Loading...
HomeMy WebLinkAbout20150958 Ver 1_More Info Received_20151014 Homewood, Sue From:Todd Love <toddml@cityofws.org> Sent:Wednesday, October 07, 2015 4:19 PM To:Homewood, Sue Subject:RE: Cedar trail greenway connection Attachments:EC 1.PDF Hi Sue, Our standard rip rap outlet stabilization detail shows burying the rip rap below natural grade for a well-defined channel. It is shown on the attached detail sheet and is included in the Erosion Control plans for this project. Let me know if this works for you. Thanks, Todd From: Homewood, Sue \[mailto:sue.homewood@ncdenr.gov\] Sent: Tuesday, October 06, 2015 5:10 PM To: Todd Love Subject: Cedar trail greenway connection Hi Todd, I reviewed the 401 application (PCN) for this project and there’s just one thing I still need. Do you have a profile of the culvert that shows the riprap energy dissipater installation details? I like to have documentation that it will be installed to match the natural channel, with the top of the riprap being the same elevation as the stream bed. Thanks. Thanks, Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Resources 450 W. Hanes Mill Rd, Suite 300 Winston Salem NC 27105 Voice: (336) 776-9693 Cell: (336) 813-1863 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 1