc 1000 Corporate Drive • Suite 101 • Hillsborough, NC 27278 314-A North Madison Boulevard • Roxboro, NC 27573 Telephone (919) 732-3883 • Fax (919) 732-6676 www.summit-engineer.com Telephone (336) 599-3900 • Fax (336) 599-7226