HomeMy WebLinkAbout20150958 Ver 1_More Info Received_20151014
Homewood, Sue
From:Todd Love <toddml@cityofws.org>
Sent:Wednesday, October 07, 2015 4:19 PM
To:Homewood, Sue
Subject:RE: Cedar trail greenway connection
Attachments:EC 1.PDF
Hi Sue,
Our standard rip rap outlet stabilization detail shows burying the rip rap below natural grade for a well-defined channel.
It is shown on the attached detail sheet and is included in the Erosion Control plans for this project.
Let me know if this works for you.
Thanks,
Todd
From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\]
Sent: Tuesday, October 06, 2015 5:10 PM
To: Todd Love
Subject: Cedar trail greenway connection
Hi Todd,
I reviewed the 401 application (PCN) for this project and there’s just one thing I still need. Do you have a profile of the
culvert that shows the riprap energy dissipater installation details? I like to have documentation that it will be installed to
match the natural channel, with the top of the riprap being the same elevation as the stream bed. Thanks.
Thanks,
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Resources
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
Voice: (336) 776-9693
Cell: (336) 813-1863
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
1