Loading...
HomeMy WebLinkAbout20060912 Ver 1_Other Agency Comments_20060223H r~°~ L~ µ~~o ~ ~n •~~.~• STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR February 22, 2006 Mr. William D. Gilmore, P.E., Director Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Dear Sir: U~,o~.~~ ~°~~ ~~r ~~~~ ~~ ~ X55 F~B~~ ~~ ,.. S}o~h ~~~ , M~°~gTF ~ ~ea~/~~ LYNDO TIPPETT SECRETARY Subject: Proposed replacement of Bridge No. 59 on SR 1304 over Sutton Creek in Perquimans County. Federal Aid Project No. BRZ-1304 (7), State Project No. 8.2120401, TIP No. B-4228. The purpose of this letter is to request that the North Carolina Ecosystem Enhancement Program (EEP) grant confirmation that you are willing to provide compensatory mitigation for the project in accordance with the Memorandum of Agreement (MOA) signed July 22, 2003 by the USAGE, the NCDENR and the NCDOT. NCDOT proposes to replace existing Bridge No. 59 over Sutton Creek [DWQ Index # 30-6-8-(1), Class "C SW"], a warm water stream, on SR 1304 in Perquimans County. The project involves replacing the bridge at the existing location using an off-site detour. RESOURCES UNDER THE JURISDICTION OF SECTION 404 AND 401 OF THE CLEAN WATER ACT. We have avoided and minimized the impacts to jurisdictional resources to the greatest extent possible as described in the permit application. The remaining impacts to jurisdictional resources will be compensated for by mitigation provided by the EEP program. We estimate that permanent riverine wetland impacts associated with the replacement bridge approach work will be 0.208-acre from road fill, and clearing and grubbing activities. The project is located in the Coastal Physiographic Province (Northern Outer Coastal Plain EEP Ecoregion) in Perquimans County, in the Albemarle Sound Basin, Hydrological Cataloguing Unit 03010205. We propose to provide compensatory mitigation for the wetland impacts by using the EEP for the 0.208-acre of impacts. Please send the letter of confirmation to Mr. Bill Biddlecome (USAGE Coordinator) at U. S. Army Corps of Engineers Washington Regulatory Field Office, P.O. Box 1000, Washington, NC 27889-1000. Mr. Wescott's FAX number is (252) 975-1399. The current let date for the project is December 19, 2006. In order to satisfy regulatory assurances that mitigation will be performed; the NCDWQ requires a formal letter from EEP indicating their willingness and ability to provide the mitigation work requested by NCDOT. The NCDOT requests such a letter of confirmation be addressed to Mr. John Hennessy of NCDWQ, with copies submitted to NCDOT. Please respond to NCDOT in writing within 10 business days with an EEP acceptance letter for this NCDOT project. If you have any questions or need additional information, please contact Mr. Tyler Stanton at tstanton@dot.state.nc.us or (919) 715-1439. Sincerely, Gregory J. Thorpe, Ph.D., Environmental Management, Director Project Development & Environmental Analysis Branch Cc: Mr. John Hennessy, NCDWQ Ms. Nicole Thompson, NCDWQ Mr. Bill Biddlecome, USACE Ms. Cathy Brittingham, NCDCM Mr. Bill Arrington, NCDCM Ms. Linda Fitzpatrick, NCDOT Natural Environment Unit Mr. Majed Alghandour, P. E, NCDOT Project Management/Scheduling Unit Mr. Todd Jones, NCDOT External Audit Branch