Loading...
HomeMy WebLinkAboutNCG080664_Inspection Report Charlotte GP Transflo_20240208 ChmrfoN-M4cA4nburg ji / STORM Facility Inspection Wi E 5tormW ate r.Cho rMeck,org SuviceS Facility Name: Charlotte GP Transflo Terminal Inspection#: 81554 Contact:Andrew McSwain, Operations Manager Permit#: NCG080664 Inspector: Ron Eubanks Receiving Stream: IRWIN Inspection Date: 01/30/2024 Entry Time: 10:00 am Exit Time: 11:30 am SIC#: Facility Description:The Charlotte GP Transflo Terminal is located at 601 North Hoskins Road on approximately 50 acres in Charlotte. The facility receives bulk quantities of chemicals via rail car for local distribution. File Review/History: Charlotte-Mecklenburg Storm Water Services (CMSWS)previously inspected this facility on December 17, 2015 and November 15, 2018. The facility was observed to be in compliance during the December 17, 2015 inspection. During the inspection on November 15, 2018,the facility was observed to be in violation of the City of Charlotte Stormwater Pollution Control Ordinance for an active discharge of industrial wastewater from their sanitary sewer collection system. A follow up inspection was conducted on November 29, 2018 and issued as satisfactory to correct the Notice of Violation. Inspection Summary:At the time of inspection, the Charlotte GP Transflo Terminal was observed to be in compliance with the City of Charlotte Storm Water Pollution Control Ordinance. Please refer to the report for comments and recommendations from the inspection. Site Inspection Deficiency Comments Stormwater system (catch basins, Satisfactory Stormwater flows through the facility via sheet flow to a series inlets, outfalls, etc.) of catch basins and drainage swales,which discharge from the property via seven outfalls into a tributary to Stewart Creek. Four outfalls that receive flow from the rail car loading and unloading areas are equipped with automated or manual gate valves that provide containment in the event of a spill. Rubber mats are also used to cover the inlets during the loading and unloading. No stormwater pollution issues were observed. Erosion issues Satisfactory There were no significant erosion issues observed on the property. Structural stormwater control N/A There were no stormwater SCMs observed on the property. measures(SCMs) Illicit discharges/connections Satisfactory No illicit discharges or connections were observed on the property during the inspection. Aboveground storage tank(s)(ASTs) Satisfactory The facility has the following tanks located on site: one 550-g and any associated venting and/or allon diesel fuel AST and one 1,000-gallon diesel fuel AST. dispenser(s)—list tank size(s)and Each of the diesel fuel ASTs has double-walled secondary contents containment. The 10,000-gallon AST for envtherm asphalt additive has been removed from the property.There were no stormwater pollution issues observed with the ASTs. Underground storage tank(s)(USTs) N/A Per facility staff, there are no USTs located on the property. and any associated fill port area(s) and dispenser(s)—list tank size(s) and contents (& To report pollution or drainage problems call: 311 :T QARLOTTE_ http://stormwater.charmeck.org 2/8/2024 3:47:54PM Page 1 of 3 Site Inspection Deficiency Comments Outdoor material storage area(s) Satisfactory Rail cars and tanker trucks are temporarily stored on site while awaiting loading/unloading. No stormwater pollution issues were observed. Outdoor processing area(s) Satisfactory The outdoor processing consists of loading/unloading rail cars and tanker trucks with a mobile transfer vehicle. No stormwater pollution issues were observed. Loading/unloading area(s) Satisfactory The loading and unloading areas appeared to be in good condition; no stormwater pollution issues were observed. Vehicle/equipment area(s)-fueling, Satisfactory Vehicle fueling and maintenance are conducted on site. maintenance,washing, storage, etc. Mobile tankers are stored on a gravel lot on the property awaiting loading/unloading. Per facility staff, no vehicle washing activities are conducted on site. No stormwater pollution issues were observed. Oil/water separator and/or Satisfactory Per facility staff,there is one oil/water separator located on pretreatment the property which discharges to the sanitary sewer system. No stormwater pollution issues were observed. Waste storage/disposal area(s)- Recommendation The facility has a covered storage area for hazardous and non open tops,waste containers, scrap -hazardous waste materials. Several 55-gallon drums of metal bins, etc. waste materials are stored in this area, and the drums are located on spill containment pallets.There is also a municipal waste dumpster located on the property. One of the rain lids was observed to be missing from the dumpster. CMSWS recommends that the rain lid be replaced to prevent stormwater exposure. Food service area(s) N/A Indoor material storage area(s) Satisfactory Parts and equipment are stored inside the maintenance shop building. No stormwater pollution issues were observed. Indoor processing area(s) N/A Floor drains N/A There were no floor drains observed on the property during the inspection. Spill response equipment Satisfactory There are several spill kits located on site.The spill kits are routinely inspected and restocked as needed. SWPPP Section Observed Comments Does the facility have a Stormwater Satisfactory A SWPPP has been prepared and implemented for the Pollution Prevention Plan (SWPPP)? Charlotte GP Transflo Terminal. Reviewed and updated annually Satisfactory The SWPPP was reviewed and updated in December 2023. Responsible party Satisfactory General location (USGS)map Satisfactory Detailed site map Satisfactory Narrative description of industrial Satisfactory processes Feasibility study Satisfactory Evaluation of stormwater outfalls(non Satisfactory A non-stormwater discharge evaluation of the outfalls was -stormwater discharge evaluation) conducted on April 28, 2023 and documented in the SWPPP. Stormwater best management Satisfactory practice(BMP)summary Secondary containment plan (all Satisfactory The ASTs have double-walled secondary containment. Four necessary secondary containment outfalls that receive flow from the rail car loading and provided and documented) unloading areas are equipped with automated or manual gate valves that also provide containment in the event of a spill. To report pollution or drainage problems call: 311 CIIARIATTE_ http://stormwater.charmeck.org 2/8/2024 3:47:54PM Page 2 of 3 SWPPP Section Observed Comments Records on every release from a N/A secondary containment system (for the last 5 years) Spill prevention and response Satisfactory procedures(SPRP) List of significant spills or leaks(for Satisfactory Per facility staff, no significant spills have occurred on the the last 3 years) property during the previous three years and documented in the SWPPP. Solvent management plan (SMP) Satisfactory Preventative maintenance and good Satisfactory housekeeping program (PMGHP) Facility inspections conducted as Satisfactory Facility inspections are conducted quarterly. The recent required quarterly inspections were conducted on March 27, June 27, September 27, and December 18, 2023. Employee training (provided and Satisfactory The recent employee training was conducted on August 30, documented) 2023 and the employee training rosters were documented in the SWPPP. Qualitative/Analytical Monitoring Observed Comments Qualitative monitoring conducted as Satisfactory The recent quarterly qualitative monitoring event was required conducted on December 26, 2023. Analytical monitoring conducted as N/A Analytical monitoring is not required, since the facility uses required less than 55 gallons of new motor oil and/or hydraulic oil per month when averaged over the calendar year. Analytical monitoring for onsite N/A Analytical monitoring is not required, since the facility uses vehicle and equipment maintenance less than 55 gallons of new motor oil and/or hydraulic oil per as required I month when averaged over the calendar year. Permit and Outfalls Observed Comments Copy of permit and certificate of Satisfactory The facility has Certificate of Coverage NCG080664. coverage onsite All outfalls observed Yes There were no stormwater pollution issues observed at the outfalls during the inspection. Number of Outfalls Observed 7 Representative outfall status N/A documented by DEMLR Annual no-exposure self re-certificatio N/A n documented To report pollution or drainage problems call: 311 CHARIATTE_ http://stormwater.charmeck.org 2/8/2024 3:47:54PM Page 3 of 3