Loading...
HomeMy WebLinkAbout20061671 Ver 1_EEP Acceptance Letters_20060210 dµ~~~ a u., ~~~~~~~ STATE OF NORTH CAROLINA SFr ~F~I .f~,~,~; ~9.I~~Fh~,, , ~ DEPARTMENT OF TRANSPORTATION `(J~~~q~~,;~ ~h~ MICHAEL F. EASLEY LYNDO T~TT GOVERNOR SECRETARY ~ Mr. William D. Gilmore, P.E., Director Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Dear Sir: February 8, 2006 Subject: Request for Neuse River buffer mitigation for the replacement of Bridge No. 255 over UT to Swift Creek on SR 1006, Wake County. Federal Aid Project No. BRSTP-1006(14), State Project No. 8.2408401, Division 5, T.I.P. No. B-4299. WBS Element No. 33636.1.1 The purpose of this letter is to request that the North Carolina Ecosystem Enhancement Program (EEP) provide confirmation that you are willing to provide compensatory mitigation for the project in accordance with the Memorandum of Agreement (MOA) signed July 22, 2003 by the USACE, the NCDENR and the NCDOT. The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 255 over a UT to Swift Creek on SR 1006, Wake County. There will be impacts to Neuse River Buffers associated with this project which will require compensatory mitigation. We have avoided and minimized the impacts to riparian buffers to the greatest extent possible as described in the permit application. We do not anticipate any impacts to jurisdictional streams or wetlands. An application for Neuse River Riparian Buffer Certification will be submitted upon receipt of acceptance of this mitigation. A copy of the permit application, when submitted, can be found at http:/1www.ncdot.org_/plannin~/ne/naturalunit/Applications html. The project is located in the Piedmont Physiographic Province in Wake County in the Neuse River basin in Hydrological Cataloguing Unit 03020201. Table 1 summarizes buffer impacts. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 LOCATION: TELEPHONE: 919-715-1500 2728 CAPITAL BLVD. FAX: 919-715-1501 PARKER LINCOLN BUILDING, SUITE 168 WEBSITE: WWW.NCDOT.ORG RALEIGH NC 27604 Table 1. Neuse Buffer Impacts Bridge Parallel Impacts Construction Zone 1 Im act (s . ft) 952 6164 Zone 2 Im act (s . ft) 3860 5632 Mitigation requirements allowable Allowable with (exempt, allowable or allowable with mitigation miti ation) The total buffer impacts requiring mitigation are 11796 square feet. In order to satisfy regulatory assurances that mitigation will be performed, the NCDWQ requires a formal letter from EEP indicating their willingness and ability to provide the mitigation work requested by NCDOT. The NCDOT requests such a letter of confirmation be addressed to Mr. John Hennessy of NCDWQ, with copies submitted to NCDOT. If you have any questions or need additional information please call Erica McLamb at 919-715- 1521. Sincerely, ~ , Z~ Gregory J. Thorpe, Ph.D., Manager Project Development and Environmental Analysis Branch cc: ~Ir. John Hennessy, NCDWQ Ms. Nicole Thompson, NCDWQ Ms. Linda Fitzpatrick, NCDOT Natural Environment Unit Mr. Majed Alghandour, P. E., NCDOT Project Management/Scheduling Unit Mr. Todd Jones, NCDOT External Audit Branch File-B-4299 2