Loading...
HomeMy WebLinkAboutWQ0044978_Application (FTSE)_20240212::WithersRavenel Our People. Your Success 115 MacKenan Drive Cary, NC 27511 t: 919.469.3340 1 f: 919.467.6008 TO: DWQ Fast Track Permitting Unit 3800 Barrett Drive Raleigh, NC 27609 WE ARE SENDING YOU THE FOLLOWING ITEMS- 0 Attached ❑ Under Separate Cover Via ❑ Shop Drawings ❑ Prints O Plans ❑ Copy of Letter ❑ Change Order ❑ Disk Letter otj-p�nsmittalAy DEC - 5 20B 12/04/2023 ••• • 23_0500 Fast Track Permitting Unit Southern Oaks Gravity Sewer Outfall - Rasa ll Fast Track Sewer Application ❑ Samples ❑ Specifications ❑ Other COPIES• 2 Cover Letter 2 Fully Executed and sealed FTA Application (one original and one copy) 2 Fully Executed USE form from Harnett County 2 Fully Executed FTSE form from Town of Fuquay-Varina 2 USGS Quad Site Map 2 Aerial Site Map 1 Application Fee for $600.00 THESE ARE TRANSMITTED as checked below: ® For approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections ❑ For review and comment ❑ For bids due REMARKS: COPYTO- 0 Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ Other ❑ Prints returned after loan to us Please see attached Fast Track Sewer Application for Southern Oaks Gravity Sewer Outfall Phase II oroiect. Town of FuguayVarina, NC SIGNED. Clark Maness RECEIVED. If enclosures are not as noted, kindly notify us at once. ■0 NCDe�t of Frv:10t?t.tentai �G�,i:ty N/ WithersRavenel Our People. Your Success. December 4, 2023 DEC - 5 2023 Division of Water Resources 3800 Barrett Drive Ralet-.;� Rcg ona€ ().`fiCC Raleigh, North Carolina 27609 (919) 791-4200 (919) 571-4718 Fax RE: WR Project #23-0500 Town of Fuquay - Varina Southern Oaks Gravity Sewer Outfall - Phase II DWQ Sewer Fast Track Application Submittal To Whom it May Concern: Please find enclosed a sewer Fast Track Application package for the Fuquay-Varina Southern Oaks Gravity Sewer Outfall - Phase II project. The project consists of the installation of approximately 6,600 linear feet (LF) of 18-inch gravity sewer and 1,380 LF of 12-inch gravity sewer generally parallel to Kenneth Creek from just north of Phelps West Road to the existing Southern Oaks Pump Station off of Wagstaff Road. The project also consists of re-routing existing sewer to the new outfall with approximately 40 LF of 8-inch gravity sewer and 48 LF of 18-inch gravity sewer. The proposed gravity sewer is to be installed using open -cut and dry bore and jack methods. The project meets all required setbacks, separations, and all gravity sewer minimum design criteria. When the gravity sewer is installed the Hwy 42 No. 2 Pump Station will be decommissioned. All above -grade structures and electrical gear at the pump station will be removed and all below -grade structures at the pump station will be demolished/filled with No. 57 stone. The existing force main will be flushed/cleaned with water, abandoned in place, and capped on both ends with grout/flowable fill. An erosion and sedimentation control plan has been submitted for this project to the NCDEQ Raleigh Regional Office for review and approval. We anticipate having full approval and an NCG01 Certificate of Coverage no later than 1/2/2024. A US Army Corp of Engineers (USACOE) NWP 58 notification letter has been submitted to the USACOE for this project for review and approval. We anticipate having full approval no later than 1/2/2024. All other required permits (NCDOT encroachments agreements, Duke Energy encroachment agreements, local floodplain development permits, etc.) will also be acquired no later than 1/2/2024. Attachments include: 1. Fully executed and sealed FTA application 2. Fully executed FTSE forms from Town of Fuquay-Varina and Harnett Regional Water 3. Application Fee for total of $600.00 4. Site Maps Should you have any questions, please contact me at 919-535-5213 or at cmaness@withersravenel.com. WiLhersRavenel J. Clark Maness, PE Design Manager 115 MacKenan Drive Cary NC 27511 t: 828.255,0313 1 f: 828.348,5354 1 www.withersravenel corn I License No. F-1479 Asheville I Cary I Charlotte I Greensboro I Pittsboro I Raleigh I Southern Pines I Wilmington State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION This application is for sewer extensions involving gravity sewers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of IS N AC2T and the Division's Minimum Design Criteria (Gravin. Sewer & Pumn Stations/Force Mains) and that plans, specifications and supporting documents have been prepared in accordance with 15A NCAC 2 A NCACp2T.0300 Division policies, and good engineering practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in IAA NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be immediately available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A 'r�-AC 92T,0.301, Projects not eligible for review via the fast track process (must be submitted for full technical review): ➢ Projects that do not meet any part of the minimum design criteria (MDC) documents; ➢ Projects that involve more than one variance from the requirements of 15A NCAC 02T; ➢ Pressure sewer systems utilizing simplex septic tank -effluent pumps (STEPs) or simplex grinder pumps; ➢ Simplex STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); ➢ Vacuum sewer systems. General - When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy (second copy maybe digital) of Application and Supporting Documents ® Required unless otherwise noted. Signatures on original must be "wet ink" or secure digital signatures. Please do not submit engineering design plans with the application unless specifically requested. B. Cover Letter/Narrative Description (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. ➢ Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ Include the permit number!status of any other required sewer permits (downstream. -upstream) ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Modification Application Packages): ® Submit a check or money order in the amount of $600.00, dated no more than 90 days prior to application submittal. ➢ Payable to North Carolina Department of Environmental Quality (\CDEQ) D. Fast Track Application (Required for All Application Packages, Form FTA 10-23): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item 1.2 is a corporation or company, provide documentation it is registered for business with the North C'ao1ina Cr+G1ar - of Stale. ❑ If the Applicant Type in item I.2 is a partnership or d/bia, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ® The Project Name in Item 11.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ® The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional. F.ngincer. ® The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0106{ b1. Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 10-23 & SCPPOR'[ ING DOCUMENTATION Page I of 3 E. Flow Tracking/Acceptance Form (Form: FTSE 10-23) (If Applicable): ® Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. ➢ Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. ➢ The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. ➢ Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143-215.67(a}. ➢ Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 1 I -inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area, including the closest surface waters. ➢ General location of the project components (gravity sewer, pump stations, & force main) ➢ Downstream connection points and permit number (if known) for the receiving sewer ® Include an aerial location map showing general project area (such as street names or latitude.: longitude) so that Division staff can easily locate it in the field. G. Existing Permit (Application Packages for Modifications to an Existing Permit): ❑ Submit a copy of the most recently issued existing permit. ❑ Include a descriptive and clear narrative identifying the previously permitted items to remain in the permit, items to be added, and/or items to be modified (the application form itself should include only include items to be addedlmodified). The narrative should also include whether any previously permitted items have been certified. ❑ The narrative should clearly identify the requested permitting action and accurately describe the sewers to be listed in the final permit. H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAc 02T .0305{hy 11, submit documentation of power reliability for pumping stations. ➢ This alternative is only available for average daily flows less than 15,000 gallons per day ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .01 15(a)1 1 F provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the Forth Carolina t'tilitiesCoimmission's Waicr and Scwcr Division Public SEalf stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .01.I5ici, submit the properly executed Operational AgreementAJFORM:_H�. ElPer 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .01 15(b), submit the properly executed Operational Agreement ( FORM: DEV). !'or more information, visit the Division's collection systems ii ebsile INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778-8211 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5095 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910)486-0707 Fax Alexander, Cabarrus, Catawba, Cleveland, Mooresville Regional Office 610 E. Center Avenue Water Quality Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax 3800 Barrett Drive Raleigh Regional Office Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27609 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 571-4718 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquolank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pender (910)796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Alleghany, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336)776-9800 (336)776-9797 Fax INSTRUCTIONS FOR FORM: FTA 10-23 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina Department of Environmental Quality DWR Division of Water Resources FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvlsion of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION Application Number: t VC04�(q-7 D (to be completed by DWR) DEC - 5 2023 All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Fuquav-Varina (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public E ltility ❑ Federal ❑ State. -County ® Municipal ❑ Other 3. Signature authority's name: Michael Wagner per 15A NCAC 02T .0106(b) Title: Public Utilities Director 4. Applicant's mailing address: 134 N. Main Street City: Fu u�Varina State: NC Zip: 27526 5. Applicant's contact information: Phone number: (919) 567-3911 Email Address: mwagner@faquay-varina.org 11. PROJECT INFORMATION: 1. Project name: Southern Oaks Gravity Sewer OutfalI - Phase 11 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: , For modifications, also attach a detailed narrative description as described in Item G of the checklist. If new construction, but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Wake 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.566667•- Longitude:-78.809751 5. Parcel ID (if applicable): See attached list of affected parcels (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: J. Clark Maness License Number: 047235 Firm: WithersRavenel Mailing address: 1 ] 5 MacKenan Drive City: CAry State: NC Zip: 27511-_ Phone number: (90) 535-5213 Email Address: cmaness@withersravenel.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional WWTF Permit Number: NCO021636 Owner Name: Harnett Regional Water V. RECEIVING DOWNSTREAM SEWER INFORMATION: VILWGLv^1 '�-h 1 I. Permit Number(s): WQWaiting on Phase I gravity sewer permit. E-.ventual receiving downstream sewer is 36-inch �b E0MB1TL 8 2. Downstream (Receiving) Sewer Information: 24 inch Z Gravity Force Main 3. System Wide Collection System Permit Number(s) (if applicable): WQCS00193 � Owner Name(s): Town of Fuquav-Varina FORM: FTA 10-23 Page I of 5 .� N -0- V1. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑ No ®N?A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Awrccment(FORM: DEVI been attached? (]Yes []No ®N/A 3. If the Applicant is a Home. -Property Owners' Association, has an HOA?POA Operational AEreementIFORM: HOAI and supplementary documentation as required by 15A NCAC 02T.0115(c) been attached? ❑ Yes ❑ No ® N!A 4. Origin of wastewater: (check all that apply): ® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel andior Motels ❑ School 1 preschool f day care ❑ Medical I dental f veterinary facilities ❑ Swimming PooltClubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming PoollFilter Backwash ❑ Businesses? offices! factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic % Commercial % Industrial (See 15A NCAC 02T .0103(20)) If Industrial, is there a Pretreatment Program in effect? ❑ Yes❑ No 6. Has a flow reduction been approved under 15A NCAC 02T .0l 14i 1 ? ® Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter with this application 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow '° No. of Units Flow gal/ GPD gal/ GPD gall GPD gall GPD gall GPD gall GPD Total 0 GPD a See 15A NCAC 02T .01 14tb1. {dl_ (eit 11 and (e)(2) for caveats to wastewater design flow rates (i.e. proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S_ 42A-4). b Per 15A NCAC 02T .0l 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01 14] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 0 GPD (per 15A NCAC 02T .0114 and G.S_ 143-215,1) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, please indicate why: ❑ Pump Station. Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line. Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow. ❑ Flow has already been allocated in Permit Number: Issuance Date: ❑ Rehabilitation or replacement of existing sewers with no new flow expected ® Other (Explain): The project includes installation of a new 18" and 12" gravi1y sewer from just north of ex. Hwy 42 No. 22pump station to the ex. Southern Oaks pump station. The Southern Oaks pump station will be decommissioned under Phase I. The Hwy 42 No. 2 pump station will be decommissioned under this project (PhaseIl). No new flow will be generated. FORM: FTA 10-23 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 18 6,648 PVC C900 DR 18 12 1,380 PVC C900 DR 18 & Ductile Iron Pipe 8 40 PVC C900 DR 18 ➢ Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC Vill. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains): PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . j Longitude: -_�& 3. Total number of pumps at the pump station: __ 3. Design flow of the pump station: _ millions gallons per day (firm capacity) ➢ This should reflect the total GPM for the pump station with the largest pump out of service. 4. Operational point(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) I Length (feet) I Material If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per MDCPSFM Section 2.01 C. Lb. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify) 6. Power reliability in accordance with 15A NCAC 02T .0305(h)i I): ❑ Standby power source or ❑ Standby pump D Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility and may not be portable Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C): ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - or ❑ Portable pumping unit with plugged emergency pump connection and telemetry: ➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided as part of this permit application in the case of a multiple station power outage. FORM: FTA 10-23 Page 3 of 5 1X. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305 & W? ® Yes ❑ No 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 18 inches zWater mains (vertical - water over sewer preferred, including in benched trenches) 18 inches zWater mains (horizontal) 10 feet Reclaimed water lines (vertical - reclaimed over sewer) 18 inches Reclaimed water lines (horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-1 waters of Class I or Class 11 impounded reservoirs used as a source of drinking water, and associated wetlands. 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water (or tide elevation) and wetlands associated with these waters (see item IX.2) 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches, as well as wetlands associated with these waters or classified as WL. 10 feet Any building foundation (horizontal) 5 feet Any basement (horizontal) 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade (vertical) 36 inches If noncompliance with 02T.0305(t) yr l�z}lt- see Section XA of this application * 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. Please check `Yes" above if these alternatives are used and provide narrative information to explain. **Stream classifications can be identified using the Division's NC Surface Water Classifications webtwae 2. Does this project comply with the minimum separation requirements for water mains? ® Yes ❑ No ❑ N.:A If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document, signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule. 3. Does the project comply with separation requirements for wetlands? ®Yes ❑ No ❑ N-A ➢ Please provide supplementary information identifying the areas of non-conformance. See the Division's draft separation requirements for situations where separation cannot be met. No variance is required if the alternative design criteria specified is utilized in design and construction. 4. is the project located in a river basin subject to any State buffer rules? ❑ Yes Basin name: Cape Fear ® No If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02BA2002 ❑ Yes ❑ No This includes Trout Buffered Streams per 15A NCAC 2B.0202 1�, W e _MA1t.. VQ f 5. Does the project require coverage/authorization under a 404 Nationwidelindividual permits Yes ® No or 401 Water Quality Certifications? DO R 20 Z 3 16 $F1 D Please provide the permit number/permitting status in the cover letter if coverage/authorization is required. 6. Does project comply with 15A NCAC 02T.0105;c}(6) (additional permitscertifications)? ® Yes ❑ No Per 15A NCAC 02T.0102SI 61, directly related environmental permits or certification applications must be being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 7. Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters, siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer. Siphons and sewers suspended through interferencelconflict boxes require a variance approval. If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit. FORM: FTA 10-23 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design, Criteria.{Iegg version) as applicable? ® Yes ❑ No If no, for projects requiring a single variance, complete and submit the Variance. -'Alternative Design Request application (VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer review times. For projects requiring two or more variances or where the variance is determined by the Division to be a significant portion of the project, the full technical review is required. 2. Professional Engineer's Certification: I, J. Clark Maness , attest that this application for Southern Oaks Gravity Sewer Outfall - Phase II (Professional Engineer's name from Application Item III I ) (Project Name from Application Item Il 1) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Minimum Design Criteria for Gravil;, Sewers ( latest version), and the Minimum Desism Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701) North Carolina Professional Engineer's seal, signature, and date:A o°fv e 3C3426. o� a a SEAL r P e 047235 0 e ° e 4G1NEB°°°�°iO°vo °c44RK ONN6°ii/zo/ o23 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, Michael Wagner , attest that this application for Southern Oaks Gravity Sewer Outfall - Phase 11 (Signature Authority Name from Application Item 13 ) (Project Name fro-i Application Item 11.1) attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. 1 understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 11/20/2023 FORM: FTA 10-23 Page 5 of 5 NC Dept of Em';i om-n =taI Qttaltty DEC — 5 2023 State of North Carolina Department of Environmental Quality Division of Water Resources Division of Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Town of Fuquay-Varina Project Name for which flow is being requested: Southern Oaks Gray. Sewer Outfall-Ph 2 More than one FTSE may be required for a single project if the owner of the WWT.P is not responsible for all pump stations along the route of the proposed wastewater, flaw. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. W WTP Facility Name: North Harnett Regional W WTP b. W WTP Facility Permit #: NCO021636 All flows are in MGD c. W WTP facility's permitted flow 7.5 d. Estimated obligated flow not yet tributary to the WWTP 3.328 e. W WTP facility's actual avg. flow 5.375 f. Total flow for this specific request 0.000 g. Total actual and obligated flows to the facility 8.703 h. Percent of permitted flow used l 16.04%* I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W WTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Fiow Pius (Name or Permit Capacity, * (Firm! pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** SLS-120 14.4 5.76 3.367 2.378 5.745 0.015 * The Firm Capacity (design slow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < U. Downstream Facility Name (Sewer): North Harnett Regional W WTP Downstream Permit Number: NCO021636 Page 1 of 8 FTSE 10-23 11I. Certification Statement: I Steve Ward, Utilities Director certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and 1I plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature HRW Director Title of Signing Official ( I.- 79 — 2 ) Date *Bids to expand the NHRWWTP treatment capacity were opened November 9, 2023. Page 2 of 8 FTSE 10-23 NC Dept of,,,rvirc:nl:�e; DEC - 5 202' State of North Carolina DV Department of Environmental Quality , 'R��` �' IZelo� _ ��.Fat L Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Town of Fu uay-Varina Project Name for which flow is being requested: Southern Oaks Gray. Sewer Outfall-Ph 11 More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NCO021636 All flows are in MGD c. WWTP facility's permitted flow 2.600 d. Estimated obligated flow not yet tributary to the WWTP 0.496 e. WWTP facility's actual avg. flow 1.493 f. Total flow for this specific request 0.000 g. Total actual and obligated flows to the facility 1.989 h. Percent of permitted flow used 76.5% 11. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Finn Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm ;' po, Avg. Daily Daily Flow, Obligated Available Number) No. MOD MOD Flow, MOD MOD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can b achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): ToFV to Kenneth Creek/Neils Creek Downstream Permit Number: WQCS00193 to WQ0028647 Page 1 of 8 FTSE 10-23 III. Certification Statement: I Michael Wagner certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Public Utilities Director Title of Signing Official 11 /21 /2023 Date Page 2 of $ FTSE 10-23 Ntate of North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor William G. Ross Jr., Secretary Gregory J. Thorpe, Ph.D., Acting Director November 7, 2001 Mr. Michael A. Aliway, Assistant Town Manager Town of Fuquay-Varina 401 Old Honeycutt Road Fuquay-Varina, North Carolina 27526 Subject: Dear Mr. Allway: NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 'REC P ill tgryv Q 82,001 Tom of-vatttvg Town of Fuquay-Varina Flow Reduction Approval Wake County On September 10, 2001, the Division of Water Quality Non Discharge Permitting Unit received your flow reduction request for future and present, but not yet tributary, single-family dwellings in the Town of Fuquay-Varina. The letter requests approval of a residential flow value of 220 GPD/residence for these dwellings. The information provided water use information for 2000 and actual daily waste water flow recordings for their peak month of May. Other supporting data was provided. The evaluation covered 90 homes that are representative of the subdivisions in Fuquay-Varina in accordance with 15A NCAC 211.0219(l)(3). Based on the information submitted, the Division hereby approves the use of 75 GPD per bedroom per dwelling for residential units (225 GPD per three bedroom home) in all applicable non -discharge permit applications for future sewer line extensions and present, but not yet tributary projects for the Town of Fuquay- Varina. The Division did note that the average flow per residence in February 2000 was 271 GPD. Regardless of the adiusted design dailv wastewater flow rate, at no time shali the wastewater flows exceed the effluent limits defined in the Town's NPDZ S permit for the treatment facility or exceed the capacity of the sewers downstream of any new sewer extension Please submit a separate letter to the Raleigh Regional Office that requests flow reductions for specific previously permitted projects (indicate permit number, vrq1ect name er_mitted flow. new flow under red tion and the difference between_therm). If you have any questions or comments regarding this matter, please contact Marie Doldovic at (919)733-5083 ext. 371. Since L` f' Gregory J. Thorpe, Ph.D. cc: Raleigh Regional Office Flow Reduction File 1617 Mail Service Center. Raleigh, North Carolina 27699-1617 Telephone 919-733-5083 Fax 919-715-6048 An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper w of n m V O• V m O O O• O Ln Ol n N O m O O m m N m N m N p m o N N n o m 0 `C 0 N N IV N 1� m o m 0 O• o O y m o to o O, a N N n N c ❑ w co O N m W u ul O NN N N N NCN O N N W w Q 0 N O N O N N 0 N ol O N 0 N 0 N 0 N O N O N 0 ry O N O N 0 N 0 N O N O N 0 N to C7 41 m V N Cl) n N V1 m V N ^ � N v1 .O n V `U n .-I �o .-1 N m 10 �O N O N �t1 V `U o �O M N �o W N '~ m n N n N n N O• .+ N .+ N N O N O N n 04 A ry .-� N N W Y Q m` of O �o C ra �O W W W O W *O v v] Ln V m N OP 1O C, 10 n m O N .+ O *O n ,0.+ W N N p Q n N m m m N Cl) Q n a M m m N 10 N 10 n Io rl n m '-1 O• V m Q o. O m N 10 m m �o m Q n w w fl N LA N u z Q '^ ❑ a p O a ° a ❑ a 0 a ❑ W o ° Z ❑ W O a ❑ W ❑ m 0 pp p a O Y F w w H w n. a w 0 p O t- w a H w a F w H w w w v~i Z O O J Z W z W 3 Z } a 3 0 J 3 3 W z° z Q Y W m ce w Q 4 n W w �n 0.d lc7 lc7 w z d to W ❑ 7 Ln W 0 LA W Ln w a -w-� w J o Z �j w a yy = O.' m w x L w L w m z o LLJ Z !JL x a m ❑ LL x w = x Z o m a a C 3 N C m.ti C J J O J co p CL ° C J C C JI4 N V N y9O C W O O O N O O N n O N O LL LL C 0 N r4 N 14 d 0 H CL p a a 3 W � m a a u Z z u Z u z cJ z kn u z u Z LL z o W z z o z0 w W z } z z0 z J a ay W A u p x u O uu o ,nZ O w m w O a aaauto o u p sU J �H+ i z wa w Z } w Q N z y= m 3 to m ° a w vvii J a' 0 K w m w p ] C' x 9 aL m ut W to c u > z ; u o z z w z Ww mm ua w �' > m z 3 z W> > LM a z z p 3 xu%+? �a o zy a z m Z w p z w O O of o ❑W W 0 Z z a z ° w f p °cr w z in `a l? Lh= t7 ❑ X 2 LL a V u p Ln W _ S I o w S H Lu z F a �,i ❑ a w a v; F z W m x w r,r{� '� C r a l7 l= LL,Z U p O z LLI [7 a O vZi Lu F a og U w w a m W Z G L�. 9 CCa V W oaa_' U Y Y w Y ce 0C w 0 o1 F� vtN aix o n O O O .-� n P C, m m 'o Cl) N m O n n N P m 10 m N W n n n n O m n O m n m m N m n V m Ol m m m o, O m m cq 18 � " it a 7 .O m m O m Ln V V m O in m Q m V, �o .-� v5 .. -0 1O Cl) a �O m m m 1 .-� Ln N c7 cl 3 o z .0 �o `0 �o�tn in %0 10 �o10 10 �o10 O O O b 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 ti L' y d Z o S o S g o 0 0 0 0 0 0 0 0 o a a a Legend Manholes WWTPk I Existing Pump Station EX. HWY 42 NO.2 PUMP STATION TO BE Ex. Force Main DECOMMISSIONED � — Ex. Gravity Sewer UNDER PHASE II Phase II Gravity Sewer Alignment • 6C 0$V. r • 1 Southern Oaks Sewer Phase H Map 1 Wihersvenel ir4-r:vi:r-, I AJr-nC r, 1 5�-vcyu'5 1V;VarKgrpnUr I GvyNC 27`11 s vy v aov.3xa0 Noah 4 C U832 aww w 7ks- uaaerr. I car 0 350 700 1,400 Fe>k 1 +rid, = 700 feet J:%2310500-I' ii;i ,rr Varina Southern 02 jo 0 , EX. SOUTHERN OAKS PUMP STATION DECOMMISSIONED UNDER PHASE I CONNECTION TO SOUTHERN OAKS PHASE I SEWER BUILT BEFORE PROJECT i inx.. date. 11:'212023 r.:ated by Mille From: Maness, Clark To: Michael Wagner; Wilson. Susan A Subject: [External] RE: Fast Track Sewer Extension Application - Southern Oaks Gravity Sewer Outfall Phase II (WQ0044978) Additional Information Request Date: Wednesday, January 17, 2024 1:20:10 PM Attachments: image001.pnng CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Susan, Please see my responses below. 1. When we submitted the Fast Track Applications for this project we had been told that we would not need to submit for a 401/404 permit and that all three phases would fall under an NWP 58 non -notifying permit. Since we always notify the USACOE and NCDWR of what we are doing (even if it is an NWP 58) we did state in the narrative that we would be getting "approval". However, since that time the threatened and endangered species survey came back and showed that we may be affecting potential habitat for the Atlantic pigtoe mussel and the tri-colored bat. This kicked us into needing to submit for a 401/404 permit forjust Phases I & 11. Our impacts on Phase III do not require a 401/404 permit. The 401/404 permit applications for Phase I & II was submitted on 12/8/2023 and based on correspondence with NCDWR and USACOE we expect to have approval by 2/8/2024. The DWR permit application number is 20231689 and the USACOE application number is SAW-2023-02416. 2. We have had a lot of issues finding the correct permit number for the 36-inch outfall. The only number we found was WQ0015801, which was from an approved permit application for another relatively new gravity sewer that is a tributary to the 36-inch outfall. We know now that this number is not correct. If the Raleigh Regional Office does not have the number, then we request that the permit number for the receiving downstream sewerjust be listed as "unknown". 3. We are finalizing this map now and will have it to you as soon as possible. Regards, Clark Maness, PE ®❑ 115 MacKenan Drive I Cary, NC 27511 Office:919.469.3340 1 Direct:919.535.5213 cmaness0withersravenel.com CONFIDENTIALITY AND NONDISCLOSURE From: Michael Wagner <mwagner@fuquay-varina.org> Sent: Wednesday, January 17, 2024 11:17 AM To: Wilson, Susan A <susan.wilson@deq.nc.gov>; Maness, Clark <cmaness@withersravenel.com> Subject: [EXTERNAL] Re: Fast Track Sewer Extension Application - Southern Oaks Gravity Sewer Outfall Phase II (WQ0044978) Additional Information Request CAUTION: This email originated from outside of WithersRavenel. Do not click links or open attachments unless you recognize the sender and know the content is safe. Susan, Good morning. Please see me responses below. #2: Our system wide collection permit is WQCS00193. 1 apologize for not knowing where the WQ0015801 number came from, as I thought the engineering team had looked that up and provided. The actual connection portion that the "new" line connects to was constructed in 2006 when the Kenneth Branch WWTP was taken offline and flow sent to Harnett County through our shared line. The Town owns, operates, and maintain the 36" Line to the meter vault, and we have capacity after the vault to the WWTP. #4: To be clear, there will be no "new" flow that hasn't already been permitted through other development projects. Current flow and flow not yet tributary was accounted for in the FTSE, as this project takes two pump stations offline. The flow from those pump stations will be going through these "new" lines. Elaine Wild has been reviewing an application for the Holston Subdivision since around August, which doesn't officially have a permit number yet, but that flow is in my NYT volume. As it was originally submitted before these applications. Please let me know if further clarification is needed. Thanks, Mike Michael Wagner 1415 Holland Road Public Utilities Director Fuquay-Varina, NC 27526 Town of Fuquay-Varina www•fuquay-varina.ora Office: Facebook Instagram Twitter E-mail correspondence to and from this address is subject to North Carolina's Public Records Act, N.C. Gen. Stat. Sec. 132, and may be disclosed to third parties. However Federal and State law protects personal health and other information that may be contained in this e-mail from unauthorized disclosure. If you are not the intended recipient, please delete this e-mail and any accompanying documents and contact the sender immediately. Unauthorized disclosure, copying or distribution of any confidential or privileged content of this e-mail is prohibited. From: Wilson, Susan A <susan.wilson@deq.nc.gov> Sent: Wednesday, January 17, 2024 10:40 AM To: cmaness@withersravenel.com <cmaness@withersravenel.com> Cc: Michael Wagner <mwagner@fuquay-varina.org> Subject: Fast Track Sewer Extension Application - Southern Oaks Gravity Sewer Outfall Phase II (WQ0044978) Additional Information Request CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Clark — I've given this application an initial review. I picked up all three phases of the Southern Oaks project (WQ0044978 and WQ0040249 MOD also), but I'll keep these emails separate. I appreciate our discussion of these projects on Friday (1/12). If you would answer the following (and I will add/upload your answers as part of the record for the application). I don't think it is necessary to revise the existing application, unless you and Michael want to do that. 1. Regarding Part IX.5. You indicated "no" on the requirement for a 404/401. The narrative indicates you have sought approval of the project through the ACOE. Please provide the reference number for this. 2. After our discussion on Friday, I believe that it is our understanding that WQ0015801 listed as the downstream sewer in Part V of the application is incorrect. And at this time, it is unknown what the reference permit is downstream (just that the receiving line is 36 inch gravity sewer)? Michael if you can enlighten us further on that — maybe I could find it by a previous project name. 3. Also during our discussion Friday, you are going to provide a more wholistic map outlining all 3 phases and the force main to be eliminated. 4. Just want to confirm that these projects will be designated as 0 GPD and that Fuquay-Varina acknowledges that the flow in these lines is accounted for elsewhere? Likely I'll put a special condition in stating this and Fuquay-Varina will need to submit a modification of this permit to add additional flow if it is not added through separate permits. Please provide the above information within 30 days. If additional information/corrected application is not received within 30 days, your application will be returned, and you will need to resubmit along with the fee (ref. 15A NCAC 02 T. 010 7(e) (2)]. Thanks also for the information regarding abandonment of the existing facility/lines. Feel free to contact me if you have any questions. (And likely easiest to reach me via email initially). Thanks much. Susan Wilson Environmental Engineer (Part Time, Temporary) Water Quality Regional Operations — Raleigh Regional Office NC Department of Environmental Quality Office: 91 9-791-4240 eo"-ME` QT� Nf- Eumd cnrnesparrdwx* to and kam Ums address is senyied to the M rlh Carohne Public ideoards taw errd may be dmpkxsed fa third pardie- Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Path: J:\23\0500-Fuquay Varina Southern Oaks Design Build\GIS\Data\SO Sewer Phase 1-III Map 8x11.mxd Date: 1/17/2024 Created By: JWillett From: Michael Waaner To: Wilson, Susan A; cmaness(cbwithersravenel.com Subject: [External] Re: Fast Track Sewer Extension Application - Southern Oaks Gravity Sewer Outfall Phase II (WQ0044978) Additional Information Request Date: Wednesday, January 17, 2024 11:17:21 AM Attachments: image001.pnng CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Susan, Good morning. Please see me responses below. #2: Our system wide collection permit is WQCS00193. 1 apologize for not knowing where the WQ0015801 number came from, as I thought the engineering team had looked that up and provided. The actual connection portion that the "new" line connects to was constructed in 2006 when the Kenneth Branch WWTP was taken offline and flow sent to Harnett County through our shared line. The Town owns, operates, and maintain the 36" Line to the meter vault, and we have capacity after the vault to the WWTP. #4: To be clear, there will be no "new" flow that hasn't already been permitted through other development projects. Current flow and flow not yet tributary was accounted for in the FTSE, as this project takes two pump stations offline. The flow from those pump stations will be going through these "new" lines. Elaine Wild has been reviewing an application for the Holston Subdivision since around August, which doesn't officially have a permit number yet, but that flow is in my NYT volume. As it was originally submitted before these applications. Please let me know if further clarification is needed. Thanks, Mike "it -haul Wgapnr Public Utilities Director Town of Fuquay-Varina Office: 1415 Holland Road Fuquay-Varina, NC 27526 www.fuquay-varina.org Facebook Instagram Twitter u E-mail correspondence to and from this address is subject to North Carolina's Public Records Act, N.C. Gen. Stat. Sec. 132, and may be disclosed to third parties. However Federal and State law protects personal health and other information that may be contained in this e-mail from unauthorized disclosure. If you are not the intended recipient, please delete this e-mail and any accompanying documents and contact the sender immediately. Unauthorized disclosure, copying or distribution of any confidential or privileged content of this e-mail is prohibited. From: Wilson, Susan A <susan.wilson@deq.nc.gov> Sent: Wednesday, January 17, 2024 10:40 AM To: cmaness@withersravenel.com <cmaness@withersravenel.com> Cc: Michael Wagner <mwagner@fuquay-varina.org> Subject: Fast Track Sewer Extension Application - Southern Oaks Gravity Sewer Outfall Phase II (WQ0044978) Additional Information Request CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hi Clark — I've given this application an initial review. I picked up all three phases of the Southern Oaks project (WQ0044978 and WQ0040249 MOD also), but I'll keep these emails separate. I appreciate our discussion of these projects on Friday (1/12). If you would answer the following (and I will add/upload your answers as part of the record for the application). I don't think it is necessary to revise the existing application, unless you and Michael want to do that. 1. Regarding Part IX.5. You indicated "no" on the requirement for a 404/401. The narrative indicates you have sought approval of the project through the ACOE. Please provide the reference number for this. 2. After our discussion on Friday, I believe that it is our understanding that WQ0015801 listed as the downstream sewer in Part V of the application is incorrect. And at this time, it is unknown what the reference permit is downstream (just that the receiving line is 36 inch gravity sewer)? Michael if you can enlighten us further on that — maybe I could find it by a previous project name. 3. Also during our discussion Friday, you are going to provide a more wholistic map outlining all 3 phases and the force main to be eliminated. 4. Just want to confirm that these projects will be designated as 0 GPD and that Fuquay-Varina acknowledges that the flow in these lines is accounted for elsewhere? Likely I'll put a special condition in stating this and Fuquay-Varina will need to submit a modification of this permit to add additional flow if it is not added through separate permits. Please provide the above information within 30 days. If additional information/corrected application is not received within 30 days, your application will be returned, and you will need to resubmit along with the fee [ref. 15A NCAC 02T.0107(e)(2)]. Thanks also for the information regarding abandonment of the existing facility/lines. Feel free to contact me if you have any questions. (And likely easiest to reach me via email initially). Thanks much. Susan Wilson Environmental Engineer (Part Time, Temporary) Water Quality Regional Operations — Raleigh Regional Office NC Department of Environmental Quality Office: 919-791-4240 E"i0cvrrespandense ro by from this address rs su4-actta Me Nwh Cauhr3a Aubk iZxwd's Law aWmaybe drsdosed ro third parties Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.