Loading...
HomeMy WebLinkAboutNCS000424_MS4 Annual Report (2023)_20240213 NC5000518_NAVASSA 2023 ANNUAL SELF ASSESSMENT Reporting Line Year 2 BMP Reporting Measurable Goal Comments No. (Jan 1- Ref. Metric Dec 31) Did Fletcher submit the Annual Self-Assessment to NCDEQ prior to Self assessment for 2023(Year 2 of 2 2 1 February 28? YES permit cycle sent prior to 2/28/24) McGill Assoc assisted w/budget Did Fletcher evaluate methods and options for obtaining additional analysis and budget approved by funding? 10 2 3.B.2. YES Council June 12,2023 Did Fletcher determine if additional staffing and/or contract services will be This Activity was completed as part of 11 2 4.B.1. required for successfully implementing the SWMP? YES the Town's Budget Workshop. Did Fletcher execute a legal agreement with LOSRC to provide educational materials and activities that target Town of Fletcher audiences as listed in 13 2 5.B.1. Table 12? YES Yes,legal agreement signed 6-13-2023 Did Fletcher provide education and outreach to target audiences on topics per Table 12 each year so that all topics and audiences have been Sept.2023 Newsletter,(Yard Waste. 14 2 5.B.2. addressed by permit year 5? YES Number of Contacts:2000) Did Fletcher place educational stormwater literature in key locations at the 23 2 6.B.2. Town Hall facility? YES Front Office Counter/lobby area. Did Fletcher replace educational stormwater literature in key locations at Each month new brochures and 24 2 6.B.2. the Town Hall facility monthly? YES magnets. How many educational stormwater literature items were distributed? 60 25 2 6.B.2. Approximately 60. Did Fletcher make improvements to the Stormwater web page to include links to pertinent permitting authorities,applicable ordinances, MS4 Permit and SWMP,hotline and instructions for reporting illicit discharges and other environmental issues,opportunities for public Year 1,Stormwater Web Page with 45 2 8.B.1. involvement,mapping,and general stormwater awareness information? YES required information Updated Web Page 12-20-2023, Did Fletcher maintain the web page,including any updates and resolving removed broken links,added IDDE 48 2 8.B.2. technical issues? YES Plan Did Fletcher provide the hotline and pertinent information on the 53 2 9.B.1. Stormwater Web page and in all new stormwater literature? YES Continually maintaining. 58 2 10.B.1. Did Fletcher develop SOP for managing hotline calls? YES Created in Year 1. 64 2 10.B.2. Did Fletcher train staff on the SOP for managing hotline calls? YES Year 1 _ 65 2 10.B.2. Number of staff trained on the SOP for managing hotline calls? 2 Two additional staff,8-8-2023 Did Fletcher advertise Board meetings with stormwater issues and program March,May,August Mtgs SW(Detail 73 2 11.B.1. implementation items on web site? YES in Tracking Document) Did Fletcher create a list of potential volunteer groups and document their 79 2 13.B.1. main focus? YES Posted on web page 12-20-2023 Did Fletcher contact at least one of the volunteer groups and establish an 80 2 13.B.2. activity focused on stormwater issues? YES 3/22/2023 88 2 14.B.1. Did Fletcher plan a clean-up day for one of the Town's Parks? YES Occurred 4-28-2023(20 paricipants) Did Fletcher Create New MS4 Map and determine areas to be inventoried by creating three inventory areas that comprise approximately 1/3 of the 96 2 15.B.2. Town's jurisdictional area? YES 6/1/2023 113 2 17.B.3. Did Fletcher implement the IDDE Plan? YES 10/19/2023 Did Fletcher conduct a review of the IDDE Plan and make changes as 117 2 18.B.1. necessary? YES 12/9/2023 122 2 19.B.2. Did Fletcher perform IDDE inspections using the data sheet? YES 5 Inspections 126 2 19.B.2. Number of illicit/illegal discharges documented? 0 0 illicit Discharges 130 2 20.B.1. Did Fletcher develop an IDDE training program for staff? YES 12/11/2023 Did Fletcher train public works staff that will be using the IDDE Plan and 131 2 20.B.2. new employees that will be involved in IDDE,when hired? YES 12/11/2023 132 2 20.13.2. Number of staff trained on IDDE? 9 12/11/2023 Did Fletcher train municipal staff on proper handling of construction site 145 2 24.B.1. runoff control complaints? YES 8/8/2023 Number of staff trained on proper handling of construction site runoff 146 2 24.B.1. control complaints? 9 8/8/2023 Did Fletcher maintain adequate legal authority to require and enforce Henderson Co.Resolution and 155 2 25.B.2. construction site waste management? YES Fletecher Ordinance updated 2022 Page 1 of 2 NC5000518_NAVASSA 2023 ANNUAL SELF ASSESSMENT Did Fletcher track the number of low-density and high-density plan reviews 171 2 27 performed? YES Data from Henderson Co. 172 2 27 If so,how many low density project reviews were performed? 1 1 173 2 27 If so,how many high density project reviews were performed? 3 3 174 2 27 If so,how many low density project reviews were approved? 1 1 175 2 27 If so,how many high density project reviews were approved? 3 3 Did Fletcher maintain a current inventory of low-density projects and constructed SCMs,including SCM type or low-density acreage,location,last Yes,info was received by Henderson 192 2 27 inspection date and type of enforcement action(if any)? YES Cty and filed by the Town How many high density non-municipally owned SCM inspections were 28%of SCMs currently functioning 197 2 27 performed? 5 within the Town 202 2 27 How many low-density inspections were performed? 2 9/12/2023 No enforcement actions were necessary.Town filing inspection 0 reports for post construction inspections performed by McGill Assoc 207 2 27 How many post-construction enforcement actions were issued? on behalf of the Town. 220 2 31.B.1. Did Fletcher inspect a minimum of 20%of SCMs? YES 28%inspection reports on file. 5 SCMs Inspected by Town&Cert. 221 2 31.B.1. Number of SCM inspections performed? 5 Inspector Did Fletcher perform a site inspection of municipal facilities to determine and document items of potential for spills or stormwater pollution.Review 232 2 33.B.2. in place SPCC plans and update as necessary? YES 10/19/2023 233 2 33.B.2. Number of municipal facility site visits? 2 10/19/2023 Did Fletcher review in place SPCC plans for minicipal facilities and update as 234 2 33.B.2. necessary? YES 10/19/2023 235 2 33.B.2. Number of municipal facilities requiring a new SPCC plan? 2 10/19/2023 Did Fletcher put written spill response procedures put in place at municipal facilities that store or work with materials which have the potential to contribute to polluted runoff? 236 2 35.B.1. run-off shall be identified and? YES 12/21/2023 Did Fletcher review written spill response procedures with relevant 237 2 35.B.2. municipal facility staff? YES 12/21/2023 243 2 36.B.2. Did Fletcher inspect and maintain 20%of the MS4? YES 411 CBs cleaned 248 2 36.B.2. Total%of MS4 inspected to date? 58% Inspected and maintained 252 2 37.B.3. Number of storm drains/catch basins cleaned? 411 261 2 37.B.2. Did Fletcher complete an annual inspection of each municipal SCM? YES 12/15/2023 Did Fletcher create/maintain a list of all Town employees that hold 2 employees Listed in Town's Tracking 267 2 38.B.1. landscape chemical applicator certifications and their certification number? YES document file. Number of Town employees that hold landscape chemical applicator Certification numbers in Town's MS4 268 2 38.B.1. certifications? 2 Tracking document file. Did Fletcher train staff on the storage and handling of landscape materials 276 2 38.B.2. and pollution prevention procedures? YES 3/6/2023 Number of staff trained on the storage and handling of landscape materials 281 2 38.B.2. and pollution prevention procedures? 10 10 staff trained 3-06-2023 Did Fletcher develop an inspection checklist for vehicle and equipment 12/21/2023 Overview of list needs,list 285 2 39.B.1. facilities? YES to be finalized Jan.2024 Did Fletcher review/revise the street sweeping schedule and 295 2 40.B.1. implementation? YES Reviewed throughout the year. 296 2 40.B.1. Did Fletcher implement and document the street sweeping schedule? YES Yes throughout the year. 297 2 40.B.1. Miles of streets swept? 13 12.74 miles swept 308 2 40.B.2. Volume of leaves collected(cubic yards)? 250 250 cu yds leaves collected Did Fletcher implement the written schedule for catch basin inspection and 313 2 41.B.1. cleaning? YES Throughout the year. Did Fletcher create/maintain a document for procedures of spill clean-up Yes and confirmed with Fire Chief 12-2- 317 2 42.B.1. in emergency situations such as vehicle accidents? YES 2023 Page 2 of 2