HomeMy WebLinkAboutNC0046043_Authorization to Construct_20080612Oakridge Military Academy
A To C No. 046043AOI
Issued March 3, 2008
'it lw�1 _. _ 4
as a duly registered Professional Engineer in the
State of North Carolina, having been authorized to observe (periodically/weekly/full time) the
construction of the modifications and improvements to the Oakridge Military Academy, located
on Oak Ridge Road in Guilford County for Oakridge Military Academy, hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the following
construction:
DEC 1 0 2003
Engineer's Certification
Installation of a dechlorination system utilizing sodium sulfite pursuant to the fast
track application received on February 18, 2008, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
I certify that the construction of the above referenced project was observed to be built
within substantial compliance and intent of the approved plans and specifications.
Signature Registration No. / 00 64-
Date to- /Z. 6>.3
Send to: Construction Grants & Loans
DENR/DWQ
1633 Mail Service Center
Raleigh, NC 27699-1633
� ,
:.........
5sl
SEAL9�•9 ,
i8804 - — .
OFwArp
`0 pG
March 3, 2008
Mr. James M. Cheshire
Oakridge Military Academy
PO Box 473
Kernersville, North Carolina 27284
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
SUBJECT: Authorization to Construct
A to C No. 046043AOI
Oakridge Military Academy
Dechlorination Facilities
Guilford County
Dear Mr. Cheshire:
Coleen H. Sullins, Director
Division of Water Quality
A fast track application for Authorization to Construct dechlorination facilities was
received on February 18, 2008, by the Division. Authorization is hereby granted for the
construction of modifications to the existing Oakridge Military Academy, with discharge of
treated wastewater effluent into an unnamed tributary to Haw River in the Cape Fear River
Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a dechlorination system utilizing sodium sulfite pursuant to the fast
track application received on February 18, 2008, and in conformity with the
Minimum Design Criteria for Dechlorination Facilities.
This Authorization to Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO046043 issued June 12, 2006, and shall be subject to revocation unless
the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0046043.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Winston-Salem Regional Office, telephone number (336) 771-5000 shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site
Cnf Carolina
)Vatura!!y
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: www.ncwaterquality.oro 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper
Mr. Cheshire
March 3, 2008
Page 2
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of these permitted facilities, the
attached Engineer's Certification form must be received from a professional engineer certifying
that the permitted facility has been installed in accordance with the NPDES Permit and this
Authorization to Construct. Mail the Certification to: Construction Grants & Loans,
DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T 15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the Permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
Mr. Cheshire
March 3, 2008
Page 3
If you have any questions or need additional information, please do not hesitate to contact
Ken Pohlig, P.E. at telephone number (919) 715-6221.
Sincerely,
s, o. �•,1; J,
Coleen H. Sullins
ME
cc: David W. Gipe, P.E., Gipe & Associates, P.A., Charlotte
Guilford County Health Department
DWQ Winston-Salem Regional Office, Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
Point Source Branch, NPDES Program
Ken Pohlig, P.E.
Anita E. Reed, P.E.
ATC File