HomeMy WebLinkAboutNCC200424_NOT Closeout Documents_20240207 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building,225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
County: Robeson Project: Robeson Co.County-Wide Water River basin: Lumber
Person financially responsible:County of Robeson-Kellie Blue,Manager Project#: ROBES-2020-004
Address: 701 North Elm Street,Lumberton,NC 28358
1. Project Location: Rev.Bill Road,Lumberton
Pictures: No
2. Weather and soil conditions: Clear Soil Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Sam Noble Title: Project Engineer
Inspection report: Sent Report Date given/sent: February 04,2021
9. Corrective action needed:
10. Comments: Project is complete and stable.Close Project.
Reported by: Nicholas Mills Others present:
Date of inspection: February 03,2021 Time arriving on site: 1:00 PM Time leaving site: 3:00 PM
CC:
■