Loading...
HomeMy WebLinkAbout20001195 Ver 15_Approval Letter_20151013hJo�h Carolina Department mfEnvironmental Quality Pat McCrory Governor October l3,ZOI5 Federal Aviation Administration Terminal Engineering Center Attn: Ms. Courtney J. Nolan, P. E. PO Box 20036 Atlanta, 6A3O32O Donald R. van der V@Grt Secretary DVVR#OO-1Iq5Vl5 Mecklenburg County Subject: Approval of Individual 401 Water Quality Certification with Additional Conditions [[T Airport Traffic Control Tower Project USACE Action ID. No. SAVV-2O14-OO83O Dear K4S. Nolan: Attached hereto is a copy of Certification Nn. 4034 issued to Ms. Courtney J. Nolan and Federal Aviation Administration, dated October 13, 2015. Please note that you should get any other federal, state Or local permits before proceeding with the subject project, inc|udingthOs2requin2d by /but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4ofGeneral Statute I5OBbv filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within shrh/ (60) calendar days. A petition form may be Obtained from the OAH at .ncOah.con)/orh« calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and One /2\ copy along with any applicable OAH filing fee i5 received in the OAH during normal office hours (Monday through Friday between 8:008rn and 5:00pno, excluding official state The petition may he faxed to the OAH at (919) 43I-3100, provided the original and One copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Dvinion of Water Resources -481& Buffer PenmhUnAUnit 1G17Ma�| Service Cane[ Raueigh, North Cardina278Q8 1617 Lmnoion�512NDa||mbury St, Raleigh, North Carolina 278O4 Federal Aviation Administration DVVR#OO1195VI5 Individual Certification #4O34 Page 2 of 7 Mailing address for the OAH: If sending via U8 Postal Service: If sending via delivery service (UFS,FedEx,ou± Office Of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center I71I New Hope Church Road Raleigh, N[27599-67I4 Raleigh, N[276O9-6285 One (1) copy of the petition must also be served to DENR: Sam M. Hayes, General Counsel Department of Environmental Quality 26Ol Mail Service Center Raleigh, N[27699-lb01 Unless such a petition i5 filed, this Certification shall be final and binding. This certification completes the review of the Division under section 401 of the Clean Water Act and l5ANCACO2H.D5OO. Contact Alan Johnson at7O4-395-32OOOra|anjOhnson@ncdenr,gOv|f you have any questions Orconcerns. Sincerely, Karen Higgins, Sup2rviSOrL1 401 & Buffer Permitting Unit cc: Mr. Charles Benton, AECOM/URS, 1600 Perimeter Park Drive, Morrisville, NC 27560 USACE Asheville Regulatory Field Office Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DVVRMRO4OIfile DVVR4Ol Oi Buffer Permitting Unit file Federal Aviation Administration DWR# 00-1195 V15 Individual Certification #4034 Page 3 of 7 CERTIFICATION #4034 is issued in conformity with the requirements of Section 401, Public Laws 92-5OO and 95-2l7of the United States and subject tO North Carolina's Regulations in15NCAC 02H .0500. to M5. Courtney J. Nolan and Federal Aviation Administration, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on August 7, 2015 and subsequent information on August 20, 2015 and September ll,2O15,and by Public Notice issued by the U.S. Army Corps of Engineers and received by the Division OD November 25,2O14. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections ]O1,3O2,3O3,3O6, 3O70fthe Public Laws 92-50O and PL95-217if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval requires you tm follow the conditions listed in the certification below. Conditions mfCertification: 1. Impacts Approved The following impacts are hereby approved provided that all of the other specific and general conditions Of the Certification are met. NO other impacts are approved, including incidental impacts. [15ANCACO2H.O5O6(b) &k1l 404/401 Wetlands She I Streams Site 2. Comvensatory Mitigation Amount Approved (units) Permanent / U.007(acnB) |7O9 (linear feet) Amount Approved (units) Temporary | 0 (aCr8) | O (linear feet) | Mitigation must be provided for the proposed wetland impacts as specified in the table below. The Division has received an acceptance letter from the NC Division of Mitigation Services (DK4S) tQ meet this mitigation requirement. Until the L}K85 receives and clears your payment, and proof of payment has been provided to this Office, impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement [15A NCAC 02H .0506 (b)(6)]: Federal Aviation Administration is hlrvja��161 Individual Certification #4034 Page 4of7 Compensatory River and Mitigation Required Sub-basin Number Catawba/ Streams 709 (linear ' ` ' 03050I03 3. Stormwater Management Plan You are required to provide one copy of the approved SMP, including plan details on full-sized plan sheets, with proof of City of Charlotte's approval. The approved SMP shall be submitted to the UVVR 4O1& Buffer Permitting Unit (1617 Mail Service Center, Raleigh, N[ 27699-1617) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from City of Charlotte. |f the SMPis modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Unit prior to the commencement of the modifications. [154NCACO2H 4. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification for this project. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit. [15A NCAC 02H .0501 and .0503] 5. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. |f applicable, the project rnustconnp|yvviththespeciUcoonditions and requirements of the NPIDES Construction Stormwater Permit issued to the site and the following requirements [15AN[ACO2H.O5OO/bV3> and (c)(3\l: a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version Of the North Carolina Sediment and Erosion Control Manual. The devices shall bemaintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. b. For borrow pit sites, the erosion and sediment control measures must bedesigned, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. C. Reclamation measures and implementation must comply with the r8C|ann8tiOn in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. Federal Aviation Administration DVVR#OU'lI95VI5 Individual Certification #4O34 d. Sufficient rn3t8ha|5 required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 6. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval bythe Division. |f placement Of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream Ofthe above structures. All sediment and erosion control devices shall b8removed and the natural grade restored within two /2\ months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project. /15ANCACO2H .O5Ol and .O5O2l 7. Construction Stormwater Permit NCGO10000 An NPDE5C0nstruction StOnmxxater Permit is required for construction projects that distunb one /I\or more acres Qfland. This Permit allows sturnovvatertVbedischarged during land disturbing construction activities 35 stipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation DOntnJ| plan, inspections and maintenance, self-monitoring, reCOn] keeping and reporting requirements isrequired. A copy of the general permit /NCG01OO8O\, inspection log sheets, and other information may befound at �ittp,/fP0NL@[.ricdenr.0r q/vvs/'6u/mpdes5wv#tab-wv. I5ANCACO2H .0506(b)(5) and O. Work in the Dry All work inVr adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. [I5A 9. If concrete isused during the construction, then all necessary measures shall he taken tO prevent direct contact between uncured Or curing concrete and waters Of the state. VV3t8r that inadvertently contacts uncured concrete shall not be discharged tO waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [15ANCACO28.0200] 10. Any hpnap required for proper culvert placement, stream stabilization, or restoration Of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprapshall be buried and/or "keyed in" such that the original stream elevation and 5treGrnb8nhCOntOurs are restored and nn@int2in2d. Placement ofripr8p Federal Aviation Administration Individual Certification #4034 Page 6 of 7 or other approved materials shall not result in cle-stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] II. Any hprap used for stream stabilization shall beofa size and density to prevent movement b« wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap shall not be installed in the Streanobed except in specific areas required for velocity control and to ensure integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)] 12. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas including riparian buffers, but i6 restricted tOnO closer than 1O feet from top Of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. [I5ANCACO28.023I] IS. This Certification does not relieve the applicant Vf the responsibility to obtain all other required Federal, State, or Local approvals. 14. Continuing Compliance K45. Courtney J. Nolan and Federal Aviation Administration shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 3O3(d)Ofthe Clean Water Act) and any other appropriate requirements ofState and Federal law. [15ANCA[038.0200] If the Division determines that such standards Or |avvS are not being met (including the failure tO sustain 3designated or achieved use) or that State nr federal law is being violated, 0rthat further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify K85. Courtney J. Nolan and Federal Aviation Administration and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15ANCACO2H.0504. Any new 0r revised conditions shall be provided to Ms. Courtney]. Nolan and Federal Aviation Administration in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. l5. This approval is for the purpose and design described in your application and 3S described in the Public Notice. The plans and specifications for this project ameincorporatedb«r8ferenc8 and are an enforceable part of the Certification. |f you change your project, younnustnotif« the Division and you may be required to submit a new application package with the appropriate fee. |f the property iS sold, the new owner must be given a copy Ofthis Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name. [I5ANCACO2H.O5O1and Federal Aviation Administration Individual Certification #4034 Page 7 of 7 25. The applicant and/or authorized agent shall provide aCOrnp|eted Certificate of Completion Form tothe DVVR4Ol & Buffer Permitting Unit within ten days of project C0nop|etiOn (available at: ��V/formns). [15AN[ACO2H.0502Hl] 17. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours. [15A NCACO2H .0502(e)] This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. |15AN[A[02H .0507(d)(2) and lSAN[AC 02H .0506] Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 1]th day Of October 2O15 Karen Higgins, Supemiso� / 40I& Buffer Permitting Unit