Loading...
HomeMy WebLinkAboutSW6240201_Design Calculations (Riprap)_20240213 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 12-21-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Langdon Preserve Subdivision 2005 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 1 OUT Qio/Qfull = 0.31 Pipe Dia= 18 in V/Vfull = 0.87 Q10= 2.49 cfs V= 3.9 fps Qfull = 7.98 cfs Vfull = 4.51 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in III :•:•:•:•:•: Riprap Class = B i�����i���� L Apron Thickness = 18 in 0•0-0•0•0•: _�•������=�� 3 Apron Length 9.0 ft 1••�••�••�••�••�••�•• Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length Storm Outlet Structure FES No.= PIPE 2 OUT Q1o/Qfull = 0.88 Pipe Dia= 18 in V/Vfull = 1.13 Q10= 7.14 cfs V= 5.2 fps Qfull = 8.10 cfs Vfull = 4.58 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 9.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 10.5 ft Length 2005-Storm drainage.xlsx LATEST REVISION:2/13/2024 7:29 AM PAGE 1 OF 2 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 12-21-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Langdon Preserve Subdivision 2005 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CEK OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= PIPE 3 OUT Q1o/Qfull = 0.42 Pipe Dia= 18 in V/Vfull = 0.94 Q10= 7.68 cfs V= 9.6 fps Qfull = 18.08 cfs Vfull = 10.22 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 :44444.1* Apron Thickness = 22.5 in I 3 Apron Length = 12.0 ft Apron Width @ Outlet = 4.5 ft Apron Width @ End = 13.5 ft Length 2005-Storm drainage.xlsx LATEST REVISION:2/13/2024 7:29 AM PAGE 2 OF 2