Loading...
HomeMy WebLinkAboutSW3240202_Stormwater Report_20240212 (2) Stormwater Management & Erosion and Sediment Control Calculations Rowan 85 Trade Center Unincorporated Rowan County, North Carolina Prepared for: RP Salisbury Partners, LLC 445 Bishop Street NW Atlanta, GA 30318 Date: December, 2023 KHA Reference#: 013335005 ,,,\,III,,,, .•'*N CAR0 ." '• • SEAL 030861 VG•'•:LNG I NEEF;•��,� ,i'',,�,,,,,, �,,, 12/21/23 KimIey >) Horn ©Kimley-Horn and Associates,Inc.2023 200 South Tryon,Suite 200,Charlotte,NC 28202 Phone:704-333-5131 NC FIRM#F-0102 ROWAN 85 TRADE CENTER SALISBURY,NC STORMWATER MANAGEMENT & EROSION AND SEDIMENT CONTROL CALCULATIONS Prepared for: RP Salisbury Partners,LLC 445 Bishop Street NW Atlanta,GA 30318 Prepared by: KIMLEY-HORN AND ASSOCIATES,INC. 200 SOUTH TRYON ST,SUITE 200 CHARLOTTE,NORTH CAROLINA 28202 DECEMBER, 2023 KHA PROJECT NO. 013335005 This document,together with the concepts and designs presented herein,as an instrument of service,is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Hom and Associates,Inc.shall be without liability to Kimley-Horn and Associates,Inc. STORMWATER MANAGEMENT & EROSION AND SEDIMENT CONTROL CALCULATIONS TABLE OF CONTENTS 1.0 BACKGROUND 2 2.0 EXISTING CONDITIONS 2 3.0 SOILS 2 4.0 FLOODPLAIN/FLOODWAY/FIRM FLOOD INSURANCE RATE MAP 2 5.0 PROPOSED DEVELOPMENT 2 6.0 WATER QUALITY/ STORMWATER CONTROL MEASURES 3 7.0 STORMWATER ROUTING AND RESULTS 3 8.0 PIPE CONVEYANCE NETWORK 4 9.0 EROSION CONTROL 5 10.0 EROSION AND SEDIMENT CONTROL PLANS 5 11.0 CONCLUSION 8 APPENDIX A: SITE MAPS SITE VICINITY MAP FIGURE 1 USDA SOIL CLASSIFICATION MAP FIGURE 2 FEMA FIRMETTE FIGURE 3 USGS TOPOGRAPHIC MAP FIGURE 4 APPENDIX B: WATERSHED MAPS PRE-DEVELOPMENT DRAINAGE AREA MAP EXHIBIT 1 POST-DEVELOPMENT DRAINAGE AREA MAP EXHIBIT 2 APPENDIX C: WATER QUALITY PRE-AND POST-DEVELOPMENT CN AND TC CALCULATIONS EXHIBIT 3 NCDEQ SANDFILTER CALCULATIONS EXHIBIT 4 APPENDIX D: WATER QUANTITY PRE-AND POST-DEVELOPMENT HYDROCAD REPORT EXHIBIT 5 STORM SEWERS DATA TABLE EXHIBIT 6 APPENDIX E: EROSION CONTROL CALCULATIONS RIP RAP APRON CALCULATIONS EXHIBIT 7 NCDEQ SEDIMENT BASIN PHASE 1 CALCULATIONS EXHIBIT 8 NCDEQ SEDIMENT BASIN PHASE 2 CALCULATIONS EXHIBIT 9 TEMPORARY DIVERSION DITCH CALCULATIONS EXHIBIT 10 APPENDIX F: SUPPLEMENTAL INFORMATION SEASONAL HIGHWATER TABLE REPORT EXHIBIT 11 NOAA RAINFALL DATA EXHIBIT 12 1 1.0 BACKGROUND This report contains the approach and results of the stormwater analysis conducted for the proposed logistics center facility (Salisbury Logistics Center) in Salisbury, North Carolina. The approximately 91.56- acre project site is located east of 1-85 at the intersection of Webb Road. The development is planned to consist of approximately 2 industrial buildings totaling approximately 1,240,000 +/- SF, surrounding trailer parking and associate parking. This project consists of the following components: ■ Clearing and grubbing of the existing site. ■ Construction of the building and associated site appurtenances for operation (i.e. parking, driveways and sidewalks); ■ Construction of the stormwater conveyance network and proposed stormwater control measures. 2.0 EXISTING CONDITIONS The site is located east of 1-85, between Webb Road and Lane Parkway and is currently undeveloped. The existing topography drains towards three points of analysis (POA): approximately 4.58-acres towards the North of the site (POA 1), 67.14-acres towards the Northwest corner of the site (POA 2). The remaining 19.83-acres drains to a creek at the southern point of the site (POA 3). See appendix A for a Pre-Development drainage map. 3.0 SOILS According to the USGS Soils Map, downloaded on August 31, 2023, the existing soils onsite are: Cecil sandy clay loam with a hydrologic soil group B, Enon fine sandy loam and Mecklenburg loam with a hydrologic soil group C, and Sedgefield fine sandy loam, Iredell loam and Chewacla loam with hydrologic soil group D. In a separate report prepared specifically for this project, Terracon investigated four boring locations to understand the infiltration rates throughout the site. The infiltration rates were: 0.004, 0.007, 0.014 and 0.027 in/hr. Based on the reported findings from Terracon's testing and the results from the USGS Soils Maps, the calculations were done using hydrologic soil groups B,C and D. Refer to the appendix for the USDA Soil Classification Map. 4.0 FLOODPLAIN/FLOODWAY/FIRM FLOOD INSURANCE RATE MAP Based on the effective FEMA Flood Insurance Rate Map Number 3710564700J, dated June 16, 2009, the site is determined to be outside the 0.2%annual chance floodplain. 5.0 PROPOSED DEVELOPMENT The development is planned to consist of approximately 2 industrial buildings totaling approximately 1,240,000+/-SF, surrounding trailer parking and associate parking, utility infrastructure and stormwater improvements including three sand filters. The site will be composed of approximately 63.60 acres of impervious area. The site is divided into three drainage areas, one to the North of the site (DA-1), one in the center of the site (DA-2) and one in the South of the site (DA-3). Drainage areas 2 and 3 contain proposed sand filters to treat for water quality and decrease peak flows leaving the site in the post-development condition. DA-1 will discharge to the North of the site, DA-2 discharges to a stream that runs through the center of the site and DA-3 discharges to a stream at the South of the site. 2 This report contains the locations of the final stormwater quality measures. Drainage areas for the development have been delineated in the existing and proposed conditions. The proposed impervious areas have been calculated based on the proposed development footprint. A separate design package has been submitted to NCDOT for the construction of the extension of Lane Parkway to Webb Road, the majority drainage from the proposed road will bypass the stormwater BMPs. The additional water quality volume associated with the treatment of the impervious area associated with the proposed right-of-way was included in the water quality calculations for the sand filter on-site. 6.0 WATER QUALITY/STORMWATER CONTROL MEASURES In accordance with the North Carolina Department of Environmental Quality (NCDEQ) Stormwater Design Manual, a stormwater quality control system designed to treat runoff of the first inch of rain for 85% average annual removal of total suspended solids will be required. This requirement will be met by the construction of on-site above ground sand filters. The above ground sand filters 1, 2 and 3, have been designed in accordance with Part C-6 of the NCDEQ BMP Design Manual, to treat the first inch of runoff from the development for water quality. The sand filters have been designed with a media depth of 1.5 feet and minimum drawdown of 2 inches per hour to achieve 85% TSS removal. The media depth of includes a 3" layer of washed stone, 1.0' of cleaned washed "concrete" sand, 6" gravel layer for underdrain system, and 4" perforated PVC. The water quality volume (WQV) for the sand filter was calculated and in accordance with the design manual, was multiplied by 0.75 due to the water draining through the sand media at quicker rate. The sand filters been designed with a maximum ponding depth of 6 feet. Detailed calculations are included in the appendix of this report. Proposed impervious area were used to calculate the CN values for the sand filter drainage areas. Hydrologic soil groups of were assigned in the pre and post conditions based on the downloaded Web Soil Survey from the Natural Resources Conservation Service (NRCS). The table below displays the drainage area summary for all proposed development areas. SCM SAND FILTER RESULTS FINAL FINAL FINAL Drainage WQV WQV Q10 Area Required Provided Discharge SCM NAME (ac) (CF) (CF) (cfs) 1 25.77 46,265 256,240 28.35 2 17.95 44,098 113,325 81.86 3 36.80 76,067 489,994 11.46 7.0 STORMWATER ROUTING AND RESULTS Peak attenuation was analyzed by routing the required rain events through the proposed stormwater control measures. Refer to the construction plans for detailed design of the stormwater control measures. The pre- and post-development peak discharge from the site was modeled in HydroCAD. The hydrologic analysis was conducted using NRCS TR-55 (SCS Method) of calculating runoff, curve numbers, and time of concentration. Sheet flow lengths for use in the time of concentration calculations were limited to 3 100 feet or less. The SCS Type-II, 24-hour storm with a peaking factor of 484 was used in the analysis. As reported by the NOAA Precipitation Frequency Data Server, the 24-hour rainfall depths used for this analysis were (1-yr= 2.73 inches, 2-yr = 3.30 inches, 10-yr=4.80 inches; refer to Appendix C). Results of the HydroCAD analysis are provided in a detailed report in Appendix B. Results of the stormwater analysis are provided in the tables below. PRE-VS POST-DEVELOPMENT PEAK DISCHARGE RESULTS POA-1 POA-2 POA-3 Pre- Post- Percent Pre- Post- Percent Pre- Post- Percent Event Development Development Reduction Development Development Reduction Development Development Reduction Frequency* (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) 1-year,24- 4.47 2.30 49% 61.74 61.62 0.2% 74.97 72.93 3% hour 2-year,24- 6.55 3.39 48% 96.59 92.48 4% 110.80 107.86 3% hour 10-year, 12.59 6.55 48% 201.60 191.36 5% 215.63 209.44 3% 24-hour The site's post-development discharge was compared to the peak flow rates for the pre-development discharge at the points of analysis. Refer to appendix A and the pre- and post-development drainage area maps for the exact locations of the Points of Analysis. As shown in tables above, the results of the analysis indicate attenuation of post-development discharge to the pre-development peak flow rate for all POAs which impacts the residential neighboring community. As shown in the table above, the results of the routing indicate peak attenuation is achieved for the 1-year, 2-year, and 10-year 24-hour storm events at POA-1, POA-2 and POA-3. In addition to the peak attenuation, sand filters 2 and 3 have been provided with an outlet control structure designed to provide 1 foot of freeboard between the 10-year, 24-hour peak elevation and the emergency spillway. A summary of the peak water surface elevation for each pond has been provided in the summary table below. Sand filter 1 is surrounded by proposed roadways and parking areas, therefore an emergency spillway was not provided but the principal riser was sized to pass the 100-year event without overtopping the pond. Sand Filter 3 is also sized to pass the 100-year through the principle spillway. PEAK WATER SURFACE ELEVATION SUMMARY Top of Pond Emergency Spillway 10 year Water Freeboard Pond Name (ft) Elevation(ft) Surface Elevation(ft) (ft) SAND FILTER 1 792 N/A 789.90 2.10 SAND FILTER 2 793 792.5 791.67 1.33 SAND FILTER 3 786 785.75 784.67 1.33 8.0 PIPE CONVEYANCE NETWORK The onsite development includes paved parking areas and an associated storm drainage system. The onsite stormwater drainage system was analyzed using Autodesk Civil 3D 2022 by Autodesk, Inc. for pipe 4 analysis. This program performs pipe analysis and computes hydraulic grade lines according to HEC-22, 3rd edition standards. A minimum time of concentration of 5 minutes was assumed for the entire site for the analysis. The stormwater network was designed using the 10-year rational storm event.The inlets' drainage areas for the site were delineated using the finished ground surface at the proposed build out conditions. The stormwater network was analyzed using a tail water condition equal to the calculated 10-year stage at their respective discharge locations. Refer to the Construction Plans Stormwater Network Analysis for the results of drainage network analysis. Additionally, refer to the Salisbury Logistics Center Civil Plans for Stormwater Profile Sheets C405 to C414 for hydraulic grade lines of the proposed stormwater conveyance networks. 9.0 EROSION CONTROL The project will require disturbance of approximately 89 acres. Proposed temporary erosion control measures include a stone construction entrance, silt fence, sediment basins, sediment trap, stone filter outlet ring, and catch basin inlet protection. All measures have been designed in accordance with North Carolina Department of Environmental Quality Erosion Control standards. 10.0 EROSION AND SEDIMENT CONTROL PLANS A variety of storm water pollutant controls are proposed for this project. Please see below for a detailed description of each measure and refer to the attached Erosion and Sedimentation Control Plan/Site Maps, Phase 1 and Phase 2 prepared by Kimley-Horn and Associates, Inc. (Construction Drawings) for further information. The following measures will be used to control erosion and sedimentation for this project. Please see the calculations for more information on the design of each item. 5 10.1 Soil Stabilization The purpose of soil stabilization is to prevent soil from eroding and leaving the site. In the natural condition, soil is stabilized by native vegetation. The primary technique to be used at this project for stabilizing site soils will be to provide a protective cover of grass, pavement, or building structure. 6.1.1.Temporary Seeding or Stabilization— All denuded areas that will be inactive for 7 days or more must be stabilized temporarily with the use of fast-germinating annual grass/grain varieties appropriate for site soil and climate conditions, straw/hay mulch, wood cellulose fibers, tackifiers, netting and/or blankets. Stockpiles and diversion ditches/berms must be stabilized to prevent erosion and dust issues. 6.1.2.Permanent Seeding, Sodding or Mulching— All areas at final grade must be seeded or sodded within 7 days after completion of work in that area. Seed immediately after final grade is achieved and soils are prepared to take advantage of soil moisture and seed germination. At the completion of ground-disturbing activities the entire site must have permanent vegetative cover, meeting vegetative density requirements, or mulch per landscape plan, in all areas not covered by hardscape (pavement, buildings, etc.). Seeded areas shall be protected with mulch or a rolled erosion control product. Mulch must be anchored to the soil surface by spray-on tackifiers or crimped by disc or other machinery and/or rolled erosion control products must be installed per manufacturer recommendations. Consideration is given to climate conditions, soil type and native vegetation when designing the final landscaping plan. Final site stabilization is achieved when perennial vegetative cover provides an established permanent ground cover sufficient to restrain erosion. This shall be no less than a coverage density of at least 80 percent over the entire area to be stabilized by vegetative cover. Furthermore, "establishment of stabilization" is loosely defined by the State and could include vegetation growing through at least on growing season, based on site and drought conditions at the time vegetation is first established. This area is exclusive of areas that are covered with rock (crushed granite, gravel, etc.) or landscape mulch, paved or have a building or other permanent structure on them. 6.1.3.Rip Rap— Riprap is a cover of rock used to create a stabilized outlet by dissipating concentrated flow paths and catching larger sediment or debris. Riprap stone and apron size are calculated based on the drainage areas concentrated flow. See plan details for specific rip rap stone size, type, and apron dimensions. 6 10.2 Structural Controls 6.1.4.Silt Fence Silt fence is a synthetic permeable woven or non-woven geotextile fabric incorporating metal support stakes at intervals sufficient to support the fence (5-feet maximum distance between posts), water, and sediment retained by the fence. The fence is designed to retain sediment- laden stormwater and allow settlement of suspended soils before the stormwater flows through the fabric and discharges off-site. Silt fence shall be located on the contour to capture overland, low-velocity sheet flows and is typically installed with a wire fence backing for additional support. Wire fence backing is required unless the silt fence is installed using the slicing method as the slicing method ensures the silt fence fabric is anchored securely in the ground. 6.1.5.Inlet Protection— All existing and proposed storm network structures shall have inlet protection during construction. Inlet protection is put in place to trap sediment as it approaches the storm drainage system before final stabilization is complete. Inspect, clean and properly maintain all inlets twice a week, and after each storm event until entire project area has been properly stabilized. See detail sheets for specific inlet protection types and installation requirements. 6.1.6.Construction Exit— All access points from the public street into the construction site shall include a construction exit composed of course stone to the dimensions shown on the Construction Drawings detail sheet. The rough texture of the stone helps to remove clumps of soil adhering to the construction vehicle tires through the action of vibration and jarring over the rough surface and the friction of the stone matrix against soils attached to vehicle tires. In addition to the stone at the construction exit, it may be necessary to install devices such as pipes (cattle guard) to increase the vibration and jarring. It may also be necessary to install a wheel wash system. If this is done, a sediment trap control must be installed to treat the wash water before it discharges from the site. All site access must be confined to the construction exit(s). Barricade to prevent use, any locations other than the construction exit(s) where vehicles or equipment may access the site. Use jersey barriers, construction fencing/drums, etc. near construction exit(s) to prevent traffic by-pass or short circuiting. 6.1.7. Temporary Sediment Trap— A temporary sediment trap is a small, temporary ponding basin formed by an embankment or excavation to detain sediment-laden runoff and trap the sediment to protect receiving streams, lakes, drainage systems, and protect adjacent property. Select locations for sediment traps during site evaluation. Note natural drainage divides and select trap sites so that runoff from potential sediment producing areas can easily be diverted into the traps. Ensure the drainage areas for each trap does not exceed 5 acres. Install temporary sediment traps before land disturbing takes place within the drainage area. 7 6.1.8.Sediment Basin— A sediment basin is an earthen embankment suitably located to capture sediment with a primary spillway system consisting of a riser and barrel pipe. The purpose of a sediment basin is to retain sediment on the construction site, and prevent sedimentation in off-site streams, lakes, and drainageways. Select key locations for sediment basins during initial site evaluation. Install basins before any land-disturbance takes place within the drainage area. Select basin sites to capture sediment from all areas that are not treated adequately by other sediment controls. Always consider access for cleanout and disposal of the trapped sediment. Locations where a pond can be formed by constructing a low dam across a natural swale are generally preferred to sites that require excavation. Where practical, divert sediment-free runoff away from the basin. 11.0 CONCLUSION The proposed Salisbury Logistics Center will occupy a 91.56-acre site that will treat both water quality and quantity using three sand filters.The first 1.0" rainfall event will be treated for water quality and the 1-, 2-, and 10-year storms will be treated for water quantity. The stormwater control measures that have been put in place will allow the removal of 85% TSS and reduce the pre-development peak flow conditions for the 1-, 2-, and 10-year storms. 8 APPENDIX A: SITE MAPS / 1 NORTH / , Z. .,�/ 41 / m f 4ha W YOUTFIF RN }3' d IT4 T 9 //J � M IN65 :f "a�+` H .'4 A', "'S14 o� NCti CV r„- >trnwlY>IHO( O N CD a m U 5 d X W_ C7 N. C1 3 I.+v.1 AL WS 3 SITE LOCATION Lo O GRAPHIC SCALE IN FEET In 0 1000 2000 4000 M M de/ _ /f 0 J 0 ' TITLE: PROJECT: 1 (CLIENT: JOB NUMBER: 013335005 TRACT WEST SCALE: 1"= 1000' E KingleY* Horn SALISBURY PARTNERS, LLC DATE o VICINITY MAP 10/19/2023 200 SOUTH TRYON ST.,SUITE 200 LOGISTICS CENTER 1962 HOWELL MILL RD., SUITE 210 SHEET: E CHARLOTTE,NC 28202 ATLANTA, GA 30318 EXHIBIT A PHONE:(704)3 3 3-51 311 www.kimley-horn.corn l a Hydrologic Soil Group—Rowan County, North Carolina P, P § § 541100 541503 541900 542300 542700 543100 543500 543900 544300 544700 545100 35°36 42"N 1 11# 35°36'42"N _ _ 1. . MbC / - 1_ .- /u130- lATF Pap gIU 14.. ..1 *I StnEeB Aiii3* .A . 1400411- • , ‘44, . ' • iLdB2 SITE •Vir GeB2 III LOCATION 7 , ir ar_l EnC EuB MbB IAA:3 i_ i_o3,1:3 En_.-, 2,538 ,-. . o.,,,...., . . . - . ..: , . s• . .!:•0 t " "-• '''. • • • EnC 01 M -' • ,, ii,... . 4. ; • ,, -. .f,C-h •-- . p4 SeB VaB -. • 4,,,? .<// MbB el* Aig, GM Well3 ,,' e A Mill3 GeB, . • .- III - - • 1 A'473 c i , ' *•-• i _:•":' • 1 IRfl 1 P 1 c EnB Vn B2 4 ...113 CC3 SeB o E , 1 i‘ SeB VaB ._ 0) ill iviri ,-• - ' . ' i., 1 / pxD \wcf)et k • GeB2 ee)32 ,t f•- ' - - - i • _I_ . 1 GeB2 0 VnIE4d • 0 eeB2 4 @@@s ecB lc? En B PiseG2 PeS-2"Irv, ,,, @OD, Z--Cipb:j1W t Weili3 111, 1 COCO SeB 2 En BillithiNVnB2 SeB -/ 0 , EnB GeGvrig2 r GeB2 -\ , ' - ' Ce-B2M •-•.. ... . 1 4 r , 35°35'14"N 11111111111111WIIIIIIMIll i&r.‘ 35°35'14"N 541100 341500 541900 543100 544700 545100 Map Scale:1:19,200 if prit ket1 on A landscape(11"x 8.5)sheet. P P, Meters § N 0 250 500 1000 1500 Feet A 0 5(5) 1000 2000 3000 Map projection:Web Mercator Corner coordinates:WG584 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 8/31/2023 Iliad Conservation Service National Cooperative Soil Survey Page 1 of 5 Hydrologic Soil Group—Rowan County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. O C/D Soils Please rely on the bar scale on each map sheet for map Soil Rating Polygons • D measurements. 0 A p Not rated or not available Source of Map: Natural Resources Conservation Service n A/D Water Features Web Soil Survey URL: Streams and Canals Coordinate System: Web Mercator(EPSG:3857) B Maps from the Web Soil Survey are based on the Web Mercator Transportation 0 B/D projection,which preserves direction and shape but distorts Rails distance and area.A projection that preserves area,such as the n C •.i Interstate Highways Albers equal-area conic projection,should be used if more accurate calculations of distance or area are required.C/D US Routes This product is generated from the USDA-NRCS certified data as 0 D Major Roads of the version date(s)listed below. n Not rated or not available Local Roads Soil Survey Area: Rowan County,North Carolina Soil Rating Lines Background Survey Area Data: Version 20,Sep 12,2022 A 1111 Aerial Photography Soil map units are labeled(as space allows)for map scales • A/D 1:50,000 or larger. .v B Date(s)aerial images were photographed: Mar 13,2022—May 9,2022 •y B/D The orthophoto or other base map on which the soil lines were • • C compiled and digitized probably differs from the background • • C/D imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. • • D • • Not rated or not available Soil Rating Points O A O ND ▪ B • B/D USDA Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group-Rowan County, North Carolina Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI ArA Armenia loam,0 to 2 C/D 8.1 0.6% percent slopes, frequently flooded CcB Cecil sandy loam,2 to 8 B 103.7 7.4% percent slopes CcC Cecil sandy loam,8 to A 3.0 0.2% 15 percent slopes CeB2 Cecil sandy clay loam,2 B 290.5 20.6% to 8 percent slopes, moderately eroded CeC2 Cecil sandy clay loam,8 B 43.3 3.1% to 15 percent slopes, moderately eroded ChA Chewacla loam,0 to 2 B/D 73.9 5.3% percent slopes, frequently flooded EnB Enon fine sandy loam,2 C 192.3 13.7% to 8 percent slopes EnC Enon fine sandy loam,8 C 43.1 3.1% to 15 percent slopes EuB Enon-Urban land C 14.7 1.0% complex,2 to 10 percent slopes IrB Iredell loam, 1 to 8 C/D 10.4 0.7% percent slopes LdB2 Lloyd clay loam,2 to 8 B 25.3 1.8% percent slopes, moderately eroded MbB Mecklenburg loam,2 to C 37.6 2.7% 8 percent slopes MbC Mecklenburg loam,8 to C 0.4 0.0% 15 percent slopes MeB2 Mecklenburg clay loam, C 12.1 0.9% 2 to 8 percent slopes, moderately eroded PaD Pacolet sandy loam, 15 B 0.0 0.0% to 25 percent slopes PcC2 Pacolet sandy clay B 23.7 1.7% loam,8 to 15 percent slopes,moderately eroded PxD Poindexter-Rowan C 12.9 0.9% complex, 15 to 25 percent slopes tism Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 3 of 5 Hydrologic Soil Group—Rowan County,North Carolina Map unit symbol Map unit name gm Rating Acres in AOI Percent of AOI SeB Sedgefield fine sandy C/D 154.6 11.0% loam, 1 to 6 percent slopes Ud Udorthents,loamy C 197.7 14.0% Uf Urban land 7.9 0.6% VaB Vance sandy loam,2 to C 55.1 3.9% 8 percent slopes VnB2 Vance sandy clay loam, C 73.2 5.2% 2 to 8 percent slopes, moderately eroded W Water 8.0 0.6% WaA Warne loam,0 to 2 C/D 15.6 1.1% percent slopes, occasionally flooded Totals for Area of Interest 1,406.9 100.0% t si)\ Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 4 of 5 Hydrologic Soil Group—Rowan County,North Carolina Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.None Specified Tie-break Rule: Higher USDA Natural Resources Web Soil Survey 8/31/2023 Conservation Service National Cooperative Soil Survey Page 5 of 5 80°32'46.79"W 35°36'44.98"N r r 7�FEff /r /.\ v\ �� ti - �ti - .. FFF / 17 • 1 Za,;eAE ' / f it -j ^t _ + FEE / / �. _ ; . '' • • `_' ," N 6,54.4? „. • 1 • •R ; SITE LOCATION ec,`AO/ • . if .'-k.,_ ,..e.,�� F�.ZonerAE vo /- I . ;� r d e- :11) 760 FEET • i _ • 1. .,~ r FEEii r767 FEET , ..• • •. • :,1 • 71� r i. • b,..A,g 43-27 / <J110 I (&K( c( „•, _ KS �/ 116. ROW iUNTY ;eve 4 (7......--4 AREA OF MINIMAiLOODHAZARD - One..s/wy � � 4T 5 ,=l1 --- y _I • )7 (ir 1111/11 . /w0 4:47/- ,,,$',s6:9 /.../. ' 0 ,s 4 ie- . •• •• L-...116 w-. /40.‘,./....... .. . ,/ , e -1,<, le.. o_ tor SW # -. a +�:10:::: Iy iplit:TP. �17 ./ • . ,.*,_,i• -li :4., f % * v ..-"Cv.-. __Lv•.-- , 7 •7.- e-Q.cig. i ...,y „„., ~ , . •Vylki• it . -11F" ' " iiiiff-)' .. . . . ,, •I ... . . , . � , •7,76 • .3 FEET • _ + FFr 8s,407% o f' - ' �'� ' 1 tB5 • it . '-, t ► • ..-_4.. -11401; ,.! • ... -oar . 15,.. \ a • • ...../. s }fit•,• �+. - f u • 4 4 ,F``"' 0% i•. • • • 4'41 _ +� q FEE T J .* z ++)♦. '"I 800 FEET ♦ r803T �' — 00 -.imoa. .4. b - , - iir , 806 FEET •..�� ; , - 1• f • All` •.'1 ' _�__�,. ..: �. 899 FEET r.1 80°30'53.44"W 35°34'39.31"N FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP NATIONAL FLOOD INSURANCE PROGRAM FOR DRAFT FIRM PANEL LAYOUT For Information and questions about this Flood Insurance Rate Map(FIRM),available products associated with Map Projection: this FIRM,including historic versions,the current map date for each FIRM panel,how to order products, GCS,Geodetic Reference System 1980; E LOOD INSURANCE RATE MAP or the National Flood Insurance Program(NFIP)in general,please call the FEMA Map Information eXchange at Vertical Datum:NAVD88 CO — 1.877.FEMA-MAP(1-877.336-2627)or visit the FEMA Flood Map Service Centerwebsile at https://msc.fema.gov. For information about the specific vertical datum for elevation features,datum Without Base Flood Elevation(BFE) Available products may include previously issued Letters of Map Change,a Flood Insurance Study Report, conversions,or vertical monuments used t0 create this map,please see the Flood Zone A,V,A99 and/or digital versions of this map.Many of these products can be ordered or obtained directly from the website. Insurance Study(FIS)Report for your community at hops://msc.fema.gov With BFE or Depth zone AE,A0,AH,VE,AR 0 PANEL 5647 OF 6702 SPECIAL FLOOD Communities annexing land on adjacent FIRM panels must obtain a current copy of the adjacent panel as well L as the current FIRM Index.These may be ordered directly from the Flood Map Service Center at the number A 1 inch=500 feet 1.6,000 ..Lil1 HAZARD AREAS Regulatory Floodway listed above. For community and countywide map dates,refer to the Flood Insurance Study Report for this jurisdiction. 0 250 500 1,000 1,500 2,000 Q) 0.2%Annual Chance Flood Hazard,Areas Feet V of 1%annual chance flood with average To determine if flood insurance is available in this community,contact your Insurance agent or call the National A 1 Meters = depth less than one foot or with drainage Flood Insurance Program at 1-800-638.6620. I\' �.`, areas of less than one square mile zone xY 0 50 100 200 300 400 4 Basemap information shown on this FIRM was provided in digital format by the United States Geological Survey(USGS). C ) L 1 Future Conditions 1%Annual The basemap shown is the USGS National Map:Orthoimagery.Last refreshed October,2020. ` = Panel Contains: N111111Chance Flood Hazard Zone X This mapwas exported from FEMA's National Flood Hazartl Layer(NFHL)on 10/19/2023]:00 AM antl tloes N COMMUNITY NUMBER PANEL �/// Area with Reduced Flood Risk due to Levee chtng eor beco es upense dments new data ovt rp me.dote d The NFi n,ple esesee he Floodon may = changn or become superseded by hee data overtime.For additional information,please see the Flood Hazard ROWAN COUNTY 370351 5647 See Notes Zone X Mapping Updates Overview Fact Sheet at https:/Iwww.fema.govlmedia-library/asselsldocumenls/118418 OTHER AREAS OF '/ Area with Flood Risk due to Levee Zone D This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. Q FLOOD HAZARD The basemap shown complies with FEMA's basemap accuracy standards.This map image is void if the one 0 or more of the following map elements do not appear:basemap imagery,flood zone labels,legend,scale bar, NO SCREEN Area of Minimal Flood Hazard Zone X map creation date,community identifiers,FIRM panel number,and FIRM effective date. I Effective LOMRs MS OTHER AREAS Area of Undetermined Flood Hazard Zone D = 0 GENERAL ---------- Channel,Culvert,or Storm Sewer 47, STRUCTURES r r r r r r r r r r Levee,Dike,or Floodwall CO © 20.2 Cross Sections with 1%Annual Chance 17.5 Water Surface Elevation ®--- Coastal Transect ——------Coastal Transect Baseline —--—Profile Baseline Hydrographlc Feature •^^'••6f7'•••••Base Flood Elevation Line(BFE) OTHER - Limit of Study FEATURES -Jurisdiction Boundary MAP NUMBER 3710564700J x EFFECTIVE DATE w June 16,2009 r,, USGS U.S.DEPARTMENT OF THE INTERIOR The NationalMap CHINA GROVE QUADRANGLE Ju U.S.GEOLOGICAL SURVEY US TOpO 7.5-MINUTE NORTH CARLINA science for a changing world SERIES -80.6250° -80.5000° 35.6250° 534°0°7E 35 36 37 38 39 40 41 42 43 44 45 35.6250° 1 _ .. B , 42 a'42°0°mN - ., JSALISBURY f t Q' .. ter • rHIR e ° . , ii e d 0_' °® i .4 SITE LOCATION e; boa �3ecmm I 1 E / - f. t 01 AL o !s 40 �e 1 v s 40 I 1' e 4 N% " m 6 9 ® a 9 "006300 39 \ ACP 4 - 39 ® e %� °® 6psn�ae° m � 0 �� aom m H e m 38 i I m E - &A; • 13`ZILN 38 �0E7980•tl � �.. g a Q6 9 o 2) % e� to e �s� sit / e 6 \ - N ti �d e m a1m • ea 9 - \� � ec � \ � 35/ �rP�2.�35 � �A�4 M3 ® elagfr� Q a El - i d Qe e\ � � RC l m ° a °. a p T r.,, 34 ��r4 %k.p 0 r © N ��am 'giarGm 4 4 � �y qa 9 \F,g'"gnp� r Py9O`ti, RI'@YDd'W caoDKCOd� ©N'iff r © `EaQ OR®� d 1 - 6 �m &C @ ? p 68m 33 B �. l EiyaCO B .....,,,ytwuu i 33 © - EaImo.6p i 000000OD58L7 g N I I I .e N) CO]S&1 - 'P 1a8 as 4 €,i m .= a d' m 32 .9J GA cClS�a _ 32 Caomarecra Wa320 V, 0 ;% UCEIDeJ LP t i g FID 5 aI • I @0 0 ti re N3 %A gg 9 0maw MOW &MEW 0 N sp 31 0 Q. C 9 6 e t 7 31 1 zot. �I co.f� _ N 4q fI, E""" 9 crrmm1 ' pie cte co sMW [�,yp6 46 30 li IT' ■ 8 gg - p 30 az,meap 6 St 4' Imam Mau a 02x a ©k'47m Co QBRLity /r.� CL'•7f9GDQJ _..__.-- ©IIp® aLtm£O 62 • 0 ° mom a dam 1 0 i =R.,. �m gym© w°D wx�fFxwneD� ye k �a �m 29 d .,rnFm8? . CE7LaJ D°em7� r�"° g Q* q� � .--- -.-_.._,� _ IRISH✓.4TO RP EakM f69D 4? 3929°0°'nN IL... 0 Jim, EA4 1 - 4435.5000' 35 36 37 38 39 40 41 42 43 44 '4500P1 35.5000° -80.6250' -80.5000' Produced by the United States Geological Survey ,` SCALE 1:24 000 ROAD CLASSIFICATION __ Nor 83(NAD83) Expressway Local Connector World Geodetic oy tam o!1984(wG5841.Projection and Lo 1 0.5 0 KILOMETERS 1 3 /,,1—''",,''''' \] er gnd:Universal Transverse Merta[or,Zane 1]S �— -�^VL'�,^ Secondary Hwy Local Road TM1IDs map iz not a legal document.Boundaries may be 142 MILS 1000 500 0 5 0 METERS 1000 2000 f" Ramp 4WD generalized for IM1is map xale.Private lands wilM1in government 1 1 of be shown.Obtain permission before ts 4.0LS MILES •Interstate Route 0 US Route 0 State Route en eNng priv teykndz. moo__0 1000 2000 3000 4000 5000 6900 7000 8000 9000 10000 Cv^o^^ao�s.°c^mon Imagery NAIP, July 202s - July 202D E` Roads US. Cemus Bureau, 2016 FEET Names GNI5,1980-2022 ATOENIEROFSHEE DECLINATION T 1Cleveland m Hydrogra0W National HydrograEhy Dataset,2002-2018 1 2 3 2Rawan Mills onal Ievallon Oataset, 2008 CONTOUR INTERVAL 10 FEET ;Salisbury —,o i 6ounda�r es Mul[ipk sources, see metadata file 3019 2021 ,moon q Io NORTH AMERICAN VERTICAL DATUM OF 1988 4 5 4 Enocbvale Wetlands FW8 National Wetlands Inventory Not Available This map was praducetl to conform toot Ott SRockwell = K NV National Geospatlal Program US Topo Product Standard. 6 Kannapolis =i Q 6 ] a Mount CHINA GROVE, NC a M Mount Pleasant CHINA i `rid Zone naDealgruilloo ADJOINING QUUMRANGIES 2022 APPENDIX B: WATERSHED MAPS PRE-DEVELOPMENT DRAINAGE • - + 4 ,� AREA2-OFFSITEA 9 /�� AREA 5.86 - / - CURVE NUMBER:85.76 TC(MIN)'.11.99 Z I PRE-DEVELOPMENT LEGEND • �� PROPERTY LINE - - ,00 FTOFSHEET FLOW @309% l DRAINAGE AREA BOUNDARY — — / TIME OF CONCENTRATION 503 FT OF CHANNEL FLOW@ 0.99% Tc., ,V PRE-DEVELOPMENT DRAINAGE AREA 1-ONSITE FLOW PATH POA-, AREA(AC):4.58 PROPOSED LIMITS OF �'� CURVE NUMBER:77.89 201 FT OF SHALLOW I TC(MIN):20.96 - __ 1 LOD CONCENTRATED FLOW@ 4.98% / D' '"'" ...L........................ DISTURBANCE it1 POINT OF ANALYSIS * jooFTOFSHEET • EXISTING MAJOR CONTOUR —'°°— — — �%>"\ • ` FLOW @ 3.09% • (\ \ -- `.7 - EXISTING MINOR CONTOUR -----TM0----- \ N 571 FT OF SHALLOW ...lea / (\ / \ 430FT OF CHANNEL CONCENTRATED FLOW @ 3.42% 1 /ii KIT // , -FLOW @246% r / l ' " PRE-DEVELOPMENT - J I DRAINAGE AREA 2-ONSITE - .. ( /2 F.� / AREA(AC):fi7.14 / CURVE NUMBER:75.]8 _/ % 1\1 TC(MINI:36.41 „j / ) I /< ° ��CON ENT ATEDFLo1 ///// / `i •\� CONCENTRATED FLOW @ 1.74% / • / JI%r �`\\ / f m l'/7 ///I / /7/./ A•. , . - w rT PRE-DEVELOPMENT DRAINAGE I I\ / AREA2-OFFSITEB w '!/ / AREA(AC):43.18 CURVE NUMBER:72.07 j �� /--: . \ // \ —/ ` TC(MIN):18.00 I / / '2 \ PRE-DEVELOPMENT �' / - I DRAINAGE AREA 3-ONSITE • 1521 FT OF SHALLOW j / • / AREA(AC):19.83 ` CONCENTRATED FLOW @ 2 24% 1POA® CURVE NUMBER:74.84 •• I TO(MIN):20.75 100 FT OF SHEET % /••' L' �� FLOW @ 2.81% 111 �- i•) / — - - i l 1120 FT OF SHALLOW 1000'FT OF SHEET 1 - 3 - I V CONCENTRATED FLOW 1.79% y. �� ® I FLOW @ 2.82 {� / • y Ef • PRE-DEVELOPMENT a I /// ` ` f':• ' o f • ❑RAINA DRAINAGE (A)34.OFFSITE B 7' J/ CURVE NUMBER:82.56 o TC(MIN):57.32 I n. v ��\� 100 FT OF SHEET FLOW@3.01% �` Mom, r - .� . ' I — . 701 FT OF CHANNEL V �` FLOW'@ 1 80% 369 FT OF SHALLOW 1� a - / ), ` CONCENTRATED FLOW @ 4.31% .1I _ _ 2300 FT OF SHALLOW N \\ •_1 -�- - @_ t /.•I" • -� ' CONCENTRATED FLOW @ 1.31% /` y,..- a- i I' mil - _ i i vAh yI Q • •`. I/I \\ 1.‘Ati,v,/ , 1 PRE-DEVELOPMENT DRAINAGEgi 100 FT OF SHEET \\ I 1981 FT OF SHALLOW - AREA 3-OFFSITE AFLOW @ 1.00) A ARE3-OFFSa.2a \\\\ 1 1\ CONCENTRATED FLOW @2.98% CURVENUMBER:75.4]o \ i TC(MIN).43.,] 1/ N z - 100 FT OF SHEET > r - FLOW @ 1.00% 1 a / I N GRAPHIC SCALE IN FEET /\ 0 150 300 600 I 11 NORTH ° N d. SALISBURY LOGISTICS CENTER PRE-DEVELOPMENT DRAINAGE AREA MAP - Ki m l e >> H o r n CHAARLOTTE 3 ORTH STREET, SUITE 200 NA28202©2023- yPHONE DATE: 11-28-2023 d THIS DOCUMENT,TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN,AS AN INSTRUMENT OF SERVICE,IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED.REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES,INC.SHALL BE WITHOUT LIABILITY TO KIMLEY.HORN AND ASSOCIATES,INC. , , POST-DEVELOPMENT / .DRAINAGEAREA OFFSITE C AREA(AC):5.86 \ -0 CURVE NUMBER:85.76 Ii '.-- TC(MIN):11.99 POST-DEVELOPMENT PRE-DEVELOPMENT LEGEND GiftDRAINAGE AREA 1-ONSITE 100 FT OF SHEET FLOW @ 3.09% (\\ AREA AREA 1-O 1 - ♦ CURVE NUMBER:7626 " PROPERTY LINE - 503 FT OF CHANNEL FLOW @ 0.99% TC(MIN):5.00 Ole 201 FT OF SHALLOW '' DRAINAGE AREA BOUNDARY - - - CONCENTRATED FLOW @4.98% - TIME OF CONCENTRATION Z. /�/ r FLOW PATH POST-DEVELOPMENT TO, POA-1 DRAINAGE AREA 2-ONSITE B POST-DEVELOPMENT - _ _ PROPOSED LIMITS OF 1 'I •, DRAINAGE AREA ONSITEC AREA AC):5.29 L LOD • AREA(AC)-4.39 / V AREA NUMBER:]8.41 I DISTURBANCE ' E NUMBER 78.03 '- •�1'•II _-- - TC(MIN):21.06 iY,, MIN):nsz / _ �� _ _ POINT OF ANALYSIS * CURVE POST DEVELOPMENT IP C_ ` ` , I DRAINAGEAREA2 ONSITEA(SCM_1)' 1-::: %► EXISTING MAJOR CONTOUR "'°°" { POST-DEVELOPMENT / IJ AREA(AC)20.77 , DRAINAGE AREA 2-OFFSITE A(SCM1)' 700 ��� CURVE NUMBER 94.76 AREA(Ac>50o EXISTING MINOR CONTOUR - ®� TC(MIN)'.5.00 CURVE NUMBER:79.64 r 430 FT OF CHANNEL ) TC(MIN).44.69 'FLOW @246% 359 FT OF SH\ H L / ,/ ® CONCENTRATED FLOW @/ FLOW@246/ ) 100 FT F O SHEET . • / 1 1c� - - A7'4 .' - - \ Flow@6.ao ( /2<ti . L 4TE FT OF SHALLOW1 t _ ^\ ` POST DEVELOPMENT \~ /- CONCENTRATED FLOW @ 7.04/ __ _ - _ ritilliil'ii'I'll GGG DRAINAGE AREA 2 ONSITE DAREA(AC).0.78 /L CURVE NUMBER:77.62 v \\ / - 100 FT OF SHEET / `1 ��� '.m"'�' •-• III 11. • H TC(MIN)5.00 FLOW 3.29% - - n � \\\,� 1. CONCENTRATED T SHALLOW . \ \\\� ICES y' ,CONCENTRATED FLOW @ 1.29°ro �Iil POST DEVELOPMENT / 1 ` 1 Y- ����'�'. DRAINAGE AREA 3 OFFSITE C(SCM-3) �w/I /< i POST DEVELOPMENT �� En �I AREA(AC)188 / /\/ / \`/ DRAINAGE AREA 2-ONSITE E(SCM-2) M, �� Z `1 ' CURVE NUMBER:69.95 ii /�//��,\:��� \ AREA(AC).1795 ,�. TC(MIN)-2078 / CURVE NUMBER:96.73 I r I�- ., #1"( _ f \ I ( I TC(MIN):5.00 - - IyI, / / / I // l _ - �� �� III L ( I -`//�// r- // /� �/� • - 141 POST-DDEVELOPMENT EI I I ) - ,'� L U POST-DEVELOPMENT I tii MOW _ DRAINAGE AREA 3-ONSITE A(SCM-3) DRAINAGE AREA 2-OFFSITE B a 1�� 4 / , , - II ■■ AREA C):34.92 ■ .. ■� I IIII� AREA(AC).36.29 / / 1FCCR=E5RSS92RS FSOW I�' CONCENTRATED FLOW @2.,1%' , , / / II ‘; - - - )� �e, 1521 FT OF SHALLOW / yn rf // \ Irti-1110 __ _.", _ -�\"/� �� `J !CONCENTRATED FLOW @ 2.24%' •-- J100 FT OF SHEET1E / . �9i _ �-/- FLOW @2.93% /j �(\,.-r . -. ,-- /) - •/ / \ 1120 FT OF SHALLOW o I�� /,,.I \ j \ ,n 1) :........,. CONCENTRATED FLOW@1]9% •-` Y M�fE �, POSTDEVELOPMENTili 4+ DRAINAGE A(AC: 2.35 TE Ba // ¢ I l RVE NUMB R 82,,,,, 1� CURVE NUMBER:82.56 o I / {\'\ \ \\\\\Iii:,%' TC(MIN):57.32 \ .- 100 FT OF SHEET o • / '�►�_`�'.i �� �,\ (I'I ` - _ FLOW@2.82 ..... . _ _.,- ...„ _,,,, , • • , ,,,, ___ .....• , .- l', i 1 _i.,.. . , ,„„., ,_ • `� •c 2300 FT OF SHALLOW f - \ \ �\\ .1 I " • I 701 FT OF CHANNEL .�p/ y�.::._____ .t, • - -� - - C CONCENTRATED FLOW @ 1.31 6 • M _.,,4.\ \ \1 ' - - '1� •• / FLow@1.80% VLS/ r. ]�j' -, -�T ` • _ III �,',.III f / i? • \s 1 l \. '� -,.I I - rif ,POST-DEVELOPMENT ` ems'9 `: U • 3t',' -_ ...... \ o. �'' \ •'/I I("•F•• /-�--.•••. DRAINAGE AREA 3-ONSITEB - .\- ` \ ,,• {�, J AREA(AC)584 • I Y '''1 • r /=, R CURVE NUMBER:78.29 POST-DEVELOPMENT _ j // -\��I / Ili 1 l TC(MIN)1496 ` DRAINAGE AREA3-OFFSITEA ' ' // • \t\\=',j / ( / 100FT 8.SHEETAREA(AC):83.2 • I.� \ _',�.e••Fa.aa c FLOW @ 8.10% CURVE NUMBER:75.47 r 'i k i 236 FT OF SHALLOWJ )i, �, ' \ \� \ :ITC(MIN):43.17_ CONCENTRATED FLOW @ 753% .,M \ ( -- o \\\ \ \Ic ` ✓/ i I .IH���'III(', ; _ 100 FT OF SHEET 1{ \ li 1981 FT OF SHALLOW 1 FLOW @1.00% r CONCENTRATED FLOW @ 2 98% a. Q `' ) 100 FT OF SHFFT 1- OW @ 1 00% Z iill,_ , / , .. ...-. ......- . _ \ / L, iii! o ._ isiews , H I a N GRAPHIC SCALE IN FEET /\ 0 150 300 600 I 11 NORTH ° N SALISBURY LOGISTICS CENTER POST-DEVELOPMENT DRAINAGE AREA MAPSTREET,SUITE 200 - iii Kimley >> HornHOONE 7 4.330R3H CAROLINA 28202Q2023_ DATE: 12-19-2023 d• THIS DOCUMENT,TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN,AS AN INSTRUMENT OF SERVICE,IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED.REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES,INC.SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES,INC. APPENDIX C: WATER QUALITY Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics center KHA Project St: Designed by: EM ts s Date: 10/19/2023 Revised by: Date: Checked by: Date: Minimum Tme of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Pre-Development Drainage Area:DA-1-ONSITE 1 7 M1 1 socesW 1 can;e,u w rPSawr em., re rtse,cwt m et Pen meo taanr aam, yMe"av it Id ele,n SHALLOW CONCENTRATED rzvwu uamsnn owuooaow szt oo omaz a Pre-Development Time of Concentration,DA-1-ONSITE 2095 Pre-Development Drainage Area:DA-2-ONSITE I I r w,;nrM1,L I so ,sltt/55 e«teuee.s I,wa Ptlllmma,I I nowapl t ,I wetw P,R,. ."'Ix,dr.'tto l .ra a1omy,v (._tact CHANNEL nrxnxxzzrimv a274400 0.0246 0.05 u Pre-Development Time of Concentration,DA-2-ONSITE 36.01 Pre-Development Drainage Area:DA-2-OFFSITE A I flow 171,1 wlnlss11 I soce,sln/i I m co<mneeZe s I"" PZOnt ram a,I unwuad I c now,nlnelrea of I Wen.P tnlat r,ma Ixyerarllpaaus ver tntl.,s I n'v tetet SHALLOW CONCENTRATED nww tw awmnmrzoaow xo80400 o.oase u Pre-Development Time of Concentration,DA-2-OFFSITE A ties Pre-Development Drainage Area:DA-2-OFFSITE B II"'wr"L I sloa.s„tw I m rce::m,h u n r,t 1rrama,I d I ero r owApaa t I wm Penr w ,m Itsaraenac a,a . atva)lo ary I.menm sxnuowmrvrr:rarvreo rz WALLOW uouams.,EoFLOW 1521.00 o 1672.00 azza a Pre-Development Time of Concentration,DA-2-OFFSITE B 1500 Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project 0: ts Designed by: EM Date:s 10/19/2023 Revised by: Date: Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Pre-Development Drainage Area:DA-3-ONSITE 1 1 pte1fl,0ex,L 1 soce.s„rw 1 M..mt1.M..cs rn rea 1,usd0.1 upamaap 1 pipe,nnp'c 1 W'" pn rda.txra,00 v,"ov 1 nsue,e,e CHANNEL nexnxxErrimv 298.00 0.0128 0.05 u 13.00 Pre-Development Time of Concentration,DA-3-ONSITE 20.25 Pre-Development Drainage Area:DA-3-OFFSITEA I Slow WlnlrtnL l soce.sln/nl 1 M caeninencn r 1Swo p2xN rainfall,1 unpavee I c now.nlnplrea of l wetted p'nletr,pa lxv arllpaaus, Averagmeisse,irmv 71:n7, CHANNEL .sexarxetrimv 702.00 0.0180 0.02 a Pre-Development Time of Concentration,DA-3-OFFSITE A 03.12 Pre-Development Drainage Area:DA-3-OFFSITE B r a,'kreex,L I S pc.s ln/W coatx:oe,o IT.o p2110lrraia 1L p a I c ploo,cxt'I"t l We're plet a .w IHvma,lI aaua, v r IWst'•nrv.v I T.v'no'a, SHALLOW CONCENTRATED TE MALLOW LOICRERCID FLOW 2300.0D 0.0.1 1.85 20.78 SHALLOW CONCENTRATED T;aurww twumwrzo ROW1120.00 0.a1pa a 8,65 Pre-Development Time of Concentration,DA-3-OFFSITE B 57.32 Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project 0: 13 Designed by: EM Date:S 10/19I2023 Revised by: Date: Checked by: Date: Minimum Tme of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Pest-Developmet Drainage Area:DA-1-ONSITE tbw MryrML aH m Pavedcr reluea eere ra nerd,pw HMraeacrealus, ryeveloary,v INI soce.,ItRtf m ca.N:0,0,n rend r. al, unpaved ar flow,nlrr'1 m w a PSI rp4 ve IsRsi Tr llnige,n 155.00 110.0000 I. I I I I I 5.00 Post-Developmet Time of Concentration,DA-I-ONSITE see Drainage Area:DA-2-ONSITE A(SCM-1) w lN 2ryL see. nNI ra canneece s P2 aU-nnl a man, unpved c now.Areaos weneare11 s1m er r,wHvdraurfilnc radios, ver In/al' rrev Inele, 1 T,M„„UM., 1 '"'" 1 'DODO 1 1 1 1 1 1 Soo Time of Concentration,DA-2-ONSITE A(5CM-1) 5.00 1 ' Post.Developmet Drainage Area:DA-2•ONSITE B n .L Two rainfall. Lr or wene Perimeter, Hy s. Average ,v i < w lNlstb slope.s(WIN Coefficient,nneu P2 On) Unpaved Flow.A. aPIN es erl(r0 n/sl+odty -Travel SHALLOW CONCENTRATED rzawww cwmnumo Now 1409.00 0.0129 u 1.83 12.02 CHANNEL naamnfiow 234.00 0.0246 0.05 U 4G.00 12.39 an 11.68 0.33 Post-Developmet Time of Concentration,DA-2-ONSITE B 21.06 Post.Developmet Drainage Area:DA-2-ONSITE C now Lg wN gryL sacest/NI ra CueldeEe ss anr rain.all, vd It, PawA u ea oswete PeN r r,wHydraurl1tttc7.4, vv aatev@e"etyv 3rav lmme SHALLOW CONCENTRATED rzauuowcwuerwrzorww 483.00 0.0204 u 4.20 1.00 CHANNEL naamacaww 76.00 0.0246 0.05 U 46.00 12.39 3.71 11.68 0.11 Post-Developmet Time of Concentration,DA-2-ONSITE C 12.62 Post.Developmet Drainage Area:DA-2-ONSITE D 1 I Plow rcenL 1 m ope,, /NI 1' ne caelfincn c 1 Tw -,anlll,1 unpaved 1 L naw_Alenlrea0,1 weneaP,lslerr,pw 111 ydraur1,1,caaos] AveragmeiVse,!,o.clw,V 1Traar ea, 11 1 .,.„sc,,r 1 32a0D 1 ec000 1 1 1 1 1 1 not Post-Developmet Time of Concentration,DA-2-ONSITE D too Post.Developmet Drainage Area:DA-2-ONSITE E ISCM-2l 1 I'IT"I sope.slN,NI 1 a 4oelfinentn s rwn P25nlrenla1 unpaved 1` How°AIfi',eaos I went r,:lerr,pw 1Hy aa:otaaus,1 vera;N/s,LLuc ,V 1Trcod,na.r 1lirvilIML,11, 1 3,35 00 1 a0000 1 1 1 1 1 1 Sao Post-DevelopmetTime of Concentration,DA-2-ONSITE E(SCM-2) see Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics Center KHA Project ft: 13 Designed by: EM Date:S 10/19/2023 Revised by: Date: Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Post-Developmet Drainage Area:DA-2-OFFSITE A(SCM-1) I I P''Ir<Idtn,E I'I.E.'II'AII P.sln/nl I co=rn s ITw'' PZI'nlraer i, p a I c nowoglXAlr.,r I ware e€c .pw Icnu,tlnl,a,v y r€u€vdn,c I T.v'ipr• SHEET -.'.'r,ow 100.00 0.0000 0.40 3.39 40.25 SHALLOW CONCENTRATED 0 ewmemno wow 359.00 0.0010 a 1.35 4.4a Post-Developmet Time of Concentration,DA-2-OFFSITE A(SCM-1) doss Post-Developmet Drainage Area:DA-2-OFFSITE B flowLength,l Two man, c or wend Perimeter, Hydraulic radius, Average ,v Inl slopes Wit) Cumnent,n P2 ilnir ra unpaved flow,A ln'Irea Wetted MI et rR0 Ws)""c Travel Time, Post-Developmet Time of Concentration,DA-2-OFFSRE B 2.93 Post-Developmet AlDrainage Area:DA-2-OFFSITE C I I F lnM I tinpepI e ae e,m.-ITa saadn.ua,I uraya nmade I cr nowre"u r I Wm pen. .e Iceda,tIn a,v ver W'oay.v I TV mse.n SHEET n,,,,,wW 100.00 0.0200 0.1S 3.30 9.65 Post-Developmet Time of Concentration,DA-2-OFFSITE C u.99 Post-Developmet Drainage Area:OA-3-ONSITE A(SCM-3) w Hr)gr E S P,sln/nl mama.,:., Two ccnal arc r u,pavaa co now,AlfAlaa r I w.n.PIrn a r.w Hv'rinlna s. .r./9/,:'' Taelmel`.1 I Taww �vuu,c 12243 I loo.0000 I I I I 5.00 Post-Developmet Time of Concentration,DA-3-ONSITE A(SCM-3) So0 !ii Post-oevelopmet Drainage Area:DA-3-ONSITE B I I'1 7°1 I,Ippa.sprm I M a m,r,.mh u w r,t0 1cadent Uraua npavedao I cr P Iewanaoa I w€e nlma .w Iceda.tln.e ae N1ve"o d„.v I n atmnm SHEET nsxss.ROW 100.00 0.0810 0.a0 3.30 12.09 Post-Developmet Time of Concentration,DA-3-ONSITE B 14.95 Kimley»>Horn Pre vs.Post Runoff Analysis Time of Concentration Project Information Project Name: Salisbury Logistics center KHA Project tit 16 Designed by: EM Date:6 10/19/2023 Revised by: Date: Checked by: Date: Minimum Time of Concentration 5.0 minutes 2YR-24HR Rainfall,P2 3.30 Post.Developmet Drainage Area:DA-3-OFFSITE A Plow ln 11,Lsoceseal comaee0e Two Fn-Hnnlr rainfall,man, Unwve Lr .nnale Area ettetleelrira et r,ew Hydraurll ftc;echos, Aver In/sl"c nav lmnle SHALLOW CONCENTRATEDTzswLww cwuerwnN Row 1981.00 0.0298 U 238 11.86 CHANNEL naaneerww 701.00 0.0180 0.07 U 11.00 6.20 1.77 d.19 2.7e Post-Developmet Time of Concentration,DA-3-OFFSITE A 43.1t Post.oevelopmet Drainage Area:DA-3-OFFSITE B PIw ngtryL Two rraman, c Area Wetted Perimeter, Hydraulic rad, Average Velocity, Travel e lnl Slopeele/al Coefficient,n Pa Hnl Unpaved now,AM al r lel tt/sr. Intel SHALLOW CONCENTRATED R...cwmnmrtorww 2300.00 0.0131 u 1.s8 70.76 SHALLOW CONCENTRATED Ts SALLOW cwmnmrtorww 1120.00 0.0179 U 2.16 8.65 Post-Developmet Time of Concentration,DA-3-OFFSITE B s7.32 Post-Developmet Drainage Area:DA-3-OFFSITE C(SCM-3) Flow Length, Two-year, rrantan, U.S. a ) 0a Wetted p• Hv a a. AverageVelocity, r av it l slope.s ln/r6 costar/entn 2 Rnl Unpaved FlowA IftOil r60 Mis Huai Post-Developmet Time of Concentration,DA-3-OFFSITE C(SCM-3) 20.78 Kimley>>>Horn Pre vs.Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project 8: 13335005 Designed by: EM Date: 10/19/2023 Revised by: Date: Revised by: Date: Checked by: Date: Pre-Development Drainage Area: DA-1-ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (C,Ar) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 1.76 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.56 WOODS WOODS,Fair condition(grass cover SO to 75%) D 0.58 79.00 0.99 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 0.27 COMPOSITE C-VALUE-DA-1-ONSITE 0.56 4.58 COMPOSITE SCS CURVE NUMBER-DA-1-ONSITE 77.89 Pre-Development Drainage Area: DA-2-ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cast) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 39.38 WOODS WOODS,Fair condition(grass cover 50to75%) C 0.46 73.00 6.26 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.90 WOODS WOODS,Fair condition(grass cover 50to75%) D 0.58 79.00 15.80 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.80 COMPOSITE C-VALUE-DA-2-ONSITE 0.52 67.14 COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE 75.78 Pre-Development Drainage Area: DA-2-OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (ac.) OPEN_SPACE Good condition(gross cover>75%) C 0.48 74.00 2.19 WOODS WOODS,Fair condition(grass cover SO to 75%) C 0.46 73.00 0.47 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 0.39 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 2.81 COMPOSITE C-VALUE-DA-2-OFFSITE A 0.72 5.86 COMPOSITE SCS CURVE NUMBER-DA-2-OFFSITE A 85.76 Pre-Development Drainage Area: DA-2-OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Carr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.97 WOODS WOODS,Fair condition(grass cover 50to75%) C 0.46 73.00 6.68 RESIDENTIAL 1/4 acre(38%imp.) C 0.66 83.00 0.18 URBAN_DISTRICTS Industrial(72%imp.) C 0.82 91.00 0.13 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 7.38 WOODS WOODS,Fair condition(grass cover S0 to 75%) D 0.58 79.00 13.18 WOODS WOODS,Fair condition(grass cover 50 to 75%) A 0.15 36.00 3.00 WOODS WOODS,Fair condition(grass cover SO to 75%) 8 0.20 60.00 5.88 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 5.78 COMPOSITE C-VALUE-DA-2-OFFSITE B 0.47 43.18 COMPOSITE SCS CURVE NUMBER-DA-2-OFFSITE B 72.07 Kimley>>>Horn Pre vs.Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project 8: 13335005 Designed by: EM Date: 10/19/2023 Revised by: Date: Revised by: Date: Checked by: Date: Pre-Development Drainage Area: DA-3-ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Canr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 8.05 WOODS WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 2.00 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 8.05 - WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 1.66 vavee parxing ion,roots, ro driveways, - IMPERVIOUS ways,etc.lexcluaing D 0.96 98.00 0.07 COMPOSITE C-VALUE-DA-3-ONSITE 0.50 19.83 COMPOSITE SCS CURVE NUMBER-DA-3-ONSITE 74.84 Pre-Development Drainage Area: DA-3-OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 6.12 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.69 WOODS WOODS,Fair condition(grass cover 50to75%) D _ 0.58 79.00 5.17 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.38 URBAN_DISTRICTS Industrial(72%imp.) _ D 0.86 93.00 16.61 - OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 14.43 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 11.70 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 20.13 URBAN_DISTRICTS Industrial(72%imp.) B 0.76 88.00 2.32 Paved parking lots,roots,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.65 COMPOSITE C-VALUE-DA-3-OFFSITE A 0.51 83.20 COMPOSITE SCS CURVE NUMBER-DA-3-OFFSITE A 75.47 Pre-Development Drainage Area: DA-3-OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (C,,r) (CN) (ac.) RESIDENTIAL 1/4 acre(3B%imp.) C 0.66 83.00 0.29 URBAN_DISTRICTS Industrial(72%imp.) C 0.82 91.00 1.80 WOODS WOODS,Fair condition(grass cover 50to75%) D 0.58 79.00 5.48 URBAN_DISTRICTS Industrial(72%imp.) D _ 0.86 93.00 9.76 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 10.62 WOODS WOODS,Fair condition(grass cover 50to75%) B 0.20 60.00 2.39 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 12.01 COMPOSITE C-VALUE-DA-3-OFFSITE B 0.65 42.35 COMPOSITE SCS CURVE NUMBER-DA-3-OFFSITE B 82.56 Kimley F>>Horn Pre vs.Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project 8: 13335005 Designed by: EM Date: 10/19/2023 Revised by: Date: Revised by: Date: Checked by: Date: Post-Development Drainage Area: DA-1-ONSITE HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cam.) ([N) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 1.35 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 0.14 COMPOSITE C-VALUE-DA-1-ONSITE 0.53 1.49 COMPOSITE SCS CURVE NUMBER-DA-1-ONSITE 76.26 Post-Development Drainage Area: DA-2-ONSITE A(SCM-1) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Ctsr) (CN) (as.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 1,27 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 2.05 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 17.45 COMPOSITE C-VALUE-DA-2-ONSITE A(SCM-1) 0.90 20.77 COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE A(SCM-1) 94.76 Post-Development Drainage Area: DA-2-ONSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (ec.) OPEN_SPACE Good condition(grass cover>75%) C 0,48 74.00 1.72 WOODS WOODS,Fair condition(grasscover SOto75%) C 0.46 73.00 0.00 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 2.44 _ WOODS WOODS,Fair condition(grass cover 50to75%) D 0.58 79.00 0.97 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 0.16 COMPOSITE C-VALUE-DA-2-ONSITE B 0.57 5.29 _ COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE B 78.41 Post-Development Drainage Area: DA-2-ONSITE C HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Ca,) (CN) lac.) OPEN_SPACE Good condition(grass cover>75%) C 0,48 74,00 0,68 WOODS WOODS,Fair condition(grass cover 50to75%) C 0.46 73.00 2.36 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 0.21 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 0.45 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right ofway) D 0.96 98.00 0.69 COMPOSITE C-VALUE-DA-2-ONSITE C 0.56 4.39 COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE C 78.03 Post-Development Drainage Area: DA-2-ONSITE D HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Carr) (CN) lac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.31 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 0.47 COMPOSITE C-VALUE-DA-2-ONSITE D 0.55 0.78 COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE D 77.62 Post-Development Drainage Area: DA-2-ONSITE E(SCM-2) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Caxr) (CN) (as.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.95 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 17.00 COMPOSITE C-VALUE-DA-2-ONSITE E(SCM-2) 0.93 17.95 COMPOSITE SCS CURVE NUMBER-DA-2-ONSITE E(SCM-2) 96.73 Kimley F>>Horn Pre vs.Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project 4: 13335005 Designed by: EM Date: 10/19/2023 Revised by: Date: Revised by: Date: Checked by: Date: - Post-Development Drainage Area: DA-2-OFFSITE A(SCM-1) - HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cwtr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.30 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 4.70 COMPOSITE C-VALUE-DA-2-OFFSITEA(SCM-1) 0.59 5.00 COMPOSITE SCS CURVE NUMBER-DA-2-OFFSITEA(SCM-1) 79.64 Post-Development Drainage Area: DA-2-OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cs,,,.) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0,48 74.00 0.67 WOODS WOODS,Fair condition(grass cover 50to75%) C 0.46 73.00 6.06 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 2.67 WOODS WOODS,Fair condition(grass cover 50to75%) D 0.58 79.00 13.06 WOODS WOODS,Fair condition(grass cover 50 to 75%) A 0.15 36.00 3.00 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 5.06 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 5.59 RESIDENTIAL WOODS,Fair condition(grass cover 50 to 75%) C 0.46 73.00 0.18 _ URBAN DISTRICTS Industrial(72%imp.) C 0.82 91.00 0.00 COMPOSITE C-VALUE-DA-2-OFFSITE B 0.46 36.29 COMPOSITE SCS CURVE NUMBER-DA-2-OFFSITE B 71.13 Post-Development Drainage Area: DA-2-OFFSITE C HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 2.19 WOODS WOODS,Fair condition(grass cover S0 to 75%) C 0.46 73.00 0.47 - WOODS WOODS,Fair condition(grass cover 50to75%) D 0.58 79.00 0.39 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 2.81 COMPOSITE C-VALUE-DA-2-OFFSITE C 0.72 5.86 COMPOSITE SCS CURVE NUMBER-DA-2-OFFSITE C 85.76 Post-Development Drainage Area: DA-3-ONSITEA(SCM-3) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cwtr) (CN) (HE) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 6.40 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.76 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) D 0.96 98.00 26.76 - COMPOSITE C-VALUE-DA-3-ONSITE A(SCM-3) 0.85 34.92_ COMPOSITE SCS CURVE NUMBER-DA-3-ONSITE A(SCM-3) 92.69 Post-Development Drainage Area: DA-3-ONSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Cwtr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 1.39 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 1.87 OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 0.05 WOODS WOODS,Fair condition(grass cover SO to 75%) C 0.46 73.00 0.05 OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 0.26 WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 1.12 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.10 COMPOSITE C-VALUE-DA-3-ONSITE B 0.57 5.84 COMPOSITE SCS CURVE NUMBER-DA-3-ONSITE B 78.29 Kimley F>>Horn Pre vs.Post Runoff Analysis Composite CN and Crat Project Name: Salisbury Logistics Center KHA Project 8: 13335005 Designed by: EM Date: 10/19/2023 Revised by: Date: Revised by: Date: Checked by: Date: Post-Development Drainage Area: DA-3-OFFSITE A HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (ac.) OPEN_SPACE Good condition(grass cover>75%) C 0.48 74.00 6.12 OPEN_SPACE Good condition(grass cover>75%) D 0.60 80.00 3.69 _ WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.17 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 1.38 URBAN_DISTRICTS Industrial(72%imp.) D 0.86 93.00 16.61 _ OPEN_SPACE Good condition(grass cover>75%) B 0.22 61.00 14.43 _ WOODS WOODS,Fair condition(grass cover 50 to 75%) B 0.20 60.00 11.70 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 20.13 URBAN_DISTRICTS Industrial(72%imp.) B 0.76 88.00 2.32 Paved parking lots,roofs,driveways,etc.(excluding IMPERVIOUS right of way) A 0.96 98.00 1.65 COMPOSITE C-VALUE-DA-3-OFFSITE A 0.51 83.20 COMPOSITE SCS CURVE NUMBER-DA-3-OFFSITE A 75.47 Post-Development Drainage Area: DA-3-OFFSITE B HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL[-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (CMr) (CN) (as.) RESIDENTIAL 1/4 acre(38%imp.) C 0.66 83.00 0.29 URBAN_DISTRICTS Industrial(72%imp.) C 0.82 91.00 1.80 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 5.48 URBAN_DISTRICTS Industrial(72%imp.) D 0.86 93.00 9.76 RESIDENTIAL 1/4 acre(38%imp.) D 0.74 87.00 10.62 _ WOODS WOODS,Fair condition(grass cover 50to75%) B 0.20 60.00 2.39 RESIDENTIAL 1/4 acre(38%imp.) B 0.50 75.00 12.01 COMPOSITE C-VALUE-DA-3-OFFSITE B 0.65 42.35 COMPOSITE SCS CURVE NUMBER-DA-3-OFFSITE 8 82.56 Post-Development Drainage Area: DA-3-OFFSITE C(SCM-3) HYDROLOGIC CONDITION OR HYDROLOGIC SOIL RATIONAL C-VALUE SCS CURVE NUMBER AREA,A COVER DESCRIPTION COVER TYPE GROUP (Carr) (CN) (ac.) RESIDENTIAL 1/4 acre(38%imp.) C 0.66 83.00 0.18 WOODS WOODS,Fair condition(grass cover 50to75%) C 0.46 73.00 0.62 URBAN_DISTRICTS Industrial(72%imp.) C 0.82 91.00 0.13 WOODS WOODS,Fair condition(grass cover 50to75%) B 0.20 60.00 0.82 WOODS WOODS,Fair condition(grass cover 50 to 75%) D 0.58 79.00 0.13 COMPOSITE C-VALUE-DA-3-OFFSITE C(SCM-3) 0.40 1.88 COMPOSITE SCS CURVE NUMBER-DA-3-OFFSITE C(SCM-3) 69.95 APPENDIX D: WATER QUANTITY Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER 1A Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-2 Onsite A and Offsite A Drainage Area(DA)= 25.77 Acres Impervious Area(IA)= 17.45 Acres Percent Impervious(I)= 67.7 % SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 779.0 ft Top of Sand Filter Media Elevation= 786.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 5.5 ft OK Sand Filter Design Required Storm Depth RD= 1 inch Percent Sizing= 100% Design Storm Depth RD= 1 inch Determine Rv Value= 0.05+.9(I)= 0.66 in/in WQV= 61,686 cf WQV,dJ= 46,265 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 786.0 ft Top of Ponding Elevation= 791.0 ft Ponding Depth Provided= 5.0 ft OK Total Volume Required= 46,264.8 cf Minimum Required Sand Chamber Volume= 23,132.4 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 23,132.4 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 1 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft2) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 785.0 9,393 0 0.22 0.00 786.0 10,691 10,042 0.25 0.23 787.0 12,060 21,429 0.28 0.49 788.0 13,492 34,205 0.31 0.79 789.0 14,985 48,444 0.34 1.11 790.0 16,540 64,206 0.38 1.47 791.0 16,541 80,747 0.38 1.85 Top of Sand Chamber 792.0 19,835 98,935 0.46 2.27 Provided Surface Area of Sand Chamber= 9,393.0 Approximate Sand Chamber Volume Provided= 98,934.8 OK Stormwater Stage-Area-Storage Table-Sandfilter 1 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft') Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 785.0 14,831 14,831 0.34 0.34 786.0 16,353 30,423 0.38 0.70 787.0 17,950 47,575 0.41 1.09 788.0 19,614 66,357 0.45 1.52 789.0 21,349 86,838 0.49 1.99 790.0 23,153 109,089 0.53 2.50 791.0 23,154 132,243 0.53 3.04 Top of Sediment Chamber 792.0 26,972 157,306 0.62 3.61 Provided Surface Area of Sediment Chamber= 14,831.0 Approximate Sediment Chamber Volume Provided= 157,306 OK Required Sand Filter Volume= 46,265 cf Total Provided Sand Filter Volume= 256,240 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER B100 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 9393 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 2.5 ft Sand Filter Media Drawdown = 1.16 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 12.71 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 3 Underdrain Design Flow(Q)= 3.48 cfs multiply by factor of safety 2- 10 Orifice Flow Number of Pipes= 3 Size of Pipe= 6 in Sand Filter Media Drawdown = 1.16 cfs Orifice flow design based off of Factor of safety= 3.00 Required Design Flow Per Pipe(Qtotal) w/sf= 3.48 Required Design Flow Per Pipe(Qreq) per pipe= 1.16 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 6 in Number of Pipes= 3 Used to calculate orifice flow above Length of Pipes= 120 LF Total Length of Perf Pipe Rows of Perforations= 4 Perforations per Row= 240 assume 6"o.c. Number of 3/8" Perforations= 960 50%of Perforations= 480 Capacity of each 3/8" Perforation = 0.009 Total Underdrain Capacity= 4.43 cfs OK Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER 2 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: FM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-2 ONSITE E Drainage Area(DA)= 17.95 Acres Impervious Area(IA)= 17.00 Acres Percent Impervious(I)= 94.7 SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 775.0 ft Top of Sand Filter Media Elevation= 786.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 9.5 ft OK Sand Filter Design Required Storm Depth RD= 1 inch Percent Sizing= 100% Design Storm Depth RD= 1 inch Determine Rv Value= 0.05+.9(I)= 0.90 in/in WQV= 58,797 cf WQVadI= 44,098 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 786.0 ft Top of Ponding Elevation= 792.0 ft Ponding Depth Provided= 6.0 ft OK Total Volume Required= 44,097.7 cf Minimum Required Sand Chamber Volume= 22,048.8 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 22,048.8 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 2 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft2) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 786.0 4,125 0 0.09 0.00 787.0 5,000 4,563 0.11 0.10 788.0 5,980 10,070 0.14 0.23 789.0 7,030 16,575 0.16 0.38 790.0 8,175 24,178 0.19 0.56 791.0 9,345 32,938 0.21 0.76 792.0 10,578 42,899 0.24 0.98 Top of Sand Chamber 793.0 11,880 54,128 0.27 1.24 Provided Surface Area of Sand Chamber= 4,125.0 Approximate Sand Chamber Volume Provided= 54,128.0 OK Stormwater Stage-Area-Storage Table-Sandfilter 2 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft) Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 786.0 3,645 0 0.08 0.00 787.0 4,840 4,243 0.11 0.10 788.0 6,130 9,728 0.14 0.22 789.0 7,515 16,550 0.17 0.38 790.0 9,000 24,808 0.21 0.57 791.0 10,580 34,598 0.24 0.79 792.0 12,272 46,024 0.28 1.06 Top of Sediment Chamber 793.0 14,075 59,197 0.32 1.36 Provided Surface Area of Sediment Chamber= 3,645.0 Required Sand Filter Volume= 44,098 cf Total Provided Sand Filter Volume= 113,325 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER 2 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 4125 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 3.0 ft Sand Filter Media Drawdown = 0.57 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 9.76 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 3 Underdrain Design Flow(Q)= 1.72 cfs multiply by factor of safety 2- 10 Number of Pipes= 3 Size of Pipe= 6 in Sand Filter Media Drawdown = 0.57 cfs Orifice flow design based off of Factor of safety= 3.00 Required Design Flow Per Pipe (Qtotal) w/sf= 1.72 Required Design Flow Per Pipe(Qreq) per pipe= 0.57 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 6 in Number of Pipes= 3 Length of Pipes= 50 LF Rows of Perforations= 4 Perforations per Row= 200 assume 3"o.c. Number of 3/8" Perforations= 800 50%of Perforations= 400 Capacity of each 3/8" Perforation = 0.009 Total Underdrain Capacity= 3.69 cfs OK Kimley>>>Horn SAND FILTER CALCULATIONS SAND FILTER SCM 3 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Design Resource: NCDEQ-Stormwater BMP Manual(2017) Site Information Sub Area Identification: DA-3 ONSITE A AND OFFSITE C Drainage Area(DA)= 36.80 Acres Impervious Area(IA)= 29.00 Acres Percent Impervious(I)= 78.8 SHWT Separation Type of Sand Filter: Open Bottom SHWT Elevation= 776.7 ft Top of Sand Filter Media Elevation= 782.0 ft Sand Chamber Media Depth= 18.0 in SHWT Separation Required= 2.0 ft SHWT Separation Provided= 3.8 ft OK Sand Filter Design Required Storm Depth Rp= 1 inch Percent Sizing= 100% Design Storm Depth Ro= 1 inch Determine Rv Value= 0.05+.9(I)= 0.76 in/in WQV= 101,422 cf WQV,di= 76,067 cf 75%of WQv per SCM Manual Top of Sand Filter Media Elevation= 782.0 ft Top of Ponding Elevation= 786.0 ft Ponding Depth Provided= 4.0 ft OK Approximate Surface Area Required= 19,017 Total Volume Required= 40.0 cf Minimum Required Sand Chamber Volume= 6.0 cf 50%of Water Quality Volume Minimum Required Sediment Chamber Volume= 20.0 cf 50%of Water Quality Volume Stormwater Stage-Area-Storage Table-Sandfilter 3 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft') Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 782.0 18,740 0 0.43 -.-- 783.0 20,660 19,700 0.47 0.45 784.0 22,675 41,368 0.52 0.95 785.0 24,776 65,093 0.57 1.49 Top of Sand Chamber 786.0 26,965 90,964 0.62 2.09 Provided Surface Area of Sand Chamber= 18,740.0 Approximate Sand Chamber Volume Provided= 90,963.5 OK Stormwater Stage-Area-Storage Table-Sandfilter 3 Stage Area Area Storage Volume DRY-POND CHARACTARISTICS (ft) (ft') Storage Volume(ft3) (ac) (ac.ft) Bottom of Basin Elevation 782.0 92,100 0 2.11 0.00 783.0 95,880 93,990 2.20 2.16 784.0 99,700 191,780 2.29 4.40 785.0 103,615 293,438 2.38 6.74 Top of Sediment Chamber 786.0 107,570 399,030 2.47 9.16 Provided Surface Area of Sediment Chamber= 92,100.0 Approximate Sediment Chamber Volume Provided= 399,030 OK Required Sand Filter Volume= 76,067 cf Total Provided Sand Filter Volume= 489,994 cf OK Kimley>>> Horn UNDERDRAIN CALCULATIONS SAND FILTER 3 Project Name: Track West-Rowan KHA Project#: 013335005 Designed by: EM Date: 9/15/2023 Revised by: SMC Date: 11/2/2023 Checked by: Date: Compute Sand Filter Drawdown Discharge Surface Area of Sand Chamber(Af) = 18740 sf Coefficient of Permeability(ft/day)= 4.0 ft/day Filter Bed Depth (df)= 1.5 ft Maximum Ponding Depth (hf)= 3.0 ft Sand Filter Media Drawdown = 2.60 cfs Computer Diameter of Single Pipe D=16(Q*n/S^0.5)^(3/8) Diameter of single pipe (D)= 17.21 in Roughness factor(n) = 0.011 Internal Slope (S)= 0.005 for a slope of 0.5% Factor of safety= 3 Underdrain Design Flow(Q)= 7.81 cfs multiply by factor of safety 2- 10 Orifice Flow Number of Pipes= 5 Size of Pipe= 6 in Sand Filter Media Drawdown = 2.60 cfs Orifice flow design based off of Factor of safety= 3.00 Required Design Flow Per Pipe(Qtotal) w/sf= 7.81 Required Design Flow Per Pipe(Qreq) per pipe= 1.56 cfs maximum drawdown. Head (H) = 6.25 Orifice Coefficient= 0.6 Orifice Flow(Q)= 2.4 is Qreq<=Qorifice? YES SUFFICIENT UNDERDRAINS Compute Perforation Capacity Pipe Diameter= 6 in Number of Pipes= 5 Length of Pipes= 250 LF Rows of Perforations= 4 Perforations per Row= 1,000 assume 6"o.c. Number of 3/8" Perforations= 4,000 50%of Perforations= 2,000 Capacity of each 3/8" Perforation = 0.009 4125 Total Underdrain Capacity= 18.46 cfs OK 1S \3S 5S 6S I \ (10S\PRE-DEVA-2 PRE-D VIDA2PR -DEV DA-27S C8S I JPRE-DV DA-1 ONSITEOFFITEAFFSITE B / ON ITE PRE-D V DA-3 PRE-DEV 3 OFF ITE A PR -DEV DA-3 ONSITE FFSITE B 2L �� 4L 9L POA 1 /� POA3 POA2 (Subca) Reach Ond MN Routing Diagram for PRE-DEVELOPMENT Prepared by Kimley-Horn&Associates, Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC PRE-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.73 2 2 10-Year Type II 24-hr Default 24.00 1 4.80 2 3 25-Year Type II 24-hr Default 24.00 1 5.70 2 4 50-Year Type II 24-hr Default 24.00 1 6.41 2 5 100-Year Type II 24-hr Default 24.00 1 7.21 2 PRE-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 4.580 78 (1S) 150.340 76 (3S, 8S) 5.860 86 (5S) 43.180 72 (6S) 19.830 75 (7S) 42.350 83 (10S) 266.140 77 TOTAL AREA PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 4.47 cfs © 12.15 hrs, Volume= 0.359 af, Depth= 0.94" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 5 - i 4.47 cfs i —Runoff Type II 24-hr 4- 1-Year Rainfall=2.73" Runoff Area=4.580 ac 3 Runoff Volume=0.359 af Runoff Depth=0.94" 2— Tc=21.8 min CN=78 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 39.16 cfs © 12.34 hrs, Volume= 4.687 af, Depth= 0.84" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 42 z 39.16 cfs —Runoff 40= 38= , 36; Type II 2-4-I r 32= 32= 1-Year; Rainfall2,73" , , Runoff Area=6T :4a 1 ac 28; 26= Runoff=volume=4.88- af - 24=o LL 201 Runoff Depth=Q.84" 18= TC=36.4 MI6 16; 14; h CN=76 12: , , 10; 8, 6= 4= 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 12.07 cfs © 12.04 hrs, Volume= 0.700 af, Depth= 1.43" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 13- i 12.07 cfs i —Runoff 12- 11 Type--1124-hr 10 1-Year RaFnfaII=2.73" 9= Runoff Area=$.$60 ac w 8- Runoff Volume=,O.TQO of G = r Runoff ,Depth=1.43" LT 5- ,Ic=12.0_miln 4- CN w'=86 3- 2- 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 28.40 cfs © 12.14 hrs, Volume= 2.348 af, Depth= 0.65" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 43.180 72 43.180 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 30- 128.40 cfs —Runoff 28= 26 Type II 24-hr 24= 1-Year Raiinfalll=2.73" 22= Runoff ac 20= rn 18= Runoff VoIurye==2.848 of 3 16- Runoff Depth-0.6-5" O 14- T--6=19. xYl in 10= C N=72 8- 6= 4- 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 15.73 cfs © 12.15 hrs, Volume= 1.304 af, Depth= 0.79" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 17= , 15.73 cfs —Runoff 16: 15: Type II 24-hr 14= 13= 1-Year, RaFnfaII-2.73" 12= Runoff Area= 9.830 ac 11— rn 10 R-undff VoILrn=1.304 of = LL $ Runoff Depth=0.79" T6=20.7 Mill 6= CN=75 5= 4= 3= 2= 1= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 42.93 cfs © 12.43 hrs, Volume= 5.808 af, Depth= 0.84" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 48- 46 44= 42.93 cfs i —Runoff 42= 40= r r i "Type 1I''24-h,r 38; 36= 1-Year Ra fnfa 11=2.73'" 34= I , 32; J Runoff Area -83.200 ac 30- Runoff-Volume 5.808 -af • 28= 6 26- LL 22- Runoff bepth=0.84" 20= 18= Tp=4.3.2-m-lp 16: 1 1 1 1 r fir_ L7 14 CN 7 12= 10= 8= 6= 4- 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 28.19 cfs © 12.61 hrs, Volume= 4.350 af, Depth= 1.23" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 30= 128.19 cfs l —Runoff 28: 26= Type II 24-hr 24= 1-Year Rainfar172.7-3" 22= =4 Runoff Area- 2. 20 50, ac w 18- Rundff IfOh r e=4.350 of 0 16= Runoff Depth=1.23" LT 14= TCi 7. 10= C N=83 8 6= 4- 2- 0 ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,,�,,,,�,,,,�,,,,�,,,,�,,,,�,,,,, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 11 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 0.94" for 1-Year event Inflow = 4.47 cfs @ 12.15 hrs, Volume= 0.359 af Primary = 4.47 cfs @ 12.15 hrs, Volume= 0.359 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 5 _ 14.47 cfs I —Inflow —Primary 4 Inflow Area=4.580 ac 3— w - - 0 2— 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 12 Summary for Link 4L: POA 2 Inflow Area = 116.180 ac, 0.00% Impervious, Inflow Depth = 0.80" for 1-Year event Inflow = 61.74 cfs @ 12.21 hrs, Volume= 7.735 of Primary = 61.74 cfs @ 12.21 hrs, Volume= 7.735 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 65= 161.74 cfs I -Inflow -Primary Inflow Area=116.180 ac ::i.- 50- 45- 40- 3 35_ o - LL 30- 25- 20- 15- 10- 5- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 13 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 0.95" for 1-Year event Inflow = 74.97 cfs @ 12.48 hrs, Volume= 11.461 af Primary = 74.97 cfs @ 12.48 hrs, Volume= 11.461 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 80= 174.97 cfs I Inflow 75: —Primary 70= I of ow-Area=1-45.380 --ac 65: 60: 55= 50= u 45-- c 40; u. 35= 30= 25= 20= 15= 10= 5= 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 12.59 cfs © 12.14 hrs, Volume= 0.970 af, Depth= 2.54" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 14- 13- I 12.59 cfs i —Runoff 12- Type II 24-hr 11= 10-Year Rainfall=4.80" 10- 9 Runoff,Area=4.580_--ac =8 Runoff VoII� rn =b.970 af 0 7- D Runoff- pth-=2.5-4" LL 6 Tc=21 .0 m i n 5- 4 LII�l=--- --8 7$ 3- 2- 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 120.57 cfs © 12.33 hrs, Volume= 13.270 af, Depth= 2.37" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 130- 120.57 cfs I —Runoff 120: 110- Type II24-hr 100 10-Year- Raipfall=-4-80" 90- Runoff Arca=67.140 ac 80- Runoff Volume=13.270 of - 3 70= Runoff Depth2.137" LL 60= Tc=364 m i n ON=76 40- 30- 20- 10- 0 ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,, ,,,,�,,,,�,,,,�,,,,�,,,,�,,,,�,,,,, 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 27.02 cfs © 12.04 hrs, Volume= 1.602 af, Depth= 3.28" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 30- 28- 27.02 cfs —Runoff 26= I . TYpe li'2 r 24- 22 10-Year.-Ra_i-nfaU=4.8_0" 20 Ru noff Area=5.866 ac 18= Runoff Vorum - `f V16- � 1.602a 3.28" 0 14 RRunoff_De-p h= 12 Tc=12.0 min I I C N=86 8- 6- 4- 2- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 99.91 cfs © 12.12 hrs, Volume= 7.359 af, Depth= 2.05" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 43.180 72 43.180 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 110= 105- 99.91 cfs —Runoff 100= 95= Type tl 24-h r 90= 85= T 1 1 10-Year Rainfall 4.80" 80= 75= Runoff Area-43.180 an 70= w 65- ' Runoff V 60 . . 1/c►lume=1.3�e5}�9 af 3 55; Runoff Depth=L.05" LL 50= 45= Tc=19.0 m i n 40= 35= C'N=72 30= 25= 20= 15= 10= 5.. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 49.21 cfs © 12.14 hrs, Volume= 3.781 af, Depth= 2.29" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 55— i 49.21 cfs i -Runoff 50- 45- Type- 11 24-hr 40- I , 10_-Year_Ra-i-nfa-il=4.$_0�' 35- Runoff-Area=19.830--a-c 30- Runoff Volume=,3.781 af 3 - Runoff Depth=2.29" ° 25- 20- ,Tc=20.7 m i In 15- CN=75 10- 5- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 132.47 cfs © 12.43 hrs, Volume= 16.444 af, Depth= 2.37" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 140- 1 132.47 cfs I —Runoff 130- 120 .Type II 24-hr 110= 10 Ypar Rai0f0+4 80" Runoff Area83.200 ae 90- Runoff Voluil e=16.444 of so= Runoff p 0 =70 De th=2.''37 LL 60= To=43;2--IY1i +► 50- t IV j7t 40- 30- 20- 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 70.19 cfs © 12.55 hrs, Volume= 10.565 af, Depth= 2.99" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 75_ 170.19 cfs —Runoff 70- I 1 A 65: Type 124-hr 60= 10-blear Rainfa11=4.80" 55= Runoff Area=42.350 ac 50= • 45— Runoff / luM0=1 0.5fi f 3 40_ Runoff Depth*2.997 LL 35= Tc=57s3 min 30: 25 CN=83 20- 15- 10- 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 21 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 2.54" for 10-Year event Inflow = 12.59 cfs @ 12.14 hrs, Volume= 0.970 of Primary = 12.59 cfs @ 12.14 hrs, Volume= 0.970 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 14- 13- 12.59 cfs —Inflow —Primary 12 Inflow Area=4.580 ac 11- 10- 9- w 8- 3 7= o = LL 6 5- 4- 3- 2- 1- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 22 Summary for Link 4L: POA 2 Inflow Area = 116.180 ac, 0.00% Impervious, Inflow Depth = 2.30" for 10-Year event Inflow = 201.60 cfs @ 12.17 hrs, Volume= 22.230 of Primary = 201.60 cfs @ 12.17 hrs, Volume= 22.230 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 220= Inflow 210 f ;1201.60 cfs I Primary I 200= 190= inflow Area-116.180 ac 180-s 1701 160= 150= 140= , , N 130= u 120= c 110= I I I I I LT: 100= r 90= 80= 70= ; r r ; 60= 50= 40= 30= i 20 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 23 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 2.54" for 10-Year event Inflow = 215.63 cfs @ 12.43 hrs, Volume= 30.790 af Primary = 215.63 cfs @ 12.43 hrs, Volume= 30.790 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 240� 230= 1215.63 cfs —Inflow 220! I : n Primary 210= 200= h ,low Area=i 45.380 ac 190: 180: 170: 160= 150: i h h h ; w 140= 4 4 I ' I u 130= 120= 1 h I h h h h h h I .° 110g 1 100.. l 90! 4 4 4 4 + 80= 70= h h h 1 1 60: 50: i i h ; 40: 30= I h h h ; 20: , 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 16.42 cfs © 12.14 hrs, Volume= 1.265 af, Depth= 3.32" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 18= 17- I 16.42 cfs —Runoff 16= 15= T-Ype--11-.24-hr 14= 25-Year Rainfall=5.7 " 13 12= R noff1A ea=4.58O arc Runoff Volume=1 5af Runoff Depth=3.32" 8= 7= T6=21.0-min 6= 5= N=78 4.- 3= 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 159.80 cfs © 12.33 hrs, Volume= 17.472 af, Depth= 3.12" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 170 1159.80 cfs I —Runoff 160 150= Typ II 24=hr 140- 25-Year Rainfall=5.70" 130= 120- Runoff Area=67.140 ac 110= Runoff Volume=17.47 Lf 100= o Runoff DOpth3.12" $°_ Tc=364 m i n 70= �+►60= N=76 50: 40_ 30= 20= 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 33.62 cfs © 12.04 hrs, Volume= 2.014 af, Depth= 4.12" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 36=' 133.62 cfs —Runoff 34= 32= Type fl 24-hr 30 r 28 25-YearRainf-aII=5.7O ' 26: 24= RunoffRijnoft Area= 60- ac 22= Runoff Votumn =2.014 � � � f 0 20: 0 18= Runoff Runo - - De th-4.12" .� � � 16= T _� 14= ,l__C 2.O_m-i4, 12= N=86 10= 8= 6r 4= 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 135.54 cfs © 12.12 hrs, Volume= 9.894 af, Depth= 2.75" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 43.180 72 43.180 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 150- 140- 135.54 cfs —Runoff 130- Type rl 24-fir 120- 110 25-Year,_Rainfall=_5.J01' 100= Runoff Area=43.i 80 90- Runoff Volume=9-.894 of 80— LL 70= f uno - Qg trh=2.75"' 3 60= I Tc=19.9 min 50 cN=72 40- 30- 20- 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 28 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 65.42 cfs © 12.13 hrs, Volume= 5.004 af, Depth= 3.03" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 70_ I65.42 cfs _ —Runoff ::: Type II 24-1hr 55= 25-Year Rainfall=5.7O ' 50= R[unoff Area='19.030 ac 45= 40= Runoff YolUm -5.404 af 35 c - Runoff bepth-3.03" 30- iC=2 .7 m i n 25= CN=7$ 20= 15= 10= 5r , 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 175.61 cfs © 12.43 hrs, Volume= 21.651 af, Depth= 3.12" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 190. ; ; 180= 1 175.61 cfs —Runoff 170= r 'Type IIT 24-hr 160= I 150. ©25:Year Rainfa11=5.70" 130 Runoff Area , =83.�QQ a 120= Iurlofif Voruma-2�1.G51 of Elio; 100= Runoff Dipth=3.12" 0 90: 80= TG=43.2_-miri 70= tri=76 60; 50= 40i 30= 20 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 89.40 cfs © 12.55 hrs, Volume= 13.460 af, Depth= 3.81" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 25-Year Rainfall=5.70" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 100_ 95- 1 89.40 cfs I —Runoff 85; I 80— Type II 24-h'';r 75 254Ypar Rainfall=5:70' I " = I I I I 651 Runoff Area=42.350 ac 60- Runoff Volume 1',3.460 of .4 55= 3 50_ Ruoff!Depth-3.81 LL 45= Tc=57,3 min 40; 351 01*=83 30 25= 15: 5- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 31 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 3.32" for 25-Year event Inflow = 16.42 cfs @ 12.14 hrs, Volume= 1.265 of Primary = 16.42 cfs @ 12.14 hrs, Volume= 1.265 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 18 17= 16.42 cfs Inflow —Primary) 16_ 15= Inflow---A''rea=4.58-0-ac 14= 13 12 11. 41-11 10 3 9= o = U. 8= 7= 6= 5= 4= 3 2 1= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 32 Summary for Link 4L: POA 2 Inflow Area = 116.180 ac, 0.00% Impervious, Inflow Depth = 3.03" for 25-Year event Inflow = 270.20 cfs © 12.17 hrs, Volume= 29.381 af Primary = 270.20 cfs © 12.17 hrs, Volume= 29.381 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 300- 280- 1270.20 cfs i Inflow —Primary 260- Inflow Area=116.180 ac 240= < 220- 200- 180- ti 160- c 140 120: 100.- 80- 60- 40- 20: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 25-Year Rainfall=5.70" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 33 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 3.31" for 25-Year event Inflow = 282.46 cfs @ 12.43 hrs, Volume= 40.115 af Primary = 282.46 cfs @ 12.43 hrs, Volume= 40.115 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 300_ , 282.46 cfs I —Inflow 280= —Primary 260_ Inflow Area=145.380 ac 240-E 220 200 w 180 o 3 160 0 M 140= 120. 100- 80 60 40- 20_ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 34 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 19.51 cfs © 12.13 hrs, Volume= 1.505 af, Depth= 3.94" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 21: , 20:: l 19.51 cfs i -Runoff 1 = 18 Yp � '. T � II!24-1�r = � A if 17= 50-Year RainfE�. H 6.41 ' 16= O J 1 = 14= Runoff A e =4.580 aci `, es ,1 13= Runoff-Volum .50 4-• 12= -af 3 11= Runoff Lb pth=3 94" O 10= 8= Tc=21.0 m i n 7 C N=78 6= 5= 4= 3= 2= 1= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 191.54 cfs © 12.33 hrs, Volume= 20.905 af, Depth= 3.74" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 210= I 200- 1191.54 cfs r h h ; i h h —Runoff 190 i 1 180= `T a--II 24--h 170= � 160= 50-Y-ear--Rai-nfall=6:41" 150= Runoff_Area' 140= . 67.140_ac 130= Runoff VoluMe=20.905 af w 120= 0 110 Ru17bff'-Depth-3.74" 0 100= Li 90-: TE=36.,4 min So= t t 01070 60: 50= 40= 30= F -E_ ' ) 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 38.79 cfs © 12.03 hrs, Volume= 2.344 af, Depth= 4.80" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 42= —Runoff 40= 38.79 cfs 38= 36= Typa II 24-I r 34; 324 50-Year Rainfall6.41" 30= 28: RUnaff Area=5,86O ac 26= Runoff-Vo[um� = O 24: e- af 3 221 O• 20: Runoff Depth-4.50.. Tc=1 0 min 16; /swF 14= C N=86 12= 10= 8= 6; 4: 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 164.68 cfs © 12.12 hrs, Volume= 11.989 af, Depth= 3.33" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 43.180 72 43.180 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 180- 170: 1164.68 cfs I —Runoff 160= 150: Type II'24-h r 140: ? 5U i ear Rai faII76 4i.n 120 120= Runoff_Area43._180__ac 110= Runoff Volume 11.989 of 100= Runoff!Depth=3..''33';" c 90_ Li 80: TC=19,0111irr 60= r CN=7 50= 40= 30= 20- 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 78.57 cfs © 12.13 hrs, Volume= 6.005 af, Depth= 3.63" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 85= , 78.57 cfs —Runoff 80: 75: Type II 24 hr 70= 65 50-Year RainfaH1=6..41" 60- Runoff Area19.830 ac 55= `, �A�■{� 5 w 50- Runoff Volume=8 00 af 3 45= 3 40_ Runoff JDepth=3.63" 35= '176=20.1 min 30= d =75 25= 20: 15= 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 210.54 cfs © 12.43 hrs, Volume= 25.906 af, Depth= 3.74" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 230= 220- 1 210.54 cfs i h h ; i h h —Runoff 210- 200= Type- II 24-hr 190= 180= 5U Year Rai0fall=6.41" 160- Runoff Area 8- = 3.20© aitr 150= 140= iioff /Q'funle=25.906 of 74 130: h ; Ru trff De th 3. 0 -110 4' u 100= Te�3,2 rnil'Y 90; AA'' cc 80= 1s=7' 70= 60= 50= 40= 30= 20= ) i t t i t 10= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 104.68 cfs © 12.55 hrs, Volume= 15.787 af, Depth= 4.47" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 50-Year Rainfall=6.41" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 115= 110- 1 104.68 cfs I -Runoff 105- 100= Type II,24-h'r 95= 90= 50-Year--Rainfall 6 417 85= 80= Runof--Area 42.35© ac 75= 70= Runoff 'Volume 15.787 of 65= ; 3 60= Runoff Depth=4.,47" G 55= _ Tc 57, II 50= = 3 mip 45= 40 =8 35= 30= 25= 20= 15= 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 41 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 3.94" for 50-Year event Inflow = 19.51 cfs @ 12.13 hrs, Volume= 1.505 of Primary = 19.51 cfs @ 12.13 hrs, Volume= 1.505 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 21: : 20= 19.51 cfs ' —Inflow ' —Primary 1 : ' '18 Inflow Area-4.580 ac 17: 16= 15= 14: 13= F 12= 3 11= o 10: 9= 8= : 7= 6: -- -- 5 4= 3= 2= 1f 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 42 Summary for Link 4L: POA 2 Inflow Area = 116.180 ac, 0.00% Impervious, Inflow Depth = 3.64" for 50-Year event Inflow = 326.04 cfs @ 12.16 hrs, Volume= 35.238 af Primary = 326.04 cfs @ 12.16 hrs, Volume= 35.238 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 360 340= 326.04 cfs -Inflow 320= —Primary) 300_ ! ! Inflow Area=116.180 ac 280- 260-- 240 220 200=o I I 180= 0 u 160- 140= 120 100 80 60= 40= 20 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type 1124-hr 50-Year Rainfall=6.41" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 43 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 3.94" for 50-Year event Inflow = 336.22 cfs @ 12.42 hrs, Volume= 47.699 af Primary = 336.22 cfs @ 12.42 hrs, Volume= 47.699 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 360= , 336.22 cfs I ' ' ' —Inflow 340_ —Primary 320= * inflow Area=145.380 ac 300 280 260 240: 220: = I I I I I 200 c 180 L.T. 160 140: , 120: 100; 80 60 40i 20: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 1 S: PRE-DEV DA-1 ONSITE Runoff = 23.01 cfs © 12.13 hrs, Volume= 1.781 af, Depth= 4.67" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 4.580 78 4.580 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.0 Direct Entry, Subcatchment 1 S: PRE-DEV DA-1 ONSITE Hydrograph 24— 23.01 cfs —Runoff 22— Type II 24-hr 20= 100-Year Rainfaill7. 1" 18: Runoff Area=4.580 ac 16- 14= Runoff Volume=,1 .781 of o 0 12— Runoff Depth=4.6-7" Tc - 1 8= E N=78 6- 4- 2— 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 3S: PRE-DEV DA-2 ONSITE Runoff = 227.86 cfs © 12.33 hrs, Volume= 24.868 af, Depth= 4.44" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 67.140 76 67.140 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 36.4 Direct Entry, Subcatchment 3S: PRE-DEV DA-2 ONSITE Hydrograph 240— '1227.86 cfs l —Runoff 220- , Type 11'24-hr 200- 100-Year Rainfall=7.421" 180— RuRunoff Area67.140 ac Runoff Volume=24.868 of w 140- 3 = Runoff D ;pth=4.447 G 120— Tc=36,4 min 100- So CN=76 60- 40— 20- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Runoff = 44.63 cfs © 12.03 hrs, Volume= 2.719 af, Depth= 5.57" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 5S: PRE-DEV DA-2 OFFSITE A Hydrograph 48= —Runoff 46! 44.63 cfs 44= 42; rType- II 24-hr 40= 38; r 100-Year'Rainfall=7.21" 36: 3 ; 32= Runoff Are-fi=5.860---fi-c p /� 30= FEUi�L.(9 1 _ 28= iOff V-diuM Of -- 26; i 1 r r r r r r 24; i Runoff Depth-5.57" u 22= 20= 17=12.0min 18; 16: 1 C N=86 14: 12; 10; 8: 6= 4; 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Runoff = 198.26 cfs © 12.12 hrs, Volume= 14.424 af, Depth= 4.01" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 43.180 72 43.180 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.0 Direct Entry, Subcatchment 6S: PRE-DEV DA-2 OFFSITE B Hydrograph 220 ' 210- 1198.26 cfs i —Runoff 200; 190; Type II,24-h.r 180; 170= 100 Year Fainfatl=7. 1 r. 160= 150 Runoff 4r0a=43.1$0 aic 140; 130: Runo#f Volu 171E=14.424 of c, 120= 110; : RunOff DOpt-h=4.O1;�" - 100: T 90= c=1=9 0_min--- 80 70' N7 60; 50- 40; 30= 20= 10; 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 7S: PRE-DEV DA-3 ONSITE Runoff = 93.65 cfs © 12.13 hrs, Volume= 7.164 af, Depth= 4.33" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 19.830 75 19.830 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.7 Direct Entry, Subcatchment 7S: PRE-DEV DA-3 ONSITE Hydrograph 100= 93.65 cfs -Runoff 95= F 90= 'Type-1124-h.r 85= 80= 100-Year Rainfall=7.21`' 70 Runoff are=19.830 ac 65= Runoff Volume-=7.�64af 55= _0 50= Runoff Depth#4.33"' U. 45= 40= Tc=2'0�'*� rn i n 35= 30= CN=75 25= 20= 15= 10- 5= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Runoff = 250.36 cfs © 12.42 hrs, Volume= 30.817 af, Depth= 4.44" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 8S: PRE-DEV DA-3 OFFSITE A Hydrograph 280- 260- 1250.36 cfs —Runoff 240= Type 1124-hr 220- 100-Year Rainfall=7.'21`' 200- 180= Ru hofF Area83.200 ac kunoff_Volu 3 81 ' f 3 140= Runoff.-DOpth=4.44" O u_ 120- Tc=43 2 mi -- 100_ cN=76 80- 60- 40- 20 J 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Runoff = 121.96 cfs © 12.55 hrs, Volume= 18.444 af, Depth= 5.23" Routed to Link 9L : POA 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 10S: PRE-DEV DA-3 OFFSITE B Hydrograph 130- 1121.96 cfs I —Runoff 120= 110_ Type II 24-h r 100 1 Q0 Year Rai if II 7.21 90- Runoff Area42. ►50 a 80 R1 no f Volume=1,[8.444 a1f - 70= Runoff Depth-5.23'' Li 60- Tn=573 D'1n ON=83 40- 30- 20- 10- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 51 Summary for Link 2L: POA 1 Inflow Area = 4.580 ac, 0.00% Impervious, Inflow Depth = 4.67" for 100-Year event Inflow = 23.01 cfs @ 12.13 hrs, Volume= 1.781 af Primary = 23.01 cfs @ 12.13 hrs, Volume= 1.781 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 24- 23.01 cfs —Inflow —Primary ::i. Inflow Area=4:580 ac 18- 16- o 14_ o 12- 10- 8- 6- 4- 2- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 52 Summary for Link 4L: POA 2 Inflow Area = 116.180 ac, 0.00% Impervious, Inflow Depth = 4.34" for 100-Year event Inflow = 390.23 cfs @ 12.16 hrs, Volume= 42.012 af Primary = 390.23 cfs @ 12.16 hrs, Volume= 42.012 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 420 400: 1390.23 cfs I —Inflow I _ —Primary 380= 360: ! Inflow Area`116.180 ac 340: 320-E 300; 280 260-E F. 240; 3 220= 0 200= LL = 180-E 160= 140: 120: , 1005 1 80: 1 1 1 i 60= 40= 20= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 53 Summary for Link 9L: POA 3 Inflow Area = 145.380 ac, 0.00% Impervious, Inflow Depth = 4.66" for 100-Year event Inflow = 397.65 cfs @ 12.42 hrs, Volume= 56.425 af Primary = 397.65 cfs @ 12.42 hrs, Volume= 56.425 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 440= 420- 1397.65 cfs l —Inflow 400= —Primary 380= Inflow ► rea=14 .380 ac 360 340= 320= . 3001 280= 260= = 2401 . . . 3 220- LL 200= 180-E 160= 140= 120 100- 80 60= 40=20= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) PRE-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 1-Year Event 4 Subcat 1 S: PRE-DEV DA-1 ONSITE 5 Subcat 3S: PRE-DEV DA-2 ONSITE 6 Subcat 5S: PRE-DEV DA-2 OFFSITE A 7 Subcat 6S: PRE-DEV DA-2 OFFSITE B 8 Subcat 7S: PRE-DEV DA-3 ONSITE 9 Subcat 8S: PRE-DEV DA-3 OFFSITE A 10 Subcat 10S: PRE-DEV DA-3 OFFSITE B 11 Link 2L: POA 1 12 Link 4L: POA 2 13 Link 9L: POA 3 10-Year Event 14 Subcat 1 S: PRE-DEV DA-1 ONSITE 15 Subcat 3S: PRE-DEV DA-2 ONSITE 16 Subcat 5S: PRE-DEV DA-2 OFFSITE A 17 Subcat 6S: PRE-DEV DA-2 OFFSITE B 18 Subcat 7S: PRE-DEV DA-3 ONSITE 19 Subcat 8S: PRE-DEV DA-3 OFFSITE A 20 Subcat 10S: PRE-DEV DA-3 OFFSITE B 21 Link 2L: POA 1 22 Link 4L: POA 2 23 Link 9L: POA 3 25-Year Event 24 Subcat 1 S: PRE-DEV DA-1 ONSITE 25 Subcat 3S: PRE-DEV DA-2 ONSITE 26 Subcat 5S: PRE-DEV DA-2 OFFSITE A 27 Subcat 6S: PRE-DEV DA-2 OFFSITE B 28 Subcat 7S: PRE-DEV DA-3 ONSITE 29 Subcat 8S: PRE-DEV DA-3 OFFSITE A 30 Subcat 10S: PRE-DEV DA-3 OFFSITE B 31 Link 2L: POA 1 32 Link 4L: POA 2 33 Link 9L: POA 3 50-Year Event 34 Subcat 1 S: PRE-DEV DA-1 ONSITE 35 Subcat 3S: PRE-DEV DA-2 ONSITE 36 Subcat 5S: PRE-DEV DA-2 OFFSITE A 37 Subcat 6S: PRE-DEV DA-2 OFFSITE B PRE-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 11/28/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC 38 Subcat 7S: PRE-DEV DA-3 ONSITE 39 Subcat 8S: PRE-DEV DA-3 OFFSITE A 40 Subcat 10S: PRE-DEV DA-3 OFFSITE B 41 Link 2L: POA 1 42 Link 4L: POA 2 43 Link 9L: POA 3 100-Year Event 44 Subcat 1 S: PRE-DEV DA-1 ONSITE 45 Subcat 3S: PRE-DEV DA-2 ONSITE 46 Subcat 5S: PRE-DEV DA-2 OFFSITE A 47 Subcat 6S: PRE-DEV DA-2 OFFSITE B 48 Subcat 7S: PRE-DEV DA-3 ONSITE 49 Subcat 8S: PRE-DEV DA-3 OFFSITE A 50 Subcat 10S: PRE-DEV DA-3 OFFSITE B 51 Link 2L: POA 1 52 Link 4L: POA 2 53 Link 9L: POA 3 ® POS®A-2 ® '® POST-D V DA-2 ONSI E(SCM-2) OFFSITE (SCM-1) POSTD-2 POST-D V DA-1 ONSITE E AE(SC ) • O'.ITE OFFSITE B S M2 OFFSITE TEDEVC -3 P -DEVA DA-3 C (S 3) O ITE (SCM-3) SCM1 • AT-DOS DA-3 POST-DEV DA-2 FFSITE B ONSITE D 13R Q--® SC 30R �3 NORTH TREAM A-3 BYPASS PIPE DEPRESSION POST-DEV DA-2 b ONSITE B 28R 14R 1-® SOUTH TREAM • POST-DEV DA-2NORTH POST-DEV DA-3 P 2 M TO ONSITE C OFFSITE A_ 21 4L 4 ® 9L ---,_ POA 3 POST-DEV DA-3 POA 1 POA 2 POST-DEV DA-2 ONSITE B OFFSITE C (Subca) Reach andIN Routing Diagram for POST-DEVELOPMENT Prepared by Kimley-Horn&Associates, Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC POST-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-Year Type II 24-hr Default 24.00 1 2.73 2 2 2-Year Type II 24-hr Default 24.00 1 3.30 2 3 10-Year Type II 24-hr Default 24.00 1 4.80 2 4 100-Year Type II 24-hr Default 24.00 1 7.21 2 POST-DEVELOPMENT Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 3 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 1.880 70 (10S) 84.690 76 (11S, 32S) 17.950 97 (12S) 5.860 86 (15S) 20.770 95 (16S) 5.000 80 (17S) 16.310 78 (18S, 19S, 23S, 29S) 36.290 71 (22S) 34.680 93 (25S) 42.350 83 (31S) 265.780 82 TOTAL AREA POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ _ Page 4 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE C Runoff Area=1.880 ac 0.00% Impervious Runoff Depth=0.57" Tc=20.8 min CN=70 Runoff=0.96 cfs 0.089 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=0.84" Tc=5.0 min CN=76 Runoff=2.30 cfs 0.104 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=17.950 ac 0.00% Impervious Runoff Depth=2.39" Tc=5.0 min CN=97 Runoff=70.00 cfs 3.577 of Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.43" Tc=12.0 min CN=86 Runoff=12.07 cfs 0.700 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=2.19" Tc=5.0 min CN=95 Runoff=77.21 cfs 3.784 af Subcatchment 17S: POST-DEV DA-2 OFFSITE A Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=1.05" Tc=44.7 min CN=80 Runoff=3.32 cfs 0.438 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=5.300 ac 0.00% Impervious Runoff Depth=0.94" Tc=21.1 min CN=78 Runoff=5.14 cfs 0.416 of Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=0.94" Tc=17.6 min CN=78 Runoff=4.76 cfs 0.344 af Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff Area=36.290 ac 0.00% Impervious Runoff Depth=0.61" Tc=28.9 min CN=71 Runoff=16.27 cfs 1.845 of Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=0.94" Tc=5.0 min CN=78 Runoff=1.36 cfs 0.061 af Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=2.00" Tc=5.0 min CN=93 Runoff=121.32 cfs 5.771 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=0.94" Tc=15.0 min CN=78 Runoff=6.92 cfs 0.458 af Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.23" Tc=57.3 min CN=83 Runoff=28.19 cfs 4.350 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=0.84" Tc=43.2 min CN=76 Runoff=42.93 cfs 5.808 af Reach 13R: NORTH STREAM DEPRESSION Inflow=47.87 cfs 10.097 af Oufflow=47.87 cfs 10.097 af Reach 14R: NORTH STREAM TO POA 2 Inflow=51.90 cfs 10.441 af Outflow=51.90 cfs 10.441 af POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 5 Reach 28R: SOUTH STREAM Inflow=72.93 cfs 16.239 af Outflow=72.93 cfs 16.239 af Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=0.94' Max Vet=11.75 fps Inflow=28.19 cfs 4.350 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=28.17 cfs 4.350 af Pond 10P: SCM 2 Peak EIev=790.42' Storage=69,620 cf Inflow=70.00 cfs 3.577 af Primary=28.99 cfs 3.568 af Secondary=0.00 cfs 0.000 af Outflow=28.99 cfs 3.568 af Pond 12P: SCM 1 Peak EIev=788.12' Storage=105,379 cf Inflow=77.72 cfs 4.222 af Outflow=4.63 cfs 4.207 af Pond 24P: SCM 3 Peak EIev=783.40' Storage=168,174 cf Inflow=121.56 cfs 5.860 af Primary=3.44 cfs 5.624 af Secondary=0.00 cfs 0.000 af Outflow=3.44 cfs 5.624 af Link 2L: POA 1 Inflow=2.30 cfs 0.104 af Primary=2.30 cfs 0.104 af Link 4L: POA 2 Inflow=61.62 cfs 11.141 af Primary=61.62 cfs 11.141 af Link 9L: POA 3 Inflow=72.93 cfs 16.239 af Primary=72.93 cfs 16.239 af Total Runoff Area= 265.780 ac Runoff Volume=27.745 af Average Runoff Depth = 1.25" 100.00%Pervious=265.780 ac 0.00%Impervious= 0.000 ac POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 0.96 cfs © 12.17 hrs, Volume= 0.089 af, Depth= 0.57" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 1.880 70 1.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 1— 0.96 cfs —Runoff Type II 24-hr 1-Year Rainfall=2.73" Runoff Area='i .880 ac - Runoff Volume=0.089 of Runoff Depth-0.57" LL Tc=20.8 min CN=i0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 2.30 cfs © 11.97 hrs, Volume= 0.104 af, Depth= 0.84" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 12.30 cfs i —Runoff i Type II 24-hr 2- 1-Year Rainfall=2.73'" Runoff Area=1 .490 ac Runoff Volume=0.104 of Runoff Depth-0.84'" - 1- Tc=5.Q r: w' Cw =76 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 70.00 cfs © 11.96 hrs, Volume= 3.577 af, Depth= 2.39" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 17.950 97 17.950 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 75 I 70.00 cfs —Runoff 70- 65= Type 11 *4-hr 60- 1-Year Rainfall= .73t� 55- 50 Runoff Area=i 7,950 ac 45= Runoffme= � � Votu , 3.571 of 407 Runoff h:2. 9r� o 35- 30= F�s=5.O--min 25i C N=97 20 15 - 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff = 12.07 cfs © 12.04 hrs, Volume= 0.700 af, Depth= 1.43" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE C Hydrograph 13- 112.07 cis i —Runoff 12- 117 Type 11--*4 hr 10- 1-Year RainfaN-2.73" Runoff Area=$.800 ac $- Runoff Volume=0:700 of N - Runoffe 7- a - . , D p ,h= 11 67 57 Tc- 12.0►w--'m-in 4- 1>NF=86 3- 2- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 77.21 cfs © 11.96 hrs, Volume= 3.784 af, Depth= 2.19" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 85i 80= l 77.21 cfs i —Runoff 75= Type « 24-h r 65_ r1 Year Rainfall=2 7 11 60 55 I Runoff_Area 5).- 77a--1C w 50= Runoff me=';3.784 ff�/otu Of 45- Li 40- Runoff bei?fh=2.19'" 357 Tc=5 Q m: 30 r 25- C w' (�CC =9a7 20 15 10 5 , L , L L , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Runoff = 3.32 cfs © 12.46 hrs, Volume= 0.438 af, Depth= 1.05" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.000 80 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.7 Direct Entry, Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Hydrograph 3.32 cfs i —Runoff 3- Type. II 24-hr 1-Year Rainfall=2.73'" Runoff Area=5.000 ac Runoff Volume=0.438 'f u 3 Runoff Depth='1.05'" o LL Tc=44.7 m i n CN=80 L ................ 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 5.14 cfs © 12.15 hrs, Volume= 0.416 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.300 78 5.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 15.14 cfs i —Runoff 5 Type II 24-hr 1-Year Rainfall=2.73'1 4- un Roff Area=5.300 ac w = Runoff Volume,=0.416 of 3 Runoff Depth-O.941" LL Tc=21 .1 m i n 2- CN=18 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 4.76 cfs © 12.11 hrs, Volume= 0.344 af, Depth= 0.94" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 5— 4.76 cfs —Runoff - Type II 24-hr 4- 1-Year Rainfall=2.73 Runoff Area=4.390 ac E 3— off VoIu ne Run' -0.344 Of - Runoff Depth-0.94' 0 2- Tc=1.7.6 -min. CN=78 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff = 16.27 cfs © 12.27 hrs, Volume= 1.845 af, Depth= 0.61" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 36.290 71 36.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE B Hydrograph 18- 17= 1 16.27 cfs —Runoff 16= _ Type h 157 13 1-Year Rainfall=2 73" 12_ Runoff Area=86.29 ac 11= ! Runoff Volume=1.845 of 0• 10= 97 Runoff Depth 0.61" LL 8= T 7= o- 28.9 min 5= C 1',\ /�, 1 4 3 2 0 M i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 15 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 1.36 cfs © 11.97 hrs, Volume= 0.061 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 1.36 cfs —Runoff Type II 24-hr 1-Year Rainfall=2.73'" 1- Runoff Area=O.780 ac Runoff Volume=0.061 af Runoff Depth=0.94'" 0 Tc=5.0 min CN=78 i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 121.32 cfs © 11.96 hrs, Volume= 5.771 af, Depth= 2.00" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 130- 121.32 cfs I —Runoff r 1207 . . L . . L =1107 , . , , , l-ype.- --h44 it 1007 1--Year--Rai nfal-I=2.73" 90= Runoff-Area - $°= Runoff Volume=5.771 Of - Riunoff Depth=2.00'" . . Tc 5.Q rrOn 30 f 20 , , 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 6.92 cfs © 12.08 hrs, Volume= 0.458 af, Depth= 0.94" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 16.92 cfs I —Runoff 7- Type II 24-hr 1-Year Rainfall=2.73" Runoff Area: - . . 84a ac 5- � = Runoff Volume,=0.458 Of Ruoff De 3 4- LL pth=0.94'" Tc=15.8---rr�-" 3 Fn. CIN= 8 2- 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 28.19 cfs © 12.61 hrs, Volume= 4.350 af, Depth= 1.23" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 30= I 28.19 cfs —Runoff 28= Type 1124- 24- 1-Year Ra'nfaW=-2.73rr 22 Runoff Area=42.= 35� Oc 20= w 1 Runoff VolOrne:=43$0 Of - Ill Runoff�re ` A�i 3 16- 1. " 0 , 14- 12 , c=57.3 10= C 141�4Z 8 8- 6 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 42.93 cfs © 12.43 hrs, Volume= 5.808 af, Depth= 0.84" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.73" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 48= 461 44= 142.93 cfs —Runoff 42 I h 40; / , Type II 44-hr 38- 361 1 Year Rainfall=2.7 " 341 32= Runoff Area=83.20O ac 30= Runoff-V'Otume_5:808 -af 28= 0 26= 3 22= Runoff D' h=0� 4" 20= k =43.2 -111 in 18- � 16= r 14= N� =-; 12_ 10 8 6 4 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 20 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 86.090 ac, 0.00% Impervious, Inflow Depth > 1.41" for 1-Year event Inflow = 47.87 cfs © 12.20 hrs, Volume= 10.097 af Outflow = 47.87 cfs © 12.20 hrs, Volume= 10.097 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 50- 1 47.87 cfs , —Inflow I —Outflow 45- ( =- Inflow Area-&6.f98 ac 40 35- 30- 0 25- 20 15- 10- 5- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 21 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 90.480 ac, 0.00% Impervious, Inflow Depth > 1.38" for 1-Year event Inflow = 51.90 cfs @ 12.17 hrs, Volume= 10.441 af Outflow = 51.90 cfs @ 12.17 hrs, Volume= 10.441 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 55_ 1 51.90 cfs C Inflow —Outflow 50- Inflow Area=90.480 ac 45- 40- ----, , . . , 35- , . . , 30- 3 - o - u. 25- 20- 15- 5- , . . , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 22 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 1.16" for 1-Year event Inflow = 72.93 cfs © 12.51 hrs, Volume= 16.239 af Outflow = 72.93 cfs © 12.51 hrs, Volume= 16.239 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 80 75 72.93 cfs Inflow —Outflow 70 Inflow Area=157.95-O ac 65 60 55 50 .: 45 3 40 u. 35 30 25 20 15 10 5 0 - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 23 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 1.23" for 1-Year event Inflow = 28.19 cfs @ 12.61 hrs, Volume= 4.350 af Outflow = 28.17 cfs @ 12.63 hrs, Volume= 4.350 af, Atten= 0%, Lag= 1.3 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Max. Velocity= 11.75 fps, Min. Travel Time= 0.8 min Avg. Velocity = 4.86 fps, Avg. Travel Time= 2.0 min Peak Storage= 1,403 cf @ 12.61 hrs Average Depth at Peak Storage= 0.94' , Surface Width= 3.65' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 30= 28.17 cfs —Inflow 287 I! —Outflow 26= I rlf low>Area=42.350 OP 24- I Avg. Plow Depth=0.94+ 22= -1 Max Vel T. 75 fps 20- . . 54��,J�i ^ 18- �1 Rb1nd-Pfpe- 3 0.01-1 127 107 L=585 0, 8 S=0.0163 •I� 6 Clpaci ty 2g6.47 cfs 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 24 Summary for Pond 10P: SCM 2 Inflow Area = 17.950 ac, 0.00% Impervious, Inflow Depth = 2.39" for 1-Year event Inflow = 70.00 cfs @ 11.96 hrs, Volume= 3.577 af Outflow = 28.99 cfs @ 12.05 hrs, Volume= 3.568 af, Atten= 59%, Lag= 5.7 min Primary = 28.99 cfs @ 12.05 hrs, Volume= 3.568 af Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 790.42' @ 12.05 hrs Surf.Area= 20,290 sf Storage= 69,620 cf Plug-Flow detention time= 327.7 min calculated for 3.568 af(100% of inflow) Center-of-Mass det. time= 326.0 min ( 1,091.7- 765.7 ) Volume Invert Avail.Storage Storage Description #1 786.00' 129,160 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 11,400 0 0 787.00 13,294 12,347 12,347 788.00 15,260 14,277 26,624 789.00 17,290 16,275 42,899 790.00 19,385 18,338 61,237 791.00 21,526 20,456 81,692 792.00 23,720 22,623 104,315 793.00 25,970 24,845 129,160 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.011, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.318 0.446 0.573 0.700 0.828 0.955 #3 Device 1 788.20' 48.0"W x 12.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 790.20' 36.0"W x 12.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c sin 02344 ©2023 HydroCAD Software Solutions LLC Page 25 Primary OutFlow Max=28.95 cfs @ 12.05 hrs HW=790.42' (Free Discharge) 4-1=Culvert (Passes 28.95 cfs of 99.06 cfs potential flow) 2=Special & User-Defined (Custom Controls 0.75 cfs) 44 3=Orifice/Grate (Orifice Controls 25.18 cfs @ 6.30 fps) =Orifice/Grate (Orifice Controls 3.02 cfs @ 1.51 fps) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 75- I I 170.00 cfs I —Inflow 70= t L r —Outflow Inflow--Area` 17 950--at —Primary 65= � Secondary 60- Peak Elev 79O 42' ::ii StOiageiT'6v►j620 irf w 45 u 40- , - ° 35= 128.99 cfs I 30- 25= , 20- 15= 10- 0.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 26 Summary for Pond 12P: SCM 1 Inflow Area = 25.770 ac, 0.00% Impervious, Inflow Depth = 1.97" for 1-Year event Inflow = 77.72 cfs @ 11.96 hrs, Volume= 4.222 af Outflow = 4.63 cfs @ 13.08 hrs, Volume= 4.207 af, Atten= 94%, Lag= 67.5 min Primary = 4.63 cfs @ 13.08 hrs, Volume= 4.207 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 788.12' @ 13.08 hrs Surf.Area= 37,307 sf Storage= 105,379 cf Plug-Flow detention time= 442.4 min calculated for 4.207 af(100% of inflow) Center-of-Mass det. time= 440.0 min ( 1,232.4- 792.4 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.725 1.015 1.305 1.594 1.884 2.174 #3 Device 1 786.00' 12.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.00' 48.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=4.63 cfs @ 13.08 hrs HW=788.12' (Free Discharge) L=Culvert (Passes 4.63 cfs of 86.37 cfs potential flow) -2=Special &User-Defined (Custom Controls 1.34 cfs) -3=Orifice/Grate (Orifice Controls 3.29 cfs @ 6.58 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 27 Pond 12P: SCM 1 Hydrograph 85- - i 77.72 cfs r_ -Inflow 80= —Primary liTfloliv Area= 5'.•770arc. 65= Peak Elev=78-8.12' 55= Storage`1-05,379---c w 50= 45= 3 = O 40- LL 35= 30= , , „ , 25= 20 15 ( 10 4.663 cfs 5 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 28 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 0.00% Impervious, Inflow Depth = 1.92" for 1-Year event Inflow = 121.56 cfs @ 11.96 hrs, Volume= 5.860 of Outflow = 3.44 cfs @ 14.04 hrs, Volume= 5.624 af, Atten= 97%, Lag= 124.9 min Primary = 3.44 cfs @ 14.04 hrs, Volume= 5.624 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 783.40' @ 14.04 hrs Surf.Area= 123,035 sf Storage= 168,174 cf Plug-Flow detention time= 902.4 min calculated for 5.623 af(96% of inflow) Center-of-Mass det. time= 878.8 min ( 1,674.6- 795.8 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 1.735 2.603 3.470 4.338 5.206 #3 Device 1 783.00' 20.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 784.50' 72.0"W x 6.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 785.75' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 29 Primary OutFlow Max=3.44 cfs @ 14.04 hrs HW=783.40' (Free Discharge) t1=Culvert (Passes 3.44 cfs of 42.69 cfs potential flow) 2=Special &User-Defined (Custom Controls 2.08 cfs) 3=Orifice/Grate (Orifice Controls 1.36 cfs @ 2.03 fps) -Orifice/Grate ( Controls 0.00 cfs) =Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) t6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 24P: SCM 3 Hydrograph 130_ 121.56 cfs i Inflow i —Outflow 120= —Primary Inflow Area=36.560.-ac. —Secondary 110= C *� An 100= Peak TG-Iev-=783.40'---- tarage=1 68,'I 74 cf 80= < N _ V 70_ 3 0 1L 60_ 50- 40 . 30- 20= n- 13.44 cfs I 10.00 cfs I 0 .. ... ... .I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 30 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 0.84" for 1-Year event Inflow = 2.30 cfs @ 11.97 hrs, Volume= 0.104 of Primary = 2.30 cfs @ 11.97 hrs, Volume= 0.104 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph I2.30 cfs I —Inflow i —Primary Inflow Area=1 .490 ac 2- - 3 0 LL p 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 31 Summary for Link 4L: POA 2 Inflow Area = 96.340 ac, 0.00% Impervious, Inflow Depth > 1.39" for 1-Year event Inflow = 61.62 cfs @ 12.08 hrs, Volume= 11.141 af Primary = 61.62 cfs @ 12.08 hrs, Volume= 11.141 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 65 1 61.62 cfs —Inflow 1—Primary ::. Inflow Area=96.340 ac 50- 45- 40- a = 3 35 0 LL 30- 25- 20_ 15- 10- 5= O 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 1-Year Rainfall=2.73" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 32 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 1.16" for 1-Year event Inflow = 72.93 cfs @ 12.51 hrs, Volume= 16.239 af Primary = 72.93 cfs @ 12.51 hrs, Volume= 16.239 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 80= 75 72.93 cfs I —Inflow —Primaryl 70= Inflow Area=167.950 ac 65= 60 55= 50- 45= 40= o u 35 30= 25- 20 15 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ _ Page 33 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE C Runoff Area=1.880 ac 0.00% Impervious Runoff Depth=0.89" Tc=20.8 min CN=70 Runoff=1.64 cfs 0.139 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=1.22" Tc=5.0 min CN=76 Runoff=3.39 cfs 0.152 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=17.950 ac 0.00% Impervious Runoff Depth=2.96" Tc=5.0 min CN=97 Runoff=85.41 cfs 4.421 af Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=1.92" Tc=12.0 min CN=86 Runoff=16.11 cfs 0.939 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=2.74" Tc=5.0 min CN=95 Runoff=95.37 cfs 4.747 of Subcatchment 17S: POST-DEV DA-2 OFFSITE A Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=1.48" Tc=44.7 min CN=80 Runoff=4.78 cfs 0.616 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=5.300 ac 0.00% Impervious Runoff Depth=1.35" Tc=21.1 min CN=78 Runoff=7.55 cfs 0.595 of Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=1.35" Tc=17.6 min CN=78 Runoff=6.96 cfs 0.493 af Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff Area=36.290 ac 0.00% Impervious Runoff Depth=0.94" Tc=28.9 min CN=71 Runoff=27.25 cfs 2.839 af Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=1.35" Tc=5.0 min CN=78 Runoff=1.96 cfs 0.088 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=2.54" Tc=5.0 min CN=93 Runoff=152.02 cfs 7.346 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=1.35" Tc=15.0 min CN=78 Runoff=10.10 cfs 0.656 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=1.69" Tc=57.3 min CN=83 Runoff=39.24 cfs 5.970 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=1.22" Tc=43.2 min CN=76 Runoff=65.53 cfs 8.473 af Reach 13R: NORTH STREAM DEPRESSION Inflow=70.37 cfs 13.281 af Outflow=70.37 cfs 13.281 af Reach 14R: NORTH STREAM TO POA 2 Inflow=77.10 cfs 13.774 af Out low=77.10 cfs 13.774 af POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 34 Reach 28R: SOUTH STREAM Inflow=107.86 cfs 22.322 af Outflow=107.86 cfs 22.322 af Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=1.11' Max Vet=12.93 fps Inflow=39.24 cfs 5.970 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=39.23 cfs 5.970 af Pond 10P: SCM 2 Peak EIev=790.88' Storage=79,033 cf Inflow=85.41 cfs 4.421 af Primary=45.22 cfs 4.412 af Secondary=0.00 cfs 0.000 af Outflow=45.22 cfs 4.412 af Pond 12P: SCM 1 Peak EIev=788.92' Storage=135,843 cf Inflow=96.23 cfs 5.364 af Outflow=5.50 cfs 5.347 af Pond 24P: SCM 3 Peak EIev=783.74' Storage=210,095 cf Inflow=152.57 cfs 7.485 af Primary=5.15 cfs 7.223 af Secondary=0.00 cfs 0.000 af Outflow=5.15 cfs 7.223 af Link 2L: POA 1 Inflow=3.39 cfs 0.152 af Primary=3.39 cfs 0.152 af Link 4L: POA 2 Inflow=92.48 cfs 14.712 af Primary=92.48 cfs 14.712 af Link 9L: POA 3 Inflow=107.86 cfs 22.322 af Primary=107.86 cfs 22.322 af Total Runoff Area= 265.780 ac Runoff Volume=37.474 af Average Runoff Depth = 1.69" 100.00%Pervious=265.780 ac 0.00%Impervious= 0.000 ac POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 35 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 1.64 cfs © 12.16 hrs, Volume= 0.139 af, Depth= 0.89" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 1.880 70 1.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 1.64 cfs —Runoff Type II 24-hr 2-Year Rainfall4.30'1 Runoff Area='i .880 ac Ru n e o ume Runoff Depth=0.89'" LL - Tc=20.9 min CN=i0 0 ,..i....i....i....,..�.... i i rn i hn• ...4 �i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 36 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 3.39 cfs © 11.97 hrs, Volume= 0.152 af, Depth= 1.22" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 3.39 cfs i —Runoff 3- Type II 24-hr 2-Year Rainfall=$.30" Runoff Area=1 .400 ac Runoff Volume,=0.152 of 2 . , . - Runoff Depth='I.22'" LL Te=5.Q min CN=75, 1- 0TTrr, 1 i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 85.41 cfs © 11.96 hrs, Volume= 4.421 af, Depth= 2.96" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 17.950 97 17.950 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 95-: „ 90 r 1 85.41 cfs I , —Runoff 85= t t , 80- TIIh 11 *4-hr 75= Year Rainfa► 65= Runoff a= .95a 60 Are ac Runoff Volume=4:421 of w _ ,R 45- a noff a t "� E 40- *ri 35 � 30= C14=97 25 20 15 10 5 7 -- 0 _ ..................................i....,....,...., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff = 16.11 cfs @ 12.04 hrs, Volume= 0.939 af, Depth= 1.92" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE C Hydrograph 18- 17- 16.11 cfs —Runoff 16= 15= TYP I *4'f'}r 137 2-Year Rainfall1=3.301 12-: Iu noff Area=$.860 ac 11_ 107 Runoff Volume=0,939 of Runoff2" �� h19 , c=12.0 n 1 IFn 5- C 86 4 3 2 1 0 ,, , , , , , ,, , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 95.37 cfs © 11.96 hrs, Volume= 4.747 af, Depth= 2.74" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 105: 100= I 95.37 cfs f t I t 1 t —Runoff 95: 90- type' 85= nn 80= 2-'-Year Rainfall=3 $0" 75= R noff Area= 0.77a 70- aC N 60= ';Runoff volume -- 4.741 if 55= 50= Runoff Depth=2.74'" ii 45 .jam _ /� 40= c 5.O-n -n 35= w' r� 30= �N_95 25= 20 15- 10: 5= 0 ...................................................................................................................... 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Runoff = 4.78 cfs © 12.46 hrs, Volume= 0.616 af, Depth= 1.48" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.000 80 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.7 Direct Entry, Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Hydrograph 5- 14.78 cfs I —Runoff Type II 24-hr 4- 2-Year Rainfall=3.80'1 Runoff Area=5.000 ac E 3- Runoff VoIurne=1L61 _ Runoff Depth=1.48'" 0 2- ,_ Tc4�7m=4 -'. min CN=80 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 7.55 cfs © 12.15 hrs, Volume= 0.595 af, Depth= 1.35" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.300 78 5.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 8_ 1 7.55 cfs C —Runoff 2-Year Rainfall=3.30' 6 Runoff Area=5.300 ac 5_ Runoff Volume=O.5$$ of _ Runoff Depth-1.35' c 4- Tc=21 .1 m i n CN=78 2- 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 42 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 6.96 cfs © 12.11 hrs, Volume= 0.493 af, Depth= 1.35" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 6.96 cfs —Runoff 7 Type II 24-hr 6= 2-Year Rainfall=3.30" 5- Runoff Area=4.390 ac w = Runoff Volume,=p.493 of Runoff Depth=1.35' 3- Tc=-'I 7-.-6----min CN=78 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 43 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff = 27.25 cfs © 12.26 hrs, Volume= 2.839 af, Depth= 0.94" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 36.290 71 36.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE B Hydrograph 30- 28- 127.25 cfs l —Runoff 26 22= 24= Type II 4- r 2-Year in all= h.� 20= Runoff Area=36 290 ec 187 Runoff Volume=2.839 Of N _ 16- 3• 14- -1 Runoff_Depth=Q.94'1 12- c=28.9 jn 10- 1k1 11 8 6 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 44 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 1.96 cfs © 11.96 hrs, Volume= 0.088 af, Depth= 1.35" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 1.96 cfs —Runoff 2— Type II 24-Fi r 2-Year Rainfall4.30'1 Runoff Area=0.780 ac Runoff Volume=0.088 Of Runoff Depth=1.35' 2 1— Tc=5.Q min CN=18 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 45 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 152.02 cfs © 11.96 hrs, Volume= 7.346 af, Depth= 2.54" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 170- 160= ,I 152.02 cfs h —Runoff 150= 140_ Type--II--24-hr 130_ 2-Year Rainfall*.*' 120= 110= a'34.6$a----------------------------------------------------------------RunAff Ax'E 1G 100_ Runoff Vol .346 ' so. Urrie-=7 �f 80_ wunt�ff Depth-2-.541� 70_ 5.0 IYI�n 60= ' 50= w 03 40- L ; 30 20 10 0 ���������������I ..I....I....I....I....I....I....I....I....I....I....I....I....I....I...., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 46 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 10.10 cfs © 12.08 hrs, Volume= 0.656 af, Depth= 1.35" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 11- 110.10 cfs I —Runoff 10- Type II 24-hr 9- 2-Year Rainfall=3.30" 8- Runoff Area=5.840 ac 7- Runoff Volume='O.656 of 0 6- Runoff Depth=1.35" 5- Tc- 15.0 mjn CN=78 3: 2� 1] ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,, ,,,,,,,,,,,,,,, 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 39.24 cfs © 12.60 hrs, Volume= 5.970 af, Depth= 1.69" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 42- 139.24 cfs 40- -Runoff 381 r r r r 36; r r Type 11 24 �r 321 2 ar Ranfa 301 r r r r Run0fl__Area=42350 ac 28= 26= .- 24- 1\ Runoff olum - e*5.9 0 of 22 . cc(!� LL 20 Runoff Depth=1.69" 181 r r . 16- ,Tc=57.3 mjn 14= J ifr =8 , 10 8 I , , 6 4 2 ������1���� ���������1���� �� 1����I�"n�����I����I����I����I����I����I����I����I����Inn Inn Inn Inn I����I����I����I�'��I�'��I����I���� I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 65.53 cfs © 12.43 hrs, Volume= 8.473 af, Depth= 1.22" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 2-Year Rainfall=3.30" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 70 165.53 cfs Runoff ::i Type II 24- I j 55= 2-Year Rarn#a11-3.301r 50- Runoff Area 3.2O0 pc 45- Run g 40= , Runoff Volum0=8.473r�Pf co 35- Runoff-beioth=1-.22" 307 Tc--43.2 rn jn, 25- ww'' 20 c N=7'6 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 49 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 86.090 ac, 0.00% Impervious, Inflow Depth > 1.85" for 2-Year event Inflow = 70.37 cfs © 12.07 hrs, Volume= 13.281 af Outflow = 70.37 cfs © 12.07 hrs, Volume= 13.281 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 75= 170.37 cfs Inflow 70= —Outflow 65- Inflow Area=86.090 ac 60- 55- 50= 45= I! 40 35 30 25 20 15 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 50 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 90.480 ac, 0.00% Impervious, Inflow Depth > 1.83" for 2-Year event Inflow = 77.10 cfs © 12.08 hrs, Volume= 13.774 af Outflow = 77.10 cfs © 12.08 hrs, Volume= 13.774 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 85 80 77.10 cfs I- I Inflow —Outflow 75= Inflow _ 70= nflow_-Ar_aa=-9O.480--ac 65 60 55. 50= 45- 0 I i inn i I����I���� I I � �i �i�n�inn Inn Inn ����Inn Inn In��l 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 51 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 1.59" for 2-Year event Inflow = 107.86 cfs @ 12.48 hrs, Volume= 22.322 af Outflow = 107.86 cfs @ 12.48 hrs, Volume= 22.322 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 120— -- , 115= 107.86 cfs F Inflow 110= 1 —Outflow 105_ 100_ ! Inflow Area=167.950 ac 95-i 90-i 85: a a , 80: I 75; 70: u 65: fi0; O 55= 50: - ; , . , 45: 40: 35: 30= 25= - ; 20: , . , 15- 10= 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 52 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 1.69" for 2-Year event Inflow = 39.24 cfs @ 12.60 hrs, Volume= 5.970 af Outflow = 39.23 cfs @ 12.62 hrs, Volume= 5.970 af, Atten= 0%, Lag= 1.1 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Max. Velocity= 12.93 fps, Min. Travel Time= 0.8 min Avg. Velocity = 5.20 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,775 cf @ 12.61 hrs Average Depth at Peak Storage= 1.11' , Surface Width= 3.87' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' 0 Reach 30R: DA-3 BYPASS PIPE Hydrograph 42- I 39.23 cfs —Inflow 401 —Outflow 381 r i r , Inflow Area__4 .3 0 -C� 361 L - 31 32= `+'Av Flow DepiM=1.11' Max Vet 12:93 fps � 28; 26; 54.{hhri , 3 22= Round Pipe lo 20= n^ 0.- ,. 18= : : r— 11 16= = 0 F 14= 10_ S4.0163 '.7fi 8 Capacity=296''.47 efs 6 4 2 I I 0 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 53 Summary for Pond 10P: SCM 2 Inflow Area = 17.950 ac, 0.00% Impervious, Inflow Depth = 2.96" for 2-Year event Inflow = 85.41 cfs @ 11.96 hrs, Volume= 4.421 af Outflow = 45.22 cfs @ 12.04 hrs, Volume= 4.412 af, Atten= 47%, Lag= 4.8 min Primary = 45.22 cfs @ 12.04 hrs, Volume= 4.412 af Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 790.88' @ 12.04 hrs Surf.Area= 21,260 sf Storage= 79,033 cf Plug-Flow detention time= 277.3 min calculated for 4.412 af(100% of inflow) Center-of-Mass det. time= 276.3 min ( 1,036.9- 760.6 ) Volume Invert Avail.Storage Storage Description #1 786.00' 129,160 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 11,400 0 0 787.00 13,294 12,347 12,347 788.00 15,260 14,277 26,624 789.00 17,290 16,275 42,899 790.00 19,385 18,338 61,237 791.00 21,526 20,456 81,692 792.00 23,720 22,623 104,315 793.00 25,970 24,845 129,160 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.011, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.318 0.446 0.573 0.700 0.828 0.955 #3 Device 1 788.20' 48.0"W x 12.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 790.20' 36.0"W x 12.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 54 Primary OutFlow Max=45.15 cfs @ 12.04 hrs HW=790.87' (Free Discharge) 4-1=Culvert (Passes 45.15 cfs of 103.12 cfs potential flow) 2=Special & User-Defined (Custom Controls 0.81 cfs) 44 3=Orifice/Grate (Orifice Controls 28.34 cfs @ 7.08 fps) =Orifice/Grate (Orifice Controls 16.00 cfs @ 2.64 fps) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 95- 90 r 185.41 cfs I r r r r r r r r —Inflow —Outflow 80 , , I1flQWFree=i7.95© aC - —Primary -Seondary 75 70= Peak Elev`79O.88' 60 St_ _-�--9-7 0 3 cf _ ^ 55= N _ 50= 145.22 cfs I r 0 45- ` LL 40= . 35- ` 30= 25 20= 15= , 10 0.00 cfs UT 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 55 Summary for Pond 12P: SCM 1 Inflow Area = 25.770 ac, 0.00% Impervious, Inflow Depth = 2.50" for 2-Year event Inflow = 96.23 cfs @ 11.96 hrs, Volume= 5.364 af Outflow = 5.50 cfs @ 13.16 hrs, Volume= 5.347 af, Atten= 94%, Lag= 72.2 min Primary = 5.50 cfs @ 13.16 hrs, Volume= 5.347 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 788.92' @ 13.16 hrs Surf.Area= 39,185 sf Storage= 135,843 cf Plug-Flow detention time= 435.4 min calculated for 5.346 af(100% of inflow) Center-of-Mass det. time= 433.7 min ( 1,220.6- 787.0 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.725 1.015 1.305 1.594 1.884 2.174 #3 Device 1 786.00' 12.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.00' 48.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=5.50 cfs @ 13.16 hrs HW=788.92' (Free Discharge) L=Culvert (Passes 5.50 cfs of 94.35 cfs potential flow) -2=Special &User-Defined (Custom Controls 1.57 cfs) -3=Orifice/Grate (Orifice Controls 3.93 cfs @ 7.86 fps) -4=Orifice/Grate ( Controls 0.00 cfs) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 56 Pond 12P: SCM 1 Hydrograph 105- 100= 4 'l 96.23 i! 6 2 Inflow 95. —Primary 90= Inflow Area 25'.77© ac 85: I r + So= Peak Ele =788 ' 75- 70tt `StOi`ag',€135,843 Of 65= y 60= 55: 0 50: 45- 40] 35= 30: 25= . 20= � � 'r � � i i 15= . . 10: 5.50 cfs 5- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 57 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 0.00% Impervious, Inflow Depth = 2.46" for 2-Year event Inflow = 152.57 cfs @ 11.96 hrs, Volume= 7.485 of Outflow = 5.15 cfs @ 13.64 hrs, Volume= 7.223 af, Atten= 97%, Lag= 101.1 min Primary = 5.15 cfs @ 13.64 hrs, Volume= 7.223 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 783.74' @ 13.64 hrs Surf.Area= 124,511 sf Storage= 210,095 cf Plug-Flow detention time= 812.7 min calculated for 7.223 af(97% of inflow) Center-of-Mass det. time= 791.5 min ( 1,580.8- 789.3 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 1.735 2.603 3.470 4.338 5.206 #3 Device 1 783.00' 20.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 784.50' 72.0"W x 6.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 785.75' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c sin 02344 ©2023 HydroCAD Software Solutions LLC Page 58 Primary OutFlow Max=5.15 cfs @ 13.64 hrs HW=783.74' (Free Discharge) 4-1=Culvert (Passes 5.15 cfs of 44.51 cfs potential flow) 2=Special & User-Defined (Custom Controls 2.38 cfs) 44 3=Orifice/Grate (Orifice Controls 2.78 cfs @ 3.33 fps) =Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 24P: SCM 3 Hydrograph 170- 160_ 152.57 cfs 1 --- —Inflow i —Outflow 150_ �" ^ —Primary 140= in -Fiow Area=3 V.560 a —Secondary 130_ Peak Elev^733.7 ' 120 110_ Storage=2-1-a,095--cf'---- 100= > < Vl 90: . . , . 0 80=_ LL 70= 60= 50= 40: 30 20 ,i 5.15 cfs 10.00 cfs 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 59 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 1.22" for 2-Year event Inflow = 3.39 cfs @ 11.97 hrs, Volume= 0.152 of Primary = 3.39 cfs @ 11.97 hrs, Volume= 0.152 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph I3.39 cfs I —Inflow i —Primary Inflow Area=1 .490 ac 3— F 2- 3 _ 1— 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 60 Summary for Link 4L: POA 2 Inflow Area = 96.340 ac, 0.00% Impervious, Inflow Depth > 1.83" for 2-Year event Inflow = 92.48 cfs @ 12.06 hrs, Volume= 14.712 af Primary = 92.48 cfs @ 12.06 hrs, Volume= 14.712 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 100= I , I i , . , —Inflow 95= 192.48 cfs r', 1 —Primary 90 85- Inflow Area=96 340 ac , 80E 75= _ ; 70E 4 1 , 1 1 1 4 4 4 , 65: - 4 , } 42 C) 55= c 50: ' LL 45: 40: 35 30E , 25- 201 15: 10= 5= r r > o 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 2-Year Rainfall=3.30" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 61 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 1.59" for 2-Year event Inflow = 107.86 cfs @ 12.48 hrs, Volume= 22.322 af Primary = 107.86 cfs @ 12.48 hrs, Volume= 22.322 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 120- I I 115= 107.86 cfs i —Inflow 110= h 1 h h 1 h —Primary 105= 100_ h h h h h h h h Inflow Area=167.950 ac 95- 90- 85- 80= 75= - h h h 1r---- h h h h h--- ' h h h h h ---f 70= h h + h h h h h h + + 65= 60= 0 55= M 50= h h h r h h h h h h h h h h 45= 40: 35= 30- 25 h h ; 20- 15= 4 4 1 i i 1 4 , 4 4 1 4 1 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 62 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE C Runoff Area=1.880 ac 0.00% Impervious Runoff Depth=1.89" Tc=20.8 min CN=70 Runoff=3.77 cfs 0.296 af Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=2.37" Tc=5.0 min CN=76 Runoff=6.55 cfs 0.294 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=17.950 ac 0.00% Impervious Runoff Depth=4.45" Tc=5.0 min CN=97 Runoff=125.70 cfs 6.653 of Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=3.28" Tc=12.0 min CN=86 Runoff=27.02 cfs 1.602 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=4.22" Tc=5.0 min CN=95 Runoff=142.67 cfs 7.307 of Subcatchment 17S: POST-DEV DA-2 OFFSITE A Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=2.72" Tc=44.7 min CN=80 Runoff=8.96 cfs 1.133 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=5.300 ac 0.00% Impervious Runoff Depth=2.54" Tc=21.1 min CN=78 Runoff=14.52 cfs 1.123 of Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=2.54" Tc=17.6 min CN=78 Runoff=13.34 cfs 0.930 of Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff Area=36.290 ac 0.00% Impervious Runoff Depth=1.97" Tc=28.9 min CN=71 Runoff=61.84 cfs 5.947 af Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=2.54" Tc=5.0 min CN=78 Runoff=3.66 cfs 0.165 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=4.00" Tc=5.0 min CN=93 Runoff=232.01 cfs 11.565 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=2.54" Tc=15.0 min CN=78 Runoff=19.25 cfs 1.237 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=2.99" Tc=57.3 min CN=83 Runoff=70.19 cfs 10.565 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=2.37" Tc=43.2 min CN=76 Runoff=132.47 cfs 16.444 af Reach 13R: NORTH STREAM DEPRESSION Inflow=154.35 cfs 22.299 af Outflow=154.35 cfs 22.299 af Reach 14R: NORTH STREAM TO POA 2 Inflow=167.69 cfs 23.230 af Outflow=167.69 cfs 23.230 af POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 63 Reach 28R: SOUTH STREAM Inflow=209.44 cfs 39.783 af Outflow=209.44 cfs 39.783 af Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=1.49' Max Vet=15.26 fps Inflow=70.19 cfs 10.565 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=70.15 cfs 10.565 af Pond 10P: SCM 2 Peak Elev=791.67' Storage=96,640 cf Inflow=125.70 cfs 6.653 af Primary=81.86 cfs 6.644 af Secondary=0.00 cfs 0.000 af Outflow=81.86 cfs 6.644 af Pond 12P: SCM 1 Peak EIev=789.90' Storage=175,445 cf Inflow=144.60 cfs 8.440 af Outflow=28.35 cfs 8.420 af Pond 24P: SCM 3 Peak EIev=784.66' Storage=325,859 cf Inflow=233.64 cfs 11.861 af Primary=11.46 cfs 11.537 af Secondary=0.00 cfs 0.000 af Outflow=11.46 cfs 11.537 af Link 2L: POA 1 Inflow=6.55 cfs 0.294 af Primary=6.55 cfs 0.294 af Link 4L: POA 2 Inflow=191.36 cfs 24.832 af Primary=191.36 cfs 24.832 af Link 9L: POA 3 Inflow=209.44 cfs 39.783 af Primary=209.44 cfs 39.783 af Total Runoff Area= 265.780 ac Runoff Volume=65.262 af Average Runoff Depth = 2.95" 100.00%Pervious=265.780 ac 0.00%Impervious= 0.000 ac POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 64 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 3.77 cfs © 12.14 hrs, Volume= 0.296 af, Depth= 1.89" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 1.880 70 1.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph 4 3.77 cfs -Runoff Type II 24-hr 10-Year Rainfall 4.80" 3- Runoff Area=1 .880 ac Runoff Volume=0.296 Of 0 2- Runoff Depth 1.89"�. Tc=20.8 m i n CN=i0 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 65 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 6.55 cfs © 11.96 hrs, Volume= 0.294 af, Depth= 2.37" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 7- 6.55 cfs Runoff 6- Type ll 24-hr 10-Year Rainfall=4.80" Runoff area=1 .40 a ac Ru n 4- - e. Volume 0,294 Of 3 Runoff Depth=2.37'" O - 3_ T05.Q rnjn 2- C =16 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 66 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 125.70 cfs © 11.96 hrs, Volume= 6.653 af, Depth= 4.45" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 17.950 97 17.950 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 140- 130= 1125.70 cfs I. —Runoff 120: Type 11 24-hr 110= 10-Ye,ar Rainfall=4.$ h�� 100- /�,� {W/ 90= Runoff--Al"ea=17.95Q--ac w 80= Rurt ff Volume--6.6_ a3 �f 70 Runoff Depth=4.4$" 60- Tc=5.Q mmn 50_ 40- C 1�- 7 30- 20- 10- 0 rn Rf}Tn 1................................................................................ ............................... 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 67 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff = 27.02 cfs © 12.04 hrs, Volume= 1.602 af, Depth= 3.28" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE C Hydrograph 30- 28- 27.02 cfs —Runoff 26- 24- T II 24---t r 22- 10-Year Rainfall=4.80 20 u noff Area=5.860 ac 18 Runoff Volume=1'602 16- • f LL 14- Runoff Depth=3.28'" 12= 1 cj 12.Q 1 jn 10- CO=66 8- 6 4 2 0 }I i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 68 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 142.67 cfs © 11.96 hrs, Volume= 7.307 af, Depth= 4.22" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 150: 1 142.67 cfs I —Runoff 140= Type r 130: 120_ 1 0TYear-Raillfai-i—4 8G" 110= Runoff Area-20.770 ac 90_ Ru - df- q1 if r� f volume-�.3, 3 80_ Runoff Depth=4.22" LL 70= .5.Qm, 40 30 20 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 69 Summary for Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Runoff = 8.96 cfs © 12.42 hrs, Volume= 1.133 af, Depth= 2.72" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.000 80 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.7 Direct Entry, Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Hydrograph 10- I 8.98 cfs I -Runoff 9- 8= Type II 24-fir 10-Year Rainfall=4.$0" 7- Runoff Area=5.000 ac 6- w - Runoff Vofume=1.133 at Runoff 2. 2'4 3 5- r �Te��n= 7 4- 1 c=44.7 iCn mn 3- CN=80 2- 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 70 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 14.52 cfs © 12.14 hrs, Volume= 1.123 af, Depth= 2.54" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.300 78 5.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 16= 15= 114.52 cfs l —Runoff - 14= 13- Type Il 24-hr 12 10-Year Rainfall=4.&O"', 11_ Runoff area=5.3O0 ac Runoffoff Volu me-,1 123 af 87 Runoff Depth-2.54' LL 7 Tic= .1.1, m w'min 5= 1�1= 8 4 T 3 :11, , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 71 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 13.34 cfs © 12.10 hrs, Volume= 0.930 af, Depth= 2.54" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 14- i 13.34 cfs —Runoff 13- 12- Type �! 24-hr 11- J 10-Year Rainfall=4 80" 10- Runoff Area=4 390 ac 97 - Runoff Volume=,0.930 af LL 77 Runoff Depth-2.54' 67 Tc- 17.6 min 5- j►ww'' j 4- 3 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 72 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff = 61.84 cfs © 12.24 hrs, Volume= 5.947 af, Depth= 1.97" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 36.290 71 36.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE B Hydrograph 65- 161.84 cfs —Runoff ::i T 4 , 50- 10-Year Rainfall=4. 0'//�� 45- Runoff Area- =36.290 p �/ aC 40-_ � , Runoff o ff Y tume=5:94fi Of 3 35_ Runoff Depth=1.9 ' o - Li 30- Tic=28.9 m i n 25- /►w' 20- l'�=1-1 15 10 0 Rl i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 73 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 3.66 cfs © 11.96 hrs, Volume= 0.165 af, Depth= 2.54" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 4- 13.66 cfs i —Runoff Type II 24-hr 10-bear Rainfal l=4.8 Runoff Area=O.780 ac Runoff Volume=0.165 Of j 2— Runoff- De, pth 2.54'� - Tc=5.Q min CN=78 1- 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 74 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 232.01 cfs © 11.96 hrs, Volume= 11.565 af, Depth= 4.00" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 240= 1232.01 cfs I. ! ; -Runoff 220= Type rr 24-nhr 200= 10-Year Rainfall=4.80 180_ Runoff Area34.680 OP 160= Runoff Vole L 1t565 of 140_ Runoff Depth,=4.00'" O 120= LL = Tc=5.0 mmn 100- CN=93 80- 60 40 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 75 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 19.25 cfs © 12.07 hrs, Volume= 1.237 af, Depth= 2.54" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 21 I 201 19.25 cfs —Runoff 191 18= Type i L 2 h r 171 16 1rRainfaiV=4.807 15= 141 pp R no m uff Area`5.840- aC 13= 12 Runoff-Volue=1.237 of = Runoff DeOth=2.64" 0 10= 9; TC'71 min 8- 7- T �r 6- C N=78 5 4 3 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 76 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 70.19 cfs © 12.55 hrs, Volume= 10.565 af, Depth= 2.99" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 75- 70.19 cfs —Runoff 70- Type I 607 1 O�Yeer-Rainfa11=4.80" 55= Runoff, Arlen=42.350 aG 50= �w3, 457 h Run' o ume Z.fi b _40 Runoff Depth= .99ur �f O • 35- Tc=87.3 min 30= 25= C.N83 20 L, 15 10 5 emir) LTh 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 77 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 132.47 cfs © 12.43 hrs, Volume= 16.444 af, Depth= 2.37" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 10-Year Rainfall=4.80" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 140= 1 132.47 cfs i —Runoff 130: 120= .Type II 24-hr 110= P i -Year.Ralrif01l=4 80'1 100= Runoff Area=83.200 ac 90_ Runoff V oIu me16,A44 of 13 80: off De' t Rwn � � - LL 60- Tc-4 . min 50 GN=76 40 30 20 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 78 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 86.090 ac, 0.00% Impervious, Inflow Depth > 3.11" for 10-Year event Inflow = 154.35 cfs © 12.10 hrs, Volume= 22.299 af Outflow = 154.35 cfs © 12.10 hrs, Volume= 22.299 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 170= 160= I 154.35 cfs Inflow —Outflow 150_ Inflow Area=80,090_ac 140: 130= 120- 110: 90- c 80: 70: 60: 50- 40: 30= 20= 10: 0 wirfrrrr� j i i i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 79 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 90.480 ac, 0.00% Impervious, Inflow Depth > 3.08" for 10-Year event Inflow = 167.69 cfs © 12.10 hrs, Volume= 23.230 af Outflow = 167.69 cfs © 12.10 hrs, Volume= 23.230 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 180_ 1167.69 cfs —Inflow 170_ —Outflow Inflow Area=90. 160= 150= 80 ac 140: 130: 120z_ 100= c 90- a 80: 70- 60: 50 40 30= 20= 10: 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 80 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 2.84" for 10-Year event Inflow = 209.44 cfs @ 12.44 hrs, Volume= 39.783 af Outflow = 209.44 cfs @ 12.44 hrs, Volume= 39.783 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 230= 220_ 209.44 i —Inflow I cfs I I I —Outflow 200_ I /� 1nflow_Area167.950 ac 90- 180= -- -- - 170= h ; 160= 150] 140: 12 130= o 120 c 110= LL 100= 90 80 70 60 50 40 30 20 10 rI1111'i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 81 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 2.99" for 10-Year event Inflow = 70.19 cfs @ 12.55 hrs, Volume= 10.565 af Outflow = 70.15 cfs @ 12.58 hrs, Volume= 10.565 af, Atten= 0%, Lag= 1.4 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Max. Velocity= 15.26 fps, Min. Travel Time= 0.6 min Avg. Velocity = 5.89 fps, Avg. Travel Time= 1.7 min Peak Storage= 2,690 cf @ 12.56 hrs Average Depth at Peak Storage= 1.49' , Surface Width= 4.24' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 75 170.15 cfs —Inflow 707 , —Outflow 657 1 la ow Area=42.350 ac 607 Avg. Plow h=1.49' 55= Max 15.26 f VeI- pS 50: =F 45_ 54.o�i 40 Pi pe Ppe 3 LL 35= 0.01-1' 30= 25= L=5850 20 �! S=O.0163 Capaci 15 . ty=2g6.47 cfs 10 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 82 Summary for Pond 10P: SCM 2 Inflow Area = 17.950 ac, 0.00% Impervious, Inflow Depth = 4.45" for 10-Year event Inflow = 125.70 cfs @ 11.96 hrs, Volume= 6.653 of Outflow = 81.86 cfs @ 12.02 hrs, Volume= 6.644 af, Atten= 35%, Lag= 4.0 min Primary = 81.86 cfs @ 12.02 hrs, Volume= 6.644 of Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 791.67' @ 12.02 hrs Surf.Area= 22,999 sf Storage= 96,640 cf Plug-Flow detention time= 203.5 min calculated for 6.644 af(100% of inflow) Center-of-Mass det. time= 202.5 min ( 954.3 - 751.8 ) Volume Invert Avail.Storage Storage Description #1 786.00' 129,160 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 11,400 0 0 787.00 13,294 12,347 12,347 788.00 15,260 14,277 26,624 789.00 17,290 16,275 42,899 790.00 19,385 18,338 61,237 791.00 21,526 20,456 81,692 792.00 23,720 22,623 104,315 793.00 25,970 24,845 129,160 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.011, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.318 0.446 0.573 0.700 0.828 0.955 #3 Device 1 788.20' 48.0"W x 12.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 790.20' 36.0"W x 12.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 83 Primary OutFlow Max=81.74 cfs @ 12.02 hrs HW=791.67' (Free Discharge) L1=Culvert (Passes 81.74 cfs of 109.87 cfs potential flow) 2=Special & User-Defined (Custom Controls 0.91 cfs) 44 3=Orifice/Grate (Orifice Controls 33.15 cfs @ 8.29 fps) =Orifice/Grate (Orifice Controls 42.18 cfs @ 4.69 fps) 5=Orifice/Grate (Weir Controls 5.50 cfs @ 1.35 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=786.00' (Free Discharge) L6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 10P: SCM 2 Hydrograph 140- 130- 125.70 cfs —Inflow —Outflow _ —Primary 120= 1n ow Area=17.950 ac -Secondary 110= Peak Elev 100_90= 81.86 cfs F Stoi age 96,640--vF w 80_ V 3 70= _o 60- 50- 40- 30- 20- in= i 0.00 cfs i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 84 Summary for Pond 12P: SCM 1 Inflow Area = 25.770 ac, 0.00% Impervious, Inflow Depth = 3.93" for 10-Year event Inflow = 144.60 cfs @ 11.96 hrs, Volume= 8.440 of Outflow = 28.35 cfs @ 12.12 hrs, Volume= 8.420 af, Atten= 80%, Lag= 10.0 min Primary = 28.35 cfs @ 12.12 hrs, Volume= 8.420 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 789.90' @ 12.12 hrs Surf.Area= 41,549 sf Storage= 175,445 cf Plug-Flow detention time= 341.5 min calculated for 8.420 of(100% of inflow) Center-of-Mass det. time= 339.9 min ( 1,117.0- 777.1 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.725 1.015 1.305 1.594 1.884 2.174 #3 Device 1 786.00' 12.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.00' 48.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=28.35 cfs @ 12.12 hrs HW=789.90' (Free Discharge) t-1=Culvert (Passes 28.35 cfs of 103.33 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 1.85 cfs) -3=Orifice/Grate (Orifice Controls 4.60 cfs @ 9.20 fps) -4=Orifice/Grate (Orifice Controls 21.90 cfs @ 3.04 fps) -5=Orifice/Grate ( Controls 0.00 cfs) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 85 Pond 12P: SCM 1 Hydrograph 160= 150_ 1 144.60 cfs I —Inflow —Primary 140_ Inflow Area=25.770 ac 130: �] 120= Peak Elev=789 90' 110_ StOt g'e=175,445 Cf 100= Co 90: u 80: o - LL 70: 60: , 50: 40= 28.35 cfs I 30 . 20 10 . 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 86 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 0.00% Impervious, Inflow Depth = 3.89" for 10-Year event Inflow = 233.64 cfs @ 11.96 hrs, Volume= 11.861 af Outflow = 11.46 cfs @ 12.95 hrs, Volume= 11.537 af, Atten= 95%, Lag= 59.7 min Primary = 11.46 cfs @ 12.95 hrs, Volume= 11.537 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 784.66' @ 12.95 hrs Surf.Area= 128,537 sf Storage= 325,859 cf Plug-Flow detention time= 707.0 min calculated for 11.537 af(97% of inflow) Center-of-Mass det. time= 690.0 min ( 1,467.3- 777.3 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 1.735 2.603 3.470 4.338 5.206 #3 Device 1 783.00' 20.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 784.50' 72.0"W x 6.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 785.75' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 87 Primary OutFlow Max=11.45 cfs @ 12.95 hrs HW=784.66' (Free Discharge) 4-1=Culvert (Passes 11.45 cfs of 49.10 cfs potential flow) 2=Special & User-Defined (Custom Controls 3.17 cfs) 44 3=Orifice/Grate (Orifice Controls 4.75 cfs @ 5.70 fps) =Orifice/Grate (Orifice Controls 3.53 cfs @ 1.26 fps) 5=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 24P: SCM 3 Hydrograph 260- 240- 233.64 cfs 1 —Inflow I —Outflow - — 220= I n l i w Area=36 V.560 Cc,,---- —SeconPrimarydary 200= Peak EIev^784.66' Storage=325,859 cf 180_ 160- 140= - 0 120- 100- 80: I . 60- 40- 20- I 11.46 cfs I i 0.00 cfs i y �n}nnntnnjrm� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 88 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 2.37" for 10-Year event Inflow = 6.55 cfs @ 11.96 hrs, Volume= 0.294 af Primary = 6.55 cfs @ 11.96 hrs, Volume= 0.294 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 7 16.55 cfs —I Inflow I i —Primary 6- Inflow Area=1I.490 ac 5- 4- 3 - 0 3 1- 0Tnrtrml.............. ................................................,Mph ............................................................................... 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 89 Summary for Link 4L: POA 2 Inflow Area = 96.340 ac, 0.00% Impervious, Inflow Depth > 3.09" for 10-Year event Inflow = 191.36 cfs @ 12.06 hrs, Volume= 24.832 of Primary = 191.36 cfs @ 12.06 hrs, Volume= 24.832 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 210 200 'l I 191.36 cfs I I , —Inflow 190- ' —Primary 180= Inflow Area=96.340 ac 170= : 160- I I 150: 140! 130= w 120= 110 0 100 90 80- h h h h h h h + 70E 60= 50= 40= 4 30= 1 4 L r 20- 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type 1124-hr 10-Year Rainfall=4.80" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 90 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 2.84" for 10-Year event Inflow = 209.44 cfs @ 12.44 hrs, Volume= 39.783 af Primary = 209.44 cfs @ 12.44 hrs, Volume= 39.783 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 230- 220_ 209.44 —Inflow 0= I —Primary 21 li 09. cfs i 200 i r r 4 4Inflow Area=167.950 ac 190: r , 180: 1 rr 170= 160: r r r , 150= 140: F 130= u 120: c 110 LL 100- 90= 80] 70! 60= 50= r 40! 30= 20: r r 10= 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 91 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 10S: POST-DEV DA-3 OFFSITE C Runoff Area=1.880 ac 0.00% Impervious Runoff Depth=3.79" Tc=20.8 min CN=70 Runoff=7.77 cfs 0.594 of Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff Area=1.490 ac 0.00% Impervious Runoff Depth=4.44" Tc=5.0 min CN=76 Runoff=12.02 cfs 0.552 of Subcatchment 12S: POST-DEV DA-2 ONSITE E Runoff Area=17.950 ac 0.00% Impervious Runoff Depth=6.85" Tc=5.0 min CN=97 Runoff=190.03 cfs 10.249 of Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff Area=5.860 ac 0.00% Impervious Runoff Depth=5.57" Tc=12.0 min CN=86 Runoff=44.63 cfs 2.719 of Subcatchment 16S: POST-DEV DA-2 ONSITE A Runoff Area=20.770 ac 0.00% Impervious Runoff Depth=6.61" Tc=5.0 min CN=95 Runoff=217.80 cfs 11.449 of Subcatchment 17S: POST-DEV DA-2 OFFSITE A Runoff Area=5.000 ac 0.00% Impervious Runoff Depth=4.89" Tc=44.7 min CN=80 Runoff=16.11 cfs 2.037 of Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff Area=5.300 ac 0.00% Impervious Runoff Depth=4.67" Tc=21.1 min CN=78 Runoff=26.54 cfs 2.061 af Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff Area=4.390 ac 0.00% Impervious Runoff Depth=4.67" Tc=17.6 min CN=78 Runoff=24.30 cfs 1.707 of Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff Area=36.290 ac 0.00% Impervious Runoff Depth=3.90" Tc=28.9 min CN=71 Runoff=125.89 cfs 11.797 af Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff Area=0.780 ac 0.00% Impervious Runoff Depth=4.67" Tc=5.0 min CN=78 Runoff=6.55 cfs 0.303 of Subcatchment 25S: POST-DEV DA-3 ONSITE A Runoff Area=34.680 ac 0.00% Impervious Runoff Depth=6.38" Tc=5.0 min CN=93 Runoff=358.74 cfs 18.436 of Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff Area=5.840 ac 0.00% Impervious Runoff Depth=4.67" Tc=15.0 min CN=78 Runoff=34.97 cfs 2.271 of Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff Area=42.350 ac 0.00% Impervious Runoff Depth=5.23" Tc=57.3 min CN=83 Runoff=121.96 cfs 18.444 of Subcatchment 32S: POST-DEV DA-3 OFFSITE ARunoff Area=83.200 ac 0.00% Impervious Runoff Depth=4.44" Tc=43.2 min CN=76 Runoff=250.36 cfs 30.817 af Reach 13R: NORTH STREAM DEPRESSION Inflow=322.12 cfs 37.864 af Outflow=322.12 cfs 37.864 af Reach 14R: NORTH STREAM TO POA 2 Inflow=346.36 cfs 39.571 af Outflow=346.36 cfs 39.571 af POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 92 Reach 28R: SOUTH STREAM Inflow=421.89 cfs 70.206 af Outflow=421.89 cfs 70.206 af Reach 30R: DA-3 BYPASS PIPE Avg. Flow Depth=2.01' Max Vet=17.73 fps Inflow=121.96 cfs 18.444 af 54.0" Round Pipe n=0.011 L=585.0' S=0.0163'/' Capacity=296.47 cfs Outflow=121.89 cfs 18.444 af Pond 10P: SCM 2 Peak Elev=792.67' Storage=120,698 cf Inflow=190.03 cfs 10.249 af Primary=117.82 cfs 10.210 af Secondary=7.65 cfs 0.030 af Outflow=125.47 cfs 10.239 af Pond 12P: SCM 1 Peak Elev=791.52' Storage=246,078 cf Inflow=221.70 cfs 13.486 af Outflow=86.94 cfs 13.463 af Pond 24P: SCM 3 Peak Elev=785.67' Storage=457,995 cf Inflow=362.51 cfs 19.030 af Primary=53.72 cfs 18.674 af Secondary=0.00 cfs 0.000 af Outflow=53.72 cfs 18.674 af Link 2L: POA 1 Inflow=12.02 cfs 0.552 af Primary=12.02 cfs 0.552 af Link 4L: POA 2 Inflow=381.50 cfs 42.290 af Primary=381.50 cfs 42.290 af Link 9L: POA 3 Inflow=421.89 cfs 70.206 af Primary=421.89 cfs 70.206 af Total Runoff Area= 265.780 ac Runoff Volume= 113.436 af Average Runoff Depth = 5.12" 100.00%Pervious=265.780 ac 0.00%Impervious= 0.000 ac POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 93 Summary for Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Runoff = 7.77 cfs © 12.13 hrs, Volume= 0.594 af, Depth= 3.79" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 1.880 70 1.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.8 Direct Entry, Subcatchment 10S: POST-DEV DA-3 OFFSITE C (SCM-3) Hydrograph f 8_ 7.77 cfs —Runoff 7- Type II 24-hr 100-Year Rainfall=7.21" Runoff Area=1 .880 ac = Runoff Volurrte=O:5 Runoff_Depth=a.79' c 4- " Tc=20.8 mink 2- 0 -rpm i frrrrtn 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 94 Summary for Subcatchment 11S: POST-DEV DA-1 ONSITE Runoff = 12.02 cfs © 11.96 hrs, Volume= 0.552 af, Depth= 4.44" Routed to Link 2L : POA 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 1.490 76 1.490 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 11S: POST-DEV DA-1 ONSITE Hydrograph 13- 112.02 cfs I —Runoff 12 117 Type- ! 24-br 10= 100-Year Rainfall=7.21"� Runoff Area=1.490 ac $_ Runoff Vorum �:5= $2 Of 3 = h=4.44 unoffD u 67 5- l- s1�1Jww_''m mn 4- C hF=16 3 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 95 Summary for Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Runoff = 190.03 cfs © 11.96 hrs, Volume= 10.249 af, Depth= 6.85" Routed to Pond 10P : SCM 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 17.950 97 17.950 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 12S: POST-DEV DA-2 ONSITE E (SCM-2) Hydrograph 210 I I I 200 ° 190.03 cfs i , , —Runoff 190 180 TYPO II 24-hr 170 160 , ©0-Year-,Rainfa I l=7.'21 1 ` Ru n►off--Are = -L .950 140 40 aC 130 `r ^� ',-- `Runoff V QIume=1 O,249 of f: 120 10 Rulroff Qepth= .$ " c 100 t 1 TC5.O 1�1 LL 90 11 80 . C _91 70 60 ; 50 : 40 30 20 10 0 — 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 96 Summary for Subcatchment 15S: POST-DEV DA-2 OFFSITE C Runoff = 44.63 cfs © 12.03 hrs, Volume= 2.719 af, Depth= 5.57" Routed to Link 4L : POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.860 86 5.860 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.0 Direct Entry, Subcatchment 15S: POST-DEV DA-2 OFFSITE C Hydrograph 48- , 464 144.63 cfs I —Runoff 444 -42- Time 1144-~lr 40= 364 i r i r 10 0- i;}�ear RaiinfFFCall=7.21 ar; Runoff Ars 34= a= .80 pc n 284 Runoff�' 1 �f 304 O�INFYlE��2.;7 264 -- �� 24- Runoff-Det}th=v.5 Li 22- 20- TC=l-2.o irn in 184 wF 16= 1'�1 144 12- 104 8- 61 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 97 Summary for Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Runoff = 217.80 cfs © 11.96 hrs, Volume= 11.449 af, Depth= 6.61" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 20.770 95 20.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 16S: POST-DEV DA-2 ONSITE A (SCM-1) Hydrograph 240 230 217.80 cfs I —Runoff 220 'TYPO [[ 24=hr 200 180 1 IDO-Nrar- RainfOl ==7. 1.170 160 ©u rlo; f--A►re =,20 770 a '; I Q�ir 150 unoff Vol m �---- 13 140 R -D � RR� 1 -�yy++ - 130 Runoff e th=6 V 120 � u 100 r i TC--4-0 mid I r171 1 ;, , h , 20 10 0 — .............. ....,....,....,....,....,....,....,....,....,....,....,....,....,....,....,....,....,....,.... ...., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 98 Summary for Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Runoff = 16.11 cfs © 12.42 hrs, Volume= 2.037 af, Depth= 4.89" Routed to Pond 12P : SCM 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.000 80 5.000 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.7 Direct Entry, Subcatchment 17S: POST-DEV DA-2 OFFSITE A (SCM-1) Hydrograph 18- 17- 116.11 cfs f —Runoff 16 15= Type II 24- 'Tr 13 14= 100-Year Rainfaill-7.21'r 12 Iu noff Area=5 000 ac 11_ Ru'n', 1o= '- af 3 VO�um�-Z,D3 Runoff Depth 4.89" LL 8- C+44.7 cn ,� gin,. 6- c IY firs/� V 4= 3 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 99 Summary for Subcatchment 18S: POST-DEV DA-2 ONSITE B Runoff = 26.54 cfs © 12.13 hrs, Volume= 2.061 af, Depth= 4.67" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.300 78 5.300 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 21.1 Direct Entry, Subcatchment 18S: POST-DEV DA-2 ONSITE B Hydrograph 28- 126.54 cfs I —Runoff 26- Type II 24-' �r 22- O04e-ar Rainfall=7.21 2 187 Runoff area=5.300 ac Runoff Volume=2.001 'f o 16-14- "Runoff Depth=4,67' 127 Tc- 21.1- m n 10- w w'= Ei 8 6 0 ..........6' .. i....i....i....i....i....i...2 4..i.........i....i....i....i....i....i....i....in..i....i....i....i....i....i....i....i....i....i....i....i....i....I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 100 Summary for Subcatchment 19S: POST-DEV DA-2 ONSITE C Runoff = 24.30 cfs © 12.10 hrs, Volume= 1.707 af, Depth= 4.67" Routed to Reach 14R : NORTH STREAM TO POA 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 4.390 78 4.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.6 Direct Entry, Subcatchment 19S: POST-DEV DA-2 ONSITE C Hydrograph 26 1 24.30 cfs Runoff 24- - �/„ 22- J'�T IPP II 24-hr 20- 1-00-Year Rainfall=7.21 18 Ru not= T =4�. . # area- �90 ac 167 Runoff Volume=1.JOI Of _ cc 1� c J D Runoff e h 4.61 Li 12- Tc=17.6 min 8- C 14=18 6- 4- 2- 0 .............. ............ ....,.... .... ....,....,.... ....,....,....,....,....,....,....,....,.... ....,.... ....,.... ....,...., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 101 Summary for Subcatchment 22S: POST-DEV DA-2 OFFSITE B Runoff = 125.89 cfs © 12.23 hrs, Volume= 11.797 af, Depth= 3.90" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 36.290 71 36.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.9 Direct Entry, Subcatchment 22S: POST-DEV DA-2 OFFSITE B Hydrograph 140- 130- 1 125.89 cfs —Runoff 120= Type rl 241 r 110 1 100-Year Rainfa111=7:21'r Ru noif Area-36.290 ac 90- y 80- Runoff Volume1,1r797 Of 70_ Runoff bept-1h=3.9O' _o Qp " � 60 = TC2v.91Y111� 50 CN 40 30 20 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 102 Summary for Subcatchment 23S: POST-DEV DA-2 ONSITE D Runoff = 6.55 cfs © 11.96 hrs, Volume= 0.303 af, Depth= 4.67" Routed to Reach 13R : NORTH STREAM DEPRESSION Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 0.780 78 0.780 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 23S: POST-DEV DA-2 ONSITE D Hydrograph 7 6.55 cfs —Runoff 6 Type Z4- '1r 100-Year Rainfall=7.21" Runoff ea O.780 ,Run Off 4 eff Volume: 0 303ef Runoff Depth=4.67'" 0 3 �5.Q rjn 2 C14= 8,1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 103 Summary for Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Runoff = 358.74 cfs © 11.96 hrs, Volume= 18.436 af, Depth= 6.38" Routed to Pond 24P : SCM 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 34.680 93 34.680 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 25S: POST-DEV DA-3 ONSITE A (SCM-3) Hydrograph 400- 380= 1358.74 cfs I —Runoff 3601 f' 340; Type f f 24-hr 320_ �/ p, 300= 1 90-8par-'-Rainfa-i I=7. '� 280 Runoff Area 3- 260= ^ .680 ac 240_ Runoff Volume=184436 of 3 _ p - = .38'" 200= ux�off De - LL 180: TC0.0 m Nn 160; 140: C N=9 3 120 100 80 60 40 20 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 104 Summary for Subcatchment 29S: POST-DEV DA-3 ONSITE B Runoff = 34.97 cfs © 12.07 hrs, Volume= 2.271 af, Depth= 4.67" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 5.840 78 5.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.0 Direct Entry, Subcatchment 29S: POST-DEV DA-3 ONSITE B Hydrograph 38= 36= 34.97 cfs I —Runoff i 34 32= ■+ ype 024-hr 30_ 100-Year Rainfall=7.21" 28= 26_ u Hoff area=5.8 ae 24 = N 22 fume Runoff Vo =2.211 3 20= Runo ff De Lhy4.67« O 18_ 167 L 'Tc 1E� .O nin 14= t 12- CN=78 10 8 6 4 2 0 ... .... .... ) : 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 105 Summary for Subcatchment 31S: POST-DEV DA-3 OFFSITE B Runoff = 121.96 cfs © 12.55 hrs, Volume= 18.444 af, Depth= 5.23" Routed to Reach 30R : DA-3 BYPASS PIPE Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 42.350 83 42.350 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 57.3 Direct Entry, Subcatchment 31S: POST-DEV DA-3 OFFSITE B Hydrograph 130_ 1 121.96 cfs —Runoff 120= 110_ Type II 24-h r 1100= 90-Year Rai nfal l=7.21'1 90- Runoff Area 42.350 ac w 80_ Runoff Volume=18,444 of 3 70_ Runoff Depth=J.'23" LL 60_ Tc=57.3l�n 50 CN=83 40 30 20 10 0 .,....I ..I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I....I...., 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 106 Summary for Subcatchment 32S: POST-DEV DA-3 OFFSITE A Runoff = 250.36 cfs © 12.42 hrs, Volume= 30.817 af, Depth= 4.44" Routed to Reach 28R : SOUTH STREAM Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type II 24-hr 100-Year Rainfall=7.21" Area (ac) CN Description * 83.200 76 83.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 43.2 Direct Entry, Subcatchment 32S: POST-DEV DA-3 OFFSITE A Hydrograph 280- 260- .1 250.36 cfs I —Runoff 240_ Type 1124-h r 220_ 100-8(ear Rapnfall=7.2 200- 180= Runoff Area-83.200 aG Vl a r81 Runoff of w 160= © Q �� �"` 7 140_ Runoff beet =4. 4'" 0 u. 120= Tc 43.2 11'111 -- 100- cN=76 80 60 40 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 107 Summary for Reach 13R: NORTH STREAM DEPRESSION Inflow Area = 86.090 ac, 0.00% Impervious, Inflow Depth > 5.28" for 100-Year event Inflow = 322.12 cfs @ 12.11 hrs, Volume= 37.864 af Outflow = 322.12 cfs @ 12.11 hrs, Volume= 37.864 af, Atten= 0%, Lag= 0.0 min Routed to Reach 14R : NORTH STREAM TO POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 13R: NORTH STREAM DEPRESSION Hydrograph 360- 340_ I 322.12 cfs Inflow 320= " —Outflow 300= Inflow Area=86.090 ac 280= 260- 240: 220 .4 200! o 3 180= LL 160= 140: 120- 100 80 60 : 40 r 20 0 ...I....i.u. i j �n nrfrtntnn}n� 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 108 Summary for Reach 14R: NORTH STREAM TO POA 2 Inflow Area = 90.480 ac, 0.00% Impervious, Inflow Depth > 5.25" for 100-Year event Inflow = 346.36 cfs @ 12.11 hrs, Volume= 39.571 af Outflow = 346.36 cfs @ 12.11 hrs, Volume= 39.571 af, Atten= 0%, Lag= 0.0 min Routed to Link 4L : POA 2 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 14R: NORTH STREAM TO POA 2 Hydrograph 380= 360= I 346.36 cfs Inflow 340: I —Outflow f" /�Q nn 320 �Inflow /�1 '$a=9O'.TV V ac 300= 280= 4 4 4 . 260= 240= 220= 2001 ; l , , , 0 180: 160: r 140= i 120= , 100= 80 ; 40 20 ---- ; - 0 rrn lInn�nn � � u �n n�nn�nn�nn I �I �I Inn�7TT1 Inn Inn Iu Inn I1 0 2 4 6 8 10 12 14� 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 109 Summary for Reach 28R: SOUTH STREAM Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 5.02" for 100-Year event Inflow = 421.89 cfs @ 12.43 hrs, Volume= 70.206 af Outflow = 421.89 cfs @ 12.43 hrs, Volume= 70.206 af, Atten= 0%, Lag= 0.0 min Routed to Link 9L : POA 3 Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Reach 28R: SOUTH STREAM Hydrograph 460= 440= r 'r 1421.89 cfs r —Inflow 420= —Outflow 1nffOw 400: Ar• a-167.950 cac 380= 360: 340] 320] 4 4 ; 300: 280= 4 260' . . 240- r , 0 220= a 200: . . , , . , 180] ; , 160' 140: 120- 100 80 I �nn . 60 40 � . I 20 - I I I I I Inn Inn Inn Inn Iu Inn I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 110 Summary for Reach 30R: DA-3 BYPASS PIPE Inflow Area = 42.350 ac, 0.00% Impervious, Inflow Depth = 5.23" for 100-Year event Inflow = 121.96 cfs @ 12.55 hrs, Volume= 18.444 af Outflow = 121.89 cfs @ 12.57 hrs, Volume= 18.444 af, Atten= 0%, Lag= 1.1 min Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind+Trans method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Max. Velocity= 17.73 fps, Min. Travel Time= 0.5 min Avg. Velocity = 6.74 fps, Avg. Travel Time= 1.4 min Peak Storage= 4,022 cf @ 12.56 hrs Average Depth at Peak Storage= 2.01' , Surface Width= 4.47' Bank-Full Depth= 4.50' Flow Area= 15.9 sf, Capacity= 296.47 cfs 54.0" Round Pipe n= 0.011 Concrete pipe, straight& clean Length= 585.0' Slope= 0.0163 '/' Inlet Invert= 788.52', Outlet Invert= 779.00' Reach 30R: DA-3 BYPASS PIPE Hydrograph 130_ 1 121.89 cfs i _Inflow 120- Outflow Inflow Area�4�. 50 c 110- 100- Avg, Flow depth=2r011 9o= Max Ve1=17.73 fps 80= 54.0" 3 70_ Roll rid Pi Pe o - Li 60_ n=0.011 50_ L=585.0' ao S=0 016' 30 Capacity=296.47 cfs 20 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 111 Summary for Pond 10P: SCM 2 Inflow Area = 17.950 ac, 0.00% Impervious, Inflow Depth = 6.85" for 100-Year event Inflow = 190.03 cfs @ 11.96 hrs, Volume= 10.249 af Outflow = 125.47 cfs @ 12.02 hrs, Volume= 10.239 af, Atten= 34%, Lag= 3.9 min Primary = 117.82 cfs @ 12.02 hrs, Volume= 10.210 of Routed to Reach 13R : NORTH STREAM DEPRESSION Secondary= 7.65 cfs @ 12.02 hrs, Volume= 0.030 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 792.67' @ 12.02 hrs Surf.Area= 25,226 sf Storage= 120,698 cf Plug-Flow detention time= 146.4 min calculated for 10.238 of(100% of inflow) Center-of-Mass det. time= 146.1 min ( 890.0 - 743.9 ) Volume Invert Avail.Storage Storage Description #1 786.00' 129,160 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 786.00 11,400 0 0 787.00 13,294 12,347 12,347 788.00 15,260 14,277 26,624 789.00 17,290 16,275 42,899 790.00 19,385 18,338 61,237 791.00 21,526 20,456 81,692 792.00 23,720 22,623 104,315 793.00 25,970 24,845 129,160 Device Routing Invert Outlet Devices #1 Primary 783.50' 36.0" Round Culvert L= 67.0' Ke= 0.200 Inlet/Outlet Invert= 783.50'/780.00' S= 0.0522 '/' Cc= 0.900 n= 0.011, Flow Area= 7.07 sf #2 Device 1 786.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.318 0.446 0.573 0.700 0.828 0.955 #3 Device 1 788.20' 48.0"W x 12.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 790.20' 36.0"W x 12.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.50' 72.0" x 72.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 792.50' 40.0' long +3.0 '/' SideZ x 25.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 112 Primary OutFlow Max=117.81 cfs @ 12.02 hrs HW=792.67' (Free Discharge) 4-1=Culvert (Inlet Controls 117.81 cfs @ 16.67 fps) 2=Special & User-Defined (Passes < 0.96 cfs potential flow) 44 3=Orifice/Grate (Passes < 38.34 cfs potential flow) =Orifice/Grate (Passes < 60.63 cfs potential flow) 5=Orifice/Grate (Passes < 99.10 cfs potential flow) Secondary OutFlow Max=7.47 cfs @ 12.02 hrs HW=792.67' (Free Discharge) 4-6=Broad-Crested Rectangular Weir (Weir Controls 7.47 cfs @ 1.10 fps) Pond 10P: SCM 2 Hydrograph 210: I I I I I 200= 190.03 fs c I, r —Inflow 190= I ,}: —Outflow 1 hf10W Ar�� 1�. __ __ —SePricondary 180= S —Secondary 170- O I� - 160; Peak :=/ 92.V'_ 150= +� (� �`©Q ��" 140: Storage=1 O,698 {+� 130= 125.47 cfs 117.82 cfs 120: — 110= r c 100: — 4 4 ? u 90: 80=--- 70 60= 50 40 r 30 tA 20 7.65 cfs I I I I I I 10 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 113 Summary for Pond 12P: SCM 1 Inflow Area = 25.770 ac, 0.00% Impervious, Inflow Depth = 6.28" for 100-Year event Inflow = 221.70 cfs @ 11.96 hrs, Volume= 13.486 af Outflow = 86.94 cfs @ 12.06 hrs, Volume= 13.463 af, Atten= 61%, Lag= 6.1 min Primary = 86.94 cfs @ 12.06 hrs, Volume= 13.463 af Routed to Reach 13R : NORTH STREAM DEPRESSION Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 791.52' @ 12.06 hrs Surf.Area= 45,581 sf Storage= 246,078 cf Plug-Flow detention time= 260.3 min calculated for 13.462 of(100% of inflow) Center-of-Mass det. time= 259.5 min ( 1,026.9- 767.4 ) Volume Invert Avail.Storage Storage Description #1 785.00' 268,196 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 785.00 30,293 0 0 786.00 32,482 31,388 31,388 787.00 34,718 33,600 64,988 788.00 37,020 35,869 100,857 789.00 39,378 38,199 139,056 790.00 41,792 40,585 179,641 791.00 44,264 43,028 222,669 792.00 46,791 45,528 268,196 Device Routing Invert Outlet Devices #1 Primary 782.50' 36.0" Round Culvert L= 158.0' Ke= 0.200 Inlet/Outlet Invert= 782.50'/779.00' S= 0.0222 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean, Flow Area= 7.07 sf #2 Device 1 785.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Disch. (cfs) 0.000 0.725 1.015 1.305 1.594 1.884 2.174 #3 Device 1 786.00' 12.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 789.00' 48.0"W x 12.0" H Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 791.00' 60.0" x 60.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=86.88 cfs @ 12.06 hrs HW=791.52' (Free Discharge) t-1=Culvert (Passes 86.88 cfs of 116.67 cfs potential flow) - 2- =Special &User-Defined (Custom Controls 2.17 cfs) -3=Orifice/Grate (Orifice Controls 5.53 cfs @ 11.05 fps) -4=Orifice/Grate (Orifice Controls 54.61 cfs @ 6.83 fps) -5=Orifice/Grate (Weir Controls 24.57 cfs @ 2.36 fps) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC _ Page 114 Pond 12P: SCM 1 Hydrograph 220- 221 7 Inflow —Primary 230= 0 cfs 210= Inflow Area225 770 ac 180- Peak 1 246 7 150_ cf p7$ iiiw 140: 130- , . r r . 3 120: o = LL 110: 100= 186.94 cfs f l 90: 80: 70' 50] 40- 30! 20: 10=_ � I I I I I I I I I I I I I I I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c sin 02344 ©2023 HydroCAD Software Solutions LLC Page 115 Summary for Pond 24P: SCM 3 Inflow Area = 36.560 ac, 0.00% Impervious, Inflow Depth = 6.25" for 100-Year event Inflow = 362.51 cfs @ 11.96 hrs, Volume= 19.030 of Outflow = 53.72 cfs @ 12.18 hrs, Volume= 18.674 af, Atten= 85%, Lag= 13.3 min Primary = 53.72 cfs @ 12.18 hrs, Volume= 18.674 af Routed to Reach 28R : SOUTH STREAM Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routed to Reach 28R : SOUTH STREAM Routing by Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Peak Elev= 785.67' @ 12.18 hrs Surf.Area= 133,036 sf Storage= 457,995 cf Plug-Flow detention time= 506.6 min calculated for 18.674 af(98% of inflow) Center-of-Mass det. time= 494.5 min ( 1,260.3- 765.8 ) Volume Invert Avail.Storage Storage Description #1 782.00' 502,747 cf Custom Stage Data(Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 782.00 116,983 0 0 783.00 121,285 119,134 119,134 784.00 125,644 123,465 242,599 785.00 130,060 127,852 370,451 786.00 134,532 132,296 502,747 Device Routing Invert Outlet Devices #1 Primary 778.00' 30.0" Round Culvert L= 195.0' Ke= 0.500 Inlet/Outlet Invert= 778.00'/777.02' S= 0.0050'/' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 782.00' Special &User-Defined Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 1.735 2.603 3.470 4.338 5.206 #3 Device 1 783.00' 20.0"W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Device 1 784.50' 72.0"W x 6.0" H Vert. Orifice/Grate X 3.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 785.00' 96.0" x 96.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Secondary 785.75' 30.0' long x 15.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c sin 02344 ©2023 HydroCAD Software Solutions LLC Page 116 Primary OutFlow Max=53.72 cfs © 12.18 hrs HW=785.67' (Free Discharge) 4-1=Culvert (Barrel Controls 53.72 cfs @ 10.94 fps) 2=Special & User-Defined (Passes < 4.05 cfs potential flow) 44 3=Orifice/Grate (Passes < 6.23 cfs potential flow) =Orifice/Grate (Passes < 41.33 cfs potential flow) 5=Orifice/Grate (Passes < 56.80 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=782.00' (Free Discharge) 4-6=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Pond 24P: SCM 3 Hydrograph 400: I 380= 362.51 cfs 1 + —Inflow 360= I ! —Outflow Primary 340; 1 nf1 ovv Area=36.56 - --ac', -Secondary 320- 300= ltV=7 260_ Storage=4 - 9, 95--cf 240= 220 3 200= o ii 180: t t ' 160= 140= 1 1 1 1 1 r 120= 100= 80= 53.72 cfs 60L 40 0.0 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 117 Summary for Link 2L: POA 1 Inflow Area = 1.490 ac, 0.00% Impervious, Inflow Depth = 4.44" for 100-Year event Inflow = 12.02 cfs @ 11.96 hrs, Volume= 0.552 of Primary = 12.02 cfs @ 11.96 hrs, Volume= 0.552 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 2L: POA 1 Hydrograph 13- I 12.02 cfs I —Inflow 12- r —Primary 11- Inflow---Area=1 .490-ac 10- 9- 8- 7- 3 - 0 LT 6- 5- 4- 2- ,L 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 118 Summary for Link 4L: POA 2 Inflow Area = 96.340 ac, 0.00% Impervious, Inflow Depth = 5.27" for 100-Year event Inflow = 381.50 cfs @ 12.09 hrs, Volume= 42.290 af Primary = 381.50 cfs @ 12.09 hrs, Volume= 42.290 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 4L: POA 2 Hydrograph 420 400_ � 381.50 cfs ; —Inflow —Primary 360: Inflow Area=96.340 ac 340! 320: 300= 280= t r r - t t t r t . 260 w 240= 220= 0 200 a 180 160= 1 + r I r r r + 140L i r 120= : : r r 100- 80: 60: t 4 t 4 4 4 r 40= 20: 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Type II 24-hr 100-Year Rainfall=7.21" Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD®10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC Page 119 Summary for Link 9L: POA 3 Inflow Area = 167.950 ac, 0.00% Impervious, Inflow Depth > 5.02" for 100-Year event Inflow = 421.89 cfs @ 12.43 hrs, Volume= 70.206 af Primary = 421.89 cfs @ 12.43 hrs, Volume= 70.206 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Link 9L: POA 3 Hydrograph 460: 440= r 1421.89 cfs i r r i r ; , : —Inflow 420= —Primary 400] Inflow Area=167.950 ac 380= 360= 340= 320: rr L 1 L ; ; 300= 280= 260= r . 240= 0 220: a 200= 1 r r r 180 1 r r r 1 r r r 160= IiI I IIr.wri 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68 70 72 Time (hours) POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC TABLE OF CONTENTS Project Reports 1 Routing Diagram 2 Rainfall Events Listing (selected events) 3 Area Listing (all nodes) 1-Year Event 4 Node Listing 6 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 7 Subcat 11 S: POST-DEV DA-1 ONSITE 8 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 9 Subcat 15S: POST-DEV DA-2 OFFSITE C 10 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 11 Subcat 17S: POST-DEV DA-2 OFFSITE A (SCM-1) 12 Subcat 18S: POST-DEV DA-2 ONSITE B 13 Subcat 19S: POST-DEV DA-2 ONSITE C 14 Subcat 22S: POST-DEV DA-2 OFFSITE B 15 Subcat 23S: POST-DEV DA-2 ONSITE D 16 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 17 Subcat 29S: POST-DEV DA-3 ONSITE B 18 Subcat 31S: POST-DEV DA-3 OFFSITE B 19 Subcat 32S: POST-DEV DA-3 OFFSITE A 20 Reach 13R: NORTH STREAM DEPRESSION 21 Reach 14R: NORTH STREAM TO POA 2 22 Reach 28R: SOUTH STREAM 23 Reach 30R: DA-3 BYPASS PIPE 24 Pond 10P: SCM 2 26 Pond 12P: SCM 1 28 Pond 24P: SCM 3 30 Link 2L: POA 1 31 Link 4L: POA 2 32 Link 9L: POA 3 2-Year Event 33 Node Listing 35 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 36 Subcat 11 S: POST-DEV DA-1 ONSITE 37 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 38 Subcat 15S: POST-DEV DA-2 OFFSITE C 39 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 40 Subcat 17S: POST-DEV DA-2 OFFSITE A (SCM-1) 41 Subcat 18S: POST-DEV DA-2 ONSITE B 42 Subcat 19S: POST-DEV DA-2 ONSITE C 43 Subcat 22S: POST-DEV DA-2 OFFSITE B 44 Subcat 23S: POST-DEV DA-2 ONSITE D 45 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 46 Subcat 29S: POST-DEV DA-3 ONSITE B POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c sin 02344 ©2023 HydroCAD Software Solutions LLC 47 Subcat 31S: POST-DEV DA-3 OFFSITE B 48 Subcat 32S: POST-DEV DA-3 OFFSITE A 49 Reach 13R: NORTH STREAM DEPRESSION 50 Reach 14R: NORTH STREAM TO POA 2 51 Reach 28R: SOUTH STREAM 52 Reach 30R: DA-3 BYPASS PIPE 53 Pond 10P: SCM 2 55 Pond 12P: SCM 1 57 Pond 24P: SCM 3 59 Link 2L: POA 1 60 Link 4L: POA 2 61 Link 9L: POA 3 10-Year Event 62 Node Listing 64 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 65 Subcat 11 S: POST-DEV DA-1 ONSITE 66 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 67 Subcat 15S: POST-DEV DA-2 OFFSITE C 68 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 69 Subcat 17S: POST-DEV DA-2 OFFSITE A (SCM-1) 70 Subcat 18S: POST-DEV DA-2 ONSITE B 71 Subcat 19S: POST-DEV DA-2 ONSITE C 72 Subcat 22S: POST-DEV DA-2 OFFSITE B 73 Subcat 23S: POST-DEV DA-2 ONSITE D 74 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 75 Subcat 29S: POST-DEV DA-3 ONSITE B 76 Subcat 31S: POST-DEV DA-3 OFFSITE B 77 Subcat 32S: POST-DEV DA-3 OFFSITE A 78 Reach 13R: NORTH STREAM DEPRESSION 79 Reach 14R: NORTH STREAM TO POA 2 80 Reach 28R: SOUTH STREAM 81 Reach 30R: DA-3 BYPASS PIPE 82 Pond 10P: SCM 2 84 Pond 12P: SCM 1 86 Pond 24P: SCM 3 88 Link 2L: POA 1 89 Link 4L: POA 2 90 Link 9L: POA 3 100-Year Event 91 Node Listing 93 Subcat 10S: POST-DEV DA-3 OFFSITE C (SCM-3) 94 Subcat 11 S: POST-DEV DA-1 ONSITE 95 Subcat 12S: POST-DEV DA-2 ONSITE E (SCM-2) 96 Subcat 15S: POST-DEV DA-2 OFFSITE C 97 Subcat 16S: POST-DEV DA-2 ONSITE A (SCM-1) 98 Subcat 17S: POST-DEV DA-2 OFFSITE A(SCM-1) POST-DEVELOPMENT Table of Contents Prepared by Kimley-Horn &Associates Printed 12/21/2023 HydroCAD® 10.20-3c s/n 02344 ©2023 HydroCAD Software Solutions LLC 99 Subcat 18S: POST-DEV DA-2 ONSITE B 100 Subcat 19S: POST-DEV DA-2 ONSITE C 101 Subcat 22S: POST-DEV DA-2 OFFSITE B 102 Subcat 23S: POST-DEV DA-2 ONSITE D 103 Subcat 25S: POST-DEV DA-3 ONSITE A (SCM-3) 104 Subcat 29S: POST-DEV DA-3 ONSITE B 105 Subcat 31S: POST-DEV DA-3 OFFSITE B 106 Subcat 32S: POST-DEV DA-3 OFFSITE A 107 Reach 13R: NORTH STREAM DEPRESSION 108 Reach 14R: NORTH STREAM TO POA 2 109 Reach 28R: SOUTH STREAM 110 Reach 30R: DA-3 BYPASS PIPE 111 Pond 10P: SCM 2 113 Pond 12P: SCM 1 115 Pond 24P: SCM 3 117 Link 2L: POA 1 118 Link 4L: POA 2 119 Link 9L: POA 3 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan • _ 9 10 11 12 ti 0. •♦___ 2 •0-0-_1 File: New.stm Number of lines:15 Date 12 20 2023 Line Flow Line Size Line Line Invert Elev. Invert Elev. Line HGL HGL Minor HGL No. Line ID Rate (Rise x Span) Type Length Down Up Slope Down Up Loss Junct (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) 1 PIPE-1560 91.95 54 ar 210.771 791.00 793.12 1.01 793.81 795.93 0.98 795.93_ 2 PIPE-1550 92.58 54 ar 193.773 793.12 795.06 1 1.00 795.93 797.88 n/a 797.88 • 3 PIPE-1360 58.05 42 ar 60.552 785.00 785.45 0.74 789.90 790.10* 0.55 790.66 4 PIPE-1350 30.93 36 ar 237.248 785.95 787.71 0.74 790.66 791.17* 0.29 791.46 5 PIPE-1340 28.53 30 ar 351.000 788.21 790.82 0.74 791.46 792.99 0.09 793.08 6 PIPE-1330 18.52 24 Cir 387.000 791.07 793.95 0.74 793.08 795.55 0.11 795.66 7 PIPE-1320 9.34 24 Cir 369.000 794.20 796.94 0.74 795.66 798.03 n/a 798.03 j 8 PIPE-1470 40.47 42 Cir 248.748 785.45 786.73 0.51 790.66 791.06* 0.23 I 791.29 9 PIPE-1460 40.36 36 Cir 157.338 787.23 788.05 0.52 791.29 791.87* 0.20 792.07 10 PIPE-1450 i 35.40 36 Cir 228.000 788.05 789.22 0.51 792.07 792.71* 0.06 792.77 , 11 PIPE-1440 29.92 36 Cir 258.000 789.22 790.55 0.52 792.77 793.23 0.05 793.27 12 PIPE-1430 24.30 30 Cir 222.304 791.05 792.20 0.52 793.27 793.92 0.11 794.03 J 13 PIPE-1420 19.10 24 Cir 251.696 792.70 1 794.00 0.52 794.70 796.50* 0.57 797.07 14 PIPE-1570 28.35 36 Cir 158.288 779.00 782.50 2.21 780.10 784.22 n/a 784.22 15 PIPE-1640 28.35 6 Cir 40.000 782.50 783.70 3.00 784.22 1389.51* 324.12 1713.62 I Notes: *Surcharged(HGL above crown).j-Line contains hyd.jump Hydraflow Summary Report 1 Hydraflow Storm Sewers Extension for Autodesk® Civil 3D® Plan • 7. 21 2 r 19 19 I- /11/ 17 176 / 2 = 10 5 n ` 7 8 9 1 22 15 orr�4 as d7 a J =-o er.= a _c=-s-FM-E _:-- Number of lines:38 Date:12!20i2023 Ex.-1 a-.e5 :C:i Line Flow Line Size Line Line Invert Elev. Invert Elev. Line HGL HGL Minor HGL Dn Str No. Line ID Rate (Rise x Span) Type Length Down Up Slope Down Up Loss Junct Line No. (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) (ft) 1 PIPE-1150 89.51 54 Or 118.245 782.00 782.59 0.50 784.66 785.36 1.18 785.36 Outfall 2 PIPE-1140 80.31 48 Or 160.000 782.84 783.62 0.49 785.55 786.33 1.22 786.33 1 3 PIPE-1160 I 72.23 42 Or 161.997_1 783.62 784.40 0.48 786.61 787.39 0.16 787.55 2 4 PIPE-1170 65.76 42 Or 161.933 784.40 785.19 0.49 787.55 788.06 0.14 788.21 3 _ 5 PIPE-1180 59.14 42 Or 162.070 785.19 785.97 0.48 788.21 788.59 I 0.91 789.50 4 6 PIPE-1190 50.52 42 Cir 162.315 785.97 786.76 0.49 789.50 789.82 0.07 789.90 5 7 PIPE-1200 43.75 42 Cir 161.685 786.76 787.41 0.40 789.90 790.09 0.07 790.16 6 8 PIPE-1210 36.89 1 42 Cir 162.176 787.41 788.06 0.40 790.16 790.30 0.50 790.80 7 9 PIPE-122 T 21.56 36 Cir 111.824 ' 788.06 788.50 0.39 790.80 790.87 1 0.17 791.04 8 10 PIPE-1230 14.20 30 Cir 132.316 788.50 789.03 0.40 791.04 791.16 0.02 791.19 9 11 I PIPE-1240 I 13.95 24 Or 291.576 789.02 791.34 0.80 791.19 792.68 n/a 792.68 j 10 12 , PIPE-1250 10.26 24 Or 368.952 791.34 794.27 0.79 792.68 795.42 n/a 795.42 j 11 13 PIPE-1290 I 2.43 18 Or 12.579 794.77 795.78 8.03 795.42 796.37 n/a 796.37 j 12 14 PIPE-1280 2.96 18 Or 12.492 794.27 795.27 8.00 794.59 795.92 n/a 795.92 11 15 PIPE-1130 I 5.47 36 Or 115.973 784.09 784.67 0.50 785.36 785.40 0.22 785.40 1 16 PIPE-1120 5.23 30 Or 110.529 785.17 785.72 0.50 785.89 786.47 n/a 786.47 15 17 PIPE-1110 4.23 30 Or 348.536 785.72 787.46 0.50 786.47 788.14 n/a 788.14 j 16 18 PIPE-1690 1.67 30 Or 66.633 787.46 787.80 0.51 788.14 788.22 n/a 788.22 j 17 19 PIPE-1100 2.02 24 Or 356.660 788.30 790.08 0.50 788.78 790.57 n/a 790.57 18 20 PIPE-1300 0.61 18 Or 117.941 790.58 791.17 0.50 790.87 791.46 0.10 791.56 19 21 PIPE-1260 1 3.45 18 Or 44.938 789.12 792.07 1 6.56 789.50 792.78 n/a 792.78 5 22 PIPE-1270 8.55 24 Or 50.805 788.33 790.87 5.00 790.80 791.91 n/a 791.91 j 8 J 23 PIPE-1680 3.14 18 Or 26.222 785.62 785.88 0.99 1786.33 786.55 n/a 786.55 j 2 24 PIPE-1090 72.01 54 Cir 60.709 786.00 786.29 0.48 791.67 791.75* 0.07 791.82 Outfall 25 PIPE-1070 62.35 54 Cir 161.829 786.29 I 787.10 0.50 791.82 791.98* 0.04 792.02 24 26 PIPE-1060 54.44 48 Cir 161.973 787.10 787.91 0.50 792.02 792.25* 0.04 792.29 25 27 PIPE-1050 46.17 42 Cir 162.028 787.91 788.72 0.50 792.29 792.64* 0.05 792.69 26 28 PIPE-1040 37.57 36 Cir 162.418 788.72 789.53 0.50 792.69 793.20* 0.07 793.27 27 29 PIPE-1030 28.84 36 Or 161.582 789.53 790.34 I 0.50 1793.27 793.57* 0.04 793.61 28 30 PIPE-1020 19.76 30 Or 162.230 790.34 791.15 0.50 793.61 793.99* 0.04 794.03 29 31 PIPE-1010 10.26 24 Or 111.771 791.15 791.71 0.50 1 794.03 794.26* 0.14 794.40 30 32 PIPE-1000 0.93 18 Or 131.714 791.71 792.36 0.49 794.40 794.41* 0.00 794.41 31 33 PIPE-1700 115.26 ' 54 Or 84.291 I 779.00 779.42 0.50 1782.13 782.58 n/a 782.58 Outfall 34 PIPE-1480 115.66 54 Cir 146.974 779.41 781.62 1.50 782.58 784.78 1.18 784.78 33 35 PIPE-1520 116.62 54 Cir 352.036 781.62 788.52 1.96 784.78 791.70 n/a 791.70 34 36 PIPE-1620 116.66 54 Cir 11.976 788.52 788.80 2.34 791.70 791.98 n/a 791.98 35 37 PIPE-1610 81.86 36 Cir 66.746 I 781.00 783.50 3.75 I 782.73 786.29 2.22 786.2 -Outfall 38 PIPE-1580 11.46 30 Cir 57.655 777.15 777.44 0.50 778.24 778.57 0.41 778.57 Outfall 39 I PIPE-1590 11.46 30 Or 115.395 777.42 778.00 0.50 778.57 779.13 0.44 779.13 38 1 Notes: *Surcharged(HGL above crown).j-Line contains hyd.jump 1 Hydraflow Summary Report 1 APPENDIX E: EROSION CONTROL CALCULATIONS STORM WATER CONVEYANCE NETWORK CALCULATIONS DISSIPATOR PAD CALCULATIONS(HEC14) Project Information: Project Name: TRACK WEST ROWAN KHA Project#: 013335005 Designed by: BEG Date: Revised by: XXX Date: Checked by: XXX Date: TABLE 10.1 RIPRAP CLASSES AND APRON DIMENSIONS RIP-RAP CLASS NOMINAL SIZE NOMINAL SIZE APRON LENGTH APRON DEPTH (#) D50 D50 MULTIPLIER MULTIPLIER (in.) (ft) (X) (Z) 1 5.0 0.4 4 3.5 2 6.0 0.5 4 3.3 3 10.0 0.8 5 2.4 4 14.0 1.2 6 2.2 5 20.0 1.7 7 2.0 6 22.0 1.8 8 2.0 `TABLE 10.1 WAS UVELOPED FROM HYDRAULIC ENGINEERING CIRCULAR 141HEC-141-"ENERGY DISSIPATORS"REVISED 13-AUG-2012 RIPRAP APRON ANALYSIS TABLE SYMBOL(UNITS) CALCULATE NOMINAL RIP-RAP SIZE SDI SD2 SD3 SD5 SD6 SD7 SD8 SD9 SD10 NOMINAL RIP-RAP SIZE D50(ft) 0.812 0.468 0.638 0.275 0.565 0.566 0.580 0.279 0.602 (10-YR)DESIGN DISCHARGE 0(ft^3/s) 55.81 26.84 61.05 12.20 20.93 30.95 43.38 3.66 73.75 PIPE DIAMETER(FT) D(ft) 3 2.5 3.5 2 2 2.5 3 1 4 TAIL WATER DEPTH(ASSUMED TO BE 0.4*D) TW(ft) 1.2 1 1.4 0.8 0.8 1 1.2 0.4 1.6 GRAVITY CONSTANT g(ft/s) 32.2 32.2 32.2 32.2 32.2 32.2 32.2 32.2 32.2 RIP RAP APRON CHARACTARISTICS RIP RAP CLASS CLASS 3 2 1 3 3 3 1 APRON WIDTH(FT)(START) 3*D(ft) 9 7.5 10.5 6 6 7.5 9 3 12 LENGTH(FT) X*D(ft) 15 10 17.5 8 10 12.5 15 4 20 DEPTH(INCHES) Z*D50(in.) 24.00 20.00 24.00 18.00 24.00 24.00 24.00 18.00 24.00 APRON WIDTH(END) 3*D+(2/3)*L(ft) 19.00 14.20 22.20 11.40 12.70 15.90 19.00 5.70 25.40 ALL RIP RAP CALCULATIONS WERE PERFORMED IN ACCORDANCE WITH THE FHWA"HYDRAULIC ENGINEERING CIRCULAR"14 Kimley>»Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 1 -Phase 1 Drainage Area(Site)(ac)= 16.42 Disturbed Area(ac)= 16.42 Runoff Coefficient(C)= 0.60 Time of Concentration= 30.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 2.53 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 3.42 Flow(Q2)(cfs)= 24.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 33.7 (Q=c*i*drainage area) Required Storage(cf)= 29,556.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 14,656.8 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 785.00 30,293 0 786.00 32,482 31,388 787.00 34,718 64,988 788.00 37,020 100,857 789.00 39,378 139,056 Riser Elevation 789.75 41,188 169,268 790.00 41,792 179,640 Spillway Elevation 790.50 43,028 200,845 791.00 44,264 222,668 Top of Basin 792.00 46,791 268,196 Designed Storage Elevation(ft)= 790.00 Designed Storage Volume(cf)= 179,640 O.K.>Minimum Required Storage Designed Surface Area(sf)= 41,792 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 24.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 2.3 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH7'S 24.9 (Weir equation) H=head above riser crest(ft) 2.25 (fixed based on design parameters) L=circumference of riser(ft) 2.24 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 8.5 Therefore choose Riser size(in)= 18.0 Barrel Size(in)= 12.0 Orifice Flow:Q=CA(2gH)°'S 24.9 H=head above riser crest(ft) 2.3 (C=oriflce coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 3.5 Riser Size determined from A(in) 25.2 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 24.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 9.8 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 2.15 Barrel Size(in)= 19.9 Therefore choose Barrel size(in)= 30.0 Riser Size(in)= 36.0 <-From Figure 8.07b Required Riser Size(in)= 36.0 Required Barrel Size(in)= 30.0 Page 1 of 10 Kimley>»Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 789.75 ft Bottom Riser Elev.: 785.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 6.8 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 168.8 cf (Water Displaced) *Bouyancy force 10,530 lbs Water=62.4lb/cf *Weight of Riser 9,113 *Required antifloatation block weight 2,126 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 29,556 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.70 Orifice Diamter(in) 3.50 Page 2 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 2-Phase 1 Drainage Area(Site)(ac)= 42.37 Disturbed Area(ac)= 40.00 Runoff Coefficient(C)= 0.60 Time of Concentration= 30.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 2.53 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 3.42 Flow(Q2)(cfs)= 64.3 (Q=c*i*drainage area) Flow(Q10)(cfs)= 86.9 (Q=c*i*drainage area) Required Storage(cf)= 72,000.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 37,820.3 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 779.00 27,795 0 780.00 29,956 28,876 781.00 32,171 59,939 Riser Elevation 781.40 34,441 73,261 Spillway Elevation 782.40 37,824 109,394 Top of Basin 784.00 39,264 171,064 Designed Storage Elevation(ft)= 782.40 Designed Storage Volume(cf)= 109,394 O.K.>Minimum Required Storage Designed Surface Area(sf)= 37,824 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 64.3 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 2.6 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 64.3 (Weir equation) H=head above riser crest(ft) 2.60 (fixed based on design parameters) L=circumference of riser(ft) 4.65 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 17.8 Therefore choose Riser size(in)= 24.0 Barrel Size(in)= 18.0 Orifice Flow:Q=CA(2gH)°'S 64.3 H=head above riser crest(ft) 2.6 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 8.3 Riser Size determined from A(in) 39.0 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 64.3 L=barrel length(ft) 70.0 Invert elevation of outlet end of barrel(ft) 780.5 h=head above the centerline of the outlet end of 1.8 barrel(ft) (Iterative based on barrel size) Kn, 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 11.92 Barrel Size(in)= 46.8 Therefore choose Barrel size(in)= 42.0 Riser Size(in)= 54.0 <-From Figure 8.07b Required Riser Size(in)= 54.0 5'x5'box equivalent diameter equal to 67.7" Required Barrel Size(in)= 42.0 Page 3 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 784.00 ft Bottom Riser Elev.: 779.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 7.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 175.0 cf (Water Displaced) *Bouyancy force 10,920 lbs Water=62.4lb/cf *Weight of Riser 9,450 *Required antifloatation block weight 2,205 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: Qv)(cfs)= 86.9 Water Depth Over Spillway(ft)= 0.5 Spillway Length(ft)= 80.0 Spillway Crest Elevation(ft)= 782.4 O.K.>1'Separation Provided Freeboard(ft)= 1.09 O.K.>Minimum Required Freeboard Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 72,000 (Required Storage Volume Provided for Riser Basin) Days to Drain 4 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.80 Orifice Diamter(in) 3.60 Page 4 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 3 Phase 7 Drainage Area(Site)(ac)= 13.62 Disturbed Area(ac)= 13.62 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 3.66 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 29.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 45.8 (Q=c*i*drainage area) Required Storage(cf)= 24,516.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 19,907.0 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 2.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 782.00 116,982 0_ 783.00 121,284 119,133 784.00 125,643 242,597 784.25 126,747 274,145 784.75 128,955 338,071 Riser Elevation 785.00 130,059 370,448 Top of Basin 786.00 134,531 502,743 Designed Storage Elevation(ft)= 784.00 Designed Storage Volume(cf)= 242,597 O.K.>Minimum Required Storage Designed Surface Area(sf)= 125,643 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: QRs(cfs)= 29.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 29.9 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 9.06 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 34.6 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Orifice Flow:Q=CA(2gH)e'S 29.9 H=head above riser crest(ft) 1.0 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 6.2 Riser Size determined from A(in) 33.7 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)]e'S 29.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 2.5 barrel(ft) (Iterative based on barrel size) K> 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kp for common pipe sizes) a=cross-sectional area of barrel in SF 5.09 Barrel Size(in)= 30.6 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Based on Permanement Pond Routing,the Permanent Outfall Required Barrel Size(in)= 36.0 Structure if sufficient and passes the 100 year event Page 5 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 9.00 ft Riser Width: 9.00 ft Top Riser Elev.: 785.00 ft Bottom Riser Elev.: 778.00 ft Depth of Antiflotation(beyond bottom of riser): 5.00 Overall Height of Riser(including anti-float block): 12.0 ft Outside Area of Riser: 81.0 sf (Water Displaced) Total Volume of Riser: 972.0 cf (Water Displaced) *Bouyancy force 60,653 lbs Water=62.4lb/cf *Weight of Riser 30,600 *Required antifloatation block weight 45,079 factor of safety 1.50 Depth of Antifloatation block: 5 Weight of Anti-flotation block 48,000 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: O10(cfs)= 45.8 Ignore this. As Routed,the 100 Passes Thru the Principal Riser Water Depth Over Spillway(ft)= 0.8 Spillway Length(ft)= 20.0 Spillway Crest Elevation(ft)= 785.0 NOT O.K.1'Separation Required Between Riser and Spillway! Freeboard(ft)= 0.2 NOT O.K.INCREASE FREEBOARD! Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 242,597 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4 Orifice Radius(in) 1.60 Orifice Diamter(in) 3.3 Page 6 of 10 Kimley>>>Horn SEDIMENT TRAP DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Trap A Drainage Area(Site)(ac)= 3.79 Disturbed Area(ac)= 3.79 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 3.66 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 4.72 Flow(Q2)(cfs)= 8.3 (Q=c*i*drainage area) Flow(Ow)(cfs)= 10.7 (Q=c*i*drainage area) Required Storage(cf)= 13,644.0 (3600 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 4,669.0 (435 s.f.per cfs of Quo peak inflow) Storage Dimensions: Basin Side Slopes(X: 1 )= 2.0 Storage Depth"R"(ft)= 4.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 775.00 6,006 0 776.00 7,135 6,571 777.00 8,317 14,297 Spillway Elevation 777.50 8,930 18,608 Top of Basin 779.00 9,558 32,474 Designed Storage Elevation(ft)= 777.50 Designed Storage Volume(cf)= 18,608 O.K.>Minimum Required Storage Designed Surface Area(sf)= 8,930 O.K.>Minimum Required Surface Area Sizing of Emergency Spillway: QspiHway(cfs)= 10.7 (spillway designed to pass peak discharge of 10-year storm) Water Depth Over Spillway(ft)= 0.4 Spillway Length(ft)= 15.0 (4'minimum) Spillway Crest Elevation(ft)= 777.5 (1 ft min.above sediment storage depth) Freeboard(ft)= 1.1 (1 ft minimum) Page 7 of 10 Kimley>>>Horn SEDIMENT TRAP DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Trap B Drainage Area(Site)(ac)= 1.64 Disturbed Area(ac)= 1.48 Runoff Coefficient(C)= 0.60 Time of Concentration= 5.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 5.46 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 7.01 Flow(Q2)(cfs)= 5.4 (Q=c*i*drainage area) Flow(Ow)(cfs)= 6.9 (Q=c*i*drainage area) Required Storage(cf)= 5,328.0 (3600 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 3,000.6 (435 s.f.per cfs of Q,o peak inflow) Storage Dimensions: Basin Side Slopes(X: 1 )= 2.0 Storage Depth"R"(ft)= 4.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation 777.00 1,218 0 778.00 1,910 1,564 779.00 2,731 3,885 Spillway Elevation 779.50 3,166 5,359 Top of Basin 781.00 3,615 10,445 Designed Storage Elevation(ft)= 779.50 Designed Storage Volume(cf)= 5,359 O.K.>Minimum Required Storage Designed Surface Area(sf)= 3,166 O.K.>Minimum Required Surface Area Sizing of Emergency Spillway: QspiHway(cfs)= 6.9 (spillway designed to pass peak discharge of 10-year storm) Water Depth Over Spillway(ft)= 0.3 Spillway Length(ft)= 15.0 (4'minimum) Spillway Crest Elevation(ft)= 779.5 (1 ft min.above sediment storage depth) Freeboard(ft)= 1.2 (1 ft minimum) Page 8 of 10 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 1 -Phase 2 Drainage Area(Site)(ac)= 25.78 Disturbed Area(ac)= 20.78 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.37 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 67.6 (Q=c*i*drainage area) Flow(Q10)(cfs)= 86.6 (Q=c*i*drainage area) Required Storage(cf)= 37,404.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 37,680.0 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 785.00 30,293 0 786.00 32,482 31,388 787.00 34,718 64,988 788.00 37,020 100,857 789.00 39,378 139,056 Riser Elevation 789.75 41,188 169,268 790.00 41,792 179,640 Spillway Elevation 790.50 43,028 200,845 791.00 44,264 222,668 Top of Basin 792.00 46,791 268,196 Designed Storage Elevation(ft)= 790.00 Designed Storage Volume(cf)= 179,640 O.K.>Minimum Required Storage Designed Surface Area(sf). 41,792 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 67.6 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH7'S 67.6 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 20.48 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 78.2 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Orifice Flow:Q=CA(2gH)°'S 67.6 H=head above riser crest(ft) 1.0 (C=oriflce coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 14.0 Riser Size determined from A(in) 50.7 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 67.6 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 8.5 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kn for common pipe sizes) a=cross-sectional area of barrel in SF 6.24 Barrel Size(in)= 33.8 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Required Barrel Size(in)= 36.0 Page 1 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 789.75 ft Bottom Riser Elev.: 785.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 6.8 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 168.8 cf (Water Displaced) *Bouyancy force 10,530 lbs Water=62.4lb/cf *Weight of Riser 9,113 *Required antifloatation block weight 2,126 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 37,404 (Required Storage Volume Provided for Riser Basin) Days to Drain 3 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.70 Orifice Diamter(in) 3.50 Page 2 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 2-Phase 2 Drainage Area(Site)(ac)= 18.06 Disturbed Area(ac)= 18.06 Runoff Coefficient(C)= 0.60 Time of Concentration= 12.50 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.02 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.16 Flow(Q2)(cfs)= 43.6 (Q=c*i*drainage area) Flow(Q10)(cfs)= 55.9 (Q=c*i*drainage area) Required Storage(cf)= 32,508.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 24,322.5 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 5.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 786.00 11,925 0 787.00 14,330 13,128 788.00 16,811 28,698 789.00 19,370 46,789 790.00 22,003 67,475 Riser Elevation 791.00 24,574 90,764 Spillway Elevation 792.25 27,278 123,197 Top of Basin 793.00 30,039 144,662 Designed Storage Elevation(ft)= 791.00 Designed Storage Volume(cf)= 90,764 O.K.>Minimum Required Storage Designed Surface Area(sf)= 24,574 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: ORB(cfs)= 43.6 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.3 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 43.6 (Weir equation) H=head above riser crest(ft) 1.25 (fixed based on design parameters) L=circumference of riser(ft) 9.43 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 36.0 Therefore choose Riser size(in)= 36.0 Barrel Size(in)= 30.0 Orifice Flow:Q=CA(2gH)°'S 43.6 H=head above riser crest(ft) 1.3 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 8.1 Riser Size determined from A(in) 38.5 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+KpL)1°'S 43.6 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 9.8 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kr for common pipe sizes) a=cross-sectional area of barrel in SF 3.76 Barrel Size(in)= 26.3 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 5'x5'box equivalent diameter equal to 67.7" Required Barrel Size(in)= 36.0 Page 3 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 791.00 ft Bottom Riser Elev.: 786.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 7.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 175.0 cf (Water Displaced) *Bouyancy force 10,920 lbs Water=62.4lb/cf *Weight of Riser 9,450 *Required antifloatation block weight 2,205 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 32,508 (Required Storage Volume Provided for Riser Basin) Days to Drain 2 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4.00 Orifice Radius(in) 1.80 Orifice Diamter(in) 3.60 Page 4 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sediment Basin 3-Phase 2 Drainage Area(Site)(ac)= 36.56 Disturbed Area(ac)= 30.00 Runoff Coefficient(C)= 0.60 Time of Concentration= 10.00 Rainfall Intensity(2-yr Storm)"i"(in/hr)= 4.37 Rainfall Intensity(10-yr Storm)"i"(in/hr)= 5.60 Flow(Q2)(cfs)= 95.9 (Q=c*i*drainage area) Flow(Q10)(cfs)= 122.8 (Q=c*i*drainage area) Required Storage(cf)= 54,000.0 (1800 cf per Disturbed Acre) *Required Surface Area(Trapping Efficiency)(sf) 53,436.1 (435 s.f.per cfs of Q10 peak inflow) Storage Dimensions: Basin Side Slopes(X:1)= 3.0 Storage Depth"R"(ft)= 2.0 Cumulative Elev(ft) Area(SF) Volume(CF) Bottom Elevation_ 782.00 116,982 0_ 783.00 121,284 119,133 784.00 125,643 242,597 Riser Elevation 784.25 126,747 274,145 784.75 128,955 338,071 Spillway Elevation 785.00 130,059 370,448 Top of Basin 786.00 134,531 502,743 Designed Storage Elevation(ft)= 784.00 Designed Storage Volume(cf)= 242,597 O.K.>Minimum Required Storage Designed Surface Area(sf)= 125,643 O.K.>Minimum Required Surface Area Sizing of Barrel&Flashboard Riser: QRs(cfs)= 95.9 (from Peak Discharge for 2-yr,24 hr storm) Water Depth over Riser(ft)= 1.0 (Spillway elevation minus Riser Crest elevation) Weir Flow:Q=CLH1'S 95.9 (Weir equation) H=head above riser crest(ft) 1.00 (fixed based on design parameters) L=circumference of riser(ft) 29.05 (C=weir coefficient=3.1 for corrugated metal pipe risers) Riser Size determined from L(in) 111.0 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Orifice Flow:Q=CA(2gH)°'S 95.9 H=head above riser crest(ft) 1.0 (C=orifice coefficient,0.6 for corrugated metal pipe risers) A=cross-sectional area of riser(sf) 19.9 Riser Size determined from A(in) 60.4 Therefore choose Riser size(in)= 48.0 Barrel Size(in)= 36.0 Pipe Flow:Q=a[2gh/(1+Km+K,L)]°'S 95.9 L=barrel length(ft) 100.0 Invert elevation of outlet end of barrel(ft) 781.0 h=head above the centerline of the outlet end of 2.5 barrel(ft) (Iterative based on barrel size) Km 1.0 (coefficient of minor losses,assumed to be 1.0 for most principal spillways) KP 0.0267 (pipe friction coefficient,see Table 8.07c for Kp for common pipe sizes) a=cross-sectional area of barrel in SF 16.33 Barrel Size(in)= 54.7 Therefore choose Barrel size(in)= 36.0 Riser Size(in)= 48.0 <-From Figure 8.07b Required Riser Size(in)= 48.0 Required Barrel Size(in)= 36.0 Page 5 of 8 Kimley>)Horn SEDIMENT BASIN DESIGN CALCULATIONS Project Information Project Information Project Name: Rowan KHA Project#: Designed by: Date: Checked by: Date: Revised by: Date: Sizing of Antiflotation Block: Riser Length: 5.00 ft Riser Width: 5.00 ft Top Riser Elev.: 784.00 ft Bottom Riser Elev.: 782.00 ft Depth of Antiflotation(beyond bottom of riser): 2.00 Overall Height of Riser(including anti-float block): 4.0 ft Outside Area of Riser: 25.0 sf (Water Displaced) Total Volume of Riser: 100.0 cf (Water Displaced) *Bouyancy force 6,240 lbs Water=62.4lb/cf *Weight of Riser 5,400 *Required antifloatation block weight 1,260 factor of safety 1.50 Depth of Antifloatation block: 2 Weight of Anti-flotation block 4,800 OK Is Antiflotation Device Sufficient(yes/no)? Yes *Weight of riser assumes that the wall thickness is 6"and weight of concrete is 150 lb/cf Sizing of Emergency Spillway: Qio(cfs)= 122.8 Water Depth Over Spillway(ft)= 1.6 Spillway Length(ft)= 20.0 Spillway Crest Elevation(ft)= 785.0 O.K.>1'Separation Provided Freeboard(ft)= -0.6 NOT O.K.INCREASE FREEBOARD! Sizing of Faircloth Skimmer:(Calculated per Faircloth Skimmer online calculator) Basin Volume in Cubic Feet 54,000 (Required Storage Volume Provided for Riser Basin) Days to Drain 4 (2 day minimum,Jurisdictionally Specific) Skimmer Size(in) 4 Orifice Radius(in) 1.60 Orifice Diamter(in) 3.3 Page 6 of 8 Kimley>>Horn TEMPORARY DIVERSION ANALYSIS Project Information Project Name: Salisbury Logistics Center KHA Project#: 013335005 Designed by: Revised by: Date: DIVERSION DITCH AND CHECK DAM DATA TABLE Ditch/ Ditch Side Bottom Min.Ditch Max.Ditch Drainage Composite -lc Intensity Peak Flow Max.Depth Min.Depth Max.Calculated Check Dam Phases of Berm Dimensions Slopes Width Gradient Gradient Area C-Value (min) (inlhr) Q,o Manning's of Flow** of Flow** Velocity** Height Construction No. (H:V) (ft.) (ac) (%) (ac) (cfs) "n"" (ft) (ft) (fps) (ft) Required DD1 2'Deep I TRAPEZIODAL 2:1 4.0 1.00% 1.95% 27.20 0.60 30.00 3.42 55.81 0.03 1.57 1.32 6.37 2.00 1,2,FINAL DD2 2'Deep 3:1 4.0 0.75% 0.75% 13.08 0.60 30.00 3.42 26.84 0.03 1.08 1.08 3.45 1.50 1 TRAPEZIODAL DD3 2'Deep 3:1 4.0 0.50% 4.50% 29.75 0.60 30.00 3.42 61.05 0.03 1.78 1.04 8.27 2.00 1 TRAPEZIODAL 2'Deep DD4 3:1 2.0 0.75% 2.25% 2.90 0.60 10.00 5.60 9.74 0.03 0.81 0.62 4.06 1.00 1 TRAPEZIODAL _ _ _ _ _ DD5 2'Deep 3:1 4.0 0.50% 0.50% 3.63 0.60 10.00 5.60 12.20 0.03 0.80 0.80 2.39 1.00 1,2 TRAPEZIODAL DD6 2'Deep 8:1 4.0 0.75% 0.75% 6.23 0.60 10.00 5.60 20.93 0.03 0.78 0.78 2.63 1.00 2 TRAPEZIODAL DD7 2'Deep 8:1 4.0 0.50% 0.88% 9.21 0.60 10.00 5.60 30.95 0.03 1.02 0.90 3.12 1.50 2 TRAPEZIODAL DD8 2'Deep 3:1 4.0 0.50% 0.75% 12.91 0.60 10.00 5.60 43.38 0.03 1.01 0.93 2.78 1.50 2 TRAPEZIODAL DD9 2'Deep 10:1 4.0 0.80% 1.30% 1.09 0.60 10.00 5.60 3.66 0.03 0.32 0.28 1.92 0.50 2 TRAPEZIODAL DD10 2'Deep 10:1 4.0 1.00% 1.00% 4.26 0.60 10.00 5.60 14.31 0.03 0.58 0.58 2.52 1.00 2 TRAPEZIODAL DD11 2'Deep 3:1 2.0 0.75% 2.25% 3.01 0.60 10.00 5.60 10.11 0.03 0.83 0.63 4.10 1.00 1 TRAPEZIODAL DD12 2'Deep 3:1 2.0 1.00% 3.00% 1.50 0.60 10.00 5.60 5.04 0.03 0.55 0.42 3.76 1.00 1 TRAPEZIODAL DD13 2'Deep 3:1 1.0 3.75% 4.50% 0.69 0.60 10.00 5.60 2.32 0.03 0.35 0.33 3.92 0.50 1 TRAPEZIODAL "Manning's"n"roughness coefficient from Manufacturer Specification Sheet. **From Bently Flowmaster channel design software. Ditch/ ECB Max.Calculated Permissible Min.Depth Calculated Permissible Berm Type Velocity** Velocity" of Flow** Shear stress Shear stress" No. (fps) (fps) (ft) 1 (Ibs/ft') (Ibs/fta) DD1 SC150 or 6.37 .. 1.32 1.60 2.00 Greater DD2 DS150 or • 3.45 6.00 1.08 0.51 1.75 Greater _ _ _ DD3 SC150 or - 8.27 8.00 1.04 2.93 2.00 Greater DD4 DS150 or 4.06 6.00 0.62 0.87 1.75 Greater DD5 DS150 or 2.39 6.00 0.80 0.25 1.75 Greater DD6 DS150 or 2.63 6.00 0.78 0.37 1.75 Greater DD7 SC150 or 3.12 6.00 0.90 0.49 1.75 Greater DD8 SC150 or 2.78 6.00 0.93 0.43 1.75 Greater DD9 SC150 or 1.92 6.00 0.28 0.23 1.75 Greater DD10 SC150 or 2.52 6.00 0.58 0.36 1.75 Greater DD11 SC150 or 4.10 6.00 0.63 0.89 1.75 Greater DD12 SC150 or 3.76 6.00 0.42 0.78 1.75 Greater DD13 SC150 or 3.92 6.00 0.33 0.93 1.75 Greater Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a— 1 ��.. .-. „ . . 4 ..m.,.,.,a, 1 o ••, 'd f Project: Salisbury Logistics Center �,o',,.r*^` ii /f1 Calculated By: EM Date: 10/19/2023 • 1 Nil •;a r „... Revised By: Date: '"`,,1 it 'oee Ai o 1',, k e".r. Revised By: Date: _ "( I j� -''` 14116..;:' ID: 2200-FES TN< 0.5 Do: Y Use Fig. 8.06a I i , ,>; STA: N/A TW_ 0.5 Do: J "�. �- gg p r rre 8 o N Use Fig. 8.06b 1 ,,.1 —� �'I �dIa�'t�i{�w ��{:( �M I�R`�4'�Wllio La: 1- _ t- ate.", t111 I11 DIA: 36 in19 ft ,,, IMO Q: 28.35 cfs d50: 0.6 ft =,�•�•.��•�.• .. ..,,,....a. rod. ,>.. ,�a.�.� „,• .. _�_..�,�,.....,... dmax: 0.9 ft 1�1 a,» "° r wrr "a _1 .`, 1, ,I�riJ If�ll�lliflr 1` J 11lE'11144 °O lk Do = 36 in - 1:1 ITC Do 1 00 1 3Do Do+La 3D0 = 9 ftI.'vo Q9 , La - 19ft �,F,44� �i .'. ! !• Iirindif'- ., R •:11111�,'ill1 I •,I Do + La = 22 ft �wp a':Atidr. d� Ja�r``gg�u���l�'�Pi +�ia� n r ,f Orlir —) a ') A WSc1wW(�/Nq'ro ]00 wo laoo Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 294.5 sf Apron thickness*: 1.35 ft Rip Rap: 19.9 tons Rip Rap Class: B Filter Fabric: 33 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a- 1 ...„--f.. . „ . . 4 ..m.,.,L, 1 o••. f Project: Salisbury Logistics Center �,�'"'*'' ii /11 Calculated By: EM Date: 10/19/2023 • a Nil •;a r „j Revised By: Date: w�m�,`. I it 'oee Ai o 1',, k r3 L, Revised By: Date: _ "( :_ -''` 14116..;:' ID: 1700-FES TN< 0.5 Do: Y Use Fig. 8.06a Ii , ig STA: N/A T�„_ 0.5 Do: N Use Fig. 8.06b , ~ ���� p r ae 8 f:i � .. �i�tiiiil�dpti Ii �:i , Es '� DIA: 36 in 20 ft ,,, ,,, ,M; Q: 81.86 cfs d50: 1.1 ft =,�•�•.��•�.• .. dmax: 1.65 ft 1�1 a,» _ - ,. r 'W „o -6 1, I, ,Ariii;'if�l�lli ,C 1` J 11lE' 191,i! °O lk Do = 36 in - MITE Do 1 00 1 3Do Do+La 3D0 = 9 ft 1•.'EV ITVvo Q9 , La - 20ft �,F. �i �'. ! � :� l1 i Do + La = 23 ft �wp a �� Ja�r``gg�u'11�ll'1Pi +4ia� n :1 r ',f �`;/�%�4- r/�.Pen , $ Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 320.0 sf Apron thickness*: 2.475 ft Rip Rap: 39.6 tons Rip Rap Class: 2 Filter Fabric: 36 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION — 1 ...„--f.. . „ . ..m.,.,L: 1 Project: Salisbury Logistics Center wo',,.r"^` ii elf • Calculated By: EM Date: 10/19/2023 •� a 1V a' „jr;; Revised By: Date: w�m�,`. 1 ii li '•;O �� .1 , I r33:, Revised By: Date: _ ( :. -''` ' 41VIT, ID: 1610-FES TN< 0.5 Do: Y Use Fig. 8.06a i �• + .. STA: N/A TW_ 0.5D NJ �"�" �- gg p rre 8 „ N Use Fig. 8.06b f ,t,, —� �'iiiiiI�t�i{�w i t�{s i � �M I�R`�4'�Wllio DIA: 54 in La: E-__ tiuii% J, 1111 111 32 ft ,CY ,OW Q: 91.95 cfs d50: 0.9 ft =,�•�•.��•�.• .. .,„,...a. rod. ,>.. ,�a.�.� „,• .. _�_..�,�,.....,... dmax: 1.35 ft 1�1 a,» ,. r '•Sri „u -6 1, 1, ,�' ri 'iif�ll�lifi O a s� li i` J 11lE' 19r1 i! OQ Do = 54 in �� / A �;a�,: W,b iti . 1,: i writ 7 Do co 3Do Do+La 3D0 = 13.5 ft Io •.' v� 89 , La - 32 ft Do + La = 36.5 ft f °i � � �h� 1 �� , I F^ . : 1 ii:h'firm a 1. PAlf:',' Elk; l �``gg �' _n ' �� ' ' ' :`���/ a3a, 4 g� La ' �y ,� ,q . -l S „ A W(�]/NC:'OD 200 KO 1000 aKw Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 800.0 sf Apron thickness*: 2.025 ft Rip Rap: 81.0 tons Rip Rap Class: 1 Filter Fabric: 89 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Kimley >>> Horn DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION 7:-....L,'---------1Liu Project: Salisbury Logistics Center wo'''"'*'' '' 'ii Calculated By: EM Date: 10/19/2023 ,,,,„'"r 1 ] H IV .5,1.'ir'l A ,'• ' Revised By: Date: - • .l..:.,' Revised By: Date: .01 ; i; !!.,.1 I._ 74i.. _.1.r..,••:,:p.7,4„, ,__ • ''''!IL , : -''` - 4 ' ' . 'r'74e111Y% .. Use Fig. 8.06a ID: 1660-FES TN< 0.5 D.: Y , •:0,400*, ..__ _Lij _ i:1 : Ai dfrof ,,, .. , i STA: N/A -1,, 0.5 Do: N Use Fig. 8.06b DIA: 30 in La: 18 ft Es itiiiiiiii , 011111111111. SOO IMO 330.225000(930•91 Q: 11.46 cfs d50: 0.5 ft dmax: 0.75 ft .. 1 ,-----------.1 "° i ', yfil I i POO ‘ ,e,. "a- -1:, .11; 1, Oririfitifi 0 °O li Do = 30 in llar'.41,144 1:11i'L hio,Pliti 1'WY i rarrviw Do col 3D. Do+La 3D0 = 7.5 ft A. - j., . ...: ..I CCO 89:) La — 18 ft Do + La = 20.5 ft ormiwri, ' i Ape illif,111 i Iro /. 11 it ' rrkluil .''1 ' ' A .i.rphlirP! illi:i .(1,! . Efirm7r41,drA,Ari"itirtirjwirli 01.4p:','. g f : .44:- A _,,,ArAtift4.A jr,-,,14 4-- La ....64:•-:? ArrApriar47.04''4, I ' : , .1 _,. - ,,- , Wiliiii .2;or.-icrove,-6200.211i. _ -- , MIMI _ 3 5 3) 29 SO 103 203 SOO 009 0019/31109.013000 Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 252.0 sf Apron thickness*: 1.125 ft Rip Rap: 14.2 tons Rip Rap Class: B Filter Fabric: 28 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a� ,1 �f.. .-. „ . ..m.,.,L, 1 is ,.y 0,•. f Project: Salisbury Logistics Center ,,,,,,.r�^` gi /f� Calculated By: EM Date: 10/19/2023 • ' IN MN •;at „jr:, Revised By: Date: w,m",`,. 1 N !R .1 , earF. Revised By: Date: ( j� -,,- ' ¢11.51.;;' ID: 5000-FES T,„< 0.5 Do: Y Use Fig. 8.06a ii , i STA: N/A TW_ 0.5 D : NJ l" �- gg p .r rre 8 o N Use Fig. 8.06b I �',.� � �'In�dIa�'t�i{�w ��{:( �' �M I�R`�4'�Wllio DIA: 54 in La: 1-__ tiuii% J, IIl1i mi 40 ft 0 m50 ma 200 ,m ,OW Q: 209.66 cfs d50: 1.25 ft =,�•�•.��•�.• .. dmax: 1.875 ft 1�1 iiiviji,',FgritYlti O00 li Do = 54 in a,� I 7:: 1` J iIlEI 1 rirIIi! Do ©0 3Do Do+La 3Do = 13.5 ft Sr I1.. e. r��l y�J 'ittO wirr 1,, 1 iris i� i I' ' � °° � Il,il, . II r a vo 89 , La = 40 ft ,F�^ i .i t: mar Amur]] I ,,I 8 Do + La = 44.5 ft �wp a' S�� �JaEi Ajar �r,,gR,11�l�,'1Pi .,ia� n r �,_ 4 La 0 .� .,e I '�'7�`��j'�"�t?,��.r.o,qsi i.i. I �Z�AB� r/�.Pen ' $ Quantity Calculations *Minimum apron thickness of 10"to be used Outlet Pad: 1160.0 sf Apron thickness*: 2.8125 ft Rip Rap: 163.1 tons Rip Rap Class: 2 ,sm•,°'� ,,,•oo.,� Filter Fabric: 129 sy .,�...•.. .�.a�,.�....�., .om.�.�a..�.�o�.�.�.m��._ „r.>o••.,,.,, Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« °.m.,..,1 ��.. .-. „ . L, 1 is ..1 °,•. f Project: Salisbury Logistics Center a,,,°wr^` gi /-"id: Calculated By: EM Date: 10/19/2023 •. i1 111 ,a . „jr, Revised By: SMC Date: 12/12/2023 w°,m'm'`,. I II Aqu i ra3 Revised By: Date: __ �( �j� , 'I l ,.y- ��' .�¢�r�ke..;' ID: 1000-FES T,„< 0.5 Do: Y Use Fig. 8.06a I i , i STA: N/A T�„_ 0.5 D N J o" �- gg p .s- .u- rro 8 o N Use Fig. 8.06b � �,,.1 -.-� ��'I�n�'dIa�t�i{�w'� � ��{:( , i DIA: 42 in La: E- tiuii% J, IIlli Mi. 26 ft ° tW ,m ,ma Q: 58.05 cfs d50: 0.7 ft =°,�•�•.��•�.• ..° .,,........ rod. ,>.. ,�a.�.� „.. .. _�_..�,�,...°.,... dmax: 1.05 ft 1�1 il „° _1 .`, .1, ,IIriJ Ir�ll�lI lc 1` J �I�E' 19r11! 00 Do = 42 in �,, / A �;a�,: W,b I? Do 00 3Do Do+0.4La 3D0 = 10.5 ft �o I1.' e. r�i F ij � °° � Il,il, . II r a vo 89 , La = 26 ft .0,. i .i is 1/ � iIhlia!IPiIF I In Do + 0.4L b Arai ig!'lli!lk.ii y l!: , O a 13.9 ft .p rdWAJZIP,R111.1,, +pia n r �,_ � La ..,: '�y�`�1��9/a' �?,3�a��,q��' �iA`;/�%�AB� r/�.Pen ' $ tivt — s" .- „ m " 'w ,m mo I ,mo Quantity Calculations a" `�,.. Outlet Pad: 317.2 sf Apron thickness: 1.575 ft Rip Rap: 25.0 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 36 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« ,1 ��.. .-. „ . °.m.,..L, 1 is ..1 ` °,.. f Project: Salisbury Logistics Center a d,°wr^` gi /fd: Calculated By: EM Date: 10/19/2023 • a 111 •;a � „jr, Revised By: Date: w.--" ,. I ii z't A .1 , efF. Revised By: Date: ( j� -,,- ' r¢�1.51.;;' ID: 3100-FES T, < 0.5 Do: Y Use Fig. 8.06a Ii , i STA: N/A T�„_ 0.5 D N J o" �- gg p .r .. rre 8 o N Use Fig. 8.06b � �,,.1 -.-� ��'I�n�'dIa�t�i{�w'� � ��{:( , i DIA: 54 in La: E- tiuii% J, IIlli Mi. 29 ft ° m 200 ,m ,OW Q: 72.01 cfs d50: 0.9 ft =°,�•�•.��•�.• ..° dmax: 1.35 ft 1�1 a„« r a.,.,.,«lWl i 4aU1 I p� „° _� .`, .1, fiE Ir�ll�lI lc 1` J 11�E' 19r11! 00 Do = 54 in �,•� / A �;a�,: W,b I? Do 00 3Do Do+0.4La 3Do = 13.5 ft �o I1' e. r��l F Ot � °° � Il,il, . II r a vo 89 , La = 29 ft .0,. i .i is � � iIhii:1!IPiIF ii : In Do + 0.4L b Arai ig!'lli!lk. y l!: , O a 16.1 ft .p iiiEVr.;if) rigittlAR111,1, +�iai n r �,_ � Lan .,: '�y�`�1��9/a' �?,3�a��,q��' � P%�d8� r/�.Pen ' $ Quantity Calculations a" `�,—) Outlet Pad: 429.2 sf Apron thickness: 2.025 ft Rip Rap: 43.5 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 48 sy Salsibury Logistics Center PROJECT NO.: 13335005 BY: EM Ki m I ey >>> H o r n DATE: 10/19/23 T.M: REVISED: P.M.: RIP RAP OUTLET RIP RAP OUTLET PROTECTION a.« ,1 ��.. .-. „ . °.m.,..L, 1 is ..1 ` °,.. f Project: Salisbury Logistics Center a d,°wr^` gi /fd: Calculated By: EM Date: 10/19/2023 • a 111 •;a � „jr, Revised By: Date: w.--" ,. I ii z't A .1 , efF. Revised By: Date: ( j� -,,- ' r¢�1.51.;;' ID: 3000-FES T,„< 0.5 Do: N Use Fig. 8.06a Ii , i STA: N/A T�„_ 0.5 D N J o" �- gg p .r .. rre 8 o Y Use Fig. 8.06b � �,,.1 -.-� ��'I�n�'dIa�t�i{�w'� � ��{:( , i DIA: 54 in La: E- tiuii% J, IIlli Mi. 29 ft ° m 200 ,m ,OW Q: 89.51 cfs d50: 0.9 ft =°,�•�•.��•�.• ..° dmax: 1.35 ft 1�1 a„« r a.,.,.,«lWl i 4aU1 I p� „° _� .`, .1, fiE Ir�ll�lI lc 1` J 11�E' 19r11! 00 Do = 54 in �,•� / A �;a�,: W,b I? Do 00 3Do Do+0.4La 3Do = 13.5 ft �o I1' e. r��l F Ot � °° � Il,il, . II r a vo 89 , La = 29 ft .0,. i .i is � � iIhii:1!IPiIF ii : In Do + 0.4L b Arai ig!'lli!lk. y l!: , O a 16.1 ft .p iiiEVr.;if) rigittlAR111,1, +�iai n r �,_ � Lan .,: '�y�`�1��9/a' �?,3�a��,q��' � P%�d8� r/�.Pen ' $ Quantity Calculations a" `�,—) Outlet Pad: 429.2 sf Apron thickness: 2.025 ft Rip Rap: 43.5 tons Rip Rap Class: 1 vBSTeY°°°°°•°°°°° Filter Fabric: 48 sy i , I•,• .I i i;t ,!. Outlet w = Do + La 1 It pipe 90 i. . I::' ; 1 ii i II ,I diameter (Do) i ' :i� - ' 4 II I ,,,,,:,,,if�II Da 80 • I 1 Si i '},1._. '' J'll i 1wa ter < 0.5Do ! .i ; i :I : {I..':.'..'.:y '=�illr )'- i 11 i'I I I . (. .+I. il. It!.I 1 , 1j+) Ipt� 2 I^ �' i I :1 It '!1''/ •I • f1 fil,/u11.1 i . + • O i, I . . , 1 �•d i Ir,11d11 / ' I Pi�4 i! it 1 1 a1. 1'11t.iPil['- I I . . fluII ■ - I 4� IIP' 1 , 1 Ip ■ •; ;AO, AI 1 rii�ii�ti iii i[. �c\' L i I_ 1 i' ' .1'J , ( fI 1, s. .t• � i oli�Ai diiiiiIll� it ilii I1 I 40 - _ } ` + .- Ir� )I• tr Iw■ulu .IIIIIIIIII!!! <0 Illll1. 'I+ Lw:il� ld � Belli HIl1i111111 gig illI I,,I 30 , i s 1•_ ' Opazgl=11111011111 �1/Ai■ A III1111111 I ,i�rr '!'. .I r" I ...~. .F ...-• _ - :- 1.j .wrJL*, - ' . li t i'`I l;r !'IlI I• ► Zo la l' nrlli , dl 1�.' , .. ... 2 .... s oil .. : ■ 1Plpso III Inn : F irr gc• , 3 .. � S r .. ;. j'4 i, {lilt I10 .- ,ilu r "1 i ' 1 MIM Mrl{il ' i'j��^i • ;,•" .n _ . , . I I _ - Ili. i �f.��: II!�ilf /i,'Iliit..�- , 0 —..- fl , 'I - ... .t. :.t ' I :1 tt. 1.t-. iri . b /�[ , - '1!' 4) 'I l• .itlO. 2 Milli I I I E I I ' 'IIII ■■■■ ■■._ i I ilit llln I111I1 :It �� , b.1111 i Illi •' i ii;E•• ii�pi ___ III iIIIIIIIII iil Iil ' ! II 1a S Mill __1 �iuE,'°"" I i• �7, i I.,,II ���!i� ; il't llil'�Iprlldll r�lll�i i�ililllll . iiiiiiimprii IIIII 11militti, I n+ �. �. i+ '',I V = yr 10' ,�� r..l i� 1' p l t l 1 1 Illlllgll '�' 1�.+! II1'' . ili f �=�;a�!l��i�!�It�ilil i���I�II'i;i,��il� I 'IiIINIlilii{ I � l !lI��II itill v =2 -.altlt ri&i I :!!!mi 1er/ 4 4a A ri�lli�it{i���Ii�Iiii'hall 1 sill �i iI ills1 i + ,- l� � p+ /" r Ii t vim „ is i .i l. y. . 1...i.q !'d�M11 rlr 'w,i g(l'S � mill <!� i I{II s�li�nliMill1.1 �� NI 3 5 10 20 50 100 200 500 1000 Discharge (ft3/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T.<0.5 diameter). 3D0 Outlet W = Do + 0.4La 120 - -• diameter ! La - t •1• , 1 :,�' 110 e t Tai l wat r >_0.500 ,.- ,� } ' : ;: ' r, i. ii 1' 100 :1. ' 1 . . 1 ! ( ( C , ....:I I,. l ►apl l t, ., It ..r.1 i, •I i:1 111 I - 1 II -, :`,.::, , .,, ., fl..,.., • ' � �: it a 0,1 �� 80 1; N „ rl ■II I ' 1 i i ,QQ I AI11 q l , ' " I I tla,ilIi :.: :};' :•;a I a 1 . i .L i 1 • lin V ,. r I' : ry.'i:11 1 �i Airauramiu,'IMOINIIIr111..l �` ..r. 'hi. 7 ~•�n•4 .I . ill 4•.....� ,I,I f�1�1, iWiiji,gtii'• FI■ .,,.., �1All1 3 40 � ...._. , • .1 . .- it III I 1 1 lip 30 •1�11111 I 111: b, ' ' f• ' .-r, . ' I l 1 ; 'I . 1 'jig ' 1, I'II��le( .. 11.,L ...r��•.0 ilpri r. .. • �I..��� 4i�ti�IlI9!I 11 • •t ,,I�I��!�f/II��iE�a �� 2 20 Ino 1 .11111�I'. •la I� 1111�I� I �.I N'1 n{III 1 I,.,ti , V O� - / 1 I I I�(►i.al Oltl y t1A I r'I I Ill e i - t N .. ;�I�Iilliil •I 'al. ,III lii�� I . . , �' pA{I; %1il! , 1 ri •- 10 • _ D!L...lii�ll, =� I, ar "...`• . �� 1 a'� ..Ile, i{i! I I� Ii • , Ii1 . .l ;1'�1 � � aA�l1 n � Mf! p , rt"t;° i li 4 }! l1�I II'� v _. i 5vM a , • ° _ •• • �i••ri Al . "1 }1 '( 1'111II ' Il s , 2 15 �� �,. �' �'•�' �i(Rili '. 3 5 10 20 50 100 200 500 1000 Discharge(ft3/sec) Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full,maximum tailwater condition(T.2 0.5 diameter). APPENDIX F: SUPPLEMENTAL INFORMATION r ierracon 2701 Westport Road Charlotte, NC 28208 P (704) 509-1777 NC License No. F-0869 Terracon.com November 17, 2023 RP Salisbury Partners, LLC c/o Rooker 445 Bishop St NW Atlanta, Georgia 30318 Attn: Cason Bufe P: (470) 235-3530 E: CasonBufe@RookerCo.com Re: Supplemental Geotechnical Consulting Services - Seasonal High Water Table Honbarger Tract Lane Parkway Salisbury, North Carolina Terracon Project No. 71225131 Dear Mr. Bufe: Terracon Consultants, Inc. (Terracon) has completed a seasonal high water table (SHWT) exploration for the above-referenced project. This study was performed in general accordance with Terracon Supplement to Agreement for Services dated November 7, 2023. This letter presents the findings of the Seasonal High Water Table (SHWT) Evaluation performed by others. Please refer to our Geotechnical Engineering Report (Revision 1) - Honbarger Tract, Terracon Project No. 71225131, dated January 27, 2023, for additional geotechnical information for design and construction. Our subconsultant, Willcox & Mabe Soil Solutions, evaluated the soil samples in the borings for the evidence of seasonal high water table (SHWT). Based on the evaluation, the soil samples in the observed borings indicated the following SHWT results: Seasonal High Water Apparent Water Depth Boring Boring Table (SHWT) Table (AWT) Terminated Location Elevation (inches)' Elevation (inches)1 (inches)' B-37 172 >240 240 B-39 55 >120 120 SHWT-1 >144 >144 144 SHWT-2 >120 >120 120 1. The "Stormwater Control Measure (SCM) Soil Testing, Seasonal High Water Table (SHWT) Evaluation" report is attached to this letter. Facilities i Environmental I Geotechnical i Materials Supplemental Geotechnical Consulting Services - Seasonal High Water Table ..wri��wwM Honbarger Tract I Salisbury, North Carolina ICI I QVV� November 17, 2023 I Terracon Project No. 71225131 We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this letter, or if we may be of further service, please contact us. Sincerely, Terracon Christopher R. Briggs, P.E. Janette M. Prosser, P.E. Geotechnical Department Manager Senior Engineer Facilities i Environmental I Geotechnical Supplemental Geotechnical Consulting Services - Seasonal High Water Table Aft rrwwwM Honbarger Tract I Salisbury, North Carolina ICI I QbVI November 17, 2023 I Terracon Project No. 71225131 Attachments Contents: Willcox & Mabe Soil Solutions "Seasonal High Water Table (SHWT) Evaluation - Energy United Statesville Site" dated 11/16/2023 (9 pages) Facilities I Environmental I Geotechnical I Materials willcox&mabe SOIL SOLUTIONS November 16, 2023 Terracon Consultants, Inc. 2701 Westport Road Charlotte,North Carolina 28208 Attention: Ms. Janette M. Prosser, P.E. Transmitted by e-mail:janette.prosser@terracon.com Reference: Stormwater Control Measure(SCM) Soil Testing Seasonal High Water Table(SHWT)Evaluation Proposed SCMs Honbarger Tract II—Rowan County,N.C. Willcox&Mabe Soil Solutions, PLLC Project No. 21-04; Phase: 66 Dear Ms. Prosser: Willcox&Mabe Soil Solutions, PLLC (WMSS)has conducted Stormwater Control Measures (SCM) Soil Testing in accordance with Terracon Consultants, Inc. (Terracon) Subcontract Master Services Agreement dated March 23, 2021, and WMSS Subcontract Work Authorization No. 20-22 dated August 15, 2022 and WMSS Subcontract Work Authorization No. 33-23 dated November 7, 2023. The SCM Soil Testing was performed to provide information for technical assistance with the design of proposed SCMs. A soil scientist investigation was conducted to evaluate the soil properties at four(4)proposed SCM locations, to determine suitability for stormwater management systems. The soil scientist investigation was conducted to evaluate: seasonal high water table (SHWT) elevations below existing ground surface (bgs). A "Site Plan"was provided to WMSS by Terracon that identified relative site features and potential location for the proposed SCMs. PROJECT BACKGROUND The areas evaluated were located within the areas associated with the planned SCMs. The SCMs are planned in conjunction with proposed site improvements associated with the Honbarger tract in Rowan County,North Carolina(N.C.). The proposed SCM locations (Boring location SHWT-1)was located in an existing crop field, and(Boring locations SHWT-2, B-37 and B-39)were located in former pastures. The site is located east of Interstate 85 and south of Lane Parkway in Salisbury,N.C. (Figure 1). Use of on-site stormwater management systems, is being considered to comply with stormwater management requirements. The use of stormwater SCMs is subject to the suitability of site soils and regulatory approval. Regulatory guidance on requirements for Willcox&Mabe Soil Solutions,PLLC/7231 B Summerfield Road/Summerfield,NC 27358/Rob 336.339.9128 or Martin 336.312.1396/www.willcoxmabesoil.com SHWT Evaluation WMSS Project No. 21-04; Phase: 66 Honbarger Tract II November 16, 2023 permitting of stormwater SCMs is provided in the North Carolina Department of Environmental Quality(NCDEQ), Division of Energy, Mineral and Land Resources (DEMLR)— Stormwater Design Manual (NCDEQ-DEMLR-SDM), (Revised, 2017). The NCDEQ-DEMLR-SDM requires that the SHWT shall be taken into consideration for the design of most SCMs. A WMSS soil scientist conducted an evaluation of the soils through the review of hand auger borings (SHWT-1 and SHWT-2), and drill rig borings (B-37 and B-39)within the areas identified on a base map provided by Terracon, and were located in the field by Terracon. Maps were prepared using Arcview 10.8 a Geographic Information System (GIS). Base maps were generated using information from the ESRI Web site and maps provided by Terracon (Figures 1 and 2). FINDINGS Seasonal High Water Table Evaluation The SHWT evaluation was performed on August 23, 2022 by evaluating 2 drill rig borings (B-37 and B-39), and on November 14, 2023 by evaluating 2 hand auger borings (SHWT-1 and SHWT-2)to depths ranging from approximately 120 to 240 inches bgs (Figure 2). The soils were evaluated by a NC Licensed Soil Scientist for evidence of seasonal high water table influence. This evaluation involved observing the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate processes that are driven by SHWT fluctuations such as iron reduction and oxidation and organic matter staining. B-37 was observed to consist of brown sandy clay loam in the upper soil horizon,to dark yellowish brown sandy clay loam and yellowish brown clay in the subsurface horizons. B-37 transitioned into yellowish brown clay with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and multicolored sandy loam and silt loam. Evidence of a SHWT was identified at approximately 172 inches bgs, and no apparent water table (AWT)was observed prior to the boring being terminated at 240 inches bgs. B-39 was observed to consist of dark brown sandy clay loam in the upper soil horizon, to yellowish brown sandy clay loam and multicolored clay in the subsurface horizons. B-39 transitioned into multicolored silt loam and silty clay loam with massive structure at approximately 20 inches bgs, followed by multicolored silty clay loam and silt loam. Evidence of a SHWT was identified at approximately 55 inches bgs, and no AWT was observed prior to the boring being terminated at 120 inches bgs. SHWT-1 was observed to consist of dark yellowish brown sandy clay loam in the upper soil horizon, to yellowish brown clay in the subsurface horizons. SHWT-1 transitioned into multicolored clay loam and sandy loam with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and sandy loam parent material / saprolite. No evidence of a SHWT was identified, and no AWT was observed prior to the boring being terminated at 144 inches bgs. 2 SHWT Evaluation WMSS Project No. 21-04; Phase: 66 Honbarger Tract II November 16, 2023 SHWT-2 was observed to consist of dark yellowish brown sandy clay loam in the upper soil horizon, to yellowish brown clay in the subsurface horizon. SHWT-2 transitioned into yellowish brown clay with massive structure at approximately 13 inches bgs, followed by multicolored clay loam and loam with massive structure at approximately 28 inches bgs, followed by multicolored clay loam and sandy loam parent material/ saprolite. No evidence of a SHWT was identified, and no AWT was observed prior to the boring being terminated at 120 inches bgs. Reference attached Figure 2 for the approximate SHWT test locations, and Table 1 and the attached soil profile descriptions for the approximated SHWT depths. Please note that SHWT evaluations are based on secondary evidence and not on direct groundwater level measurements. Groundwater levels fluctuate for numerous reasons and these findings do not indicate that groundwater levels have not or will not rise above the noted depths. Table 1: Approximated SHWT and AWT Depths Seasonal High Apparent Water Boring Water Table Table Depth Boring Location (SHWT) (AWT) Terminated (inches bgs) (inches bgs) (inches bgs) B-37 172 [ >240 240 B-39 55 >120 120 SHWT-1 >144 >144 144 SHWT-2 >120 >120 120 CONCLUSIONS Based upon our findings associated with the locations evaluated, a SHWT was identified at boring location B-37 at approximately 172 inches bgs, and at boring location B-39 at approximately 55 inches bgs. These findings should be taken into careful consideration when designing appropriate SCMs for the proposed locations. If the proposed SCM locations change from the locations evaluated, further evaluation may be necessary. 3 SHWT Evaluation WMSS Project No.21-04; Phase: 66 Honbarger Tract II November 16,2023 CLOSING Willcox & Mabe Soil Solutions appreciates the opportunity to provide these services to you. If you have any questions,please contact us. Sincerely, Wilcox & Mabe Soil Solutions, PLLC �9 5O11 SC 2S A W I L/ /F • 4" A, C. cSrATE `CO re, tVr- colli rite Nf O 1098 ,O NORTH GP v Martin Mabe Rob Willcox, L.S.S. Partner/ Agronomist Partner/ Soil Scientist Tables: Approximated SHWT and AWT Depths Attachments: Figure 1 —Vicinity Map Figure 2—Boring Location Map Boring Profile Sheets Shared\WMSS Projects\2021\21-04 Terracon Consultants\Phase 66-Honbarger Tract II SHWT\21-04 Honbarger Tract II Stormwater SCM Soil Report.doc 4 • IN �, , r . /s 0•0 0 0 0 0 : 185 / ...,/////. usso1 '''''') .---i-,- • �a d ``av 507 ai 71ff- ;is:v; P46'41 409d------ '� 185 v`� U56ot 1 /,, 185 I IS Dukemortt Street E T. it To- • l,1_��1' f ...�_--- tr Arrowhead Circle N -e Circle 2 p 0 cos I Hey Road min d o_ -a- 0 REFERENCE: m GIS DATA LAYERS WERE OBTAINED FROM ESRI,INC. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL PURPOSES ONLY. IT IS NOT MEANT FOR DESIGN,LEGAL,ORANY OTHER USES. THERE ARE NO o GUARANTEES ABOUT ITS ACCURACY. WMSS,PLLC ASSUMES NO RESPONSIBILITY FOR ANY DECISION N MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. ©OpenStreetMap(and)contributors,CC-BY-SA o N SCALE: 1 „= 1 000, FIGURE NO. ti • DATE: 11-14-23 VICINITY MAP DRAWN BY: MEM \Mllcox&mabe I `m PROJECT NO: SOIL SOLUTIONS HONBARGER TRACT II ` 21-04 Ph:66 ROWAN COUNTY, NORTH CAROLINA Nit• • 11 - try .1a �.� A� T x,� \ - "" „�,' . , ��% .: , ,\ ,. 'I V � � ,� VV • • V1 ,, ' '- `, ' ?-§. L.y .ten • •�! 1, ..F. 4/ 1 1 It: fir\ I' , _ �• �� r'a., -., • �11 �Ll *,11 C ���y-,�� r ., 4 +., ..,,' �JLrLIUJ ll 2 . J y' f' J r, y a\I� �.rid y i '.. �' r ;.- -- - • , ��. , 1 s� r. i Y r F . it � ' It. age' '` ?" ;�' '1,,.1"r+._, -te c.: ,;14'0'l'f/:/., ;I,',.. - t,, ' ' "; ' iii tti!1 z Ps Alt f f 1 i� 0. . •-°`'.1-o ' „ b 4,T• ;- ...4.4„,, ‘ ,,, Itpk ; :," e'. ' yr./ lip. 0: .. ,, ^ig .` ' ' Nili, I / illi-- co ok!--11— ' .,, - , 4 ''',;s ..,•„ ;,i:Vp41.717 b7;1 41, It v 6 :.;........ ' -a. - it . . 2 r•-»* '.7 ' .-'i-. '4•jv ,4•Filit f.. l' 2 '�� �' °' 0cn 9 Approximate Boring Location to a c REFERENCE: m - GIS DATA LAYERS WERE OBTAINED FROM ESRI,INC. PLEASE NOTE THIS MAP IS FOR INFORMATIONAL ''? • PURPOSES ONLY. IT IS NOT MEANT FOR DESIGN,LEGAL,ORANY OTHER USES. THERE ARE NO o • GUARANTEES ABOUT ITS ACCURACY WMSS,PLLC ASSUMES NO RESPONSIBILITY FOR ANY DECISION N F MADE OR ANY ACTIONS TAKEN BY THE USER BASED UPON THIS INFORMATION. N l ri a,— SCALE: 1 .._ 500' FIGURE NO. ti DATE: 11-14-23IICO BORING LOCATION MAP 2 DRAWN BY: MEM PROJECT NO: SOIL SOLUTIONS HONBARGER TRACT II 21-04 Ph:66 ROWAN COUNTY, NORTH CAROLINA WILLCOX & MABE SOIL SOLUTIONS, PLLC i/ of -- SITE/SOIL EVALUATION Project No. 2 f-04' ptIA5E: Z4 Phone No. Date: gf 23127- Location 1Lloti Bei2L,ER 7 fPin County: l,JA l , Property Size Proposed Facility: ,jTpf(Mw,' r 5'iip Water Supply: On-Site Well ❑ Evaluation: Auger Boring El Community ❑ Pit ❑ Described By: c r3 /'1/1LLCo'C Public ❑ Cut ❑ Weather: ` ur� ,ji 4pj d' Antecedent Moisture / ,i �7 Surface Water: r. /)f-/ L[ De/LL FACTORS PROFILE PROFIL PROFILE PROFILE ,t3- 3C t3- 3 (can +) S- 3q 8- 3`/coo4% Landscape Position% 2 ,_ 2% L - Z-3'7o LEGEND Horizon Depth I b- a Q - 5 LANDSCAPE POSITION Color Munsell /6 ye 3/4- JO /K. 4.13 R Ridge Interfluve Texture ,g.C. I /SC I S Shoulder Structure w sib K Aisb/€. L Linear Slope Consistence 55 ;p 4-( 55 s -Pi FS Foot Slope 1 I N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II e-_ 4s_ /20 t S - it 1 46)_ 50 T Terrace Color-Munsell /0 Y,e $J(p al K 4-! /D�j/Z 414 j't U l-I-( P Flood Plain Texture e (r 13 I t c l TEXTURE Mottles - s sand Structure Vihatk /fiCjs/for 1 Sb(�/INQbX lyr'gss/v' Is loamy sand Consistence 5 f SS Sb P? S$ Sr .4\r SS S r -P Sl sandy loam I loam si silt sil silt loam Boundary sicl silty clay loam Horizon Depth III /2- 2g te 2? SD - 240 cl clay loam Color-Munsell .6 L// S/(o /6 e sl(p ink I4 1 sel sandy clay loam Texture /C i G c 7 she's to 51150 sc sandy clay Mottles M-,5c ) Inc, — — I sic silty clay Structure rylcr!.s;de 19/SJ //rtlabt neor5,,/ c clay Consistence S p v P l $ p 4 55- S P4611 cf CONSISTENCE WET 1 Ns non-sticky /72"- reabstompl4e Ss slightly sticky -4a re S/ S sticky Boundary Horizon Depth IV 2 We F(tt5 5 Vs very sticky $— 4S 2g 46 Np non-plastic Color-Munsell /n u (1- /awe sly Sp slightly plastic Texture C C I C P plastic Mottles PI' /.$ g (o/Q c- �PP, WC Vp very plastic Structure ma >S1 ive 7ni SS i ke MOIST Consistence 5 r ./.; s p -P vfr Very friable i fr friable fi firm y vfi Very firm Boundary STRUCTURE Soil Wetness } i 2i O I j r7 Z i r sg single grain Restrictive Horizon m massive Saprolite I g.,,- S) tie 28"- massive cr crumb LTAR gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic WILLCOX & MABE SOIL SOLUTIONS, PLLC SITE/SOIL EVALUATION 2 of Project No. 2/-04 pi4 c ,.2¢Phone No. Date: PI 23) 22 Location ] //e,grem, jeiatr Pin County: /(.duJ,q N Property Size Proposed �« �� ty: S7ortnwA.,t,' r l vI W Facili ater Supply: On-Site Well ❑ Evaluation: Auger Boring Community ❑ Pit ❑ Described By: 7a13 l/1f1LL[D v" Public ❑ Cut ❑ Weather: Sa >t ; 14,/qtett Antecedent Moisture i i'/4 Surface Water: FACTORS PROFI E PROFILE 29 PROFILE PROFILE Landscape Position% 7_I 2% l - 3- 4,0 LEGEND Horizon Depth I ,) 6) D _ S LANDSCAPE POSITION Color Munsell w u S 14 10 1, 313 R Ridge Interfluve Texture ] ( 5C1 S Shoulder Structure w b4 wsbe L Linear Slope Consistence 3'5' p c- $S S? " FS Foot Slope N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II _ I Z. S- 1 S 30- C0 5 T Terrace Color-Munsell Or (S14 /t viz s)4- n 1 f P Flood Plain Texture SG( s; I TEXTURE • Mottles c' S'' ' WIC •r- 30e ,RC 55n_ rcdpx s sand Structure Nab- inarc,Je NJ b,t dla5 s I lie Is loamy sand Consistence $S p-: SS SP „1`,' SS s D .P, sl sandy loam 1 p l loam si silt sil silt loam Boundary sicl silty clay loam Horizon Depth III I Z— ,'(- /5 2O 6,5 - 12 O el clay loam Color-Munsell Mu i--, /Y)A 14-il ma l r< , scl sandy clay loam Texture C C s 1/ sc sandy clay Mottles ri-ID 6,13 41- /Orig. Sr?'> m. /o y,P ( r 2 sic silty clay Structure MG? Si J/�L Y✓ab /!yl SS1✓2 /hASS I ✓G c clay Consistence 5 • -1--r S p 41: SS 5 p f i' CONSISTENCE WET M- 5 4/40 ,4- so? litC Ns non-sticky I Ss slightly sticky S sticky Boundary Vs very sticky Horizon Depth IV z4 alb 2p D Np non-plastic Color-Munsell M j}- r /4 k/ i Sp slightly plastic Texture 4.1 ; 1 Si / /! S;G( P plastic Mottles _ Vp very plastic Structure ,1 . 5111a- /YIAS$1tie MOIST Consistence SS.$ ' P+ .S 1 IC; vfr Very friable /J51I- E'LIDX' 2 ChfaMA - fr friable 112"- Bh/aNl4 011 ockgAm)C fi firm , Y vfi Very firm Boundary STRUCTURE Soil Wetness 514) - I0S tl Si-Ivi r_ SS" sg single grain Restrictive Horizon m massive Saprolite _12°- lass"/de ' cr crumb LTAR 20' Nl�tsS,Jel p✓� gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic WILLCOX & MABE SOIL SOLUTIONS, PLLC SITE/SOIL EVALUATION ���( - of Project No. 2/- i'PHRSE', 64Phone No. Date: a / 14(23 Location liONl�4ee ew *re4GT Pin County: Kptoc)/J Property Size Proposed Facility: SITpP,y'vimrfitv 1 ,D Water Supply: On-Site Well ❑ Evaluation: Auger Boring Community ❑ Pit ❑ Described By: ,8 Prazetlgr' e94/N Miler Public ❑ Cut III Weather: SMAIAIy' W4 'frt Antecedent Moisture De Surface Water: C2e/' FLo�/E S -/e,6 FACTORS PROFILE PROFILE PROFILE PROFILE ji-i'W7 -- I 51f -l6;onr-) sn i- -Z Landscape Position% L , ( _ 2 ®,,, • T— 3-4 476 LEGEND Horizon Depth I 0 -10 O _ 5 LANDSCAPE POSITION Color Munsell /4 Vie 3/4 /Q LI,Q ,414 R Ridge Interfluve Texture SC( < a/ S Shoulder Structure tils,be Sys h Z L Linear Slope Consistence SS S12 $s Sp 7C— FS Foot Slope N Nose Slope H Head Slope Cc Concave Slope Boundary Cv Convex Slope Horizon Depth II /6- 20 /44 5— (3 T Terrace Color-Munsell /Q�Q S!(o M it/ t. /, /D 2- S/f P Flood Plain Texture C // / / S ' C TEXTURE Mottles %e- bye 5)4 — -/)_/Q y, G•f¢ s sand Structure /�jQ+/ij,[' ll245st,re `(/Gbid/4,9 4/ve Is loamy sand Consistence SS- S-p A SS SP P. r -i sl sandy loam F 1/e- res/t raQ , I loam 11- Clay Mettles si silt uy dep)1.2,2 sil silt loam Boundary / sicl silty clay loam Horizon Depth III 26_ 22 13_ 4' cl clay loam Color-Munsell /4 sly /b u e s/e, scl sandy clay loam Texture 7 C C sc sandy clay Mottles -A/t 4.13 {'/R- /Q 4, sic silty clay Structure u/q /l] SS!V : MA se re c clay Consistence .S S S S F+ S p {�,� CONSISTENCE WET 2 thr6tii — '!e— e,/$_fv Lav Ns non-sticky /;fheelt✓oM'C H6- /d y/d £ /2 Ss slightly sticky 1,Mochie0,,c S sticky Boundary Vs very sticky Horizon Depth IV 2$ - 45 /f _ /261, Np non-plastic Color-Munsell /) a/IL,' Mill 4-/ Sp slightly plastic Texture C / C C( I P plastic Mottles ✓n-/A et c/2 l r�1 )_ �j ,fir` ly Vp very plastic Structure in*.SS1 Le MR SS"/ye* MOIST Consistence 5S sp Ss 5r vfr Very friable Z eh /rlj/yb _ fr friable //{ i cimorrIlG fi firm vfi Very firm Boundary STRUCTURE Soil Wetness sfi 7 /44 " s/+ y leo it sg single grain Restrictive Horizon m massive Saprolite all✓WY/lve /3 if ,5.4t cr crumb LTAR gr granular Classification sbk subangular blocky abk angular blocky pl platy pr prismatic 9/6/23, 10:17 AM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 SALISBURY Station ID:31-7615 ""T°"°44. Location name: Salisbury, North Carolina,USA* '''''''`'* 1 It " Latitude:35.6836°, Longitude:-80.4811° - non 1 Elevation: �°�� Elevation(station metadata):700 ft** '1e„w,,,,,, *source:ESRI Maps **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 0.384 0.455 0.530 0.583 0.642 0.681 0.716 I 0.745 0.777 0.798 (0.354-0.417) (0.420-0.495) (0.488-0.576) (0.536-0.632) (0.587-0.696) (0.620-0.738) (0.647-0.776)1(0.670-0.810) (0.691-0.847) (0.703-0.872) 10-min 0.614 0.727 0.849 0.933 1.02 1.08 1.14 1.18 1.23 1.26 (0.566-0.665) (0.671-0.791) (0.782-0.923) (0.856-1.01) (0.935-1.11) (0.987-1.18) (1.03-1.23) _(1.06-1.28) (1.09-1.34) (1.11-1.37) 15-min 0.767 0.914 1.07 1.18 1.30 1.37 1.44 1.49 1.55 1.58 (0.707-0.832) (0.844-0.994) (0.989-1.17) (1.08-1.28) (1.18-1.40) (1.25-1.49) (1.30-1.56) (1.34-1.62) (1.38-1.69) (1.39-1.72) 30-min 1.05 1.26 1.53 1.71 1.92 2.07 2.20 2.32 2.46 2.55 (0.970-1.14) (1.16-1.37) (1.41-1.66) i (1.57-1.85) (1.76-2.08) (1.88-2.24) (1.99-2.39) (2.09-2.52) (2.19-2.68) (2.25-2.79) 60-min 1.31 1.58 1.96 2.23 2.56 2.80 3.04 3.26 3.53 3.73 (1.21-1.42) (1.46-1.72) (1.80-2.13)_ (2.04-2.41) (2.34-2.77) (2.55-3.04) (2.74-3.29) (2.93-3.54) (3.14-3.85) (3.28-4.07) 2-hr 1.51 1.83 2.28 2.61 3.04 3.36 3.67 3.98 4.37 4.66 (1.39-1.64) (1.68-1.99) (2.09-2.48)_ (2.39-2.84) (2.77-3.30) (3.04-3.65) (3.30-4.00) (3.55-4.34) (3.85-4.78) (4.06-5.10) 3-hr 1.61 1.94 2.43 2.79 3.28 3.65 4.01 4.38 4.86 5.22 (1.48-1.75) (1.79-2.12) (2.23-2.65) (2.56-3.04) (2.98-3.56) (3.30-3.96) (3.60-4.35) (3.89-4.76) (4.26-5.30) (4.53-5.71) 6-hr 1.95 2.34 2.93 3.38 3.98 4.45 4.93 5.40 6.04 6.53 (1.79-2.12) (2.16-2.56) (2.69-3.20) (3.10-3.68) (3.62-4.32) (4.02-4.83) (4.42-5.34) (4.79-5.86) (5.28-6.57) (5.63-7.11) 12-hr 2.29 2.76 3.46 4.01 4.76 5.35 5.96 6.59 7.44 8.09 (2.11-2.50) (2.54-3.02) (3.18-3.77) (3.68-4.37) (4.32-5.16) (4.83-5.79) (5.33-6.44) (5.82-7.11) (6.46-8.02) (6.93-8.74) 24-hr 2.73 3.30 4.14 4.80 5.70 6.41 7.13 7.88 8.89 9.68 (2.56-2.93) I(3.09-3.54) (3.88-4.44) (4.48-5.14) (5.30-6.10) (5• .96-6.86) (6.61-7.64 (7.28-8.44) (8.18-9.54) (8.88-10.4) 2-day 3.17 3.82 4.75 5.48 6.47 7.24 8.04 8.84 9.94 10.8 (2.97-3.38) (3.58-4.07) (4.45-5.07) (5.12-5.84) (6.03-6.89) (6.74-7.72) (7.46-8.56) (8.18-9.44) (9.16-10.6) (9.91-11.5) 3-day 3.37 4.05 5.02 5.78 6.81 7.62 8.45 9.30 10.4 11.3 (3.17-3.59) (3.81-4.32) (4.71-5.35) (5.41-6.15) (6.36-7.25) (7.10-8.12) (7.85-9.00) (8.61-9.91) (9.64-11.2) (10.4-12.1) 4-day 3.58 4.29 5.29 6.08 7.15 8.00 8.86 9.75 11.0 11.9 (3.37-3.80) (4.04-4.57) (4.97-5.63)_ (5.70-6.46) (6.68-7.60) (7.46-8.51) (8.24-9.44) (9.04-10.4) (10.1-11.7) (10.9-12.7) 7-day 4.13 4.93 6.00 6.84 7.99 8.91 9.84 10.8 12.1 13.1 (3.91-4.39) (4.66-5.24) (5.66-6.36)_ (6.45-7.26) (7.51-8.48) (8.35-9.44) (9.19-10.4) (10.1-11.5) (11.2-12.9) (12.1-14.0) 10-day 4.71 5.60 6.73 7.61 8.79 9.71 10.6 11.6 12.8 13.8 (4.47-4.98) I (5.32-5.91) (6.38-7.10) (7.21-8.02) (8.30-9.27) (9.16-10.2) (10.0-11.2) I (10 9-12.2) (12.0-13.6) (12.9-14.7) 20-day 6.34 7.48 8.83 9.89 11.3 12.4 13.6 14.7 16.3 17.4 (6.04-6.64) (7.13-7.84) (8.40-9.25)_ (9.40-10.4) (10.7-11.9) (11.8-13.1) (12.8-14.3) (13.8-15.5) (15.2-17.1) (16.3-18.4) 30-day 7.84 9.22 10.7 11.9 13.4 14.5 15.7 16.8 18.3 19.4 (7.50-8.20) (8.82-9.63) (10.2-11.2) (11.3-12.4) (12.7-13.9) (13.8-15.2) (14.8-16.4) (15.9-17.6) (17.2-19.2) (18.3-20.4) 45-day 9.86 11.5 13.2 14.4 16.1 17.3 18.5 19.6 21.2 22.3 (9.48-10.3) (11.1-12.0) (12.7-13.7) (13.8-15.0) (15.4-16.7) (16.5-18.0) (17.6-19.3) (18.7-20.5) (20.1-22.1) (21.1-23.3) 60-day 11.7 13.7 15.4 16.8 18.5 19.8 21.1 22.3 23.8 25.0 (11.3-12.2) (13.2-14.2) (14.9-16.0) (16.2-17.4) (17.8-19.2) (19.0-20.6) (20.2-21.9) (21.3-23.2) (22.7-24.8) (23.8-26.1) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 1/4 9/6/23, 10:17 AM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.6836`, Longitude: -80.4811` 25 - Average recurrence interval (years) c 20 . 1 -C 2 ate, 15 - — 5 v — 10 o — 25 A'rigio0 — 50 1010 - •a — 100 Va �� — 200 5 -- 500 -= f� — 1000 0 I 1 1 I I 1 I I 1 1 I 1 I I C_ C _C C_ .>. >,C - ' " - - >. > >, >. >. >.>. E E E E E N Rti 6 N v v 10-0 -0 -0 -0 v -0-0 LA O ,N O O.) Duration IN N A V ^ O O O 'Cr O 25 - ^. 20 - c Duration s 15 - —.Mil —...1 — 5�nrn — 2-day C — 10-non — 3-day 011 z., 0 15-min — 4-day a10 �� — 30-mon — 7-day 1= — 60-mm — 10-day al EL ' — 2-hr — 20-day 5 —�� — — 3fir — 30-day ------� — 6-hr — 45-day 0_ _f — — 12-hr — 60-day ' ' ' ' ' 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Sep 6 14:14:24 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 2/4 9/6/23, 10:17 AM Precipitation Frequency Data Server Franklin' o i • spo / 5t Salisbury' r-•„ , ( �, — 3km 2miEft ail . R l Large scale terrain • i t• Bristol • 0 City. 0 f•,:` Winston-Salem • • Durham Greensboro • ;• lit Mitchell I Raleic ri •Asheville NORTHICAROLINA •Charlotte Fayetteville ).ji 100km l 1i ' ii I H i- ARCI I N . ..., J Large scale map ipott BO ;Johnson City ti instonS lem p Greensboro D -J I �� Asheville North Carolina arl offs —� + ill Gr le 100km , J 60mi .7, Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 3/4 9/6/23, 10:17 AM Precipitation Frequency Data Server igsRort_•-Bristol—; _ • ) - -- Johnson City • Winston-Salem • • Greensboro Durham • Rateic Asheville • North Carolina Charlotte • I evil • Greenville • 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?st=nc&sta=31-7615&data=depth&units=english&series=pds#table 4/4 9/13/23,3:06 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 °`' .°\. Location name: Salisbury, North Carolina,USA* �'''"``P g A Latitude:35.6672°, Longitude:-80.4696° - none 1. . p Elevation: 782 ft** 1 i? �o�•E �,a`' *source:ESRI Maps "�s„� J s **source:USGS """`' POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90%confidence intervals (in inches/hour)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 5-min 4.62 5.46 6.37 7.01 7.72 8.18 8.59 8.94 9.32 9.56 (4.26-5.02) (5.04-5.94) (5.87-6.92) (6.43-7.60) (7.04-8.35) (7.44-8.87) (7.78-9.32) (8.04-9.72) _(8.29-10.2) (8.44-10.4) 10-min 3.68 4.37 5.11 5.60 6.14 6.52 6.83 7.09 7.37 7.53 (3.40-4.00) I (4.03-4.75) (4.70-5.54) (5.14-6.07) (5.62-6.65) (5.93-7.06) (6.17-7.40) (6.38-7.70) (6.56-8.03) (6.64-8.22) 15-min 3.07 .•• 1 '.7 5. • 5.51 5.7. 5.96 6.19 6.30 (2.83-3.34) (3.38-3.98) (3.96-4.68) (4.34-5.12) , 4.74-5.62) 55.00-5.96) (5.20-6.24) (5.36-6.48) (5.50-6.74) (5.56-6.88) 30-min 2.11 2.53 3.06 3.42 3.85 4.14 4.41 4.64 4.92 5.10 (1.94-2.29) (2.33-2.75) (2.82-3.32) (3.14-3.71) (3.51-4.17) (3.77-4.49) (3.98-4.78) (4.17-5.04) (4.38-5.36) (4.50-5.57) 60-min 1.31 1.59 1.96 2.23 2.56 2.80 3.04 3.26 3.53 3.72 (1.21-1.42) (1.46-1.73) (1.80-2.13)_ (2.05-2.42) (2.34-2.77) (2.55-3.04) (2.74-3.29) (2.93-3.54) (3.14-3.84) (3.28-4.06) 2-hr 0.757 0.916 1.14 1.31 1.52 1.68 1.84 1.99 2.18 2.33 (0.696-0.824) (0.842-0.999) (1.05-1.24)_ (1.20-1.42) (1.38-1.65) (1.52-1.82) (1.65-2.00) (1.77-2.17) (1.92-2.39) (2.03-2.55) 3-hr 0.536 0.648 0.809 0.931 1.09 1.22 1.34 1.46 1.62 1.74 (0.493-0.585) (0.597-0.707) (0.744-0.883) (0.852-1.01) (0.992-1.18) (1.10-1.32) (1.20-1.45) (1.30-1.58) (1.42-1.76) (1.51-1.90) 6-hr 0.325 0.392 0.489 0.565 0.665 0.744 0.823 0.903 1.01 1.09 (0.299-0.355) (0.361-0.428) (0.450-0.535) (0.517-0.615) (0.605-0.723) (0.673-0.807) (0.738-0.893) (0.801-0.979) (0.883-1.10) (0.942-1.19) 12-hr 0.190 0.229 0.287 0.333 0.395 0.445 0.496 0.548 0.619 0.673 (0.175-0.207) (0.211-0.251) (0.264-0.313) (0.305-0.363) (0.359-0.429) (0.401-0.481) (0.443-0.535) (0.484-0.591) (0.537-0.667) (0.576-0.727) 24-hr 0.114 0.137 0.172 0.200 0.237 0.267 0.297 0.328 0.371 0.404 (0.106-0.122) (0.129-0.147) (0.161-0.185) (0.187-0.214) (0.221-0.254) (0.248-0.286) (0.275-0.318) (0.303-0.352) (0.341-0.398) (0.370-0.433) 2-day 0.066 0.079 0.099 0.114 0.134 0.151 0.167 0.184 0.207 0.225 (0.061-0.070) (0.074-0.085) (0.092-0.105) (0.106-0.121) (0.125-0.14J(0.140-0.161) (0.155-0.178) (0.170-0.197) (0.191-0.221) (0.206-0.240) 3-day 0.046 0.056 0.069 0.080 0.094 0.106 0.117 0.129 0.145 0.157 (0.044-0.050) (0.053-0.060) (0.065-0.074) (0.075-0.085) (0.088-0.100) (0.098-0.113) (0.109-0.125) (0.119-0.137) (0.134-0.155) (0.145-0.168) 4-day 0.037 0.044 0.055 0.063 0.074 0.083 0.092 I 0.101 0.114 I 0.124 (0.035-0.039) (0.042-0.047) (0.051-0.058) (0.059-0.067) (0.069-0.079) (0.077-0.088) (0.086-0.098) (0.094-0.108) (0.105-0.122)i (0.114-0.132) 7-day 0.024 0.029 0.035 0.040 0.047 0.053 0.058 I 0.064 0.072 0.078 (0.023-0.026) (0.027-0.031) (0.033-0.037) (0.038-0.043) (0.044-0.050) (0.049-0.056) (0.054-0.062) (0.059-0.068) (0.066-0.076) (0.072-0.083) 10-day 0.019 0.023 0.028 0.031 0.036 0.040 0.044 0.048 0.053 0.057 (0.018-0.020) (0.022-0.024) (0.026-0.029) (0.030-0.033) (0.034-0.038) (0.038-0.042) (0.041-0.046) (0.045-0.051) (0.050-0.056) (0.053-0.061) 20-day 0.013 0.015 0.018 0.020 0.023 0.025 0.028 I 0.030 0.033 I 0.036 (0.012-0.013) (0.014-0.016),(0.017-0.019) (0.019-0.021) (0.022-0.024) (0.024-0.027) (0.026-0.029),(0.028-0.032) (0.031-0.035)1(0.033-0.038) 30-day 0.010 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.025 0.027 (0.010-0.011) (0.012-0.013) (0.014-0.015) (0.015-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.022) (0.022-0.024) (0.023-0.026) (0.025-0.028) 45-day 0.009 0.010 0.012 0.013 0.014 0.016 0.017 I 0.018 0.019 0.020 (0.008-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.014-0.015) (0.015-0.016) (0.016-0.017) (0.017-0.019) (0.018-0.020) (0.019-0.021) 60-day 0.008 0.009 0.010 0.011 0.012 0.013 0.014 0.015 0.016 0.017 (0.007-0.008) (0.009-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.014) (0.014-0.015)i(0.014-0.016) (0.015-0.017) (0.016-0.018)1 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lot=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 1/4 9/13/23,3:06 PM Precipitation Frequency Data Server PDS-based intensity-duration-frequency (IDF) curves Latitude: 35.6672°, Longitude: -80.4696° 101 - Average recurrence ,__ inter\al (years l TZ r 1 I 10 „_-:::::_. 5 — 10 10-1 _ \` a \\ — 200 a �,- — 500 — 1000 10-2 i i i 1 1 1 1 1 1 •_C C C C_ C 6- 6- 6- 6- 1- T TT >. A A T TT E E E E E A r6 kb N 4 v v v v 7 -o v v v .-1 NO ,,-1 m Duration N N O N m cr 1.0 101 - I — iimmill111111111111111111111111111111111 10° - — Duration Y. IIIMIIIII. 1.1 == — 5-min — 2-day __ — 10i1M — 3-day— 15aNn — 4-dayc10-1 - — 30nNn — 7-day — 60 nNr — 1 da ya — 2-hr — 20-day ar a` momomeim — 3-hr — 30-day — 6-hr — 45-day 10-2 — 12-hr — 60-day — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NOAA Atlas 14,Volume 2,Version 3 Created(GMT):Wed Sep 13 19:05:33 2023 Back to Top Maps & aerials Small scale terrain https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 2/4 9/13/23,3:06 PM Precipitation Frequency Data Server c' 1 `S . Spencer East Spencer Ltd i cs• s Salisbu ROWANC0, ^ ✓off, +AIRPORT r T nd.910S. • 3km \1 2mi rimer, � Large scale terrain f- • ' .. t• Bristol � 1 • 0 Ci� Winston-Salem • • Durham Greensboro • c, Nit Michell I ` Raleic •Asheville NORTHICAROLINA •Charlotte Fayetteville• + 100km l lJ Li son C: ARO1 TNA Large scale map IPA B ist l Johnson City inston8 gem Greensboroam • _ Ralep Ash North Carolina arlotte III .p Greenvale a 100km 60mi Large scale aerial https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lit=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 3/4 9/13/23,3:06 PM Precipitation Frequency Data Server Iss2ort_.-tan st of Johnson City Winston Salem • Greensboro Durham Raleie • Asheville • North Carolina Charlotte f evil Greenville • • 100km 60mi \ Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?:HDSC.Questions@noaa.aov Disclaimer https://hdsc.nws.noaa.gov/pfds/pfds_printpage.html?lat=35.6672&Ion=-80.4696&data=intensity&units=english&series=pds 4/4 USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for \ RCS States Department of Agriculture and other Rowan County, Federal agencies, State Natural agencies including the Resources Agricultural Experiment North Carolina Conservation Stations, and local Service participants IP ( / if:' . / ', e,) ` 1 / V/ • �� Dukemont St '• - / / it -1' I •t" r , `• / , r` R°ft, r'' f�a, m s. F. 0 n u • .. If 0 t 0 ■■■■■■■■■■1.000 ft J _ ii November 30, 2023 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs)or your NRCS State Soil Scientist(http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface 2 How Soil Surveys Are Made 5 Soil Map 8 Soil Map 9 Legend 10 Map Unit Legend 11 Map Unit Descriptions 11 Rowan County, North Carolina 14 CeB2—Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded 14 CeC2—Cecil sandy clay loam, 8 to 15 percent slopes, moderately eroded 15 ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded 16 EnB—Enon fine sandy loam, 2 to 8 percent slopes 18 EnC—Enon fine sandy loam, 8 to 15 percent slopes 19 EuB—Enon-Urban land complex, 2 to 10 percent slopes 20 IrB—Iredell loam, 1 to 8 percent slopes 21 LdB2—Lloyd clay loam, 2 to 8 percent slopes, moderately eroded 22 MbB—Mecklenburg loam, 2 to 8 percent slopes 23 SeB—Sedgefield fine sandy loam, 1 to 6 percent slopes 24 Soil Information for All Uses 26 Soil Properties and Qualities 26 Soil Qualities and Features 26 Hydrologic Soil Group 26 References 31 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil 5 Custom Soil Resource Report scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and 6 Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately. 7 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 8 Custom Soil Resource Report M Soil Map pNo $M $M W W 542900 543000 543100 543200 543300 543400 543500 543600 543700 543800 35°36'28"N .• `-— 35°36'28"N . ,,,_ ;700.1 Qc R ceill MbB �� ,, lit , 'MbB //.r.. EnC ; EnB LdB2 l s ChA �il `'' 7.._, 7 11111111111111111111111; EnB 114 P y MbB - —i M M g <4 rR yip ya,Foiy g� r IrB '. `. t ,,R 7/ r- a�-ar s t f p r ItieH r ,� r G 'awn Gtilap rnniiar Nioi ba e IM vs,1-±,h1,2 0,.a0o° 35°35'46"N •, 35°35'46"N 542900 543000 543100 543200 543300 543400 543500 543600 543700 543800 3 3 Map Scale:1:6,250 if printed on A portrait(8.5"x 11")sheet. a " Meters m N 0 50 100 200 300 $ Feet 0 ?00 600 m 1200 1800 Map projection:Web Mercator Coer coordinates:WG584 Edge tcs:UTM Zone 17N WGS84 9 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 14 Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:24,000. Q Stony Spot Soilsit Very Stony Spot Soil Map Unit Polygons Warning:Soil Map may not be valid at this scale. Wet Spot ,..,. Soil Map Unit Lines Enlargement of maps beyond the scale of mapping can cause p Other misunderstandingof the detail of mapping and accuracyof soil p Soil Map Unit Points pp 9 .• Special Line Features line placement.The maps do not show the small areas of Special Point Features contrasting soils that could have been shown at a more detailed Blowout Water Features scale. Streams and Canals kg Borrow Pit Transportation Please rely on the bar scale on each map sheet for map * clay Spot 1.44 Rails measurements. 0 Closed Depression o,/ Interstate Highways Gravel Pit Source of Map: Natural Resources Conservation Service .r US Routes Web Soil Survey URL: Gravelly Spot Major Roads Coordinate System: Web Mercator(EPSG:3857) ® Landfill Local Roads Maps from the Web Soil Survey are based on the Web Mercator • Lava Flow Background projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the 46 Marsh or swamp Aerial Photography Albers equal-area conic projection,should be used if more It Mine or Quarry accurate calculations of distance or area are required. 4 Miscellaneous Water This product is generated from the USDA-NRCS certified data as O Perennial Water of the version date(s)listed below. v Rock Outcrop Soil Survey Area: Rowan County,North Carolina + Saline Spot Survey Area Data: Version 21,Sep 13,2023 Sandy Spot Soil map units are labeled(as space allows)for map scales Severely Eroded Spot 1:50,000 or larger. • Sinkhole Date(s)aerial images were photographed: Mar 13,2022—May 31 Slide or Slip 9,2022 oa Sodic Spot The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 10 Custom Soil Resource Report Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 to 8 1.6 1.4% percent slopes,moderately eroded CeC2 Cecil sandy clay loam,8 to 15 2.0 1.8% percent slopes,moderately eroded ChA Chewacla loam,0 to 2 percent 3.4 3.0% slopes,frequently flooded EnB Enon fine sandy loam,2 to 8 57.1 51.0% percent slopes EnC Enon fine sandy loam,8 to 15 2.9 2.6% percent slopes EuB Enon-Urban land complex,2 to 3.3 2.9% 10 percent slopes IrB Iredell loam, 1 to 8 percent 3.4 3.1% slopes LdB2 Lloyd clay loam,2 to 8 percent 12.1 10.8% slopes,moderately eroded MbB Mecklenburg loam,2 to 8 6.6 5.9% percent slopes SeB Sedgefield fine sandy loam, 1 to 19.6 17.5% 6 percent slopes Totals for Area of Interest 112.0 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a 11 Custom Soil Resource Report particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. 12 Custom Soil Resource Report Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 13 Custom Soil Resource Report Rowan County, North Carolina CeB2—Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9w5 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Cecil, moderately eroded, and similar soils: 88 percent Minor components: 12 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cecil, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 6 inches: sandy clay loam Bt- 6 to 40 inches: clay BC-40 to 48 inches: clay loam C-48 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No Minor Components Madison, moderately eroded Percent of map unit: 8 percent 14 Custom Soil Resource Report Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No Vance, moderately eroded Percent of map unit:4 percent Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Hydric soil rating: No CeC2—Cecil sandy clay loam, 8 to 15 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9w6 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Cecil, moderately eroded, and similar soils: 92 percent Minor components: 8 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Cecil, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from granite and gneiss and/or schist Typical profile Ap- 0 to 6 inches: sandy clay loam Bt- 6 to 40 inches: clay BC-40 to 55 inches: clay loam C- 55 to 80 inches: sandy loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches 15 Custom Soil Resource Report Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No Minor Components Madison, moderately eroded Percent of map unit: 5 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No Wedowee Percent of map unit: 3 percent Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Hydric soil rating: No ChA—Chewacla loam, 0 to 2 percent slopes, frequently flooded Map Unit Setting National map unit symbol: 2vy6r Elevation: 330 to 660 feet Mean annual precipitation: 39 to 47 inches Mean annual air temperature: 55 to 63 degrees F Frost-free period: 200 to 250 days Farmland classification: Prime farmland if drained and either protected from flooding or not frequently flooded during the growing season Map Unit Composition Chewacla, frequently flooded, and similar soils: 90 percent Minor components: 10 percent 16 Custom Soil Resource Report Estimates are based on observations, descriptions, and transects of the mapunit. Description of Chewacla, Frequently Flooded Setting Landform: Flood plains Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Linear Parent material: Loamy alluvium derived from igneous and metamorphic rock Typical profile Ap- 0 to 6 inches: loam Bw- 6 to 52 inches: sandy clay loam Cg- 52 to 80 inches: stratified sandy loam Properties and qualities Slope: 0 to 2 percent Depth to restrictive feature: More than 80 inches Drainage class: Somewhat poorly drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.20 to 2.00 in/hr) Depth to water table:About 6 to 24 inches Frequency of flooding: Frequent Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 7.6 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4w Hydrologic Soil Group: B/D Ecological site: F136XY610GA- Flood plain forest, wet Hydric soil rating: No Minor Components Wehadkee,frequently flooded Percent of map unit: 5 percent Landform: Flood plains Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: Yes Riverview, frequently flooded Percent of map unit: 5 percent Landform: Flood plains Landform position (two-dimensional):Toeslope Landform position (three-dimensional):Tread, talf Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: No 17 Custom Soil Resource Report EnB—Enon fine sandy loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3vn 1 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Enon and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Enon Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: fine sandy loam BA - 7 to 10 inches: sandy clay loam Bt- 10 to 27 inches: clay BC-27 to 33 inches: clay loam C-33 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No 18 Custom Soil Resource Report EnC—Enon fine sandy loam, 8 to 15 percent slopes Map Unit Setting National map unit symbol: 3vn2 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Enon and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Enon Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: fine sandy loam BA - 7 to 10 inches: sandy clay loam Bt- 10 to 27 inches: clay BC-27 to 33 inches: clay loam C-33 to 80 inches: loam Properties and qualities Slope: 8 to 15 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No 19 Custom Soil Resource Report EuB—Enon-Urban land complex, 2 to 10 percent slopes Map Unit Setting National map unit symbol: 3vn5 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Not prime farmland Map Unit Composition Enon and similar soils: 50 percent Urban land: 30 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Enon Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: fine sandy loam BA - 7 to 10 inches: sandy clay loam Bt- 10 to 27 inches: clay BC-27 to 33 inches: clay loam C-33 to 80 inches: loam Properties and qualities Slope: 2 to 10 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No 20 Custom Soil Resource Report Description of Urban Land Setting Landform: Hillslopes on ridges Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Linear Across-slope shape: Convex Parent material: Impervious layers over human transported material Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 8 Hydric soil rating: No IrB—Iredell loam, 1 to 8 percent slopes Map Unit Setting National map unit symbol: 3vnb Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: Farmland of statewide importance Map Unit Composition Iredell and similar soils: 85 percent Minor components: 3 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Iredell Setting Landform: I nterfl uves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Linear Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 6 inches: loam Bt- 6 to 25 inches: clay BC-25 to 28 inches: clay loam C-28 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches 21 Custom Soil Resource Report Drainage class: Moderately well drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:About 12 to 24 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 10.8 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C/D Ecological site: F136XY710NC - Basic upland woodland, expansive clay, seasonally wet and dry Hydric soil rating: No Minor Components Armenia, undrained Percent of map unit: 3 percent Landform: Drainageways on interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: Yes LdB2—Lloyd clay loam, 2 to 8 percent slopes, moderately eroded Map Unit Setting National map unit symbol: 2m9wt Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Lloyd, moderately eroded, and similar soils: 90 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lloyd, Moderately Eroded Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex 22 Custom Soil Resource Report Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 7 inches: clay loam Bt1 - 7 to 58 inches: clay Bt2-58 to 73 inches: clay loam C- 73 to 80 inches: loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Low Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: Moderate (about 8.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B Ecological site: F136XY820GA-Acidic upland forest, moist Hydric soil rating: No MbB—Mecklenburg loam, 2 to 8 percent slopes Map Unit Setting National map unit symbol: 3vnf Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Mecklenburg and similar soils: 85 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Mecklenburg Setting Landform: Interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Convex Across-slope shape: Convex Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss 23 Custom Soil Resource Report Typical profile Ap- 0 to 8 inches: loam Bt- 8 to 25 inches: clay BC-25 to 36 inches: clay loam C-36 to 80 inches: sandy clay loam Properties and qualities Slope: 2 to 8 percent Depth to restrictive feature: More than 80 inches Drainage class:Well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 9.3 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C Ecological site: F136XY720NC - Basic upland forest, moist Hydric soil rating: No SeB—Sedgefield fine sandy loam, 1 to 6 percent slopes Map Unit Setting National map unit symbol: 3vp8 Elevation: 200 to 1,400 feet Mean annual precipitation: 37 to 60 inches Mean annual air temperature: 59 to 66 degrees F Frost-free period: 200 to 240 days Farmland classification: All areas are prime farmland Map Unit Composition Sedgefield and similar soils: 85 percent Minor components: 3 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Sedgefield Setting Landform: Ridges Landform position (two-dimensional): Summit, footslope Down-slope shape: Concave Across-slope shape: Concave Parent material: Saprolite derived from diorite and/or gabbro and/or diabase and/or gneiss Typical profile Ap- 0 to 3 inches: fine sandy loam 24 Custom Soil Resource Report E-3 to 8 inches: fine sandy loam Bt- 8 to 40 inches: clay C-40 to 80 inches: loam Properties and qualities Slope: 1 to 6 percent Depth to restrictive feature: More than 80 inches Drainage class: Moderately well drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table:About 12 to 18 inches Frequency of flooding: None Frequency of ponding: None Available water supply, 0 to 60 inches: High (about 9.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: C/D Ecological site: F136XY710NC - Basic upland woodland, expansive clay, seasonally wet and dry Hydric soil rating: No Minor Components Armenia, undrained Percent of map unit: 3 percent Landform: Drainageways on interfluves Landform position (two-dimensional): Summit Landform position (three-dimensional): Interfluve Down-slope shape: Linear Across-slope shape: Linear Hydric soil rating: Yes 25 Soil Information for All Uses Soil Properties and Qualities The Soil Properties and Qualities section includes various soil properties and qualities displayed as thematic maps with a summary table for the soil map units in the selected area of interest. A single value or rating for each map unit is generated by aggregating the interpretive ratings of individual map unit components. This aggregation process is defined for each property or quality. Soil Qualities and Features Soil qualities are behavior and performance attributes that are not directly measured, but are inferred from observations of dynamic conditions and from soil properties. Example soil qualities include natural drainage, and frost action. Soil features are attributes that are not directly part of the soil. Example soil features include slope and depth to restrictive layer. These features can greatly impact the use and management of the soil. Hydrologic Soil Group Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. 26 Custom Soil Resource Report Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. 27 Custom Soil Resource Report ,, Map—Hydrologic Soil Group p $ •No M M W O 542900 513000 543100 543200 543300 543400 543500 543600 543700 543800 35°36'28"N , -��� ''. 35°36'28"N _/ir ,,,Vkcp/ ' ,c,:rdr."H, , .:‘.1. .,.,\,)6,.: u_.t. .77: • J`��wJc¢ I3 MbB r, MbB , 1 0.- . gfig\ _ . : ILarriN s1 a lE—nC ChA `'' a al 1. -.., ',1.416, 0.,4,2 ,i'',13.iet P =rl MbB M NA- IrB !jilt if a N �J) r ' � 11,, :CeC-2 ( 4f• f .1 I` ti ,,ql • P IN qt r ` . 47 ,‘ s 4 �000 Glop oaf Eiot�b@ da0od ai}aGio� ,ga0�o � 7 35°35'46"N 35°35'46"N 542900 543000 543100 543200 543300 543400 543500 543600 543700 543800 3 3 r. N Map Scale:1:6,250 if printed on A portrait(8.5"x 11")sheet. b Meters $ N 0 50 100 200 300 $ Feet A 0 300 600 m 1200 1800 Map projection:Web Mercator Coercooniinates:WGS84 Edge tics:UTM Zone 17N WGS84 28 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) 0 C The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) CID 1:24,000. Soils D Soil Rating Polygons Warning:Soil Map may not be valid at this scale. A 0 Not rated or not available Enlargement of maps beyond the scale of mapping can cause I Water Features A/D misunderstanding of the detail of mapping and accuracy of soil 1 Streams and Canals line placement.The maps do not show the small areas of I I B Transportation contrasting soils that could have been shown at a more detailed I B/D scale. 1-FF Rails I C ^,/ Interstate Highways C/D Please rely on the bar scale on each map sheet for map ti US Routes measurements. D Major Roads Not rated or not available Source of Map: Natural Resources Conservation Service Local Roads Web Soil Survey URL: Soil Rating Lines Background Coordinate System: Web Mercator(EPSG:3857) • Ael Aerial Photography Maps from the Web Soil Survey are based on the Web Mercator . • A/D projection,which preserves direction and shape but distorts • B distance and area.A projection that preserves area,such as the Albers equal-area conic projection,should be used if more ....we B/D accurate calculations of distance or area are required. ✓ w c This product is generated from the USDA-NRCS certified data as • r C/D of the version date(s)listed below. . r D Soil Survey Area: Rowan County,North Carolina . • Not rated or not available Survey Area Data: Version 21,Sep 13,2023 Soil Rating Points A Soil map units are labeled(as space allows)for map scales 1:50,000 or larger. ▪ A/D ▪ B Date(s)aerial images were photographed: Mar 13,2022—May 9,2022 ▪ B/D The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. 29 Custom Soil Resource Report Table—Hydrologic Soil Group Map unit symbol I Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 B 1.6 1.4% to 8 percent slopes, moderately eroded CeC2 Cecil sandy clay loam,8 B 2.0 1.8% to 15 percent slopes, moderately eroded ChA Chewacla loam,0 to 2 B/D 3.4 3.0% percent slopes, frequently flooded EnB Enon fine sandy loam,2 C 57.1 51.0% to 8 percent slopes EnC Enon fine sandy loam,8 C 2.9 2.6% to 15 percent slopes EuB Enon-Urban land C 3.3 2.9% complex,2 to 10 percent slopes IrB Iredell loam, 1 to 8 C/D 3.4 3.1% percent slopes LdB2 Lloyd clay loam,2 to 8 B 12.1 10.8% percent slopes, moderately eroded MbB Mecklenburg loam,2 to 8 C 6.6 5.9% percent slopes SeB Sedgefield fine sandy C/D 19.6 17.5% loam, 1 to 6 percent slopes Totals for Area of Interest 112.0 100.0% Rating Options—Hydrologic Soil Group Aggregation Method: Dominant Condition Component Percent Cutoff- None Specified Tie-break Rule: Higher 30 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nres.usda.gov/wps/portal/nres/detail/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 31 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf 32